HomeMy WebLinkAbout2022.03.21 CC Minutes
Call to Order
Mayor Weidt called the meeting to order at 7:00 p.m.
COUNCIL PRESENT: Klein, Miron, Petryk, Strub, Weidt
COUNCIL ABSENT: None
OTHERS PRESENT: City Administrator Bryan Bear, City Engineer Mark Erichson,
Community Development Director Rachel Juba, Parks Planner Shayla Denaway, City Clerk
Michele Lindau
Minutes for the March 7, 2022, City Council Meeting
Petryk made motion, Klein seconded, to approve the minutes for the City Council meeting held
on March 7, 2022, as presented.
All Ayes. Motion carried.
Minutes for the March 14, 2022, Redistricting Workshop
Strub made motion, Klein seconded, to approve the minutes for the Redistricting Workshop
held on March 14, 2022, as presented.
All Ayes. Motion carried.
Approval of Agenda
Weidt made motion, Klein seconded, to approve the agenda as presented
All Ayes. Motion carried.
Hugo Area Business Association Easter Egg Hunt Special Event Permit – President Julie
Larson
The Hugo Area Business Association had requested a Special Event Permit to hold an Easter
Egg Hunt at Hanifl Fields on Saturday, April 9. HBA President Julie Larson explained they
were expecting approximately 1,200 kids and would hold the egg hunt in two waves. There
were four different levels of sponsorship for the event, and sponsors would purchase the eggs
and provide bags. There will also be food trucks, and she was hoping to have the fire trucks
there. She was asking the City to wave the $75 permit fee, and asked for help with traffic
control and porta potties.
Weidt made motion, Klein seconded, to waive the Special Event Permit fee and help provide
traffic control for the event.
All Ayes. Motion carried.
Minutes
HUGO CITY COUNCIL MEETING
HUGO CITY HALL
MONDAY, MARCH 21, 2022 – 7 P.M.
Hugo City Council Meeting Minutes for March 21, 2022
Page 2 of 8
Update on Yellow Ribbon Network-Chair Chuck Haas
Hugo Yellow Ribbon Network Chair Chuck Haas provided an update on recent activities of the
YRN. He showed a PowerPoint with pictures from the Rotary Polar Plunge, and he presented
Certificates of Appreciation to those that participated. Bri Seekon and Shelby Kramer were
there to accept them, and they presented a check to the YRN for $700 that was collected in
donations. Haas also had pictures of soldiers receiving care packages and pictures of the
Welcome Home Pheasant Hunt held the previous weekend at Wild Wings. The talked about
upcoming events that include Burger Night on March 22 sponsored by the Arcand Family and
Oneka Ridge Golf Course.
Approval of Consent Agenda
Miron made motion, Petryk seconded, to approve the following Consent Agenda:
1. Approve Claims Roster
2. Approve Matt Derr as Vice-Chair of the Planning Commission
3. Approve Agreement with Lakes Center for Youth and Families
4. Approve Agreement with Northeast Youth and Family Services
5. Approve Resolution Approving Wards, Precincts, and Polling Locations
6. Approve Ordinance Rezoning 15500 Keystone Avenue North – Haas
7. Approve Application for Metropolitan Council Water Efficiency Grant
8. Approve Extension of Purchase Agreement for City Owned Property
9. Approve Ross Hoernemann as Safety Captain on the Hugo Fire Department
10. Approve Jason Palmquist as Training Captain on the Hugo Fire Department
11. Approve Resolution Approving Encroachment Agreement for 6593 145th Circle North
12. Approve Resolution Approving Encroachment Agreement for 12560 Foxhill Avenue North
All Ayes. Motion carried.
Approve Claims Roster
Adoption of the Consent Agenda approved the Claims Roster as presented.
Approve Matt Derr as Vice-Chair of the Planning Commission
Former Planning Commission Vice-Chair Scott Arcand retired at the end of his term on
December 31, 2021, after serving over 12 years on the Commission. Matt Derr had submitted a
letter of interest to be the next Vice-Chair. At its March 10, 2022, meeting, the Planning
Commission nominated Matt to fill the position. Adoption of the Consent Agenda approved the
appointment of Matt Derr as the new Vice-Chair of the Planning Commission.
Approve Agreement with Lakes Center for Youth and Families
Over the past several years, the City had entered into an agreement with the Lakes Center for
Youth and Families to support programs for Hugo families related to counseling, intervention,
and enrichment. Through this agreement, the City sponsored LCYF by providing financial
support. In the 2022 budget, Council approved $15,000 in funding for their services. Adoption
Hugo City Council Meeting Minutes for March 21, 2022
Page 3 of 8
of the Consent Agenda approved the agreement with Lakes Center for Youth and Families.
Approve Agreement with Northeast Youth and Family Services
Over the past several years, the City had entered into an agreement with Northeast Youth and
Family Services to support programs for Hugo families related to counseling, intervention, and
enrichment. Through this agreement, the City sponsored NYFS by providing financial support.
In the 2022 budget, Council approved $15,000 in funding for their services. Adoption of the
Consent Agenda approved the agreement with Northeast Youth and Family Services.
Approve Resolution Approving Wards, Precincts, and Polling Locations
Every ten years upon completion of the United States census, cities were required to use the
census data to confirm or reestablish ward boundaries to ensure equal representation. At the
Council redistricting workshop on March 14, 2022, Council reviewed the data which showed all
three wards increased nearly the same in population. Staff recommended Council keep the same
ward boundaries and reestablish precinct boundaries and polling locations to make voting more
manageable. Adoption of the Consent Agenda approved RESOLUTION 2022-14
RESOLUTION APPROVING REDISTRICTING PLAN CONFIRMING EXISTING
MUNICIPAL WARD BOUNDARIES AND CREATING NEW PRECINCT BOUNDARIES
AND POLLING LOCATIONS.
Approve Ordinance Rezoning 15500 Keystone Avenue North – Haas
Charles and Marykay Haas had submitted a zoning amendment request to rezone from the
Agricultural Zoning District to the Long-Term Agricultural Zoning District for their property
located at 15500 Keystone Avenue North. At its March 10, 2022, regularly scheduled meeting,
the Hugo Planning Commission considered the zoning amendment request and held a public
hearing. No one came forward to speak. The Planning Commission agreed the request met the
criteria necessary to approve the application and recommended approval of the zoning
amendment to the City Council. Adoption of the Consent Agenda approved ORDINANCE
2022 – 512 AMENDING CHAPTER 90 (ZONING ORDINANCE) OF THE CITY CODE TO
CLASSIFY CERTAIN LANDS LOCATED 15500 KEYSTONE AVENUE NORTH.
Approve Application for Met Council Water Efficiency Grant Application
The Metropolitan Council will implement a water efficiency grant program effective July 1,
2022 to June 30, 2024. Grants would be awarded on a competitive basis to municipalities that
manage municipal water systems. The Met Council would provide 80% of the program cost
while the municipality would be responsible for the remaining 20%. Staff proposed to apply for
$50,000, which would require the City to contribute $12,500. Should funds be awarded, staff
would propose to use the grant money to implement a rebate program that would update the
irrigation systems in up to eight City parks and the Hugo Fire Hall. The proposed irrigation
system updates were expected to reduce water usage by 62% due to the increased efficiency of
the devices. Adoption of the Consent Agenda approved staff’s request to submit an application
to the Metropolitan Council Water Efficiency Grant Program with the understanding that the
City of Hugo would be responsible for a local match of $12,500.
Hugo City Council Meeting Minutes for March 21, 2022
Page 4 of 8
Approve Extension of Purchase Agreement for City Owned Property
Denny Trooien of Dennis Properties had the purchase agreement on the City owned property in
downtown. Mr. Trooien had provided an update to the EDA on the proposed project at their
meeting on March 15, 2022. Mr. Trooien had also requested the EDA consider a purchase
agreement amendment to extend the closing dates and construction completion dates. The
existing closing date for the first phase was May 20, 2022. He requested the first phase closing
date be September 20, 2022, with the availability to extend with written notice to January 31,
2023. He also requested a one-year extension on the closing date for the second phase. He
requested the completion of the first phase construction to be extended from December 31,
2022, to December 31, 2023. Mr. Trooien stated that he had been working on marketing and
had submitted development applications to the City for approval of the project, but it took
longer than expected to work through environmental regulations. The EDA had discussed next
steps with Mr. Trooien. He stated he wanted to continue to work with staff on refining the plans
and get scheduled for a Planning Commission meeting date. The EDA unanimously
recommended approval of the purchase agreement to the City Council. Adoption of the Consent
Agenda approved the extension of the purchase agreement for the City owned property
Approve Ross Hoernemann as Safety Captain on the Hugo Fire Department
Ross Hoernemann currently served as the Training Captain and the Administrative Captain on
the Fire Department. Fire Chief Jim Compton had recommended appointment of Ross as the
Safety Captain while he continued to hold a second position as the Administrative Captain.
Adoption of the Consent Agenda approved the appointment of Ross Hoernemann as the Safety
Captain effective April 1, 2022.
Approve Jason Palmquist as Training Captain on the Hugo Fire Department
With the appointment of Ross Hoernemann from Training Captain to Safety Captain, there was
a vacancy in the Training Captain position. Fire Chief Jim Compton had recommended
appointment of Jason Palmquist to fill this vacancy. Adoption of the Consent Agenda approved
the appointment of Jason Palmquist as Training Captain effective April 1, 2022.
Approve Resolution Approving Encroachment Agreement for 6593 145th Circle North
Brad and Mary Dinndorf had requested an encroachment agreement to allow construction of a
fence within a drainage and utility easement on property located at 6593 145th Circle North.
Staff had reviewed the request and recommended City Council approve the encroachment
agreement. Adoption of the Consent Agenda approved 2022-15 APPROVING AN
ENCROACHMENT AGREEMENT FOR BRAD AND MARY DINNDORF TO ALLOW
CONSTRUCTION OF A FENCE WITHIN A DRAINAGE AND UTILITY EASEMENT ON
THE PROPERTY LOCATED AT 6593 145TH CIRCLE NORTH.
Approve Resolution Approving Encroachment Agreement for 12560 Foxhill Avenue
North
Terrance Reetz had requested an encroachment agreement to allow construction of a fence
within a drainage and utility easement on property located at 6593 145th Circle North. Staff had
reviewed the request and recommended Council approve the encroachment agreement.
Hugo City Council Meeting Minutes for March 21, 2022
Page 5 of 8
Adoption of the Consent Agenda approved RESOLUTION 2022-16 APPROVING AN
ENCROACHMENT AGREEMENT FOR TERRANCE REETZ TO ALLOW
CONSTRUCTION OF A FENCE WITHIN A DRAINAGE AND UTILITY EASEMENT ON
THE PROPERTY LOCATED AT 12560 FOXHILL AVENUE NORTH.
Public Hearing on Oneka Parkway Improvement Project
On September 7, 2021, the City Council authorized the preparation of a feasibility study for the
2022 Oneka Parkway Improvement Project. Staff had held a neighborhood meeting on
February 16, 2022. The City Council accepted the competed study at their February 22, 2022,
meeting and called for a public hearing to be held on March 21, 2022.
City Engineer Mark Erichson presented a PowerPoint that detailed the proposed improvements
and findings of the feasibility study. The project would consist of bituminous mill and overlay
from Frenchman Road (CSAH 8) to Farnham Avenue, partial street reconstruction from
Farnham Avenue to Heritage Parkway, construction of a right-turn-lane northbound on Oneka
Parkway at CSAH 8, and construction of a traffic signal at the intersection of Oneka Parkway
and CSAH 8. Funding for the project would be provided through assessments to benefiting
properties, County funds, and City MSA/Street Funds. He explained the assessment process as
it followed MN State Statute, Chapter 429. An assessment hearing would be held in October.
Assessments can be prepaid without interest being accrued if paid within 30 days of the
assessment hearing. Assessments were typically spread out over ten years, but this project may
be assessed over five years.
The total project cost would be $2,600,000. He explained that, according to the assessment
policy, a partial reconstruction would be $4,100 per unit, which converts to $76.88 per front
foot, and an urban roadway overlay would be $1,800 per unit, which converts to $39.38 per
front foot. The total footage of all association parcels along Oneka Parkway was 6,035, which
did not include the clubhouse frontage of 405 feet. Based on the frontage along the home
owners association properties on Oneka Parkway, assessments were calculated uniformly
among the townhome properties. Areas outside the home owner association frontages were not
used to calculate the assessment amount, such as turn lanes and areas where there were ponds.
There would be future road assessments to the same group of properties when improvements
were made to Farnham, 149th Street, and Heritage Parkway. Those projects were not currently
in the five-year plan. With the future assessment combined, it would still be less than a typical
per parcel assessment. Erichson provided a rough schedule saying if it was approved this
evening, they would prepare plans and have a neighborhood open house in April to review
them. Bids would be opened and a contract awarded in June. Construction would take place
over the summer and an assessment hearing would take place in October, 2022.
He reviewed some of the concerns by that were expressed during the neighborhood meeting.
There were questions on the assessments to the HOA for the clubhouse and the condition of the
trail along Freedom Avenue. Erichson explained there would be a one-time charge of
approximately $20 for all those who had access to the clubhouse, and the trail needed
improvement but it was not funded. Parks Planner Shayla Denaway would be looking into
options.
Mayor Weidt asked staff what would happen if the construction costs came in higher than
anticipated and if there was any discussion on traffic signal versus a roundabout. Erichson
Hugo City Council Meeting Minutes for March 21, 2022
Page 6 of 8
explained the City’s cost would increase but assessments would not since the assessment policy
is uniform from project to project. When the intersection was constructed, it had been planned
for a future signal, which would be less expensive than a roundabout. It was also pointed out
that assessments only cover approximately 14% of the total costs of the road projects.
Mayor Weidt opened public hearing.
Rick Bieniek, 5161 Farnham Drive North, said he was on the board for the manor group and on
the master board, and he gets a lot of questions from neighbors. Concerns he heard were about
the truck and construction traffic breaking down the roadway, and he asked what assurances do
they have the road would be built properly and won’t prematurely degrade. He questioned why
the roadway was failing since it was not that old. Rick talked about the water reuse project
stalling in the construction phase and asked that the road project remain on task. He said he
appreciated the traffic signal going in at Frenchman and Oneka Parkway.
George Finn, 5169 Farnham Dr. N, stated that from 2018-2020, his total Washington County
property tax went up 47% and the total taxes for Hugo went up 43% in two years. He said a
concern was he was also paying for the 86% through taxes. He wanted Council to know that
those who live in the area have already been hit really hard.
Mayor Weidt talked about how home values change the taxes. The City is on a flat tax rate, and
he was not sure if the value of George’s home had increased. He provided George information
on the Board of Appeal and Equalization to be held on April 7, 2022, where he could appeal his
value.
George stated he understood that but wanted to make clear that this was a major increase. He
said the increase in the value of the property is of no significance to him, but the cost of living
there is.
Paul Hughes, 15411 Farnham Avenue, said he had moved in last July when the 147th Street
project began and kept getting postponed. He asked about a project deadline.
Nate Koenig, 15396 Farnham Avenue, asked how homes were selected. He questioned if his
home was going to be valued at a higher rate and why the 14% wasn’t budgeted as maintenance.
He referenced State Statute 429 that talked about the benefit of an assessment needing to be
greater than the cost of the assessment.
Johnny Johnson, 5157 Farnham Drive, had questions on detour routes.
Ellen Johnson, 15443 Freedom Drive N, asked if she would be assessed again when Farnham
was improved.
Erichson addressed the question on quality control saying the project would need to meet
MnDOT State Aid design standards. Senior Engineering Technician Liz Finnegan would be on
site during construction and would be responsible to make sure they met specifications. There
were also material testing requirements. Staff would be provided with a construction schedule,
and he explained the 147th street project was not delayed; the signage was not properly placed.
Erichson addressed the questions on how homes were assessed and State Statute 429. He
Hugo City Council Meeting Minutes for March 21, 2022
Page 7 of 8
explained the properties being assessed were based on the frontage of any streets in the HOA.
There would be additional assessments for the same group of properties when other roads were
improved. He said he had worked closely with the City attorney to ensure the City was in
compliance with State Statute 429. An appraiser had done a benefit appraisal, and the value
increases far exceed what the assessed amounts would be.
Erichson addressed the question on why the City did not budget for the entire project and the
issue on the road deterioration. He said the City had never not assessed for improvements, and it
was not uncommon to see a mill and overlay project done within a 15-20 year period. He
acknowledged there were issues with the concrete curb and gutter, and that could have created
some of the pavement issues, but it was hard to narrow down the deficiencies.
Koenig asked why the single-family villas and patio homes were not being assessed. Erichson
responded they would be assessed at the time those roadways were improved.
Erichson addressed the question on detours saying they had not received authorization for plans
and specifications. If the Council authorizes the project to move forward, a number of different
options would be considered and shared in another neighborhood meeting.
Erichson addressed the issue of improvements to private drives saying they were the HOA’s
responsibility, and there would be no assessments.
Bieniek further explained there were private roadways that abut some of those roads.
Improvements to those roads would be paid for with collected dues. He also reiterated that
those in the project area would be assessed twice, now and when Farnham was improved. He
talked about the concerns neighbors had with MnDOT overseeing the project since the last
project was failing. He questioned why the contractor or City was not being held responsible.
Erichson responded that he had no knowledge as to what happened with that roadway project.
The road was constructed by the developer and was not a City-led project. He said unfortunately
there was a one-year warranty. MnDOT was not involved, and it was not a state aid route at that
time.
Weidt explained that streets are a part of an entire system used by the entire City, including
construction traffic. The majority of the cost for improvements is paid by all residents and state
money and grants.
Ellen Johnson talked about the large construction vehicles she sees every day and how it was
unfair they do not pay for the roads.
There were no other comments, and Mayor Weidt closed the public hearing.
Council talked about the deferral and when a resident could request that. Erichson responded it
could be done at the assessment hearing that will be held the first meeting in October, 2022.
Hugo City Council Meeting Minutes for March 21, 2022
Page 8 of 8
Klein made motion, Petryk seconded, to approve RESOLUTION 2022-17A RESOLUTION
ORDERING THE PROJECT AND AUTHORIZING THE PREPARATION OF PLANS AND
SPECIFICATIONS FOR THE 2022 ONEKA PARKWAY IMPROVEMENTS PROJECT.
Ayes: Klein, Miron, Petryk, Strub, Weidt
Motion carried.
Discussion and Approval of Letter of Support for Hardwood Creek Trail Extension
Washington County Senior Planner Connor Shafer addressed the Council on the Hardwood
Creek Trail Extension. Washington County had studied the feasibility of constructing the final
extension of the Hardwood Creek Regional Trail from Fenway Boulevard North and 130th
Street North to 120th Street North (Ramsey County Rd J). He explained how regional trails
were defined by Metropolitan Council and how the trails are designed saying the southern
extension forces them to be creative. A lot of the trail lies within the railroad right-of-way.
Work continues on Segment 1 from 130th Street to 125th Street, and Segment 2 from 125th Street
to 120th Street along Falcon Avenue. Two concepts were identified for Falcon Avenue.
Concept A made no modification to Falcon Ave and reduced the width of the trail. Concept B
reduced the width of Falcon and maintained a 10-foot wide trail. Both met regional standards,
and the decision was made to move forward with Concept B. The total estimated cost for the
project was $1,767,425, with 80% of the project cost eligible through a grant. Shafer talked
about the Regional Solicitation Grant explaining that Federal funding for the multi-use trail
category was the most competitive. He felt it would be most successful to just apply for Section
1, which was estimated to cost $1,121,106. Funding would be available in five years. He
explained the next steps would be to finalize the study, submit the Regional Solicitation
Application, and coordinate with the City to develop additional funding strategies.
Parks Planner Shayla Denaway explained Washington County would be applying for
Metropolitan Council Regional Solicitation funding, and a letter of support had been drafted
indicating that the City of Hugo was supportive of construction and complete of the Hardwood
Creek Regional Trail. The Parks Commission had been presented with this at their last meeting
and was very supportive. Staff recommend Council approve the draft letter of support for the
grant application.
Strub made motion, Miron seconded, to sign the letter of support for the Regional
Transportation Grant Application.
Adjournment
Miron made motion, Klein seconded, to adjourn at 9:29 p.m.
All Ayes. Motion carried.
Respectfully Submitted,
Michele Lindau, City Clerk