Loading...
HomeMy WebLinkAbout2017.09.18 (5) Forest Road Bridge Discussion September 18, 2017 1 Sunset Lake Forest Road Bridge Location 2 Bridge rated in Fall of 2016 Constructed in 1920 17-ft width making it a one lane bridge Removal of excess class 5 on bridge deck Load Carrying Capacity significantly reduced Background 3 Current Bridge – BL8186 4 Remove bridge and replace with concrete slab bridge Remove bridge and replace with dual box culverts Remove bridge and replace with beam bridge Leave as is Remove bridge Bridge Considerations 5 High level estimates identify a project cost of approximately $600,000 Project can fit into our Capital Improvement Plan without affecting future project schedules Bridge Bonding Project Costs/Financing 6 Recommendation/Next Steps Further Evaluate Alternatives for Replacement, complete wetland delineation and soil borings Receive Authorization for Final Design at upcoming City council meeting for recommended alternative Submit Final Plans for Bridge Bonding 7