Loading...
HomeMy WebLinkAboutPC Packet 08.07.17AGENDA HUGO PLANNING COMMISSION THURSDAY, AUGUST 10, 2017 HUGO CITY HALL 7:00 p.m. A. ROLL CALL (Arcand, Kleissler, Lessard, McRoberts, Tjernlund) B. PLEDGE OF ALLEGIANCE C. APPROVAL OF MINUTES 1. July 27, 2017 D. PUBLIC HEARING 1. Fable Hill 41h Addition Amendment to the Preliminary Plat and PUD E. NEW BUSINESS F. OLD BUSINESS 1. Comprehensive Plan Update G. ADJOURNMENT If you need accommodations for the Planning Commission meeting please contact Rachel Juba at (651) 762-6304 or riuba(&ci.hugo.mn.us, thank you. Minutes for the Planning Commission Meeting of Thursday, July 27, 2017 Chair, Kleissler called the meeting to order at 7:09 p.m. PRESENT: Arcand, Kleissler, Lessard, McRoberts. ABSENT: Tjernlund. STAFF: Rachel Juba, Planner Sarah Rumppe, Community Development Intern Approval of Minutes for the Planning Commission Meeting of June 8, 2017 Commissioner Lessard made a motion, seconded by Commissioner Arcand, to approve minutes for the meeting of June 8, 2017. All Ayes. Motion carried. Public Hearing: Xcel Energy Inc. Site Plan and Conditional Use Permit (CUP) Juba presented Xcel Energy Inc.'s request to approve the site plan for a 12,000 square foot building addition to the previously approved training barn. The addition would be used for indoor training exercises to compliment electric and gas field training. The plan also includes an expanded location northwest of the building for small house simulators used for gas leak training. Juba noted concern with this project regarding storm water management, but stated the city will continue to work with Xcel to resolve these issues before the plan goes to the City Council next week. Kleissler opened the podium for Xcel representatives to make additional comments. Lee Stokes, Xcel property services and project manager approached the podium. Stokes stated he had no additional remarks, and asked the Commission if they had any further questions. The Commission had no additional questions. Kleissler opened the public hearing. In absence of comments, Kleissler closed the public hearing, returning the discussion to the Commission. Lessard stated Xcel's plans are a simple and this is an easy decision. McRoberts moved to approve Xcel Energy Inc.'s Conditional Use Permit, Arcand seconded. All Ayes, Motion carried. New Rusiness Juba asked the Commission if there are any additional matters to discuss. McRoberts stated in light of the Eastern Hugo workshop he has questions in regards to conservation easements. He suggested a presentation be made to explain conservation easements and aid in understanding of residents options. Planning Commission July 27, 2017 Page 2 Juba stated the Minnesota Land Trust provides such workshops and can provide the information to the Commissioners. McRoberts suggested a brief presentation be made to the Commission by an outside representative, then judging on how it goes, another workshop be provided to the public. The Commission agreed a workshop would be a valuable idea to pursue. Juba gave a brief update on upcoming events like the Parks and Trails Comprehensive Plan Workshop on August Stn McRoberts requested a reminder be made to the Commission leading up to the event. Adiournment Commissioner McRoberts made a motion, Commissioner Lessard seconded, to adjourn at 7:31 p.m. All Ayes. Motion carried. Respectfully Submitted, Sarah Rumppe, Community Development Intern Agenda Number: CITY OF HUGO PLANNING AND ZONING APPLICATION STAFF REPORT TO: Hugo Planning Commission FROM: Rachel Juba, Planner D I SUBJECT: Elmerest Investments, LLC. Request for an amendment to the preliminary plat and PUD for "Fable Hill 4th Addition" to add 3 lots to the preliminary plat. DATE: August 4, 2017, for the Planning Commission meeting of August 10, 2017 ZONING: Planned Unit Development (PUD) DEADLINE DATE: August 25, 2017 1. DESCRIPTION OF REQUEST: The applicant is requesting an amendment to the preliminary plat and PUD to add 3 lots to the existing preliminary plat approval. The previous approval consisted of 46 detached villa lots 14 single family home lots for a total 60 lots. The applicant is requesting for 54 detached villa lots and 9 single family home lots for a total of 63 lots. In 2015, the applicant final platted 26 of the detached villa lots. 2. BACKGROUND: In 2003, the City Council approved the PUD General Plan for Fable Hill. Since then four phases have been developed. The first phase included 52 single family home lots and a lot split in 2009 made it 53 lots. The second phase included 24 single family home lots. The third phase included 5 single family home lots. The fourth phase included 46 detached villa lots 14 single family home lots and modified some setback PUD standards to accommodate the detached villa home product. The PUD allowed flexibility on the following: 1. Minimum lot size — the PUD allows smaller lots 2. Minimum lot width — the PUD allows narrower lot widths Page 2 3. Reduced Setbacks — the PUD allows reduced front, side, and rear yard setbacks The developer is requesting the amendment to the forth phase to include 63 lots, where 60 lots were previously approved. 3. CONTEXT: A. Surrounding land Use and Zoning The properties to the north and west are zoned Single Family Detached Residential (R-3) and are occupied by single family homes. The properties to the south are zoned PUD and are occupied by single family homes in the Fable Hills development. The property to the east is zoned Large Lot Single Family Residential and is the City owned Clearwater Creek Preserve Park. B. Natural Characteristics of Site The site is rolling terrain including some trees along the edges, with pockets of wetlands. The site has been previously rough graded. 4. ANALYSIS: C. Level of Discretion in Decision Making The City's discretion in approving or denying a preliminary plat is limited to whether or not the proposed plat meets the standards outlined in the subdivision regulations in the City Code. If it meets these standards, the City must approve the preliminary plat. The City has relatively high level of discretion in approving PUD amendments. A PUD amendment must be consistent with the City's comprehensive plan. The City may impose reasonable requirements in a PUD amendment not otherwise required if the City deems it necessary to promote the general health, safety, and welfare of the community. D. Consistency with the PUD and Ordinance Standards Preliminary Plat and PUD There are minor revisions to the plan that include 3 additional units and a slight shift of Fable Hill Road North, adjusting it to the south. The development is required to meet all of the conditions from the previously approved preliminary plat and PUD. The proposed plans meet the intent of the previously approved preliminary plat and PUD. The 63 homes proposed by the developer will result in a net density of 2.49 units per acre. This is less than what would be allowed in a straight zoning single family development (3-4 units per acre) and what would be allowed with a PUD (Up to 4 units per acre). The density is consistent with City requirements. Page 3 Grading and Stormwater Management The grading for the site was partially completed with the previous phases of development. There will be an expansion of an existing pond on site. The pond has an outlet to the east that drains into Clearwater Creek Preserve Park that has caused some flooding. The City is working with the development team to correct this problem. Park Dedication The remaining lots will be required to pay the full park dedication fee of $88,800 (37 lots x 2,400). 5. CONCLUSION: The site is currently within the Fable Hills PUD and the plan layout maintains a development pattern that complies with the approvals for the Fable Hill PUD. Staff has reviewed the PUD amendment and preliminary plat for consistency with the standards outlined in the City Code and finds that the application is consistent with all the standards, except as outlined in the report and included as recommended conditions. 6. RECOMMENDATION: Staff recommends approval of the amendment to the preliminary plat and PUD, subject to the conditions listed in the resolution. ATTACHMENTS: 1. Resolution Approving the Amendment to the Preliminary Plat and PUD 2. Previously Adopted Resolution 2015-29 3. Location Map 4. Engineers Memo dated July 31, 2017 5. Applicants Narrative 6. Previously Approve Preliminary Plat 7. Proposed Preliminary Plat Graphics, dated June 26, 2017 8. Building Elevations RESOLUTION 2017 - APPROVING AN AMENDMENT TO THE PRELIMINARY PLAT AND PUD FOR ELMCREST INVESTMENTS, LLC, FOR "FABLE HILL 4TH ADDTION" ON PROPERTY LOCATED EAST OF ELMCREST AVE NORTH OF FABLE HILL PARKWAY WHEREAS, Elmcrest Investments, LLC, has requested approval of a PUD Amendment and preliminary plat to add 3 lots to the preliminary plat property legally described as follows: Outlot C, Fable Hills 4t' Addition WHEREAS, the Planning Commission has reviewed the preliminary plat at a duly called Public Hearing and recommends approval, and; NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF HUGO, MINNESOTA, that it should and hereby does approve the request by Elmcrest Investments, LLC, for an amendment to the preliminary plat and PUD, subject to the following conditions: 1. A preliminary plat is approved to allow the creation of 54 villa units and 9 single family homes, in accordance with the plans and application received by the City on June 26, 2017, except as amended by this resolution. 2. The development shall comply with the Fable Hill PUD standards in Resolution 2002-40 and 2015-29, as amended. 3. The applicant shall comply with all conditions in the City Engineer's letter dated May 6, 2015 and July 31, 2017. ADOPTED by the City Council this 21" Day of August 2017 Tom Weidt, Mayor ATTEST: Michele Lindau, City Clerk RESOLUTION 2015-29 APPROVING A PUD AMENDMENT AND PRELIMINARY PLAT FOR ELMCREST INVESTMENTS, LLC, FOR "FABLE HILL 4TH ADDTION" ON PROPERTY LOCATED EAST OF ELMCREST AVE NORTH OF FABLE HILL PARKWAY WHEREAS, Elmerest Investments, LLC, has requested approval of a PUD Amendment and preliminary plat to allow a subdivision for 60 lots and on the 32.3 acre property legally described as follows: Outlot A, Fable Hills Yd Addition WHEREAS, the Planning Commission has reviewed the preliminary plat at a duly called Public Hearing and recommends approval, and; NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF HUGO, MINNESOTA, that it should and hereby does approve the request by Elmcrest Investments, LLC, for a PUD amendment and preliminary plat, subject to the following conditions: 1. A preliminary plat is approved to allow the creation of 46 villa units and 14 single family homes, in accordance with the plans and application received by the City on February 11, 2015, and revisions received May 1, 2015, except as amended by this resolution. 2. The development shall comply with the Fable Hill PUD standards in Resolution 2002-40, as amended. 3. The applicant shall comply with all conditions in the City Engineer's letter dated May 6, 2015. 4. The applicant shall provide staff with the homeowner association documents for review and approval. The documents shall include language to ensure architectural review and development sign maintenance. S. The setbacks for the development shall be as follows: Setback Proposed House Setbacks: Front yard 15 feet Side yard — facing street 15 feet Side yard — interior 5 feet Rear yard 25 feet Garage Setbacks: Front yard — garage door side f 25 feet Front yard — non -door side [ 15 feet Resolution 2015-29 Page 2 Side yard — garage door side 25 feet Side yard — non -door side _ 5 feet Rear Yard -- non -door side S feet Setback around site perimeter (exterior property 30 feet Setback from OHW of Clearwater Creek 50 feet 6. Outlot A and B will be used for stormwater management and will be dedicated to the City. Outlot C will include a portion of a wetland and will be dedicated to the City. 7. A minimum of two parking stalls shall be provided for each lot. The minimum length of each driveway shall be 22 feet. 8. Right-of-way for public streets shall be 50 feet wide. 9. The public streets shall be 28 feet wide face of curb to face of curb. 10. The applicant shall install improvements to the park (Outlot A, Fable Hill) as shown on the plan dated May 8, 2015, and approved by the Parks Commission at its May 13, 2015, meeting. The approval includes improvements to the park in lieu of a park dedication fee for the first phase .of 26 lots. The estimated cost of the improvements will be $77,472, which is approximately $15,000 more than the required park dedication fee .for the first phase. The required park dedication fee (currently $2,400 per lot) shall be paid for all lots platted in subsequent phases. 11. The park (Outlot A, Fable Hill) improvement shall be completed with the first phase of the development, along with the roadways and utilities. 12. The development shall comply with the Fire Chief s requirements regarding fire flow calculations, the location of fire hydrants, fire department connections, and fire lane signage. 13. The applicant shall correct the building locations for lot 13 and 14, block 2, to ensure the required sewer pipe clearance is met. 14. The location for the development signs shall be reviewed and approved by staff: a. The signs shall comply with ordinance standards in place at the time of permit application. b. Signage is proposed two private lots, the applicant will be required to provide a sign easement. c. The sign shall be installed and paid for by the applicant and the home owners association shall be responsible for all sign maintenance, including landscaping. 15. Exterior lighting shall be consistent throughout the development. The developer shall comply with the City standards for street lighting within the public right-of-way and match the existing decorative lighting in the Fable Hills development. Resolution 2015-29 Page 3 16, The location and species of all landscaping materials within the development are subject to further review and approval by the City staff Two overstory shade trees are required for each .lot. 17. An 8 -foot wide bituminous trail shall be provided along the west side of Fable Hill Road. The construction will be completed during each corresponding final plat. The applicant shall provide a grading plan showing the location of trails. There shall be a buffer between the trail and back of street curb and a buffer between property lines and the trial. Staff will continue to work on the location of the trail and shall review and approve the location prior to installation. 18. An 8 foot wide bituminous trail connection to Clearwater Creek Preserve Park shall be constructed with the first phase. The exact location and grading plan for the trail connection to Clearwater Creek Preserve Park shall be reviewed and approved by staff prior to installation. 1.9. The applicant shall provide detailed drawing and plans for the retaining walls for review and approval by staff. 20, The following conditions shall be met prior to release of the final plat for filing: a. The plat shall comply with the City's street naming system, except as otherwise approved by the City Council. Staff will continue to work with the applicant on the street names. b. The applicant shall enter into a development agreement for each phase of development, shall agree to complete all improvements, and pay all fees as required by the agreement. 21. The following conditions shall be met prior to issuance of building permits: a. The applicant shall record the final plat, development agreement and all other documentation at Washington County and provide the City with proof of recording. ADOPTED by the City Council this 1 st Day of June, 2015 Tom Weidt, Mayor ATTEST: i + Michele Lindau, City Clerk N Fable Hills 4th Addition Amendment to the Preliminary Plat and PUD Site Map W+>E S 4111M All All V. 11C 20 %x ry?.- OUTLOT CSr ~tet 'SFUTURE PHASES%; w e -_ _ •- OUTLOT A _ Joni � _c a OUTLOT B V6, 90 . , s •. Site Legend Parcel Boundary 26 Villa lots - Final Plat Right -of -Way A WSB 477 Temperance Street I St. Paul, MN 55101 1 (651) 286-8450 July 31, 2017 Mr. David Hempel Construction Coordinator/Project Manager Westwood Professional Services 7699 Anagram Drive Minneapolis, MN 55344 Re: Preliminary Plat and PUD Review Fable Hill 41' Addition WSB Project No. 1904-78 Dear Mr. Hempel: We have reviewed the preliminary PUD site plan submittal and drainage analysis for the above - referenced project. In particular, we have reviewed the following plans related to this particular request: • Plan Set (9 sheets) dated June 26, 2017, prepared by Westwood • Preliminary Stormwater Runoff Narrative dated July 12, 2017, prepared by Westwood Based on the review of the application materials, we offer the following comments related to this application. General 1. Final plat will require project specifications which include all current applicable City standard details and reference the most recent edition of the City's general specification, MnDOT Standard Specifications for Construction, and the City Engineer's Association of Minnesota Standard Specifications. 2. Provide the utility, grading, and street profile plan updates as requested in the red -lined plans attached to this memo. Utility Plan 3. The watermain is shown as approaching the right of way line at several locations along Fable Road North. Consider modifying the location of sanitary manholes to allow for the watermain to be shifted more into the roadway at the following locations: a. In front of Lot 15 Block 3 b. In front of Lot 3 Block 3 4. Provide a plan sheet (not as part of the construction set) that shows a 250' range from each proposed hydrant location to demonstrate coverage. Provide additional hydrants throughout the development where minimum fire protection requirements are not met. 5. There are a few conflicts where catch basins are conflicting with the watermain location. Confirm that the structure depths do not conflict with the watermain or modify the watermain layout at the following locations: a. Between Lots 12 & 13 of Block 3 b. Between Lots 2 & 3 of Block 3 Building a legacy — your legacy. Equal Opportunity Employer I wsbeng.com KA01904-7801AdminTons LTR -d hampW-FableHiUth PP 07 91 17.doo Mr. David Hempel July 31, 2017 Page 2 Grading, Drainage, and Erosion Control Plan 6. Provide additional drainage/utility easements to accommodate proposed drainage swales; a. Lots 1-3 Block 1 b. Lots 1-2 Block 2 7. Provide a drainage easement for the Fable Road North EOF located on Lot 5 of Block 4. 8. Provide the natural EOF elevation for Lot 4 of Block 1. Verify if compliant with adjacent low floor elevation. 9. The City requires 3 feet of freeboard between the lowest building opening and the 100 -year HWL. The City/Watershed District requires 2 feet of freeboard between the lowest building floor elevation and the 100 -year HWL. Provide the HWL for the previously constructed pond (Outlot A), and ensure freeboard requirements are met for all adjacent lots in Block 3. Street Profiles / Details 10. Design vertical curves to meet 30 mph design speed for stopping sight distance. Specifically, confirm that the sag curve at station 28 on Fable Road North meets the design speed requirements. 11. Curb type shall be the Modified S design shown on the Hugo detail. Stormwater Management 12. Label the location and provide the invert of the Filtration Pond outlet pipe on the plans. What happens to the outlet flow at this location? The City owns the adjacent land to the east, and there is an existing trail near the property line (running N -S along Clearwater Creek) that is currently being inundated by runoff from this existing basin. The City will require that discharge from the Filtration Pond outlet pipe does not flow overland across the trail. A culvert crossing may be necessary to correct this problem. 13. Provide a detail of the revised Filtration Basin's outlet control structure. 14. Clarify the function of Device #6 in Pond 10P: Revised Pond with Filtration in the HydroCAD model. What happens at the weir elevation of 922.50? The plans show the riprap overflow at 923.50. 15. Time of concentrations typically include a maximum limit of 150' for sheet flow. Generally, runoff becomes concentrated after this distance, and should be modeled as shallow concentrated flow. Revise the following time of concentrations in the HydroCAD model to reflect this limit: a. Existing Subcatchment 8S b. Existing Subcatchment 10S c. Proposed Subcatchment 9S Wetlands 16. Provide an electronic shapefile to confirm the most recent wetland delineation. 17. No wetland impacts are proposed as part of the Phase 4 improvements. We will continue to work with the developer to address technical design and other minor issues related to the project as the project moves forward. Thank you for the opportunity to provide comments on this project. If you have questions, please do not hesitate to contact me at 651-286-8463. K:1D19047801Admin\D-1LTR-d hempel-FableHiNth PP 07 31 17.docx Westwood Memo JUN 2 u 2917 i7.o17- BY _ 7 C11 7699 Anagram Drive Eden Prairie, MN 55344 Main (952) 937-5150 Fax (952) 937-5822 westwoodps.com (888) 937-5150 Date: June 26, 2017 To: Rachel Juba, City Planner, City of Hugo From: David Hempel, Westwood Professional Services Re: Project Narrative — Fable Hills PUD Amendment and Preliminary Plat — Fable Hills 5h Addition Executive Summary — Request PUD Amendment to remaining development of Fable Hills PUD. This request corresponds with market demand for the villa style dwelling currently being constructed in Fable Hills. As a result, the PUD Amendment proposes replacing 5 single family lots, in the future phases, with 7 villa style units and alter a short segment of the street, specifically curvature which improves sight lines. Enclosed is an application for a PUD Amendment and Preliminary Plat for the remaining phases of Fable Hills. If you have any questions, please feel free to contact me. Grading, and Drainage — The grading for the site was partially completed with previous phase/s of Fable Hills. Only minor lot grading is anticipated for this street and lot configuration and expansion to the existing pond. No impacts to the existing wetlands are proposed. Storm water management will follow the original PUD plan for Fable Hills. Detailed drainage and ponding data will be provided with the final plat submittal for the city/watershed to review and approve. Utilities — Sanitary Sewer and Water mains will be extended in accordance with the previous utility plans. Only changes will be providing additional services for the additional lots. Streets - The street configuration follows the previously approved PUD with the exception to the sharp curve along lots 6-10, Bk 3 of the previous preliminary plat of Fable Hills Fourth Addition. The PUD Amendment proposes to lessen the curvature of the street in this area which will improve sight lines. Multi -Disciplined Surveying & Engineering TBPLS Firm No. 10074302 westwoodps.com June 26, 2017 Page 2 Landscapinu - Landscape will follow the previously approved PUD with similar number of trees per lot and species as permitted by city code. Final landscape plans will be provided with each final plat. Lot Phasin- - It is anticipated that the remaining development area will be platted in two phases (5th & 6th). The Fifth Addition is anticipated to have 21 villa lots final platted after approval of the PUD Amendment. E PRELIMINARY PLAT OF: FABLE HILL FOURTH ADDITION OUTLOT A, FABLE HILL THIRD ADDITION, RIENARD !KAREN g64EB SECTION 30, TOWNSHIP 31 NORTH, RANGE 21 WEST, WASHINITON COUNTY, MINNESOTA BLO"I B - I / /` I > 7 � /�v J�� � / so 2211111 k J IIF 6IF , BUCK �-4 j +V,- 2 - aolieoi a6o5„ - `Li TLC T A ' ��. .i• ` e,, VET 5, BLO'...... 1 UV 5, BLOCK 1,` K ' \`/\ n,` fnBLE /CLL TXIRO �'�1 ,p00IT100 SIE'S5'96'E I. p N. +1O u 4 X\ EIMO EW INY LLC ^ I � / a0u}taz4aw g l � n: �BF � ,i..,.,✓� i 4"" OUTLOT B os+/_ AOE51 7. n. ua i i 9RER Y MOLLY WA1EK 9009191310050 100 0 100 3m3Im9loosf scale 50 feet / ORIENTATION OF THIS BEARING SYSTEM IS BASED ON THE WASHINGTON COUNTY COORDINATE SYSTEM (NAD 83/1986). DRAWN BY: UJW SURVEYED BY: TZ CHECKED BY: RH SURVEY TEAM NO. BY DATE REVISIONS / K/, I 2 1N10 rt _ WFC_ 1W IOU A�W 5 I k 008. B li PARCEL CURVE DATA C1 55.00' 59.35-1 56.51 S 87'39'38- W 061-49-39- C2 B. 1 47,55-1 46.08 S 3118'42' W 049-32-13- C3 2 n: �BF � ,i..,.,✓� i 4"" OUTLOT B os+/_ AOE51 7. n. ua i i 9RER Y MOLLY WA1EK 9009191310050 100 0 100 3m3Im9loosf scale 50 feet / ORIENTATION OF THIS BEARING SYSTEM IS BASED ON THE WASHINGTON COUNTY COORDINATE SYSTEM (NAD 83/1986). DRAWN BY: UJW SURVEYED BY: TZ CHECKED BY: RH SURVEY TEAM NO. BY DATE REVISIONS / K/, I 2 1N10 rt _ WFC_ 1W IOU A�W 5 I k 008. B li PARCEL CURVE DATA C1 55.00' 59.35-1 56.51 S 87'39'38- W 061-49-39- C2 55.00' 1 47,55-1 46.08 S 3118'42' W 049-32-13- C3 55.00' 1 23.74' 23.56 5 0509'25' E 024'44'01" C4 55.00' 45.05' 43.80 5 57'10'28' E 046'55'59- 05 55.00' 50.89' 49.09 N 72.51.OV E 05300'55" Cfi ::F5 N 3226'46- W 016'46'41' 49.68 N 19'29'40' E 053'41'53' C7 22500' 19.77' 19.76 N 5305'34' E 00502'03" C9 22500' 63.90' 1 63.68 N 2653'11' E 1 016'16'18' C10 225.00' 17.65' 17.64 N 16'30'14" E 004'29'36" C11 225.D0' 21.14' 21.14 N 11'33'55' E 005'23'03' -C12 22500' 67.22' 66.97 N 0018'51' E 01707'05' C13 225.00' 62.03' 81.63 N 1608'34" W 015'47'46" C14 225.00' 66.02' 65.78 N 3226'46- W 016'46'41' C15 22500' 20.32' 20.32 N 43'26'24" W 005'10'31' C16 20.00' 27.32' 2624 5 06'53-57' E 07815'25' C17 175.00' 24.90' 24.87 N 28'09'14' E 0080904' I CIO 175.00' 61.69' 81.37 N 1358'48' E 020'11'52' CIO 176DO' 8.53' 8.53 N 02.29.01 E 01 I C20 425.00' 43.03' 4.101 N 01'48'48" W 005'48'01" C21 425.00' 20.00' 20.00 N 08'03'42' W 002'41'47' C22 375.00' 10.00' 10.00 N 01'55'41' W 001-31-41- C23 375.DO' 32.06' 32.05 N 05'08'27' W DD453'52- C24 125 -OV 67.38' 66.66 N 16'31'42' E 030'52'59' C25 125.00' 56.25' 55.78 N 44'51'45" E 025'47'05" C26 20.00' 26.50' 24.68 N 8408'11' W 07613'03' C27 175.00' 161.06-1 146.41 N 2117'56' W 049-27-27- 028 175.00'33.07' SIDE YARD FACING STREET=15 FEET SIDE YARD INTERIOR=5 FEET 33.02 N 08'50'37' E 010'49'38' C29 75.D0' 18.49' 15.48 N 1657'22' E 00523'50' C30 17600' 68.19' 87.76 N 30'49'05" E 022719'38" 031 175.00 41.83 41.53 N 4847'44' E 073'37'42' C32 55.00' 15.54' 15.48 S 25'36'57' E 010-11-03- C33 110.00 88.59 67.48 N 7303-41 E 03543'27" C34 175.00' 43.78' 43.68 5 340338 E 01420'00' 7 /" E' "-1 NY 74629 RII.-CE TO CR[EK ,J � PARCEL LINE DATA KCaWWI ,alclx MKoonW1 LI 50.59 3 32'14.43' E L2 64.70 S 07'26'44' W L3 72.60 S 01'11'10' W L4 86.74 S 13'20'13' E L5 44.72 S 01.06'49' E L6 35.64 S 32'14.43' E L7 46.99 S 32.14'43' E LB 43.62 S 23'35'56' E L9 59.52 S 22'21.08' E LSO 6520 S 22'21'08' E 1-11 51.13 S 59'19'13' E L12 28.77 S 32'14'43' E L13 37.87 S 58'01'48' E L14 45.78 S 80'52.21' E L15 67.12 S 62'41'04' E L16 29.85 S 86'07'10' E L17 47.40 S 71'37.26' E L18 147.05 S 89.52'26' E L19 I 143.15IS 89'52'26' E L20 1 55.38 S 86'13'48' E PARCEL LINE DATA ca- q43.81 00K:Cr0N 1_61 N 69'11'20' E L62 S 60'49'49' E L63 S 81'43'52' E L64 S 48'01'07' E L65 S 65'49'29' E L66 S 80'06'43' E L67 S 67.5511' E L68 35.32 N 22.0419' E L69 84.97 N 22'04'59' E L70 127.06 S 6B'11'41' E 1_71 61.54 S 68'1141' E L72 37.50 S 47'09.11' E L73 28.65 S 32'14'43' E L74 33.87 S 32'14'43' E L75 52.15 S 67.57.08' E L76 111.32 S 44.51'33' E L77 18.70 S 55.36'35' W L78 18.70 N 55'36'35' E L79 29.52 N 14'15'26' E L80 29.52 S 14'15'26' W Prev i ou slY Ir4ppavea PARCEL LINE DATA IEOOR "IN MHOCTM L21 41.72 S 65'55'18' E L22 27.08 N 50'19.45' E LES 29.68 N 87.26'51' E L24 136.99 S 89.52'26' E L25 83AB S 89.52'26' E L26 42.96 N 87'26'51' E L27 3028 N 65.57'33' E 1.28 44.31 N 81'45.18' E L29 35.99 N 77'55'15' E L30 57,68 S 89'52.26' E L31 77.10 S 89'52.26' E L32 35.49 N 66.51.29' E L33 27,53 S 81'07'37' E L34 161.76 N 71.14'58' W L35 169.51 S 71'36'21' E L36 68.96 S 23'11'45' E L37 29.29 S 51.58'40' E L3B 31A3 S 39.25'27' E L39 43.26 S 18'25'24' E Loo 312.29 5 33.02'20' E Prev i ou slY Ir4ppavea PARCEL UNE DATA NOTES 1_81 728 N 01'05'13' E L82 7,88 N 01.05'13' E L83 51.94 5 63.56'16' V L84 33.79 S 89'00'36' E L85 133.15 N 55'15'57' E L86 180.50 N 41'47133' E L87 110.53 S 57'41'47' E LBB 290.08 S 40'19'54' E L89 61.74 N 84'00'46' E Prev i ou slY Ir4ppavea y.l 4 PROJECT LOCATION s?7. y� C'<23n7 111u11`C VICINITY MAP J f Ye9•ar36'_C 22u0.0•a°o (NOT TO SCALE) i SECTION 30, TOWNSHIP 31 NORTH, RANGE 21 WEST, RVE8.80 - WASHINGTON COUNTY, MINNESOTA B4E98 BF 1 VILLA LOT SINGLE FAMILY BLOCK 2 ", �:� LEGEND .:l 1D NOTES PARCEL 1. THE PROJECT AREA FALLS WITHIN ZONE X AS +' 04846 OF LINE DATA SHOWN ON THE FIRM 2716300119E, WITH AN 25' FRONT GARAGE EFFECTIVE DATE OF FEB 3, 2010. uaKNr ,.KNcrN mxnRN ZONE Xis AN AREA DETERMINED TO BE L41 20999 S 11.56'42- E OUTSIDE OF THE 0.2% ANNUAL CHANCE L42 23.86 S 16'51'48' E FLOODPLAIN L43 39.15 S 40'18'11' E 2.OUTLOT A AND B INTENDED FOR USE AS A L44 3080 S 09'21'32' W RETENTION POND. L45 50.35 S 48'29'35' W •. '� 15' FRONT DCK 15' FRONT D&U L46 108.75 S 24'23.57' W PROPERTY OWNERSIDEVELOPER: L 77 96:67 S 39'16'13' W ELMCREST INVESTMENTS, LLC L48 53.30 S 69'43'06' W 3500 WILLOW LAKE BLVD '2•800.00 n•,6.44•ee• 2 `` VADNAIS HEIGHTS, MN 55110 L49 4096 S 49.40'36' W TOTAL PLAT ACREAGE: 32.3+/ -ACRES L50 3682 N 82.47.25• W NAME OF SURVEYOR/DESIGNER.- URVEYOR/DESIGNER:L51 L51 37.03 N 70'36'17' E ua 5' SIDE 5' SIDE SETBACK I O&U EASEMENT DENNIS J. WARNER, LIC. NO. 42656, SEH L52 196.08 5 87.53.36' E 1200 25TH AVE SOUTH L53 27,93 S 85.39'48' E ST. CLOUD, MN 56301 L54 39.25 N 69.1120' E ZONING: PUD (PLANNED UNIT DEVELOPMENT) L55 82.15 N 37.07'45' W SETBACKS L56 59.31 N 70.17.24' W HOUSE SETBACKS: L57 35.24 S 33'15'12' E L58 90.44S 57'37'33' E FRONT YARD MIN. SETBACK --15 FEET L59 75.59 N 69'11'20' E SIDE YARD FACING STREET=15 FEET SIDE YARD INTERIOR=5 FEET L60 68.58 N 69.11'20' E REAR YARD=25 FEET GARAGE SETBACKS: FRONT YARD GARAGE DOOR SIDE= 20 FEET FRONT YARD NON GARAGE DOOR SIDE=15 FEET SIDE YARD GARAGE DOOR SIDE -25 FEET SIDE YARD NON DOOR SIDE -5 FEET REAR YARD -25 FEET SETBACK AROUND SITE PERIMETER (EXTERIOR PROPERTY LINES) --30 FEET ROAD RIGHT OF WAY -_50.00 FEET y.l 4 PROJECT LOCATION s?7. y� C'<23n7 111u11`C VICINITY MAP J f Ye9•ar36'_C 22u0.0•a°o (NOT TO SCALE) i SECTION 30, TOWNSHIP 31 NORTH, RANGE 21 WEST, RVE8.80 - WASHINGTON COUNTY, MINNESOTA B4E98 BF 1 VILLA LOT SINGLE FAMILY BLOCK 2 ", �:� LEGEND .:l 1D :r �. DETAIL LOT DETAIL +' 04846 OF W G: [ nCK 3l.C.A.r. 1 25' FRONT GARAGE FOUND MONUMENT 'R"3MOONM 45WM^^amu r SETBACK • DENOTES N. e 5 �1fj1,' 15' FRONT SETBACK O DENOTES SET 5/8" REBAR W/ CAP, I 'DEQ+ WErLAxn •. '� 15' FRONT DCK 15' FRONT D&U LIC. NO. 42656 + 4 ce=;;eoi+ii•v L433.73 ,!•; EASEMENT I EASEMENT X DENOTES COMPUTED POSITION '2•800.00 n•,6.44•ee• 2 `` LOT NUMBER LOT AREA I TOTAL PLAT ACREAGE: 32.3+/ -ACRES 9F I „4S f `• N 89.52'25• V 27646 ,Wyp, a aANn>l p4111ffi LOT NUMBER '00121'0060 (SQUARE FEET) LOT AREA TOTAL AREA OF WETLANDS WITHIN PLAT= 7.0.1- ACRES doNAn1AN CHN EE OP9 EAe,E Nlu Your uoEA 9oa91amoau 3oostzf3laaI w4a¢ nECN / ua 5' SIDE 5' SIDE SETBACK I O&U EASEMENT (SQUARE FEET) 5' SIDE TOTAL AREA OF RIGHT OF WAY WITHIN PLAT=3.6+/-ACRES 9oo9tztstaotz / `-'* F71 '?:iia' I SETBACK 5 ' SIDE D&U ZONING: PUD (PLANNED UNIT DEVELOPMENT) / I EASEMENT ! NUMBER OF UNITS IN PROPOSED SUBDMSION CULVERT T CONTOUR 1'CONTOUR PROPOSED BOUNDARY PROPOSED RIGHT OF WAY LOT LINE SECTION LINE U'FD.ITY EASEMENT (D&U) SETBACK LINE (SB) DENOTES WETLANDS PHASE 4 TOWNHOMES: TOTAL - 26 25' REAR SETBACK 25' REAR SETBACK / PHASE SINGLE FAMILY: TOTAL -14 10' REAR D& U EASEMENT 10' REAR EASEMENT J PHASE TOWNHOMES: TOTAL -20 1 HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED LAND SURVEYOR HUGO,TELMCREST PRELIMINARY PLAT FOR: FILE No. 1 UNDER THE LAWS OF THE STATE OF MINNESOTA. P200 25TH OAVENUEOSOUhiELMCR 130939 DENNIS J. WARNER. LS. SEH ST. CLOUD, MN 56301-1717 MINNESOTA INVESTMENTS, LLC 4 Date: 05/08/2015 Li.. Na. 42656 Ln Www.sehinc.com o 2017 Westwood Professional Services, Inc. for loll mitt Preliminary Plat, Grading, and Landscape Plans for Fable Hill 4th Addition Hugo, MN Prepared for: El crest Investments, LLC 3500 Willow Lake Road Vadnais Heights, Minnesota 55110 Contact: Len Pratt Phone: 651-429-8032 Prepared by: Westwood Phone (952) 937-5150 7699 Anagram Drive Fax (952) 937-5822 Eden Prairie, MN 55344 Toll Free (888) 937-5150 westwoodps.com Westwood Professional Services, Inc. Project number: 0010423.00 Contact: David Hempel Utilities, Streets, Sheet List Table Sheet Number Sheet Title 1 COVER 2 EXISTING CONDITIONS 3 PRELIMINARY PLAT 4 PRELIMINARY PHASING PLAN 5 PRELIMINARY GRADING, DRAINAGE, AND EROSION CONTROL PLAN 6 PRELIMINARY UTILITY 7 STREET PROFILES 8 PRELIMINARY LANDSCAPE PLAN 9 PRELIMINARY LANDSCAPE NOTES & DETAILS 10 DETAILS Vicinity Map (Not to Scale) NO. DATE REVISION SHEETS Preliminary PUD Plans for Preliminary Plat, Grading, Utilities, Streets, and Landscape Plans for Fable Hill 4th Addition Hugo, MN Date: 06/26/17 Sheet: 1 of 9 0010423CVP01.d n 9017 Wcc+uinnrl Prnfcccinnnl Ccr%Ar•cc Inn 94Z' \ o, 940 1— g3¢ 17" 18 C> O r' o J � � N N \7 928 rn rn 940 J I ^ry .930 9341 < 8 Q �IL 9 936 ( 36 �� co V g38 — \\ — — 11-01 1 94S9srR J 9 O IceQ2 �`L \ \ \ 4 0 ebb 946 \ J / ali, °� \ ali, / 922 \ \ 0 \ 924 \ Ali, S8p° 30, 34„ W / \ 9 I \ r /� \ -� 1 \ 9 r- L 26 iIV 930940 932 00 193 \ 1 �v6 R Q \ 3 g�b( \ 936 10 3 O— �° O 942 ` I \ O --EDGE OF WETLAND A I f � 940 -L � _ N I,JL cNpl I I 942 r \ / \ \ / ►` o N ° � � I I o \ _ \ t r s \ \ LO -EDGE F WETLANDI, `g40_ ~ \\ C%P a'I ON X I '940— i \ 938 lu j I I rn .`53 ' 930 \ \ \ \ EXIST INv �� 1 r'6' e I ISTI 18" K 26 -STU ,IE 9A2 / \ \ J UB � 2030 EXI Ie �(g40�' 1 S H TI f8 F S \ \ ali, \ 938 i 9 „ 011 h RE S X55 IE — 9 .4 — ` o o 43, 21 ��Q a O�� N 91 7 j \ I _cam / k �, o LAI . cl 0 00 \ J \ g� \ � U, O 1 303.79 \ \ \ a \ ` — S88�."W 161.67 0' a S8� 00 36 E ��'' / / \ 9 — — � �°50'10� L EXISTING f1" �6P E�CISING 8" PVC SDR z co _6 STUB --@--O.4 % Q _ STAB @ 0.V_ / rn ;TUB IE �4 7 v' 1 J / STU IE = 93P�2 \ �C _ \ •� ►� I c� N 05 1 055'36"E 93$ I 6 46 584" �� � � 56�°�$ Westwood I I hereby certify that this plan was prepared me or under IRevisions direct supervision and that I am a duly licensed PROFESSIONAL Mi ENGINEER under the laws of the State of nnesota Phone (952) 937-5150 7699 Anagram Drive Fax (952) 937-5822 Eden Prairie, MN 55344 Toll Free (888) 937-5150 westwoocips.com Westwood Professional Services, Inc. john Bender, PE Date: 07/05/17 License No. 43358 L5` IE = 211105 EXISTING A A t MH 1-1 N�' RE = 95 .7 IE = 9 'V' I 00 lar Prepared for: Checked: DCH, K1tT Elmcrest Investments, LLC Drawn DW, SRS 3500 Willow Lake Road Remora Draw* bydate: Vadnais Heights, Minnesota 55110 Property Description Outlot C, FABLE HILL FOURTH ADDITION, according to the recorded plat thereof, Washington County, Minnesota Fable Hill 4th Addition 0' 60' 120' 180' 0010423EXP01.dwg Date: 06/26/17 sheet•. 2 OF 9 Existing Conditions Call 48 Hours before digging: GOPHER STATE ONE CALL Twin City Area 651-454-0002 Mn. Toll Free 1-800-252-1166 Legend 0 BUSH/SHRUB ST STORM MANHOLE CONIFEROUS TREET❑ TELEPHONE BOX DECIDUOUS TREE TELEPHONE MANHOLE ' WETLAND ® TRAFFIC CONTROL BOX ® STEEL/WOOD POST HH HAND HOLE —o— SIGN-TRAFFIC/OTHER TRAFFIC LIGHT SIGN-TRAFFIC/OTHER D4 GATE VALVE MAIL MAIL BOX �(5 HYDRANT HANDICAPPED STALL 9 WATER METER O PER TEST ❑s CURB STOP BOX Mw MONITORING WELL WATER MANHOLE Tv CABLE TV BOXwO WELL GAS METER CTV CABLE TV STREET LITE —GAS— GAS LINE r GUY WIRE POH POWER OVERHEAD K)j POWER POLE —PUG— POWER UNDERGROUND ❑E ELECTRIC BOX —FOP— FIBER OPTIC ELECTRIC METER —SAN— SANITARY SEWER ELECTRIC MANHOLE —STO— STORM SEWER ® ELECTRIC TOWER —TOH— TELEPHONE OVERHEAD Q SANITARY MANHOLE — TUG— TELEPHONE UNDERGROUND co SEWER CLEANOUT —WA T— WATERMAIN ® BEEHIVE CATCH BASIN x FENCE LINE ® CATCH BASIN rt� — DECIDUOUS TREE LINE ® FLARED END SECTION CURB & GUTTER ® CULVERT BITUMINOUS SURFACE SOIL BORING CONCRETE SURFACE O Denotes 1/2" x 14" Iron Pipe marked with Plastic Cap inscribed with Lic. No. 23021, unless otherwise noted • Denotes Iron Monument Found as noted Denotes Cast Iron Monument Property Description Outlot C, FABLE HILL FOURTH ADDITION, according to the recorded plat thereof, Washington County, Minnesota Fable Hill 4th Addition 0' 60' 120' 180' 0010423EXP01.dwg Date: 06/26/17 sheet•. 2 OF 9 Existing Conditions o2017 Westwood Professional Services, Inc. // �-------�� 1318.13 11, I - - - - - - - - - - - - - - - -790 1 1 4// -----------7 -----------4 -----EDGE% F WETLAND -7 24,920 sf i 1 all, �i � all, 1 y � \ R 1 a�l. - 1 �,�I, / / I / / 27,251 sf - / - / I -� _ � � / a�l, I 4 ___8' TRAIL F - _ -! -� \ / I I / // 0II-EDGE OF WETLAND ' 2 % / / -�2 - - J i�� 23,458 sf�/ B -S / 2 ► o I \ all, 23,747 sf J / I < 20,325 sf / 7 v 15,710 sf 14,468 sf 9 I Im 1 / / / 18,221 sf l l I I 30,873 sf \ \ /4 11 II r 2z /1129 � 28 W / / ,72e sf 190.99 1 \\\ 3 \ � o // I I 34, 035 sf 22,857 sf 8 10 / \ 54,937 sf \ 61 26 \��� \�/ 59 so ti �Pr _ - - - -- s¢ 2s 8' TRAIL- 21 164 78 44,382 sf \ 9 all, 23,642 sf / / -6' all, II 1s,o� of � a,�s sf \ 2� 75 \ I I so I 10 / 10,020 sf / I 5 / 14,542 sf I 9 \ \ �/� /2 - \\✓// 11,185 sf I / \ 76,636 sf 2 . I I 13,095 sf 8 Il a�l, �� ,� \ "` _ - _ \ \ I I Ffl I ry" J _j - I I 3 3g 9,205 sf 10,194 sf _ 10,955 sf // /6 0 �fb3 80 7 N I 2 all, w /`., / / s -- � I (O I I / � � 13 4 I � Y / � , �� s \ 3 I , // ,1 p 10,913 sf S 3 cp I all, all A 13,031 sf 13,103 sf / rn CQ I F- I - \ I � / / JJ II 20,452 sf / all, / - \ / 68 \ I / / /' \\ / /�/ 80 26 2> \ � - // 28 � I 14 3p 1 ii �- �/ 5ti T 13 / \ i 8,998 sf 0� N \ \ ,OS `EDGE OF- 98 \ < all, 11,771 sf / 2� o \ / WETLAND 1 a \ /G - all, 50 \ 77,756 sf \ RD / \ sr> all. /) - / 14 15 1 EDGE OF - 9,635 sf / \ B / 70,31p Sf 1 X71 I �-�\ � sr> / WETLAND 159, 308 s112 2 f 0 12,876 sf / 1 &JMOT A \776 sf \ all, I \ il, �_l-� / o - 16 7 / - N� 17p / ( \ 12,051 sf / 4 / 01 1, 161.67 ' ;- 25.06 �0 05 614 S9 \ o �o O��X' ,y�k Westwood Phone (952) 937-5150 7699 Anagram Drive Fax (952) 937-5822 Eden Prairie, MN 55344 Toll Free (888) 937-5150 westwoocips.com Westwood Professional Services, Inc. I hereby certify that this plan was prepared by me or under myI Revisions: direct supervision and that I am a duly licensed PROFESSIONAL ENGINEER under the laws of the State of Minnesota john Bender, PE Date: 07/05/17 License Na 43358 Setbacks: STREET House Setbacks SF Lot Detail Front yard 15 feet Side yard (facing street) 15 feet Side yard (interior) 5 feet Rear yard 25 feet Garage Setbacks N \ \ Drainage & Front yard (garage door side) 25 feet Front yard (non -door side) 15 feet Side yard (garage door side) 25 feet Side yard (non door side) 5 feet Rear yard (non door side) 5 feet Exterior Boundary 30 feet OHW of Clearwater Creek 50 feet lar Prepared for: Checked: DCH, K1tT Elmcrest Investments, LLC Drawn DW, SRS 3500 Willow Lake Road Remora Draw* by�date: Vadnais Heights, Minnesota 55110 h �0 Call 48 Hours before digging: GOPHER STATE ONE CALL Twin City Area 651-454-0002 Mn. Toll Free 1-800-252-1166 Property Description Outlot C, FABLE HILL FOURTH ADDITION, according to the recorded plat thereof, Washington County, Minnesota Development Data Existing Zoning: PUD Proposed Zoning: PUD Gross Site Area: 19.58 ac Existing Wetlands: 3.56 ac Net Developable Area: 16.02 Proposed Residential Lots: 37 Detached Villas 28 Single Family 9 Overall Gross Density (37 un/19.58 ac) 1.89 un/ac Overall Net Density (37 un/16.02 ac) 2.31 un/ac Project Street R/W.• 2.16 ac Outlot A: 1.99 ac Side -Load Villa Lot Detail (No Scale) � 0 \\ N �\ �\ ----� 5 \\ \ 17, Drainage & /'� \ Utility Easement- h / L \ Setback Line - y 7,386 sf 7,411 sf \ \ \ Lot Number - - - , Lot Area ---� / Lot Dimension - --� - - Side Loaded Garage - - - - - - Driveway - - J / STREET Front -Load Villa Lot Detail (No Scale) 55 0 55 - - - 5 �5 I I I \I T 2� N 5,850 s I I I,850s� 5 5 L--- 55 41 55 Fable Hill 4th Addition T) -Drainage & Utility Easement -Setback Line Lot Dimension Lot Number - Lot Area -Front Loaded Garage - - Driveway I� 0' 60' 120' 180' 0010423PPP01.dwg Date: 06/26/17 Sheet•. 3 of 9 Preliminary Plat STREET Typical SF Lot Detail (No Scale) 74 51-� �5 N \ \ Drainage & Utility Easement Setback Line 0 N 0 1 N R - Lot Dimension 8,880 sf 7.5 Lot Number IF -Lot Area L N Ln N 74 STREET Fable Hill 4th Addition T) -Drainage & Utility Easement -Setback Line Lot Dimension Lot Number - Lot Area -Front Loaded Garage - - Driveway I� 0' 60' 120' 180' 0010423PPP01.dwg Date: 06/26/17 Sheet•. 3 of 9 Preliminary Plat o 2017 Westwood Professional Services, Inc. 980 — 66.30 DENOTES SOIL BORING DENOTES SILT FENCE DENOTES HEAVY DUTY SILT FENCE DENOTES EXISTING CONTOURS DENOTES PROPOSED CONTOURS DENOTES PROPOSED SPOT ELEVATION DENOTES BIO—ROLL EROSION CHECKS Westwood Phone (952) 937-5150 7699 Anagram Drive Fax (952) 937-5822 Eden Prairie, MN 55344 Toll Free (888) 937-5150 westwoocips.com Westwood Professional Services, Inc. ❑—�� DENOTES EXISTING STORM SEWER ■--i►►� DENOTES PROPOSED STORM SEWER DENOTES EXISTING TREE LINE DENOTES APPROXIMATE TREE REMOVAL LIMITS x 856.3 DENOTES EXISTING SPOT ELEVATION DENOTES EMERGENCY OVERFLOW E.O.F. ELEVATION I hereby certify that this plan was prepared by me or under my I Revisions: direct supervision and that I am a duly licensed PROFESSIONAL ENGINEER under the laws of the State of Minnesota. John Bender, PE Date 07/05/17 License No. 43358 EROSION CONTROL NOTES: ALL SILT FENCE AND OTHER EROSION CONTROL FEATURES SHALL BE IN—PLACE PRIOR TO ANY EXCAVATION/CONSTRUCTION AND SHALL BE MAINTAINED UNTIL VIABLE TURF OR GROUND COVER HAS BEEN ESTABLISHED. EXISTING SILT FENCE ON—SITE SHALL BE MAINTAINED AND OR REMOVED AND SHALL BE CONSIDERED INCIDENTAL TO THE GRADING CONTRACT. IT IS OF EXTREME IMPORTANCE TO BE AWARE OF CURRENT FIELD CONDITIONS WITH RESPECT TO EROSION CONTROL. TEMPORARY PONDING, DIKES, HAY BALES, ETC., REQUIRED BY THE CITY SHALL BE INCIDENTAL TO THE GRADING CONTRACT. ALL STREETS DISTURBED DURING WORKING HOURS MUST BE CLEANED AT THE END OF EACH WORKING DAY. A ROCK ENTRANCE TO THE SITE MUST BE PROVIDED ACCORDING TO DETAILS TO REDUCE TRACKING OF DIRT ONTO PUBLIC STREETS. Checked: DCH, KIT Drawn DJW, SRS Record Drawing by/date: Prepared for: GENERAL GRADING & DRAINAGE NOTES: ALL CONTOURS AND SPOT ELEVATIONS ARE SHOWN TO FINISHED SURFACE/GUTTER GRADES UNLESS OTHERWISE NOTED. REFER TO THE SITE PLAN/RECORD PLAT FOR MOST CURRENT HORIZONTAL SITE DIMENSIONS AND LAYOUT. THE CONTRACTOR SHALL VERIFY THE LOCATION AND ELEVATION OF EXISTING UTILITIES AND TOPOGRAPHICAL FEATURES WITH THE OWNERS AND FIELD—VERIFY PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM PLAN. ALL CONSTRUCTION SHALL CONFORM TO LOCAL RULES. POSITIVE DRAINAGE FROM THE SITE MUST BE PROVIDED AT ALL TIMES. Elmcrest Investments, LLC 3500 Willow Lake Road Vadnais Heights, Minnesota 55110 I I CN '00 Side -Load Villa Lot (No Scale) Call 48 Hours before digging: GOPHER STATE ONE CALL Twin City Area 651-454-0002 Mn. Toll Free 1-800-252-1166 DRAINAGE & UTILITY EASEMENT SETBACK LINE FINISHED GRADE ELEVATION LOT NUMBER MINIMUM BASEMENT FLOOR ELEVATION - FRONT GARAGE SLAB ELEVATION SIDE LOADED GARAGE DRIVEWAY STREET Front -Load Villa Lot (No Scale) STREET Typical SF Lot (No Scale) — DRIVEWAY LO = GRADED FOR 5.0' DIFFERENCE FROM FINISH GROUND ELEVATION AT REAR OF PAD TO FRONT GARAGE SLAB ELEVATION. WO = GRADED FOR 8.0' DIFFERENCE FROM FINISH GROUND ELEVATION AT REAR OF PAD TO FRONT GARAGE SLAB ELEVATION. WO = WALKOUT LO = LOOKOUT R = RAMLER SOG = SLAB ON GRADE (1) = DENOTES ADDITIONAL STEPS IN GARAGE Fable Hill 4th Addition DRAINAGE & UTILITY EASEMENT SETBACK LINE NISHED GRADE ELEVATION T DIMENSION ,T NUMBER NIMUM BASEMENT OOR ELEVATION =RONT GARAGE SLAB ELEVATION FRONT LOADED GARAGE ZIVEWAY DRAINAGE & UTILITY EASEMENT SETBACK LINE LOT DIMESNION LOT NUMBER MINIMUM BASEMENT FLOOR ELEVATION FRONT GARAGE SLAB ELEVATION TES GARAGE LOCATION 0' 60' 120' 180' 0010423GDP01.dwg Date: 06/26/17 sheet: 5 OF 9 Grading, Drainage, and Erosion Control Plan o2017 Westwood Professional Services, Inc. 8" PVC PLUG 8" DIP PLUG STUB -18- \ IE=924.87 MH-17�`' RE = 937.79 IE (N) = 924.79 / - - - - IE (S) = 924.69 / r----------- D=13_1 2 I I I I I I I _J 1 MH -10 \\ / \\ 3 RE = 947.70 IE (N) = 923.46 \ \ SIE (SW) = 923.46 � D=24.2 i I 4 I � I I I I I I MH -14 RE = 945.15 IE(W)=925.44 IE (E) = 925.34 °, DIP M D=19.8 8" DIP PLUG j STUB -15 IE=925.52 F_ MH -20 8" PVC PLUG RE = 946.75 \ IE (N) = 928.40 \ IE (SE) = 928.30 D=18.4, STUB -19 �IE(NW)=928.26 \ r 2 � i I REMOVE PLUG & I CONNECT TO EX. FVC SANITARY SEWER Westwood Phone (952) 937-5150 7699 Anagram Drive Fax (952) 937-5822 Eden Prairie, MN 55344 Toll Free (888) 937-5150 westwoocips.com Westwood Professional Services, Inc. -------------------7/ I I � I �-----7 � F----------- -------- I------------ MH -16 \ / ��� \ / / / I I I 4 ice/ / RE = 942.66 \ 2 I IE (N) = 924.16\> I I IE (S) = 924.06 i JI -7 D=18.6 i � 3 iZ/l I 8 I I 7 9 �\ 6 4 Ii 1 I MH -6 / / / / I I MH -5 - - _jL _ i _ I JI RE = 940.39 / I I I RE = 940.03/ RE =9 944.83 I (W) = 920.98 / /l /l I I IE (W) = 92Q4/9 10 \IE (W) = 923.74 I AE (E) = 920.88 / / I I IE (SE) = 9 .39 / / ►► lE, (SE) = 922.87 // D-19.5 / / _ J _ - _ �I I I D=19.6 / / / \\ EXISTING STORMWATER POND � \ M H' 7 J / / / RE = \ D=�'2 0 � / RE = 939.04 \ /'- RE =8.92 �', -� / // IE (NW) = 920.02 --- \��/ IIEE (E) - 921.44 �/ - -_►�� \�� � / //// IE (SE) - 919.9 - D=17.5 21 RE = 944.07 _1/ / / D=19.1 \ '(IH -11 I I II �� i =� ----- ��• \ /// 11 \ �\ � IE (SW) = 923.961 I % 22 -- . -- ° A IE (NE) = 923.861 I / ���\ �Q - 00 ` D=20.2 3 I I 4 / / - X \ _ I 1 I I \ 23 � � � I I 10 R = 94 I I / i�, I I I I / // / /\ �\ \ J S= 924.42- 1 I / 5 I I 12 X gE( ) - J I I R� 940.15 1 ` \ I I 9 I / / / \ �' MH -3 NE = 924.32 1 - � � I / =19.9 2 I J / IE (NW)I 1922.07 \\ 7 1 1 I I I I // // \ RE = 938.07 I J �H-13 1� L� -IE E 1 921.97 I I 8 I I I / / / / IE (NW) 919.55 J E = 948.49 1 �� )I I D=18.2 \ \ I I I I I I \ IE (SE) = 919.45_ - - - - W= 924.86 J J I \\ I I I I I I // i �� \ D=18.6 ---924-7 -----� L23.7, REMOVE PL 1 \ \ I I I I I I / / // \ �' - MH -2 13 `�' I \ I & CONNECT TO I 6 \\ \ I I I I I I / / 111112 // RE = 936.82 MH- 1 II EX. 8" DIP I \ I L - - - I I I / / / / / / IE (NW) = 918.97 J RE = 94 61 WATER MAIN I \\ \\ ) I I / // //// // // �i ,\ \ IE (S) = 918.$7- \ IE (S) = 128. D=180���'�/14 D=20.0 --� �� �/ / // �_ Tom,/ 13 EXISTING 8' PVC SDR / 14 , �'� \ ' ; �' 15 \ EXISTING 18" RCP / 26 STUB @ 0.40 I \ �' , \ �' STUB @ 2.03 \ / STUB IE = 928.26 REMOVE PLUG\ & � STUB -1 \ STUB IE = 926.59 \ / EXISTING 8" DIP / \ _ 15 CONNECT TO EX. 8" \ IE(N)=91 4 PVC SANITARY SEWER \ EXISTING SANITARYAH \ \ �� �3 _ _ _ - - - \ �EXISTING 18" F S RE = 935.4\\� _---- -�1 i \ ��� oo IE = 921.05 IE SW = 935.40/ &JMOT A � r - REMOVE PLUG \ ��O IE SE = 9117 17 I 16 & CONNECT TO I _ EX. 8 DIP WATER MAIN I \ U EXISTING 21" RCP / / ` - - J �� EXISTING 8" PVC SDR z STUB @ 0.14% \ �' 26 STUB @ 0.40% Q STUB IE = 936.82 �/ \ / STUB IE = 918.44 ' CL "Po - 00 ODK I hereby certifythat this plan was prepared by me or under my I Revisions. I KIT I Prepared for o • direct supervision and that I am a dulylicensed PROFESSIONAL ENGINEER under the laws of the State of Minnesota Checked. DCH. K rr Drawn DJW, SRS Record Drawing by/date: John Bender, PE Date: 07/05/17 License No. 43358 EXISTING SANITARY MH RE = 953.78 IE = 917.91 Elmcrest Investments, LLC 3500 Willow Lake Road Vadnais Heights, Minnesota 55110 Call 48 Hours before digging: GOPHER STATE ONE CALL Twin City Area 651-454-0002 Mn. Toll Free 1-800-252-1166 General Utility Nota THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO CONSTRUCTION AND NOTIFY THE OWNER OF ANY DIFFERENCES. UNLESS OTHERWISE NOTED, ALL MATERIALS, CONST. TECHNIQUES AND TESTING SHALL CONFORM TO THE CITY OF CHASKA ENGINEERING GUIDELINES & THE 1999 ED. OF THE "STANDARD UTILITIES SPECIFICATIONS FOR WATER MAIN AND SERVICE LINE INSTALLATION AND SANITARY SEWER AND STORM SEWER INSTALLATION BY THE CITY ENGINEERING ASSOCIATION OF MINN." AND TO THE "STANDARD SPECIFICATION FOR HIGHWAY CONSTRUCTION" MINN. DEPT. OF TRANS., AUGUST 31, 2005 INCLUDING THE CURRENT ADDENDUM. THE CONTRACTOR SHALL BE REQUIRED TO FOLLOW ALL PROCEDURES AS OUTLINED BY THE LOCAL AGENCY. THE CONTRACTOR SHALL RECEIVE THE NECESSARY PERMITS FOR ALL WORK OUTSIDE OF THE PROPERTY LIMITS. VERIFY EXISTING INVERT LOC. & ELEV. PRIOR TO BEGINNING CONSTRUCTION. THE WATER SERVICE SHALL BE INSTALLED WITH A MIN. OF 7.5 FT. OF COVER. THE CONTRACTOR SHALL VERIFY THE CITY AS -BUILT CONSTRUCTION PLANS TO CHECK LOCATION AND MATERIAL TYPE. THE CONTRACTOR SHALL CONTACT "GOPHER STATE ONE CALL" FOR FOR UTILITY LOCATIONS PRIOR TO UTILITY INSTALLATION. MAINTAIN MINIMUM 18" VERTICAL SEPARATION BETWEEN WATER MAIN & SANITARY SEWER. Legend EXISTING SANITARY SEWER WATER HYD. W/VALVE STORM SEWER Fable Hill 4th Addition �� PROPOSED SANITARY SEWER WATER HYD. W/VALVE STORM SEWER 0' 60' 120' 180' 0010423UTP01.dwg Date: 06/26/17 sheet•. 6 of 9 Preliminary utility o2017 Westwood Professional Services, Inc. Preliminary Plant Schedule Single Family Landscape Requirements SYMBOL QTY. OVERSTORY TREES 74 COMMON/BOTANICAL NAME SIZE SPACING O.C. MATURE SIZE Autumn Blaze Maple / Acer x freemanii 'Jeffersred' 2.5" BB AS SHOWN H 50'-60' W 40' Sienna Glen Maple / Acer x freemanii 'Sienna' 2.5" BB AS SHOWN H 50'-60' W 40' Red Sunset Maple / Acer rubrum 'Franksred' 2.5" BB AS SHOWN BB H 45' W 35' Fall Fiesta Maple / Acer saccharum 'Bailsto' 2.5" BB AS SHOWN H 50'-75' W 50' Autumn Gold Ginkgo / Ginkgo biloba 'Autumn Gold' 2.5" BB AS SHOWN W H 50' W 30' Northern Pin Oak / Quercus ellipsoidalis 2.5" BB AS SHOWN H 50'-60' W 45' Red Oak / Quercus rubra 2.5" BB AS SHOWN H 60'-80' W 40'-50' Swamp White Oak / Quercus bicolor 2.5" BB AS SHOWN H 50'-60' TREES W 40'-50' Frontyard Linden / Tilia americana 'Frontyard' 2.5" BB AS SHOWN H 60'-70' W 30'-40' Boulevard Linden / Tilia americana 'Boulevard' 2.5" BB AS SHOWN H 50'-60' W 25-30' Discovery Elm / Ulmus davidiona var. japonica 'Discovery' 2.5" BB AS SHOWN H 35-45' W 35-45' Princeton Elm / Ulmus americana 'Princeton' 2.5" BB AS SHOWN H 60' W 40' Accolade Elm / Ulmus japonica x wilsoniona 'Morton' 2.5" BB AS SHOWN H 70' W 40'-50' Skyline Honeylocust / Gleditsia tricanthos var. inermis 'Skycole' 2.5" BB AS SHOWN H 50' W 30'-35' NOTE: QUANTITIES ON PLAN SUPERSEDE LIST QUANTITIES SEE FINAL PLANS FOR TREE SELECTIONS AND QUANTITIES. IN THE EVENT OF A DISCREPANCY. Westwood I hereby certify that this plan was prepared me or under my Reviston&- direct supervision and that I am a duly licensed PROFESSIONAL LANDSCAPE ARCHITECT under the laws of the State of Minnesota Phone (952) 937-5150 7699 Anagram Drive Fax (952) 937-5822 Eden Prairie, MN 55344 Toll Free (888) 937-5150 westwoocips.com Kevin Teppen Westwood Professional Services, Inc. Daft 07/05/17 License No. 26980 SINGLE FAMILY RESIDENTIAL REQUIREMENTS: 74 TREES * 2 OVERSTORY TREES PER SINGLE FAMILY LOT (37 PROPOSED SINGLE FAMILY LOTS) Single Family Landscape Provisions TOTAL SINGLE FAMILY LANDSCAPING PROVIDED: 74 TREES * OVERSTORY DECIDUOUS TREES: 74 TREES NOTE: OVERTSORY TREES SHOWN ON PLAN ARE FOR ILLUSTRATIVE PURPOSES ONLY, SUBJECT TO FIELD AND SITE CONDITIONS, AND SHALL BE PLANTED IN A LOCATION THAT DOES NOT INTERFERE WITH CURBSTOPS, INDIVIDUAL SEWER & WATER CONNECTION OR DRIVEWAY LOCATIONS. Planting Notes 1. CONTRACTOR SHALL CONTACT COMMON GROUND ALLIANCE AT 811 OR CALL811.COM TO VERIFY LOCATIONS OF ALL UNDERGROUND UTILITIES PRIOR TO INSTALLATION OF ANY PLANTS OR LANDSCAPE MATERIAL. 2. ACTUAL LOCATION OF PLANT MATERIAL IS SUBJECT TO FIELD AND SITE CONDITIONS. 3. NO PLANTING WILL BE INSTALLED UNTIL ALL GRADING AND CONSTRUCTION HAS BEEN COMPLETED IN THE IMMEDIATE AREA. 4. ALL SUBSTITUTIONS MUST BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO SUBMISSION OF ANY BID AND/OR QUOTE BY THE LANDSCAPE CONTRACTOR. 5. CONTRACTOR SHALL PROVIDE ONE YEAR GUARANTEE OF ALL PLANT MATERIALS. THE GUARANTEE BEGINS ON THE DATE OF THE LANDSCAPE ARCHITECT'S OR OWNER'S WRITTEN ACCEPTANCE OF THE INITIAL PLANTING. REPLACEMENT PLANT MATERIAL SHALL HAVE A ONE YEAR GUARANTEE COMMENCING UPON PLANTING. 6. ALL PLANTS TO BE SPECIMEN GRADE, MINNESOTA -GROWN AND/OR HARDY. SPECIMEN GRADE SHALL ADHERE TO, BUT IS NOT LIMITED BY, THE FOLLOWING STANDARDS: ALL PLANTS SHALL BE FREE FROM DISEASE, PESTS, WOUNDS, SCARS, ETC. ALL PLANTS SHALL BE FREE FROM NOTICEABLE GAPS, HOLES, OR DEFORMITIES. ALL PLANTS SHALL BE FREE FROM BROKEN OR DEAD BRANCHES. ALL PLANTS SHALL HAVE HEAVY, HEALTHY BRANCHING AND LEAFING. CONIFEROUS TREES SHALL HAVE AN ESTABLISHED MAIN LEADER AND A HEIGHT TO WIDTH RATIO OF NO LESS THAN 5:3. 7. PLANTS TO MEET AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1-2014 OR MOST CURRENT VERSION) REQUIREMENTS FOR SIZE AND TYPE SPECIFIED. 8. PLANTS TO BE INSTALLED AS PER MNLA & ANSI STANDARD PLANTING PRACTICES. 9. PLANTS SHALL BE IMMEDIATELY PLANTED UPON ARRIVAL AT SITE. PROPERLY HEEL -IN MATERIALS IF NECESSARY; TEMPORARY ONLY. 10. PRIOR TO PLANTING, FIELD VERIFY THAT THE ROOT COLLAR/ROOT FLAIR IS LOCATED AT THE TOP OF THE BALLED & BURLAP TREE. IF THIS IS NOT THE CASE, SOIL SHALL BE REMOVED DOWN TO THE ROOT COLLAR/ROOT FLAIR. WHEN THE BALLED & BURLAP TREE IS PLANTED, THE ROOT COLLAR/ROOT FLAIR SHALL BE EVEN OR SLIGHTLY ABOVE FINISHED GRADE. 11. REMOVE POT ON POTTED PLANTS; SPLIT AND BREAK APART PEAT POTS. 12. PRUNE PLANTS AS NECESSARY - PER STANDARD NURSERY PRACTICE AND TO CORRECT POOR BRANCHING OF EXISTING AND PROPOSED TREES. 13. WRAP ALL SMOOTH -BARKED TREES - FASTEN TOP AND BOTTOM. REMOVE BY APRIL 1ST. 14. STAKING OF TREES OPTIONAL; REPOSITION, PLUMB AND STAKE IF NOT PLUMB AFTER ONE YEAR. 15. THE NEED FOR SOIL AMENDMENTS SHALL BE DETERMINED UPON SITE SOIL CONDITIONS PRIOR TO PLANTING. LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT FOR THE NEED OF ANY SOIL AMENDMENTS. 16. BACKFILL SOIL AND TOPSOIL TO ADHERE TO MN/DOT STANDARD SPECIFICATION 3877 (COMMON TOPSOIL BORROW) AND TO BE EXISTING TOP SOIL FROM SITE FREE OF ROOTS, ROCKS LARGER THAN ONE INCH, SUBSOIL DEBRIS, AND LARGE WEEDS UNLESS SPECIFIED OTHERWISE. MINIMUM 4" DEPTH TOPSOIL FOR ALL LAWN GRASS AREAS AND 12" DEPTH TOPSOIL FOR TREE, SHRUBS, AND PERENNIALS. 17. THREE INCHES OF SHREDDED HARDWOOD BARK MULCH SHALL BE USED AROUND ALL TREES WITHIN TURF AREAS. 18. INDIVIDUAL TREE BEDS TO BE SPADED EDGE, UNLESS NOTED OTHERWISE. 19. ALL DISTURBED AREAS TO BE SODDED OR SEEDED, UNLESS OTHERWISE NOTED. SOD TO BE STANDARD MINNESOTA GROWN AND HARDY BLUEGRASS MIX, FREE OF LAWN WEEDS. ALL TOPSOIL AREAS TO BE RAKED TO REMOVE DEBRIS AND ENSURE DRAINAGE. 20. PROVIDE IRRIGATION TO ALL PLANTED AREAS ON SITE. IRRIGATION SYSTEM TO BE DESIGN/BUILD BY LANDSCAPE CONTRACTOR. LANDSCAPE CONTRACTOR TO PROVIDE SHOP DRAWINGS TO LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION OF IRRIGATION SYSTEM. CONTRACTOR TO PROVIDE OPERATION MANUALS, AS -BUILT PLANS, AND NORMAL PROGRAMMING. SYSTEM SHALL BE WINTERIZED AND HAVE SPRING STARTUP DURING FIRST YEAR OF OPERATION. SYSTEM SHALL HAVE ONE-YEAR WARRANTY ON ALL PARTS AND LABOR. ALL INFORMATION ABOUT INSTALLATION AND SCHEDULING CAN BE OBTAINED FROM THE GENERAL CONTRACTOR. 21. CONTRACTOR SHALL PROVIDE NECESSARY WATERING OF PLANT MATERIALS UNTIL THE PLANT IS FULLY ESTABLISHED OR IRRIGATION SYSTEM IS OPERATIONAL. OWNER WILL NOT PROVIDE WATER FOR CONTRACTOR. 22. REPAIR, REPLACE, OR PROVIDE SOD/SEED AS REQUIRED FOR ANY ROADWAY BOULEVARD AREAS ADJACENT TO THE SITE DISTURBED DURING CONSTRUCTION. 23. REPAIR ALL DAMAGE TO PROPERTY FROM PLANTING OPERATIONS AT NO COST TO OWNER. Planting Detail PRUNE OUT MISDIRECTED BRANCHES. PROVIDE ONE CENTRAL LEADER. GUYING AND STAKING, (OPTIONAL), FOR ONE (1) YEAR ON ALL 4 DECIDUOUS AND CONIFEROUS TREES: TOP STAKES 5' ABOVE GROUND (MAX.) OR TO FIRST BRANCH. o e BOTTOM OF STAKE 3' (MIN.) �$ BELOW GROUND. STAKING POSTS TO BE 2"X2" STAINED WOOD OR PAINTED STEEL DELINEATOR or omoQ ° ° POSTS. PLACE 3 POSTS siP�°g� coca EQUIDISTANT AROUND AND OUTSIDE ROOT BALL. SECURE TREE TO POSTS WITH 16" LONG POLYPROPYLENE OR POLYETHYLENE, 40 MIL., 1.5" WIDE STRAP. a TREE WRAP MATERIAL FROM GROUNDLINE UPWARD TO FIRST BRANCHES, AS REQUIRED. PLACE MULCH, DEPTH AS SPECIFIED, 2X BALL L OVER PLANT PITS - DO NOT PILE [DIAMETERJX AGAINST TRUNK. FORM 3" DEEP WATERING BASIN. BACKFILL PLANT PIT WITH SPECIFIED BACKFILL SOIL. SCARIFY SIDES AND BOTTOM OF HOLE. III III- REFER TO AMERICAN STANDARD FOR I=III=� SII=III NURSERY STOCK FOR MINIMUM BALL SIZE. ROOT FLARE TO BE PLANTED AT OR NEAR FINISHED GROUNDLINE. SET ROOT BALL ON UNDISTURBED SUBSOIL OR COMPACTED SOIL MOUND MATCHING TREES NATURAL GROUNDLINE WITH FINISHED SITE GRADE. N.T.S. LAST REVISED: Vkwltwood DECIDUOUS TREE 06/05/13 PLANTING LA28 El NOT FOR CONSTRUCTION N,U Prepared for: Checked- Kff Elmcrest Investments, LLC Drawn: NTM Rerora ��� 3500 Willow Lake Road Vadnais Heights, Minnesota 55110 Fable Hill 4th Addition L !I 0' 60' 120' 180' Call 48 Hours before digging: GOPHER STATE ONE CALL Twin City Area 651-454-0002 Mn. Toll Free 1-800-252-1166 0010423PLP01.dwg Date: 06/26/17 sheet. 8 of 9 Preliminary Landscape Plan 2017 Westwood Professional Services, Inc. o n A n Cl for A n r 3GRADE ELEV. )TEXTILE FILTER AGGREGATE IDOT 3149.2H) PERF. PVC PIPE SDR 35 �JTEXTILE FABRIC—TYPE II (MnDOT 3733) PERFORATED UNDER DRAIN DETAIL INSTALL AT LOW POINT AS DIRECTED BY THE ENGINEER NOTE• DRAINTILE INSTALLED 50' IN EACH DIRECTION FROM CATCH BASIN R/W PERFORATED DRAIN TILE 1/-/- SD -12 22' (STA. 15+87 TO 29+32) TRANSITION 22'-25 (STA. 29+32 TO 31+31) 25(STA. 30+30 TO 30+67) 7' (STA. 15+87 TO 29+32) TRANSITION 7'-10' (STA. 29+32 TO 31+31) 10' (STA. 30+30 TO 30+67) 15' DWY VARIES 8% MAX. TURF VARIES 15% MAX. 'a 6" TOPSOIL AND SEED R/W 10' IIII I 60,�O � O,RFC Mn/DOT B 618 00 FOey Na q& Y_ 4�. 00000rr�)))o�'O�%�oo 'Q��tko. 8" 18" 1/2" r IIIII III �p.;,.�o 3" r ,b1 2" WASHED COARSE AGGREGATE e --SLOP E 314'/FT. < 6"MIN.DEPTH NOTES: 1. CRUSHED CONCRETE NOT ALLOWED. 2. LENGTH AND WIDTH SUBJECT TO CHANGE BY ENGINEER 3. FABRIC REQUIRED UNDER ROCK FOR DRIVEWAYS LARGER THAN 24 FEET, HEAVY TRAFFIC, OR AS DIRECTED BY THE ENGINEER. 28" r FACE OF CURB t8" PLATE NO. HU -EC -1 1/2"� TOP OF BITUMINUS MAT `v REVISION MODIFIED'S' DESIGN 28 DATE HUGO ROCK CONSTRUCTION 3" r 3 " 112" r ENTRANCE Mn/DOT B 612 50' CL ROAD 28' (STA. 15+87 TO 29+32) TRANSITION 28'-25' (STA. 29+32 TO 31+31) 25' (STA. 30+30 TO 30+67) 13' (STA. 15+87 TO 29+32) TRANSITION 13'-10' (STA. 29+32 TO 31+31) 15' I 10' (STA. 30+30 TO 30+67) R/W 6" Distance to CL Variable 1/2" r e• 3" r " � 3 Q SLOPE 314"IFT. Mn/DOT B 618 e— 8" 18" 1/2" r g" Distance to CL Variable 3" r ,b1 3 1/2" r e --SLOP E 314'/FT. < Mn/DOT B 624 8" 24" 28" r FACE OF CURB t8" 12"r� 68" r 1/2"� TOP OF BITUMINUS MAT `v o :BASE MODIFIED'S' DESIGN 28 g'• 1/2Distance to C �(ariable " r 3" r 3 " 112" r LOPE 3/4"IT f— Mn/DOT B 612 M a 8" 12" NOTES: 1. MINIMUM OF 3" CLASS 5 AGGREGATE BASE UNDER ALL CURB AND GUTTER PLATE NO.HU-STR-2B REVISCONCRETE DATE ION 10/05/06 HUGO CURB & GUTTER R/W 7' A) Installation WIRE FENCING POST .� SET POSTS AND STAPLE THE WIRE EXCAVATE A MESH FENCING TO 6"X 67RENCH EACH POST TRENCH UPSLOPE ALONG THE 6"X 6" \ LINE OF THE POSTS 1111=1111�NIII= \Y �1=1�I�IIIs 11111=1111=41m_ 1=11111=1111 11111-11111=11_111 Mlle -111 1111=-111IIIII_IIIII 11111-111111 III= -- 1111 11 FILTER FABRICt-3TTACH THE FILTER 4 BACKFILL THE TRENCH ABRIC TO THE AND COMPACT THE IRE FENCING AND EXCAVATED SOIL HE TRENCH COMPACTED BACKFILL 11111=111111111=11111-1111111 IIIII111 111 11111 BOTTOM OF DRAINAGE WAY uB A–' A ELEVATION: POINTS "A" SHOULD BE HIGHER THAN POINT 'B' B) Maintenance 1. FILTER BARRIERS SHALL BE INSPECTED IMMEDIATELY 3. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER AFTER EACH RAINFALL AND AT LEAST DAILY DURING EACH STORM EVENT. THEY MUST BE REMOVED WHEN PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL DEPOSITS REACH APPROXIMATELY 1/3 THE HEIGHT OF BE MADE IMMEDIATELY. THE BARRIER. 2. SHOULD THE FABRIC DECOMPOSE OR BECOME 4. ANY SEDIMENT DEPOSITS REMAINING PLACE AFTER INEFFECTIVE PRIOR TO THE END OF THE EXPECTED THE SILT FENCE OR FILTER BARRIER IS NO LONGER USEABLE LIFE AND THE BARRIER STILL BE NECESSARY, REQUIRED SHALL BE DRESSED TO CONFORM WITH THE THE FABRIC SHALL BE REPLACED PROMPTLY. EXISTING GRADE, PREPARED AND SEEDED. 5. WETLANDS ARE TO BE PROTECTED BY TWO ROWS OF H.D. SILT FENCE. DOUBLE H.D. SILT FENCE IS REQUIRED AROUND WATER BODIES, STEEP SLOPES, AND HIGHLY ERODIBLE SOILS. 22' PLATE NO. HU -EC -2— PLACEMENT AND REVISION DATE HUGO CONSTRUCTION OF A SILT FENCE 15' 50' CL ROAD 15' 28' Material: 1. The Road Drain -Curb & Gutter model consists of a reusable, open topped receptacle that sets inside the Strom sewer grate. An incorporation rear deflector plate is connected to the receptacle directing the water into the basin for filtration. 2. The Road Drain -Curb & Gutter model has a replaceable filter cartridge. 3. The Filter media shall meet all local specifications for inlet protection. Maintenance: 1. Check Filter media after each rain event. Clean or replace if sediment clogs filter. 2. Remove sediment and debris from the receptacle after each rain event ZkRy Y PLATE NO. HU -EC -4 HUGO WIMCO Curb &Gutter REVISION DATE Inlet Protection (Model CG23) 13' - 4' 8' 4' 8' BIT TRAIL DWY VARIES 8% MAX. BIT TRAIL TURF VARIES 15% MAX. DWY VARIES 8% MAX. 2.0% SLOE (WITH TRAIL) ("THOUT TRAIL) TURF VARIES 15% MAX. 2.0% SLO E 2% SLOPE 2% SLOPE 2% SLOPE 2% SLOPE a 6" TOPSOIL AND SEED BIT. TRAIL (STATION 15+87 TO 26+48) NO TRAIL (26+48 TO 30+67) FABLE ROAD NORTH TYPICAL STREET SECTION 25' 15' 50' CL ROAD 15' 25' 10' DWY VARIES 8% MAX. DWY VARIES 8% MAX. TURF VARIES 15% MAX. TURF VARIES 15% MAX. (WITHOUT TRAIL) R/W Westwood Phone (952) 937-5150 7699 Anagram Drive Fax (952) 937-5822 Eden Prairie, MN 55344 Toll Free (888) 937-5150 westwoodps.com Westwood Professional Services, Inc. STREET 2 TYPICAL STREET SECTION I hereby certify that this plan was prepared by me or under myI Revisions: direct supervision and that I am a duly licensed PROFESSIONAL ENGINEER under the laws of the State of Minnesota John Bender, PE Date 07/05/17 License No. 43358 STREET 1 TYPICAL STREET SECTION - 1 1/2" BIT. WEARING COURSE MNDOT SPEC 2360, TYPE SP 9.5 WEAR COURSE (3.B)(SPNWEA340B) TACK COAT, MnDOT 2357 2 1/2" BITUMINOUS BASE COURSE MNDOT SPEC. 2360, SP12.5 NON WEAR COURSE (3.B)(SPNWB330B) 12" CLASS 5 AGGREGATE BASE (100% CRUSHED) 24" MNDOT 2211 CLASS AGGREGATE SUB—BASE (100% CRUSHED) GEOTEXTILE FABRIC, FOR CLAY SUBSOILS — MIRAFI 50OX TYPICAL PAVEMENT NO SCALE lar Checked:" DCH, iar Drawn: DJW, SRS Record Drawing by/date: Prepared for: R/W /2" BIT. WEARING COURSE )OT SPEC 2360, TYPE SP WEAR COURSE (3.B)(SPNWEA340B) CLASS 5 AGGREGATE BASE J% CRUSHED) ��tvIPACTED SUBGRADE BITUMINOUS TRAIL NO SCALE Elmcrest Investments, LLC 3500 Willow Lake Road Vadnais Heights, Minnesota 55110 Fable Hill 4th Addition Call 48 Hours before digging: GOPHER STATE ONE CALL Twin City Area 651-454-0002 Mn. Toll Free 1-800-252-1166 0010423DTP02.dwg Date: 06/26/17 Sheet: 9 OF 9 Details The Conifer On -Grade • 2 Bedroom • 2 Bath BR2 Screen House -1793 sq.ft. I MasterB�droom Porch Mechanical - 47 sq -ft. Garage - 690 sq.ft.._—�� r , ° 1 Great Room CMas)r Bath oast I ,- 0 Bath - H O M L S- i.ots s or a or oiocrr r in i ne v►iras or raoie r w Master ' Closet Mechanical Room Three Car Garage {- t - I_ r'zc ry li Mud Room — — . -1 Dining Area Kitchen I ! Office rn minht PRATTHOMFR 9017 - Plana ruihiant to rhanna wbnirn nMra . rroitart Saha Ranroaantativa fnr n amnt infnrmalinn I I ITS FRANK[ Total tal 1, 595 Sq. F • 2 Bedroom •2Bath M.A' Builder LiC['ntie s� One Level 1595 Sq. Ft Copyright PRAT HOMES 2017 - Plans subject to change without notice - Contact Sales Representative for current information The FRANKLIN Tota/ 2,198 Sq. Ft. • 2 Bedroom • 3 Bath P MN &rffdcr Lkeme #z Main Level 1586 Sq. Ft. Upper Level 612 Sq. Ft. Copyright PRAT HOMES 2017 - Plans subject to change without nofice - Contact Sales Representative for current information The KRISTIN, Total 2,968 Sq. Ft. • 3 Bedroom • 3 Bath Three Car Garage a h}' First Floor 1605 Sq. Ft. Master Closet Master Bath 73 W Q Master Bedroom P Screen Porch `Laundry py t Bath Mud Room Kitchen G. L IDining Area Frons Foyer i Porth L GrealIRQovk Den/ Office F" 4 ARTIST RENDERING RENDERING ONLY, MAY INCLUDE OPTIONS NOT INCLUDED IN BASE PRICE Lower Le Copvriuht PRATTHOMES 2017 - Plans subied to change without notice - Contact Sales Representative for current information The 0AKW001 Total Z560 Sq. Ft. (2776 with Optional Garr • 3 Bedroom •3Bath GARAGE I 11 - _ _ _ _ _ - _ - - - _ _ _ -- Main Main Level 1446 Sq. Ft. STALK NPD MASTER MASTER BATH BEDROOM orr7- �I �II aR GRILL J OEGK 1 I I SCREEN PORCH PRATT UN NrrOde r License #r OPT GAME �f11 III FAMILY ROOM UNEXCAVATED ROOM �I �II r. } n� UTILITY — — SUM yyN Iorr weT Bars Lower Level 1114 Sq. Ft. (1330 with Optional Game Room) - - - BEDROOM #2 PRATT I Main Level 1654 Sq. Ft. Lower Level 1110 Sq. Ft. Copyright PRATMOMES 2017 - Plans subject to change without notice - Contact Sales Representative for current infortnation P �f T ,YIN Budde, license 41 The 4 iiDELINE Irv- ! ., :6 -ledroom (Master Up) } yr 7.141 JCI. PC. aecona rloor %4o/ Ja. rt. LDWA MAKE fo to l 3, 375 Sq. Ft. • 4 Bedroom (Main • 3 Bath II 0❑0 ■ -F101 M E ss �I CI ❑ C� III 1111 ;III 11{j First Floor 1787 Sq. Ft. Lower Level 1588 Sq. Ft. I I I I I I I Rear Elevation /`.......:..M DDATTWf)R GQ ')n17 - DI.......k; M In nMennn uriN....d —H..n QaI— fn. --f inin.m ff— L A N D F O R M From 5ite to Finish 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 TO: Planning Commission FROM: Mary Matze through Kendra Lindahl, Landform DATE: August 2, 2017 for the August 10, 2017 Planning Commission Meeting RE: 2040 Comprehensive Plan — Land Use Study Areas 1. Background • ■ Tel: 612-252-9070 Fax: 612-252-9077 www.landform.net As part of the 2040 Comprehensive Plan update, the City has held several meetings with residents, Commissions, and Council to gather feedback and understand community priorities. As a result of the feedback, staff has been meeting with individual property owners and neighborhood groups to understand specific Land Use issues. Staff met with the Planning Commission on June 1, 2017 to provide a summary of findings from the Open House and the Council and Commission Kickoff. The purpose of the August 10th meeting is to: 1. Review and approve the proposed study areas 2. Affirm the recommended direction proposed by staff. On October 12, 2017, the Planning Commission will review a draft of the 2040 Comprehensive Plan and on December 14, 2017 the Planning Commission will hold a public hearing on the final document. 2. Summary Land Use Study Areas and Land Use Issues Since June 1, 2017 staff has identified a preliminary list of land use study areas. These are specific locations that should be reviewed as part of the Land Use Plan update. Several landowners also have requested that the City consider specific changes to the status of their property. Possible changes might include the future land use designations or utility staging. The following is a list of potential land use study areas, which are also identified on the attached Land Use Study Area Map: Landform®, SensiblyGreen° and Site to Finish° are registered service marks of Landform Professional Services, LLC. • Description 2030 Plan Issues Mixed Use Districts: Must be developed as a PUD • Comp Plan does not provide a distinction • Hwy 61 & 170th Includes a combination of retail, between the mixed-use districts. • 170th & Elmcrest office, cultural or entertainment • Transitions: Mixed Use Districts • Downtown (Hwy 61 uses with higher density residential compatible with nearby districts? & Frenchman use. However, these uses can Road) occur without housing and still be Recommendation: Evaluate characteristics of the considered mixed use. three mixed-use district areas and the transitions between the district and neighboring land uses. Provide policy recommendations for each mixed use district. 1651h & Fenway Industrial / Medium Density • Interest from landowners in developing Residential properties.* • Currently in District Q of Sanitary Sewer Plan. Services have not been extended yet. *Staff meeting with landowners in August to understand desired plans Recommendation: Review Land Use designation to see if still appropriate for desired development. Evaluate timing and feasibility of extending services. Elmcrest north of Frenchman Range of Land Uses • Future County Road Washington / Anoka Road County Road Plans to upgrade and connect Otter Lake Road • Future Land uses may be incompatible with Lino Lakes Future land uses. Recommendation: Evaluate if uses are still appropriate and transitions between land uses. Provide policy recommendations to reduce potential conflicts between incompatible land uses. Eastern Hugo Agriculture and Large Lot • No services planned by Met Council residential • Additional study needed to determine if service is possible • Resident feedback supports future study and keeping development options open Recommendation: Staff recommends no change to the land use plan, and that the feasibility study be included as an implementation step Planning Commission - 2040 Land Use August 10, 2017 ■ • • Planning Commission should discuss the following questions: ■ - Should study areas or other issues be added? - Should any of the study areas be deleted? - Are there additional concerns or issues for each area that should be addressed for each area? Next Steps Staff received a handful of additional land use comments from individual property owners. Staff has contacted the property owners and will meet with them over the summer to discuss their concerns. Next Meeting Based on the feedback we've received at the Open Houses and meetings with Commissioners, staff will proceed with preparing a draft of the Comprehensive Plan for review at the October 12, 2017 meeting. 3. Action Items: Approve land use study areas and recommended next steps for implementation in the 2040 Comprehensive Plan update. 04fnrhmnnfc a. Eastern Hugo Open House Feedback dated June 13, 2017 b. Land Use Study Areas: 2040 Update Planning Commission - 2040 Land Use 3 August 10, 2017 fCITY OF Hugo 2040 W-W Comprehensive Plan Update EST. 1908 Participant Responses June 13, 2017 Eastern Hugo Open House The following is a summary of the responses received at the Eastern Hugo Open House Workshop on June13, 2017. Staff estimates that approximately 40 people attended the Workshop. 1. Are there any primary concerns about your property or about development in Eastern Hugo? - Internet service is VERY limited. I've called the City to determine if there are additional options. Last fall (2016) Century Link was installing a fiber service. I've contacted them and nothing is available to our property. —Doug and Diane Anderson, 9815 17011 Street N - The development of "Future Irish Ave Park." We would like to see it stay open public, non -motor space. -Niki Anderson, 14107 Hyde Ave N - No increase in density beyond 10 -acre minimum. -Anonymous - Sewer not needed since that drives density. -Anonymous - I think Cluster Development is useful in certain areas that are already on path to development. To me, cities are best served with diverse offerings. Hugo has development in the West, open space in the East. We shouldn't open the door to density in the east with cluster development. Keep 10 -acre minimum to discourage development. This will do a better job of protecting farmland and resources than planning developments. -Jim Dropps 9783 122nd St N - Would like to keep 10 -acre minimum. -Carol Swiden, 9250 13011 St. N - 1. Internet service is poor. 2. When the county was resurfacing Cty 8, there were plans to expand it because of federal/state $. Then it suddenly changed and it was just milled/overlay. Was this change a knee-jerk response, is it a temporary fix, or?? 3. Allow ATVs in Eastern Hugo. I will help draft the regulations. -John N Bartunek, 13936 Isleton Ave N - I want to divide my land, total 17.65 acres with a lot of lakeshore: 2 separate lots of appox 7.65 and 10 acres. The 10 acre would be a new building site, on a hill sloping to lake shore. I would also like to try and make a combo driveway to eliminate a new access into Co Rd 7 for safety reasons. —Juanita Lovegren, 8355 122nd St N - No Cluster homes — Sue & Ron Bragg, 15649 Jeffrey Ave N June 13, 2017 CITY DF Eastern Hugo Open House As a landowner of a family farm (137 acres) that is surrounded by acre developed lots, my concern is to reclaim the value (development potential) of my property, which in my opinion can only be achieved by reducing minimum lot size from 10 acres to 5 acres. This is my family's legacy and retirement asset. -David Wlaschin, 12140 Illies Ave N - Preservation of the rifle and archery range. Preservation of the woodlands for hunting and natural resources. - If property is bordered on most sides by 5 -acre lots why should the 1/10 acre be maintained? — Cathy Scobie, 7676 120th St & 12140, Illies Ave N - What sets Hugo apart from other cities is that it does not at this time feel over- crowded, packed with people and have "cookie -cutter" filled wall to wall homes. I love the rural feel. We need better internet service. We would not like it if parcels went below 10 acres for rural development. -Gina and Steve Sadowski, 15960 Jeffrey Ave N - Can the definition of Eastern Hugo change? I.e."zoning" of what is considered Eastern Hugo? (map) — Bart Cuthrie, 8991 13011 St. N - My primary concern is to plan for sewer in Eastern Hugo and allow flexible options for future development which does not have primary purpose of protecting natural resources. Sewer connection pipes have been increased since first constructed. -John Waller, 14010 Homestead Ave N - Just would like lots of space for parks & recreation; outdoor activity — Already on the list. - I enjoy our "rural living" on the east side of Hugo, except for the dirt roads. Paving our remaining dirt roads would be my request. -Neil Fagerhaugh, 9511 140 St N - It is a worry about fire department services with no hydrants. Water could be an issue. Does water come with the sewer? - Kathy Brevig, 14120 Hyde Ave N 2. What should Hugo look like in 20 years? 40 years? - 20 -Some development but preserve the small town feel and farm/ hobby farm lifestyle. 40 -small developments with land conservation plans in place, promote small town feel. —Doug and Diane Anderson, 9815 17011 Street N - We would like to have more rec space on our side of town. More paths, or paths in general. There is no save pavement areas to run or bike from our home. (Dump trucks drive 50+ mph down 14011) -Niki Anderson, 14107 Hyde Ave N - 10 -acre home sites. That is why most of us moved out here. -Anonymous - Density in West, the same in the east. Farmland will become more scarce in the future, we should preserve it by discouraging development on it. -Jim Dropps, 9783 122nd St N - It should reflect what the residents of Hugo want in 20 and 40. -Carol Swiden, 9250 13011 St. N - SAME — Richard Verdick, 13561 Homestead Ave CITY OF Eastern Hugo Open House, June 13, 2017. Page 2 i�y�y 1W You cannot stop development for very long. Lot sizes of more than 4-5 acres on good land is adequate for septic systems. — Juanita Lovegren, 8355 122nd St N - Multiple cluster developments based on a density of 2.5-3.5 acre lots. No sewer and water in eastern Hugo. -David Wlaschin, 12140 Illies Ave N - I like how it is now. — David Arcand, BESA 5775 12511 St - Lots of open space with clusters on 2-3 acre lots. No future development on outlots. Preserve natural resources & farmland. There is a large demand for small parcels of farmland for organic farming. — Cathy Scobie, 7676 12011 St & 12140 Illies Ave N - I hope it is still rural, with large lots, beautiful landscape, nice roads. -Gina and Steve Sadowski 15960 Jeffrey Ave N - Hugo is located near metro center and will need to provide land use change to provide for population growth. A possible change may be need to expand rail line connection near south east corner of city to be industrial job centers. Currently over 500 jobs depend on rail service in south west Hugo. -John Waller 14010 Homestead Ave N - Same as now. -Neil Fagerhaugh 9511 140 St N - More restaurants! Get downtown developed. Can rules for development of downtown be relaxed a bit? - Kathy Brevig 14120 Hyde Ave N 3. Based on the information provided in the presentation, should we plan for Sewer Services after 2040 in Eastern Hugo? Please rank the following options, with 1 being the most preferred and 4 being the least preferred option: All Responses" Options Rank Choice Rank Choice Rank Rank Choice 1 * 2 * Choice 3* V Plan for Sewer Services — Keep 10 acres; 2 0 5 14 Consider allowing Flexible Residential Development to preserve options for future development Plan for No Sewer Services — Keep 10 13 6 3 3 acres; Consider allowing Flexible Residential Development to preserve natural resources No change to existing plan — Keep the 13 5 4 3 same classifications and keep options open for the future Combination of Options— Provide services 1 10 7 2 for a portion of Eastern Hugo *Indicates the number of people that ranked the option as 1, 2, 3, or 4 **Not all participants ranked all of the options. Does not include response from attendee indicating that they were not a resident CITY OF Eastern Hugo Open House, June 13, 2017. Page 3 yW ��� - Responses from property owners with more than 40 -Acres Options Rank Choice Rank Choice Rank Rank Choice 11 1* 2 * Choice 3* V Plan for Sewer Services — Keep 10 acres; 2 0 3 0 Consider allowing Flexible Residential Development to preserve options for future development Plan for No Sewer Services — Keep 10 3 1 0 2 acres; Consider allowing Flexible Residential Development to preserve natural resources No change to existing plan — Keep the 2 0 1 2 same classifications and keep options open for the future Combination of Options— Provide services 0 3 1 0 for a portion of Eastern Hugo *Indicates the number of people that ranked the option as 1, 2, 3, or 4 **Does not include response from attendee indicating that they were not a resident 4. Please tell us how big your property is: Property Size* L L ji—a # of ppi Less than 2.5 acres 3 2.5 -10 acres 11 11-40 acres 7 More than 40 acres 8 *Property sizes were verified using Washington County GIS. Eastern Hugo Open House, June 13, 2017. Page 4 im N W H W q CITY OF EST. 1906 Land Use Study Areas: 2040 Update DRAFT Legend Streams/Ditches MUSA Line i 0 0.25 0.5 1 O Miles NORTH L 8/1/2017 Figure XX Agriculture (AG) Large Lot Residential (LL) Very Low Denisty (VLD) Low Density Residential (LD) - Medium Density Residential (MD) - High Density Residential (HD) Business Park (BP) Commercial (COM) - Industrial (IND) Mixed Use (MIX) - Public/Quasi-Public (PQ) ftt* Areas i 0 0.25 0.5 1 O Miles NORTH L 8/1/2017 Figure XX N W F W CITY OF EST. 1906 Land Use Study Areas: 2040 Update DRAFT Legend Streams/Ditches MUSA Line i 0 0.25 0.5 1 O Miles NORTH L 8/1/2017 Figure XX Agriculture (AG) Large Lot Residential (LL) Very Low Denisty (VLD) Low Density Residential (LD) - Medium Density Residential (MD) - High Density Residential (HD) Business Park (BP) Commercial (COM) - Industrial (IND) Mixed Use (MIX) - Public/Quasi-Public (PQ) ftt* Areas i 0 0.25 0.5 1 O Miles NORTH L 8/1/2017 Figure XX