Loading...
HomeMy WebLinkAboutParks Packet 11.18.20Agenda Parks, Recreation, and Open Space Commission Meeting of November 18, 2020 Hugo City Hall, 7:00 pm This meeting will be held remotely pursuant to MN Statute Sec. 13D.021. Anyone who wishes to speak at the meeting is strongly encouraged to make arrangements by 4:30 pm on the meeting day by contacting Parks Planner Shayla Denaway at 651-762-6342. For more information on the remote meeting and participation, go to https://www.ci.hugo.mn.us/participate. Meeting ID: 816 8672 0921 7:00 pm 1. Approve Minutes from the October 21, 2020 Meeting 7:02 pm 2. Lions Park Design Development Update 7:30 pm 3. SHIP Active Living Partnership 2021 8:00 pm 4. Adjournment Page 1 of 2 Parks Commission Agenda November 18, 2020 Background Parks, Recreation, and Open Space Commission Meeting of November 18, 2020 Hugo City Hall, 7:00 pm Approve Minutes from October 21, 2020 Meeting Staff recommends approval of the minutes of the Parks Commission meeting of October 21, 2020. PLEASE SEE THE ATTACHED MINUTES. Lions Park Design Development A joint workshop was held with the City Council and Parks Commission on June 29, 2020. At the meeting of July 15, 2020 the Parks Commission approved a revised Master Plan and Feasibility Study. The City Council adopted the Master Plan and approved the Feasibility Study at their July 20, 2020 meeting. At the October 5, 2020 meeting, the City Council approved agreements with WSB and HCM Architects. At the meeting of October 19, 2020 the City Council appointed stakeholders to the pavilion and playground stakeholder committees. These committees have each held their first meeting. Staff will provide an update on the design development of Lions Park. THE MEETING MINUTES OF THE COMMITTEES ARE ATTACHED AS WELL AS THE LIONS PARK MASTER PLAN. SHIP Active Living Partnership Project 2021 Staff is anticipating that information on the 2021 SHIP Active Living Partnerships will be made available by Washington County the week of this Parks Commission meeting. The City of Hugo has been successful in applying for funds in the past that which have been used to study the 1301" Street/ Hardwood Creek Trail corridor and the Goodview Avenue Trail corridor. Staff would like the Parks Commission to discuss a possible trail feasibility study to be completed in 2021. THE PARKS PLAN CAN BE FOUND AT: https://www.ci.hugo.mn.us/2040compplan Page 2 of 2 Parks Commission Agenda November 18, 2020 Minutes Parks, Recreation, and Open Space Commission Meeting of October 21, 2020 Hugo City Hall, 7:00 pm Meeting held remotely pursuant to Minn. Stat. Sec. 13D.021 Present: Cathy Moore-Arcand, Roger Clarke, Shawn Haag, Mat Rauschendorfer, Nicole Schmid, Dave Strub, Absent: Ranell Tennyson Staff Present: Scott Anderson Public Works Director Shayla Denaway, Parks Planner Debi Close, Secretary Strub called the meeting to order at 7:00 pm. 1. Approval of Minutes from the September 16, 2020 Meeting Clarke made a motion, Schmid seconded to approve the minutes of the September 16, 2020 Parks Commission meeting. Ayes: Roger Clarke, Mat Rauschendorfer, Nicole Schmid, Dave Strub Abstained: Cathy Moore-Arcand Motion carried. 2. Snow and Ice Control Policy Public Works Director Scott Anderson reviewed the City of Hugo's Snow and Ice Control Policy and Procedures. The map of the sidewalks and tails to be maintained was last updated in 2011. Anderson provided an updated map which shows trails that Public Works have been maintaining and would like to maintain. The maintenance of trails and sidewalks is secondary, with snow being cleared after all public streets and city -owned parking lots have been cleared. Cathy Moore-Arcand asked if homeowners are required to maintain the sidewalks on their property. Page 1 of 2 Parks Commission Minutes October 21, 2020 Anderson said residents are not required to clear the sidewalks but the expectation is that residents will be good neighbors. Public Works doesn't have enough man power or equipment to clear all sidewalks and trails in the City. Some areas are maintained by Homeowner Associations. Moore-Arcand asked if we will be over extended with cost and staffing to maintain the additional routes added to the policy. Anderson said we should be fine as long as the equipment has no major break downs or necessary repairs. Moore-Arcand made a motion, Strub seconded to approve the changes City of Hugo's Snow and Ice Control Policy and Procedures. Ayes: Shawn Haag, Cathy Moore-Arcand, Mat Rauschedorfer, Nicole Schmid, Dave Strub Motion passed. Dave Strub asked City Staff to provide a second map showing trails and areas maintained by Homeowner Associations to encourage use. 3. Lions Park Design Developments Update Shayla Denaway, Parks Planner updated on the Lions Park design developments. September 8, 2020 City Council approved the Architectural proposed September 25, 2020 Architects were interviewed October 5, 2020 City Council approved WSB and HCM Architects. Total consultant cost: $161,200 October 6, 2020 Lions Club meeting October 8, 2020 Planning Commission meetings for the pavilion and playground October 12, 2020 Community Workshop - 3 residents at City Hall, 13 residents remotely participating. Mentimenter Survey on line — ongoing with participation available October 19, 2020 Stakeholders were appointed October — December 2020 Design process with stakeholders January— February 2021 Coordinate with WSB designs at 50 Present plans to the Parks Commission and City Council January— February 2021 Authorize construction documents Spring/Summer 2021 Bids, bond and construction starts Cathy Moore-Arcand requested City Staff to provide email updates for all Park Commission members. 4. Adjournment Dave Strub made a motion, Cathy Moore-Arcand seconded to adjourn the meeting at 7:35 pm. Ayes: Shawn Haag, Mat Rauschendorfer, Nicole Schmid, Dave Strub. Motion approved. Page 2 of 2 Parks Commission Minutes October 21, 2020 7. 0 U 0 Z W U) 0 0 00 Lo co Z U) J 0 a a W Z Z 0 0 W Z) U) T W Z W a a Z W x 0 r, ws b Kick -Off Meeting Lions Park Design Development — Site Design WSB Project Number 016969-000 Date: October 29, 2020 Time: 10:00 — 11:00 am Agenda 1. Zoom Meeting Information Meeting ID: 871 3283 0498 2. Welcome & Introductions: • Introduce yourself & role • Tell us why you have an interest for being on this committee Name Organ ization/Title Email X Shayla Denaway Hugo — Parks Planner sdenaway(c�ci.hugo.mn.us X Scott Anderson Hugo — Public Works Director sanderson(a)ci.hugo.mn.us X Liz Finnegan Hugo — Sr. Engineering Technician Ifinnegan@ci.hugo.mn.us X Candace Amberg WSB — Land. Arch / PM camberg(cDwsbeng.com X Bailey Wolf WSB — Landscape Architecture bwolf wsbeng.com X Cathy Moore-Arcand Hugo — Parks Commission sarcand(cDcomcast.net X Tom Weidt Hugo — Mayor mayortom(cDci.hugo.mn.us 3. Project Steering Committee Roles & Responsibilities a. Attend meetings: this is important for consistent messaging throughout the design process so there is guidance b. Brainstorm ideas: we'll be having an open discussion and brainstorming ideas that we can use in our design process c. Provide input to guide planning outcomes: we need your input to help provide feedback on the design so we can further refine how the spaces are shaped. Members are asked to provide input based on the needs of the greater community residents. K:\016969-000\Admin\Meeting\Steering Committee\Site\016969_2020-1029_Kick-off Meeting Site Min utes.docx October 29, 2020 Page 2 4. Master Plan Review a. Overall master plan b. Site vision / goals c. Design development further refines the master plan by creating more defined design based on actual site conditions, programming and spatial configurations. This is where we take it from a 1,000 foot high level down to a pedestrian level. Eventually we'll be getting into the 1/4 inch level. Programming Discussion / Brainstorming a. General appearance / appeal: • If you had out of town guests visiting, tell me what one place or event in Hugo you would want to take them to and why 1. Hanifl: The playground, it is scenic and like the design of the shelter 2. Fran Miron: working dairy farm 3. Irish Park & trails: Cross Country Skiing, hiking & snow shoeing 4. Arcand Park: Trails & play features, recently completed 5. The lake in the summer months or the eastern part of Hugo where it is more of a country setting & Hanifl Park 6. All 36 sq mi • What images and types of activities do you envision when I say Community or Civic Campus 1. Plazas, areas for community gatherings, walking paths, lots of landscaping 2. Gathering areas with a performance stage -Music in the park & a variety of unique features 3. Multi -sport/ flex use area, obstacle course for adults on the perimeter path or designated to a specific area (Eagan Central Park example) 4. Multiple different uses for families that have children of different ages or no children at all b. Views Lighting Primary and secondary vehicular routes 1. Finale will eventually connect to Frenchman Rd & become a busier road 2. Parallel parking along Finale & Fitzgerald should be adequate Focal points 1. Remove east ballfield so the NE corner entry is a better view into the open greenspace Parking lots 1. yes Trails 1. No specific requests from the community, but this would be the park to add lighting to trails Night focal lighting 1. Around pavilion will be important for later evening events K:\016969-000\Admin\Meeting\Steering Committee\Site\016969_2020-1029_Kick-off Meeting Site Minutes.docx October 29, 2020 Page 3 Landscape Appeal • Natural or more manicured 1. Blend of both — have areas of focused planting areas while the playground space can become blended with the landscape • Determine the maintenance necessary of each • Where is shade important 1. natural shade throughout entire park and blending in with the surroundings is important 2. What is shown in master plan looks good- but make sure there is an adequate amount in the playground area e. Active Recreation • What should be in the community sports pad 1. Tennis is lacking in community, still demand 2. Pickleball would be appropriate. 2 at Arcand but already desire higher quality courts, have dedicated use, not over top of tennis 3. Basketball is well used 4. Possibly futsal — depends if there will be funding and space/fit with park (min. 82' x 49'; max. 138 x 82') 5. An area for flexible space 6. No dedicated lawn games (keep informal) • Skate Park: consider moving up by sports pad where more active recreation is located and visible along a more used route • General skating? Maintenance and condition? 1. No skating — many kids currently skate on ponds in their neighborhoods & it is difficult to keep the ice frozen and in good condition 2. Rink would be tough on turf 3. Hugo Elementary has a rink and is adding another for pleasure skating 4. Hanifl building is designed to accommodate warming house so that may be a better location • Open lawn spaces or developed ballfield? 1. Remove NE ballfield 2. Have backstop with grass infield for SW ballfield 3. City is pushing to get more developed (T-Ball) fields located at new elementary school (discuss with White Bear Lake LL) 4. Keep as much open/flexible lawn space as possible • If developed, what level of programming and what are the impacts? 1. No programming —just for pick-up games • Winter Activities 1. Walking, keep snow off. Are heated coils an option or too spendy with different maintenance and replacement costs? 2. Fire pits 3. Building activities Park / Community Events • What activities could happen here? What events are desired? 1. Monthly Music & Movies in the park 2. Good Neighbor Days 3. Tour de Hugo 4. Larger Holiday events K:\016969-000\Admin\Meeting\Steering Committee\Site\016969_2020-1029_Kick-off Meeting Site Minutes.docx October 29, 2020 Page 4 What types of stage performances do you envision — at what capacity 1. Music/Movies — 50'x50' area would be too small a. Move performance stage area to north of pavilion so it's a N-S orientation to avoid sun in eyes and allows for larger crowds with more space to spread out Is there a farmers market 1. yes Holiday or memorial events and celebrations 1. Planning to host those events here Access & Parking • What access is needed for large events 1. The NE corner of the park should provide min. 12' wide access • What size vehicles enter the park and where do they go 1. Up to full size semi trucks; ensure subgrade is built to account for weight 2. Sandy compacted soils now — consider draintile with irrigation • Temporary trailers, vehicles, etc • Parking locations in relation to use areas 1. Good layout shown in master plan. Could possibly expand south parking lot if more parking is needed 2. If stormwater pond is not needed in NW corner utilize the space 3. Think about areas for snow storage 4. Added after meeting: plug in stations for electric vehicles? 5. Keep island along Upper 146th so any use in the lawn is buffered • Food trucks 1. Parallel parking on Fitzgerald will be a good location 2. Electrical outlets Site Furnishings • Locations • Capacity • Styles & materials • Maintenance Comfort & Convenience • Shade • Access to water and restrooms • Electric outlets • Wifi j. Let Xcel know what power services are needed so they can work on plans this winter 6. Next Steps a. WSB: Conceptual Designs b. November 24th: SC Meeting #2 (Concept Review) c. WSB: Design Development d. January 13th: SC Meeting #3: Preferred Design Review e. Parks Commission Mtg f. City Council Mtg 7. Adjourn K:\016969-000\Admin\Meeting\Steering Committee\Site\016969_2020-1029_Kick-off Meeting Site Minutes.docx H A G E N, CHRISTENSEN & MCILWAIN A R C H I T E C T S MEETING MINUTES To: City of Hugo From: Matt Lysne Date: October 29, 2020 Minutes generated 11/5/2020 Comm. No: 2060 Subject: Lions Park — Agenda Copies To: Team Steering Committee Meeting #1 1. Zoom Meeting Information: • Meeting ID: 880 1422 8758 • Passcode:281006 1. 2. Introductions & Communication Present Matt Lysne lysne@hcmarchitects.com X Tim Mcllwain Mcllwain@hcmarchitects.com X Liz Gutzman Gutzman65ftmarchitects.com X Candace Amberg (Camberg(a wsbeng.com) X Bailey (Krause) Wolf Bwolf wsbeng.com X Shayla Denaway Sdenawa�ci.hugo.mn.us X Rachel Juba Rjuba ci.hugo.mn.us X Scott Anderson sanderson(d�ci.hugo.mmus X Tom Weidt mavortom(a)ci.hugo.mn.us X Dave Strub dave strubnet.net X Matt Derr Matthew. derr(a)gmai1.com X Dan Balthazar dmbalthazor(a)gmail.com; X Lynette Anderson Lynetteandersen17@gmail.com; X • Team and Committee Introduction and Roles 3. Steering Committee Roles & Responsibilities a. Attend Meetings — See last agenda item for schedule b. Brainstorm ideas and provide input on needs c. Help establish goals • Introduction of project and base goals by Mayor Weidt 4. Programming Discussion • What is programming • Key / Primary Space Need(s) — Event type, capacity, views / setting • The large gathering space was discussed, as it is the driver for many of the adjacent components size. • Hanifl park is a 2,200 sf building with approx.. 950 sf of exterior covered pavilion. Approximate 30-40 people in a seated at table capacity and 110 +/- auditorium style. The Onieka Room seats 110 auditorium style. • The starting place for Lions Park should be 100-110 people seated at tables and 150+ auditorium style. This will put the building overall size in the 4,000 — 5,000 sf size range. PH 6 1 2- 9 0 4- 1 3 3 2 F A X 6 1 2- 9 0 4- 7 3 6 6 4 2 O 1 CEDAR AVENUE SOUTH M I N N E A P O L I S, M N 5 5 4 0 7 MEETING MINUTES CITY ❑F HUGO - LIONS PARK DATE: 1 0/29/202❑ • The design team will explore at least one idea where the main space could be sub -divided by an operable partition. The key components that affect this are acoustic separation and ease of use / operation. • Related Exterior Space Need(s) • The adjacent main, covered, outdoor space should be 20'x40' minimum and in addition potentially have more space or wrap around characteristics that allow multiple break out spaces or uses. • From the related earlier meeting the outdoor performance space will be planned for the north end of the building (not east). • Current, adjacent outdoor space is approximately 100' x 100' size to provide an area that can function as a beer garden for special events and be separated from a larger viewing area. • Support Functions — Public / Functional • A conference room / meeting room is desired. This space can function separately for smaller meetings, but can also support the large space for bridal groups, act as a coat room, break out space, etc. • Secondary storage will be in a separate structure, so the building storage only needs to take into account the tables / chairs and any support materials from the building itself. • Kitchen / catering space will not provide for food prep. or cooking. The space is anticipated for catered events, etc. to provide work space, counters, 3-comp. sink and hand sink. Outlets, etc. to support refrigerator / freezer. Food trucks are expected for large public events. • Support Spaces — Utility / Maintenance • A separate janitorial closet with space for cleaning supplies, mops, buckets, mop sink etc. will be provided. • Other? • Lions will use separate storage building to support Good Neighbor Days and their related storage. 5. Site & Context Discussion • What influence can the adjacency to City Hall provide? • What influence can this structure have on Lions Park? • The group all agreed with the 4-sided nature of the site and a desire to be cohesive with the area and planning requirement. 6. Building Style & Civic Presence — Open Brainstorming Discussion • Traditional Example • Lynette commented on liking the traditional feel and respecting City Hall, while not mimicking it. • She also commented on the building help support a "Village Green" type space on the east to compliment the civic nature of the space between the pavilion and City Hall. She also referenced Gathering Space, Rhythm, Order and Repetition in the conversation. • Dan expressed liking the timeless of traditional, but also the openness of modern. • Traditional speaks to civic space. • Modern Example • Dave commented on exploring the idea of glass garage doors or other operable style exterior wall applications to facilitate flow and flexibility. The design team agreed, with the caveat that it does compromise thermal efficiency of the exterior envelope. The group liked the open, airy and accessible feeling of this style of architecture. • The modern blends well with warm materials and an inviting feeling. • Lots of natural light seems important. HAGEN CHRISTENSEN & MCILWAIN PAGE 2 ❑ F 3 MEETING MINUTES CITY ❑F HUGO - LIONS PARK DATE: 1 0/29/202❑ • Ties the interior and exterior spaces together. • Possibly blending the openness and glazing with the forms of traditional to blend the two more popular examples explored. • Rustic Example • Dave commented that the rustic example seems to "heavy" and not appropriate for the context. There was general agreement on that. • Prairie Style Example • The flow from interior to exterior and view to surroundings were the two items that were received positively with this example. 7. Next Steps / Wrap Up a. HCM will generate a programming document to quantify space / size need. b. HCM will generate a conceptual plan to start to describe agencies of space. C. November 241h — SC Meeting #2 (Concept Design) d. January 13th — SD Meeting #3 (Schematic Design) e. Parks Commission Meeting f. City Council meeting — Design Development & Budget presentation • The group did a quick "around the room" and with no other comments, ajorned. • HCM will distribute meeting minutes. • HCM will distribute a draft program and concept options prior to next meeting. • Next meeting will be 7:00 — 8:30 on November 24th. Please notify originator of any corrections, additions, or deletions within 48 hours of receipt. HAGEN CHRISTENSEN & MCILWAIN P A G E 3 ❑ F 3 7. 0 U 0 z w m 0 0 00 LO Cl) a z 73 U) J 0 a a w z z 0 0 M w Z) U) U) w z w Q Q z w x 0 ws b Kick -Off Meeting Lions Park Design Development - Playground WSB Project Number 016969-000 Date: October 29, 2020 Time: 6:00 — 7:00 pm Agenda 1. Zoom Meeting Information Meeting ID: 934 4043 7620 Passcode: 030197 2. Welcome & Introductions • Introduce yourself, role and your goal for this committee Name Organization/Title Email X Shayla Denaway Hugo — Parks Planner sdenaway(c�ci.hugo.mn.us X Emily Weber Hugo — Community Development Assistant eweber(u-)ci.hugo.mn.us X Mike Miron Hugo — City Council mmiron ci.hugo.mn.us X Candace Amberg WSB — Land. Arch / PM camberq@wsbeng.com X Bailey Wolf WSB — Landscape Architecture bwolf wsbenq.com X Kim Luchsinger Hugo — Planning Commission Kimberly.luchsinger(cDgmail.com X Nicole Schmid Hugo — Parks Commission 2gators95@gmail.com X Tiffany Goodchild Kourageous Karter Foundation Tgoodchild10(cDgmail.com X Steve Andress Hugo Resident Steve. and ress(aDyahoo.com X Tom Weidt Hugo — Mayor mayortom(a�ci.hugo.mn.us K:\016969-000\Admin\Meeting\Steering Comm ittee\Playground\016969_2020-1029_Kick-off Meeting Playground Minutes.docx October 29, 2020 Page 2 3. Project Steering Committee Roles & Responsibilities a. Attend meetings: this is important for consistent messaging throughout the design process b. Brainstorm ideas: we'll be having an open discussion and brainstorming ideas that we can use in our design process c. Provide input to guide planning outcomes: we need your input to help provide feedback on the design so we can further refine how the spaces are shaped 4. Master Plan Review a. Overall master plan b. Playground vision / goals: difference between an inclusive playground and an accessible playground • Meets a variety of interests, ages, abilities and challenge levels in an interactive play experience rather than a separate space or activity • Varying sensory stimulating experiences • Socially engaging • ADA requirements are focused more on mobility, which is about 1 % of all disabilities. The remainder include cognitive, emotional, hearing, vision, autism, speech, social and combinations • Needs of caretakers: 40% grandparents provide childcare to their grandchildren • Promote interaction between parents/caregivers and children c. Design Development further refines the master plan by creating more defined design based on actual site conditions, programming and spatial configurations. This is where we take it from a 1,000 foot high level down to a pedestrian level. Eventually we'll be getting into the 1/4 inch level. 5. Programming Discussion / Brainstorming a. Design Themes: exploring type of design theme that would be appropriate here b. General appearance / appeal: What playground have you visited, what made it memorable, what types of evets you want here, what works well? • Magic Forest Playground: Kept kids interest entire time, loved exploring, great entrance feature (single entrance), hide and seek, forts, and music https://www.yelp.com/biz/magic-forest-playground-ormond-beach-2 • Madison's Playground: sometimes the disc swings are not completely accommodating for securing in but had a great zip line. https://www.playlsi.com/en/commercial-playground- equipment/plavgrounds/madisons-place/ • Minneapolis Wabun (Camper Park): themed around historical camping events that took place here, fun with wading pool https://www.plaVisi.com/en/commercial-playground- equipment/plavgrounds/wabun-picnic-area-minnehaha-regional-park/ • Arcand Park: newer park with fun events, zip line • Lions Park in New Brighton (see photo at end) • Independent play and support features to keep kids from falling • Traditional swings not important, would like to explore other options that are fun and inclusive • Create a destination playground • An area for all people — ages & abilities • Have a theme and have it more integrated with the landscaping • As children grow up, the playground doesn't get "old" to them K:\016969-OOOWdmin\Meeting\Steering Committee\Playground\016969_2020-1029_Kick-off Meeting Playground Minutes.docx October 29, 2020 Page 3 • Have lots of unique features • Have a unique center piece that is a large/tall element of the playground • An area for teens and tweens, hangout spots • Zipline that is ADA accessible • Swing coaster or climbing feature, like natural rock look • Exercise equipment • No Challenge course like Ninja Warrior, but a variety of challenge levels on play events c. Security, seating and viewing • Minimizing access points into the playground 1. Yes — very important 2. Look at entrance at Magic Forest Playground in Florida • Use of fencing, amenities, landforms and landscaping to help delineate spaces and keep children safe 1. Possibly fencing around entire playground 2. Provide a main entrance that could possibly because a feature of the playground • Relationship from play elements to viewing and seating areas 1. Incorporate seating throughout d. Types of events, sensory applications & challenge levels e. Multi -age design considerations • Preschool — elementary — teen — adult f. Supplemental amenities, comfort and convenience (water, restrooms, shade) • Shade opportunities • Access to water and cooling features • Access to restrooms • Electrical outlets • Wifi g. Budget: $250K Phase 1; future expansion opportunities 6. Next Steps a. WSB: Conceptual Designs b. November 24th: SC Meeting #2 (Concept Review) c. WSB: Design Development d. January 13th: SC Meeting #3 (Preferred Design Review) e. Parks Commission Mtg f. City Council Mtg 7. Additional Equipment Links: review and let us know of any items you find of particular interest Landscape Structures: https://www.l)laylsi.com/ Ultimate Playgrounds (check out Kompan, Icon, Galaxy, Corocord, Bloqx): https://ultimateplaygrounds.com/playgrounds/ St. Croix Recreation (check out Berliner, Percussion Play, or Get Inspired at top): https://stcroixrec.com/ Miracle Recreation (look under Our Products at top): https://www.miracle- rPcrPation rnm/ 8. Adjourn K:\016969-OOOWdmin\Meeting\Steering Committee\Playground\016969_2020-1029_Kick-off Meeting Playground Minutes.docx October 29, 2020 Page 4 Ad Lions Park Playground 4.3 **** t (8) Playground in New Brighton, Minnesota K:\016969-OOOWdmin\Meeting\Steering Committee\Playground\016969_2020-1029_Kick-off Meeting Playground Minutes.docx ■ r 1 T. ri x i MW AN �.MAE-, all Ape l 1 � i•3 2;1' j t, :1 J `. jam•/ N S' �9..� (. - 1� _ _ a AP COMMUNITYFUTURE SPORTS PAD KING ey21 • a Tom. s'"1!F` TT"�-err• � RELOCATED SKATE PARK MAIN *' PAVILION �'• .� ` �" 1 � li .,:, '_fir � ..l � '��"�' • 1 ' S lw 't E