HomeMy WebLinkAbout2020.08.17 RESO 2020-44 Site Plan for SW Corner of 140th and Fenway AveRESOLUTION 2020-44
APPROVING A SITE PLAN FOR VICTOR LAND HOLDINGS, LLC, FOR AN
OFFICE/WAREOUSE BUILDING ON THE PROPERTY LOCATED AT THE
SOUTHWEST CONER OF 140TH STREET NORTH AND FENWAY AVENUE
NORTH
WHEREAS, Victor Land Holdings, LLC, requested approval of a site plan for an
approximately 27,000 square foot office/warehouse building, on property legally
described as follows:
Lot 1, Block 1, Roy Molitor 3rd Addition
WHEREAS, the Planning Commission has reviewed said site plan on August 17, 2020,
and recommends approval subject to the conditions listed in this resolution.
NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF
THE CITY OF HUGO, MINNESOTA, that it should and hereby does approve the site
plan for Victor Land Holdings, LLC, for an approximately 27,000 square foot
office/warehouse building, subject to the following conditions and findings:
All items on the Engineer's memo and "red -line" detailed engineering comments that
have been sent directly to the applicant's engineer dated August 7, 2020, shall be
addressed.
2. The applicant shall be required to apply for formal site plan approval for all future
phases to be considered by the Planning Commission and City Council.
3. No Exterior storage shall be located on the lot.
4. The applicant shall meet all conditions listed in the conditional use permits for the
campus development.
5. Prior to the installation of any signs, the applicant shall obtain a sign permit.
6. The landscaping shall be irrigated to ensure establishment.
Prior to the issuance of a building permit:
7. The applicant shall submit a revised landscape plan that meets the City's landscape
ordinance requirements to be reviewed and approved by staff.
8. The applicant shall submit cut sheets for the wall mounted light fixtures to be
reviewed and approved by staff.
a. The applicant shall revise the plans to remove the lights on the north side
of the building.
Resolution 2020-44
Page 2
9. The applicant shall submit the final building material samples and colors for the
building to be reviewed and approved by staff. The materials shall be compatible and
cohesive with the existing building on Lot 1, Block 1, Roy Molitor 3rd Addition.
10. The architecture of the building shall be revised to show a more clearly defined main
entrance by using other architectural elements or providing more glass/windows in
that area.
11. The proposed metal awing design shall be reviewed and approved by staff.
12. The internal roof drainage system that shall be integrated into the building design and
shall be reviewed and approved by staff.
13. The trash receptacles shall be stored inside the building.
14. Cross access and maintenance agreement between the subject lot and Lot 1, Block 1,
Roy Molitor 4th Addition for the shared access shall be reviewed and approved by
staff. The document shall be recorded against the property.
15. Easement and maintenance agreements between the subject lot and Lot 1, Block 1,
Roy Molitor 4 h Addition for the stormwater ponds and utility extensions shall be
reviewed and approved by staff. The document shall be recorded against the property.
Prior to issuance of a Certificate of Occupancy:
16. The applicant shall restore any part of the Fenway Boulevard Trail that is damaged
during construction.
17. All roof top and ground mechanical equipment must be screened from view of
adjacent properties. Staff shall perform an inspection when equipment is installed to
ensure compliance with City code.
18. All required landscaping shall be fully installed.
19. Drainage and utility easements shall be dedicated to the City over the wetland,
stormwater management facilities, and utility extensions.
20. A maintenance agreement for the stormwater management facilities between the City
and the applicant shall be reviewed. and approved by the City then recorded against
the property.
Resolution 2020-44
Page 3
ADOPTED by the City Council this 17 day of August, 20
r
Tom Weidt, Mayor
ATTEST:
Michele Lindau, City Clerk