HomeMy WebLinkAbout2017.09.18 (5)
Forest Road Bridge Discussion
September 18, 2017
1
Sunset
Lake
Forest Road Bridge Location
2
Bridge rated in Fall of 2016
Constructed in 1920
17-ft width making it a one lane bridge
Removal of excess class 5 on bridge deck
Load Carrying Capacity significantly reduced
Background
3
Current Bridge – BL8186
4
Remove bridge and replace with concrete slab bridge
Remove bridge and replace with dual box culverts
Remove bridge and replace with beam bridge
Leave as is
Remove bridge
Bridge Considerations
5
High level estimates identify a project cost of approximately $600,000
Project can fit into our Capital Improvement Plan without affecting future project schedules
Bridge Bonding
Project Costs/Financing
6
Recommendation/Next Steps
Further Evaluate Alternatives for Replacement, complete wetland delineation and soil borings
Receive Authorization for Final Design at upcoming City council meeting for recommended
alternative
Submit Final Plans for Bridge Bonding
7