Loading...
HomeMy WebLinkAboutPC 09.12.19Minutes for the Planning Commission Meeting of Thursday, September 12, 2019 Chair Kleissler called the meeting to order at 7:01 p.m. PRESENT: Arcand, Derr, Fry, Kleissler, Lessard, Mulvihill, Tjernlund. ABSENT: Luchsinger. STAFF: Rachel Juba, Community Development Director Emily Weber, Community Development Assistant Pledge of Allegiance. Approval of Minutes for the Planning Commission Meeting of August 22, 2019 Commissioner Arcand made a motion, seconded by Commissioner Derr to approve minutes for the meeting of August 22, 2019. All ayes. Motion carried. Old Business: Minnesota Built Hugo Minnesota LLC — Site Plan and Variance for Gopher State Storage Madam Chair invited staff, Rachel Juba, to provide a background. The site plan and variance was discussed and tabled at the last meeting. Juba continued with the background on the property. The property is located in the Peloquin Industrial Park and is zoned General Industrial. The applicant is requesting approval of a site plan to construct a building totaling approximately 16,600 square feet for a three-story climate controlled storage facility. The applicant is also requesting approval of a variance from the front yard setback requirements to construct the building 0 feet from the property line. The applicant has made changes to the site plan that was previously presented to the Planning Commission, one of which is making the drive aisle wider. The Planning Commission recommended that the project be completed in one phase and that the applicant work with staff on revisions to ensure the proposed building is cohesive with the existing buildings. The applicant has revised the plan to include that the project will be completed in one phase. The tip -up concrete panel colors have been revised to match the rock -faced block colors on the existing buildings. The architectural metal color has been revised to match the garage doors on the existing buildings. Architectural metal will also be added to the existing building to be more cohesive with the proposed buildings. The applicant has revised the architecture along the west side of the building to break up the massing of the building. In regards to the variance request. The applicant is requesting approval of a variance from the front yard setback requirements to construct the building 0 feet from the right-of-way easement on the west side of the property. September 12, 2019 PC Minutes Page 2 It is in staff's opinion that there are practical difficulties in meeting the ordinance standard. The building height and use is allowed in the zoning district. The right-of-way further limits buildable area and creates new setbacks for the property. In conclusion, the applicant has made changes to the architecture and building materials and has done a good job to make the project cohesive with the existing buildings. The applicant is proposing to build the project in one phase, which was requested by the Planning Commission Staff recommends approval of the site plan and variance requests for the three-story climate controlled storage facility located at 5560 152nd Street North. Luke Doubler, came forward to address the Planning Commission. Doubler stated that the overall look of the building has improved and they are happy with the outcome of the building. They have been working with staff to finalize the design of the building and agree to complete the project in one phase. Commissioner Derr asked if the windows are fake. Doubler stated that the windows are a fagade and that there will not be any banners or images displayed in the window. Commissioner Derr made a motion to approve the site plan and variance request for Minnesota Built Hugo Minnesota LLC for Gopher State Storage, seconded by Commissioner Tjernlund. All Ayes. Motion carried. New Business Cancel the November 14, 2019 and November 28, 2019 Planning Commission meetings and schedule a meeting for November 21, 2019. Motion by Tjemlund, seconded by Derr. All ayes. Motion Carried. Cancel the December 12, 2019 and December 26, 2019 meeting and schedule a meeting for December 19, 2019. Motion by Derr, seconded by Lessard. All ayes. Motion Carried. Staff asked the Planning Commission to RSVP for the Hugo Bus Tour on October 5, 2019. Adiournment Commissioner Derr made a motion, Commissioner Arcand seconded, to adjourn at 7:25 pm. All Ayes. Motion carried. Respectfully Submitted, Emily Weber, Community Development Assistant