HomeMy WebLinkAbout2017.03.22 Parks PacketAgenda
Parks, Recreation, and Open Space Commission
Meeting of March 22, 2017
Hugo City Hall, 7:00 pm
7:00 pm 1.Approve Minutes from January 11, 2017 Meeting
7:05 pm 2.Adelaide Landing Park Dedication Proposal
7:45 pm 3.Comprehensive Plan Workshop
8:50 pm 4.Pollinator Project
9:00 pm 5.Adjournment
Background
Parks, Recreation, and Open Space Commission
Meeting of March 22, 2017
Hugo City Hall, 7:00 pm
Approve Minutes from January 11, 2017 Meeting
Staff recommends approval of the minutes of the Parks Commission meeting of January 11, 2017.
*There are no minutes from the meeting scheduled for February 1, 2017 because wasn’t a quorum.
PLEASE SEE THE ATTACHED MINUTES.
Adelaide Landing Park Dedication Proposal
Excelsior Group has submitted an application requesting approval of a Preliminary Plat and Planned Unit
Development (PUD) for a residential development to be known as “Adelaide Landing”. The preliminary plat
includes 319 single family residential lots on 146.2 buildable acres. The development is generally located
north of 130th and east of Highway 61. The plan includes residential lots, preserved wetlands, stormwater
ponding areas, a park, sidewalk and trail connections, and road connections.
Excelsior Group has made a park dedication proposal that includes a combination of 7.8 acres of land and
payment of fees in the amount of $1,128 per unit. They are also proposing to construct 1.5 miles of trail
and grade and landscape the park.
Staff recommends that the Parks Commission approve the park dedication proposal and support the off‐road
trail improvements and park landscaping and grading. Staff also recommends that the Parks Commission
have discussion on the City’s option to construct the remaining park improvements (playground, parking
areas, and park shelter, etc.) to be continued at a future meeting.
THE STAFF MEMO AND PARK DEDICATION PROPOSAL ARE ATTACHED.
Comprehensive Plan Workshop
Kendra Lindahl, of Landform Inc will be at the meeting to get input from the Parks Commission on the 2040
Comprehensive Plan updates.
AN AGENDA IS ATTACHED. THE PARKS, TRAILS, AND OPEN SPACE PLAN CAN BE FOUND HERE:
http://www.ci.hugo.mn.us/2030_comp_plan
Pollinator Project
Washington County Pheasants Forever Chapter is proposing to utilize 3 acres of Irish Avenue Park to plant
pollinator supporting plants and flowers. They will be looking to get funding for the project from Pheasants
Forever. Local volunteers from 4‐H, the Elementary schools, and more may be involved. The project would
start in May and be ongoing for 5 years. Staff recommends approval of the partnership.
A PROPOSAL EMAIL IS ATTACHED.
Minutes
Parks, Recreation, and Open Space Commission
Meeting of January 11, 2017 Hugo City Hall
Present: Cathy Moore-Arcand, Nicole Schmid, Dave Strub, Ranell Tennyson
Absent: John Pontrelli, Mat Rauschendorfer
Staff Present: Scott Anderson, Public Works Director; Shayla Denaway, Parks Planner; Debi Close, Parks
Secretary
Strub called the meeting to order at 7:03 pm.
1.Approval of Minutes from November Meeting
Tennyson made a motion, Moore-Arcand seconded to approve the minutes of the December 14, 2016 Parks
Commission meeting as presented.
All Aye. Motion carried.
2.2017 Recreation Programs
April Yetter, Outreach Director at the Forest Lake YMCA presented the Park Play Days proposal. The program
would be staffed, advertised and run by the YMCA offering Monday through Thursday for 3 hours daily and
two 5 week sessions for ages 4-12 to play and learn in a park.
Tennyson made a motion, Schmid seconded to partner with the Forest Lake YMCA and donate $1,000 –
$2,000 to help run Park Play Days.
All Aye. Motion Carried.
Shayla Denaway, Parks Planner recommended the Parks Commission set the date for the Sledding Party on
Saturday, February 4 or February 11 with flexibility for the weather.
Family movie night was January 6, 2017 with only 20 participants. Advertising will be improved for the
February 3 and March 10 Movie Nights. Schmid stated she didn’t receive any electronic notifications of the
event with school aged children in the elementary school and junior high.
Lil Sluggers proposed a partnership to offer a program for boys and girls ages 2-5. After discussion by the
Commission, they preferred looking into a multi-week program over a summer camp program. Program
would like feedback if daily or weekly practices should be scheduled.
3.2017 Goals
Shayla Denaway, Parks Planner presented the 2017 Goals of the Parks, Recreation and Open Space
Commission drafted at the December 14, 2016 meeting.
Goals included working on trails, Irish Avenue Park, Lions Park, Recreation Programs, as well as the
comprehensive plan updates.
Tennyson made a motion, Moore-Arcand seconded to approve the Parks, Recreation and Open Space
Commission goals as drafted.
All Aye. Motion Carried.
4.2017 Capital Improvement Plan
Shayla Denaway, Parks Planner presented the drafted 2017-2021 Parks Capital Improvement Plan that was
put together with input from the Parks Commission member at the December 14, 2016 meeting along with
assistance from Ron Otkin, Finance Director.
Open floor discussion included having funding set aside for yearly trail development projects.
Tennyson made a motion, Schmid seconded to approve the 2017 Capital Improvement Plan as drafted.
All Aye. Motion Carried.
5.Set Future meeting dates
Shayla Denaway, Parks Planner went over the upcoming meeting dates for discussion. New meeting dates
Include:
Wednesday February 1, 2017
Monday February 27, 2017 - Comprehensive Plan Workshop with the City Council and other Commissions
Wednesday March 15, 2017
Wednesday April 19, 2017 – Comprehensive Plan Workshop
Wednesday May 17, 2017
Wednesday June 21, 2017
Wednesday July 19, 2017
Tuesday August 8, 2017 Comprehensive Plan Workshop
Wednesday August 16, 2017
Wednesday September 20, 2017
Wednesday October 18, 2017
6.Adjournment
Tennyson made a motion, Schmid seconded to adjourn the meeting at 8:45 pm.
All Ayes. Motion carried.
- 1 -
Excelsior Group
March 22, 2017
Agenda Number: 2
CITY OF HUGO
PARKS COMMISSION REPORT
TO: City of Hugo Parks, Recreation and Open Space Commission
FROM: Shayla Denaway, Parks Planner
SUBJECT: Excelsior Group, LLC. Preliminary Plat and PUD General Plan for a
residential development to be known as “Adelaide Landing”
DATE: March 10, 2017 for the Parks Commission meeting of March 22, 2017
1. BACKGROUND:
At the meeting of July 13, 2017, the Parks Commission provided comments on a sketch
plan submitted by Excelsior Group for a residential development now known as
“Adelaide Landing”. Discussion included the proposed trail system, dedication of a park,
and construction of some park improvements.
Excelsior Group has made a proposal for park dedication that includes a combination of
park land and fees. They are also proposing to construct a trail system and grade and
landscape the park.
2. DESCRIPTION:
Excelsior Group has submitted an application requesting approval of a Preliminary Plat
and Planned Unit Development (PUD) for a residential development. The property totals
216.6 acres and is comprised of seven parcels. The preliminary plat includes 319 single
family residential lots and 10 outlots to be known as “Adelaide Landing”.
The PUD General Plan will be for all 216.6 acres of the property and will be rezoned
from Single Family Detached Residential (R-3) to Planned Unit Development (PUD).
The property includes wetlands and floodplain for a total buildable acreage of 146.2
acres. An 18 acre City-owned property that is mostly wetland will be used for
stormwater ponding.
The development is generally located north of 130th and east of Highway 61. The plan
includes residential lots, preserved wetlands, stormwater ponding areas, a park, sidewalk
- 2 -
Excelsior Group
March 22, 2017
and trail connections, and road connections. The applicant is proposing the project to be
built in five phases.
3. PARKS COMMISSION DISCUSSION
At their meeting of July 13, 2016, the Parks Commission reviewed a sketch plan and
provided informal comments on the sketch plan. The trail system was favorably
discussed, especially taking advantage of the wetlands and greenspace which make the
corridor scenic. It was important to the Commission that trail connections were made to
existing neighborhoods.
When looking at the proposed park layout, the Parks Commission discussed favorably the
open play areas, pickle ball court, soccer field, and variety of park features. Having a
variety of playground equipment for a mix of age groups and possibly including things
like climbers, spinners, and exercise equipment was discussed. The Parks Commission
expressed that it is very important to have the park and trails built in the early phases of
the development.
4. PARK PROPSOSAL:
The developer is proposing to dedicate, grade, and landscape a 7.8 acre park that is
divided into two areas- an open field area and an active park area with a playground,
multi-sport court and park shelter. An extensive off-road trail system that includes 1.5
miles of trails and boardwalks that connects to adjacent neighborhoods will be
constructed by the developer.
PUD Flexibility
The developer is requesting flexibility for lot width, lot size, and setbacks with their
PUD. In exchange for this flexibility, the city expects a higher level of design and
amenities within a project. Among other things, the developer is:
Grading and landscaping a public park within the neighborhood.
Providing a public trail to connect to existing trails in the adjacent developments.
Preserving and enhancing natural features with an off-road trail system that
meanders through the development.
Preserving existing significant trees on the property.
Phasing Plan
With phase 1, the developer shall grade and seed the city-owned outlot (Outlot A,
Country Ponds) and the areas south of the power line easement. This includes the park
area showing a soccer field. In phase 2, the developer shall grade and seed the remaining
park areas (north of power line easement) and install the 8’ bituminous trail, boardwalks,
- 3 -
Excelsior Group
March 22, 2017
and landscaping within all of outlot C. Final location of the trail and boardwalk shall be
reviewed and approved by staff prior to installation.
5. PARK DEDICATION:
The developer is proposing to dedicate 7.8 acres of land for the purposes of a public park
in combination with paying parkland dedication fees. Parkland dedication of 14.6 acres
is required, therefore the proposed dedication of 7.8 acres of satisfies 53% of the
requirement. The remaining 47% would be satisfied through fees. Currently, the park
dedication fee is $2,400 per unit and would therefore be $1,128 per unit or $359,832 in
total.
6. STAFF RECOMMENDATION:
Staff recommends that the Parks Commission support the off-road trail improvements
and park landscaping and grading. Staff also recommends that the Parks Commission
have discussion on the City’s option to construct the remaining park improvements
(playground, parking areas, and park shelter, etc.) to be continued at a future meeting.
Staff recommends that the Parks Commission approve the park dedication proposal in the
amount of 7.8 acres and $1,128 per unit ($359,832 for 319 units).
ATTACHMENTS:
1. Park Proposal dated March 8, 2017
2. Illustrative Neighborhood Design dated March 9, 2017
3. Applicant’s Narrative dated March 10, 2017
4. Park Dedication Policy
5. Parks Commission Report dated July 13, 2016 with attachments
March 8, 2017
Shayla Denaway
City of Hugo
14669 Fitzgerald Avenue N
Hugo, MN 55038
Re: Adelaide Landing – Park Proposal
Dear Shayla,
As follow-up from our discussions with staff, The Excelsior Group submits this proposal related to
park dedication for Adelaide Landing.
It is understood that park dedication for new development can be achieved in one of two ways: land
dedication (10% of net developable area) or a fee in lieu of land ($2,400 per unit). With a net
developable area of 146.2 acres, 14.6 acres of park land dedication is required. Per the attached
Park Exhibit, the total outlot area dedicated for park or public use is 35 acres. This encompasses
wetland, ponding and trails which will offer a unique experience with not only opportunities for
active play, but also connections to the natural environment. Of this larger parcel, 7.8 acres will be
specifically dedicated for park land credit or approximately 53% of the City requirement.
Therefore, the remaining requirement will be paid in cash: 47% of $2,400 or $1,128 per unit.
With 312 units in the neighborhood, the total cash dedication would be $351,936.
Under the PUD Zoning Code, flexibility is being requested for reduced road widths, setbacks and
lot sizing to create a neighborhood with an enhanced overall design. In exchange for flexibility
from the standard R-3 zoning ordinance, wetlands and wooded areas are preserved, a variety of
housing styles are created and landscaping standards are exceeded. Most notably related to Parks is
the extensive trail system; 8,000 lineal feet (1.5 miles) of trails and boardwalks are proposed to be
constructed throughout the neighborhood. These will provide connections to the much-needed
neighborhood park for Adelaide Landing and the surrounding community.
The Excelsior Group, LLC 1660 Highway 100 South, Suite 400, St. Louis Park, MN 55416
952-525-3200 ExcelsiorLLC.com Info@ExcelsiorLLC.com
Developer installed park improvements not only include the trails and boardwalks, but also the
grading, seeding and trees within the park and along the trails. The neighborhood will be served by
a water reuse system whereby the ponds will be used to irrigate lawns and common open space. The
pumps will be appropriately sized and an irrigation service connection will be provided to
accommodate the park area. The neighborhood master homeowners association will be responsible
for maintaining the pumps and winterization of the neighborhood’s mainline system.
To summarize, below is a chart of the anticipated park improvements showing the responsible party
for installation. If it means completing the park sooner, the developer is willing to install City
improvements for an in-kind reduction in park fees.
Improvement
Developer
Installed
City
Installed
Park Grading X
Park Seeding X
Park Irrigation X
Parking Lots X
Trails & Boardwalks X
Buffer Landscaping X
Shelter X
Sports Court & Pickle Ball X
Play Structure X
Additional Park Furnishings X
Phasing of the park improvements is anticipated as follows:
1. Grading and seeding
a. Within City-owned Outlot – 2017
b. South of poweline easement – 2017
c. North of powerline easement – 2019
2. Trails, Boardwalks and Buffer Landscaping
a. Within City-owned Outlot – 2018
b. South of powerline – 2018
c. North of powerline to Street 2 – 2019
We look forward to continued discussions with the Parks Commission. Please feel free to contact
me with any questions at 952.525.3223 or deb.ridgeway@excelsiorllc.com. Thank you.
Sincerely,
Deb Ridgeway
Project Manager
Cc: Rachel Juba
Attachments
Phone (952) 937-5150 7699 Anagram Drive
Fax (952) 937-5822 Eden Prairie, MN 55344
Toll Free (888) 937-5150
aDELAIDE lANDING
Hugo, MN
Preliminary Park Plan
0008463
NOTE: PARK PLAN FOR ILLUSTRATIVE PURPOSES ONLY & SUBJECT TO CHANGE
3/6/2017 N
Phone (952) 937-5150
Fax (952) 937-5822
Toll Free (888) 937-5150
7699 Anagram Drive
Eden Prairie, MN 55344
westwoodps.com
Westwood Professional Services, Inc.
Proposed Park Data:
Dedicated Park Area: 7.8 ac
(net upland, less wetlands, ponds, & easements)
Other Project Open Space : 102.5 ac
(includes wetlands, ponds, buers, woods, esmts, etc.)
Project Trails & Boardwalks: 8,000 lf +/-
Preserved Woods
Ponding
Ponding
Ponding/
Soil Borrow
City Outlot Ponding/
Soil Borrow/
Flood Storage
65 Single Family
90 Single
Family
Villa
Homes
70 Single
Family
Existing Wetland
Existing WetlandExisting Wetland
Existing Wetland
Existing Wetland
Ditch Trail
Trail
Temp
CDS
Sidewalk
Trail
Sport Court &
Pickleball
Parking
30 Stalls
Parking
8 Stalls
Park Shelter
Tot Lot
100 dia.
Open
Play
Landscape
Island
Wetland
Boardwalk
Wetland
Boardwalk
Landscape
Buer
Soccer
Field
Adelaide Landing Preliminary Plat/PUD – Narrative
1
ADELAIDE LANDING
Hugo, Minnesota
PROJECT NARRATIVE
March 10, 2017
Nestled among acres of wetlands, Adelaide Landing demonstrates an appreciation for the natural
environment. Preservation of the wetland system enhances connections with nature. The extensive
trail system meanders organically throughout the site allowing one to appreciate the open views and
wildlife.
Both street and trail connections are created to neighbors, to nature and to the surrounding
community. Trails lead to the centrally located park which is a gathering space for families to picnic,
kids to play or individuals to simply enjoy nature. Curved streets follow the edges of wetlands and
ponds to create a design where a majority of home sites back to open space.
A variety of lot sizes craft a community for those at different life stages and income levels. Home
styles will attract first time homebuyers, families with children as well as empty nesters.
LOCATION
The site is located at the northeast intersection of CSAH 61 and 130th Street North.
GENERAL DESCRIPTION OF REQUEST
Preliminary Plat and PUD approval is being sought for the 217-acre site. In all 319 units are
proposed creating a gross density of 1.5 units per acre. The net developable area of 146 acres creates
a net density of 2.2 units per acre, which is well below the maximum density of 4 units per acre in
the R-3 Zoning District. Generally, a combination of lot sizes is proposed: 45’, 50’, 65’, 70’ and 85’
widths.
Below is a comparison of the R-3 Zoning requirements versus the proposed lot sizes:
R-3 Zoning
District
Proposed
Villa Lots
Proposed
50’ Wide Lots
Proposed
65’ Wide Lots
Proposed
70’ Wide Lots
Proposed
85’ Wide Lots
Lot Size (min) 10,400 SF 5,850 SF 6,513 SF 8,450 SF 9,029 SF 11,050 SF
Lot Size (avg) 8,601 SF 8,138 SF 11,823 SF 10,529 SF 13,017 SF
Lot Width (min) 80 Ft 45 Ft 50 Ft 65 Ft 70 Ft 85 Ft
Lot Depth (min) 100 Ft 130 Ft 130 Ft 130 Ft 130 Ft 130 Ft
Front Setback (min) 30 Ft 20 Ft – Side Load Garage
25 Ft – Front Load Garage
25 Ft 25 Ft 25 Ft 25 Ft
Side Setback (min) 10 Ft 7.5 Ft 7.5 Ft 7.5 Ft 7.5 Ft 10 Ft
Rear Setback (min) 30 Ft 25 Ft 30 Ft 30 Ft 30 Ft 30 Ft
Bldg Height (max) 35 Ft 35 Ft 35 Ft 35 Ft 35 Ft 35 Ft
Lot Impervious (max) 50% 55% 50% 50% 50% 50%
Adelaide Landing Preliminary Plat/PUD – Narrative
2
The PUD is a tool that will allow flexibility from the R-3 District standards to create a better overall
design that preserves and enhances the natural features of the site while introducing a mix of product
styles for first time homebuyers, families and empty nesters. Further, it will create much needed
connections to open and play spaces for the surrounding community.
It is understood that PUDs are reviewed under the expectation that the developer will deliver a higher
quality product in exchange for relaxation of the standard Zoning Code. To summarize the above
table, flexibility is being requested for minimum lot size, minimum lot width, front, side and rear
setbacks as well as maximum lot impervious surface.
In response to the evaluation criteria specified in the PUD Zoning Code, the site provides the
following in exchange for flexibility:
1. Preservation of the Site’s Natural Features – Of the nearly 60 acres of wetland, 1.34 acres are
being impacted; leaving 98 percent untouched. Additionally, trees are being preserved to
maintain a buffer in the northeast corner of the site. A couple other pockets of trees are
planned to remain in the southern portion of the property, becoming a site amenity.
2. Creation of an Extensive Trail System – Approximately 8,000 lineal feet (1.5 miles) of trails
is being created in Adelaide Landing. The pathways provide connections from the
surrounding neighborhoods that scenically meander around the ponds and wetlands through
the park. In addition to the trails, there will be 13,000 lineal feet (2.5 miles) of sidewalk
providing even more pedestrian options.
3. Significant Landscaping – Under the standard zoning ordinance, 2 trees per lot are required
or about 638 total trees. The plan contemplates a combination of over 1,400 boulevard,
screening and front yard trees. Extensive landscaping is evident along Highway 61 and 130th
Street to buffer the rear yards from street traffic. Buffer areas are also planned for the park
and in the rear yards of homes adjacent to the existing neighborhoods.
4. Storm Water Reuse System – A storm water reuse system will be implemented to use onsite
ponding to irrigate common areas, park areas and all homes’ yards. The system’s pumps and
mainline will be owned and maintained by the Master Homeowners Association. Not only
does water reuse aid in meeting the site’s infiltration requirements, but also conserves potable
water for domestic use.
5. Decrease in the Allowed Density – Under the R-3 Zoning Ordinance, a maximum density of
4 units per acre is allowed. By creating a design that is sensitive to preserving the natural
features (wetlands and wooded areas), less density is achieved. Adelaide Landing plans for
nearly half the allowed density at 2.2 units per acre.
6. Architectural Design Guidelines – Architectural Guidelines will ensure aesthetically pleasing
homes that will complement each other, yet celebrate a variety architectural styles.
HOUSING & SETBACKS
The variety of lot sizes allow for a variety of home styles to meet the needs of many different buyers.
The 45’ wide lots are planned for Villas which offer main level living with association maintained
grounds mostly geared toward empty nesters. Single family lots with widths of 65, 70 and 85 feet are
suitable for a variety of traditional single family home sizes to meet a variety of price points. The
smaller 50-foot wide lots are ideal for smaller homes geared toward first time homebuyers. In all,
there will be about five different home series. The accompanying elevations (Attachment A)
Adelaide Landing Preliminary Plat/PUD – Narrative
3
generally depict the housing styles for the neighborhood. Additionally, Architectural Guidelines will
provide a framework for builders to follow while allowing flexibility and variety.
Setbacks for the 50-, 65- and 70-foot lots are proposed to be consistent between product types. This
includes setbacks of 25-foot front, 7 ½-foot sides and 30-foot rear. The larger 85-foot lots will have
similar front and rear setbacks with 10-foot side setbacks. The Villas are proposed to have front
setbacks of 25 feet for front loaded garages and 20 feet for side loaded garages. Side setbacks are
shown at 7 ½ feet on either side.
STREETS, SIDEWALKS & LANDSCAPING
There are number of access points to the site, which also creates connections to the surrounding
community. The curved tree-lined streets will help to calm traffic in this pedestrian friendly
neighborhood. The street design allows for many of the homes to not directly back another home
creating many premium lots with wetland, open space or park views.
Sidewalks are evident throughout and located on one side of the street creating a truly walkable
neighborhood. Trails provide the much needed connections from the surrounding area leading
around the ponds and wetlands to the public park.
While the site is generally open, there are a few stands of trees intended to be preserved. Most
notably, the center entrance along 130th Street. This centrally located entrance creates a front door
effect to the neighborhood with a large monument and public trail leading directly to the park. Near
the Villas, the trees create a private green which becomes the focal point of this sub-neighborhood.
Other existing treed areas will be preserved to the extent possible.
Extensive landscaping is planned along 130th Street and Highway 61 creating rear yard buffers. The
large monument at the main entrance will create identity for the neighborhood as will other features
throughout, including the public park, enhanced trail system and pocket green spaces.
STREETLIGHTS
The streetlight style will be the Vernon Fixture offered by Xcel Energy (see below). Proposed
locations are shown on the Preliminary Plat.
EASEMENTS
The site is intersected by 2 easements: gas line and overhead powerline. Both Koch and Xcel are in
the process of reviewing plans to respond to site planning and permitting near the easement areas.
Adelaide Landing Preliminary Plat/PUD – Narrative
4
WETLANDS
A wetland delineation has been completed and approved for the site. Of the 58 acres of existing
wetlands, only 1.34 acres are impacted by development. The impacts are generally due to street
alignments and connections. In all, 98 percent of the wetlands are preserved creating vista views and
spaces for trails to meander through; a true amenity that will be further enhanced with site
development.
Impacted wetlands will be mitigated by purchasing credits from an approved wetland bank.
The existing ditch through the site will be enhanced to become a site amenity, similar to a small creek
or brook. It will be cleaned out and include a trail that runs parallel to it. Pockets of landscaping will
be evident along the path.
PONDING
Due to the high groundwater levels, the site needs to be raised. As a result, deep ponds will be
created to not only generate material to raise the building sites, but to also manage storm water.
Additionally, the ponds will be used for irrigation to meet water reuse and infiltration requirements.
Approval is being requested to use the adjacent city-owned Outlot A, Country Ponds for ponding.
Ponding will enhance the outlot’s existing condition as well as create a more seamless transition
between the properties. In exchange, a trail will be constructed between the pond and wetland which
will be part of the neighborhood’s public trail system. As shown in the Typical Pond Cross Section
of the Preliminary Plat, a 15’ buffer is proposed off the adjacent property lines with a 10’ bench from
HWL. Overstory trees are disbursed along the pond to create a break from the existing homes
without impeding water & wetland views.
The floodplain boundary is depicted on the Preliminary Plat as agreed upon between the engineers
for both City & Developer. Ultimately, the floodplain elevations will need FEMA approval by way
of a LOMR. This will occur once grading activities are completed and elevations can be certified.
PARKS & TRAILS
In all, the site proposes a combined area in excess of 100 acres for park, open space, ponding, wetland
buffer and wooded area. The extensive trail system not only leads to the centrally located park, but
also meanders around wetlands and ponds, providing a greater connection with the natural
environment. Boardwalks further serve to protect the existing wetlands.
Approval is being requesting for the adjacent city-owned outlot to be incorporated into the
engineered site design. The outlot will be used for ponding, which will also enhance the existing
wetland. In exchange, a trail will meander through the outlot between the pond and wetland to offer
greater connectivity to the adjacent public park.
It is understood that park dedication for new development can be achieved in one of two ways: land
dedication (10% of net developable area) or a fee in lieu of land ($2,400 per unit). With a net
developable area of 146.2 acres, 14.6 acres of park land dedication is required. Per the attached Park
Exhibit, the total outlot area dedicated for park or public use is 35 acres. This encompasses wetland,
Adelaide Landing Preliminary Plat/PUD – Narrative
5
ponding and trails which will offer a unique experience with not only opportunities for active play,
but also connections to the natural environment. Of this larger parcel, 7.8 acres will be specifically
dedicated for park land credit or approximately 53% of the City requirement. Therefore, the
remaining requirement will be paid in cash: 47% of $2,400 or $1,128 per unit. With 312 units in
the neighborhood, the total cash dedication would be $351,936.
Under the PUD Zoning Code, flexibility is being requested for reduced road widths, setbacks and lot
sizing to create a neighborhood with an enhanced overall design. In exchange for flexibility from the
standard R-3 zoning ordinance, wetlands and wooded areas are preserved, a variety of housing styles
are created and landscaping standards are exceeded. Most notably related to Parks is the extensive
trail system; 8,000 lineal feet (1.5 miles) of trails and boardwalks are proposed to be constructed
throughout the neighborhood. These will provide connections to the much-needed neighborhood
park for Adelaide Landing and the surrounding community.
Developer installed park improvements not only include the trails and boardwalks, but also the
grading, seeding and trees within the park and along the trails. The neighborhood will be served by a
water reuse system whereby the ponds will be used to irrigate lawns and common open space. The
pumps will be appropriately sized and an irrigation service connection will be provided to
accommodate the park area. The neighborhood master homeowners’ association will be responsible
for maintaining the pumps and winterization of the neighborhood’s mainline system.
To summarize, below is a chart of the anticipated park improvements showing the responsible party
for installation. If it means completing the park sooner, the developer is willing to install City
improvements for an in-kind reduction in park fees.
Improvement
Developer
Installed
City
Installed
Park Grading X
Park Seeding X
Park Irrigation X
Parking Lots X
Trails & Boardwalks X
Buffer Landscaping X
Shelter X
Sports Court & Pickle Ball X
Play Structure X
Additional Park Furnishings X
Phasing of the park improvements is anticipated as follows:
1. Grading and seeding
a. Within City-owned Outlot – 2017
b. South of poweline easement – 2017
c. North of powerline easement – 2019
2. Trails, Boardwalks and Buffer Landscaping
a. Within City-owned Outlot – 2018
Adelaide Landing Preliminary Plat/PUD – Narrative
6
b. South of powerline – 2018
North of powerline to Street 2 – 2019
Given the site’s history of ownership, it is requested that the park be named in memory of Arthur
Arcand.
SNOWMOBILE TRAIL
It is understood that there is an existing snow mobile trail within the powerline easement that turns
south over the proposed 85-foot lots. In the future, the trail can continue to be used within the
powerline easement, only. Due to future home locations, a north/south trail will not be
permissible/possible.
HOMEOWNERS ASSOCIATION
The overall site will be governed by a master homeowners’ association with 3 individual sub-
associations professionally managed by
Master HOA. The Master Association will be responsible for a number of amenities that benefit the
neighborhood as a whole, mainly the water reuse mainline system and pumps. Additionally, the
Master will be responsible for maintaining the Neighborhood entrance monument and landscaping
features, specifically the buffer plantings along 130th St.
Villas HOA. The Villas will be responsible for summer & winter grounds maintenance for each
unit, including irrigation, mowing and snow removal. Additionally, they will own and maintain
Outlots E and F as well as maintain the island plantings in Street 6 as shown on Preliminary Plat.
Single Family HOA (65’, 70’, 85’). This Single Family HOA will mainly be responsible for
architectural control of the homes located on their respective lots. The HOA will likely contract for a
single trash hauler, as well.
Single Family HOA (50’). This sub-neighborhood consists of the small single family lots located in
the northwest corner of the site. Not only will they be responsible for architectural control of the
homes, but also trash hauling and maintenance of the island located in Street 13 of the Preliminary
Plat.
CONSTRUCTION SCHEDULE
Upon EAW, Wetland Replacement, Preliminary Plat & PUD approvals, the south portion of the site
is anticipated to be graded in May 2017 followed by street and utility construction for the 1st phase
area. Lot delivery is planned for September 2017. Subsequent phasing will be dependent on market
demand and conditions, but anticipated to occur over the next 5 years.
Adelaide Landing Preliminary Plat/PUD – Narrative
7
PROJECT CONTACTS
Developer/Contract Buyer: The Excelsior Group
Deb Ridgeway, Project Manager
deb.ridgeway@excelsiorllc.com
952.525.3223
1660 Highway 100 South, Suite 400
St. Louis Park, MN 55416
Engineer/Wetlands/EAW: Westwood Professional Services
Cory Meyer, Senior Project Manager
cory.meyer@westwoodps.com
952.906.7437
7699 Anagram Drive
Eden Prairie, MN 55344
Adelaide Landing Preliminary Plat/PUD - Narrative
ATTACHMENT A
Elevations
Adelaide landing
Hugo, MN
Illustrative Neighborhood Plan
000846303-09-2017
NPhone(952) 937-5150
Fax (952) 937-5822
Toll Free (888) 937-5150
7699 Anagram Drive
Eden Prairie, MN 55344
westwoodps.com
Westwood Professional Services, Inc.
0 200 400 600
Entry Monument
Ponding/
Soil Borrow
Soccer Field
Shelter
50 Detached
Townhomes
85 Single
Family
70 Single
Family
Existing
Wetland
Park
Trail
Preserved Trees
Existing
Wetland
Overhead Power
Easement
Existing
Wetland
Existing
Wetland
17 22
6
7
8
9
10
11
12
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32 33
34
35
36
37
38
39
40
41
42
43 44
Future Lots
PondPond
Pond
Pond
Pond
Pond
Ponding/
Soil Borrow/
Flood Storage Pond
Pond
Pond
Existing
Wetland
Pond
Pond
Tot Lot
Basketball Court
Pickleball Court
Trail
Trail
Preserved Pine Glade
Landscape Buer
Landscape Buer
Existing Trail
Pipeline Easement
65 Single
FamilyVillas
Preserved Pine Glade
Pond
Pond
Landscape
Buer
Overhead Power
Easement
Pipeline
Easement
Preserved
Aspen Grove
Preserved
Aspen Grove
PROJECT DATA
Gross Site Area: 216.6 ac
Collector Road ROW: 8.1 ac
CSAH 61: 3.4 ac.
130th Street: 4.7 ac.
Existing Wetlands:57.7 ac
Floodzone( 100 yr): 4.6 ac
(beyond wetland limits)
Net Developable Area: 146.2 ac
Park/Open Space: 111.0 ac
(includes ponds, parks, wetlands, wet buers, road buers, woods, etc.)
Proposed Residential Homes 319 lots
45 & 55 Villa Homes: 83 lots
50 Detached Townhomes: 51 lots
65 Single Family Lots: 34 lots
70 Single Family Lots: 61 lots
85 Single Family Lots: 90 Lots
*(Includes 7 future lots by others)
Overall Gross Density: 1.5 un/ac
319 units / 197.5 ac
Overall Net Density: 2.2 un/ac
319 units / 146.2 ac
Aerial photography from State of Minnesota;
Topography from State LIDAR
1110987
1
1
2
3
4
5
6
7
2
3
4
5
6 12 13
1
2
3 4 5 613
11
12
109 8 71
2
3
4 5 678 9
10
11
12
13 14 15
16
17
1
2
3
6
5
4
3
2
1
14 15 16 17 18 19 20 21 22 23 24
25
26
27 28 29
1
2
3
4
5
6
7
8
21
23
22
21
20
19
18
17
16
15
14
13
12
16
17
18
19
20
15
14
13
12
11
11
10
9
10
9
8
8
7
67
6 5
5 4
34
3
2
1
2 1
17
16
15
14
13
121
2
3
4
5
6 7
8
9
10
11
1 2 3 4 5 6
1
2
3
4
5
6 7 8
13
12
11
10
9
5
4
3
2
1
17161514131211109
8
7
6
5
4
3
2
1
6 7
8
7
6
54321
1
2 3
4
5 6
7
8
9
10
11
1
2
3
4
5
8
9
10
11
12
13
109 8 7 6
1 2 3 4 5
6
7
12345678910111213141516
12
13
14
15
17
18
19
20
21
16 15 14 13
11
10
9
8
7
6
5
4
3
2
1
1
2
3 4
5
16
4 5 6 7
8
9
10
OUTLOT C
OUTLOT E
OUTLOT H
OUTLOT D
OUTLOT I
OUTLOT J
OUTLOT B
OUTLOT D
OUTLOT C
OUTLOT A
(a)
(b)
Sec. 90-324. - Park dedication.
General dedication standards. In order to develop a system of parks within the community to serve
the public's health and recreational needs, a percentage of the net buildable acreage based on the
density of all land subdivided for residential purposes shall be dedicated to the city as public
parkland. The city finds that the more dense a development is, the more demand for park land it
creates since lots can be smaller affording less private recreational space and more occupants per
acre. The following formula will be used to determine the dedication requirement where a land
dedication is required:
Density Percentage of Land to be Dedicated (of the buildable land)
0—3.99 units per acre 10 percent
4.00—5.99 units per acre 11 percent
6.00—7.99 units per acre 13 percent
8.00—9.99 units per acre 15 percent
10.00 < units per acre 17 percent
The land so dedicated shall be subject to approval by the city council in accordance with the city's
Comprehensive Plan for parks. At the city council's discretion, a parkland dedication fee may be accepted
or required instead of or connection with land dedication. The parkland dedication fee shall be set annually
by the city council and adopted as part of the city's fee schedule. The parkland dedication fee shall be
charged for each dwelling unit originated by the subdivision or development of any property in the city, not
including any dwelling unit that may be in existence at the time of the adoption of the ordinance from which
this article is derived, or which is subject to an approved development agreement with the city that includes
a parkland dedication provision.
Appeal process. The parkland dedication fee may be appealed to the city council before the city
council makes a decision on the final plat and shall be calculated as follows: The percentage of land
to be dedicated will be multiplied by the fair market value of the net buildable acreage.
The fair market value shall be determined by the city council, following their review of a current
appraisal submitted to the city at the developer's expense. The appraisal shall be made by appraisers who
are approved members of the SREA or MAI, or equivalent real estate appraisal societies.
If the city receives written notice of a dispute over the parkland dedication fee before approval of the
final plat, the developer shall pay the fee into an escrow account pending a decision of an appeal of the
fee. If an appeal is not filed within 60 days following approval of the final plat, or if the person aggrieved by
the fee does not prevail on the appeal, then the funds paid into escrow must be transferred to the city.
(Prior Code, § 1215-040.1; Ord. No. 2010-449, § 1, 11-15-2010)
Municode http://library.municode.com/print.aspx?h=&clientID=14356&HTMReque...
1 of 1 10/5/2012 2:23 PM
- 1 -
Excelsior Group
July 13, 2016
Agenda Number:
CITY OF HUGO
PARKS COMMISSION REPORT
TO: City of Hugo Parks, Recreation and Open Space Commission
FROM: Shayla Syverson, Parks Planner
SUBJECT: Excelsior Group. Request for a sketch plan review for the “South Arcand
property” for a development called Terre De L’eau consisting of 296
residential lots on 197.5 acres east of Highway 61 and north of 130th Street
DATE: June 29, 2016 for the Parks Commission meeting of July 13, 2016
1. INTRODUCTION:
A sketch plan application has been received from the Excelsior Group. The applicant is
looking for informal comments from the Parks Commission prior to submitting a formal
application. A recommendation from the Parks Commission is not needed at this time.
2. DESCRIPTION OF REQUEST:
The applicant is requesting review and comments on a sketch plan for 296 residential lots
on 197.5 acres. The gross density of the project is 1.5 units per acre and the net density is
2.5. The property is zoned Single Family Detached Residential (R-3). The properties to
the north, south and east are zoned R-3 and are occupied by townhomes and single family
homes. The property to the west, across Highway 61, is occupied by industrial uses.
The applicant will be requesting a rezoning from R-3 to PUD. The developer is
requesting a PUD to allow development flexibility for lot width, lot size, and setbacks. In
exchange for this flexibility, the city expects a higher level of design and amenities
within a project. The applicant has indicated that they will provide landscaped streets,
decorative lighting, trails, a public park and stormwater reuse system to irrigate the park
and home sites.
The applicant is proposing a variety of lot widths and product types. They range from
villas on 45’ wide lots to single family homes on 90’ wide lots.
- 2 -
Excelsior Group
July 13, 2016
There will be a need for a traffic analysis so that the intersections and roadways can be
evaluated in light of the anticipated increase in traffic. The developer may be responsible
for the recommended upgrade of 130th Street to an urban-section collector between
Highway 61 and Goodview Avenue as outlined in the City’s long-range plans. The
Planning Commission and City Council will evaluate the street and access plans.
The property has some significant stands of trees and has 35 acres of wetlands. The
applicant is showing landscaping and tree-lined buffers between the development and
Highway 61 and existing developments. A more detailed landscaping plan will be
required with the Preliminary Plat.
3. CONSISTENCY WITH COMPREHENSIVE PLAN:
Trails
The applicant is showing a trail system that connects the residential areas to the park, as
well as to the adjacent neighborhoods and other nearby parks. The trail system is shown
to provide a recreational experience that takes advantage of the view sheds of the natural
areas. A connection to the existing trail along Flay Avenue North in Beaver Ponds is
shown. This connection is shown to be made at the entrances of the developments along
130th Street. An additional trail connection to 130th Street is shown at the second
entrance to the development.
A trail is shown along the north side of 130th Street in the City’s Trails Plan. This should
be shown on the plans and completed with reconstruction of 130th Street. This would
provide connections to the future extension of the Hardwood Creek Regional Trail and
future trail along Goodview Avenue.
Sidewalks shall supplement the connections provided by the proposed trail system.
Sidewalks along City streets are required in developments with lot widths less than 80
feet. This would include a sidewalk along the primary north-south road in the
development that is recommended to connect to the proposed trail network. Sidewalks
are also required in the villa and detached town home areas. It is recommended that these
be constructed to connect to the proposed trails and provide walking loops.
Open Spaces/Parks
The Parks, Trails, and Open Space Plan shows a strong immediate need for a park in this
area. This property is in Neighborhood Park Service Area 4 which includes the Birch
Tree Ponds, Country Ponds and Pineview Meadows developments. A park is not
currently available to residents in this service area without crossing a collector street.
The applicant is showing an active park that is centrally located in Neighborhood Park
Service Area 4. The park is connected to the passive park areas, extensive trail system,
and the existing residential developments.
- 3 -
Excelsior Group
July 13, 2016
The applicant is showing the large active park area may include: pickleball courts, ½
court basketball, play equipment (tot lot, independent play, and swings), park shelter, 30
parking stalls, sand volleyball, open play area, and a soccer field. A potential playfield is
also shown. It is unclear what would be included in the playfield and it seems
disconnected from the rest of the active park area. The applicant may consider relocating
the playfield area to be accessible from the active park area in order to be considered for
parkland dedication. It is recommended that the soccer field, potential playfield, and
other active play areas be accessible from the parking areas.
3. CITY OWNED PROPERTY
The City owns 18-acres of land, consisting of some wetlands, on the west side of the site,
which is adjacent to the parkland. The applicant is proposing to use a portion of the
property for needed stormwater ponds. They are also proposing to construct a trail on the
property to make it useful as a passive park area. The City-owned outlot is not included
in the park dedication calculation.
4. PARK DEDICATION REQUIREMENTS:
The developer is required to dedicate land, pay a fee, or a combination of land and fee.
The park dedication section of the City Code requires the applicant dedicate 10% of the
developable acres for park land with a density of up to 3.99 units per acre. The current
park dedication fee is $2,400 per unit. At this time, the developer has indicated that they
would be dedicating a combination of land and fee. In addition, they are also proposing to
make improvements to the active park area.
The applicant has indicated that there are 121 acres of developable land and a density of
2.5 units per acre. Therefore, they would be required to dedicate 12.1 acres of park land.
The applicant is showing (per a revised park land calculation) 10.2 acres of park land,
excluding wetlands and easements. In this case, the applicant would have 1.9 acres
remaining to meet the required land dedication or 15.7% of the requirement.
A fee could be considered by the Park Commission for the remaining 15.7% of the park
dedication requirement. The applicant shall pay the fee that is in effect at the time of
final plat. Currently, the fee is $2,400. Therefore, the remaining dedication would be
$111,533. (296 units * 15.7% * $2,400)
5. CONCLUSION:
No formal action is required at this time.
- 4 -
Excelsior Group
July 13, 2016
6. DISCUSSION:
The developer is requesting informal comments on the concept plan. The Parks
Commission should discuss the concept and provide input on the following:
Proposed Trail System:
Trail along 130th Street
Layout of the recreational trail through the passive park areas
Sidewalk connections
Connections to the existing neighborhood/ active park access
Park Concept:
Proposal to build active and passive park areas in addition to fulfilling park
dedication requirements.
Combination of amenities preferred in the active park area. They are showing
pickleball courts, ½ court basketball, play equipment (tot lot, independent play,
and swings), park shelter, potential play field, sand volleyball, open play area, and
a soccer field.
Size of the park in relation to the size of the neighborhood
Parking
Connectivity to neighborhoods
Location
Use of city-owned land
Park Dedication Proposal: 10.2 acres of land + $111,533 in park dedication fees
ATTACHMENTS:
1. Location Map
2. Applicant’s Narrative dated June 13, 2016
3. Terre de l’eau Concept Sketch Plan with Park Detail dated June 14, 2016
4. Terre de l’eau Concept Sketch Plan #4 dated May 25, 2016
5. Revised Parks Calculations dated June 10, 2016
6. City of Hugo Trail and Sidewalk Plan
7. City of Hugo Neighborhood Park Service Areas Map
TERRE DE VEAU
Hugo, Minnesota
PROJECT NARRATIVE
June 13, 2016
Nestled among wetlands, Terre De L'Eau demonstrates an appreciation for the natural environment.
Preservation of the wetland system enhances connections with nature. The extensive trail system
meanders organically throughout the site allowing one to appreciate the open views and wildlife.
Both street and trail connections are created to neighbors, to nature and to the surrounding community.
Trails lead to the centrally located park which is a gathering space for families to picnic, kids to play or
individuals to simply enjoy nature. Curved streets follow the edges of wetlands and ponds to create a
design where a majority of the homes back to open space.
A variety of lot sizes craft a community for those at different life stages and income levels. Home styles
will attract first time homebuyers, families with children as well as empty nesters.
LOCATION
The site is located at the northeast intersection of CSAH 61 and 130" Street North.
GENERAL DESCRIPTION OF REQUEST
Prior to preparing the Preliminary Plat, a Sketch Plan review is requested for this 200-acre Planned Unit
Development of nearly 300 housing units with a mix of lot sizes: 45', 50', 65', 70' and go' widths.
The PUD is a tool that will allow flexibility from the R-3 District standards to create a better overall
design that introduces a mix of product styles for first time homebuyers, families and empty nesters.
Further, it will create much needed connections to open and play spaces for the surrounding community.
HOUSING
The variety of lot sizes allow for a variety of home styles to meet the needs of many different buyers.
The 45' wide lots are planned for Villas which offer main level living with association maintained
grounds mostly geared toward empty nesters. The 50' wide lots could be similar one level living with
grounds maintenance or smaller lots ideally geared toward first time homebuyers. The remaining lot
sizes would offer different home styles to meet the needs of buyers at different price points. In all, there
will be about five different home series.
STREETS. SIDEWALKS & LANDSCAPING
There are number of access points to the site, which also creates connections to the surrounding
community. The curved tree lined streets will help to calm traffic is this pedestrian friendly
neighborhood. The street design allows for many of the homes to not directly back another home
creating many premium lots with wetland, open space or park views.
While the site is generally open, there are a few stands of trees intended to be preserved. Most notably,
the easterly entrance along 130' where the road is split around the trees to create a more dramatic
entry. In the Villa (45' lot) area, the trees create a neighborhood green which becomes the focal point of
this sub -neighborhood. Other existing treed areas will be reviewed for preservation where possible.
TDL Concept - Narrative
Landscaping will be reviewed in more detail during the platting process. However, extensive landscaping
is planned along 130" Street and Highway 61. A large monument at the main intersection will create
identity for the neighborhood as will other features throughout, including an overlook area and pocket
green spaces.
WETLANDS
A wetland delineation has been completed and approved in 2015. Generally, the site layout protects the
approximately 70 acres of wetlands. There are a couple smaller incidental wetlands that may be
impacted, but the larger ones are amenities creating vista views and spaces for trails to meander
through.
The existing ditch through the site is intended to be enhanced to become a site amenity, similar to a
small creek or brook.
PONDING
Due to the groundwater levels, the site needs to be raised. As a result, ponds will be created to not only
generate material to raise the building sites, but to also manage storm water. Additionally, the ponds
will be used for irrigation to meet water reuse and infiltration requirements.
PARKS
We are requesting the adjacent city outlot be incorporated into the site design. The outlot will be used
for ponding and passive open space. This will allow for a more contiguous useable public park,
anticipated to be nearly 15 acres with a soccer field, shelter/picnic area and playground. Trails provide
connections for the adjacent neighborhoods to access the park. We will work with the City in calculating
parkland vs cash dedication. In all, the site proposes nearly 65 acres of park, open space, ponding,
wetland buffer and wooded area.
CONSTRUCTION SCHEDULE
Following Sketch Plan review, the preliminary plat will be advanced along with the Environmental
Assessment Worksheet (EAW). The goal is to begin grading the south portion of the site as early as Fall
2016. Utility and street construction for the 1" phase of development would follow in Spring 2017.
TDL Concept - Narrative
terre de l'eauHugo, MNConcept Sketch Plan0008463NOTE: CONCEPT PLAN FOR ILLUSTRATIVE PURPOSES ONLY; SUBJECT TO CHANGE6-14-2016NPhone(952) 937-5150Fax(952) 937-5822Toll Free(888) 937-51507699 Anagram DriveEden Prairie, MN 55344westwoodps.comWestwood Professional Services, Inc.0‘200‘ 400‘ 600‘Landscape Bu erPreserved TreeEntry MedianPreserved TreeNbhd GreenLandscape Bu erLandscape Bu erPonding/Soil BorrowOpen Play/SoccerShelter/Tot LotTot LotPotentialPlay eldPondingPonding/Soil BorrowCity Outlot(Passive Park)City Outlot(Potential PondingExpansion vialand swap)Ponding/Soil Borrow/Flood Storage50’ DetachedTownhomes(51 lots)65’ Single Family(33 lots)90’ SingleFamily(61 lots)45’VillaHomes(91 lots)70’SingleFamily(60 lots)Existing WetlandExisting WetlandExisting WetlandExisting Wetland17.4 ac gr.13.8 ac net10.0 ac gross8.0 ac netParkWetlandFloodzone “A”Floodzone “A”DitchPondPondGreenTrailTempCDSTrailOverlookPotentialTrail SystemPark DetailNo ScaleSandVolleyballPickleballCourts1/2 CtBasketballPavedTrailsStormwaterPondingParking30 StallsParkShelterTot LotOpenPlayResidentialLotsLandscapeMedianExistingWetlandWetlandBoardwalkWetlandBoardwalkSeatingOverlookSoccerFieldSwingsPicnic/Grill StationsIndep. PlayCONCEPT DATAGross Site Area: 197.5 acCollector Road ROW: 7.0 acCSAH 61: 3.0 ac.130th Street: 4.0 ac.Existing Wetlands:45.7 acFloodzone “A” (100 yr): 23.8 ac(beyond wetland limits)Net Developable Area: 121.0 acPark/Open Space: 54.4 ac(net wetlands; includes ponds, parks, wet bu!ers, road bu!ers, woods, etc.)Net Developed Area: 90.4 ac(net R/W, Wetlands, and Park/Open Space; includes developed areas withinFloodplain)Proposed Residential Units 296 lots45’ Villa Homes: 91 lots50’ Detached Townhomes: 51 lots65’ Single Family Lots: 33 lots70’ Single Family Lots: 60 lots90‘ Single Family Lots: 61 LotsProposed PUD Setbacks:Front Setback: 25’Side Setbacks: 5/10’ (15’ total)Overall Gross Density: 1.5 un/ac296 units / 197.5 acOverall Net Density: 2.5 un/ac296 units / 121.0 acAerial photography from State of Minnesota;Topography from State LIDAR
terre de l'eau Hugo, MNConcept Sketch Plan #400084635-24-2016NPhone (952) 937-5150Fax (952) 937-5822Toll Free (888) 937-51507699 Anagram DriveEden Prairie, MN 55344westwoodps.comWestwood Professional Services, Inc. 0‘200‘ 400‘ 600‘COUNTY HWY 61130th St N134th St NFiona Cir NFenway BlvdEuropa Ct N137th St N138th St N135th St NGeneva Ave NCounty Rd 8 / Egg Lake Rd NFreeland Ave N138th St NFlay Ave NFiona Ave NLandscape BufferPreserved TreeEntry MedianPreserved TreeNbhd GreenLandscape BufferLandscape BufferPonding/Soil BorrowOpen Play/SoccerShelter/Tot LotPotentialPlayfieldPondingPonding/Soil BorrowCity Outlot(Passive Park)City Outlot(Potential Ponding Expansion via land swap)Ponding/Soil Borrow/Flood Storage50’ DetachedTownhomes(51 lots)65’ Single Family(33 lots)90’ SingleFamily(61 lots)45’ VillaHomes(91 lots)70’SingleFamily(60 lots)EstimatedWetlandExisting WetlandExisting WetlandExisting Wetland17.4 ac gr.13.8 ac net10.0 ac gross8.0 ac netWetlandParkWetlandFloodzone “A”Floodzone “A”Pipeline Easement
OHP EasementOHP EasementPipeline Easement
DitchPondPondGreenGreenTrailTempCDSTrailOverlookEstimatedWetlandPotentialTrail SystemFreeland Ct NCONCEPT DATAGross Site Area: hh 197.5 acCollector Road ROW: 7.0 acCSAH 61: 3.0 ac.130th Street: 4.0 ac.Existing Wetlands: 35.2 acFloodzone “A” (100 yr): 34.3 ac(beyond wetland limits)Net Developable Area: 121.0 ac Park/Open Space: 64.9 ac(net wetlands; includes ponds, parks, wet buffers, road buffers, woods, etc.)Net Developed Area: 90.4 ac(net R/W, Wetlands, and Park/Open Space; includes developed areas within Floodplain)Proposed Residential Units 296 lots45’ Villa Homes: 91 lots50’ Detached Townhomes: 51 lots65’ Single Family Lots: 33 lots70’ Single Family Lots: 60 lots90‘ Single Family Lots: 61 Lots hphProposed PUD Setbacks: Front Setback: 25’Side Setbacks: 5/10’ (15’ total)Overall Gross Density: 1.5 un/ac296 units / 197.5 acOverall Net Density: 2.5 un/ac296 units / 121.0 acAerial photography from State of Minnesota; Topography from State LIDAR
170TH
FOREST165TH
140TH
132ND
122ND
180TH
125THELMCREST IRISH152ND
GOODVIEWHENNAONEKAHOMESTEADJEFFREY157TH
137TH
130TH
JODYONEKA LAKEHYDE147TH
177TH
EVERTONISLETONEGG LAKE
FRENCHMAN
KELLER175TH
ETHANFIO
N
A HARROWFALCONVICTOR
149TH
136TH
HILO148TH
126THFENWAYJANERO159TH INWOODILLIESHEATHERJULYINGERSOLLF
L
A
Y
1 2 9 T H
155TH
HERITAGE
135TH
EUROPAKERRY
121ST KEYSTONE1 5 8 T H
138TH
145THFARNHAM
VALJEAN150TH151ST
141ST GENEVAFINALEFINLEYFOXHILLGREYSTONEE L M FAI
ROAKSFABLE HILLIVANGARDEN128TH
142ND
HADLEY174TH
FERRARAFRENCHFREEDOM
EXHALL1 3 4 T HFENSON 180TH
FOXHILLHENNAKEYSTONE180TH
EVERTON130TH129TH
152ND
FRENCHMAN
142ND
EUROPA180TH
147 TH
KEYSTONEKEYSTONEFARNHAMFIONA157TH
175TH
121ST FOREST130TH
122ND
G
E
N
E
VA
KEYSTONEELMCREST130TH
150TH 150TH
125TH INGERSOLL1 2 5 T H
147TH
IRISH140TH
FENWAYINGERSOLLONEKA1 2 6 T H
177 TH
FENWAY152ND
FOXHILLOneka
Rice
Sunset
Egg
Bald Eagle
Long
Round
Hors eshoe
Plaisted
South School Section
Barker
Nort h School Section
City of Hugo
March 15, 2010
-Existing Sidewalks & TrailsMap 2-BSidewalks & Trails
Bituminous City Trail - 10.9 Miles
Hardwood Creek Trail - 3.6 Miles
Sidewalk - 18.8 Miles
Snowmobile - 26.4 Miles
Hugo_Major_Roads
0 0.5 10.25 Miles
Paul HugoFarms
Wild Wings of Oneka Game Farm
ClearwaterCreekPark
Oneka RidgeGolf Course
Rice Lake Park
Bald EagleSportsmansAssociation
Oneka Lake Park
Oneka Elementary School
Rice Lake Centre
Frog Hollow ParkHeritage Ponds Park
Lions Park
Oakshore Park
Diamond Point Park
Hugo Elementary
Withrow School
Beaver Ponds Park
Future Park
St. John's Cemetary
Lake Access
City Hall
Arbre Park Fire Department
Val Jean Park
Watertower Park
Victor Square Park
Lake Access
1920 Country School House
Oneka Lake Boat Launch
Walker Cemetary
Oneka
Rice
Sunset
Egg
Bald Eagle
Long
Round
Hors eshoe
Plaisted
South School Section
Barker
Nort h School Section
NP-2
NP-1
NP-5
NP-3
NP-7
NP-4
NP-6
NP-10
NP-9
NP-8
City of Hugo
March 15, 2010
-
City Facility
Public Recreation
Private Recreation
School
City Owned Properties - Undeveloped
Neighborhood Park Service AreasMap 7-DNP-1
NP-2
NP-3
General Service Area of Existingor Proposed Neighborhood Park
Served by existing Lions Park,Frog Hollow Park, Oneka Elementary School and Heritage Ponds Park
Park needed as area develops
Neighborhood Parks
NP
NP-4
NP-5
NP-6
NP-7
NP-8
NP-9
NP-10
Served by Victor Square Park, Arbre Park, Val Jean Park, Future FableHill Park, and 100 Acre Park/Openspace
Served by Park at Water Tower #2and Oak Shore Park
Served by Beaver Ponds Park
Strong immediate need for park
Eastern portion served by Diamond Point Park. Need for Park on western side of Egg Lake
Served by Oneka Lake Park andundeveloped adjacent openspace.
Park needed as area develops
Park needed as area develops
0 0.5 10.25 Miles
Comprehensive Plan Update 2040
Parks Commission Meeting
March 15, 2017
Agenda
1. Welcome & Introductions (5 mins)
2. Discussion (30 mins)
a. What is going well with the parks?
b. What will help you make better decisions about parks policy in the new
Comprehensive Plan?
3. Mapping Exercise to identify opportunities (30 mins)
4. Next Steps
4/19—Open House / Workshop
6/13—Open House / Workshop
6/21—Parks Commission Meeting to review Parks Plan
10/18—Parks Commission Meeting to review draft of 2040 Update
From:Shayla Denaway
To:"brentsmith6@comcast.net"
Cc:Scott Anderson
Subject:RE: Washington County Pheasants Forever Pollinator Project
Date:Friday, January 27, 2017 3:07:34 PM
Hi Brent,
Thank you for your proposal for a pollinator project at Irish Avenue Park. The Hugo Parks, Recreation,
and Open Space Commission will consider it at their February 1 meeting at Hugo City Hall at 7:00pm. I
look forward to hearing more about this project.
Thanks,
Shayla Denaway
Parks Planner
City of Hugo
651-762-6342
From: brentsmith6@comcast.net [mailto:brentsmith6@comcast.net]
Sent: Thursday, January 26, 2017 6:55 PM
To: Shayla Denaway <SDenaway@ci.hugo.mn.us>
Cc: brentsmith6 <brentsmith6@comcast.net>
Subject: Washington County Pheasants Forever Pollinator Project
Hi Shayla,
After further discussion with our chapter members, we would be interested in the Irish
Ave Park site to do a 3 acre pollinator project.
Our plan would be to hopefully start this Spring. We would begin by going in with a
tiller on three acres, then spray with herbicide, and then follow with another spray of
herbicide.
Another approach would be to do a controlled burn with a local fire department or a
Pheasants Forever Chapter. The final steps would include scoring the soil, another
herbicide treatment, and then using local youth (such as 4H groups, Scouting troops,
Science classes, etc.) to plant the seeds and plugs. Our chosen seed mixture and
plant plugs are a combination of plants and flowers that will bloom up to three times
per season.
A couple other requests:
One of the requirements for our PF grant approval is that we be allowed to put up
some Pheasants Forever signage (upon your approval).
Another requirement from Pheasants Forever is that the completed project land stay
undisturbed for 5 years.
Washington County Pheasants Forever will help maintain the pollinator project land.
If this sounds reasonable to you, I will plan to be at your board meeting on Wed. Feb.
1st at 7:00PM.
Please let me know your thoughts.
Thanks,
Brent Smith
651-245-9400
Washington County Pheasants Forever Chapter President
3 Acres at Irish Avenue Park
February 1, 2017
Map Powered by DataLink from WSB & Associates
1 inch = 376 feet±