HomeMy WebLinkAboutEDA Packet 11.16.21Agenda
ECONOMIC DEVELOPMENT AUTHORITY (EDA)
Tuesday, November 16, 2021
Hugo City Hall
5:30 PM
5:30 pm 1. Call to Order
5:31 pm 2. Roll Call
ropoK i
CI I Y O�
-4 +��fWQQ
(Arcand, Chrun, Denaway, Gallivan, Klein, Puleo, Roberts, Weidt)
5:32 pm 3. Approval of Minutes
EDA Meeting of October 19, 2021
5:35 pm 4. 140th Street Construction Request from John Schwieters
5:50 pm 5. Update on Downtown Redevelopment
6:00 pm 6. Update on Lions Park Redevelopment and Downtown Street
Improvements
6:10 pm 7. Adjournment
If you need accommodations for the EDA meeting please contact
Rachel Juba at (651) 762-6304 or riuba@ci.hugo.mn.us, thank you.
Background memo for the EDA Meeting of Tuesday, November 16, 2021
3. Approval of Minutes
Staff recommends approval of the minutes from the October 19, 2021 EDA Meeting as
presented.
4. 140th Street Construction Request from John Schwieters
John Schwieters, owner of Victor Land Holdings, LLC, is requesting the City of Hugo cost share
the design and construction of 1401h Street. Staff will provide a background on the request.
5. Update on Downtown Redevelopment
Staff will provide the EDA with an update on Denny Trooien's Downtown Hugo proposal.
6. Update on Lions Park Redevelopment and Downtown Street Improvements
Staff will provide an update on Lions Park Redevelopment and Downtown Street
Improvements.
If you need accommodations for the EDA meeting please contact
Rachel Juba at (651) 762-6304 or riuba@ci.hugo.mn.us, thank you.
MINUTES FOR THE EDA MEETING OF OCTOBER 19. 2021
Acting Chair Klein called the meeting to order at 5:31 pm.
PRESENT: Arcand, Chrun, Denaway, Klein, Roberts.
ABSENT: Gallivan, Puleo, Weidt.
STAFF: Bryan Bear, City Administrator
Rachel Juba, Community Development Director
Emily Weber, Community Development Assistant
APPROVAL OF MINUTES FOR THE EDA MEETING OF AUGUST 17, 2021
Commissioner Roberts made a motion, seconded by Commissioner Denaway, to approve the August
17, 2021 EDA meeting minutes.
Ayes: Arcand, Chrun, Denaway, Klein, Roberts.
Nay: None. Motion carried.
CENSUS DATA
Staff provided an update on the 2020 Census data that was released. Staff stated that the data is
important as the population counts are used for redrawing congressional and legislative district
boundaries. Hugo saw an 18% increase in population since that last Census in 2010. The total
population in Hugo is 15,766 people and has 5,939 households. Staff provided information on
regional data in addition to Hugo data trends.
The EDA commissioners had a discussion on population trends and how it affects planning for the
City.
UPDATE ON DOWNTOWN REDEVELOPMENT
Staff provided an update on downtown redevelopment. They are expecting Denny Trooien to submit
a site plan application in the upcoming weeks.
UPDATE ON LIONS PARK REDEVELOPMENT AND DOWNTOWN STREET IMPROVEMENTS
Staff provided an update on Lions Park redevelopment. The parking lot and park pavilion are currently
under construction with pavement expected within the next few weeks. Mass grading of the site will
also begin within the next few weeks.
ADJOURNMENT
Commissioner Chrun made a motion, seconded by Commissioner Denaway, to adjourn at 6:07 pm.
Ayes: Arcand, Chrun, Denaway, Klein, Roberts.
Nay: None. Motion Carried.
Respectfully submitted.
Emily Weber, Community Development Assistant
Memorandum
To: Hugo Economic Development Authority
From: Rachel Juba, Community Development Director
Date: November 10, 2021, for the EDA Meeting of November 16, 2021
Subject: 1401h Street Construction Request from John Schwieters, Owner of Victor Land
Holdings, LLC.
BACKGROUND/ANALYSIS:
In 2013, the City Council adopted an assessment policy for developer -driven improvements. The
policy outlines criteria to consider the requests of developers to design and construct roadways
and associated improvements and assess the costs to the property. One of the three criteria is that
the requests are limited to areas with commercial and industrial development.
Victor Land Holdings, LLC has submitted land use applications for construction the seventh
building in the Schwieters campus on Fenway Boulevard in the Bald Eagle Industrial Park. The
building is proposed to be built along 1401h Street. 140th Street. In reviewing the applications
with the engineering staff and fire department, staff recommends that 1401h Street be constructed
with their project because of the location, the manufacturing use of the building, and circulation
problems with in the site.
The developer asked staff about cost share for the construction of the road. The City of Hugo
does not have a policy for cost sharing on projects and the construction of 140th Street is not in
the City's 5-year Street Improvement Capital Improvements Plan (CIP). Staff has received a
letter from the developer requesting that the City cost share on the construction of 140th Street (to
their western property line) 50% each and that the developers cost be assessed to the property
over a five year period (generally per the assessment policy). The request also include the City
adding the construction of 140th Street in the CIP for 2022.
The request generally complies with the assessment policy for development -driven
improvements. The City owns a majority of the property along of 1401h Street, where the
extension of the road would occur. There is a benefit to the City with the construction of the
road. There is a sanitary sewer lift station north of 1401h Street that is currently accessed from a
gravel driveway. An improved paved 140th Street would provide the City better access to the lift
station for monitoring and maintenance. Also, Clearwater Creek Preserve Park is west of 1401h
Street.
STAFF RECOMMENDATION:
Staff recommends the cost sharing of the design and construction of 140th Street because the City
owned the property along 140th Street and other benefits to the City. The request generally
complies with the assessment policy for development -driven improvements.
Staff recommends the EDA review and discuss the request from Victor Land Holdings, LLC, and
make a recommendation from to the City Council.
ATTACHMENTS:
1. Location Map
2. Site Plan for New Building
3. Letter from John Schwieters
4. Assessment Policy Exhibit A
City Owned Property
r " 14 Est -Street North
L i
_ O i
7
_ � N
Q
A
(6
3
City Owned Property LL
Proposed 140th Extensi
Clearwater Creek
Preserve F
Park
,. New Proposed Building
0
2
3
4
5
6
w QD 00 00
�C-D
27 ADD'L PARKING
Z SPACES
�I
NEW 8'-0" HIGH
CHAIN -LINK FENCE
TO MATCH EXISTING
STING
FILT17
RATION 1 I New ■ p�p0p
o s
BASIN SCHWIET S
Ildth
W
30'-0"
CO
�
I
I e e e e
S89016'02"E
EXISTING 8'-0" HIGH CHAIN -LINK
70.47
FENCE TO REMAIN
-
I I
SIDE YARD SETBACK (EQUAL TO
BUILDING HEIGHT)
DRAINAGE & UTILITY EASEMENT
EXISTING CHAIN -LINK FENCE TO
I
REMAIN
�
p
Q
�
J
I
e
c�
z
x
EXISTING 40
YARD WOOD
SCRAP
CONTAINERS TO
REMAIN
N
z
v
O
a
.1/
.�
uJ
Cn
I
w
z
w
�
3:X
cD
w
CO
X
Iw
o — — — —
ARCHITECTURAL SITE PLAN
1 if = 60'-0"
DRAINAGE & UTILITY EASEMENT
- S89°16'02"E 798.73
-
� _0� --
— — —
HIGH WATER LINE — — —
I NEW 8'-0" HIGH
i CHAIN -LINK I
FENCE TO MATCH OUTLOT A'
±72, 684 SF
EXISTING (DRAINAGE & UTILITY
EASEMENT OVERALL OF � A/ A/
OUTLOT A)
RETAINING WALL, i w
SEE CIVIL
�I I w
I EXISTING I <
I INFILTRATION 1 z
II BASIN I CD
EXIJEN
I I =
TRII ,
-- -—-
EXISTING 8'-0" HIGH CHAIN -LINK
FENCE TO REMAIN
EXISTING OUTDOOR STORAGE
PLAT '2'
±664,866 SF
>CHWIETERS
BUILDING'5'
EXISTING
144,000 GSF
EXISTING OUTDOOR STORAGE
PPROXIMATE AREA OF
DEFERRED PARKING
(AS REQ'D BY CITY)
,231 SPACES/ ❑
— — — — — — — — — — — —
- -�� - - - - - - - — - — - - -- _ — --
N89°33'08"W 895.01
I
PLAT '1'
±70, 311 SF
27 PARKIN
—SPACES-
-EXISTING
L
0
N
I�
0
Ico
z
w
w
W
Q
w
J
otS
w
c�
z
0
1 4 0 T H S T
PEP
RS
GENERAL NOTES - SITE PLAN
A. DO NOT SCALE DRAWINGS
B. FIELD VERIFY ALL DIMENSIONS
C. G.C. TO VERIFY EXISTING SITE CONDITIONS PRIOR TO
CONSTRUCTION. IMMEDIATELY NOTIFY ARCHITECT OF ANY
DISCREPANCIES.
D. SEE LANDSCAPE ARCHITECTURE DOCUMENTS FOR PLANT
LOCATIONS AND TYPES.
E. SEE CIVIL ENGINEERING DOCUMENTS FOR UTILITIES, GRADING,
STORMWATER, AND DIMENSIONAL SITE REQUIREMENTS. THESE
ITEMS SHOWN HERE ARE FOR REFERENCE ONLY AND MAY NOT
BE ACCURATE.
F. SEE ELECTRICAL DOCUMENTS FOR EXTERIOR SITE LIGHTING.
PARKING CALCULATIONS
ORIGINAL PARKING CALCS
(2018)
BUILDING 5
MANUFACTURING
131,800 SF
STORAGE
7,200 SF
OFFICE
5,000 SF
PREVIOUS REQUIRED PARKING
MANUFACTURING
264 SPACES (2 PER 1,000 GSF)
STORAGE
5 SPACES (1 PER 1,500 GSF)
OFFICE
25 SPACES (1 PER 200 GSF)
TOTAL
324 SPACES
ACTUAL
127 SPACES @ BLDG 5
DEFERRED
(197 SPACES)
UPDATED PARKING CALCS
(2021)
BUILDING 5
MANUFACTURING
131,800 SF
STORAGE
7,200 SF
OFFICE
5,000 SF
BUILDING 7
MANUFACTURING
43,320 SF
TOTAL MANUFACTURING 175,120 SF
TOTAL STORAGE
7,200 SF
TOTAL OFFICE
5,000 SF
CURRENT REQUIRED PARKING
MANUFACTURING
351 SPACES (2 PER 1,000 GSF)
STORAGE
5 SPACES (1 PER 1,500 GSF)
OFFICE
25 SPACES (1 PER 200 GSF)
TOTAL
385 SPACES
ACTUAL
127 SPACES @ BLDG 5
27 SPACES @ BLDG 7
DEFERRED
(231 SPACES MAX)
■
O
d
Ln
z
L_n
J
O
o-
r*40*14 0—Q
LIJ
0 z
w
zw
LLI Q
w
N rm
rn
CV m
I hereby certify this plan, specification or
report was prepared by me or under my
direct supervision and that I am a duly
Licensed Architect under the laws of the
MINNESOTA
9W
`O
O •�
�-ntzell
i
Date: ' �, 8 Reg. No: 15125
O
NO. DESCRIPTION DATE
Revisions
SITE PLAN
REVIEW
7/30/2021
VICTOR LAND
HOLDINGS
BUILDING7
MANUFACTURING
SITE PLAN
Project number 21009.00
Date 7/30/2021
Drawn by ZHF
Checked by MW
Q
N
N
A002
Scale As indicated
IN
0
2�1
N
1 2 3
4
5
6
7
a
DocuSign Envelope ID: FCD72E00-A64B-4F6E-9E61-E015A54D85B8
VICTOR LAND HOLDINGS, LLC
13925 FENWAY BLVD N
HUGO, MN 55038
(651) 762-1110
November 9, 2021
Rachel Juba
Community Development Director
City of Hugo
14669 Fitzgerald Ave N
Hugo, MN 55038
Re: 140th Street Extension
Dear Rachel,
Victor Land Holdings is requesting that the City of Hugo adds 140th street extension to their CIP
plan for 2022. This extension would be from existing connection west of Fenway Blvd N to the
City Park property. The extension of 140th street would be City led from design through
construction of the project to be completed in 2022. Since this street is bordered by City owned
property to the north and to the west along with Victor Land Holdings property, we are
proposing a 50/50 cost share in the project. Victor Land Holdings is also requesting that its
share of the expense be assessed over 5 years.
We appreciate your consideration on this matter and look forward to the City of Hugo's
partnership on this matter.
Sincerely,
Victor Land Holdings, LLC
Docuftned by:
DBFS5D41E90 01...
John H. Schwieters
Owner
JHS/bjk
EXHIBIT A TO RESOLUTION 2013 -
TO SPECIAL ASSESSMENT POLICIES OF THE CITY OF HUGO,
WASHINGTON COUNTY, MINNESOTA
1) New Roadway Improvements
a) The City may become involved in designing, constructing, or financing new developer -
driven roadway and associated improvements where the City determines at its sole
discretion that it is a benefit to the City to do so. The following criteria shall be evaluated
by the City in making the determination:
i) Limited to collector streets and associated utilities as shown on the City's
Comprehensive Plan.
(1) Requires an evaluation of benefits to traffic flow and access.
ii) Limited to areas with commercial or industrial economic development potential.
(1) Requires an analysis of likely business opportunities and job creation.
iii) Property lines or other factors make construction of planned infrastructure
improvements unlikely.
2) Financing
a) City involvement in designing, constructing, or financing new developer -driven roadway
and associated improvements is contingent on the following parameters:
i) Development of a financing plan that identifies total costs and matching revenue
sources that guarantees 100% cost recovery by the City.
ii) Special assessments for the improvement project will be levied to the subject property
if the following conditions are met:
(1) The assessment amount does not exceed 50% of the current property value.
(2) The owner concurs that the increase in fair market value of the subject property
will be equal to the total cost of the improvement project, and that such increase
in fair market value is a special benefit to the subject property.
(3) The owner concurs that the amount of the assessment against the subject property
is reasonable, fair and equitable.
Page 1
(4) The owner represents and warrants that the subject property is not so classified for
tax purposes as to result in deferral of the obligation to pay special assessments;
and the owner agrees that it will take no action to secure such tax status for the
subject property during the term of the assessment.
(5) The City obtains mortgage consents from all lenders and/or lien holders to ensure
that payment of the assessments takes first position in the event of default.
iii) Special assessments for the improvement project will be levied to the subject property
in the following manner:
(1) Special assessments shall be payable over a maximum term of five (5) years and
bear interest at a rate of two points over the bond rate if bonds are issued by the
City for the improvement project, or two points over the current bond rate as
determined by the City's financial consultant.
(2) To secure payment of the special assessments, the owner of the subject property
shall provide to the City a letter of credit, cash surety, or combination thereof, for
60% of the total assessment amount. Reference herein to special assessments
shall be deemed to include, and shall include, all interest thereon. The bank and
form of the letter of credit or other security shall be subject to the approval of the
City Administrator. Such letter of credit shall be maintained in effect until all
assessments are paid in full. As assessments are paid, the letter of credit may be
reduced or replaced by substitute letters of credit, not more often than once every
twelve months, to an amount that is not less than the amount of the unpaid
assessments. In the event special assessments are not paid when due, the City
may draw on the letter to pay such special assessments.
iv) Special assessments against each lot must be paid in full prior to any of the following
occurrences:
(1) Change in ownership
(2) Subdivision of the lot
(3) Issuance of a building permit for that lot.
Page 2