Loading...
HomeMy WebLinkAboutPC Packet 01.25.18AGENDA HUGO PLANNING COMMISSION THURSDAY, JANUARY 25, 2018 HUGO CITY HALL 7:00 p.m. A. ROLL CALL (Arcand, Derr, Kleissler, Lessard, Luchsinger, McRoberts, Tjernlund) B. PLEDGE OF ALLEGIANCE C. APPROVAL OF MINUTES 1. December 21, 2017 D. PUBLIC HEARING E. NEW BUSINESS 1. TGK Automotive Concept Plan F. OLD BUSINESS 1. Approval of 2018 Goals G. ADJOURNMENT If you need accommodations for the Planning Commission meeting please contact Rachel Juba at (651) 762-6304 or rjuba(a ci.hugo.mn.us, thank you. Minutes for the Planning Commission Meeting of Thursday, December 21, 2017 Commissioner Kleissler called the meeting to order at 7:07 p.m. PRESENT: Arcand, Derr, Kleissler, Lessard, Luchsinger, Tjernlund. ABSENT: McRoberts. STAFF: Rachel Juba, Planner Kendra Lindahl, Planning Consultant Bryan Bear, City Administrator Approval of Minutes for the Planning Commission Meeting of October 26, 2017 Commissioner Arcand made a motion, seconded by Commissioner Lessard, to approve minutes for the meeting of October 26, 2017. All Ayes. Motion carried. Commissioner Kleissler abstained. Schwieters Properties, LLP. — Concept Plan Juba presented a concept plan for a development to be located at the southwest corner of 140th Street and Fenway Blvd N, in the Bald Eagle Industrial Park. The plan shows four buildings on 30 acres, including a manufacturing building, a cold storage building and two office buildings. The property is zoned Business Park and contains wetlands. Juba described access to the site and explained how 140th Street could be constructed through a cost sharing arrangement. The plan does not show sufficient parking to meet ordinance standards, however deferred parking is possible in the outdoor storage area. Exterior storage is proposed and requires a Conditional Use Permit. The Business Park zoning district does not allow exterior storage of raw materials. Juba explained that while the applicant is proposing to store raw materials (wood) on site, it seemed appropriate in this setting. A 350 -foot buffer, including landscaping, berms and a cold storage building, is provided for residential property owners to the north. Juba mentioned that park dedication fees do not apply to industrial projects. The buildings are proposed to be constructed with concrete tilt -up panels. Wetlands on the site make development of the property difficult. The applicant is proposing wetland impacts, and is working with the Technical Evaluation Panel, which hasn't approved the impacts so far. Because of the wetlands, it is possible that the plan will change. Juba concluded by mentioning that the EDA reviewed the plan earlier in the week and were supportive of the concept. The applicant was requesting feedback on the layout, exterior storage, parking and other factors. Mike Brass from Colliers approached the podium and introduced Pat and Blake Schwieters, as well as Eli Rupnow, engineer from AMI. Brass explained the manufacturing process, the operations plan, including deliveries and pick-ups, and outlined possible project phasing. Brass also mentioned that the applicants met with neighbors to the north of the site to explain the project and answer questions. Arcand asked about fencing. Brass said the plan shows a security fence around the yard, but they have not yet determined the height of the fence and the type of fencing material. Arcand asked about the office buildings. Brass said the offices could be occupied by Schwieters in the future, or they could be leased to other tenants, but this hasn't been decided yet. Planning Commission December 21, 2017 Page 2 Lessard asked about screening along the north property line. Brass confirmed that a berm would be constructed with landscaping. Luchsinger requested clarification on phasing. Brass responded that the phasing will be market driven. He anticipated that the large, 108,000 square foot building would be constructed in the first phase. Half the building would initially be used for cold storage with the other half being used for manufacturing. Eventually, they anticipate that the manufacturing component will expand into the entire building. As that occurs, the cold storage building would be constructed. Derr explained that he lives nearby and asked about future traffic on 140th Street. Brass explained that they like the future road connections, but they are not critical at this time. Deliveries and pick-ups will occur by truck from 8am-5pm, Monday through Friday. He expected noise from the site to be limited. Derr confirmed that minimal noise currently coming from the existing Schwieters buildings is acceptable. Arcand asked about the number of employees. Pat Schwieters said that there are currently 200 employees. There would be 100 additional employees with full build -out of the manufacturing space. Derr asked if construction of the building would look like the other buildings. Brass confirmed that they would be compatible and will look pleasing. Kleissler questioned the phasing and noted that while outdoor storage will be used in the first phase, the anticipated screening of the storage areas will occur with future buildings that will not be built until later phases. Brass discussed the possibility of adding pine trees with phase 1. Rupnow added that there will also be a significantly wide buffer zone, a wetland, and a berm. Arcand asked about future plans north of 140th Street. Juba summarized area development plans and future road improvements. Kleissler asked the Commissioners to provide comments Tjernlund suggested that the parking as shown should be sufficient. He pointed out that state agencies will address any environmental contaminants, and felt the Commission should focus on aesthetics rather than environmental issues. Luchsinger commented that good thought has been put into the plan related to screening. She would like to see connections to the trails and natural amenities within Clearwater Creek Preserve. Derr said that he was comfortable with the proposed parking layout and noted that additional parking for this campus is available on the east side of Fenway. Arcand asked staff about conditions that might be proposed under a CUP for the outdoor storage. Planning Commission December 21, 2017 Page 3 Juba anticipated conditions relating to circulation of emergency vehicles, the height of the materials being stored, and the screening methods. The applicants thanked the Commission. Discussion on Draft 2040 Comprehensive Plan Lindahl summarized the results of the public open houses and reminded the Commission of the procedural steps. She began presenting the draft plan and summarized changes, specifically noting that the future land use plan remains nearly unchanged, and discussed the status of studies and public feedback related to Eastern Hugo. Arcand asked about the public's preferences for development in Eastern Hugo. Lindahl reviewed the options that are available to the City, and commented that the public's preference was to finish the next phase of the eastern Hugo study before making land use changes. Arcand wondered if the timing was important, and specifically asked if there would be a point in time when it could be too late to make a decision about Eastern Hugo. Lindahl mentioned that the City will review it again in ten years with the next update. Tjernlund asked about the process for deciding where boundaries are created between land uses Juba and Lindahl explained the public process surrounding the comprehensive plan update, the history of established land use and zoning boundaries, and the process for landowners to initiate their own change. Juba further commented on the Planning Commission's role in the process. Lindahl continued with her presentation and highlighted various sections of the plan including a summary of how the city can meet its affordable housing goals. She also focused on mixed-used areas, the housing plan, the economic development plan, parks and open space, resiliency, transportation, and water supply. She emphasized the extensive work on the parks chapter and noted how transportation planning was being integrated with parks and trails planning. She finished by outlining the next steps which include drafting the implementation chapter, and holding an open house on February 26. She anticipated a public hearing at the Planning Commission on March 8, with possible approval by the City Council on April 2. Following Council approval is a six month review by surrounding jurisdictions and agencies, leading to formal adoption by the City and submission to the Met Council by early November 2018. Tjernlund initiated a discussion about whether eastern Hugo influences planning goals in western Hugo. Lindahl and Juba responded that the affordable housing and density goals apply to areas of western Hugo that are developing with city utilities. Land within eastern Hugo does not factor into density calculations. Arcand asked what happens if the City doesn't meet the affordable housing goals. Lindahl responded that the only requirement is to set the goal. Implementation of the goal is not required. Luchsinger commented on the layout of the document. She was pleased with the addition of the visuals and thought the document was well organized. She appreciated the blend of text with graphics and felt the document was very readable. The format worked for her while reading it on a computer screen. Derr asked about the online format. Lindahl answered that it will likely be downloadable as a pdf. Planning Commission December 21, 2017 Page 4 Schedule Goal Setting Workshop Juba talked to the Commission about scheduling a workshop for the purpose of setting goals for 2018. Juba suggested a date of Thursday, January 11, 2018 at 6pm. Staff suggested an informal workshop including a potluck dinner. The Commission agreed to the potluck workshop at the date and time suggested. Adjournment Commissioner Lessard made a motion, Commissioner Arcand seconded, to adjourn at 8:31 p.m. All Ayes. Motion carried. Respectfully Submitted, Bryan Bear, City Administrator Agenda Number: E.1 CITY OF HUGO COMMUNITY DEVELOPMENT DEPARTMENT PLANNING AND ZONING APPLICATION STAFF REPORT TO: Hugo Planning Commission FROM: Rachel Juba, Planner SUBJECT: TGK Automotive — Sketch Plan for the property located at 13891 Forest Blvd. DATE: January 19, 2018, for the Planning Commission Meeting of January 25, 2018 ZONING: Neighborhood Service (NS) COMPREHENSIVE PLAN: Commercial (COM) 60 -DAY REVIEW DEADLINE: March 11, 2018 1. BACKGROUND: The applicant is seeking comments on a sketch plan for a 13,950 square foot motor vehicle repair business on a 3 acre property formerly known as the "End Zone" site. They would like to expand their business from their existing leased space at 5241 130th Street in Hugo. The subject property is currently vacant and zoned Neighborhood Service (NS). In order for the use to be located on the property it would need to be rezoned to General Business (C-2). The applicant would like feedback on the site plan, architecture, and rezoning of the property. The applicant has the property under contract. 2. SKETCH PLAN: Rezoning The City's Comprehensive Plan identifies the subject parcel as Commercial. The Comprehensive Plan identifies three types of commercial land uses that are reflected in the zoning regulations. The regulations specifically list three types of commercial zoning as; Neighborhood Service (NS), Central Business (C-1), and General Business (C-2.) The purpose of the Neighborhood Service (NS) zoning district is to provide a location for commercial and service businesses to conveniently serve the needs of an identified residential neighborhood. The NS District provides for those neighborhood commercial uses, but it does not TGK Automotive, Sketch Plan Page 2 allow for restaurants, auto sales, or other uses intended primarily to draw traffic from outside the neighborhood. The NS district does allow for neighborhood food service, different from restaurants, which has several regulations in regards to hours of operation and outdoor noise. The purpose of the Central Business (C-1) zoning district is to provide for the establishment of a downtown which is a blend of cultural, recreational, civic, entertainment, retail, sales, and office uses. The C-1 district allows restaurants and taverns as well as a series of other uses that are not allowed in the NS District. The C-1 District allows more commercial uses, with a lesser amount of restrictions than the NS district. A motor vehicle repair business is not allowed in the C-1 zoning district. The General Business (C-2) is the zoning that is being proposed by the applicant. The purpose of the C-2 zoning district is to provide for the establishment of service and freestanding commercial businesses, including retail sales, offices, and restaurants, which are oriented toward motorists and require high volumes of traffic and visibility from major roads. The C-2 district allows restaurants and auto oriented businesses as well as a series of other uses that are not allowed in the NS District. The C-2 district allows more commercial uses, with a lesser amount of restrictions than the NS district. A motor vehicle repair business, excluding an auto body shop, paint shop, or tow lot, is allowed in the C-2 zoning district. The NS and C-2 zoning districts have different permitted, accessory, and conditional uses. The C-2 district allows for more intense commercial uses that may include additional traffic, lighting, and noise. The construction limitations are the same, except the lot coverage requirements. The applicant has stated that he would like the property to be zoned C-2 because of the expanded uses, which allows for the motor vehicle repair business, compared to the NS zoning district. The property to the north at Highway 61 and 140th St (CSAH 8) was rezoned to C-2 from NS in 2012. The property to the west across Highway 61 has a conditional use permit for an auto body shop, but is zoned NS. These uses would be allowed in the C-2 zoning district. The property has been marketed by a commercial real estate firm as a NS zoning district. The property now has a purchase agreement for a use that is not allowed in the NS district. The expanded uses may help occupy the vacant property. The property is close to an important intersection adjacent to Highway 61 and 1401h Street (CSAH 8), with high traffic counts. Any use on the property would likely draw people from several areas of the City, other than the surrounding neighborhoods. The area is consistent with what would be desired for uses in the C-2 district to locate. Rezoning the property General Business (C-2) would be in compliance with the land use guide plan. While the properties to the east are developed with town homes, they are separated from this property by a small wooded area. With additional work on transitions in the site layout the wooded area could help serve as an acceptable transition to a proposed commercial development. The properties to the north and south are vacant, zoned NS, and will likely be developed as commercial uses. The properties to the west, across Highway 61 are occupied by Schwieters Companies and are zoned General Industrial (I-3). It's staff opinion that this property can accommodate the expanded uses without having an adverse impact on the surrounding properties. TGK Automotive, Sketch Plan Page 3 Staff is comfortable with the request, as long as there are proper transitions between the land uses and the impact on the surrounding residential properties is minimized. Further analysis of the transitions would be evaluated during the site plan approval process. If the rezoning of the property is supported, then it may be reasonable to expect other property owners to the north and south of this site to request the same zoning. Staff would be comfortable with these properties also being rezoned to C-2 as well. General Layout The applicant is showing a 13,950 square foot motor vehicle repair business with an associated parking lot. There seems to be enough area on the plan to accommodate the required number of parking spaces by City Code. The applicant has stated that they will be repairing personal vehicles and medium duty trucks. Most of the overhead doors are on the north and south side of the building, with one being on the east side of the building. The applicant has stated that the medium duty trucks will be using the overhead doors on the north side. The plan is showing a stormwater pond in the northeast corner and landscaping along the east property line to further provide a transition/buffer from the residential properties to the east. The applicant will be required to meet the landscaping requirements in the City Code. The sketch plan is a rough draft of how the site could be laid out. There are still several items in regard to the general layout that need to be worked on as the projects moves forward and a formal application is submitted. The applicant is showing additional landscaping to provide a transition/buffer to the residential properties to the east. If the Planning Commission is comfortable with the rezoning of the property, staff recommends that the Commission provide comments to the applicant on what items are important if the property is rezoned. Some of these items may include: • Buffer/screening methods • Building design and architecture • Limits to vehicle storage • Lighting • Noise abatement • Other... Access There are three existing access points into the property. The applicant is showing one proposed access. MnDOT has a plan to expand Highway 61 into a 4 -lane divided Highway. The plan shows a median at this access location. The short term the access into the site would be a full access, but long-term the access into the site will be right-in/right-out only. As the project moves forward MnDOT will be provided the opportunity to comment on the plan. They may require turn lanes on Highway 61 to access the site, as per the comments received from another project previously proposed on this site. It will also be required that 39 feet of right-of-way along Highway 61 be dedicated to the City for the future expansion of the highway per the Memorandum of Understanding (MOU) between the City and MnDOT. TGK Automotive, Sketch Plan Page 4 Staff has encouraged the applicant to evaluate cross access between the properties to the north and south to limit the number access points onto Highway 61. Staff will continue to work with the applicant on this as the project moves forward. Architecture The building is not simply a square and can provide some interest as the architecture comes together. The applicant has provided elevations, renderings, and an example of what they envision the building will look like. The applicant has stated the majority of the building material would be brick. The entrance will be defined and the overhead doors do not dominate the appearance of the building. Staff recommends the applicant further break up the large building walls with additional architectural details and windows. The applicant will be required to meet the commercial and industrial construction standards and design guidelines. The applicant has some work to do in order to comply with the design guidelines. All roof top and ground mounted mechanical equipment are required to be screened. All of these items will be worked through with a formal site plan application submittal. 3. CONCLUSION/RECOMMENDATION: The applicant has provided a sketch plan for the Planning Commission to review. The applicant would like feedback on the site plan, architecture, and rezoning of the property. There are details on the plan that have not been fully evaluated since this is a sketch plan application. At the time a site plan application is submitted, they will be further evaluated with additional information that will be required. It's in staff's opinion that the important question is the rezoning of the property from NS to C-2. If the Planning Commission is comfortable with the rezoning, they should discuss items that are important to the general layout and the how the property is used in regards to the transitions between uses. Attachments: 1. Location Map 2. Zoning Map 3. Engineers Memo dated January 19, 2018 4. Sketch Plan 5. Renderings of Buildings 6. Example of Building Exterior TGK Automotive Sketch Plan Site Map NN + F s •-Lpe �h fIF r , �1 t Site Legend Right_of_Way Parcel—Boundary Y N (C-1) Central (RI -1) Density Multiple Zoning Districts (R-3) Single A (LA) Long Term Family Detached Residential Agricultural Residential n (AG) Agricultural (CR -3) Central HUG0 Central Residential Service (RR) Rural (R-4) Low (RC -1) Residential Density Multiple Restricted (R-1) Large Lot Family January 12, 2018 Single Family Residential Map Powered byDataLink Residential Water from WSB & Associates 1 inch = 376 feet (R-5) Medium (C-1) Central (RI -1) Density Multiple Business Restricted Family (C-2) General Industrial Residential Business (1-3) General (NS) (FCB) Future Industrial Neighborhood Central (FUS) Future Service Business Urban Service (RC -1) (BP) Business (PUD) Planned Restricted Park Unit Commercial Development Water WSB Building a legacy—your legacy. January 19, 2018 Ms. Rachel Juba City Planner City of Hugo 14669 Fitzgerald Avenue North Hugo, MN 55038 Re: Concept Plan Review TGK Automotive WSB Project No. 3288-00 Dear Ms. Juba: 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 We have reviewed the concept plan for TGK Automotive located on the east side of Highway 61 approximately 600 -ft south of 140th Street. Our review is based on the Sketch Plan dated 1/7/18. We will provide a more in-depth review of this project once detailed plans are provided by the applicant. Based on our review, we offer the following comments regarding the concept plan: Grading and Drainage 1. Storm Water Management: The applicant will need to obtain a permit from the City for their Storm Water Management Plan within the site, including the appropriate storage, rate control, treatment, and volume reduction. A drainage and utility easement will need to be dedicated over the proposed pond up to the 100 -year high water level of the pond and any propose outlet piping. The site can potentially support water reuse for landscaping around the buildings, and this should be explored in greater detail moving forward. Stormwater management requirements are listed below: a. The site must meet volume reduction requirements of treating 1.1 inches off new impervious areas. b. Rate control from the site must be less than existing for the 2 -year, and 10 -year rainfall event. Rate control for the 100 -year event must be limited to 0.1 cfs/acre. c. If the existing wetland is to be used for stormwater treatment, pretreatment must be provided prior to discharge into the wetland. d. Based on the wetland characteristics described in the NOA, the wetland is classified as "Slightly Susceptible". Bounce requirements and inundation period requirements are as follows: Permitted storm bounce for 2 -year and 10 -year event is existing plus 1 foot. Inundation period for the 2 -year event is existing plus 2 days. Inundation period for the 10 -year event is existing plus 14 days. e. Lowest building opening must be 3 feet above the 100 -year HWL of the existing wetlands and/or stormwater BMPs. Equal Opportunity Employer wsbeng.com S:�Users�R_Juba �RocheADEVELOPMENT PROJECTS TGK Auto TGK Auto Concept Eng Memo 011918.docx Ms. Rachel Juba January 19, 2018 Page 2 f. An easement must be established over stormwater management facilities, stormwater conveyances, ponds, wetlands, on-site floodplain up to the 100 -year flood elevation. g. Any offsite drainage must be included in the submitted drainage maps and models. Transportation/ROW 1. Access Locations: A single access from Highway 61 is proposed with the sketch plan. This access will require an access permit MnDOT before construction can begin in MNDOT right-of-way. 2. Right -of -Way: The site plan should include 39 -ft of right-of-way to be dedicated along the west edge of the site in accordance with the Highway 61 corridor plan. Sanitary Sewer Service 1. Sewer Improvements: Sanitary sewer service is available along the east side of the property with a 6" service stub extended into the site. Water Service 1. Watermain Improvements: Water service is available by connecting (wet tap) to the existing 6" watermain located along the east side of Highway 61 and the 6" watermain located in Pineview Meadows to allow proper looping of the watermain. A 20 -ft drainage and utility easement over the watermain should be incorporated to allow proper City maintenance. Thank you for the opportunity to comment on this concept plan. If you have any questions or items you wish to discuss, you can contact me at 651-286-8463. Sincerely, WSB & Associates, Inc. Mark Erichson, PE City Engineer Attachment cc: Steve Duff, Senior Engineering Technician, City of Hugo Scott Anderson, Public Works Director, City of Hugo S:�Users�R_Juba �RocheADEVELOPMENT PROJECTS �TGK Auto �TGK Auto Concept Eng Memo 011918.docx N 00 N O m Z 9 0-0 >n V r- ;a m;a C)m >mn rm a M 0m 0 Z C 0 mm m0 -C 1 218 i 90 W 218 205.86 31 CA co oa rn r 3 z 102.17 95.74 37 co CA W � 0 Ln W 0 N CD N d N iG 3ses_4 8o Q Q Q --+%� --j - -- NQ� cn- C N NZT � v cn :DQ CO - Vj (Q cn Q m — ZT Q Q CD CD C: M (n Q cn ril cn 0 M 0 cD zr 0 ij CD N c Q Q v CD `� a Q v0�Z3 (D CD W Z5 M CD -0 ED o ca C) CL (n Q "C Z5 Z 9 0-0 >n V r- ;a m;a C)m >mn rm a M 0m 0 Z C 0 mm m0 -C 1 218 i 90 W 218 205.86 31 CA co oa rn r 3 z 102.17 95.74 37 co CA W � 0 Ln W 0 N CD N d N iG 3ses_4 8o w bs. - -- w C N � 406CnNLn 0 ril ij n n N 013 1 It? ti�� 5247 37.81 co -4. 1 DRAWING5 PROVIDED BY: HAN55N ENGINEER/NG and DE5I6N, LLC. 1464 SELBY AVE. SAINT PAUL, MN 55104 651-555-2195 BUILDER: PROJECT DE5GRIPTION: TGK AUTOMOTIVE CONCEPT PLAN FOR NEN HUGO SHOP DATE: 1/l/2015 SHEET 51ZE: 5HEET: ARCH 0 (24" x 36") A-4 w r.� w C N � 406CnNLn ti�� 5247 37.81 co -4. 1 DRAWING5 PROVIDED BY: HAN55N ENGINEER/NG and DE5I6N, LLC. 1464 SELBY AVE. SAINT PAUL, MN 55104 651-555-2195 BUILDER: PROJECT DE5GRIPTION: TGK AUTOMOTIVE CONCEPT PLAN FOR NEN HUGO SHOP DATE: 1/l/2015 SHEET 51ZE: 5HEET: ARCH 0 (24" x 36") A-4 u up 42' 132'-8" 121-611 �/ 132'-8" FLOOR PLAN 5CALE: 1 /8" = V-0-- TOTAL -0"TOTAL SHOP & OFFICE = 13,850 sq ft TOTAL SHOP = 11,200 sq ft TOTAL OFFICE = 2,150 sq ft m I Ln DRAWING5 PROVIDED BY: HAN55N ENGINEER/N6 and DE5I6N, LLC. 1464 SELBY AVE. SAINT PAUL, MN 55104 651-555-2195 BUILDER: PROJECT DE5GRIPTION: TGK AUTOMOTIVE CONCEPT PLAN FOR NEN HUGO SHOP DATE: 1/l/2015 SHEET 51ZE: 5HEET: ARCH 0 (24" x 36") A-3 --------------- I I 3060FX 30bOFX 3060FX bF+ 3060FX I I O I b�+ bpb 1 – I I O oX� a OL UNISE 19'-11"x24'-2" 465 sq ft 150514" GLG. TILE I I X M O� L m O X 12, CONFERENCE ROOM 0 0 L 402 sq ft 132" GLG. CARPET F15H TANK F15H TANK MEN'S NLOMEN'S Ta'xEN TILE 13T LEG 3068 3068 _ HALL 15'-3" x 4'-0" /III x x 0 0 61 sq ft 132"GLC. TILE 3080 L,.. ., .. ..... .. ,.;, LL LL m 120140 120140 120140 120140 RECEPTION OFFICE OFFICE VTILE 571 sq ft 132", 144 3/4" LLC, s 12-0" x 12'-0" 12-0" x 12'-0" 144.q ft 144.q R 132" GLG. 132" LLC. CARPET CARPET I L I L I L �\ XN LL m Z93068 3068 —_ HALLJ J 20'-9" x 4'-T' ' 95.q ft OIF- ch -- — 132"GLG. TILE _ y F M� 3068 3068 L L SHOP . UTIL. GL5T HALL 6'4" x 12'-4" 5'-0" x 12'-2" 78 sq ft 61 sq ft 132" GLG. 132' LLC. OFFICE 12'-T" x 12 0" 150 sq ft 132' GLG. OFFICE 15'-0" x 12'-0" . ". 181 sq ft 132" LLC. bb' -b" x 30'-0" 2059 sq ft 14 � •. TILE TILE CARPET CARPET 20'-0" GLC. m UP ,. 3068 3068 3080 ALIGNMENT ALIGNMENT 120140 MACHINE MACHINE I BATHROOM 2868 2868 24'-5" x 11'-0• 264 sq ft 144 3/4" GLG. LOCKER5 X 5 LOLKER5 X 8 ' 3068 BREAK RM 204 sq ft 144 3/4" LLC, 1 JI UP 3068 1 I I o w 0 m O of v N w 1 I SHOP L ' 103'-4" x 84'-0" "1121 sq ft 20'-0" CL6. mp ❑❑ 0500 - o0 I o I 5068 mp ❑ ❑ ILI o EQUIPMENT it i Il - --- - : 5TORAGE - 20'-11" x 19'-5" 405 sq ft - _ i 144 3/4" GLG. AIR rU ,gyp GOMP N 3'dti'x Td J W N 2'X b'NORKSENCH 2'X6'WORKBENCH _1 n 'GLG ° BRAKE BRAKE WASHERT5R [NA5HER 120140 LATHE LATHE 3080 �/ 132'-8" FLOOR PLAN 5CALE: 1 /8" = V-0-- TOTAL -0"TOTAL SHOP & OFFICE = 13,850 sq ft TOTAL SHOP = 11,200 sq ft TOTAL OFFICE = 2,150 sq ft m I Ln DRAWING5 PROVIDED BY: HAN55N ENGINEER/N6 and DE5I6N, LLC. 1464 SELBY AVE. SAINT PAUL, MN 55104 651-555-2195 BUILDER: PROJECT DE5GRIPTION: TGK AUTOMOTIVE CONCEPT PLAN FOR NEN HUGO SHOP DATE: 1/l/2015 SHEET 51ZE: 5HEET: ARCH 0 (24" x 36") A-3 WEST ELEVATION 5 GAIL E : 1 /5" = V-011 BAST ELEVATION 5 GAEL E : 1 /5" = V-011 NORTH ELEVATION 5 GAEL E : 1 /5" = V-011 SOUTH ELEVATION 5 GAEL E : 1 /5" = V-011 DRAWING5 PROVIDED BY: HAN55N ENGINEER/N6 and DE5I6N, LLC. 1464 SELBY AVE. SAINT PAUL, MN 55104 651-555-2195 BUILDER: PROJECT DE5GRIPTION: TGK AUTOMOTIVE CONCEPT PLAN FOR NEN HUGO SHOP DATE: 1/l/2015 SHEET 51ZE: 5HEET: ARCH 0 (24" x 36") A-2 _�. _ ,;•47, ..�� . ,� i• _ fie* ,i M1 - � a '` -;.•_ IMMENEW womm" "Iowa !Irl 0� 'Ain` / "tee/ `''� `/ /�ftt / / .. 0 11 VSMOOOA�,9100lp M -..M ARM 10 to 'ANN dw fA4 4'-wL# t,. 100 00I• : mftS�. -.M� 2018 Goals Agenda Number: F.1 Planning Commission Approved by the Planning Commission at its Thursday, January 25, 2018, meeting • Attend Comprehensive Plan Workshops. • Review sections of the Comprehensive Plan and make recommendations for changes and improvements. • Hold Public Hearings on the 2040 Comprehensive Plan. • Schedule regular Ordinance Review Committee (ORC) meetings • Evaluate and revise the shoreland, small cells, subdivision, and PUD sections of the City Code • Schedule Planning Commission Meeting Procedures and Land Use Training • Overview of White Bear Lake DNR order • Overview of existing conditions and future of Highway 61 • Recap of design guildelines