Loading...
HomeMy WebLinkAbout2019.04.17 Parks PacketAgenda Parks, Recreation, and Open Space Commission Meeting of April 17, 2019 Hugo City Hall, 7:00 pm 7:00 pm 1. Approve Minutes from March 20, 2019 Meeting 7:05 pm 2. Adelaide Landing Park Plan 7:45 pm 3. 130t" Street/Hardwood Creek Trail 8:15 pm 4. Sunset Lake Future Park Planning 8:45 pm 5. Adjournment Page 1 of 3 Parks Commission Agenda April 17, 2019 Background Parks, Recreation, and Open Space Commission Meeting of April 17, 2019 Hugo City Hall, 7:00 pm Approve Minutes from March 20, 2019 Meeting Staff recommends approval of the minutes of the Parks Commission meeting of March 20, 2019. PLEASE SEE THE ATTACHED MINUTES. Adelaide Landing Park Plan The Parks, Recreation, and Open Space Commission reviewed a sketch plan of Adelaide Landing at their July 13, 2016 which included an area for a park. Excelsior Group made a proposal for park dedication that included a combination of 7.8 acres of land plus $1,128 per unit in fees. They also proposed to construct a trail system and grade and landscape the park area. The Parks Commission approved the park dedication proposal and discussed working together to plan and construct the park area. At the meeting of January 11, 2019 The Parks Commission heard an update on Adelaide Landing. Ben Schmidt from Excelsior Group informed that Adelaide Landing 111 and 2nd Additions are nearly complete and that the 3rd Addition is ready to start. Excelsior Group is proposing a partnership with the City to complete the park. The City of Hugo would plan the park and install the majority of the park features. Excelsior Group would construct paved areas within the park as a part of their upcoming pavement projects in exchange for a reduction in their park dedication fees. The Parks Commission discussed the partnership and the park configuration. Having a sufficient amount of parking was a priority. A drop off area adjacent to the southern ball field something they wanted to look into. The Commission discussed utilizing the power line easement areas as much as allowable, having strong trail connections between the north and south areas of the park, having large multi -purpose playground and pickleball/basketball courts. A large picnic shelter was desirable given the size of the neighborhood and total reach of the development. This input was passed on to Westwood to guide them in drafting the park site plan. Two site plans have been prepared. Staff recommends that the Commission review the plans for a future park in Adelaide Landing and provide input. Staff also recommends the Commission review the estimates for park features and provide direction. PARK PLANS DATED 3/11/2019 AND 4/5/2019 ARE ATTACHED. Page 2 of 3 Parks Commission Agenda April 17, 2019 1301h Street/ Hardwood Creek Trail In November 2018, the City of Hugo applied for a partnership project with Living Healthy Washington County through the Statewide Health Improvement Program. We were informed that our project has been funded. With the funds, a preliminary design and feasibility study will be drafted for a segment of trail on 130th Street and the alternate alignment of the Hardwood Creek Trail. Staff will present the project plan for your discussion and approval. A LOCATION MAP AND THE GRANT ACTION PLAN ARE ATTACHED. Sunset Lake Future Park Planning At the meeting of October 18, 2018, the Parks Commission approved a park dedication proposal for The Preserve on Sunset Lake. The proposal included dedication of .93 acres of land on Sunset Lake adjacent to the .7 acre city -owned parcel. The Parks Plan states that "providing access to and protect Hugo's water resources including wetlands, lakes, and streams is encouraged to build a connected, multi -function parks system". At the time of the development approvals, there was neighborhood interest in those parcels being developed into a park. Both the Parks Commission and the City Council included planning the future park in their 2019 goals. Staff will present a timeline and planning proposal from WSB and Associates. A LOCATION MAP AND A SCOPE OF SERVICES FROM WSB ARE ATTACHED. Upcoming Recreation Programs Park Play Days Starting June 10 Fridays with Fire Fighters June 14, July 12, August 16 Family Concert August 9 Tech Tac Toe June 24-27, August 5-8 Memory Cafes Ongoing (4th Wednesday of every month) Preschool Story Time Ongoing (2n1 Monday of every month) Tour de Hugo September 21 Page 3 of 3 Parks Commission Agenda April 17, 2019 Minutes Parks, Recreation, and Open Space Commission Meeting of March 20, 2019 Hugo City Hall, 7:00 pm Present: Shawn Haag, Cathy Moore — Arcand, Mat Rauschendorfer, Nicole Schmid, Dave Strub, Ranell Tennyson Absent: Roger Clarke Staff Present: Scott Anderson, Public Works Director Shayla Denaway, Parks Planner Debi Close, Secretary Strub called the meeting to order at 7:02 pm. 1. Approval of Minutes from the January 16, 2019 Meeting Schmid made a motion, Rauschendorfer seconded to approve the minutes of the January 16, 2019 Parks Commission meeting. Ayes - Mat Rauschendorfer, Nicole Schmid, Dave Strub, Ranell Tennyson Abstained - Shawn Haag, Cathy Moore — Arcand Motion carried. 2. The Meadows at Hugo Sketch Plan Shayla Denaway, Parks Planner, reviewed the sketch plan from Golden Valley Land Company for "The Meadows at Hugo". The sketch plan is for 84 residential lots on 33.41 acres located north of 1591" Street and West of Highway 61. The developer is not proposing to dedicate land and the fee would be $201,600. The developer proposed that the City build a street on the adjacent city -owned property to provide access the development. The Parks Commission discussed that Frog Hollow would serve the park needs of the neighborhood. They also discussed that a future park could go on either city owned property or be built with future development to the north. The Commission generally agreed that payment of a park dedication fee was preferred over dedication of land and trying to locate a small park in this development. In regards to the city -owned properties to the west of the proposed development, the Commission recalled that they requested a part of the land dedicated with Oneka Place to be separated to allow them to provide right-of-way and access to a future development to the east. Now called Outlot L, the parcel surrounding the watertower was sized to provide flexibility in extending Farnham Avenue to access the future park and the parcel to the east. The Commission discussed that they have not planned the future park but options for Outlot L include a parking lot, residential lots, park features and more. Strub commented that the future park will be a great amenity to The Meadows at Hugo and more trail connections to it are needed. The Engineer stated that they intend to make trail connections. Schmid asked the Engineer of the development about irrigation and wetlands. Rauschendorfer discussed the greenways in the area and wanted to ensure trails north and west through the development. He also asked about using the ditch on the east side of the development for a trail corridor. Since there is not plan for the future park, the Park Commission recommended making land available for construction of the street at the developer's expense, but not allow the development of the lots as shown on the Meadows at Hugo sketch plan. They were generally supportive of the proposed trail connections. They discussed wanting to keep their options open until the future park is planned knowing it could include a parking lot, active park features, or more if desired. 3. Rosemary Apartments Park Dedication Proposal MWF Properties is requesting approval of a park dedication proposal for a multi -family housing building with 45 housing units called "Rosemary Apartments". The apartments will are on 4.8 buildable acres. The developer has proposed payment of the park dedication fee of $108,000 in lieu of land. The Parks Commission discussed the outdoor play area, sidewalks adjacent to the development, and that nearby parks include Lions Park and Heritage Ponds Park. Schmid made a motion, Haag seconded to approve the park dedication proposal of payment of $108,000 in lieu of land for "Rosemary Apartments". All Aye. Motion Carried. 4. Upcoming Recreation Programs Kidz 'N Biz —April 6 Park Play Days —Starting June 10 Fridays with Fire Fighters —June 14, July 12, August 16 Family Concert — August 9 Tech Tac Toe — June 24-27, August 5-8 Memory Cafes — Ongoing (4th Wednesday of every month) Preschool Story Hours — Ongoing (2" d Tuesday of every month) Tour de Hugo — September 21 5. Adjournment Schmid made a motion, Moore-Arcand seconded to adjourn the meeting at 8:05 pm. All Ayes. Motion carried. 7 d z �° — 'Xpp o o x 0 >= s m; 6 $ 7 4 o �® HeCl � 5 FD°q i x / I N � >Y I s� qv ` I 1,4 8 f 1 aA Izm 1 7� I, 7 I I� \ I I DI I I I r app\ �1 I i 1�1i I I I Z£e L I \ s2>3 r—� \ JJ — Lv 1 / 7 d ® z y Csl g bz �2 5 o a�� E-D n b 3 1 inch = 376 feet A CHUGO February 14, 2019 Map Powered by DataLink from WSB & Associates City: Hugo Zip Code: 5 E-mail: sdenaway@ci.hugo.mn.us Phone: 651-762-6342 Potential number of community members impacted by this Federal Tax ID: 41-0954838 project: 14,158 residents in Hugo I submit this partner project action plan with Living Healthy Washington County (LHWC) and the Statewide Health Improvement Program on behalf of the organization listed above. My organization will provide a 10 percent match of the total funding amount being requested. As the organizational representative, I agree my project lead will fully participate in the assessment and evaluation process, including but not limited to submitting reports and invoices on time and information as requested. Additionally, the project lead will follow all guidelines for use of funds. Organizational Representative Signature: Date: organization ever received LHWC-SHIP If you need assistance due to disability or language barrier please call 651-430-6001 (TTY 651-430-6246) AN EQUAL EMPLOYMENT OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYEE 12/18 Project Description: The City of Hugo is looking to put together a feasibility study to complete missing trail connections between Highway 61 and Fenway Boulevard along and near 130th Street. There is an existing north -south trail on Fenway Boulevard and there will be a trail constructed in 2019 on 130th Street east of Highway 61. This is part of the alternate alignment identified with the Hardwood Creek Regional Trail Master Plan. The feasibility study will also include a segment of the HCRT. How will you sustain the project/initiative or policy beyond SHIP funding? The feasibility study will make it possible to construct the missing trail connections. Specific Activities Proposed ' Expected Outcomes: Activities that will lead to expected What are the expected results or outcomes for the specific activities outcomes. listed on the left? What is measurable as a result of the activity? How many individuals or organizations do you expect to reach through this Hire WSB to prepare the trail feasibilitv study activity? Hire Consultant to undertake a design feasibility study for a trail segment along 130th street from Fenway Blvd North to Highway 61 in anticipation of a trail connection to a proposed trail along 130th Street east of 61. This proposed trail will connect new and existing residents east of 61 to the existing trail along Fenway. The study will also include the study of trail segment from the existing Fenway Trail at 130th Street and extending south to connect up with Falcon Court and the future Hardwood Creek Regional Trail to run parallel to the railroad line a! an alternate route for the HCRT. Preliminary design will include a project start-up meeting with the City of Hugo, and potentially the County, to review the project schedule, key timelines and project outcomes. An initial site inventory and analysis will be conducted in order to identify opportunities and constraints, along with review and discussion of previous plans and studies. Preliminary trail routes and options will be prepared to illustrate trail types and locations. Completion Budget Date for Provide a budget for Activity: each activity and description of how those funds will be If you need assistance due to disability or language barrier please call 651-430-6001 (TTY 651-430-6246) AN EQUAL EMPLOYMENT OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYEE 12/18 Stakeholder Involvement Gather input and build local support for the project with neighborhood residents May 2019 and businesses. This will include one-on-one meetings with the surrounding property owners to review and discuss the potential trail improvements and options. Surrounding residential neighborhoods will be notified. Feasibility Design Memorandum of Understanding: A feasibility study for the trails will be prepared based on the outcome of preferred trail routes and types to include a 30% design document package illustrating trail layout and partial grading plan with an estimate of probable costs. An accompanying report/memorandum will be prepared. The preferred trail layout plan will be brought to a public Parks Commission meeting for review and approval. The preferred trail layout plan will be brought to a City Council meeting for review and approval. In -kind June 2019 1 $9,500 • By completing this action plan and signing the County service contract we agree that any equipment purchased with Statewide Health Improvement Program (SHIP) funding will be used for the intended purpose of this action plan. • Partners are expected to spend at least 50% of contracted funds by June 30, 2019 to allow for implementation and evaluation of action plan items as is required by the grant. • Project lead will complete invoices and reimbursement forms while ensuring action plan activities are being completed. • Project lead will participate in informal monthly check -ins, one site visit and complete the Final Evaluation Report by October, 2019. *Refer to the guidelines for list of allowable expenses. If you need assistance due to disability or language barrier please call 651-430-6001 (TTY 651-430-6246) AN EQUAL EMPLOYMENT OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYEE 12/18 $10,000 Applicants must provide a 10 percent match of the total funding amount being requested. Please summarize in -kind contributions or other funding sources below. Must include dollar amounts. (i.e. staff time, supplies, equipment, etc.) 10% Match Required: $3,000 in remaining consultant fees to be paid by the City of Hugo. (30% of project cost) Other in -kind contributions: Staff time: $104/hour, $69/hour, $48/hour and $41/hour for 8+ meetings = $2,096+ Total in -kind contributions: $5,096 For questions contact Kim Ball at 651-430-4040 or Kim.ball@co.washington.mn.us If you need assistance due to disability or language barrier please call 651-430-6001 (TTY 651-430-6246) AN EQUAL EMPLOYMENT OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYEE 12/18 as`s a a£ass NI1 b�nH V.I.OSBNMW `OJf1H 'N 31J2ID'Is H19£I S££8 Nmj NOL COUSNOD r��l ONI 'F�$AV IHSF. MId JZSNIIS NO 3A)13M(I W U a o Cp g ffm g a HNIDf39LL/�lYO NOU—S30 NO-38 h 0 F 0 III � z z N —I O u 0 U t7 Z w m L0 L0 Z ui 0 a Q w Z Z 7 0 0 M w D U) T w Z w Q a Z W x 0 wsb February 13, 2019 Shayla Denaway Parks Planner City of Hugo 14669 Fitzgerald Avenue North Hugo, MN 55038 Re: Sunset Lake Park Master Plan Proposal Dear Shayla: I am pleased to submit this letter proposal on behalf of WSB to the City of Hugo (City) for the Sunset Lake Park Master Plan. PROJECT UNDERSTANDING It is our understanding that this project is to include the creation of a master plan for Sunset Lake Park to include the existing city parcel with additional park land being dedicated to the city from the Preserve on Sunset Lake development. The vision for Sunset Park, located on Sunset Lake, is to focus on more passive day -use recreation with lake access for non -motorized watercraft that blends with the surroundings and fits with the character in the surrounding neighborhood. SCOPE OF SERVICES The following scope of services is meant to provide the City with the steps necessary to complete a successful master plan that will set the stage for future development. WSB is always willing to adjust our scope of services as necessary in order to be more tailored to your needs or account for budgetary concerns. A. Protect Start -Up, Management, Data Collection & Programming: WSB will gather all pertinent project related data, set up project documents, and provide ongoing project management. a. Project Start -Up & Programming Meeting: WSB will attend a project start- up/focus meeting with the city staff to create a list of preliminary programming needs to take into consideration for the master plan design and establish the project schedule to be in line with the City's neighborhood engagement tasks. b. Data Collection: WSB will gather project data from the City, including any GIS or CAD files, and will create a base map utilizing City data, lidar topography and county aerial imagery. No wetland delineation or topographical survey services are included. The City will provide WSB with the site programming elements based on preferences from the City and input gathered from the neighborhood. All community engagement for neighborhood input will be conducted by the City. c. Site Analysis: WSB will conduct a site review to identify site opportunities and constraints for consideration in the preparation of the master plan. B. Master Plan Development and Review: This task includes the design steps necessary to create a master plan which will include the following: a. Conceptual Plans: WSB will prepare one to two alternative conceptual designs in a basic plan format (not rendered) for the park based on programming, existing G:\Group Data\Municipal\Clients - Cities - Counties\Hugo\Proposals\Sunset Lake Preserve Master Plan\LTR PROPOSAL - Sunset Lake Park Master Plan_2019- 0213.docx Shayla Denaway February 13, 2019 Page 2 conditions, opportunities, site circulation, unique features, etc. which may provide a varying degree or approach to development for consideration. b. Staff Review Meeting: One (1) city staff review meeting of the concept plans will be held to review, discuss and determine which elements of the concept plans to carry forward into the preferred master plan. c. Preliminary Master Plan: WSB will prepare a preliminary master plan based on feedback from the City that represents the design solution that best responds to the needs and desires of the stakeholders. A preliminary estimate of probable cost for construction shall be prepared for the preliminary master plan. d. Staff Review: The preliminary master plan will be sent electronically to the City for review with a teleconference conversation to discuss the plan and provide feedback for any necessary refinements. e. Final Master Plan: WSB will make any necessary modifications to the preliminary master plan and estimate of probable costs for construction to create the final master plan, which will include a rendered site plan. It is assumed that the City will take the final master plan to the Parks Commission and City Council meetings, as necessary, for approval and adoption. C. Additional Services: Services other than those listed in the Scope of Services above and requested and authorized in writing by the City. These services shall be billed on an hourly basis according to the current Hourly Rate Schedule. FEE PROPOSAL It is proposed that the Scope of Services identified in Tasks A and B above to be billed on a lump sum basis of $4,600 (Four Thousand Six Hundred Dollars). If you are in agreement with the terms as outlined above, please sign where indicated below and return one copy to our office. Sincerely, Candace Amberg, PLA Sr. Associate ACCEPTED BY: City of Hugo Name/Title: Signature: Date: G:\Group Data\Municipal\Clients - Cities - Counties\Hugo\Proposals\Sunset Lake Preserve Master Plan\LTR PROPOSAL - Sunset Lake Park Master Plan_2019- 0213.docx