HomeMy WebLinkAbout2022.01.03 RESO 2022-2 Site Plan & DA for Victor Land Holding (Shwieters)RESOLUTION 2022-2
APPROVING A SITE PLAN AND DEVELOPMENT AGREEMENT FOR
VICTOR LAND HOLDINGS, LLC, FOR AN OFFICE, MANUFACTURING, AND
WAREOUSE BUILDING ON THE PROPERTY LOCATED AT 13676 FENWAY
BOULEVARD NORTH AS PART OF THE CAMPUS DEVELOPMENT ON THE
NORTHWEST PORTION OF THE PROPERTY
WHEREAS, Victor Land Holdings, LLC, requested approval of a site plan and
development agreement for an approximately 43,000 square foot office, manufacturing,
and warehouse building, on property legally described as follows:
Lot 1, Block 2, Roy Molitor 4a' Addition
WHEREAS, the Planning Commission has reviewed said site plan on December 16,
2021, and recommends approval subject to the conditions listed in this resolution.
NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF
THE CITY OF HUGO, MINNESOTA, that it should and hereby does approve the site
plan for Victor Land Holdings, LLC, for an approximately 43,000 square foot office,
manufacturing, and warehouse building, subject to the following conditions and findings:
1. All items on the Engineer's memo and "red -line" detailed engineering comments that
have been sent directly to the applicant's engineer dated December 16, 2021, shall be
addressed.
2. The applicant shall meet all conditions listed in the conditional use permit for the
campus development.
3. The applicant shall be required to apply for formal site plan approval for all fixture
phases to be considered by the Planning Commission and City Council.
4. The plans shall be revised to show proof of parking to be reviewed and approved by
City staff.
5. The proof of parking shall be constructed at any time deemed necessary by the City.
6. No exterior storage shall be located west of the building. All exterior storage shall
remain in the areas as approved with the campus development.
7. Prior to the installation of any signs, the applicant shall obtain a sign permit.
8. The landscaping shall be irrigated to ensure establishment.
9. The fence shall be black vinyl chain link.
10. 140a' Street North shall be extended to the west property line of Lot 1, Block 2, Roy
Molitor 4a' Addition.
Resolution 2022-2
Page 2
11. The overhead doors on the buildings within the campus development shall remain
closed from 9 p.m. to 6 a.m., except for normal operations of the business. The doors
shall be promptly closed after moving raw materials into the building for
manufacturing and moving finished product outside.
12. Dumpsters shall not be located outdoors north of the 143,000 square foot building
within the campus development.
Prior to the issuance of a building permit:
13. A Development Agreement and Assessment Agreement shall be executed for the
extension of 140"' Street North.
14. The applicant shall submit cut sheets for the wall mounted light fixtures to be
reviewed and approved by staff.
a. The applicant shall revise the plans to show shield over the wall lights in
the north side of the building.
15. The applicant shall submit the final building material samples and colors for the
building to be reviewed and approved by staff. The materials shall be compatible and
cohesive with the existing buildings in the campus development.
16. The proposed metal awing design shall be reviewed and approved by staff.
17. The internal roof drainage system that shall be integrated into the building design and
shall be reviewed and approved by staff.
18. The trash receptacles shall be stored inside the building.
19. Cross access and maintenance agreement between the buildings shall be reviewed and
approved by staff. The document shall be recorded against the property.
Prior to issuance of a Certificate of Occupancy:
20. The extension of 140'h Street North shall be completed with at least the first lift of
bituminous.
21. All roof top and ground mechanical equipment must be screened from view of
adjacent properties. Staff shall perform an inspection when equipment is installed to
ensure compliance with City code.
22. All required landscaping shall be fully installed.
23. Drainage and utility easements shall be dedicated to the City over the wetland,
stormwater management facilities, and utility extensions.
Resolution 2022-2
Page 3
ADOPTED by the City Council this 3rd day of January,
Weidt, Mayor
ATTEST:
Michele Lindau, City Clerk