HomeMy WebLinkAbout2022.20.19 RESO 2022-91 Pre Plat for Oneka Prairie RESOLUTION 2022-91
APPROVING PRELIMINARY PLAT FOR THE SOUTHWIND HOLDINGS,LLC,
FOR"ONEKA PRAIRIE" ON PROPERTY LOCATED NORTH OF ONEKA
PARKWAY AND NORTH OF EMPRESS AVENUE NORTH
WHEREAS, Southwind Holdings, LLC, has requested approval of a preliminary plat to
allow construction of 59 single family lots and 7 outlots on 24.83 acre property legally
described as follows:
(See Attached)
WHEREAS, the Planning Commission has reviewed the preliminary plat at a duly called
Public Hearing and recommends approval, and;
NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF
THE CITY OF HUGO, MINNESOTA, that it should and hereby does approve the
request by Southwind Holdings, LLC, for a preliminary plat, subject to the following
conditions:
1. A preliminary plat is approved to allow the creation of 59 single family home lots and
7 outlots,in accordance with the application and plans received by the City on August
9, 2022, August 19, 2022, August 23, 2022, September 16, 2022, November 30,
2022, except as amended by this resolution.
2. Approval is contingent upon City Council approval of a rezoning to PUD for the
24.83 acre site.
3. The developer shall comply with Resolution 2022-92 for the PUD.
4. Oneka Parkway shall be constructed to the north property line and all the way to the
lift station.
5. Park Dedication is to be satisfied with land dedication of Outlot C and park
dedication fee of $2,686 per unit. The plans show construction of amenities in the
park including a shelter, playground, and sidewalk loop in exchange for PUD
flexibility. The Parks Commission shall review and approve the
improvements/amenities prior to construction.
6. The preliminary plat plans dated November 21, 2022, and November 23, 2022, shall
be revised to include the following revisions, to be reviewed and approved by staff
a. The wetlands shall be updated on each plan set to be consistent, including
existing wetlands and proposed impacts.
b. Outlot G shall be dedicated as right-of-way.
c. The drainage and utility easements shall be dedicated for wetlands on lots.
Resolution 2022-91
Page 2
7. The building setbacks and impervious surface requirements for the development are
as follows:
Proposed
Lot Size 7,800 square feet 9,427 average)
Lot Width 80 feet
Front Yard 30 feet 20 feet on
Setback corner lot side
of house
Side Yard Setback 7.5 feet
Rear Yard Setback 30 feet
Impervious 50%
Surface
8. Outlot Use and Ownership:
Outlot Acres Ownership Use
A 2.17 City Wetland/Pondin
B 2.66 city Wetland
C 0.54 city City Public Park
D 1.56 city Wetland/Pondin
E 0.19 City Wetland
F 0.38 city Wetland
G 1.41 city Right-of-Way
9. The developer has indicated that an HOA will be established for the development to
own/operate/maintain landscaping within the outlots, landscaping along Oneka
Parkway, and the water re-use system. The HOA documents shall be reviewed and
approved by staff prior to the recording of the final plat.
10. Prior to commencement of any grading, the developer shall comply with the
following conditions:
a. The developer shall revise plans per items number 5.
b. The developer shall obtain all necessary stormwater management and
WCA permits from the City.
c. The development shall obtain the necessary permits from the Army Corp
of Engineers for the wetland replacement plan.
d. The developer shall comply with all conditions in the City Engineer's
letter dated December 1, 2022, and red-lined comments provided to the
developer.
I
Resolution 2022-91
Page 3
11. Prior to the release of the final plat for recording,the developer shall comply with the
following conditions.
a. The developer shall comply with the City standards for street lighting
within the public right-of-way. The street lights shall be a decorative style
light.
a. The developer shall comply with all conditions in the City Engineer's
letter dated December 1, 2022, and red-lined comments provided to the
developer.
b. The development shall comply with the Fire Chief s requirements
regarding fire flow calculations, the location of fire hydrants, fire
department connections, and fire lane signage.
c. The developer shall obtain all necessary stormwater management and
WCA permits from the City.
d. The development shall obtain the necessary permits from the Army Corp
of Engineers for the wetland replacement plan.
e. The developer shall obtain all necessary local, state, and federal permits.
f A stormwater reuse agreement shall be reviewed and approved by staff
and recorded at Washington County.
g. The Homeowners Association (HOA) documents for review and approval
by staff.
h. The City's development fees will apply to this project. The fee amounts
will be calculated and included as part of the Development Agreement. A
development agreement shall be executed and all fees shall be paid.
i. A formula has been developed to determine the amount that the water
trunk fee can be reduced based on the water reuse system, which results in
a 35% reduction in the trunk fee. This provision will be included in the
development agreement for each phase.
12. Prior to the issuance of building permits, the developer shall comply with the
following conditions.
a. The applicant shall record the final plat, development agreement and all
other documentation at Washington County and provide the City with
proof of recording.
Resolution 2022-91
Page 4
13. Prior to the issuance of a certificate of occupancy for buildings, the developer
shall comply with the following conditions.
a. The lift station shall be constructed and functioning.
ADOPTED by the City Council this 19a'day of December,2022
AomN�ei&,' Mayor
ATTEST:
Michele Lindau, City Clerk
Legal Description
The Northwest Quarter of the Southeast Quarter of Section 7, Township 31, Range 21,
according to the United States Government Survey thereof and situate in Washington County,
Minnesota EXCEPT that part of the North 521 feet thereof, lying West of the East 467 feet and
lying East of the West 16.5 feet, ALSO EXCEPT the North 467 feet of the East 467 feet thereof.