Loading...
HomeMy WebLinkAboutPreliminary Estimate (Alt B)HARDWOOD TRAIL - ALTERNATE ROUTE WSB Project: HARDWOOD CREEK TRAIL Project Location: HUGO, MN WSB Project No.: 013720-000 Date: 10/3/2019 STATEMENT OF ESTIMATED QUANTITIES Item No. Description Notes Unit Unit Price ALTERNATE ROUTE TRAIL COST Estimated Quantity Estimated Cost 2101.505 CLEARING 1 ACRE $4,000.00 0.1 $400.00 2101.505 GRUBBING 1 ACRE $3,500.00 0.1 $350.00 2104.503 REMOVE CURB AND GUTTER LIN FT $20.00 20 $400.00 2106.507 EXCAVATION - COMMON CU YD $12.00 150 $1,800.00 2106.507 COMMON EMBANKMENT C CU YD $8.00 100 $800.00 2211.507 AGGREGATE BASE C CLASS 5 2 CU YD $25.00 225 $5,625.00 2521.518 6" CONCRETE WALK 3 SQ FT $6.00 50 $300.00 2521.518 3" BITUMINOUS WALK SQ FT $3.00 9878 $29,634.00 2531.503 CONCRETE CURB AND GUTTER DESIGN B618 LIN FT $26.00 20 $520.00 2531.618 TRUNCATED DOMES SQ FT $42.00 20 $840.00 2573.503 SILT FENCE, TYPE MS LIN FT $4.00 2000 $8,000.00 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER LIN FT $4.00 1000 $4,000.00 2574.507 COMMON TOPSOIL BORROW CU YD $20.00 400 $8,000.00 2574.508 FERTILIZER TYPE 3 POUND $0.80 350 $280.00 2575.505 SEEDING ACRE $1,000.00 1.0 $1,000.00 2575.508 SEED MIXTURE 33-261 POUND $20.00 35 $700.00 2575.508 HYDRAULIC MULCH MATRIX POUND $2.00 2100 $4,200.00 20% CONTINGENCY $13,369.80 RAILROAD RIGHT OF WAY COST NOT INCLUDED TRAIL CONSTRUCTION TOTAL $80 218.80 Page 1 K:\013720-000\Quantity\Preliminary\Preliminary Estimate (Alt B)