Loading...
HomeMy WebLinkAbout2018.05.16 Parks PacketAgenda Parks, Recreation, and Open Space Commission Meeting of May 16, 2018 Hugo City Hall, 7:00 pm 7:00 pm 1. Approve Minutes from March 21, 2018 Meeting 7:05 pm 2. Oneka Place Park Dedication Proposal 7:50 pm 3. Lions Park Playground 8:00 pm 4. Adjournment Page 1 of 3 Parks Commission Agenda May 16, 2018 Background Parks, Recreation, and Open Space Commission Meeting of May 16, 2018 Hugo City Hall, 7:00 pm Approve Minutes from March 21, 2018 Meeting Staff recommends approval of the minutes of the Parks Commission meeting of March 21, 2018. PLEASE SEE THE ATTACHED MINUTES. Oneka Place Park Dedication Proposal CPDC Pratt Oakwood is requesting approval of a Preliminary Plat and Planned Unit Development (PUD) for a residential development. The preliminary plat includes 177 single family residential lots and 10 outlots to be known as "Oneka Place". The properties are generally located north of Oneka Parkway and 159th Street. The plan shows stormwater ponding areas, a passive park, sidewalk and trail connections, and road connections. The developer is proposing to dedicate the 43 acre "Outlot J" with the development to satisfy park dedication. With 20.9 acres of Outlot J being buildable the park land dedication of 9 acres is exceeded. Staff recommends that the Parks Commission approve the park dedication proposal and provide direction on the greenways, trails, and sidewalks. THE STAFF MEMO AND PARK DEDICATION PROPOSAL ARE ATTACHED. Lions Park Update Staff and members of the City Council have been receiving complaints about the playground at Lions Park. Also, upon seasonal inspection of the Lions Park playground, a few components were identified that posed safety concerns. One of the slides was significantly cracked. There are wooded foot boards that are disintegrating. The net structures are aging rapidly. Remedies to the immediate safety concerns were made. However, it is estimated that the playground has less than a year of safe use left. The structure is primarily wooden and it does not look like it would be economical or efficient to continue to make the repairs that are anticipated. The Parks Commission has a few options to consider: • The play structures and soft surfacing could be removed and grass planted in its footprint. The structure could be replaced with a new playground in its current location. Concrete curbing would need to be installed as a boundary for the soft surface material as the wooden border is no long functional. The estimated cost of this is $70,000-$90,000. The playground could be removed and a new play structure could be installed somewhere within the park. The estimated cost of this is $70,000-$90,000. Page 2 of 3 Parks Commission Agenda May 16, 2018 Additionally, the Parks Commission could choose to take action shortly or upon future failure of a playground inspection. A playground that is installed in the near future could be relocated upon additional redevelopment of the park. The Parks Commission should discuss how they would like to address the issues and make a recommendation to the City Council. PICTURES AND A COMPLAINT IS ATTACHED. Page 3 of 3 Parks Commission Agenda May 16, 2018 Minutes Parks, Recreation, and Open Space Commission Meeting of March 21, 2018 Hugo City Hall, 7:00 pm Present: Cathy Moore — Arcand, Roger Clarke, Mat Rauschendorfer, Nicole Schmid, Dave Strub Absent: Ranell Tennyson Staff Present: Scott Anderson, Public Works Director Shayla Denaway, Parks Planner Debi Close, Secretary Strub called the meeting to order at 7:00 pm. 1. Approval of Minutes from the February 21, 2018 Meeting Rauschendorfer made a motion, Moore-Arcand seconded to approve the minutes of the February 21, 2018 Parks Commission meeting as presented. Ayes — Cathy Moore—Arcand, Mat Rauschendorfer, Nicole Schmid, Dave Strub, Ranell Tennyson Abstained — Clark Motion carried. 2. Trail Update Public Works Director Scott Anderson Public Works Director gave an update on the Oneka Lake Boulevard and Harrow Avenue 2018 street reconstruction project. The shoulder of the roadway will be paved to accommodate pedestrians and bike traffic. Future trails will need to be considered with a full street reconstruction project or with development of the area. Parks Planner Shayla Denaway gave an update on other trail projects. 1301h Street: Adelaide Landing is moving forward and with the reconstruction of 1301h Street, a trail will be constructed on the east side of Hwy 61. The Parks Commission should discuss 130th Street on the west side of Hwy 61, as it does not currently have a trail. Hardwood Creek Regional Trail: The ability to connect to future trails in White Bear Lake makes the extension of the Hardwood Creek Trail in Hugo a priority. Because kiosks were installed along the trail last summer, additional projects on the Hardwood Creek Regional Trail are a low priority for Washington County. Comprehensive Plan Discussion: The Everton Avenue trail was a topic of conversation at the open house and residents in the area objected to the planned trail. The next City Council meeting is April 2nd, 2018 and it is likely that this trail will be discussed with the draft Comprehensive Plan. 3. Irish Avenue Park Exercise The Parks Commission looked at Irish Avenue Park with a concept planning exercise. The hands on facilitated discussion on a long term and short term vision, vegetation management, parking, and other possible improvements. Scott Anderson, Public Works Director will follow up with Council member Chuck Haas prior to making the recommended maintenance updates. These updates included security lighting, portable bathroom, dog pick- up bags, additional trash can, and a hitching post for horses. The existing parking lot also needs to be expanded. 4. Adjournment Moore-Arcand made a motion, Clark seconded to adjourn the meeting at 8:47 pm. All Ayes. Motion carried. Agenda Number: 2 CITY OF HUGO PARKS COMMISSION REPORT TO: City of Hugo Parks, Recreation and Open Space Commission FROM: Shayla Denaway, Parks Planner SUBJECT: CPDC — Pratt — Oakwood, LPP Preliminary Plat and PUD General Plan for a residential development to be known as "Oneka Place" DATE: May 9, 2018 for the Parks Commission meeting of May 16, 2018 1. BACKGROUND: At the meeting of November 15, 2017 the Parks Commission provided comments on a sketch plan submitted by CPDC Pratt Oakwood for a residential development now known as "Oneka Place". Discussion included the planned trail and greenway system and dedication of park land. CPDC Pratt Oakwood has recently applied for approval of "Oneka Place". This includes dedication of land to satisfy park dedication requirements. 2. DESCRIPTION: CPDC Pratt Oakwood is requesting approval of a Preliminary Plat and Planned Unit Development (PUD) for a residential development. The property totals 117.5 acres and is comprised of 3 parcels. The preliminary plat includes 177 single family residential lots and 10 outlots to be known as "Oneka Place". The PUD General Plan will be for all 117.5 acres of the property and is proposed to be rezoned from Future Urban Service (FUS) to Planned Unit Development (PUD). The property includes wetlands for a total buildable acreage of 90 acres. The properties are generally located north of Oneka Parkway and 159th Street. The plan shows 177 proposed residential lots, stormwater ponding areas, a passive park, sidewalk and trail connections, and road connections. The applicant is proposing the project to be built in four phases. The developer has indicated that an HOA will be established for the -1- Oneka Place May 16, 2018 development to maintain the landscaping and the water re -use system. A sub -association will be established for the villa units for snow removal and lawn maintenance. 3. PARKS COMMISSION DISCUSSION: At their meeting of November 15, 2017, the Parks Commission reviewed a sketch plan and provided informal comments in regards to trails, park improvements, and park dedication. The plan at that time included a concept on how the park could be developed in a more active way including a pavilion, parking area, and possible sport court/playground and ball fields. In general, the Parks Commission liked the proposal, but realized there are several details to work out. The Parks Commission provided the following comments: • They liked the trails within the development, but wanted to make sure proper connections were made to the proposed park for the residents within the development. • They looked at whether the connections to existing trails and sidewalks were sufficient in addition to planned future trails. • They had concerns about the amount of parking shown on the plan for the proposed active park area. • They questioned the concept of the park showing improvements within wetland areas. • They favorably viewed the wooded areas for wildlife habitat and as a buffer for the trails. • They had questions about the lots that were previously proposed to be located off of Farnham Avenue, as they seems disconnected from the rest of the development. 4. PROPOSAL: The developer is proposing to dedicate the 43 acre "Outlot F with the development to satisfy park dedication. The developer is also proposing to construct trails and sidewalks adjacent to all roadways in the development. Trails The applicant is proposing a 10 foot bituminous trail along Oneka Parkway, consistent with the existing trail to the south of the development. An 8 foot trail will be constructed along Ethan Trail N. and Street 3. Trails will connect the neighborhood to the open space at two locations. Sidewalks are required along lots with widths less than 80 feet. Sidewalks are shown along all of the remaining streets. Open Spaces/Geenways -2- Oneka Place May 16, 2018 The developer is proposing a park on the east side of the development. The proposed park land is within the City's greenway corridor and has been determined to have natural wooded areas including forest, woodlands, and forested wetlands. Parks With the sketch plan review, the developer presented a concept of an active park with features the City could instruct in the future, including ball fields, a playground, and a pavilion. Currently, a passive park with a trail meandering through the wetlands is shown. Any future active or passive park features on the property will need to be constructed by the City of Hugo. This development is in Neighborhood Park Service Area 2 which is served by Lions Park, Frog Hollow Park, Oneka Elementary School and Heritage Ponds Park. Frog Hollow Park is within walking distance and has a playground. Oneka Elementary has a mixed purpose ball field and playground that are available outside of school hours for residential use. If the park is improved and a parking lot is desired, Farnham Avenue could be extended to make a connection to the park. As an alternative, if the property to the east develops, a developer could approach and propose a road connection which would be installed and paid for by the developer of the property to the east. The City should be open to this alternative. This may mean a revision to the plat to have Outlot J be split into two outlots, one for park dedication and one for a possible road extension 5. PARK DEDICATION: The developer is proposing to dedicate 43.06 acres of land for the purposes of a public park on the east side of the development. The property is accessible by trails off of Street 4 and Ethan Trail North in the proposed development. Parkland dedication of 9 acres would be required with the 90 acre development. In lieu of a 10% land dedication, the developer could pay a fee of $2,400 per unit. With the 177 proposed units, the park dedication fee would be $424,000. More than half of the 43 acre property that the developer is proposing to dedicate is wetland, but the 20.9 acres of upland still exceeds park dedication requirements. 6. STAFF RECOMMENDATION: Staff recommends approval of the park land dedication of 43 acres with "Oneka Place" as proposed by CPDC Pratt Oakwood. -3- Oneka Place May 16, 2018 ATTACHMENTS: 1. Applicant's Narrative dated April 12, 2018 2. Oneka Place Preliminary Plat received March 20, 2018 3. Park land Dedication Exhibit received April 13, 2018 4. Future Trail X-Sections dated April 16, 2018 5. Park Dedication Policy 6. Greenway Corridor Map 7. Neighborhood Park Service Area Map 8. Trail Plan -4- Oneka Place May 16, 2018 Westwood April 12, 2018 7699 Anagram Drive Eden Prairie, MN 55344 Main (952) 937-5150 Fax (952) 937-5822 westwoodps.com (888) 937-5150 Oneka Place (Leroux) - PUD Development — Updated Project Narrative INTRODUCTION: The Development team: - Ownership, CPDC-PRATT-OAKWOOD LIMITED LIABILTY PARTNERSHIP - Planners and Engineers - Westwood Professional Services - Environmental Resources - Earth Science -Ken Meeks, Dan Seemon, Carex Consulting LOCATION: "Oneka Place" previously referred to as the LEROUX PROPERTY which lies north of the Prairie Village development, north of 1591h St N at the north end of Oneka Parkway in HUGO, MN. The site consists of 117.5 acres. GENERAL DESCRIPTION OF REQUEST: PUD PRELIMINARY PLAT APPROVAL Preliminary Plat and PUD flexibility approval is requested for the net developable area of 90.0 acres after subtracting 25.0 acres of wetlands. As submitted, the unit count is a total of 177 single family lots, (139 single family and 38 villa homes) which equates to an overall gross density of 1.50 units per acre, overall net density of 1.90 units per acre. In an effort to align with the City's density requirements and environmental site constraints, the PUD development process is request. The PUD will allow for maximizing density by reduced right of way, lot width, front and side yard setbacks. The project is proposed to be developed over 4 phases depending on market conditions. The phasing plan provided illustrates the areas and predicted lot counts proposed with each phase. HOUSING AND SETBACKS: Two types of dwelling types are proposed. The lots west of Oneka Parkway are proposed to be more of traditional single family homes similar to the Prairie Village development to the south. The lot widths are a minimum of 70 ft. The min lot size is 9,794 sq. ft. with an overall average of 11,425 sq. ft. There will most likely be a pool of builder's building on these lots. The final list of builders has not been determined. Architectural control (ARC) will be administrated by the developer to ensure quality homes. Architectural elements include 8/12 roof pitch, two story dwelling - min 1,750 s.f., Ramblers - min 1,500 s.f., some stone accent, 3 car garage — market driven dwelling type. ARC guidelines will be provided. The lots lying east of Oneka Parkway are proposed to be two product types, Villas on 55 ft. wide lots and single family on 65 ft. wide lots. The Villa lots have a min lot size is 7,492 sq. ft. with an overall average of Multi -Disciplined Surveying & Engineering TBPLS Firm No. 10074302 westwoodps.com April 12, 2018 Page 2 8,976 sq. ft. The 65 ft. wide single family lots have a min lot size is 8,600 sq. ft. with an overall average of 10,288 sq. ft. Capstone Homes is intended to be the builder of these homes. Capstone has provided a portfolio of home designs for each dwelling type. The reduced setbacks requested on the overall site to better meet density requirements. The setbacks proposed are 25 foot front, 25 foot front corner lot, 7.5 foot sides and 30 foot rear. The Concept review staff report pointed out concerns for mix of product on the east side of Oneka Parkway and to reevaluate the mix to ensure there is an appropriate transition. To this point more 65 ft. wide single family lots were inserted to minimize the "pockets" of Villas among the single family home. The current proposed inventory of each product is a shown below. Summary Total Lots all Phases Before #Units Now #Units Difference #Units 65' lots - Capstone 41 71 30 55' — 60' Villas/SF - Capstone 67 38 -29 70' SF, west of Oneka 69 68 -1 Totals 177 177 0 UTILITIES: Municipal Sanitary Sewer and Water Main are stubbed to the south end of the project. The project will extend these municipal services with each phase in accordance with city engineering specifications and detail plates. SITE GRADING AND STORM WATER MANAGEMENT: Initial soil borings indicated high perched groundwater conditions throughout the site. The time of the year the borings were taken was March which may attribute to the high perched water conditions (frozen ground below the surface) Perched water conditions are nothing new to Hugo sites. The city's engineering standard requirement building minimum lowest floor elevation of 3 feet above the 100 year flood elevation of ponds/wetlands and 4 ft. above the ground water. As a result, the site would require significant fill material to raise building pads above the wetlands and/or perched water. The fill material needed is either mined with storm water pond construction which then the ponds tend to be deeper than necessary, or material is imported at a significant cost. To provide the margin of safety the city requires for the groundwater or perched water conditions, an area hydrologist Mr. Ken Meeks, was employed to perform additional borings to 40 ft. depth to determine actual groundwater conditions. The groundwater Investigation study completed provides a wealth of data. In conclusion, the study indicates that a four foot separation exists between the groundwater elevations and proposed lowest floors. Perched water conditions are present and exist due to the tight soil conditions. As noted in the conclusion of the report "Basement sump pump systems are recommended for all homes on 2 April 12, 2018 Page 3 the site. Sump pump activation may occur intermittently from April to June when the spring thaw of frozen ground and heavy spring rainfall introduces addition water into the physical environment. During this period, water seepage into basement excavation from saturated native clay material is possible, and surface runoff may find its way into basement." It should be noted that basement sump pump systems are a building code requirement regardless of soil/ground types. With this hydrology study, we have provided documentation/data that supports adjusting the minimum building lowest floor elevations. The existing pond in Prairie Village 4th, adjacent to Oneka Parkway, is proposed to be expanded for fill material and ponding. The existing pond is located on the City's property, Outlot C, Prairie Village 4th. Therefore, request approval from the city for the expansion of the pond on Outlot C. The storm water ponds will be used for irrigation to meet water reuse and infiltration requirements by the city. The grading plans show grading outside the property line in 3 areas. The Developer will work with the adjacent property owners to obtain a temporary construction easement for this work. If no easements can be obtained, then the grading limits will be adjusted to the confines of the project. These types of details are typically worked out prior to final plat submission. The westerly portion of the site contains an existing storm sewer outlet pipe from Prairie Village. An easement was given to the Prairie Village developer to allow for the piping system. This piping system will either be maintained or incorporated with development storm water management system. The existing drainage easement will be petitioned to be vacated and new drainage easement provided with the final plat for Oneka Place. Ol1TLOTS- Since all of the proposed Outlots, contain either wetlands, open space or ponding, they would be dedicated to the city. Outlot H would retain an easement for a neighborhood monument. STREETS. SIDEWALKS AND LANDSCAPING: Four public street access points are available to the site, Ethan Tr., Oneka Parkway, Falcon and Farnham. Three out of the four will be utilized and extended with development of the site. Only Farnham will not be extended. The city may decide to extend Farnham in the future with improvements to the park. We have reviewed potential alternative street extension to the northwest of the site. However, due to existing wetland configuration and lack of utility extension it is not feasible. Access to this would be from Oneka Parkway — see attached conceptual layout. Oneka Parkway will be extended from its current terminus in Prairie Village with a two lane street section without a center landscape median. The street section proposed is the same as Oneka Parkway recently constructed in Clearwater Cove, south of Co Rd 14. The appropriate transition in street section and median configuration will be provided. A 10 foot wide bituminous Trail will be constructed along the eastside of Oneka Parkway. 8 foot wide bituminous trails are proposed along the north side of Ethan Trail N, west of Oneka Parkway, along Street 3, 3 April 12, 2018 Page 4 between Ethan Tr. N and Street 4 as well as in the cul de sac on Street 4. 5 foot wide concrete sidewalks will be provided along every street. These walks, along with the trails, will provide a pedestrian friendly neighborhood with access to the park and other trail systems built in the future by the city. Landscaping will be per city ordinance for the most part. In return for PUD flexibility, additional plantings are being provided along Oneka Parkway. A neighborhood entry monument will be constructed for the Villa neighborhood. Capstone homes will be providing a detailed site plan for review and approval with final plat. Street lights will provided in accordance with city standards in the general locations shown on the plans. %A/FTI ANIIC- The site contains approximately 25.0 acres of wetlands. A wetland delineation has been completed and approved by the TEP. Of the 25.0 acres of wetlands only 0.92 acres (40,410 sq. ft.) are proposed to be impacted with development. Most of the wetland impacts are generally due to public street extensions and ponding. Impacted wetlands will be mitigated by purchasing off site banking credits from an approved wetland bank. The wetland replacement report and function assessment will be prepared by. Mr. Meeks and submitted to the regulatory agencies for consideration. It is our desire to have the wetland replacement approval run parallel with the preliminary plat development process through the city. Based on preliminary discussion with regulator on wetland impacts, we feel very confident the minimum impacts proposed will be approved. PARK DEDICATION: Parkland dedication is proposed in lieu of Park Fees. The Park dedication would be 10 % of the net developable land which results in 9.25 acres of land dedication. The land breakdown of Outlot J is as follows: Outlot J land Breakdown 43.06 Acres 100% Tree Canopy 22.25 Acres 51.67% Wetlands 18.03 Acres 41.87% open space 2.78 Acres 6.46% 100.00% Proposed Tree removal for ponding and Falcon Road 3.19 Acres 14.34% No other park improvements are proposed. Connection points from the proposed park to the neighborhood are being provided at two locations shown on the plans. M April 12, 2018 Page 5 TREE PRESERVATION: Select tree removal is proposed over a minority of the site. Based on canopy coverage, below is a table which the percent of removals: Total Tree Canopy 28.63 Acres Proposed Tree Removal 7.58 Acres Results in 26.5% Tree Canopy Removal Tree protection will be provided by silt fence and/or tree removal fence to denote limits of removal. HOMEOWNER ASSOCIATIONS: The Villa development east of Oneka Parkway will be governed by a homeowners' association. The entire development will most likely be managed by a Master HOA in order to provide maintenance for the irrigation water reuse system. PROJECT SCHEDULE: Subject to PUD and Wetland Replacement approvals, Phase 1 grading is anticipated in May 2018 with utility and street construction commencing in early June 2018 and completed with first lift of bituminous base mid - July 2018. The project will be constructed in four phases as market conditions dictate. PUD Flexibility requests — In return for the PUD flexibility, we propose the following project enhancements: - Exceed Parkland dedication/open space requirement with 43.06 acres (Outlot J) vs. 9.25 acres required. - Addition of bituminous trails through the neighborhood to connect to future city park Irrigation reuse system Architectural control of building plans A mix of product type Maintained Open space/greenway corridors Enhanced landscaping along Oneka Parkway Bituminous trails Irrigation water reuse system A mix of product type and price points Thank you for your consideration. Feel free to contact anyone on the development team with questions. 5 April 12, 2018 Page 6 PROJECT CONTACTS: DEVELOPER: CPDC CPDC-PRATT-OAKWOOD LIMITED LIABILTY PARTNERSHIP Len Pratt, Managing Partner Pratt Homes 3500 Willow Lake Blvd., Suite 100 Vadnais Heights, MN 55110 lenpratt@pratthomes.com (651) 429-8032 PLANNERS/ENGINEERS: Westwood Professional Services David Hempel, Sr. Construction Coordinator/Project Manager John Bender, P.E., Project Manager 7699 Anagram Drive Eden Prairie, MN 55344 David. hem Pei@westwoodps.com 612-716-8419 John.bender@westwoodps.com 612-708-8962 ENVIROMENTAL: Earth Science Associates Ken Meek, P.G., C.P.G. 37445 Grand Ave North Branch, MN 55056 612-718-0413 esa332kgmail.com Dan Seemon, Carex Consulting Wetland Review and Permitting Denadkfrontiemet.net 651-724-2454 Attachments —Capstone Homes Building Elevations 70' Builders Pool Typical Building Elevations G Ph o n e (9 5 2 ) 9 3 7 - 5 1 5 0 7 6 9 9 A n a g r a m D r i v e Fa x (9 5 2 ) 9 3 7 - 5 8 2 2 E d e n P r a i r i e , M N 5 5 3 4 4 (8 8 8 ) 9 3 7 - 5 1 5 0 P h o n e (9 5 2 ) 9 3 7 - 5 1 5 0 1 2 7 0 1 W h i t e w a t e r D r i v e , S u i t e # 3 0 0 F a x (9 5 2 ) 9 3 7 - 5 8 2 2 M i n n e t o n k a , M N 5 5 3 4 3 T o l l F r e e (8 8 8 ) 9 3 7 - 5 1 5 0 Recieved A pril 13, 2018 P h o n e (9 5 2 ) 9 3 7 - 5 1 5 0 1 2 7 0 1 W h i t e w a t e r D r i v e , S u i t e # 3 0 0 F a x (9 5 2 ) 9 3 7 - 5 8 2 2 M i n n e t o n k a , M N 5 5 3 4 3 T o l l F r e e (8 8 8 ) 9 3 7 - 5 1 5 0 Received A pril 16, 2018 P h o n e (9 5 2 ) 9 3 7 - 5 1 5 0 1 2 7 0 1 W h i t e w a t e r D r i v e , S u i t e # 3 0 0 F a x (9 5 2 ) 9 3 7 - 5 8 2 2 M i n n e t o n k a , M N 5 5 3 4 3 T o l l F r e e (8 8 8 ) 9 3 7 - 5 1 5 0 Municode http: //Iibrary.municode.con/print. aspx?h=&clientlD=1435 6&HTMReque... Sec. 90-324. - Park dedication. (a) General dedication standards. In order to develop a system of parks within the community to serve the public's health and recreational needs, a percentage of the net buildable acreage based on the density of all land subdivided for residential purposes shall be dedicated to the city as public parkland. The city finds that the more dense a development is, the more demand for park land it creates since lots can be smaller affording less private recreational space and more occupants per acre. The following formula will be used to determine the dedication requirement where a land dedication is required: Density Percentage of Land to be Dedicated (of the buildable land) 0-3.99 units per acre 10 percent 4.00-5.99 units per acre 11 percent 6.00-7.99 units per acre 13 percent 8.00-9.99 units per acre 15 percent 10.00 < units per acre 17 percent The land so dedicated shall be subject to approval by the city council in accordance with the city's Comprehensive Plan for parks. At the city council's discretion, a parkland dedication fee may be accepted or required instead of or connection with land dedication. The parkland dedication fee shall be set annually by the city council and adopted as part of the city's fee schedule. The parkland dedication fee shall be charged for each dwelling unit originated by the subdivision or development of any property in the city, not including any dwelling unit that may be in existence at the time of the adoption of the ordinance from which this article is derived, or which is subject to an approved development agreement with the city that includes a parkland dedication provision. (b) Appeal process. The parkland dedication fee may be appealed to the city council before the city council makes a decision on the final plat and shall be calculated as follows: The percentage of land to be dedicated will be multiplied by the fair market value of the net buildable acreage. The fair market value shall be determined by the city council, following their review of a current appraisal submitted to the city at the developer's expense. The appraisal shall be made by appraisers who are approved members of the SREA or MAI, or equivalent real estate appraisal societies. If the city receives written notice of a dispute over the parkland dedication fee before approval of the final plat, the developer shall pay the fee into an escrow account pending a decision of an appeal of the fee. If an appeal is not filed within 60 days following approval of the final plat, or if the person aggrieved by the fee does not prevail on the appeal, then the funds paid into escrow must be transferred to the city. (Prior Code, § 1215-040.1; Ord. No. 2010-449, § 1, 11-15-2010) 1 of 1 10/5/2012 2:23 PM 120PARKS , TRAILS AND OPEN SPACE2040 COMPREHENSIVE PLAN UPDATE DRAFT Mar29-18 for review only DRAFT Mar29-18 for review only Horseshoe Lake Oneka Lake Barker Lake Rice LakeEgg Lake Plaisted Lake North School Section Lake South School Section Lake Sunset Lake Long Lake Round Lake Bald Eagle Lake 80TH ST E L Y N C H R D N 1 2 2 n d S t N M A N N I N G T R N I N T E R S T A T E 3 5 E 147th 120th 159 t h F a l c o n P r a i r i e 1 4 9 t h Frenchman Frenchman F o r e s t 141st E l m c r e s t K e y s t o n e 170 th F o r e s t 180th 122nd I s l e t o n 170th 157th Fox h i l l H e ritage G o o d vi e w Fable H i l l 136th 125th F a n n i n g 145th 135th 150th F i n a l e V a l j e a n F o x h i l l F a i r o a k s F a r n h a m 1 4 7th Goodview F e r r a r a O n e k a L a k eFrench E u r o p a 1 5 1 s t 1 2 9 t h F a l c o n 140th 126th 1 4 8 t h 1 2 6th F o n d a n t 138th 146th 128th F i n l e y 145th F i o n a 124th G e n e v a E l m F i n a l e E t h a n F i o n a H e r i t a g e 120th G o o d v i e w Rosemary 1 58 t h 165th 157th F o u n t a i n F a r n h a m 152nd G l e n b r o o k Gre y s t o n e F e n w a y F o r e s t Evergree n 130th 140th E t h a n F a r n h a m E u r o p a J u l y E v e r t o n G r e y s t o n e G e neva Gallivan E m e r a l d F e r r a r a I r i s h 125th 1 3 2nd F r a n c e s c a Fenway B o u l e v a r d H o m e s t e a d Geneva 147th H a d l e y F a r n h a m 147th 146th 152n d 125th 130thEuropa T r a i l F r e e d o m 137th I s l e t o n F e n w a y 132nd I n g e r s o l l 1 3 6 t h S t r e e t K e l l e r 152nd 130th I n g e r s o l l 119th 121st121st F o x h i l l 155th 1 2 9 t h K e r r y 1 2 6 t h Keller I l l i e s 180th I n w o o d F e n w a y 180th 175th 177th 152nd H a r r o w J o d y J e f f r e y Fa ble H i l l F a r n h a m J a n e r o E v e r t o n V i c t o r H u g o O n e k a O n e k a O n e k a Empres s G a r d en Educat i o n J a r d i n V i c t o r H u g o 1 4 5 t h 1 4 5 t h V i ctor F lay F o x h i l l C o s ette Elmcrest E l m c r e s t 15 7 t h E n f i e l d G eneva I n g e r s o l l Egg Lake F o r e s t K e y s t o n e H e n n a F a b le Hill F e n way 143rd Hea t h e r 151st 1 5 0 t h I r i s h I r i s h Flay H i l o H e n n a Fion a I n g e r s o l l H o m e s t e a d U pper H e a t h e r H y d e H y d e K e y s t o n e F a b l e H i l l G r e e n e Proposed Greenway Prairie & Mesic Sav anna Ground Water Priority A reas (Land and Water Legacy Program) High Quality Wetlands High Quality Wooded A reas Natural Wooded Areas (Forest, woodlands, forested wetlands) Wetlands Parks City Owned Property Municipal Boundary 2040 MUSA Boundary Parcel Open Water Public Water Course Streams and Ditches Street 1/30/2018 0 0.5 10.25 Miles DRAFT Greenway Corridor Map NORTH Map 6-1 DRAFT Mar29-18 for review only DRAFT Mar29-18 for review only NP-5 NP-12 NP-11 NP-10 NP-9 NP-8 NP-7 NP-6 NP-1 NP-4 NP-2 NP-3 !22 !23 !24 !25 !26 !27 !28 !1 !16 !2 !3 !4 !5 !6 !7 !8 !9 !10 !11 !12 !13 !14 !15 !17!18 !19 !20 !21 Horseshoe Lake Oneka Lake Barker Lake Rice Lake Egg Lake Plaisted Lake North School Section Lake South School Section Lake Sunset Lake Long Lake Round Lake Bald Eagle Lake 80TH ST E 1 2 2 n d S t N L Y N C H R D N I N T E R S T A T E 3 5 E H a r d w o o d C r e e k H a r d w o o d C r e e k C l e a r w a t e r C r e e k 120th 159 th P r a i r i e 1 4 9 t h Frenchman F o r e s t 141st E l m c r e s t 170th 180th 122nd 157th F o x h i l l Heritage 136th F a n n i n g 135th 150th V a l jean F a i r o a k s F e r r a r a O n e k a L a k eFrench E u r o p a G o o d v i e w T r a i l F a l c o n 1 4 8 t h 12 6 th F o n d a n t 138th F i n l e y 124th E l m F i n a l e F i t z g e r a l d G o o d v i e w Rosemary 158t h 165th F o u n t a i n F r e e l a n d G l e n b r o o k F e n w a y Eve r g r e e n 130th 140th E t h a n J u l y G r e y s t o n e G e n e v a Gallivan E m e r a l d F r a n c e s c a Fenway B o u l e v a r d H o m e s t e a d 147th H a d l e y 146th 125th Eur o p a T r a i l F r e e d o m 137th I s l e t o n 132nd 1 3 6 t h S t r e e t K e l l e r 119th 121st 155th 1 2 9 t h K e r r y I l l i e s I n w o o d 175th 177th 152nd H a r r o w J o d y J e f f r e y F a r n h a m J a n e r o E v e r t o n O n e k a E mpress G arden E d ucation Jardin V i c t o r H u g o 1 4 5 t h V i ctor C osette E n f i e l d G r e e n e I n g e r s o l l Egg Lake K e y s t o n e H e n n a 143rd Heat h e r 151st I r i s h Flay H i l o Fio na U p per H e a t h e r H y d e Fabl e H i l l Neighborhood Park Service Area Community Park Search Area City Park DNR Park Undeveloped City Property City Facility School Municipal Boundary 2040 MUSA Boundary Parcel Street 1/30/2018 0 0.5 10.25 Miles DRAFT Neighborhood Park Service Area Map NORTH 1. Paul Hugo Farms WMA 15. Rice Lake Park 2. Lions Park 16 . Oneka Lake Boat Launch 3. Beaver Ponds Park 17. Irish Avenue Park 4. Tower Park 18. Cove Park 5. Frog Hollow Park 19. Aspire Park 6. Victor Square Pa rk 20. Oneka Lake Park 7. Arbre Park 21. Bald Eagle Lake Access 8. Clearwater Creek Preserve 22. Bernin Property 9. H eritage Ponds Park 23. Sunset Lake Access South 10. Val Jean Park 24. Su nset Lake Access North 11. McCollar Park 25. Goodview Property 12. Diamond Point Park 26. Plaisted Property 13. Oak Shore Park 27. Property Nor th of St. John's Cemetary 14. Hanifl Fields Athletic Park 28. 1920 School House Site Map 6-4 DRAFT Mar29-18 for review only DRAFT Mar29-18 for review only Horseshoe Lake Oneka Lake Barker Lake Rice LakeEgg Lake Plaisted Lake North School Section Lake South School Section Lake Sunset Lake Long Lake Round Lake Bald Eagle Lake 80TH ST E 1 2 2 n d S t N L Y N C H R D N I N T E R S T A T E 3 5 E 120th 159 th P r a i r i e 1 4 9 t h Frenchman F o r e s t 141st E l m c r e s t 170th 180th 122nd 157th Fox h i l l H e r i t a g e 136th F a n n i n g 135th 150th V a l j e a n F a i r o a k s F e r r a r a O n e k a L a k eFrench E u r o p a G o o d v i e w T r a i l F a l c o n 1 4 8 t h 1 2 6th F o n d a n t 138th 128th F i n l e y 124th E l m F i n a l e F i t z g e r a l d G o o d v i e w Rosemary 158t h 165th F o u n t a i n F r e e l a n d G l e n b r o o k F e n w a y Evergre e n 130th 140th E t h a n J u l y G r e y s t o n e G e n e v a Gallivan E m e r a l d F r a n c e s c a Fenway B o u l e v a r d H o m e s t e a d 147th H a d l e y 146th 125th Eur o p a T r a i l F r e e d o m 137th I s l e t o n 132nd 1 3 6 t h S t r e e t K e l l e r 119th 121st 155th 1 2 9 t h K e r r y I l l i e s I n w o o d 175th 177th 152nd H a r r o w J o d y J e f f r e y F a r n h a m J a n e r o E v e r t o n O n e k a E mpress G a r d en E ducati o n J a r d i n V i c t o r H u g o 1 4 5 t h V i ctor C o s ette E n f i e l d G r e e n e I n g e r s o l l Egg Lake K e y s t o n e H e n n a 143rd Heat h e r 151st I r i s h Flay H i l o Fiona U p per H e a t h e r H y d e Fabl e H i l l City Park DNR Park Undeveloped City Property Regional Trail - Existing Regional Trail - Proposed City Trail - Existing City Trail - Proposed Sidewalks Municipal Boundary 2040 MUSA Boundary Parcels Open Water Streams and Ditches Street 1/30/2018 0 0.5 10.25 Miles DRAFT Existing and Proposed Trails Map NORTH Glacial Hills Proposed Trail Central Anoka County Regional Trail H a r d w o o d C r e e k R e g i o n a l T r a i l Map 6-5 From: Rachel Juba To: Shayla Denaway; Bryan Bear Cc: Rachel Leitz Subject: FW: [EXTERNAL] RE: Oneka Place Proposal Date: Thursday, May 10, 2018 8:18:52 AM From: Ryan.Allshouse[maiIto: Rya n.Allshouse@target.com] Sent: Wednesday, May 09, 2018 4:24 PM To: Rachel Juba <RJuba@ci.hugo.mn.us> Subject: RE: [EXTERNAL] RE: Oneka Place Proposal Hi Rachel, Here are my comments for the Planning commission to consider during the hearing tomorrow, May loth, regarding the Oneka Place Proposal. • Long term plans should be developed to ensure safety and the roads can adequacy handle the planned traffic that will be added to Heritage Parkway, Elmcrest Ave N, 159th St N, and around the Elementary school. o 159th St N doesn't seem to be created as a main artery for traffic to these neighborhoods, but it ends up being the most convenient route from 61 for traffic including visitors, school drop off and buses. As future developments are submitted around Oneka Parkway there should be plans for more appropriate main entrances into these neighborhoods. o Elmcrest Ave N needs to be improve to support additional traffic and pedestrian safety. o All of the traffic would be funneled around the elementary school. Children up to .75 miles from the Oneka Parkway and 159th St N intersection are not provided bus transportation to the school. Additionally, during warmer weather, a significant number of kids from the east side of Oneka Elementary walk and bike to school leveraging the path down 159th St N. Maintaining a safe crossing point at the Oneka Parkway and 159th St N intersection is critical. The addition of the stop signs has helped this past year and other mitigations should be considered. o If possible, limit the roads used for construction traffic to Heritage Parkway and Oneka Parkway during development. • It is wonderful that the developer has worked with the city to preserve the natural wooded area on the east side of the property. There should be plans to balance the preservation of the natural resources and providing open space for use by the residence surrounding the area. Baseball fields with open grass space, basketball court, a pavilion, and playground would be a great flexible use space. If it was easily accessible from the Farnham entrance the surrounding residence would take advantage of it. The nearby Frog Hollow park is a heavily used resource but geared to younger children. The addition of a larger use sport/open space would be beneficial for the older elementary and middle school aged kids. This could also be a consideration for first part of the property directly to the east and could be used as the initiation of developing that land. • This development is entirely located within the Forest Lake School, with the elementary school being Lino Lakes Elementary School. Which is 7.5 miles drive located off of Lake Drive in Lino Lakes. It seems likely that the elementary aged kids within this development would want to attempt to open enroll into Oneka Elementary School. The City should proactively work with the Forest Lake and White Bear Lake school districts regarding future developments around the school north of the District 624 boundary. The current school population should also be a consideration with all the developments planned and currently underway in combination with the current school buildings limitations. Thank you for all of the time on the phone today to discuss development in Hugo. Sincerely, Ryan Allshouse 5310 159th St N Hugo, MN From: Rachel Juba <RJuba(@ci.hugo.mn.us> Sent: Wednesday, May 09, 2018 11:03 AM To: Ryan.Allshouse <Rvan.Allshouse(@target.com> Subject: [EXTERNAL] RE: Oneka Place Proposal Ryan: Yes. I am available now if you can call? Thanks, RACHEL JUBA PLANNER CITY OF HUGO - MINNESOTA 14669 Fitzgerald Ave. N., Hugo, MN 55038 o: 651.762.6304 1 www.ci.hugo.mn.us From: Ryan.Allshouse[maiIto: Rya n.Allshouse((Dtarget.com] Sent: Wednesday, May 09, 2018 10:47 AM To: Rachel Juba <RJuba(@ci.hugo.mn.us> Subject: Oneka Place Proposal Hi Rachel, I'm not able to make the Planning meeting tomorrow to discuss the Oneka Place proposal. I do have From: man Bear To: Shayla Denaway; Scott Anderson Subject: FW: Lions Park (playground) Date: Monday, March 05, 2018 5:06:49 PM From: Tom Weidt Sent: Monday, March 05, 2018 4:59 PM To: Bryan Bear <BBear@ci.hugo.mn.us> Subject: Fwd: Lions Park (playground) Thank you, Mayor Weidt S-------- Original message -------- From: lauren 1 <lauren.m.jolly(a gmail.com> Date: 2/9/18 8:18 PM (GMT-06:00) To: Tom Weidt <mayortom&ci.hugo.mn.us> Subject: Lions Park (playground) Hello, this is Lauren Larson. I work with Jeremy Porter he told me to send these pictures of the playground across from Hugo city hall to you. We live only a couple houses away and with a young child she loves that playground but we refuse to even go there anymore just because of the condition its is and all the other parks around the Hugo area are brand new especially with the new developments forming. I know this is one of the older parks in the city, but so many fun events happen in Lions park and hate to see people turned away from it because of the condition things are in. I know a while back we heard of a ten year plan to change Lions park and when I went to national night out a few people were talking about that, that is why people seem to believe something soon will happen to Lions Park but no ones certain. But here are some pictures I took last summer of the park. The slide is completely cracked in the one picture, the wires are showing on those climbing ropes all over the playground, the bridge has a very big gap in it my daughters foot got stuck in it, and the handle bar on top of one of the slides was broke and last summer looks like someone tapped it with duck tape. (not pictured) - Nails that support the beams for the wood chips are pulling up from the beams, and wood chips filling needs to be filled in more. Thank you! -n, ,� :7 I 4 .16 -W