Agenda
Parks, Recreation, and Open Space Commission
Meeting of August 21, 2019
Hugo City Hall, 7:00 pm
7:00 pm 1. Approve Minutes from June 19, 2019 Meeting
7:02 pm 2. Approve Minutes from July 24, 2019 Meeting
7:05 pm 2. Trail Feasibility Study
7: 20 pm 3. Sunset Lake Future Park Planning
8:00 pm 4. Adjournment
Page 2 of 3
Parks Commission Agenda
August 21, 2019
Background
Parks, Recreation, and Open Space Commission
Meeting of August 21, 2019
Hugo City Hall, 7:00 pm
Approve Minutes from June 19, 2019 Meeting
Staff recommends approval of the minutes of the Parks Commission meeting of June 19, 2019.
PLEASE SEE THE ATTACHED MINUTES.
Approve Minutes from July 24, 2019 Meeting
Staff recommends approval of the minutes of the Parks Commission meeting of July 24, 2019.
PLEASE SEE THE ATTACHED MINUTES.
Trail Feasibility Study
At the meeting of April 17, 2019, the Parks Commission approved a feasibility study of the missing trail
connections around 130th Street and the Hardwood Creek Regional Trail. Funding was received through an
active living partnership project with Living Healthy Washington County and the Statewide Health
Improvement Program (SHIP). The total cost of the feasibility study, preliminary design, and project report is
estimated to be $13,000 with $10,000 being covered by the SHIP funds. WSB completed the site evaluation
and proposed three potential trail layouts. The Parks Commission discussed the options at their meeting of
June 19, 2019.
Staff met with representatives of Wilson Tool and sent notification letters to other potentially impacted
property owners. Noting all of the input received, WSB revised the trail concepts. Candace Amberg and
Jordan Gedrose from WSB will present the revised feasibility study.
PLEASE SEE THE ATTACHED CONCEPTS.
Sunset Lake Future Park Planning
At the meeting of October 18, 2018, the Parks Commission approved a park dedication proposal for The
Preserve on Sunset Lake. The proposal included dedication of .93 acres of land on Sunset Lake adjacent to
the .7 acre city-owned parcel. The Parks Plan states that “providing access to and protect Hugo’s water
resources including wetlands, lakes, and streams is encouraged to build a connected, multi-function parks
system”. At the time of the development approvals, there was neighborhood interest in those parcels being
developed into a park. Both the Parks Commission and the City Council included planning the future park in
their 2019 goals.
At the meeting of April 17, 2019 the Parks Commission approved a timeline and planning proposal from WSB
and Associates. Candace Amberg and Jordan Gedrose from WSB will present two concepts for a park at
Sunset Lake. Staff recommends discussion and direction on any needed changes to the concept plans and
that a neighborhood meeting be set for September 18, 2019.
PLEASE SEE THE ATTACHED CONCEPTS.
Page 3 of 3
Parks Commission Agenda
August 21, 2019
Upcoming Recreation Programs
Tour de Hugo September 21
Movie Night in the Park September 27
Page 1 of 2
Parks Commission Minutes
June 19, 2010
Minutes
Parks, Recreation, and Open Space Commission
Meeting of June 19, 2019
Hugo City Hall, 7:00 pm
Present: Dave Strub, Cathy Moore – Arcand, Mat Rauschendorfer, Nicole Schmid, Ranell Tennyson
Absent: Roger Clarke, Shawn Haag
Staff Present: Scott Anderson, Public Works Director
Shayla Denaway, Parks Planner
Amber Lozier, Administrative Assistant
Strub called the meeting to order at 7:00 pm.
1. Approval of Minutes from the May 15, 2019 Meeting
Correction to agenda item #4 – “208” changed to “2018”
Rauschendorfer made a motion, Moore-Arcand seconded to approve the minutes of the May 15, 2019 Parks
Commission meeting.
All ayes.
Motion carried.
2. Update on Trail Feasibility Study
Denaway presented three trail concepts prepared by WSB and Associates for the area of 130th Street and the
Hardwood Creek Regional Trail. The pros and cons of each option were listed, including Regional Trail
requirements, private roads versus public roads, and cost.
Moore-Arcand stated concerns with the safety of concept 3, specifically the on-road trail portion. She also
inquired as to whether or not Wilson Tool was supportive of trail construction.
Rauschendorfer stated concerns about easements need with the conceptual trail layouts and future trail
connections. He also stated the boardwalk structures in Concept 1 and 2 may affect the Regional Trail
designation.
Commissioners appreciated the connection to Oak Shore Park in Concept 1 and questioned whether concept
features could be combined to allow for access to Oak Shore Park as well as Regional Trail designation.
Page 2 of 2
Parks Commission Minutes
June 19, 2010
Anderson mentioned that boardwalks could affect how the trail is used.
3. Park Prioritization Exercise
The City Council asked the Parks Commission to prioritize community park improvements. Denaway reviewed
the community parks in Hugo.
Denaway reviewed the parks chapter of the 20140 Comprehensive Plan, including the guiding principles.
Resident preferences included trail development, multi-use facilities that serve a wide range of users, and
water amenities.
Denaway presented a draft priority list prepared for the purposes of facilitating discussion.
Schmid expressed concerns with maintaining a balance between natural parks and improved parks.
Strub suggested adding “MORC” to the options for Irish Avenue Park.
Rauschendorfer stated he would prefer Sunset Lake to be considered a community park, however it does not
meet community park standards.
Moore-Arcand made motion to accept the Staff compiled priority list with the mentioned adjustments.
Tennyson seconded.
All ayes.
Motion carried.
5. Recreation Programming Calendar
Park Play Days – Starting June 10
Fridays with Fire Fighters – June 14, July 12, August 16
Family Concert – August 9
Tech Tac Toe – June 24-27, August 5-8
Memory Cafes – Ongoing (4th Wednesday of every month)
Preschool Story Hours – Ongoing (2nd Tuesday of every month)
Tour de Hugo – September 21
6. Adjournment
Tennyson made a motion, Rauschendorfer seconded to adjourn the meeting at 9:15 pm.
All Ayes.
Motion carried.
Page 1 of 1
Parks Commission Minutes
July 24, 2019
Minutes
Parks, Recreation, and Open Space Commission
Meeting of July 24, 2019
Present: Dave Strub, Cathy Moore – Arcand, Ranell Tennyson, Shawn Haag
Absent: Roger Clarke, Shawn Haag
Staff Present: Shayla Denaway, Parks Planner
The Hugo Parks, Recreation, and Open Space Commission met at 12582 Ingersoll Avenue North to view the
city-owned property and receive a tour of Sunset Lake.
Respectfully submitted,
Shayla Denaway
Parks Planner
K:\013720-000\Cad\Exhibits\013720-000 Trail Feasibility ConceptsHugo, Minnesota August 8, 2019 | WSB Project number: 013720-0001Scale in Feet300’0’150’75’130th Trail Feasibility - Overall ContextWILSON TOOL INTERNATIONAL130TH ST NFARNHAM AVE NFOREST BLVDOAK SHORE PARKSEE ENLARGEMENTS ON PAGES 2 AND 3FOREST BLVD NRAIL LINEFALCON CT N126TH ST N125TH ST NCONCEPT 1: TRAIL CONTINUES ON FALCON CT N (SHARE THE ROAD SIGNS) CONCEPT 2: WOULD REQUIRE THE REMOVAL OF BERM WITH BUFFER VEGETATIONLEGEND:PREFERRED CONCEPT PARCELSALTERNATIVE CONCEPTTRAIL EXTENSION CONCEPTPATC
K:\013720-000\Cad\Exhibits\013720-000 Trail Feasibility ConceptsHugo, Minnesota August 8, 2019 | WSB Project number: 013720-0002Scale in Feet160’0’80’40’WILSON TOOL INTERNATIONALEXISTING PATH LEADING TO FALCON COURT SMALL AMOUNT OF CLEARANCE BETWEEN RAILROAD TRACK AND BUFFER VEGETATIONEXISTING PATH EXTENDING FROM “WILSON TOOL INTERNATIONAL” PARKING LOT130TH ST NFARNHAM AVE NOAK SHORE PARKFOREST BLVD NRAIL LINEFALCON CT N130th Trail Feasibility InventoryABCDEFBDFEAC
K:\013720-000\Cad\Exhibits\013720-000 Trail Feasibility ConceptsHugo, Minnesota August 8, 2019 | WSB Project number: 013720-0003Scale in Feet160’0’80’40’WILSON TOOL INTERNATIONAL130TH ST NEASEMENT REQUIREDBRIDGECULVERTEASEMENT REQUIREDBRIDGE / BOARDWALKPEDESTRIAN CROSSING TO CONNECT TO EXISTING TRAILALTERNATIVE ROUTE (LOWER SPEED SIGNS)TRAIL CONTINUES ON FALCON CT N (SHARE THE ROAD SIGNS) CONCEPT WOULD REQUIRE THE REMOVAL OF BERM WITH BUFFER VEGETATIONFARNHAM AVE NOAK SHORE PARKFOREST BLVD NFALCON CT NRAIL LINE130th Trail FeasibilityLEGEND:PREFERRED CONCEPT 2 FT CONTOURPARCELSALTERNATIVE CONCEPTTRAIL EXTENSION CONCEPTBRIDGE / BOARDWALKBOARDWALK EXAMPLEPATC
K:\013720-000\Cad\Exhibits\013720-000 Trail Feasibility ConceptsHugo, Minnesota August 8, 2019 | WSB Project number: 013720-0004Scale in Feet100’0’50’25’130th Trail Feasibility130TH ST N130TH ST NFENWAY BLVD NFARNHAM AVE NFOREST BLVD NAEBFCDADBCEFLEGEND:CONCEPT TRAIL ALIGNMENTPARCELS2 FT CONTOURRAIL CROSSING ARMHYDRANTHYDRANTHYDRANTTRAFFIC SIGNALPOWER POLE (TYP)NOTES:- PEDESTRIAN RAIL CROSSING REQUIRED - APPROX. 8 POWER POLES IN ROW - 2 HYDRANTS IN ROW
K:\013720-000\Cad\Exhibits\013720-000 Trail Feasibility ConceptsHugo, Minnesota August 8, 2019 | WSB Project number: 013720-0005130th Trail FeasibilityConcept 1Concept 2PROS:- EXISTING POWERLINES WOULD NOT NEED TO BE RELOCATED- MAILBOXES TO REMAIN ON NORTH SIDE OF ROADWAY - 8’ WIDE TRAIL WITH 2’ CLEAR ZONE ON EACH SIDE OF TRAIL WOULD MEET REQUIREMENTS OF REGIONAL TRAIL DESIGNATIONCONS:- REQUIRES THE ROAD TO BE RECONSTRUCTEDPROS: - 8’ WIDE TRAIL WITH 2’ CLEAR ZONE ON EACH SIDE OF TRAIL WOULD MEET REQUIREMENTS OF REGIONAL TRAIL DESIGNATION- NO ROAD RECONSTRUCTION PROJECT REQUIREDNOTES: - ROADWAY RECONSTRUCTION PROJECT WOULD BE REQUIRED TO NARROW DRIVE LANES TO 12’ WIDTH WITH B618 CURB IN ORDER TO ALLOW EXISTING POWER POLES TO REMAIN IN PLACE AND TO INCREASE THE BOULEVARD WIDTH- COORDINATION WITH MNDOT AND RAILROAD REQUIREDNOTES: - 8’ TRAIL ALONG BACK OF CURB- COORDINATION WITH MNDOT AND RAILROAD REQUIREDCONS: - MAILBOXES MOVED TO SOUTH SIDE OF ROADWAY - EXISTING POWER LINES TO BE MOVED TO R.O.W. OR TO SOUTH SIDE OF 130TH ST130TH ST NPEDESTRIAN STOP ARM RAILROAD CROSSING EXAMPLE130TH ST N130TH ST N130TH ST NFENWAY BLVD NFENWAY BLVD NFARNHAM AVE NFARNHAM AVE NFOREST BLVD NFOREST BLVD N8’ TRAILREDUCED 12’ DRIVE LANES8’ TRAILPEDESTRIAN RAILROAD CROSSING: ·STRAIGHTENED CROSSWALK ACROSS FOREST BLVD N ·RAILROAD STOP ARM ON BOTH SIDES OF PEDESTRIAN CROSSING ·COORDINATION AND PERMITTING THROUGH RAILROADINTERSECTION IMPROVEMENTS: ·SIGNAL JUSTIFICATION REPORT FOR MODIFICATIONS (ALL PUSH BUTTON SYSTEM) ·MAY QUALIFY FOR STATE AID FUNDS ·COORDINATION AND PERMITTING WITH MNDOT AND COUNTY (TH REVIEW) ·STRAIGHTEN OUT CROSSWALK ACROSS FOREST BLVD N ·RELOCATED CROSSWALK PUSH BUTTONPEDESTRIAN RAILROAD CROSSING: ·RAILROAD ARM EXTENSION ACROSS TRAIL ·COORDINATION AND PERMITTING THROUGH RAILROADINTERSECTION IMPROVEMENTS: ·SIGNAL JUSTIFICATION REPORT FOR MODIFICATIONS (ALL PUSH BUTTON SYSTEM) ·MAY QUALIFY FOR STATE AID FUNDS ·COORDINATION AND PERMITTING WITH MNDOT AND COUNTY (TH REVIEW) ·SOME ADJUSTMENTS MAY BE REQUIRED TO MEET ADAEXISTING HYDRANTEXISTING HYDRANTEXISTING HYDRANTEXISTING HYDRANTEXISTING MAILBOXEXISTING MAILBOXEXISTING ROADWAY SIGN TO BE RELOCATED EXISTING ROADWAY SIGN TO BE RELOCATED EXISTING ROADWAY SIGN TO BE RELOCATED EXISTING POWER POLE (APPROX. LOCATION)EXISTING ROADWAY SIGN TO BE RELOCATED EXISTING MAILBOX, LANDSCAPE BED, AND BUSINESS SIGNAGEEXISTING MAILBOX, LANDSCAPE BED, AND BUSINESS SIGNAGEEXISTING HYDRANTEXISTING HYDRANTPEDESTRIAN STOP ARM RAILROAD
K:\013720-000\Cad\Exhibits\013720-000 Trail Feasibility ConceptsHugo, Minnesota August 8, 2019 | WSB Project number: 013720-0006130th Trail Feasibility - SectionsTRAILTRAILEXISTING BOULEVARDCONCEPT 1 TRAIL SECTIONCONCEPT 2 TRAIL SECTIONEXISTING POWER POLE LOCATIONRELOCATED POWER POLE LOCATION
K:\013980-000\Cad\Exhibits\013980-000 Sunset Lake Park Master PlanScale in Feet60’0’30’15’Hugo, Minnesota August 8, 2019 | WSB Project number: 013980-000Sunset Lake Park - Concept 1SUNSET LAKE125TH ST NHOMESTEAD DRDOCKCANOE STORAGE RACKPORTABLE RESTROOMPARKING LOT (10 STALLS)APPROX. LOCATION OF EXISTING WATER OUTFLOWVEGETATIVE BUFFERDROP OFF AREASTORMWATER TREATMENTPICNIC AREA WITH GRILLFISHING PLATFORM TURFNATIVE GRASS SEATING AREAPAVED TRAILAGGREGATE TRAILSHELTERFISHING PLATFORM (TYP)CONCEPT 1:• Drop off zone for people unloading unmotorized watercraft (secondary option could incorporate a small boat launch next to dock)• 1 vehicular access point off of Homstead Dr• Internal park trails could connect to future 125th St N trail• Parking located on north side of property to allow buffer from 125th St• :DWHUIURPH[LVWLQJRXWÀRZstructure, could be treated in parking lot island rain garden EXISTING TREE (TYP)FISHING PLATFORMCANOE / KAYAK STORAGE RACKOCTAGON FISHING PLATFORMFUTURE TRAIL
K:\013980-000\Cad\Exhibits\013980-000 Sunset Lake Park Master PlanScale in Feet60’0’30’15’Hugo, Minnesota August 8, 2019 | WSB Project number: 013980-000Sunset Lake Park - Concept 2SUNSET LAKE125TH ST NHOMESTEAD DRDOCKSAND BEACHCANOE STORAGE RACKBUFFER VEGETATIONLOOP TRAILPORTABLE RESTROOMPOTENTIAL ACCESS TO 125TH STFUTURE TRAILPARKING LOT (10 STALLS)SHELTERSTORMWATER TREATMENTAPPROX. LOCATION OF EXISTING WATER OUTFLOWPICNIC AREA WITH GRILLFISHING BOULDER OUTCROPPING (TYP)PAVED TRAILMOWED TRAILFUTURE TRAILCANOE / KAYAK STORAGE RACKFISHING BOULDER OUTCROPPINGTURFNATIVE GRASS CONCEPT 2:• No drop off area, but larger parking stalls could be incorporated to allow space for removing watercraft from vehicles• 1 vehicular access point off of Homestead Dr with the option to add an additional vehicular access point off of 125th St• A looped internal trail could connect to a future trail along 125th St N• Parking located in center of property to allow close proximity to waterfront EXISTING TREE (TYP)