Laserfiche WebLink
HARDWOOD TRAIL - MAINLINE <br />WSB Project: HARDWOOD CREEK TRAIL <br />Project Location: HUGO, MN <br />WSB Project No.: 013720-000 <br />Date: 10/3/2019 <br />STATEMENT OF ESTIMATED QUANTITIES <br />Item <br />No. <br />Description <br />Notes <br />Unit <br />Unit Price <br />MAINLINE TRAIL COST <br />Estimated <br />Quantity <br />Estimated <br />Cost <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />$15,000.00 <br />1 <br />$15,000.00 <br />2101.505 <br />CLEARING <br />1 <br />ACRE <br />$4,000.00 <br />0.6 <br />$2,400.00 <br />2101.505 <br />GRUBBING <br />1 <br />ACRE <br />$3,500.00 <br />0.6 <br />$2,100.00 <br />2104.503 <br />REMOVE CURB AND GUTTER <br />LIN FT <br />$20.00 <br />40 <br />$800.00 <br />2106.507 <br />EXCAVATION - COMMON <br />CU YD <br />$12.00 <br />180 <br />$2,160.00 <br />2106.507 <br />COMMON EMBANKMENT C <br />CU YD <br />$8.00 <br />290 <br />$2,320.00 <br />2211.507 <br />AGGREGATE BASE C CLASS 5 <br />2 <br />CU YD <br />$25.00 <br />175 <br />$4,375.00 <br />2521.518 <br />6" CONCRETE WALK <br />3 <br />SQ FT <br />$6.00 <br />100 <br />$600.00 <br />2521.518 <br />3" BITUMINOUS WALK <br />SQ FT <br />$3.00 <br />8800 <br />$26,400.00 <br />2531.503 <br />CONCRETE CURB AND GUTTER DESIGN B618 <br />LIN FT <br />$26.00 <br />40 <br />$1,040.00 <br />2531.618 <br />TRUNCATED DOMES <br />SQ FT <br />$42.00 <br />60 <br />$2,520.00 <br />2564.618 <br />SIGN TYPE C <br />SQ FT <br />$40.00 <br />25 <br />$1,000.00 <br />2573.503 <br />SILT FENCE, TYPE MS <br />LIN FT <br />$4.00 <br />1600 <br />$6,400.00 <br />2573.503 <br />FLOTATION SILT CURTAIN TYPE MOVING WATER <br />4 <br />LIN FT <br />$20.00 <br />300 <br />$6,000.00 <br />2573.503 <br />SEDIMENT CONTROL LOG TYPE WOOD FIBER <br />LIN FT <br />$4.00 <br />800 <br />$3,200.00 <br />2574.507 <br />COMMON TOPSOIL BORROW <br />CU YD <br />$20.00 <br />175 <br />$3,500.00 <br />2574.508 <br />FERTILIZER TYPE 3 <br />POUND <br />$0.80 <br />175 <br />$140.00 <br />2575.505 <br />SEEDING <br />ACRE <br />$1,000.00 <br />0.5 <br />$500.00 <br />2575.508 <br />SEED MIXTURE 33-261 <br />POUND <br />$20.00 <br />20.00 <br />$400.00 <br />2575.508 <br />HYDRAULIC MULCH MATRIX <br />POUND <br />$2.00 <br />1000 <br />$2,000.00 <br />2575.523 <br />RAPID STABILIZATION METHOD 3 <br />M GALLON <br />$400.00 <br />1 <br />$400.00 <br />2582.518 <br />CROSSWALK MULTI -COMPONENT GROUND IN <br />SQ FT <br />$17.00 <br />150 <br />$2,550.00 <br />BRIDGE <br />5 <br />SQ FT <br />$250.00 <br />1400 <br />$350,000.00 <br />BOARDWALK <br />6 <br />SQ FT <br />$120.00 <br />14300 <br />$1,716,000.00 <br />20% Contingency <br />$427,361.00 <br />TRAIL CONSTRUCTION TOTAL <br />$2 579,166.00 <br />Page 1 K:\013720-000\Quantity\Preliminary\Preliminary Estimate (Mainline) <br />