HomeMy WebLinkAboutParks Packet 04.21.21Agenda
Parks, Recreation, and Open Space Commission
Meeting of April 21, 2021
Hugo City Hall, 7:00 pm
7:00 pm 1. Approve Minutes from March 17, 2021 Meeting
7:02 pm 2. Oneka Lake Reserve Park Dedication
7:40 pm 3. Lions Park to School Trail Study
8:00 pm 4. Adjournment
This meeting will be held in -person, but residents may participate in the meeting remotely pursuant to MN
Statute Sec. 13D.021. For more information on remote participation, go to
https://www.ci.hugo.mn.us/participate.
Meeting ID: 899 6672 8984
Page 1 of 2
Parks Commission Agenda
April 21, 2021
Background
Parks, Recreation, and Open Space Commission
Meeting of April 21, 2021
Hugo City Hall, 7:00 pm
Approve Minutes from March 17, 2021 Meeting
Staff recommends approval of the minutes of the Parks Commission meeting of March 17, 2021.
PLEASE SEE THE ATTACHED MINUTES.
Oneka Lake Reserve Park Dedication
Oneka Lake Reserve, LLC has submitted an application requesting approval of a Preliminary Plat and Planned
Unit Development (PUD) amendment for a residential development to be known as "Oneka Lake Reserve".
The development consists of 40 attached townhomes in a mix of 2 and 3 unit two-story buildings located
north of 1501" Street. The development also includes a private street, a public neighborhood park,
stormwater re -use, and sidewalks. The developer is proposing to dedicate a combination of land and fee to
satisfy park dedication. Staff recommends acceptance of .45 acres of park land to satisfy park dedication
requirements and the remainder to be paid in fees.
PLEASE SEE THE ATTACHED MEMO.
Goodview Avenue Trail Facility Study
Lions Park and a new WBLAS Elementary School are planned to be under construction in summer 2021. A
pedestrian connection between Lions Park, the school, and the existing trail along Oneka Parkway is
desirable. The natural open space owned by the City and School District is substantial, but the majority of it
is wetlands. A proposal was received by WSB to study the feasibility of trails in this area for $16,000. It
includes mapping the approved wetland delineations of the various parcels, delineating remaining wetlands,
as well as preparation and evaluation of conceptual trail alignments and a concluding report. In November
2020, the City applied for funding for this project through Living Healthy Washington County and the
Statewide Health Improvement Program. The City has had several successful SHIP Active Living Partnership
Projects, but was not awarded funding for the trail study. Staff recommends approval of the proposal from
WSB to study the feasibility of trails between Lions Park and the new school.
WSB'S PROPOSAL AND THE TRAIL PLAN ARE ATTACHED.
THE PARKS PLAN CAN BE FOUND AT: https://www.ci.hugo.mn.us/2040compplan
Page 2 of 2
Parks Commission Agenda
April 21, 2021
Minutes
Parks, Recreation, and Open Space Commission
Meeting of March 17, 2021
Hugo City Hall, 7:00 pm
Meeting held remotely pursuant to Minn. Stat. Sec. 13D.021
Present: Cathy Moore-Arcand, Roger Clarke, Emily McGinnity, Mat Rauschendorfer, Nicole Schmid,
Dave Strub, Ranell Tennyson.
Staff Present: Shayla Denaway, Parks Planner
Debi Close, Parks Secretary
Chair Strub called the meeting to order at 7:02 pm.
1. Approval of Minutes from the February 17, 2021 Meeting
Moore-Arcand made a motion, Raushendorfer seconded to approve the minutes of the February 17,
2021 Parks Commission meeting.
Ayes: Cathy Moore-Arcand, Roger Clarke, Emily McGinnity, Mat Rauschendorfer, Nicole Schmid, Dave
Strub, Ranell Tennyson.
Motion approved.
2. Lions Park Update
The City Council held a workshop February 23, 2021 to revise the pavilion design. Denaway shared
updates on the pavilion roof changes, site furnishings, playground and court spaces.
3. Sunset Lake City Owned Property Update
Denaway shared an update on a letter received from a resident regarding access and use of the city -
owned property on Sunset Lake. The concepts that were drafted for the property in 2020 were
revisited.
Discussion included: removing kayak storage rack, future shelter, adding trash receptacles and a bike
rack, and where to locate the access to not impact neighboring properties.
Page 1 of 3
Parks Commission Minutes
March 17, 2021
Strub requested City Staff to have a third concept plan drafted before the fall budgeting and CIP
planning meeting.
St. Pierre asked if something could be done during the planning interim to encourage the use.
Denaway informed a discussion has already occurred with Scott Anderson, Public Works Director about
shrub clearing and mowing to improve access this summer and that the concepts will be revisited in the
fall.
4. Beaver Ponds Playground Replacement
Denaway informed that the 2021 CIP funding allocated $60,000 to replace the playground equipment at
Beaver Ponds Park. The Lions park play equipment needs to be removed for the construction of the new
park and should be located to Beaver Ponds. Cost estimates were presented to replace the
trails/sidewalks, new playground container curb, removal of existing equipment, installation of the new
equipment, new surfacing, irrigation repairs, site restoration and landscaping improvements totaling
$56,000.
Tennyson made a motion, Moore-Arcand seconded to approve a budget of $56,000 to reinstall the
playground equipment from Lions Park to Beaver Ponds Park.
Ayes: Cathy Moore-Arcand, Roger Clarke, Emily McGinnity, Mat Rauschendorfer, Nicole Schmid, Dave
Strub, Ranell Tennyson
Motion carried.
5. 2021 Recreation Programs
Forest Lake YMCA is continuing the Park Play Days at Hanifl Fields Athletic Park and Washington County
will be hosting Library in the Parks. The YMCA is requesting the city's contribution of $2,000 be
increased to $2,500 to offset additional costs due to COVID.
Tennyson made a motion, Moore-Arcand seconded to approve the $2,500 donation to the YMCA
programming services.
Ayes: Cathy Moore-Arcand, Roger Clarke, Emily McGinnity, Mat Rauschendorfer, Nicole Schmid, Dave
Strub, Ranell Tennyson
Motion carried.
6. Upcoming meetings
Page 2 of 3
Parks Commission Minutes
March 17, 2021
Shayla Denaway informed that the City Council meetings are going to be in person starting in April and
that it would be possible for the Parks Commission to also start meeting in person. All Commission
members felt comfortable having the in person meetings resume in April. Staff is also requesting an
additional meeting be held in April to go over the Lions Park plans and host a neighborhood meeting.
The Parks Commission set the meeting for April 14, 2021 at City Hall.
7. Adjournment
Moore-Arcand made a motion, Rauschendorfer seconded to adjourn the meeting at 8:36 pm.
Ayes: Cathy Moore-Arcand, Roger Clarke, Emily McGinnity, Mat Rauschendorfer, Nicole Schmid, Dave
Strub, Ranell Tennyson.
Motion approved.
Page 3 of 3
Parks Commission Minutes
March 17, 2021
Agenda Number: 2
CITY OF HUGO
PARKS COMMISSION REPORT
TO: City of Hugo Parks, Recreation and Open Space Commission
FROM: Shayla Denaway, Parks Planner
SUBJECT: Oneka Lake Reserve, LLC. Request for a PUD and Preliminary Plat for
"Oneka Lake Reserve"
DATE: April 15, 2021 for the Parks Commission meeting of April 21, 2021
1. DESCRIPTION:
Oneka Lake Reserve, LLC has submitted an application requesting approval of a
Preliminary Plat and Planned Unit Development (PUD) for a residential development.
The property totals 6.7 acres and located north of 150th Street North and Generation
Avenue North. The preliminary plat includes 40 attached townhomes.
The plan includes residential units, a private street, a public neighborhood park,
stormwater re -use (community irrigation and infiltration basins) and sidewalks. The
proposed development includes a mix of 2 and 3 unit two-story buildings.
The property is currently zoned (R-4) and will be rezoned Planned Unit Development
(PUD). The properties to the south, east and west are zoned (R-4) and include the
Generation Acres Townhomes, Hugo Estates mobile home park, and Oneka Lake View
Townhomes. The property to the north is zoned (R-3) Single Family Detached
Residential and is the Sweet Grass Meadows development.
The property does not include wetlands and totals 6.05 net acres and a .45 acre public
park. The applicant is requesting flexibility from the standard zoning code with the PUD
for increased density and building setbacks. The density can be increased to eight units
per acre under a PUD. The developer proposes to rezone the property to PUD in part to
allow a gross density of 6 units per acre. The density net of the park dedication is 6.4
units per acre.
-1-
Oneka Lake Reserve
April 21, 2021
2. BACKGROUND:
The Parks Commission reviewed a similar PUD application at their July 17, 2021
meeting. Current changes to the plat include a reduction in the number of units, from 44
to 40 and a new site layout. The developer is continuing to propose a combination of
park land and fee dedication, but is not proposing to build park amenities in exchange for
PUD flexibility. At the meeting of July 17, 2021, the Parks Commission approved .65
acres of park dedication land with park amenities and fee of $26,400.
3. PARK DEDICATION:
The developer is required to dedicate land, pay a fee, or a combination of land and fee to
satisfy park dedication per Sec. 90-324 of the City Code. The applicant is required to
dedicate 13% of the developable acres for park land with a density of 6.00- 7.99 units per
acre. The developer has indicated that there are 6.7 acres of buildable land in the
development. Therefore, the developer is required to dedicate .87 acres of park land.
The current park dedication fee is $2,400 per unit. If a fee is preferable, with 40 units,
the park dedication fee would be $96,000.
ark41equired
Dedication
dOped
Calculations
Land OR Fee
13% of the developable acres
.87 acres
.45 acres and
$46,080
16
$2,400 per unit
$96,000
The developer is proposing to dedicate land to satisfy the park dedication requirements.
The proposed land dedication of .45 acres satisfies 52% of the requirement. The
remaining should be satisfied with payment of 48% of the fee ($1,152 per unit) which
would total $46,080 with 40 units.
4. CONSISTENCY WITH PARK PLAN
Parks/ Open Space
This development is in Neighborhood Park Service Area 10 which includes Oneka Lake
Park, the Bernin property, and DNR boat launch. Oneka Lake Park is .6 miles distance
from the neighborhood. The case could be made that due to the density in the immediate
neighborhood, additional park amenities are desirable. The neighborhoods to the south
and west would have easy access to the park.
-2-
Oneka Lake Reserve
April 21, 2021
Trails
The Existing and Proposed Trails Map does not show a trail in the area. Sidewalks are
required to be built in developments with lots less than 80' wide (Sec. 90-336). The
developer is showing sidewalks to be constructed along 150th Street and adjacent to the
private street. These would connect to the existing sidewalk on Generation Avenue to the
south and eventually the trail on Oneka Lake Boulevard. The developer is also showing a
walking loop in the interior of the development around a storm water pond.
5. STAFF RECOMMENDATION:
Staff recommends that the Parks Commission approve dedication of the .45 acre park and
payment of fees. Staff also recommends discussion on future park amenities to be
constructed by the City.
ATTACHMENTS:
1. Location Map
2. Cover Page received March 15, 2021
3. Landscape Plan dated March 12, 2021
4. Applicant's Narrative received March 15, 2021
5. Park Sketch
6. Park Dedication Policy
7. Existing and Proposed Trail Map
8. Neighborhood Park Service Area Map
-3-
Oneka Lake Reserve
April 21, 2021
<—,,� s ..,.
I� 1 _ LL �1 LLk
Right of Way
Roads
_I Hugo Border
Parcel Boundary
t'-, CFFY OF
V� VVEST. 180E
L- C'
Oneka Lake Resrve
Location Map
Hugo, MN
L -Lji
L
N
0 200
Feet
1 in = 200 feet
1
4
5
M
w
U
VICINITY MAP
LOCATION MAP
m
Q
MIMI
OMI
F1 "re a 9, 1
%/ III lu
}� � IIIIII
/d
_ III
— III III
. III III
� ''f III III
III III
III III
III
III III
e III III
III
e III III
III III
III III
•
A
• \\--------------- III III
III III
ILL---_U
--------------
i
NOT TO SCALE
IVV 1 1 %J )%.MLL
PROJECT CONTACTS
ONEKA LAKE RESERVE, LLC
NORM DUPRE
DEVELOPER
12928 JODY AVE. N
HUGO, MN 55038
T (651) 303-0471
ELAN DESIGN LAB, INC.
STEVE JOHNSTON, PE
CIVIL ENGINEER
310 4TH AVE S, SUITE 1006
MINNEAPOLIS, MN 55415
T (612) 260-7982
LANDSCAPE
ELAN DESIGN LAB, INC.
PILAR SARAITHONG, RLA
ARCHITECT
310 4TH AVE S, SUITE 1006
MINNEAPOLIS, MN 55415
T (612) 260-7982
CORNERSTONE LAND SURVEYING, INC.
DAN THURMES, LS
LAND SURVEYOR
6750 STILLWATER BLVD. N. SUITE 1
STILLWATER, MN 55082
T (651) 275-8969
COMMUNITY
CITY OF HUGO
RACHEL JUBA
DEVELOPMENT
14669 FITZGERALD AVENUE N
CITY PLANNER
HUGO, MN 55038
T (651) 762-6304
CITY OF HUGO
MARK ERICHSON, PE
CITY ENGINEER
6900137TH STREET N
HUGO, MN 55038
T (651) 286-8463
SHEET INDEX
C-000 COVER SHEET
A-101 3-UNIT ARCHITECTURAL ELEVATIONS
A-102 3-UNIT FIRST FLOOR PLAN
A-103 3-UNIT SECOND FLOOR PLAN
A-104 4-UNIT ARCHITECTURAL ELEVATIONS
A-105 4-UNIT FIRST FLOOR PLAN
A-106 4-UNIT SECOND FLOOR PLAN
C-001 BOUNDARY AND TOPOGRAPHIC SURVEY BY CORNERSTONE
C-002 PRELIMINARY PLAT BY CORNERSTONE
C-003 GENERAL NOTES
C-010 DEMOLITION PLAN
C-101 SITE PLAN
C-200 OVERALL GRADING & EROSION & SEDIMENT CONTROL PLAN
C-201 GRADING PLAN - AREA 1
C-202 GRADING PLAN - AREA 2
C-203 GRADING PLAN - AREA 3
C-204 GRADING PLAN - AREA 4
C-205 SWPPP
C-301 UTILITY PLAN
C-501 DETAILS
C-502 DETAILS
C-503 DETAILS
C-504 DETAILS
L-101 LANDSCAPE PLAN
L-501 LANDSCAPE DETAILS
ONEKA LAKE
RESERVE, LLC.
12928 JODY AVE. N
HUGO, MN 55038
651-303-0471
ONEKA LAKE
ONEKA LAKE RuGoRMN
RESERVE PRELIMINARY PLAT,
SITE PLAN,
VACATION AND
REZONING REVIEW
HUGO - MINNESOTA I S S U E °""„°"
PRELIMINARY PLAT.,
SITE PLAN, VACATION AND
REZONING REVIEW
MARCH 12, 2021
D E S I G N
CIVIL ENGINEERING I LANDSCAPE ARCHITECTURE
310 4TH AVE SOUTH, SUITE 1006
MINNEAPOLIS, MN 55415
p 612.260.7980 www.elanIab.com
f 612.260.7990
CERTIFICATION
I hereby certify that this plan, specification
or report was preparedAng
e, or under my
direct supervisio a qam a ly
Licensed son I the
lawsof th(40 of
Stephen M ohnston DATE
REGISTRATION NO. 18914 03/12/2021
SHEET
COVER SHEET
-000
C M%
PROJECT N0.
SCH 18002
w
U
LANDSCAPE PLAN
ill =30'
Q
2
PLANTING vv
(TYP)
u
3
I I I
I I
L— — — —--------
u
ON PROPERTY LINE - - -
4
u
SNOW STORAGE
EXISTING TREES
LANDSCAPE SUMMARY LEGEND
REQUIRED
VALUE MIN. 1 % COST OF IMPROVEMENTS
1 OVERSTORY DECIDUOUS TREE / UNIT
40
1 CONIFEROUS TREE/ UNIT
40
1 ORNAMENTAL TREE / 1,000 SF OF BUILDING (71,768/1,000)
72
OR
1 ORNAMENTAL TREE/ 100 LF SITE PERIMETER (2,207/100)
22
1 SHRUB/ 200 SF OF BUILDING (71,768/200)
359
OR
1 SHRUB/ 30 LF SITE PERIMETER (2,207/30)
74
PROPOSED
RESIDENTIAL & PARK IMPROVEMENTS ABOVE 1%
55 - 2.5" TREES + 10 -1.75" TREES + SAVED 5 EXISTING TREES
55 TREES + SAVED 21 EXISTING TREES
80 TREES
699 SHRUBS
5
I L— ---- --J I II
II
I II
u
I II
u
mi �11// II
• = = _
111IN II
a I
I
BUILDING A
SOD
SEEDED TURF
SEE SHEET C-201 FOR SEEDING NOTES
MESIC SEEDING
SEE SHEET C-201 FOR SEEDING NOTES
STORMWATER SEEDING
SEE SHEET C-201 FOR SEEDING NOTES
• EXISTING TREE TO REMAIN
N
I
I
I
I
—
I i ii I
I
I i ii I
I
I I i ii I
II
I I i ii I
II
I I i ii I
II
III i ii I
II I
I II I
I II I
I II I
I II
I II I
I II
I II I
I II
I II I
I II
I II I
lu
I II I
I II
I II I
I II
I II I
II III
II ® III I
II III
II III I
II III
II III I
II III
II III I
II III
II Z III I
II III
II � III I
w
W III
II �/ III I
LL III
III I
U)
lu
III I
III
I II I
C:) III
Lo III
I II
� III I
I II
I II I
I II
I II I
I II
I II I
I II
I II I
III I
I II I
►II
1 11 I
1 \�
\0
\0
\O�
GENERATION
AVENUE N
4z
1 II
III I
I II I
III III
III III I
III III
III III I
III III
III III I
III III
III III I
III III
III III I
III III
III III I
III III
III III I
III III
III III I
III III
III III I
III III
III III I
III III
III III I
III III
III III I
III III
III III I
III III
III III I
III III
III III I
III III
III III I
III III
III III I
III III
III III I
III III
III III I
III III
III III I
III III
III III I
III III
III O III I
III III
III III I
III III
IRRIGATION WILL BE PROVIDED BY A CENTRALIZED
SYSTEM THAT UTILIZES WATER FROM THE
STORMWATER POND
•
•
. (D
Know what's below. 30 90
Call before you dig.
SCALE IN FEET
ONEKA LAKE
RESERVE, LLC.
12928 JODY AVE. N
HUGO, MN 55038
651-303-0471
PROJECT
ONEKA LAKE
RESERVE
HUGO, MN
SHEET INDEX
PRELIMINARY PLAT,
SITE PLAN,
VACATION AND
REZONING REVIEW
03/12/2021
ISSUE DATE
D E S I G N
CIVIL ENGINEERING I LANDSCAPE ARCHITECTURE
310 4TH AVE SOUTH, SUITE 1006
MINNEAPOLIS, MN 55415
p 612.260.7980 www.eIanIab.com
f 612.260.7990
CERTIFICATION
I hereby certify that this plan was prepared
by me, or under my directypervision, and
that I am a duly L'c Ondsca
Architect cat e I�Iws Eji�N&f
MINNES `
Cam;
Pilarsinee Saraithong DATE
REGISTRATION NO. 45059 03/12/2021
SHEET
LANDSCAPE PLAN
L-101
PROJECT NO.
SCH18002
i
D E S I G N
901 N 3rd St, Suite 120
Minneapolis, MN 55401
tel 612.260.7980
fax 612.260.7990
www.elaniab.com
March 15, 2021
City of Hugo Mayor, City Council, Parks Commission and Planning Commission
c/o Rachel Juba
Community Development Director
14669 Fitzgerald Ave N
Hugo, MN 55038
Oneka Lake Reserve Subdivision
RE: Project Narrative
Greetings:
On behalf of our client, Oneka Lake Reserve, LLC, we are pleased to present the proposed Oneka
Lake Reserve neighborhood, a community of 40 attached townhomes.
The neighborhood is located north of 150t" Street North at the extension of Generation Avenue. The
Generation Acres townhome development lies to the south, Oneka Lake View townhome
development is to the south east, Oneka, Lake View North townhomes to the east, Sweet Grass
Meadows single family to the north and the Hugo Estates manufactured home park to the west. To
the northwest of the site is an industrial park and to the southwest is the New Life Church.
The site was previously approved and platted as a 30 unit townhome development named Oneka
Lake Townhomes 2nd Addition. That project never went forward due to the 2008 recession.
Between 2008 and 2010 the previous property owner commissioned a hydrologic study that
concluded that areas previously designated as wetlands lacked the hydrology necessary to be
classified as wetlands. A Technical Evaluation Committee (TEP) agreed with the finding that there
are no wetlands on the site. Without the wetlands to work around it is desirable to increase the
overall density of the project to match the density of the adjacent townhome developments and
facilitate housing affordability.
The proposed development includes 40 units in a mixture of 2 and 3 unit buildings. Each —2,300 ftZ,
two story unit has three bedrooms and 2 % baths including a main floor master bedroom. Each unit
has an attached 2-car garage. Building materials include maintenance free vinyl siding, stone and
aluminum soffit and fascia.
The homes would be accessed via a privately owned and maintained street that is aligned with
Generation Avenue. The proposed street width is 24 feet with 20 - 8 foot wide shared guest parking
stalls. Each unit has two additional guest parking stalls located in front of their garage. A 5 foot wide
concrete sidewalk is provided on one side of the private drive. A 6 foot wide sidewalk is shown
along 150t" Street N. The private drive is located within a 50 foot wide outlot to be owned
collectively by the homeowners. Other than width and designated parking stalls the private drive
will be built to the same construction standards as city owned and maintained streets.
Site Analysis & Planning I Civil Engineering I Landscape Architecture I Construction Services
RE: Oneka Lake Reserve
March 15, 2021
The developer proposes to plat a 0.45 acre public neighborhood park in the southwest corner of the site.
The plans show a conceptual layout designed to serve the anticipate needs of young families and visiting
grandchildren within this neighborhood and the surrounding area. Park amenities could include a
playground with equipment designed for younger children, a gazebo with picnic tables for smaller
gatherings and/or a trike track to give the youngsters a place to ride safely. It is proposed that the land for
the park satisfy part of the developer's park dedication requirements with the balance made up through a
cash dedication. Alternatively, the developer could construct a portion of the park up to the value of the
cash dedication.
Stormwater will be managed through a combination of an onsite pond, expansion of the existing
stormwater pond to the north of this site and the purchase of water quality credits from the city. Water
from the onsite pond will be utilized for a centralized irrigation system. The development will be served by
publicly owned utilities installed to city standards within an easement under the roadway.
The 40 townhomes can be expected to generate on average 8 trips per unit per day or 320 total. The park
will generate minimal vehicular traffic.
ZONING
The site and the properties to the south, west and east are presently zoned R-4 Low Density Multiple Family
Residential. The properties to the southwest are zoned CR-3 Central Residential. To the northwest the
property is zoned 1-3 General Industrial. The property to the north is zoned R-3 Single Family Detached
Residential.
The R-4 District permits the townhomes as proposed at a density of three to six units per acre. The density
can be increased to eight units per acre under a PUD. The gross density of the development will be 6 units
per acre or 6.4 units per acre net of the park.
In addition to an increase in density, rezoning to PUD is necessary to allow the proposed private street and
flexibility for building setbacks. The following design standards are proposed for the development site.
Standard
R-4 Requirement
Proposed PUD
Minimum lot or parcel size
1 acre
6.7 acres
Minimum lot (development site) width at setback
150 feet
440 feet
Minimum lot (development site) depth
150 feet
663 feet
Minimum front yard building setback to public
street
25 feet
25 feet
Minimum (development site) side yard building
setback
15 feet
25 feet
Minimum (development site) rear yard building
setback
25 feet
25 feet
Minimum building separation
30 feet
20 feet
Maximum building height
35 feet
25 feet
Maximum lot area covered by buildings
40 %
26
Page 2of6
2!�4-�j
D E S I G N
RE: Oneka Lake Reserve
March 15, 2021
Maximum lot area covered by impervious surfaces
70 %
53
Minimum building size of principal building
960 sq. ft. / unit
2,300 sq. ft. / unit
Within the development the following design standards are proposed.
Standard
Proposed PUD
Street outlot width
50 feet
Street Width
24 feet — face to face
On street shared guest parking
8' x 22'
Sidewalk width
5 feet
Boulevard width — walk to curb
8 feet
Boulevard width — property line to curb (w/ walk)
18 feet
Boulevard width — property line to curb (no walk)
8 feet
Building setback to curb (minimum)
15 feet
Building setback to sidewalk (minimum)
13.5 feet
Garage setback to property line (minimum)
15.5 feet
Garage to curb line or walk (minimum)
22 feet
Side setback between buildings (minimum)
20 feet
Rear to side setback between buildings (minimum)
26 feet
Parking is provided as follows. The proposed parking exceeds the minimum requirements.
Type
Number of stalls
Stalls / Unit
Garage
80
2
Private guest
80
2
Shared guest
20
0.5
Total
180
4.5
Section 90-141 of the City's Zoning and Land Use regulations requires the following criteria as justification
for the use of Planned Unit Development (PUD) zoning for the proposed residential development.
Criteria (1) The establishment of PUD zoning districts in appropriate settings and situations, to create or
maintain a development pattern that complies with the city's comprehensive plan.
Response: The proposed development is located between a single family detached development to
the north at a density of 2.5 units/acre, an attached townhome development to the east at a
Page 3 of 6
2!�4-�J
D E S I G N
RE: Oneka Lake Reserve
March 15, 2021
density of 6.5 units per acre, an attached townhome development to the south at a density of 6.5
units/acre, and an manufactured home park to the west at a density of 5.8 units/acre. Through the
use of a PUD it is proposed to develop this site at a gross density of 6.0 units/acre. The 2 and 3 unit
townhome buildings provide a complimentary transition from the single family detached structures
to the north and the 4 unit townhomes to the south and the manufactured housing to the west.
Criteria (2) The mixing of land uses within a development when such mixing of land uses could not
otherwise be accomplished under this chapter.
Response: The project does not include a mixture of land uses but does provide a variant of
townhome that does not presently exist in the area. The townhomes to the east and south east are
back to back townhomes with 4 units per building. The townhomes to the south are single loaded
similar to the buildings proposed for this neighborhood but they are split entry units most suitable
for younger homeowners. The homes proposed for this neighborhood provide a main level master
bedroom desired by many buyers, especially older residents.
Criteria (3) Variations to the strict application of the land use regulations in this chapter in order to improve
site design and operation, while at the same time incorporating design elements (e.g., construction
materials, landscaping, lighting, open space, etc.) that exceed the city's standards to offset the effect of any
variations.
Response: The project complies with the underlying zoning districts requirements except for the
required building separation. The underlying district requires 30' of separation where 20' is
proposed. Single family detached homes in Hugo are only required to be separated by 20'.
The gross density of the development complies with the underly zoning district if not for the park
dedication which city staff requested to be added back into the project. We are supportive of this
request and believe that the neighborhood park will well serve younger children that either live in
the area or that are visiting grandparents.
In addition to the public park the development includes association owned and maintained open
space totaling more than 12% of the project area. This richly landscaped open space includes the
pond, walking trail and benches creating a wonderful environment for passive recreation. Overall,
the attractive landscaping on the site exceeds city requirements.
Criteria (4) A more creative and efficient approach to land use within the city, while at the same time
protecting and promoting the health, safety, comfort, aesthetics, economic viability, and general welfare of
the city.
Response: The project has been designed with a private street system that will be maintained by a
homeowner's association thus saving city tax payers that expense. The narrower than typical
streets with designated parallel bays will help calm traffic, while reducing impervious surfaces. By
reducing the building setback it is feasible to loop the street on this relatively narrow site, thereby
providing alternative routes in an emergency situation.
Criteria (5) Preservation and enhancement of natural features and open spaces, including but not limited to
the width expansion of greenway corridors, conservation of wooded areas, development of buffer areas,
reduction of impervious surface, and utilization of joint facilities and utilities.
Page 4of6
RE: Oneka Lake Reserve
March 15, 2021
Response: The site is generally void of natural features. The quality trees planted in the southwest
corner of the site will be preserved within the park. The proposed stormwater management plan
expands the pond to the north improving the aesthetics and creating additional wildlife habitat.
Criteria (6) Maintenance or improvement for the efficiency of public streets and utilities.
Response: The creation of a private street system reduces public expenditures per capita for
maintenance. The utilities are proposed to be publicly owned and maintained. The 5 units along
1501h utilize existing services.
Criteria (7) Establishment of appropriate transitions between differing land uses.
Response: Side setbacks between this neighborhood and the existing homes to the east have been
increased from 15 to 25 feet. Preservation of existing trees in the southwest corner of the site,
additional landscaping and a privacy fence provide a transition between this site and the
manufactured home park to the west. The expanded pond creates significant separation from the
detached single-family homes to the north. The land uses to the east and south are similar to the
proposed neighborhood.
MULTI -FAMILY DEVELOPMENT DESIGN GUIDELINES.
On December 19, 2005 the city adopted guidelines for Multi -family developments. These guidelines are
intended to help developers visualize the city's vision for the community. The developer has worked with
staff to address these guidelines going so far as to completely change the building design and with it the
site plan.
Some of the site design standards presented in the guideline relating to articulation and variable setbacks
cannot be practically met on this small sites but the desired streetscape is achievable The neighborhood has
been designed with a relatively narrow looped street system with parallel parking bays, which combined
with concrete sidewalks, tree lined boulevards and minimal building setbacks creates a warm inviting
neighborhood.
The proposed townhomes appear to be single level homes with a tall roof line from the street. The front
facade is a mixture of lap siding, a stone wainscot, shake shingled gables and wide trim boards. Grids are
installed in the windows to add interest along with the carriage garage doors. The siding is two -toned using
a lighter color above the base. The same two-tone lap siding and trim are visible on the other elevations
reducing the apparent height of the structure.
The 40 foot wide units are designed with an 18 foot wide living space that juts out 8'-6" from the garage to
the street. The outside corners of the building are living space preventing the garage doors from being seen
from the side of the building.
The street design provides traffic calming and avoids the creation of a cul-de-sac. A sidewalk along both the
private drive and 150th Street provide access to the park. The guidelines indicate private streets are not
allowed in Hugo but staff has indicated support for the concept.
The guidelines call for 22' long driveways, through the garage back design of the units this is achieved. Two
garage stalls are provided for each unit. The association documents will limit driveway and shared street
stall parking.
Page 5 of 6
Z!�4-�M
D E S I G N
RE: Oneka Lake Reserve
March 15, 2021
The development provides private common open space as required by code in addition to the public park.
Attractive landscaping is provided throughout the open space and it along with the building exteriors and
private street will be maintained by the homeowner's association. All the grounds will be irrigated with
reused storm / ground water.
We believe that the proposed development fits well with the surrounding area and will provide the current
and future residents of Hugo with an undersupplied housing option.
If you need additional information do not hesitate to contact me.
Sincerely,
Steve Johnston, PE
Principal Engineer
Cc: Elan File #SCH18002
Norm Dupre
Page 6of6
Park sketch
Oneka Lake Reserve 3/15/21 Plans
L
t 4@
® GENERATION
AVENUE N
III
--------L------
i
- !YWU PRIVA[ Y PENCE L SNOW STORAGE
5' sidewalk in to be installed by developer
Future play equipment 60' x 50' container in red
Future shelter in
Municode
http: //library municode.com/print. aspx?h=&clientlD=143 56&HTNMeque...
Sec. 90-324. - Park dedication.
(a) General dedication standards. In order to develop a system of parks within the community to serve
the public's health and recreational needs, a percentage of the net buildable acreage based on the
density of all land subdivided for residential purposes shall be dedicated to the city as public
parkland. The city finds that the more dense a development is, the more demand for park land it
creates since lots can be smaller affording less private recreational space and more occupants per
acre. The following formula will be used to determine the dedication requirement where a land
dedication is required:
Density
Percentage of Land to be Dedicated (of the buildable land)
0-3.99 units per acre
10 percent
4.00-5.99 units per acre
11 percent
6.00-7.99 units per acre
13 percent
8.00-9.99 units per acre
15 percent
10.00 < units per acre
17 percent
The land so dedicated shall be subject to approval by the city council in accordance with the city's
Comprehensive Plan for parks. At the city council's discretion, a parkland dedication fee may be accepted
or required instead of or connection with land dedication. The parkland dedication fee shall be set annually
by the city council and adopted as part of the city's fee schedule. The parkland dedication fee shall be
charged for each dwelling unit originated by the subdivision or development of any property in the city, not
including any dwelling unit that may be in existence at the time of the adoption of the ordinance from which
this article is derived, or which is subject to an approved development agreement with the city that includes
a parkland dedication provision.
(b) Appeal process. The parkland dedication fee may be appealed to the city council before the city
council makes a decision on the final plat and shall be calculated as follows: The percentage of land
to be dedicated will be multiplied by the fair market value of the net buildable acreage.
The fair market value shall be determined by the city council, following their review of a current
appraisal submitted to the city at the developer's expense. The appraisal shall be made by appraisers who
are approved members of the SREA or MAI, or equivalent real estate appraisal societies.
If the city receives written notice of a dispute over the parkland dedication fee before approval of the
final plat, the developer shall pay the fee into an escrow account pending a decision of an appeal of the
fee. If an appeal is not filed within 60 days following approval of the final plat, or if the person aggrieved by
the fee does not prevail on the appeal, then the funds paid into escrow must be transferred to the city.
(Prior Code, § 1215-040.1; Ord. No. 2010-449, § 1, 11-15-2010)
1 of 1 10/5/2012 2:23 PM
1 e �
Bald
Eagle
Lake
1
159>n
♦ One Lake
— —1
, 1 I ♦
1 , 1 ♦I
6' o° 0 151St
3.0 �
2 , U 150th
o,
�
�
1
1
1
1
1
1s
Ith
(F�
1
�
1
Round
Lake
Lake
CITY QFF
IU
EST. 1906
Existing and Proposed
Trails Map
City Park
DNR Wildlife Management Area (WMA)
Undeveloped City Property
Regional Trail - Existing
Regional Trail - Proposed
City Trail - Existing
City Trail - Proposed
Sidewalks
Municipal Boundary
Q 2040 MUSA Boundary
Parcels
Open Water
Streams and Ditches
Street
0 0.25 0.5 1 O
Miles NORTH
3/4/2019 Map 6-7
th
trF
17 Tth
orses
-T7
d
k
fi
0165h—,
-L
JE
159m
o
_
d
Onek Lake
01
15MI
15 th
e`
e
155th
h
i
15,
'1
77�
Central Anoka County
g ��o
a�
-
®®
Regional Trail
o
147th
V,cbr �
Egg
lasth
Rice
Lake
e
ose
Lake
Y
e
1�
0
1 th
�3
Pak Lake
Bn F
7th
z
ca dbe
136111
e
h SC 0
�ay8o�\ever
'� 'on L
th Sch
tion Lak
- - ❑
13 fi
1
,
w 128
1 6th
Sunset
i
w
Gallivan
Lake
o a
125th
Bald
24a,
Eagle
Lake
'd
� 12�a
12 nd
Round
-
-y
1s
9 tie
er Head d�
Lake _
CITY QF
EST. 1906
Existing Trails and
Sidewalks Map
City Park
DNR Wildlife Management Area (WMA�
Undeveloped City Property
Regional Trail
City Trail
Sidewalks
Municipal Boundary
M 2040 MUSA Boundary
C Parcel
Open Water
— Streams and Ditches
Street
0 0.25 0.5 1 O
Miles NORTH
31412019 Map 2-2
0
O
O
N � N
O _
i
>
00
N
a)
3:
>
V
J
oU
0
O
cn
O
O)
°ems°
a)
co
U
ff
_�0
w0�
as
3�00
,o
_
-0
o
m
o
'e
a)
O
OU
a)S
0 Oo C) a)
v+
s`
a)L
s
L
a) 0
V
p
U
°
°
p
(0
QL.
O
O
C/)
���
QE
o a) a)
w
OQ-wpm
O,}}3
06
U
szs
°
s}} a)
oho
w
L
> 0 o
N
04
z
s U
U o
LO
N
n
'a)
0
CN,o
a
�
N
°(Dw�
�
Q
Q
Q
a)
<
>
U Z3
m
O
s`
Q
L
O
N E
a
0
a)
O
>
>�
C
a O
O U
m
c
E
a
O
p
a)
o_ (n
3
c
ws
a
N06
E
_
4-n
m
a0i
�o
c
Lu
�
m
=
L
S
i 0 E
co
0
0
a)
a)
°
o
U
�
a)
�
p
O>
0
s
U
�,
O
�,
L
C
�
� � L
o
��'cn
Qa)o
0
�
o�
0
o Q
c
�C3
EQ
U
°
Cf)
a)
L
c
C
LO
M
m
;O
N
N
a)E
O c 0
a
wfiQKlf4G LOT 5F
IN OR SHINEi
RA -
Saturday, May 22
10am-3pm
Normandy Park Education Center
Senior Center Parking Lot
2484 East County Road F, WBL
the
PikRK
0. •ff'A
DAYS
YMCA and the cities of Forest Lake, Circle
Pines and Hugo are offering children ages
4 — 12 the opportunity to come play and
learn at the parks this summer. There
will be a variety of crafts, games and
activities. Participating children will
split into two age groups; ages 4 — 7
and ages 8 — 12.
SESSION ONE:
June 14 — July 8 (no program July 5)
SESSION TWO:
July 19 — August 12
COST: $90 each session per child
DAYS: M, T, W and TH
LOCATIONS:
Golden Lake Park: 1 — 4 p.m.
Beltz Park: 9 a.m. — 12 p.m.
Hugo-HanifI Athletic Park: 9 a.m. — 12 p.m.
Register online
ymcanorth.org/forestlakesummer