HomeMy WebLinkAbout2021.01.04 RESO 2021-2 Victor Land Holdings (Schweiters) Pre & Final Plat, Site PlanRESOLUTION 2021-2
APPROVING A PRELIMINARY PLAT, FINAL PLAT, AND SITE PLAN FOR
VICTOR LAND HOLDINGS, LLC, FOR THREE
OFFICE/MANUFACTURING/WAREOUSE BUILDINGS ON THE PROPERTY
LOCATED AT THE NORTHEAST CORNER OF 130TH STREET NORTH AND
FENWAY BOULEVARD NORTH
WHEREAS, Victor Land Holdings, LLC, requested approval of a preliminary plat and
site plan for three office/manufacturing/warehouse buildings totaling approximately
38,000 square feet on property legally described as follows:
See Attached
WHEREAS, the Planning Commission has reviewed said preliminary plat and site plan
on December 19, 2020, and recommends approval subject to the conditions listed in this
resolution.
NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF
THE CITY OF HUGO, MINNESOTA, that it should and hereby does approve the
preliminary plat and site plan for Victor Land Holdings, LLC, for three office/warehouse
buildings totaling approximately 38,000 square feet, subject to the following conditions
and findings:
1. All items on the Engineer's memo and "red -line" detailed engineering comments that
have been sent directly to the applicant's engineer dated December 10, 2020, shall be
addressed.
2. The preliminary plat will create 14 office/manufacturing/warehouse units/lots and one
common lot.
3. No exterior storage shall be located on the property.
4. The applicant shall meet all conditions listed in the conditional use permits for the
campus development.
5. Prior to the installation of any signs, the applicant shall obtain a sign permit.
6. The landscaping shall be irrigated to ensure establishment.
Prior to the commencement of grading:
7. The applicant shall revise all engineering plans per the City Engineers memo dated
December 10, 2020.
8. The civil plans and stormwater permit shall be reviewed and approved by the City
Engineer.
Resolution 2021-2
Page 2
Prior to the issuance of a building permit:
9. If roof mounted mechanical equipment is proposed to be use, the applicant will be
required to raise the parapet was to screen the equipment.
10. The applicant shall submit cut sheets for the wall mounted light fixtures to be
reviewed and approved by staff.
11. The applicant shall submit the final building material samples and colors for the
building to be reviewed and approved by staff.
12. The internal roof drainage system that shall be integrated into the building design and
shall be reviewed and approved by staff.
13. The fence shall be black chain link fencing.
Prior to issuance of a Certificate of Occupancy:
14. The applicant shall submit a shared parking and share driveway easement agreements
or similar documents for review and approval by staff. The documents shall be
recorded against the property.
15. A property owners association shall be created to own and maintain the common
spaces. The documents shall be reviewed and approved by staff and shall be recorded
against the property.
16. The applicant shall restore any part of the Fenway Boulevard North that is damaged
during utility construction.
17. The building mounted mechanical equipment shall be the same color of the building
to blend in with the building. Any utilities on the building shall be painted to blend in
with the building.
18. All roof top and ground mechanical equipment must be screened from view of
adjacent properties. Staff shall perform an inspection when equipment is installed to
ensure compliance with City code.
19. All required landscaping shall be fully installed.
20. Drainage and utility easements shall be dedicated to the City over the wetland,
stormwater management facilities, and utility extensions.
21. A maintenance agreement for the stormwater management facilities between the City
and the applicant shall be reviewed and approved by the City then recorded against
the property.
Resolution 2021-2
Page 3
ADOPTED by the City Council this 4' day of January, 2021.
a
Tom Weidt, Mayor
ATTEST:
Michele Lindau, City Clerk
That part of Lot 3, Block 2, BALD EAGLE INDUSTRIAL PARK, Washington County, Minnesota, described as
follows:
Commencing at the Northeast corner of said Lot 3, thence North 78 degrees 08 minutes 43 seconds
West, assumed bearing, along the North line of said Lot 3 a distance of 127.00 feet to the West line of
the East 127 feet of said Lot 3 to the point of beginning; thence South 11 degrees 51 minutes 17 seconds
West along said West line of the East 127 feet a distance of 280.74 feet; thence North 78 degrees 08
minutes 53 seconds West 248.00 feet to the West line of said Lot 3; thence North 11 degrees 51 minutes
17 seconds East along said West line of Lot 3 a distance of 280.76 feet to the Northwest corner of said
Lot 3; thence South 78 degrees 08 minutes 43 seconds East along said North line of Lot 3 a distance of
248.00 feet to the point of beginning.
and
That part of Lot 3, Block 2, Bold Eagle Industrial Park, Washington County, Minnesota, described as
follows:
Commencing at the Northeast corner of said Lot 3; thence North 78 degrees 08 minutes 43 seconds
West, assumed bearing, along the North line of said Lot 3 a distance of 127.00 feet to the West line of
the East 127.00 feet of said Lot 3; thence South 11 degrees 51 minutes 17 seconds West along said West
line of the East 127.00 feet a distance of 280.74 feet to the point of beginning; thence North 78 degrees
08 minutes 53 seconds West 248.00 feet to the West line of said Lot 3; thence South 11 degrees 08
minutes 53 seconds West along said west line of Lot 3 a distance of 232.14 feet to the South line of the
Southeast Quarter of Section 30, Township 31, Range 21, Washington County, Minnesota; thence South
89 degrees 00 minutes 18 seconds East along said South line of Section 30 a distance of 252.52 feet to
said West line of the East 127.00 feet of Lot 3; thence North 11 degrees 51 minutes 17 seconds East
along said West line of the East 127.00 feet a distance of 184.58 feet to the point of beginning.