Loading...
HomeMy WebLinkAbout2023.06.12 Packet A. CALL TO ORDER B. ROLL CALL C. PLEDGE OF ALLEGIANCE D. APPROVAL OF MINUTES 1. May 15, 2023, City Council Meeting E. APPROVAL OF AGENDA F. APPOINTMENTS/PRESENTATIONS 1. Legislative Update - MN House Representative Patti Anderson 2. Washington County Sheriff’s Report – Sheriff Dan Starry G. CONSENT AGENDA All matters listed under the Consent Agenda are considered to be routine by the City Council and will be enacted by one motion and a roll call vote. If a member of the City Council or the public wishes to discuss an item, that item will be removed from the Consent Agenda and will be considered separately. 11.. Approve Claims Roster 2. Approve Annual Performance Review for Public Works Mechanic Steven Garcia 3. Approve Annual Performance Review for Public Works Worker Corey Triemert 4. Approve Annual Performance Review for Public Works Worker Riley Hollerback 5. Approve Annual Performance Review for Utility Billing Clerk Jodie Guareschi 6. Approve Annual Performance Review for Public Works Streets Lead Worker Tom Smith 7. Approve Retirement of Hugo Firefighter Doug Millard 8. Approve Resignation of Administrative Intern Joe Hinzman 9. Approve Donation from the Hugo American Legion to the Hugo Fire Department 10. Approve Special Event Permit for Ruck March on August 5, 2023 11. Approve Temporary Liquor License for Hugo Yellow Ribbon Network for Ruck March on August 5, 2023 12. Approve Special Event Permit for Tough Mudder on July 8-9, 2023 13. Approve Temporary Liquor License for Hugo Lions Club for Tough Mudder on July 8-9, 2023 14. Approve Lawful Gambling Exempt Permit for Raffle at Shoot for the Troops Event on August 15, 2023 15. Approve Limited Use Permit for TH 61 Roundabout 16. Approve Cooperative Construction Agreement with MnDOT for TH 61 Roundabout 17. Approve Amended Personnel Policy to Include Juneteenth as a City Holiday 18. Approve Final Plat and Development Agreement for Oneka Prairie 19. Approve Wetland Replacement Plan for Goodview Estates 20. Approve Encroachment Agreement for 16212 Empress Avenue North Mayor: Tom Weidt Councilmembers: Becky Petryk, Ward 1 Phil Klein, Ward 2 Dave Strub, Ward 3 Mike Miron, Council at Large City Council Agenda Monday, June 12, 2023 Address: 14669 Fitzgerald Ave. N. Hugo, MN 55038 Phone: 651-762-6300 Website: www.ci.hugo.mn.us H. PUBLIC HEARING 1. Vacation of Drainage and Utility Easement for Adelaide Landing - Table I. UNFINISHED BUSINESS 1. Approve Plans and Spec and Authorize Advertisement for Bids for TH 61 Roundabout 2. Approve Plans and Spec and Authorize Advertisement for Bids for Lift Station No. 12 3. Discussion on Solar Farm Ordinance Review Committee (ORC) and Extension of Solar Farm Moratorium 4. Approve Proposal to Develop North Star Wetland Bank Prospectus J. NEW BUSINESS 1. Discussion on Consideration of Cannabis Businesses Moratorium K. VISITOR PRESENTATIONS 1. Nothing Scheduled L. COUNCIL PRESENTATIONS 1. Nothing Scheduled M. ADMINISTRATIVE PRESENTATIONS 1. Schedule Premier Bank Ground Breaking Ceremony on Tuesday, June 13, 2023 2. Schedule Torch Run Final Leg for Special Olympics on Friday, June 23, 2023 3. Reminder – Bernin Park Neighborhood Meeting on Tuesday, June 27, 2023 N. ADJOURNMENT BACKGROUND MEMO FOR THE CITY COUNCIL MEETING ON JUNE 12, 2023 D.1 Approval of Minutes for the May 15, 2023 City Council Meeting Staff recommends Council approve the above minutes as presented. F.1 Legislative Update - MN House Representative Patti Anderson Representative Patti Anderson will provide Council an update on happenings at the State Legislature. F.2 Washington County Sheriff’s Report – Sheriff Dan Starry Sheriff Dan Starry will be in attendance along with Sergeant Joe Zerwas and other Hugo Deputies to present to Council the Washington County Sheriff’s Report. G. 1 Approval of Claims Staff recommends Council approve the Claims Roster as presented. G.2 Approve Annual Performance Review for Public Works Mechanic Steven Garcia At its June 6, 2023, meeting, Council approved the hiring of Steve Garcia as the new Public Works Mechanic beginning June 7, 2023. Public Works Director Scott Anderson recommends Council approve the Annual Performance Review for Public Works Mechanic Steve Garcia. G.3 Approve Annual Performance Review for Public Works Corey Triemert At its June 6, 2023, meeting, Council approved the hiring of Corey Triemert as a Public Works Worker beginning on June 27, 2022. Public Works Director Scott Anderson recommends Council approve the Annual Performance Review for Public Works Worker Corey Triemert. G.4 Approve Annual Performance Review for Public Works Worker Riley Hollerback At its June 6, 2023, meeting, Council approved the hiring of Riley Hollerback as a Public Works Worker beginning on June 21, 2022. Public Works Director Scott Anderson recommends Council approve the Annual Performance Review for Public Works Worker Riley Hollerback. G.5 Approve Annual Performance Review for Utility Billing Clerk Jodie Guareschi Since June 17, 2002, Jodie has worked as the City’s Utility Billing Clerk in the Finance Department. Finance Coordinator Anna Wobse recommends Council approve the annual performance review for Utility Billing Clerk Jodie Guareschi. G.6 Approve Annual Performance Review for Public Works Streets Lead Worker Tom Smith Tom Smith was hired by the City of Hugo on June 26, 2000 as a Worker in Public Works Department and promoted to Streets Lead Worker on April 17, 2023. Public Works Director Scott Anderson recommends Council approve the annual performance review for Public Works Worker Tom Smith. G.7 Approve Retirement of Hugo Firefighter Doug Millard Doug Millard has served on the Hugo Fire Department since being hired in October, 2010. Doug has submitted his letter of retirement. Staff recommends Council approve the retirement of Doug Millard effective May 31, 2023. G.8 Approve Resignation of Administrative Intern Joe Hinzman Joe Hinzman was hired as an Administrative Intern and began work on October 24, 2022. Joe has found full time employment in the private sector and has submitted his letter of resignation. Staff recommends Council approve the resignation of Joe Hinzman effective June 2, 2023. G.9 Approve Donation from the Hugo American Legion to the Hugo Fire Department The Hugo American Legion has requested to donate $1,000 to the Hugo Fire Department from pull-tab proceeds for equipment. All donations to the Fire Department must be approved by the Council. Staff recommends Council approve the donation of $1,000 to the Hugo Fire Department. G.10 Approve Special Event Permit for Ruck March on August 5, 2023 Raymond Singson, 23rd Veteran representative, has applied for a Special Event Permit to hold a Ruck March on August 5, 2023, at Wild Wings of Oneka, 14733 Irish Avenue North. 23rd Veteran is a 501c3 nonprofit that works to help veterans living with trauma. Participants will walk up to ten miles on a 1-2 mile loop with backpacks loaded with donation for homeless veterans. There will also be 10-20 vendors on site. This would be the 8th consecutive year this event has been held and the first year held at Wild Wings. This requires a Special Event Permit approved by Council because there will be an estimated 500 registered attendees, use of an amplified sound system, and alcohol served. Staff recommends Council approve the Special Event Permit for the Ruck March on August 5, 2023, subject to the conditions in the staff memo. G.11 Approve Temporary Liquor License for Hugo Yellow Ribbon Network for Ruck March on August 5, 2023 The Hugo Yellow Ribbon Network has applied for a Temporary Liquor License to sell beer at the Ruck March on August 5, 2023, at Wild Wings Game Farm. The Hugo Lions Club will assist the Ruck Mark in organizing and selling. Staff has received the permit application, fee, and proper insurance. Staff recommends Council approve the Temporary Liquor License for the Hugo Yellow Ribbon Network for the Ruck March on August 5, 2023. G.12 Approve Special Event Permit for Tough Mudder on July 8-9, 2023 Tough Mudder has applied for a Special Event Permit to hold a two- day endurance sport event at Wild Wings Game Farm on July 8-9 including an overnight event on Saturday, July 8. Tough Mudder is a for profit company that has held events in the US since 2010 and elsewhere in the world since 2016. This will be the seventh year the event has been held at Wild Wings. This requires a Special Event Permit approved by Council because there will be an estimated 5,400 people on site on Saturday, 550 overnight on Saturday, and 2,000 on Sunday; impacts to public streets; use of an amplified sound system; and alcohol served. Staff recommends Council approve the Special Event Permit for the Tough Mudder on July 8-9, 2023, subject to the conditions in the staff memo. G.13 Approve Temporary Liquor License for Hugo Lions Club for Tough Mudder on July 8-9, 2023 The Hugo Lions Club has applied for a Temporary Liquor License to sell beer and seltzers at the Tough Mudder on July 8-9, 2023, at Wild Wings Game Farm. Staff has received the permit application, fee, and proper insurance. Staff recommends Council approve the Temporary Liquor License for the Lions Club for the Tough Mudder on July 8-9, 2023, subject to receipt of the permit fee. G.14 Approve Lawful Gambling Exempt Permit for Raffle at Shoot for the Troops Event on August 15, 2023 Shoot for the Troops has applied for a Lawful Gambling Exempt Permit to hold raffles at their shooting event to be held at Wild Wings on August 15, 2023. These permits need to be approved by the City before being issued by the state. Staff recommends Council approve the Lawful Gambling permit for Shoot for the Troops. G.15 Approve Limited Use Permit for TH 61 Roundabout The TH 61 and 159th Street Reconstruction is utilizing funding from MnDOT to complete the improvements. Therefore, the City is required to execute a Limited Use Permit (LUP) with MnDOT for the portion of the trail within the TH 61 (Forest Boulevard N) right-of-way. A portion of the trail that falls within the MnDOT TH 61 (Forest Boulevard N) right-of-way and the LUP. The LUP is limited to the construction, maintenance, and operation of the trail within the TH 61 (Forest Boulevard N) right-of-way. Staff recommends approval of the LUP as the use of the TH 61 (Forest Boulevard N) right-of-way to promote safe crossing of the highway. G.16 Approve Cooperative Construction Agreement with MnDOT for TH 61 Roundabout The City of Hugo was successful in the Local Partnership Program grant application and will be receiving $710,000 in funds for the TH 61 and 159th Street Reconstruction project. It is recommended that the City of Hugo enter into MnDOT Agreement No. 1052505 with the State of Minnesota, Department of Transportation to provide for payment by the State to the City of the State's share of the costs of the roundabout construction and other associated construction to be performed upon, along and adjacent to Trunk Highway No. 61 at 159th Street North within the corporate City limits under State Project No. 8206-53. The State will be finalizing the standard Cooperative Construction Agreement between the State and City. Staff is requesting authorization for the Mayor and City Engineer to sign this agreement once received, subject to City Attorney review and approval. This will help keep the project on schedule considering City Council meeting cancellation on June 19th. Staff recommends Council approve the resolution to enter into MnDOT Agreement No. 1052505 for TH 61 & 159th Street Reconstruction. G.17 Approve Amended Personnel Policy to Include Juneteenth as a City Holiday A law to establish Juneteenth as a state-recognized holiday was signed into law in February, 2023, and was to go into effect on August 1, 2023. A provision included in the state and local government omnibus bill adjusted that date to make the holiday required this year. State law prohibits transactions of public business on state holidays. Staff recommends Council approve the amendment to the City Personnel Policy to include Juneteenth as a City Holiday. G.18 Approve Final Plat and Development Agreement for Oneka Prairie The applicant is requesting approval of a final plat in order to plat 59 lots on the parcel located at the existing end of Oneka Parkway for the Oneka Prairie development. This development will be completed in one phase. The City Council reviewed and approved the preliminary plat and PUD for Oneka Prairie at its December 19, 2022, meeting. The lots meet the minimum lot standards and requirements outlined in the regulations for the Oneka Prairie PUD. Staff recommends approval the resolution approving the Final Plat and Development Agreement for Oneka Prairie, subject to review and approval by the City Attorney. G.19 Approve Wetland Replacement Plan for Goodview Estates Integrity Land Development, Inc., is proposing to develop a 70-acre property located south of Egg Lake Road and west of Goodview Avenue and the development is known as Goodview Estates. The development will include 59 residential lots. There is .64 acres of wetland impacted due to grading and street construction. The applicant is proposing to replace the impacts to the wetland basin though the purchase of wetland credits from an approved wetland bank. Staff recommends approval of the wetland replacement plan, subject to final Technical Evaluation Panel issuance of the Notice of Decision for the wetland replacement application. G.20 Approve Encroachment Agreement for 16212 Empress Avenue North Benjamin and Kindra Lesnau have requested an encroachment agreement to allow construction of a sport court within a drainage and utility easement on property located at 16212 Empress Avenue North. The Senior Engineering Technician has reviewed the location of the sport court and is comfortable with the request. Staff has reviewed the request and recommends that the City Council approve the encroachment agreement for the property located at 16212 Empress Avenue North H.1 Vacation of Drainage and Utility Easement for Adelaide Landing - Table At the request of the applicant, staff recommends Council table the public hearing scheduled for this evening. Staff will re-notice the public hearing when ready. I.1 Approve Plans and Spec and Authorize Advertisement for Bids for TH 61 Roundabout The City has collaboratively worked with the development team for the Shores of Oneka Lake regarding access to TH 61. The developer is responsible for costs associated with the construction of the roundabout and have prepared plans that are currently in the final review stages with the Minnesota Department of Transportation. MNDOT does not allow a developer to lead a project of this nature on their highway system coupled with the successful Local Partnership Program Grant the City received for this project totaling $710,000 that requires this to be a City led project. The City will be required to publicly bid the project. The development agreement for this project outlines cost responsibilities indicating the development is responsible for all costs excluding the $710,000 grant received from MNDOT. Staff recommends approval of the resolution approving plans and specifications and authorizing advertisement for bids for TH 61 & 159th Street Reconstruction. I.2 Approve Plans and Spec and Authorize Advertisement for Bids for Lift Station No. 12 Previously the Council had authorized staff to prepare plans and specifications for the Lift Station No. 12. Lift Station No. 12 will be a new sanitary lift station located on the east side of the extension of Oneka Parkway approximately 550 feet south of 165th Street. It will initially serve the Oneka Prairie residential development and eventually other sanitary sewer extensions to the west, north, and east. Since this is a trunk sanitary sewer lift station is it funded by the City. The lift station includes buried precast concrete structures, submersible pumps, flow meter, valves, piping, controls, and site work. Plans and Specifications have been prepared for Lift Station No. 12 and are ready to be advertised for bidding. Staff is requesting approval of the plans and specifications for the project and authorization to advertise for bids. Plans and Specifications are available for review at City Hall. Consideration of awarding a construction contract will occur at a future City Council meeting. Staff recommends approval of the resolution approving plans and specifications and authorizing advertisement for bids for Lift Station No. 12. I.3 Discussion on Solar Farm Ordinance Review Committee (ORC) and Extension of Solar Farm Moratorium It is meeting on February 6, 2023, the City Council approved an ordinance for a six-month moratorium on solar farms and directed staff to hold a workshop with the Planning Commission on whether changes should be made to the ordinance. A workshop was held on March 23, 2023. At its meeting on April 3, 2023, the City Council authorized the ORC to study and review the solar energy systems ordinance. The ORC has been meeting for the last few months and recommends changes to the ordinance. Staff recommends the City Council review the revisions, provide any comments, and authorize the Planning Commission to hold a public hearing on the revisions. The moratorium expires on August 6, 2023. In order to provide notice for a public hearing on the ordinance revisions, staff recommends the adoption of an ordinance extending the moratorium an additional six-months. I.4 Approve Proposal to Develop North Star Wetland Bank Prospectus At the Council meeting of May 22, 2022, authorization was given to WSB and Associates to do vegetation and hydrology monitoring and prepare a draft prospectus (scope) for the North Star Wetland Bank. WSB and Associates completed the evaluation and submitted a draft prospectus to the Technical Evaluation Panel and Interagency Review Team. Initial comments by the TEP and IRT are being addressed and WSB is recommending moving forward with preparation of the prospectus (concept plan). A memo has been prepared outlining the project options, construction cost estimates, and projected credit allocations. Parks Planner Shayla Denaway will provide an update on the project. Staff is recommending approval of the proposal from WSB to develop the North Star Wetland Bank Prospectus totaling $55,026.00. J.1 Discussion on Consideration of Cannabis Businesses Moratorium Recently adopted legislation created Chapter 63 which legalizes adult-use cannabis and creates a statewide regulatory framework and establishes the Office of Cannabis Management. The law allows for a local unit of government to adopt an interim ordinance to allow the City time to consider adoption of reasonable restrictions on the operation of cannabis businesses. The interim ordinance may regulate, restrict, or prohibit the operation of a cannabis business within the jurisdiction or a portion thereof until January 1, 2025. Before adopting an interim ordinance, the governing body must hold a public hearing. Staff recommends Council schedule a public hearing to be held on July 10, 2023, to consider an interim ordinance on cannabis businesses. M.1 Schedule Premier Bank Ground Breaking Ceremony on Tuesday, June 13, 2023 The Council has been invited to attend the Ground Breaking Ceremony for Premier Bank at 5616 147th Street North on Tuesday, June 13, 2023, at 11 a.m. To meet notice requirements, staff has posted this as a possible quorum of the Council. Staff recommends Council schedule this as a meeting if they wish to attend. M.2 Schedule Torch Run Final Leg for Special Olympics on Friday, June 23, 2023 Council has been invited by Katye Barton to be present at the Torch Run on June 23, 2023. The Law Enforcement Torchlight Run for Special Olympics carries the “Flame of Hope” from Canada to the Twin Cities. The final leg takes place the week of June 16 and is expected to be in Hugo via the Hardwood Creek Trail at approximately 11:15 a.m. on Friday, June 23. Staff recommends Council schedule this as a meeting if they are able to attend. M.3 Reminder – Bernin Park Neighborhood Meeting on Tuesday, June 27, 2023 The Council has scheduled a meeting to attend the Bernin Park Community Meeting on Thursday, June 27, 2023, at 5 p.m. in the Oneka Room at City Hall. N. Adjournment MINUTES City Council Meeting City Hall Council Chambers Monday, May 15, 2023 7:00 p.m. Call to Order Mayor Weidt called the meeting to order at 7:00 p.m. Roll Call COUNCIL PRESENT: Klein, Petryk, Miron, Strub, Weidt COUNCIL ABSENT: None OTHERS PRESENT: City Administrator Bryan Bear, City Engineer Mark Erichson, City Attorney Dave Snyder, Community Development Director Rachel Juba, Finance Director Anna Wobse, City Clerk Michele Lindau Approve Minutes for the May 1, 2023, City Council Meeting Klein made motion, Petryk seconded, to approve the minutes for the City Council meeting held on May 1, 2023, as presented. All Ayes. Motion carried. Approval of Agenda Weidt made motion, Klein seconded, to approve the agenda as presented. All Ayes. Motion carried. Approval of the Consent Agenda Klein made motion, Strub seconded, to approve the following Consent Agenda: 1. Approve Claims Roster 2. Approve Annual Performance Review for Public Works Parks Lead Worker Rick Kieffer 3. Approve Special Event Permit for North Star Gay Rodeo for July 29-30, 2023 4. Approve Temporary Liquor License for North Star Gay Rodeo on July 29-30, 2023 5. Approve Hugo Historic Site Lease Agreement for Hopkins Schoolhouse and Heritage Center 6. Approve Ordinance Amending Chapter 10, Article II, Dogs Regarding Violations and Penalties 7. Approve Pay Request No. 9 to Peterson Companies for Downtown Improvement/Lions Park 8. Approve Advertisement for Public Works Utility Lead Worker 9. Approve Purchase of Loggers and Scope of Work from WSB for North Star Wetland Bank Data Collection 10. Approve Wetland Replacement Plan for Oneka Prairie – Oneka Parkway Extension All Ayes. Motion carried. Council Meeting Minutes for May 15, 2023 Page 2 of 7 Approval of Claims Adoption of the Consent Agenda approved the Claims Roster as presented. Approve Annual Performance Review for Public Works Parks Lead Worker Rick Kieffer Rick Kieffer was re-hired by the City of Hugo as a Public Works Worker on May 31, 2005 returning after a short period of time in the private sector. Rick was promoted to Public Works Parks Lead Worker on April 17, 2023. Adoption of the Consent Agenda approved the Annual Performance Review for Public Works Parks Lead Worker Rick Kieffer. Approve Special Event Permit for North Star Gay Rodeo for July 29-30, 2023 The North Star Gay Rodeo had applied for a Special Event Permit to hold a regional rodeo at the Dead Broke Arena site at 5676 170th Street North on July 29-30, 2023. A SEP was required because there would be amplified sound and alcohol served outside. Adoption of the Consent Agenda approved the SEP for the North Star Gay Rodeo as outlined in their application. Approve Temporary Liquor License for North Star Gay Rodeo on July 29-30, 2023 North Star Gay Rodeo had applied for a Temporary On-Sale Liquor License to serve beer and seltzer at their rodeo event on July 29-30, 2022. Staff had received the completed application, payment, fee, and proof of liquor liability insurance. Adoption of the Consent Agenda approved the Temporary On-Sale Liquor License for the North Star Gay Rodeo. Approve Hugo Historic Site Lease Agreement for Hopkins Schoolhouse and Heritage Center The Hopkins Schoolhouse and Heritage Center proposed to enter into a 15-year lease for the premises to restore, manage, preserve, use and otherwise interpret the site for historical, educational and other compatible purposes for Fiscal Years 2023-2038. The site would be occupied by the HSHC and the Forest Lake Historical Society. The lease involved no payment of rent but conferred responsibility for repairing and maintaining the site to the Society and the HSHC with clear mileposts and requirements for progress on updating the site to be determined and specified in the lease (subject to later Council approval). Adoption of the Consent Agenda approved the lease in principle subject to finalization by staff of particular details of it to include: enhanced specification of goals and remedies, specification of insurance responsibilities, and other matters as is necessary and advisable to the HSHC and the Society and the City of Hugo. Approve Ordinance Amending Chapter 10, Article II, Dogs Regarding Violations and Penalties Due to an increase in public nuisance violations involving dogs, staff had determined that there was a need to revise the City’s procedure for dealing with dog nuisance violations. The proposed ordinances would revise Chapter 10, Article II, Section 32 of the City Code to remove the notification of authorities, second complaint, and failure to correct subsections relating to reporting dog public nuisances. Chapter 10, Article II, Section 39 would also be revised to classify violations of any section underneath Chapter 10, Article II as misdemeanors. The intent of these revisions was to simplify the violation process while allowing for higher enforceability. Council Meeting Minutes for May 15, 2023 Page 3 of 7 Adoption of the Consent Agenda approved ORDINANCE NO. 2023-524 AMENDING HUGO CITY CODE, CHAPTER 10, ARTICLE II – DOGS, SECTION 10- 39 – PENALTIES and ORDINANCE NO. 2023-525 AMENDING HUGO CITY CODE CHAPTER 10, ARTICLE II - DOGS, SECTION 10-32 - NUISANCES. Approve Pay Request No. 9 to Peterson Companies for Downtown Improvement/Lions Park Project Peterson Companies, Inc. had submitted Pay Voucher No. 9 in the amount of $157,733.32 for work certified through April 30, 2023, on the 2021 Downtown Improvement/Lions Park Project. Substantial work had been completed on the project. Pay Voucher No. 9 covered installation of the fence around the playground and along the retaining wall within the playground. Punch-list items were currently on-going. Adoption of the Consent Agenda approved payment to Peterson Companies, Inc. in the amount of $157,733.32. Approve Advertisement for Public Works Utility Lead Worker The City Council, at their February 6, 2023, meeting, approved the job description for a Public Works Utility Lead Worker and gave authorization to advertise for an internal candidate to fill the position. This position was not filled by an internal candidate. Adoption of the Consent Agenda approved the advertisement for the position of Utility Lead Worker. Approve Purchase of Loggers and Scope of Work from WSB for North Star Wetland Bank Data Collection At the meeting of February 6, 2023, Council heard an update on the North Star Wetland Bank. WSB and Associates had prepared the draft prospectus which was reviewed by the Technical Evaluation Panel. They had not yet made a decision on the project, but it was likely that the TEP would require additional data. WSB had provided a scope of work for hydrology monitoring and soil investigation between May and September 2023 for a cost of $9,294. WSB ahd recommended the City purchase data loggers, in lieu of renting them, as it is likely that monitoring would be required from now through potential construction and maintenance phases. Purchase of six Rugged TROLL 100s was estimated to cost $3,260.00. Adoption of the Consent Agenda approved the purchase of the data loggers and the scope of work from WSB for North Star Wetland Bank data collection. Approve Wetland Replacement Plan for Oneka Prairie – Oneka Parkway Extension Southwind Holdings, LLC, was proposing to develop a 25-acre property located at the north end of Oneka Parkway to be known as Oneka Prairie. The development would include 59 residential lots and a public park, with a short extension of Oneka Parkway to the north. Where the extension was proposed to be constructed small wetland impacts were proposed. The applicant was proposing to replace the impacts to the wetland basin though the purchase of wetland credits from an approved wetland bank. Adoption of the Consent Agenda approved the wetland replacement plan, subject to final Technical Evaluation Panel issuance of the Notice of Decision for the wetland replacement application. Council Meeting Minutes for May 15, 2023 Page 4 of 7 Resolution to Order Repair or Removal of a Hazardous Building at 14197 Forest Boulevard North Community Development Director Rachel Juba explained that on September 21, 2022, there was as structure fire at the property located at 14197 Forest Boulevard North. The house on the property was substantially damaged due to the fire. The house was in a state of dilapidation and hazardous to the health and safety of the public. In addition, Washington County Sheriff’s Department had informed staff that there had been reports of people breaking into the building. Staff had been in contact with the owners and were not aware if the owners had decided on how to abate the violations and remove the hazardous building. Juba presented three options available to the City. The City could do nothing, provide the owners more time to make a decision, or use statutory authority to order repair or removal of the hazardous building. She provided information on the Minnesota State Statute that provided the authority and process to deal with hazardous buildings. The order would go through the court system. The City would first need to identifying the house as hazardous and adopt an order for its repair or removal. This order would be served to property owners and lien holders, and they would be given a specified amount of time to repair or remove the building. If the owner did not do the work, the Court could grant the City authority to remove the hazardous building and charge all the costs against the property as a special assessment on their property taxes. Staff recommended Council approve the resolution to order repair or removal of the building. Miron asked about interactions with property owners and the due process. Juba replied staff had talked to both owners several times and had contacted the insurance company. The order would be for the repair or removal of the structure, and staff would work with the property owner if they decided to obtain a building permit to repair. Petryk asked how much time the property owner would have. Rachel responded there would be a specified time in the order. Snyder added that if it resulted in a court order, they would have another 30 days to bring it into compliance. If it is not brought into compliance within that time, it is filed with the district court. The shortest amount of time would be 21 days after filed with district court, but 60 days could easily be added to that depending on court scheduling. He said there was plenty of due process and opportunities for the resident to get this taken care of voluntarily. Juba added that a letter that was sent out to the property owner, mortgage company, and insurance company informing them of this meeting tonight if they wanted to provide any documentation or attend. No one was in attendance. Miron made motion, Petryk seconded, to approve RESOLUTION 2023-7 RESOLUTION APPROVING AN ORDER OF THE CITY OF HUGO REGARDING HAZARDOUS AND SUBSTANDARD BUILDING LOCATED AT 14197 FOREST BOULEVARD NORTH, HUGO, MINNESOTA. All Ayes. Motion carried. Council Meeting Minutes for May 15, 2023 Page 5 of 7 Discussion on Use of American Rescue Plan Act (ARPA) Funds to Fund Road Maintenance Projects Finance Director Anna Wobse reminded Council that the ARPA funds were discussed at the goal setting workshop in January, and Council showed interest in using ARPA funds for the construction of the North Star Wetland Bank. To date, the City received the full allocation of $1,668,411.91 of ARPA Funds and had until December 31, 2024, to spend them. In January 2022, the US Treasury Department released the final rule that allowed the City to use these funds to fund general government services and specifically recognized road building and road maintenance as a government service. Wobse explained that since the goal setting workshop, Public Works staff had completed a comprehensive review of the roads in the City and found that because of the continuous freeze- thaw that took place Spring of 2023, many roads in the City were in worse condition than expected. Staff worked together to re-evaluate the Street Capital Improvement Projects (CIP) and found many of these roads were not on the upcoming CIP and were in worse condition than some roads currently on the CIP. There were four streets that rated the same and should be completed over the next two years. The current street fund only funded one project each year. Staff recommended using ARPA funds to do the 2023 Birch Tree Street Improvement Project, which would free up the street funds to be used for the additional road maintenance projects that needed to be completed. Staff requested Council adopt the resolution authorizing road maintenance expenditures from the America Rescue Plan Act Funds. If approved, staff would present to Council a new CIP at an upcoming meeting. Weidt said he thought it was a good idea since there were current government negotiations to take back some of the unused funds. This would also help the City catch up on road projects. Strub said he was still concerned about the wetland bank construction and asked if there was another way to fund that. Wobse replied that the City could possibly use Capital Facility Funds since the City would get most of the money back when selling credits. Bear added that it was very easy to see delays in the wetland bank. Now extra data needed to be collected to prove hydrology, which was just one little delay in the project. There was only so much time to spend the ARPA Funds. He said staff would come back with an alternate funding path for the wetland bank, and would come back in June with a new CIP, which was being prepared by staff. Klein made motion, Petryk seconded, RESOLUTION 2023-8 RESOLUTION AUTHORIZING ROAD MAINTENANCE EXPENDITURES FROM THE AMERICAN RESCUE PLAN ACT FUNDS UNDER THE STANDARD ALLOWANCE ELECTED UNDER THE REVENUE LOSS PROVISION OF THE CORONAVIRUS LOCAL FISCAL RECOVERY FUND. All Ayes. Motion carried. Council Meeting Minutes for May 15, 2023 Page 6 of 7 Resident Kayte Barton – Transportation for People with Disabilities and Seniors Resident Kayte Barton had contacted City staff requesting to speak to Council regarding equitable transportation services in Hugo. She explained she was high function autistic and wanted to help create transportation for people with disabilities and seniors like she did in Woodbury. She talked about having issues being a part of a Special Olympics team and getting to church because of the lack of transportation. She provided reasons transportation was important to people with disabilities and seniors and statistics on the population with disabilities. She talked about Transit Link, which doesn’t have a schedule, and Metro Mobility that would involve a transit tax. New Trax picks her up on Wednesdays. This is a free service that runs off grants from the state. Council discussed those options with each having their limitations. City Administrator Bryan Bear explained that New Trax is funded through state resources as well as cities and senior facilities. They had a route in Forest Lake and White Bear Lake, and do a circular with senior citizens in those towns. The City of Hugo does not have enough of those types of facilities to make a route feasible. The City has had good conversations with them, and they have made special accommodations for Kayte. Transit Link is a service that links to other transit services. Metro Mobility has service areas set by the legislature, and he believed all cities in that area were part of the Metro Transit Taxing District. That taxing district tax could create approximately $300,000 City wide, and there was a lot that could be done with that money. It was also possible to be in the taxing district and not have Metro Mobility in the area. He pointed out that many of the Metro Transit Park and Rides were underutilized. Council thanked Katye for bringing this forward. They talked about the need to start looking at options as the City grows saying it would be a good time for staff to talk to the new Met Council representative regarding transportation. It was generally agreed that joining the taxing district would not be beneficial. Bear reminded Council of the Highway 61 visioning plan that Kayte has been participating in. A portion of that vision was transit. Weidt made motion, Miron seconded, to direct staff to continue to work with the City’s Metropolitan Council representative to look at transportation options to come up with solutions for transportation issues. All Ayes. Motion carried. Approve Change in June Council Meetings to One Meeting on Monday, June 12, 2023 Approve Change in City Administrator’s Performance Review to Monday, June 12, 2023 Approve Closing City Hall on Monday, July 3, 2023 Approve Change in July Council Meetings to Monday, July 10 and Monday, July 24, 2023 City Administrator Bryan Bear explained the MN State Legislators declared June 19 as a State holiday, Juneteenth. The seconded meeting of the Council in June fell on that date. In anticipation of it being a state holiday beginning this June, he recommended Council reschedule the meetings in June to one meeting on June 12. Council Meeting Minutes for May 15, 2023 Page 7 of 7 If Council rescheduled the June meetings, he recommended the Council reschedule the city administrator’s performance review for June 12. In addition, according to the City’s Personnel Policy, each regular, full-time employee who had worked for the City for one calendar year was allowed one day of their choosing as a personal holiday. Staff had collectively requested to use their personal holiday on Monday, July 3, and requested Council close City Hall on that date. Also, there were five Mondays in the month of July. Staff wanted to reschedule the July meeting dates to July 10 and 24 instead of July 3 and 17. This would allow for the cancellation of the July 3 meeting and keep the July meetings two weeks apart. Weidt made motion, Petryk seconded, to approve one meeting in June on June 12, rescheduling the city administrator’s performance review to June 12, rescheduling the July meetings to July 10 and 24, and closing City Hall on July 3, 2023. All Ayes. Motion carried. Adjournment Miron made motion, Klein seconded, to adjourn at 7:48 p.m. All Ayes. Motion carried. Respectfully Submitted, Michele Lindau, City Clerk 1 Michele Lindau Subject:FW: Retirement Letter From: millardda4470 <millardda4470@gmail.com>  Date: May 26, 2023 at 10:59:31 CDT  To: "Jim (Jr) Compton" <jrcompton@ci.hugo.mn.us>  Subject: Retirement Letter     Caution: This email originated outside our organization; please use caution.     Chief Compton    I am submitting my official letter of notice for retirement. My last official day will be May 31st 2023.    For the last 12‐1/2 years, it has been an honor to not only serve under 3 Chiefs for the Hugo Fire  Department, it has been my honor to work along side the best citizens of Hugo who have all given to the  community we chose to live and serve in. There isn't one member of the HFD I couldn't count on, in or  outside the Hugo Fire Department.     I would like to thank you Chief Compton,  Deputy Chief Jensen and Assistant Chief Emans for your  knowledge, expierence and guidance while I served. I have become a better person as a result. I would  also like to thank the Council Members for the City of Hugo, Mayor Weidt along with the citizens of  Hugo for allowing me to serve you. Through the training I received I would like to think, every time our  united team was called out, we made someone's day a little brighter when all they saw was gloom.    With all of the changing times and growth the city has seen, the structure the Fire Department has, it's  succes for this great community and citizens is rest assured the best group of highly trained  professionals you would want to have your back.    Again, thank you for this great opportunity to serve with and for you all as I turn the page to the next  chapter.    Best regards,  Doug Millard        Sent from my Verizon, Samsung Galaxy smartphone     You don't often get email from millardda4470@gmail.com. Learn why this is important May 16th, 2023 Bryan Bear City Administrator Hugo City Hall 14669 Fitzgerald Avenue N Hugo, MN 55038 Dear Mr. Bear, Please accept this letter as a formal notification of my resignation as Administrative Intern for the City of Hugo. My last day will be June 2nd, 2023. I would like to thank you, Hugo City Staff, and the Hugo City Council for mentoring me and providing me with an exceptional internship experience. Throughout my seven months with the City, I was able to work on several major projects across multiple departments that helped improve various administrative functions. These projects expanded my knowledge of local government while allowing me to develop a foundational skillset in time management and critical thinking which is transferrable to any position. Everyone at City Hall were a pleasure to work and were always willing to assist me if I ran into any questions. Their passion for providing excellent municipal services created a positive working environment which made me proud of the work I accomplished. On June 12th, I will be starting a new position as a Category Analyst with Best Buy. While this position will present itself with a learning curve, I am ready to take the challenge head-on. Furthermore, I will continue to attend graduate school at Hamline University to work towards obtaining my MBA. I am expected to graduate in August of 2024. This administrative internship experience helped me develop as a person more than I could have ever imagined. I will be forever grateful for this opportunity and wish the City continued success in making Hugo a great place to live. Sincerely, Joseph Hinzman K:\019275-000\Admin\Docs\Council Memo and Resolution\061323\LTR - LUP Agreement.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM June 8, 2023 Honorable Mayor and City Council City of Hugo 14669 Fitzgerald Avenue North Hugo, MN 55038 Re: TH 61 and 159th Street Reconstruction Minnesota Department of Transportation – Limited Use Permit S.P. 8206-53 WSB Project No. 019275-000 Dear Mayor and Council, The TH 61 and 159th Street Reconstruction is utilizing funding from MnDOT to complete the improvements. Therefore, the City is required to execute a Limited Use Permit (LUP) with MnDOT for the portion of the trail within the TH 61 (Forest Boulevard N) right-of-way. Attached is a figure identifying the portion of the trail that falls within the MnDOT TH 61 (Forest Boulevard N) right-of-way and the LUP. The LUP is limited to the construction, maintenance and operation of the trail within the TH 61 (Forest Boulevard N) right-of-way. Staff recommends approval of the LUP as the use of the TH 61 (Forest Boulevard N) right-of-way to promote safe crossing of the highway. If you have any questions or items you wish to discuss, you can contact me at 651-286-8463. Sincerely, WSB Mark Erichson, PE Director of Municipal Program Delivery Attachment cc: Bryan Bear, City Administrator, City of Hugo Scott Anderson, Public Works Director, City of Hugo Liz Finnegan, Senior Engineering Technician, City of Hugo 4 00 406 5 00 505 510310315 100 101102 1032093122025A A A A A A B B B B B D D D D D D D D C C C C E E E E E E 100 STA. 508+69.08 { WB 159TH ST END CITY PROJECT NOTES: A MATCH EXISTING B PAID FOR AS 6" CONCRETE WALK. CONSTRUCT CONCRETE ENTRANCE NOSE PER MNDOT STD. PLATE 7107. D SEE STANDARD PLANS CONSTRUCT PEDESTRIAN CURB RAMPS PER MNDOT STD. PLANS 5-297-250. C CONCRETE MEDIAN. SEE TYPICAL SECTION GENERAL DETAILS D & F E 5' CURB TRANSITION LEGEND INPLACE PAVEMENT PROPOSED CONSTRUCTION SEE INSET D, PLAN SHEET NO. 4" CONCRETE WALK 16 16 16 16 16 SEE INSET E, PLAN SHEET NO. 6" CONCRETE WALK SEE INSET C, PLAN SHEET NO. 3" BITUMINOUS TRAIL SEE INSET H, PLAN SHEET NO. 2" BITUMINOUS OVERLAY DIRECTION OF TRAFFIC CONSTRUCTION BY OTHERS SEE INSET J, PLAN SHEET NO. 7" CONCRETE WALK 16SEE INSET K, PLAN SHEET NO. 4" BITUMINOUS TRAIL 16SEE INSET F, PLAN SHEET NO. AGGREGATE DRIVEWAY 16SEE INSET I, PLAN SHEET NO. COMMERCIAL BITUMINOUS DRIVEWAYS SHEET OF DRAWN BY 173 Date License # Print Name: DESIGNED BY CHECKED BY NO DATE BY CKD APPR REVISION H:\Projects\14000\14824\Design\PlanSheets\FinalPlan\14824_cp02.dgn4/3/20233:50:09 PM...\FinalPlan\14824_cp02.dgn the laws of the State of Minnesota. that I am a duly Licensed Professional Engineer under was prepared by me or under my direct supervision and I hereby certify that this plan, specification, or report TH 61 & 159TH ST RECONSTRUCTION A.NILL C.KLEVE B.MAAS BRANDON J. MAAS 53788 CITY OF HUGO COMM. NO. 02114824 SP 8206-53 (TH 61) { NB TH 61 { SB TH 61 86CONSTRUCTION PLANS SEE SHEET NO. 85 MATCH LINE STA 305+30.00 { EB 159TH ST { WB 159TH ST { ROUNDABOUT { TRAIL B { TRAIL A (INFILTRATION BASIN) FOXTAIL POND BEGIN CITY PROJECT STA. 503+74.75 { WB 159TH ST 100050 SCALE IN FEET GUTTER OUT GUTTER OUT GUTTER OUT GUTTER OUT 17' 17 '22'22'22'22'14'14'10'10'8' TRA IL 8' TRAI L8' TRAIL 8' TRAI L6' BLVDS524 C&G S524 C&G S524 C&G S524 C&G S524 C&G S524 C&G R424 C&G D424 C&G + 44 .0 +01.4+36.9+96.1+42.7+69.0 RADIUS ALIGNMENT STATION LOCATION 2' 2' 2' NB61 205+89.4 3.0' (LT) SB61 307+91.3 3.0' (RT) EB159 401+92.5 2.9' (LT) EB159 406+13.4 21.8' (RT) END SP 8206-53 25'R 25'R 800'R 8' TRAIL 5.5' BLVD 16' 16' B618 C&G B618 C&G B618 C&G10' TRAIL2'WB159 503+79.9 2.9' (RT) 800' 18 '18 '+44.7MNDOT R/W MNDOT R/W +77 .2 6'+73.41:71:7+68.16'1.5'1.5'1:40+42.732'NORPA ETERCNOC '51 RADII R/W MNDOT STA. 314+42.73 { SB TH 61 BLVD10'TE EX R/W TE R/W EX MNDOT R/W EX MNDOT R/W PE R/W PE TE EX COUNTY R/W EX COUNTY R/W EX R/W EX R/W BY DEVELOPER PARCEL OWNED RESOLUTION NO. 2023 – CITY OF HUGO WASHINGTON COUNTY, MINNESOTA A RESOLUTION APPROVING LIMITED USE PERMIT WITH THE STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION FOR A NON-MOTORIZED RECREATIONAL TRAIL IN THE RIGHT-OF-WAY OF TRUNK HIGHWAY 61 (FOREST BOULEVARD) FOR THE TH 61 & 159TH STREET RECONSTRUCTION S.P. 8206-53 WHEREAS, THE City of Hugo is a political subdivision, organized and existing under the laws of the State of Minnesota; and WHEREAS, the City Council of the City of Hugo has approved the TH 61 & 159th Street Reconstruction to construct a non-motorized recreational trail in the right-of way of Trunk Highway 61 (Forest Boulevard N) to promote the orderly and safe crossing of the highway; and WHEREAS, the State of Minnesota, Department of Transportation requires a Limited Use Permit for the construction and utilization of said pedestrian trail. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF HUGO, MINNESOTA: 1. The City of Hugo hereby enters into a Limited Use Permit with the State of Minnesota, Department of Transportation for the following purposes: To construct, operate and maintain a non-motorized recreational trail within the right- of- way of Trunk Highway 61 (Forest Boulevard N) of the State of Minnesota along 159th Street N. The City of Hugo shall construct, operate, and maintain said trail in accordance with the Limited Use Permit granted by the Minnesota Department of Transportation. NOW, THEREFORE, BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF HUGO, MINNESOTA: 1. The Mayor and the City Administrator are authorized to execute the Limited Use Permit and any amendments to the Permit. This resolution was adopted by the City Council of the City of Hugo on the 12th day of June, 2023, by a vote of Ayes and Nays. Tom Weidt, Mayor ATTEST: Michele Lindau, City Clerk (seal) LUP – Standardized LUP Form Page 1 of 6 LU1001 5/19/2023 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION LIMITED USE PERMIT C.S. 8206 (T.H. 61) County of Washington LUP # 8206-0084 Permittee: City of Hugo Expiration Date: 05/19/2033 Coop. Agmt # 1052505 In accordance with Minnesota Statutes Section 161.434, the State of Minnesota, through its Commissioner of Transportation, (“MnDOT”), hereby grants a Limited Use Permit (the “LUP”) to City of Hugo, (“Permittee”), to use the area within the right of way of Trunk Highway No. 61 as shown in red on Exhibit "A", (the “Area”) attached hereto and incorporated herein by reference. This Limited Use Permit is executed by the Permittee pursuant to resolution, a certified copy of which is attached hereto as Exhibit B. Non-Motorized Trail The Permittee's use of the Area is limited to only the constructing, maintaining, and operating a nonmotorized trail ("Facility") and the use thereof may be further limited by 23 C.F.R. 652 also published as the Federal-Aid Policy Guide. In addition, the following special provisions shall apply: SPECIAL PROVISIONS 1. TERM. This LUP terminates at 11:59PM on 05/19/2033 (“Expiration Date”) subject to the right of cancellation by MnDOT, with or without cause, by giving the Permittee ninety (90) days written notice of such cancellation. This LUP will not be renewed except as provided below. Provided this LUP has not expired or terminated, MnDOT may renew this LUP for a period of up to ten (10) years, provided Permittee delivers to MnDOT, not later than ninety (90) days prior to the Expiration Date, a written request to extend the term. Any extension of the LUP term will be under the same terms and conditions in this LUP, provided: (a) At the time of renewal, MnDOT will review the Facility and Area to ensure the Facility and Area are compatible with the safe and efficient operation of the highway and the Facility LUP – Standardized LUP Form Page 2 of 6 LU1001 5/19/2023 and Area are in good condition and repair. If, in MnDOT’s sole determination, modifications and repairs to the Facility and Area are needed, Permittee will perform such work as outlined in writing in an amendment of this LUP; and (b) Permittee will provide to MnDOT a certified copy of the resolution from the applicable governmental body authorizing the Permittee’s use of the Facility and Area for the additional term. If Permittee’s written request to extend the term is not timely given, the LUP will expire on the Expiration Date. Permittee hereby voluntarily releases and waives any and all claims and causes of action for damages, costs, expenses, losses, fees and compensation arising from or related to any cancellation or termination of this LUP by MnDOT. Permittee agrees that it will not make or assert any claims for damages, costs, expenses, losses, fees and compensation based upon the existence, cancellation or termination of the LUP. Permittee agrees not to sue or institute any legal action against MnDOT based upon any of the claims released in this paragraph. 2. REMOVAL. Upon the Expiration Date or earlier termination, at the Permittee’s sole cost and expense Permittee will: (a) Remove the Facility and restore the Area to a condition satisfactory to the MnDOT District Engineer; and (b) Surrender possession of the Area to MnDOT. If, without MnDOT’s written consent, Permittee continues to occupy the Area after the Expiration Date or earlier termination, Permittee will remain subject to all conditions, provisions, and obligations of this LUP, and further, Permittee will pay all costs and expenses, including attorney’s fees, in any action brought by MnDOT to remove the Facility and the Permittee from the Area. 3. CONSTRUCTION. The construction, maintenance, and supervision of the Facility shall be at no cost or expense to MnDOT. Before construction of any kind, the plans for such construction shall be approved in writing by the MnDOT's District Engineer. Approval in writing from MnDOT District Engineer shall be required for any changes from the approved plan. The Permittee will construct the Facility at the location shown in the attached Exhibit "A", and in accordance with MnDOT-approved plans and specifications. Further, Permittee will construct the Facility using construction procedures compatible with the safe and efficient operation of the highway. LUP – Standardized LUP Form Page 3 of 6 LU1001 5/19/2023 Upon completion of the construction of the Facility, the Permittee shall restore all disturbed slopes and ditches in such manner that drainage, erosion control and aesthetics are perpetuated. The Permittee shall preserve and protect all utilities located on the lands covered by this LUP at no expense to MnDOT and it shall be the responsibility of the Permittee to call the Gopher State One Call System at 1-800-252-1166 at least 48 hours prior to performing any excavation. Any crossings of the Facility over the trunk highway shall be perpendicular to the centerline of the highway and shall provide and ensure reasonable and adequate stopping sight distance. 4. MAINTENANCE. Any and all maintenance of the Facility shall be provided by the Permittee at its sole cost and expense, including, but not limited to, plowing and removal of snow and installation and removal of regulatory signs. No signs shall be placed on any MnDOT or other governmental agency sign post within the Area. MnDOT will not mark obstacles for users on trunk highway right of way. 5. USE. Other than as identified and approved by MnDOT, no permanent structures or no advertising devices in any manner, form or size shall be allowed on the Area. No commercial activities shall be allowed to operate upon the Area. Any use permitted by this LUP shall remain subordinate to the right of MnDOT to use the property for highway and transportation purposes. This LUP does not grant any interest whatsoever in land, nor does it establish a permanent park, recreation area or wildlife or waterfowl refuge. No rights to relocation benefits are established by this LUP. This LUP is non-exclusive and is granted subject to the rights of others, including, but not limited to public utilities which may occupy the Area. 6. APPLICABLE LAWS. This LUP does not release the Permittee from any liability or obligation imposed by federal law, Minnesota Statutes, local ordinances, or other agency regulations relating thereto and any necessary permits relating thereto shall be applied for and obtained by the Permittee. Permittee at its sole cost and expense, agrees to comply with, and provide and maintain the Area, Facilities in compliance with all applicable laws, rules, ordinances and regulations issued by any federal, state or local political subdivision having jurisdiction and authority in connection with said Area including the Americans with Disabilities Act (“ADA”). If the Area and Facilities are not in compliance with the ADA or other applicable laws MnDOT may enter the Area and perform such obligation without liability to Permittee for any loss or damage to Permittee thereby incurred, and Permittee shall reimburse MnDOT for the cost thereof, plus 10% of such cost for overhead and supervision within 30 days of receipt of MnDOT’s invoice. LUP – Standardized LUP Form Page 4 of 6 LU1001 5/19/2023 7. CIVIL RIGHTS. The Permittee for itself, successors in interest, and assigns, as a part of the consideration hereof, does hereby covenant and agree that in the event improvements are constructed, maintained, or otherwise operated on the Property described in this Limited Use Permit for a purpose for which a MnDOT activity, facility, or program is extended or for another purpose involving the provision of similar services or benefits, the Permittee will maintain and operate such improvements and services in compliance with all requirements imposed by the Acts and Regulations relative to nondiscrimination in federally-assisted programs of the United States Department of Transportation, Federal Highway Administration, (as may be amended) such that no person on the grounds of race, color, national origin, sex, age, disability, income- level, or limited English proficiency will be excluded from participation in, denied the benefits of, or be otherwise subjected to discrimination in the use of said improvements. 8. SAFETY. MnDOT shall retain the right to limit and/or restrict any activity, including the parking of vehicles and assemblage of Facility users, on the highway right of way over which this LUP is granted, so as to maintain the safety of both the motoring public and Facility users. 9. ASSIGNMENT. No assignment of this LUP is allowed. 10. IN WRITING. Except for those which are set forth in this LUP, no representations, warranties, or agreements have been made by MnDOT or Permittee to one another with respect to this LUP. 11. ENVIRONMENTAL. The Permittee shall not dispose of any materials regulated by any governmental or regulatory agency onto the ground, or into any body of water, or into any container on the State’s right of way. In the event of spillage of regulated materials, the Permittee shall notify in writing MnDOT’s District Engineer and shall provide for cleanup of the spilled material and of materials contaminated by the spillage in accordance with all applicable federal, state and local laws and regulations, at the sole expense of the Permittee. 12. MECHANIC’S LIENS. The Permittee (for itself, its contractors, subcontractors, its materialmen, and all other persons acting for, through or under it or any of them), covenants that no laborers', mechanics', or materialmens' liens or other liens or claims of any kind whatsoever shall be filed or maintained by it or by any subcontractor, materialmen or other person or persons acting for, through or under it or any of them against the work and/or against said lands, for or on account of any work done or materials furnished by it or any of them under any agreement or any amendment or supplement thereto. LUP – Standardized LUP Form Page 5 of 6 LU1001 5/19/2023 13. NOTICES. All notices which may be given, by either party to the other, will be deemed to have been fully given when served personally on MnDOT or Permittee or when made in writing addressed as follows: to Permittee at: Mayor City of Hugo 14669 Fitzgerald Avenue N Hugo, MN 55038 and to MnDOT at: State of Minnesota Department of Transportation Metro District Right of Way 1500 W. County Road B2 Roseville, MN 55113 The address to which notices are mailed may be changed by written notice given by either party to the other. 14. INDEMNITY. Permittee shall indemnify, defend to the extent authorized by the Minnesota Attorney General’s Office, hold harmless and release the State of Minnesota, its Commissioner of Transportation and employees and any successors and assigns of the foregoing, from and against: (a) all claims, demands, and causes of action for injury to or death of persons or loss of or damages to property (including Permittee's property) occurring on the Facility or connected with Permittee's use and occupancy of the Area, except when such injury, death, loss or damage is caused solely by the negligence of State of Minnesota, but including those instances where the State of Minnesota is deemed to be negligent because of its failure to supervise, inspect or control the operations of Permittee or otherwise discover or prevent actions or operations of Permittee giving rise to liability to any person; (b) claims arising or resulting from the temporary or permanent termination of Facility user rights on any portion of highway right of way over which this LUP is granted; (c) claims resulting from temporary or permanent changes in drainage patterns resulting in flood damages; (d) any laborers', mechanics', or materialmens' liens or other liens or claims of any kind whatsoever filed or maintained for or on account of any work done or materials furnished; and (e) any damages, testing costs and clean-up costs arising from spillage of regulated materials attributable to the construction, maintenance or operation of the Facility. LUP – Standardized LUP Form Page 6 of 6 LU1001 5/19/2023 MINNESOTA DEPARTMENT OF TRANSPORTATION RECOMMENDED FOR APPROVAL CITY OF HUGO By_________________________________ Its ____________________________ And________________________________ Its ____________________________ By:______________________________ District Engineer Date_____________________________ APPROVED BY: COMMISSIONER OF TRANSPORTATION By:______________________________ Director, Office of Land Management Date____________________________ The Commissioner of Transportation by the execution of this permit certifies that this permit is necessary in the public interest and that the use intended is for public purposes. C:\Users\michele.lindau\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\ZGZEITLP\LTR - Approve MNDOT Agreement.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM June 6, 2023 Honorable Mayor and City Council City of Hugo 14669 Fitzgerald Avenue North Hugo, MN 55038 Re: TH 61 & 159th Street Reconstruction SP 8206-53 Enter Into MnDOT Agreement 1052505 WSB Project No. 019275-000 Dear Mayor and Council, The City of Hugo was successful in our Local Partnership Program grant application and will be receiving $710,000 in funds for the TH 61 and 159th Street Reconstruction project. It is recommended that the City of Hugo enter into MnDOT Agreement No. 1052505 with the State of Minnesota, Department of Transportation to provide for payment by the State to the City of the State's share of the costs of the roundabout construction and other associated construction to be performed upon, along and adjacent to Trunk Highway No. 61 at 159th Street North within the corporate City limits under State Project No. 8206-53. The State will be finalizing the standard Cooperative Construction Agreement between the State and City. Staff is requesting authorization for the Mayor and City Engineer to sign this agreement once received, subject City Attorney review and approval. This will help keep the project on schedule considering City Council meeting cancellation on June 19th. Staff recommends approval of the resolution to enter into MnDOT Agreement No. 1052505 for TH 61 & 159th Street Reconstruction. If you have any questions or items you wish to discuss, you can contact me at 612.360.1278. Sincerely, WSB Mark Erichson, PE Director of Municipal Program Delivery Attachment cc: Bryan Bear, City Administrator, City of Hugo Scott Anderson, Public Works Director, City of Hugo Liz Finnegan, Senior Engineering Technician, City of Hugo S:\Office_SHARED\Resolutions\2023 Resolutions\2023- -MnDOT Coop Construction Agreement for 61 Roundabout.docx RESOLUTION NO. 2023- A RESOLUTION TO ENTER INTO MNDOT AGREEMENT NO. 1052505 TH 61 & 159TH STREET RECONSTRUCTION IT IS RESOLVED that the City of Hugo enter into MnDOT Agreement No. 1052505 with the State of Minnesota, Department of Transportation for the following purposes: To provide for payment by the State to the City of the State's share of the costs of the roundabout construction and other associated construction to be performed upon, along and adjacent to Trunk Highway No. 61 at 159th Street North within the corporate City limits under State Project No. 8206-53. IT IS FURTHER RESOLVED that the Mayor and the City Engineer are authorized to execute the Agreement and any amendments to the Agreement. CERTIFICATION I certify that the above Resolution is an accurate copy of the Resolution adopted by the Council of the City of Hugo at an authorized meeting held on the 12th day of June, 2023, as shown by the minutes of the meeting in my possession. __________________________________ (Signature) Subscribed and sworn to before me this ________ day of _________________, 20__ __________________________________ (Type or Print Name) __________________________________ (Title) Notary Public ________________________ My Commission Expires _______________ Holiday Leave City offices and activities shall be closed on the days listed below in observance of holidays, except where necessary to meet work requirements. Regular and seasonal full- time employees in good standing with the City shall receive one day of regular pay for each observed holiday, and shall be credited with eight hours work for the computation of overtime requirements. Temporary and part-time employees shall not receive pay or overtime credit for these days except as specified in paragraph (b) and (c) below. a. The following holidays shall be observed by the City:  New Years Day (January 1st, or as observed)  Martin Luther King’s Birthday (as observed)  Memorial Day (last Monday in May)  Juneteenth (as Observed)  Independence Day (July 4th, or as observed)  Labor Day (first Monday in September)  Veteran’s Day (as observed)  Thanksgiving Day (fourth Thursday in November)  Friday after Thanksgiving  Christmas Day (December 25th, or as observed)  Presidents Day (as observed)   Agenda Number : G.18 CITY OF HUGO COMMUNITY DEVELOPMENT DEPARTMENT PLANNING AND ZONING APPLICATION STAFF REPORT TO: Bryan Bear, City Administrator FROM: Rachel Juba, Community Development Director SUBJECT: Southwind Holdings, LLC - Final Plat and Development Agreement for Oneka Prairie DATE: June 8, 2023, for the City Council Meeting of June 12, 2023 REVIEW DEADLINE: June 26, 2023 (60-days) 1.PROPOSED MOTION: Move to approve the resolution approving the final plat and development agreement for Oneka Prairie. Approval of the Final Plat requires a 3/5 vote of the City Council. 2.DESCRIPTION OF REQUEST: The applicant is requesting approval of a final plat in order to plat 59 lots on the parcel located at the existing end of Oneka Parkway for the Oneka Prairie development. This development will be one phase. The City Council reviewed and approved the preliminary plat and PUD for Oneka Prairie at its December 19, 2022, meeting. The lots meet the minimum lot standards and requirements outlined in the regulations for the Oneka Prairie PUD. Park Dedication is to be satisfied with land dedication of Outlot C and park dedication fee of $2,686 per unit. The plans show construction of amenities in the park including a shelter, playground, and sidewalk loop in exchange for PUD flexibility. The Parks Commission shall review and approve the improvements/amenities prior to construction. 4.RECOMMENDATION: Staff recommends approval the resolution approving the Final Plat and Development Agreement for Oneka Prairie , subject to review and approval by the City Attorney. Oneka Prairie Final Plat and Development Agreement Page 2 ATTACHMENTS: a) Location Map b) Resolution Approving the Final Plat and Development Agreement c) Engineer’s Memo dated June 8, 2023 d) Draft Development Agreement e) Final Plat f) Final Plat Construction Plans 165th Street North Ethan Trail North Empress Avenue North Fairoaks Avenue NorthOneka Parkway North162nd Street NorthEverton Avenue North162nd Court North Oneka Prairie Location Map Hugo, MN Parcel Boundary selection Roads Hugo Border Parcel Boundary ¯0 100Feet1 in = 250 feet Document Path: S:\Mapping\Emily\LocationSite Maps\2022\Oneka Prairie - 16345 Everton Ave N.mxdSite RESOLUTION 2023-______ APPROVING FINAL PLAT AND DEVELOPMENT AGREEMENT FOR SOUTHWIND HOLDINGS, LLC, ON PROPERTY LOCATED 16345 EVERTON AVENUE NORTH FOR ONEKA PRAIRIE WHEREAS, Southwind Holdings, LLC, has requested approval of a final plat development to allow construction of 59 single family lots and 6 outlots on the 24.83 acre property legally described as follows: (See Attached) WHEREAS, the Planning Commission has reviewed the preliminary plat and PUD at a duly called Public Hearing and recommends approval, and; WHEREAS, the City Council approved the preliminary plat and PUD at its meeting on December 19, 2022. NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF HUGO, MINNESOTA, that it should and hereby does approve the request by Southwind Holdings, LLC, for a final plat and development agreement, subject to the following conditions: 1. A final plat is approved to allow the creation of 59 single family home lots and 6 outlots, in accordance with the application and plans received by the City on April 27, 2023, May 3, 2023, May 17, 2023, and June 1, 2023, except as amended by this resolution. 2. The development shall substantially comply with all plans and conditions of the preliminary plat and PUD approval granted by the City Council on December 19, 2022. 3. Development standards shall comply with Resolution 2022-91 and 2022-92, as amended. 4. The developer shall comply with all conditions outlined in the City Engineer’s memo dated June 8, 2023 and revisions required in “red-lined” comments from the City Engineer. 5. Oneka Parkway with sidewalk and trail, shall be constructed to the north property line and all the way to the lift station. 6. Park Dedication is to be satisfied with land dedication of Outlot C and park dedication fee of $2,686 per unit. The plans show construction of amenities in the park including a shelter, playground, and sidewalk loop in exchange for PUD flexibility. The Parks Commission shall review and approve the improvements/amenities prior to construction. Resolution 2023-___ Page 2 7. The building setbacks and impervious surface requirements for the development are as follows: Proposed Min. Lot Size 7,800 square feet (9,427 average) Lot Width 65 feet Front Yard Setback 30 feet 20 feet on corner lot - side of house Side Yard Setback 7.5 feet Rear Yard Setback 30 feet Impervious Surface 50% 8. Outlot Use and Ownership: Outlot Acres Ownership Use A 2.17 City Wetland/Ponding B 2.66 City Wetland C 0.54 City City Public Park D 1.56 City Wetland/Ponding E 0.19 City Wetland F 0.38 City Wetland 9. The developer shall design and install a storm water re-use system for the irrigation of the lots. 10. The landscaping planned for the plat shall be installed in one phase. The developer shall take proper precautions to protect the trees as the homes are being built. 11. Staff will continue to work with the developer on the street lighting plan. Exact locations of the street lights shall be reviewed and approved by City staff prior to installation. The street lights shall be the Lantern style decorative light. 12. Final design of the entrance monument shall be reviewed and approved by staff prior to installation. 13. Prior to the release of the final plat for recording, the developer shall comply with the following conditions. a. An HOA shall be established to own/operate/maintain the following: i. landscaping and grass along Oneka Parkway within the right-of- way, ii. planting beds along Oneka Parkway within the right-of-way iii. vegetation in outlots E and F iv. and the water re-use system. Resolution 2023-___ Page 3 The HOA documents/covenants shall be reviewed and approved by staff. b. The storm water re-use system shall be reviewed and approved by staff. The storm water reuse system operation, encroachment, and maintenance agreement shall be reviewed and approved by City staff. c. An encroachment and maintenance agreements shall be reviewed and approved by staff for access and maintenance of stormwater reuse system, landscaping, and signage, with in Outlots A and D. d. The development shall comply with the Fire Chief’s requirements regarding fire flow calculations, the location of fire hydrants, fire department connections, and fire lane signage. e. The developer shall obtain all necessary stormwater management and WCA permits from the City. f. The developer shall obtain all necessary local, state, and federal permits. g. The developer shall enter into a development agreement, shall agree to complete all improvements, and pay all fees as required by the agreement. 13. Prior to the issuance of building permits, the developer shall comply with the following conditions. a. The applicant shall record the final plat, development agreement and all other documentation at Washington County and provide the City with proof of recording. b. The applicant shall submit three full sets of approved final plans to the City. c. If a sales trailer is located in the property, a site plan and building elevations shall be submitted for City review and approval. 14. Prior to the issuance of Certificate of Occupancy, the developer shall comply with the following conditions: a. The lift station shall be constructed and functioning. Resolution 2023-___ Page 4 ADOPTED by the City Council this 12th day of June, 2023 ______________________________ Tom Weidt, Mayor ATTEST: _______________________________ Michele Lindau, City Clerk S:\Users\R_Juba\DEVELOPMENT PROJECTS\Oneka Prairie\Final Plat\Engineers Memo and Redlined Comments\Engineers Memo Oneka Prairie Final Plat - 060823.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM June 8, 2023 Ms. Rachel Juba Community Development Director City of Hugo 14669 Fitzgerald Avenue North Hugo, MN 55038 Re: Oneka Prairie Preliminary Plat Review WSB Project No. 020725-000 Dear Ms. Juba: We have reviewed the Final Plat Submittal for the Oneka Prairie development. We have reviewed the following information related to this application: • Oneka Prairie Construction Documents dated May 31, 2023, for Southwind Holdings, LLC by Anderson Engineering • Oneka Prairie Final Plat received June 5th, 2023 • Stormwater Management Plan revised May 17, 2023, for Southwind Holdings, LLC by Anderson Engineering Based on the review of the documents, we offer the following comments related to this application: General/Access 1. The subject property is located north of Empress Avenue North (constructed as part of the Oneka Place Development), south of 165th Street and east of the extension of Oneka Parkway. 2. The development plans include the extension of Oneka Parkway along the full length of the development. Two access points along Oneka parkway are proposed with a 3rd access point into the development coming from the extension of Fairoaks Avenue that was constructed as part of the Oneka Place Development. 3. An existing 100-ft easement exists for the construction of Oneka Parkway. Outlot G is now included as dedicated as right-of-way. 4. Connection of Oneka Parkway to 165th Street is not planned for this development. 5. Minor detailed redline comments have been provided on the plans and sent to the applicants engineer so they can be addressed in future submittals. Utility Plan 6. As identified in the City’s Comprehensive Water Supply and Distribution Plan, a 12” trunk watermain will need to be extended north from the existing 12” trunk watermain located within Oneka Parkway with the City of Hugo paying for oversizing costs. Ms. Rachel Juba June 8, 2023 Page 2 S:\Users\R_Juba\DEVELOPMENT PROJECTS\Oneka Prairie\Final Plat\Engineers Memo and Redlined Comments\Engineers Memo Oneka Prairie Final Plat - 060823.docx 7. The City’s Comprehensive Sanitary Sewer Plan identifies the way in which properties are to be served by sanitary sewer. A trunk sanitary sewer lift station serving this development and a significant area to the north and west is identified to be constructed near the existing terminus of Oneka Parkway and will be paid for and constructed by the City of Hugo. Sighting of the lift station has been coordinated with the developer and the lift station will be located in the NW corner of the development with access coming from Oneka Parkway. 8. Sanitary Sewer within Fairoaks Avenue is available to serve a small portion of the property based on its current depth but, is not of sufficient depth to serve the developable area to the east nor the majority of the subject property. Staff has determined that it is more effective to serve the majority of the development from the lift station. Two lots at the extension of Fairoaks will be served by the sewer within Fairoaks, allowing earlier building permits and certificate of occupancy considering the lift station will not be operational as quickly as this gravity main. 9. The project is not proposed to be phased. Stormwater Management 10. The site is meeting water quality requirements through the use of onsite water reuse for irrigation and a filtration basin. The basins are properly sized to provide the required water quality volume and to provide enough water for the proposed irrigation system. 11. The site is meeting rate control requirements through the use of onsite stormwater ponds and a filtration basin. 12. While there is not FEMA floodplain onsite, there is RCWD regulated floodplain over a portion of the site. Compensatory storage calculations for all fill below the RCWD regulated floodplain have been provided showing no impact on the floodplain. 13. The site is in compliance with the City’s freeboard requirements. Wetlands 14. The wetland replacement plan for Oneka Prairie was approved by City Council and the Notice of decision was sent on 4/27/23. The plan identified 0.498 acres of permanent wetland impact which will be replaced by purchasing 0.996 acres of wetland bank credit from wetland bank 1722. 15. Oneka Parkway Extension is a separate LGU project as the wetland impacts from extending Oneka Parkway when combined with the Oneka Prairie Residential Development would have resulted in over 0.5 acres of wetland impact requiring and individual permit from the US Army Corps taking up to 12 months to review and issue a permit. 16. The Oneka Parkway Extension wetland replacement plan was approved by city council and the NOD was issued on June 2. The wetland credits have been debited for this project. 17. A revised wetland replacement plan identifying all impacts as discussed at the 11/21/22 TEP meeting needs to be submitted in a timely fashion to allow for review; no submittal has been received to date. The 11/29/22 wetland impact exhibit does not include impacts for rip-rap and grading within wetland D/E, outlot A in the northwest corner. Ms. Rachel Juba June 8, 2023 Page 3 S:\Users\R_Juba\DEVELOPMENT PROJECTS\Oneka Prairie\Final Plat\Engineers Memo and Redlined Comments\Engineers Memo Oneka Prairie Final Plat - 060823.docx 18. A site visit was completed on June 7, 2023, which showed that no signage had been erected for Bandings Turtles and proper wetland protections for unimpacted areas of wetlands D and F were not installed. An email was sent on June 8, 2023, to Larry Alm and Ken Meek requesting resolution of these permit conditions by June 16. 19. Signage should be installed along lot lines where wetlands have been preserved from impact so as to avoid future impacts to wetlands by lot owners resulting in enforcement actions. 20. Review based on plans set dated 4/11/23. Thank you for the opportunity to provide comments on this project. If you have any questions, please do not hesitate to contact me at 651-286-8463. Sincerely, WSB Mark Erichson, PE City Engineer cc: Scott Anderson, Public Works Director (email only) Liz Finnegan, Senior Engineering Technician (email only) Return To: City of Hugo 14669 Fitzgerald Ave N Hugo, MN 55038 CITY OF HUGO WASHINGTON COUNTY, MINNESOTA DEVELOPMENT AGREEMENT Oneka Prairie THIS AGREEMENT, made and entered into this _____ day of _______________, 2023 by and between the CITY OF HUGO, a Minnesota municipality organized under the laws of the State of Minnesota (hereinafter referred to as "City"); and CPDC – Pratt – Oakwood, Limited Liability Partnership (hereinafter referred to as "Developer"). WITNESS: 2 WHEREAS, the City Council of the City has, by Resolution Number 2022-91 on December 19, 2023, approved the preliminary plat for a major subdivision as proposed by the Developer to be known as "Oneka Prairie" ; and, WHEREAS, the City Council of the City has, by Resolution Number 2022-92 on December 19, 2023, approved the PUD general plan for a major subdivision as proposed by the Developer to be known as "Oneka Prairie" ; and, WHEREAS, the City Council of the City has, by Resolution Number 2033-_____ on June 12, 2023, approved the final plat for a major subdivision as proposed by the Developer to be known as "Oneka Prairie" (hereinafter referred to as the "Plat"); and, WHEREAS, the Plat proposed a development of an approximately 25 acre parcel of land into 59 residential lots and 6 outlots; and, WHEREAS, it is the policy of the City to enter into development contracts as contemplated in Minnesota Statutes §462.358, Subd. 2(a); and, WHEREAS, this development agreement applies to all of the residential lots and outlots within the Oneka Place plat, as legally described in Exhibit G. WHEREAS, the parties hereto desire to set forth their respective rights and obligations of the parties to this Agreement. NOW, THEREFORE, in consideration of the premises and of the mutual promises and conditions contained herein, it is agreed by the parties hereto as follows: A. GENERAL ENGINEERING CONDITIONS; 1. Escrow for City Costs and Fees. Developer shall, contemporaneously with the execution of this Agreement, deposit with the City an escrow as outlined in Exhibit C to cover the cost of legal fees, engineering and construction observation fees, administrative expenses, and other costs related to this Plat. All fees and costs incurred by the City in connection with the Plat shall be charged against said escrow account which shall remain in effect until the expiration of the warranty period for the Plat, as defined in paragraph 7, in all events said fees and costs shall be the responsibility of the Developer and shall be paid on demand. Any funds remaining in the escrow account after the completion of the warranty period shall be refunded to the Developer. In the event that the escrow account herein is depleted, Developer agrees to post additional funds to replenish the account and to cover projected City costs. Specifically, Developer agrees that the escrow account shall maintain a balance of no less than $5,000.00. Developer shall be entitled, upon request, to an itemized statement of all costs and fees charged against this escrow account. 3 2. Development Plans. In accordance with the policies and ordinances of the City, and subject to all City resolutions and approvals in connection herewith, the Developer shall construct the proposed improvements (hereinafter referred to as the "Improvements"). All Improvements shall be constructed and installed pursuant to the terms and conditions herein set forth in accordance with the plans approved and listed on Exhibit A, subject to all City resolutions and approvals listed in Exhibit B, subject to final approval by the City, and in accordance with City standards and requirements including those listed herein. In addition, all public street, utility, and storm drainage improvements shall comply with the City’s adopted specification book and the reasonable direction of City staff. 3. Authorization to Proceed with Construction. Developer agrees not to commence any grading, utility or street work within the Plat until the following are completed: 1) Construction plans are approved by the City and distributed. 2) Pre-construction conference is held. 3) Notice to Proceed is issued. 4. Construction Observation. The City, for its benefit, will provide staff of its choosing to provide construction observation for the Improvements outlined in this Agreement. All costs associated with construction observation and inspection will be the responsibility of the Developer. The Developer shall allow City staff and City consultants access to the property to allow for this work to occur. 5. Miscellaneous Requirements. a) Property Corners: All property corners as identified on the Plat must be monumented with iron surveyor's pipes by the Developer prior to final project acceptance, as defined in paragraph 7 of this Agreement. b) Drainage Easements: Drainage easements shall be dedicated on the Plat so as to cover any wetlands and stormwater ponding areas located below the 100-year high water levels. c) Soils Testing: Soils inspection and compaction testing by a registered professional engineer shall be accomplished on all lots where filling is required, in accordance with the approved Grading, Drainage, and Erosion Control Plan. A minimum of one (1) compaction test for all developed lots shall be obtained for every two (2) foot increment of fill that is placed. A summary of all inspections and compaction tests for all developed lots shall be provided to the City upon completion of the grading and shall be provided for a respective lot prior to the issuance of a building permit for such lot. 4 d) Private Utilities: All private utilities that are installed, including electricity, telephone, natural gas and cable television, shall be installed underground. e) Mailboxes: Developer shall coordinate mailbox locations with the United States Postal Service. f) Street Lights: Street lights shall be installed within the Plat according to the Street Lighting Plan, which will first be approved by the City Engineer. Developer shall also submit its Street Lighting Plan to the applicable power company for its review, comment and approval. The installation of the street lights shall be coordinated with the applicable power company so that the street light system is installed, constructed and operated in such a manner as will harmoniously exist with other street lights within the area. g) Working Hours: Construction activity, including equipment startup and fueling, can only occur between the hours of 7:00 a.m. and 7:00 p.m. Monday through Friday; 8:00 a.m. and 5:00 p.m. on Saturdays; at no time on Sundays or holidays. h) Street Sweeping: Developer shall sweep and/or otherwise clean all streets, as needed, within and adjacent to the Development property as a result of construction activities associated with the Plat until final acceptance of the Improvements. If the streets are not maintained in a manner acceptable to the City, after reasonable notice to the Developer the City will arrange for the street sweeping at Developer’s cost. i) Placement of Bituminous Wear Course: The bituminous wear course can be placed on all streets once all of the following have occurred: 1. A Certificate of Occupancy has been issued for at least 75% of the lots or a cash escrow in the amount of $10,000 has been deposit with the City which will be held until 75% of the lots have received Certificates of Occupancy. At the City’s discretion, the wear course may be placed prior to having 75% occupancy. If applicable, the warranty period shall be extended an additional one (1) year for a total of two (2) years from final acceptance. In no case shall the wear course be placed with less than 50% occupancy. 2. The base course on all streets has been in place for at least one full freeze-thaw cycle. 3. City staff or its assignees have visually inspected all roadways and curb within the Development, and any repairs necessary as a result of said inspection are complete and written approval issued. 6. Project Completion: The Improvements listed herein on Exhibit A, including street, sanitary sewer, storm sewer, and municipal water, shall be completed subject to the approval 5 of the City in accordance with the approved plans. All Improvements shall be substantially completed to the reasonable satisfaction and approval of the City within twelve (12) months of the execution of this Agreement. Substantial completion shall consist of all work with the exception of placement of the bituminous wear course and completion of the final punchlist. The Developer shall be excused from the strict completion date set forth herein if written notice is received from the Developer of the existence of causes over which the Developer has no control which will delay the completion of the work and approved in writing by the City. In that event, the City may extend the date or dates herein specified. 7. Project Acceptance: Final project acceptance will be considered by the City Council once the following have been completed: (a) All Improvements are installed according to the approved plans. (b) All punchlist items are completed. (c) All Record Drawing information has been provided to the City to its satisfaction. (d) Escrow account for City costs and fees is current in accordance with the provisions of this Agreement. (e) The City receives confirmation via lien waivers that contractors or other parties have been paid for the work completed. (f) The City receives a written request from the Developer to accept the Improvements. 8. Record Drawing Requirements and Engineer’s Certification. Following completion of all development activities and prior to the release of security and acceptance of Improvements, the Developer and/or their assignee shall provide to the City "as-built" plans for the Improvements listed on Exhibit A. This information shall be provided to the City in the following formats: (a) 1-set mylar drawings (22” x 34”) for all Improvements. (b) 1-set paper drawings (22” x 34”) for all Improvements. (c) Individual Adobe.pdf (or approved equivalent) for all plan sheets and the final plat. All Record Drawings shall include the following information: (a) All bench marks shown on plans (bench marks shall be top nut of hydrants). (b) Swing ties to all gate valves shown on plans (ties should be to manholes, catch basins, hydrants or other permanent objects. (c) Swing ties to curb stops shown on plans (ties should be to manholes, catch basins, hydrants, property corners or other permanent objects). (d) Top of casting and invert elevation for all structures. (e) All pipe sizes, material type, pipe classification, grades and lengths (f) All horizontal and vertical curve data in the appropriate location on the plans. (g) Televised report of the sanitary sewer with videotape. 6 (h) Swing ties to any manhole or catch basin outside the roadway area. (i) A text file including the x, y and z coordinates (based on Washington County’s coordinate system) for the following: 1. All curb stops 2. All hydrants 3. All gate valves 4. All manholes located outside of the roadway 9. Construction Warranty and Financing of Improvements. The Developer agrees to construct the Improvements described herein at its own expense and in accordance with City specifications. The Developer shall engage at its own expense a registered, professional civil engineer to prepare plans and specifications for the Improvements and shall submit the same to the City for review and approval. The Developer represents and warrants that all of the Improvements made as a part of this development shall be guaranteed to be properly functioning as designed for a period of not less than one (1) year following acceptance of the entire project by the City. In the case of any material or labor that is supplied and that is reasonably rejected by the City as defective or unsuitable, then the rejected materials shall be removed and replaced with approved material, and the rejected labor shall be done anew to the reasonable satisfaction and approval of the City at the sole cost and expense of the Developer. In any event, none of the warranty periods expressed herein shall begin to run until all of the Improvements within the Plat have been approved and accepted by the City. The Developer’s engineer shall certify that grading within the Plat was completed in accordance with the approved Grading, Drainage and Erosion Control Plan before the City issues any building permits. The Developer shall remain ultimately responsible for accurate grading of all lots and shall correct any deficiencies in grading that may be discovered until the certificate of occupancy is issued or the developer is released from its obligation under this Agreement as outlined in paragraph 7 above. 10. Signs. The Developer shall prepare a plan for all regulatory, directional and street name signs to be within the Plat. The plan shall be reviewed and approved by the City’s public works department. Upon plan approval, the City’s public works department shall install all public signage within the Plat. The installation of all private signage shall be the responsibility of the Developer. All costs related to the installation of public signage shall be the responsibility of the Developer and will be deducted from the Developer’s escrow account. The Developer shall post funds as outlined in Exhibit C prior to the City’s public works department beginning the installation. 11. Drainage Easements. a) Work within Easements: No improvements, landscaping, or grading, other than Improvements shown on the approved plans, shall be permitted in dedicated drainage easements without the prior written permission of the City and any regulatory agency having jurisdiction. 7 b) Maintenance Responsibilities: The Developer and its successors in interest, including all individual homeowners, shall be responsible for routine maintenance of all storm water management ponds, wetlands, and drainage areas within easements dedicated to the City on their property. Routine maintenance shall include litter removal, mowing and maintenance of the property adjacent to pond or wetland areas. In the case of drainage swales, routine maintenance includes the removal of obstructions from the swale as necessary to maintain proper drainage in addition to the aforementioned items. The City shall be responsible for non-routine maintenance of storm water ponds within the easements, including pond dredging, maintenance of the storm water inlet(s) and outlet(s) pipes, and erosion control at outlet and inlet locations. Such maintenance shall be completed as deemed necessary by the City. 12. Wetland Signage: Permanent signage shall be placed along wetland edges as outlined in the City’s General Specification and Standard Details Manual or approved equal by the City. 13. Lowest Floor Elevations. All minimum floor elevations shall comply with Section 90-171 of the Hugo Zoning Ordinance, the City’s Comprehensive Stormwater Management Plan, or the approved Grading, Drainage, and Erosion Control Plan, whichever is more restrictive. Except as may be specifically allowed under Exhibit A, no building shall be constructed on any of the lots herein unless the lowest floor elevation is at least three (3) feet above the 100-year flood elevation or four (4) feet above the high groundwater elevation, whichever is greater, for the subject property. Additionally, the lowest floor elevation shall be specifically referenced and designated, for each lot, on a certificate of survey, which survey shall be provided to the City before any building permits are issued for any lots within the Plat. 14. Landscaping. All disturbed areas within the Plat shall be landscaped in accordance with the approved landscape plans, the City ordinances, and the City’s General Specification and Standard Details Manual. All landscaping shall be complete, established and growing within sixty (60) days of issuance of a Certificate of Occupancy, except that, if the certificate of occupancy is issued between the dates of October 1 and May 1, then the landscaping required herein shall be complete, established and growing no later than July 1. All front yards, side yards and back yards shall be fully sodded. All landscaped areas shall be tilled or otherwise worked mechanically in order to loosen compacted soils and shall contain at least four (4) inches of black dirt containing no more than 35% sand. Unless specific arrangements are made and agreed to by the City, all landscaping installed within the Plat shall be maintained by the Developer and its successors. All areas, other than proposed street areas, disturbed by grading activities on the site shall be seeded. Seeding shall be immediate upon completion of grading activities or as directed by the City Engineer. Seeding shall be completed as follows: a) All areas shall be restored with a minimum of four (4) inches of adequate topsoil prior to seeding. 8 b) Upland areas shall be seeded in accordance with the grading, drainage, and landscape plans listed in Exhibit A. The rate of application shall be one hundred (100) pounds per acre. Areas seeded shall be mulched with Type 1 mulch at a rate of two (2) tons per acre. All mulch shall be disk anchored. c) Wetlands, wetland replacement areas and storm water ponding areas shall be seeded per the Final Landscape Plan dated June 6, 2018, and revised July 27, 2018. The minimum rate of application shall be thirty (30) pounds per acre, or as recommended by the supplier. d) All seeded areas shall be maintained for the term of this Agreement. Upland areas shall be mowed as necessary or as directed by the City Engineer. e) All disturbed areas within the development shall be maintained to limit vegetation growth to less than ten (10) inches except designated natural areas or designated open spaces as shown on the approved plans. 15. Safe Rooms. The Developer shall require all builders to offer a safe room as an option to any and all potential homebuyers. All safe rooms offered and built within the City must meet or exceed FEMA requirements and standards. B. ESCROWS, CHARGES AND UTILITY OVERSIZING: Developer shall pay the escrows, fees and charges listed on Exhibit C. C. SPECIAL PLANNING REQUIREMENTS: The Plat shall be built and maintained in accordance with the planning requirements listed on Exhibit A hereto, and any miscellaneous requirements listed on Exhibit B hereto. D. ADMINISTRATIVE REQUIREMENTS: 1. Miscellaneous Provisions. Developer specifically understands that this Plat approval is given subject to the following requirements: a) Expiration. The final plat documents for the Plat, which is the first phase of the Oneka Place preliminary plat, have been submitted to the City Council within one hundred twenty (120) days of preliminary plat approval. The final plat must be recorded with the Washington County Recorder (and the mylar "hardshells" must be fully executed) within sixty (60) days of the City Council motion giving final plat approval, unless such deadline is extended by the City Council in its sole discretion, or else said approval shall be null and void. All fees relating to this subdivision shall be paid by the Developer, including the cost of recording documents with Washington County. b) Recording. The developer shall record this Agreement with Washington County simultaneous with the recording of the Plat, and shall forward confirmation of recording of the Plat and this Agreement to the City prior to the issuance of building permits. All applicable conditions of Plat approval must be met before any deeds are stamped for recording and 9 prior to the recording of the Plat at the Washington County Recorder's Office. Plat approval shall be contingent upon compliance with the approved plans for the Improvements and upon compliance with this Agreement. c) Model Homes. In the event that site grading is approved by the City prior to Plat approval and/or execution of this Agreement, posting of security and filing of the Plat, the Developer shall be entitled to one (1) building permit per housing unit type on lots that abut existing streets or roadways, subject to final approval by the City. No model homes may be constructed or utilized until at least one (1) lift of bituminous has been installed from said model home lot providing access to a public street or roadway outside of the Plat. No certificate of occupancy shall be issued for any model or other home until all necessary public improvements and utilities have been installed and the utilities have been successfully tested. Prior to this, and at the time that a model home passes final inspection, a model home may only be used by Developer’s staff or realtors for purposes of showing the models to potential buyers. No model home may be used until landscaping conforming to City ordinance and paragraph 14 of this Agreement has been installed except that, if the certificate of occupancy is issued between the dates of October 1 and May 1, then the landscaping required herein shall be complete, established and growing no later than July 1. d) Sales Trailers. The developer may be entitled to a maximum of one (1) temporary sales office (sales trailer) for this and all subsequent phases of the development for a period of time not to exceed nine (9) months. Upon receipt of an acceptable site plan, a sales trailer may be approved by the City Community Development Director prior to the first model home being available for showing. The trailer is subject to the issuance of a building permit, shall meet all applicable building codes, shall be fully skirted, shall be suitably landscaped, shall contain sufficient parking for the size of the office, and shall have safe and suitable access to a paved, public roadway. The trailer shall be removed, and the site shall be restored within seven (7) days following the date that a model home passes final inspection. e) Deviations. No material deviations from the approved Plat shall be allowed unless approved in writing by the City. Approval herein is also given subject to full compliance with the conditions of approval and findings adopted by the City Council in connection with the approval of the development. f) Certificates of Survey. A certificate of survey shall be provided to the City Building Inspector for each lot at the time a building permit is requested for the lot. Attached to the certificate of survey shall be an erosion control plan for the lot showing location and type of all erosion control measures to be used on the lot, and spot elevations, tree preservation plan shall be submitted for each home site. g) Outhouses. The Developer shall provide on-site a sufficient number of portable outhouses to be available for the persons who will be working on-site until Improvements are accepted according to the plans in Exhibit A. 10 h) Property Owners Association. When required as a condition of approval outlined in Exhibit B, the Developer agrees to form a property owners association, membership in which shall be mandatory for all of the lots within this development. The property owners association shall be responsible for maintenance and repair of all common elements as listed in the property owners association documents within this development and the same shall be maintained in good condition in accordance with all City ordinances and reasonable directions of the City. Developer agrees to provide a copy of the property owners association documents to the City prior to the recording of the final plat. In the event of failure or refusal of any property owners association to so maintain or repair the common elements then the City may, with seven days written notice and without regard to the requirements or formalities of Minn. Stat. §429 perform the work and assess each of the lots within the plat for the cost of the work. i) Intentionally deleted j) The property owners association documents shall advise owners of all lots of the requirements of this Agreement as follows: THE LAND WITHIN THIS PLAT, INCLUDING THE LAND CONVEYED HEREIN, IS BOUND BY RESTRICTIONS IN A DEVELOPMENT AGREEMENT. SAID DEVELOPMENT AGREEMENT IS ON FILE AT THE OFFICE OF THE WASHINGTON COUNTY RECORDER. k) Developer acknowledges that a separate development agreement will be entered into at the time of final plat approval of subsequent phases in the development. That Development Agreement will address, among other things, necessary improvements to be made, financial guarantees to be provided, and the amount of the development fees to be paid by the Developer. l) Developer shall remove all tree waste, junk, miscellaneous debris, junk vehicles, and any other personal property from the Plat which does not comply with the City Zoning Ordinance until final acceptance of the Improvements. E. DAMAGES AND DEFAULT: 1. Developer agrees to pay liquidated damages to the City if any lot has a real estate closing occur before all public improvements within the Plat are certified as being substantially completed by the City. Specifically, Developer agrees to immediately pay to the City liquidated damages in the amount of Ten Thousand Dollars ($10,000.00) for each lot closing which occurs in violation of this paragraph. The City shall be authorized to retain an appropriate percentage of the financial guarantee referred to in paragraph 4 as security for payment of any liquidated damages owed to the City. Model Homes are exempt from this section. 2. Developer agrees to pay liquidated damages to the City, in the amount of Five Thousand Dollars ($5,000.00), if the Developer encroaches upon any City road right-of-way or utility easement not permitted on the plans without first obtaining a written permit from the City expressly authorizing said encroachment. The City shall be authorized to retain an appropriate 11 percentage of the financial guarantee referred to in paragraph 4 as security for payment of any liquidated damages owed to the City. 3. Events of Default. a) Events of Default Defined. The following shall be "Events of Default" under this Agreement and the term "Event of Default" shall mean, whenever it is used in this Agreement, any one or more of the following events: 1. Subject to unavoidable delays, failure by Developer to commence and complete construction of the Improvements pursuant to the terms, conditions and limitations of this Agreement. 2. Failure by Developer to substantially observe or perform any material covenant, condition, obligation or agreement on their part to be observed or performed under this Agreement. b) Remedies on Default. Whenever any Event of Default occurs, the City, subject to any rights of third parties agreed to by the City pursuant to this Agreement, or otherwise by written, executed instrument of the City, may take any one or more of the following: 1. The City may suspend its performance under the Agreement until it receives assurances from Developer, deemed adequate by the City, that Developer will cure their default and continue their performance under the Agreement. Suspension of performance includes the right of the City to withhold permits including, but not limited to, building permits. 2. The City may initiate such action, including legal or administrative action, as is necessary for the City to secure performance of any provision of this Agreement or recover any amounts due under this Agreement from Developer, or immediately draw on the financial Letter of Credit, as set forth in this Agreement. 4. Enforcement by City; Damages. The Developer acknowledges the right of the City to enforce the terms of this Agreement against the Developer, by action for specific performance or damages, or both, or by any other legally authorized means. The Developer also acknowledges that its failure to perform any or all of their obligations under this Agreement may result in substantial damages to the City; that in the event of default by the Developer, the City may commence legal action to recover all damages, losses and expenses sustained by the City; and that such expenses may include, but are not limited to, the reasonable fees of legal counsel employed with respect to the enforcement of this Agreement. 12 F. THIS AGREEMENT: 1. Release of Agreement. This Agreement shall run with the land and may be recorded against the title to the property. After the Developer has completed the work required of it under this Agreement, at the Developer’s request the City will execute and deliver to the Developer a release. 2. Warranty of Title. Developer warrants and represents to the City that it is the fee owner of the land described herein and that it has authority to execute this Agreement, with consent from the other fee owner, and agree to the conditions hereof and to subject the land hereto. Developer also represents and warrants that the use for which this development is sought will not violate any restrictive covenants applying to the property. 3. Binding Effect. This Agreement shall be deemed to be a restrictive covenant and the terms and conditions hereof shall run with the land described herein and be binding on and inure to the benefit of the heirs, representatives and assigns of the parties hereto, and shall be binding upon all future owners of all or any part of the subdivision, and shall be deemed covenants running with the land. Reference herein to the Developers, if there be more than one, shall mean each and all of them. This Agreement shall be placed of record so as to give notice hereof to subsequent purchasers. The cost of said recording shall be borne by the Owner and charged against the escrow account. 4. Restrictions on Transfer/Indemnification. Developer agrees to defend and hold the City, and its officials, employees and agents, harmless against any and all claims, demands, lawsuits, judgments, damages, penalties, costs and expenses, including reasonable attorney's fees, arising out of actions or omissions by Developer, their employees and agents, in connection with the Project. No transfer or assignment shall be made without City approval and any assignment or transfer without such approval shall be void. 5. Incorporation by Reference. All general and special conditions, plans, special provisions, proposals, specifications and contracts for the Plat and for any Improvements furnished and let pursuant to this Agreement shall be and hereby are made a part of this Agreement by reference as if fully set out herein in full. 6. Developer will comply with and promptly perform all of its obligations under this Agreement. 7. Evidence of Title. Developer shall furnish the City with evidence of fee ownership of the property being platted by way of an attorneys title opinion or title insurance 13 commitment dated not earlier than thirty (30) days prior to the execution of the Plat. IN WITNESS WHEREOF, the City and Developer have caused this Agreement to be duly executed on the day and year first above written. 14 City of Hugo By________________________________ By__________________________________ Tom Weidt, Mayor Michele Lindau, Clerk STATE OF MINNESOTA ) ) ss. COUNTY OF WASHINGTON) On this _____ day of __________________, 20__, before me, a Notary Public, personally appeared Tom Weidt, Mayor, and Michele Lindau, Clerk, of the City of Hugo, a Minnesota municipality within the State of Minnesota, and that said instrument was signed on behalf of the City of Hugo by the authority of the City Council of the City of Hugo, and Tom Weidt and Michele Lindau acknowledge said instrument to be the free act and deed of said City of Hugo. __________________________________________ Notary Public 15 Developer Southwind Holdings, LLC By________________________________ ________________________ Its: ___________________________________ STATE OF MINNESOTA ) ) ss. (Corporate Notary) COUNTY OF WASHINGTON) On this _____ day of _________________, 20__, before me, a Notary Public, within and for said County and State, personally appeared ___________________, to me personally known, who, by me duly sworn did say that they are the _________________ of ____________________________, a Minnesota _____________________, on behalf of said ____________________. __________________________________________ Notary Public 16 EXHIBIT A LIST OF DEVELOPMENT PLANS Sheet No. Plan Date Author 1-2 Final Plat Recorded at Washington County EG Rud and Sons Inc. Construction Plans Updated once approved. All Water Re-Use Map 17 EXHIBIT B APPROVAL CONDITIONS 1. A final plat is approved to allow the creation of 59 single family home lots and 6 outlots, in accordance with the application and plans received by the City on April 27, 2023, May 3, 2023, May 17, 2023, and June 1, 2023, except as amended by this resolution. 2. The development shall substantially comply with all plans and conditions of the preliminary plat and PUD approval granted by the City Council on December 19, 2022. 3. Development standards shall comply with Resolution 2022-91 and 2022-92, as amended. 4. The developer shall comply with all conditions outlined in the City Engineer’s memo dated June 8, 2023 and revisions required in “red-lined” comments from the City Engineer. 5. Oneka Parkway with sidewalk and trail, shall be constructed to the north property line and all the way to the lift station. 6. Park Dedication is to be satisfied with land dedication of Outlot C and park dedication fee of $2,686 per unit. The plans show construction of amenities in the park including a shelter, playground, and sidewalk loop in exchange for PUD flexibility. The Parks Commission shall review and approve the improvements/amenities prior to construction. 7. The building setbacks and impervious surface requirements for the development are as follows: Proposed Min. Lot Size 7,800 square feet (9,427 average) Lot Width 65 feet Front Yard Setback 30 feet 20 feet on corner lot - side of house Side Yard Setback 7.5 feet Rear Yard Setback 30 feet Impervious Surface 50% 18 8. Outlot Use and Ownership: Outlot Acres Ownership Use A 2.17 City Wetland/Ponding B 2.66 City Wetland C 0.54 City City Public Park D 1.56 City Wetland/Ponding E 0.19 City Wetland F 0.38 City Wetland 9. The developer shall design and install a storm water re-use system for the irrigation of the lots. 10. The landscaping planned for the plat shall be installed in one phase. The developer shall take proper precautions to protect the trees as the homes are being built. 11. Staff will continue to work with the developer on the street lighting plan. Exact locations of the street lights shall be reviewed and approved by City staff prior to installation. The street lights shall be the Lantern style decorative light. 12. Final design of the entrance monument shall be reviewed and approved by staff prior to installation. 13. Prior to the release of the final plat for recording, the developer shall comply with the following conditions. a. An HOA shall be established to own/operate/maintain the following: i. landscaping and grass along Oneka Parkway within the right-of-way, ii. planting beds along Oneka Parkway within the right-of-way iii. vegetation in outlots E and F iv. and the water re-use system. The HOA documents/covenants shall be reviewed and approved by staff. b. The storm water re-use system shall be reviewed and approved by staff. The storm water reuse system operation, encroachment, and maintenance agreement shall be reviewed and approved by City staff. c. An encroachment and maintenance agreements shall be reviewed and approved by staff for access and maintenance of stormwater reuse system, landscaping, and signage, with in Outlots A and D. d. The development shall comply with the Fire Chief’s requirements regarding fire flow calculations, the location of fire hydrants, fire department connections, and fire lane signage. 19 e. The developer shall obtain all necessary stormwater management and WCA permits from the City. f. The developer shall obtain all necessary local, state, and federal permits. g. The developer shall enter into a development agreement, shall agree to complete all improvements, and pay all fees as required by the agreement. 13. Prior to the issuance of building permits, the developer shall comply with the following conditions. a. The applicant shall record the final plat, development agreement and all other documentation at Washington County and provide the City with proof of recording. b. The applicant shall submit three full sets of approved final plans to the City. c. If a sales trailer is located in the property, a site plan and building elevations shall be submitted for City review and approval. 14. Prior to the issuance of Certificate of Occupancy, the developer shall comply with the following conditions: a. The lift station shall be constructed and functioning. 20 EXHIBIT C ESCROWS, FEES AND CHARGES *Fees will be updated when estimates are provided by the developer a) Escrow for City Costs and Fees. Developer shall deposit sufficient escrow with the City as outlined in Section A. 1. The required beginning balance in the account is calculated at $________________. This sum is calculated to be four percent (4%) of the estimate of the required Improvements to be installed to serve the development, plus $5,000 which is the minimum balance required in the account. b) Cash Escrow or Letter of Credit. Developer shall provide a financial guarantee to the City, in the form of a cash escrow or letter of credit, in the amount equal to one hundred twenty-five percent (125%) of the estimated amount of the required Improvements. This amount has been calculated by the City Engineer to be $________________. This amount may be reduced upon request of the Developer and approved by the City. At no point shall the Letter of Credit be reduced below ten percent (10%) of the original amount. The City shall have the right to retain the financial guarantee until the Improvements have been completed to the satisfaction of the City and the warranty period has expired. c) Storm Water Trunk Fee. The Developer shall pay the City a Storm Water Trunk Fee in the amount of $______________. This sum is calculated to be $0.07 per square foot for the _______________ square feet of net developable area within the Plat. This fee shall be paid before the Plat is signed by the City. d) Storm Water Ponding Fee. The storm water ponding requirement has been met by the Developer through the incorporation of on-site ponding. No storm water ponding fee will be applied. e) Snow Plowing. Developer agrees to pay a one-time lump sum cash escrow to the City to cover the cost of snow plowing the roads within the plat, during the first snow season, before the roads are formally accepted by the City of $.50 per lineal foot. The Developer shall post a cash escrow with the City in the amount of $______________ ($0.50 x __ = $_______). f) Street Maintenance. The Developer shall post a one-time lump sum cash escrow with the City in the amount of $______________ to cover the cost of the first sealcoating of the streets in the Plat. This sum is calculated to be $4.00 per foot for the _____________ feet of streets within the Plat. g) Park Dedication. Park Dedication is to be satisfied with land dedication of Outlot C and park dedication fee of $2,686 per unit. The plans show construction of amenities in the park including a shelter, playground, and sidewalk loop in exchange for PUD 21 flexibility. The Parks Commission shall review and approve the improvements/amenities prior to construction. h) Cul-de-sac Escrow. N/A i) Escrow for Street Signage. Developer shall deposit $______________ into an escrow account with the City. This amount represents an estimated cost of $500/sign for __________ signs to be installed within the development. j) WCA Escrow. N/A k) Sanitary Sewer Trunk Fee. The developer shall pay the City a sanitary sewer trunk fee in the amount of $_______________. This sum is calculated to be $1,632 per lot for the 59 residential lots within this phase. l) Water Trunk Fee. The Developer shall pay the City water trunk fee in the amount of $____________. This sum is calculated to be $1,960 per lot, with credit provided for the stormwater reuse/irrigation system based on the anticipated reduction in water demand. The reduction is calculated at ___________, resulting in a trunk water fee amount of $_______ per lot. The total is based on the reduced per unit fee applied to the 59 lots in the plat. 22 EXHIBIT D IRREVOCABLE LETTER OF CREDIT No._______________ Date: ______________ TO: City of Hugo 14669 Fitzgerald Avenue North Hugo, MN 55038 Dear Sir or Madam: We hereby issue, for the account of __________________________, and in your favor, our Irrevocable Letter of Credit in the amount of $________________, available to you by your draft drawn on sight on the undersigned bank. The draft must: a) Bear the clause, “Drawn under Letter of Credit No. ____________, dated ________________, 200__, of _________________”; b) Be signed by the City Administrator; and, c) Be presented for payment at ____________________________________________ on or before 4:00 p.m. on _______________________, _____. This Letter of Credit shall automatically renew for successive one (1) year terms unless, at least forty-five (45) days prior to the next annual renewal date (which shall be _________________ of each year), the Bank delivers written notice to the Hugo City Clerk that it intends to modify the terms of, or cancel, this Letter of Credit. Written Notice is effective if sent by certified mail, postage prepaid, and deposited in the U.S. Mail at least forty-five (45) days prior to the next annual renewal date addressed as follows: Hugo City Clerk, City of Hugo, 14669 Fitzgerald Avenue North, Hugo, Minnesota 55038, and is actually received by the City Clerk at least thirty (30) days prior to the renewal date. This Letter of Credit sets forth in full our understanding which shall not in any way be modified, amended, amplified or limited by reference to any document, instrument or agreement, whether or not referred to herein. This Letter of Credit is not assignable. This is not a Notation Letter of Credit. More than one draw may be made under this Letter of Credit. 23 This Letter of Credit shall be governed by the most recent revision of the Uniform Customs and Practice for Documentary Credits, International Chamber of Commerce Publication No. 400. We hereby agree that a draft drawn under and in compliance with this Letter of Credit shall be duly honored upon presentation. By: Its 24 EXHIBIT E CERTIFICATE OF INSURANCE PROJECT: CERTIFICATE HOLDER: City of Hugo 14669 Fitzgerald Avenue North Hugo, MN 55038 INSURED: ADDITIONAL INSURED: City of Hugo AGENT: WORKERS’ COMPENSATION: Policy No. Effective Date: Expiration Date: Insurance Company: COVERAGE – Workers’ Compensation, Statutory. GENERAL LIABILITY: Policy No. Effective Date: Expiration Date: Insurance Company: ( ) Claims Made ( ) Occurrence LIMITS: [Minimum] Bodily Injury and Death: $500,000 for one person $1,000,000 for each occurrence 25 Property Damage: $200,000 for each occurrence -OR- Combination of Single Limit Policy $1,000,000 or more COVERAGE PROVIDED: Operations of Contractor: YES Operations of Sub-Contractor (Contingent): YES Does Personal Injury Include Claims Related to Employment? YES Completed Operations/Products: YES Contractual Liability (Broad Form): YES Governmental Immunity is Waived: YES Property Damage Liability Includes: Damage Due to Blasting YES Damage Due to Collapse YES Damage Due to Underground Facilities YES Broad Form Property Damage YES AUTOMOBILE LIABILITY: Policy No.: Effective Date: Expiration Date: Insurance Company: (X) Any Auto LIMITS: [Minimum] Bodily Injury: $500,000 each person $1,000,000 each occurrence Property Damage: 26 $500,000 each person -OR- Combined Single Limit Policy: $1,000,000 each occurrence ARE ANY DEDUCTIBLES APPLICABLE TO BODILY INJURY OR PROPERTY DAMAGE ON ANY OF THE ABOVE COVERAGES: If so, list: Amount: $ [Not to exceed $1,000.00] SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL MAIL THIRTY (30) DAYS WRITTEN NOTICE TO THE PARTIES TO WHOM THIS CERTIFICATE IS ISSUED. Dated at on BY: Authorized Insurance Representative 27 EXHIBIT F MORTGAGEE CONSENT TO DEVELOPMENT AGREEMENT Alliance Bank, a Minnesota banking corporation, which holds a mortgage on all or part of the subject property, the development of which is governed by the foregoing Development Agreement, affirms and consents to the provisions thereof and agrees that the foregoing Development Agreement shall remain in full force and effect even if it forecloses its mortgage(s). Dated the ____ day of __________, 2018. ALLIANCE BANK a Minnesota banking corporation By R. Scott Johnson Its Vice President STATE OF MINNESOTA ) )SS COUNTY OF ____________ ) The foregoing instrument was acknowledged and sworn to before me this ____ day of ________________, 2018, by R. Scott Johnson the Vice President of Alliance Bank, a Minnesota banking corporation, on behalf of the banking corporation. __________________________________ Notary Public PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS COVER 1 N DEVELOPMENT PLAN FOR OWNER ENGINEER ANDERSON ENGINEERING OF MN, LLC 13605 1ST AVENUE NORTH, SUITE 100 PLYMOUTH, MN 55441 SOUTHWIND HOLDINGS, LLC 5615 15TH STREET N, #192 HUGO, MN 55038 SHEET INDEX ONEKA PRAIRIE HUGO, MN * SCALE:1 SITE LOCATION MAP N.T.S.SCALE:2 VICINITY MAP N.T.S. N CONTRACTOR CONSTRUCTION AREA SITE LOCATION SHEET NUMBER SHEET TITLE 1 COVER 2 NOTES, LEGEND, & TABLES 3 EXISTING CONDITIONS & DEMOLITION PLAN 4 SITE PLAN 5 GRADING PLAN 6 EROSION CONTROL PLAN 7 SWPPP - PG 1 8 SWPPP - PG 2 STREET AND STORM PLANS 9 STREET & STORM SEWER - ONEKA PARKWAY - STA 0+00 TO 5+50 10 STREET & STORM SEWER - ONEKA PARKWAY - STA 5+50 TO 10+00 11 STREET & STORM SEWER - STREET A - STA 0+00 TO 4+50 12 STREET & STORM SEWER - STREET A - STA 4+50 TO 9+00 13 STREET & STORM SEWER - STREET A - STA 9+00 TO 12+50 14 STREET & STORM SEWER - STREET A - STA 12+50 TO 16+00 15 STREET & STORM SEWER - STREET B - STA 0+00 TO 4+50 16 STREET & STORM SEWER - STREET B - STA 4+50 TO 7+79 17 STREET & STORM SEWER - FAIROAKS AVENUE - STA 0+00 TO 5+00 18 STREET & STORM SEWER - FAIROAKS AVENUE - STA 5+00 TO 10+00 19 STREET & STORM SEWER - STREET C - STA 0 TO 3+00 STORM PLANS 20 STORM PLAN 21 STORM PROFILES 22 STORM PROFILES WATERMAIN & SANITARY PLANS 23 WATERMAIN & SANITARY SEWER - ONEKA PARKWAY - STA 0+00 TO 5+00 24 WATERMAIN & SANITARY SEWER - ONEKA PARKWAY - STA 5+00 TO 9+00 25 WATERMAIN & SANITARY SEWER - STREET A - STA 0+00 TO 5+00 26 WATERMAIN & SANITARY SEWER - STREET A - STA 5+00 TO 10+00 27 WATERMAIN & SANITARY SEWER - STREET A - STA 10+00 TO 15+00 28 WATERMAIN & SANITARY SEWER - STREET A - STA 15+00 17+00 29 WATERMAIN & SANITARY SEWER - STREET B - STA 0+00 TO 5+00 30 WATERMAIN & SANITARY SEWER - STREET B - STA 5+00 TO 7+79 31 WATERMAIN & SANITARY SEWER - FAIROAKS AVENUE - STA 0 TO 5+00 32 WATERMAIN & SANITARY SEWER - FAIROAKS AVENUE - STA 5+00 TO 10 33 WATERMAIN & SANITARY SEWER - STREET C - STA 0 TO 3+00 34 GRADING DETAILS 35 TYPICAL PAVEMENT SECTIONS 36 DETAILS 37 DETAILS 38 DETAILS 39 DETAILS 40 DETAILS 41 LANDSCAPE PLAN 42 LANDSCAPE ENLARGEMENTS 43 LANDSCAPE DETAILS 44 LANDSCAPE NOTES & PLANT SCHEDULE 45 ONEKA PARKWAY - CROSS SECTIONS PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS 2 TYPICAL INTERIOR LOT TYPICAL CORNER LOT 50'50'7.5'30'30'20' 15' REAR LOT LINE ROW LINESIDE LOT LINEROW LINETYPICAL LOT DETAILS NOTES, LEGEND, & TABLES STORM STRUCTURE SCHEDULE NAME SIZE CASTING RIM INV. IN INV. OUT CB-101 2'x3'R-3067V 918.30 915.25 CBMH-102 48"R-3067V 918.30 915.14 915.00 CBMH-103 48"R-3067V 918.41 914.10 914.10 CBMH-104 48"R-3067V 917.35 913.79 913.53 CBMH-105 60"R-3067V 917.35 913.43 912.93 CBMH-106 60"R-3067V 917.42 912.30 912.60 912.14 CBMH-107 72"R-3067V 916.55 911.76 911.76 CBMH-108 48"R-3067V 916.78 911.70 911.70 CB-111 2'x3'R-3067V 917.09 914.20 CBMH-112 48"R-3067V 917.09 914.06 913.90 CBMH-113 48"R-3067V 918.21 913.01 913.00 CBMH-114 48"R-3067V 917.41 912.80 912.80 CB-201 2'x3'R-3067V 922.87 919.47 CBMH-202 48"R-3067V 922.87 919.33 919.33 CBMH-203 48"R-3067V 923.15 918.40 918.40 CBMH-204 48"R-3067V 922.07 917.50 917.15 CBMH-205 48"R-3067V 922.07 917.08 917.08 CB-301 2'x3'R-3067V 921.74 918.40 CBMH-302 48"R-3067V 920.56 917.65 917.40 CBMH-303 48"R-3067V 920.58 917.20 917.20 CBMH-304 48"R-3067V 920.67 916.85 916.85 916.85 CBMH-306 48"R-3067V 920.63 917.30 CBMH-307 60"R-3067V 920.26 916.42 914.97 914.00 STMH-308 48"R-4342 915.04 912.00 912.00 CB-310 48"R-3067V 919.14 916.00 CBMH-311 48"R-3067V 919.14 915.86 915.86 CBMH-312 48"R-3067V 919.82 915.38 915.38 CB-401 30"R-4342 923.00 919.50 CBMH-402 48"R-3067V 924.45 918.90 918.60 CBMH-403 60"R-3067V 924.43 918.35 918.35 CBMH-404 48"R-3067V 925.05 917.90 917.90 CBMH-405 48"R-3067V 924.64 917.62 917.62 CBMH-406 60"R-3067V 923.63 917.30 917.29 CBMH-407 48"R-3067V 923.72 917.18 917.18 CB-502 30"R-4342 921.77 918.00 CBMH-503 48"R-3067V 920.82 917.50 917.36 CBMH-504 48"R-3067V 920.82 917.22 917.22 STMH-608 48"R-4342 920.00 915.00 917.00 STMH-609 48"R-4342 917.03 914.48 914.48 LOT TABULATION LOT BLOCK HOUSE TYPE GUTTER ELEV SIDEWALK/TRAI L DRIVEWAY SLOPE GFE LFE LOE 100 YR HWL EOF 1 1 WO++919.4 Y 8.3%922.9 916.6 916.6 914.58 914.7 2 1 WO++921.1 Y 4.7%923.5 917.2 917.2 914.58 914.7 3 1 WO++920.6 Y 4.3%922.9 916.6 916.6 914.58 914.7 4 1 SWO 918.5 Y 5.0%921.0 918.7 918.7 914.58 914.7 1 2 WO++920.6 Y 7.3%923.8 917.5 917.5 914.58 914.7 2 2 LO 922.0 Y 6.0%924.8 917.1 920.1 914.4 914.7 3 2 LO+922.3 Y 7.3%925.5 918.5 921.5 914.4 914.7 4 2 LO++919.9 Y 6.0%922.7 916.4 919.4 914.4 914.7 5 2 LO++919.6 Y 7.0%922.7 916.4 919.4 914.4 914.7 6 2 SWO 919.2 Y 2.3%920.9 918.6 918.6 914.4 914.7 1 3 WO 923.7 N 5.8%926.2 918.5 918.5 915.31 915.5 2 3 WO 924.6 N 4.4%926.5 918.8 918.8 915.31 915.5 3 3 WO 923.3 N 6.7%926.2 918.5 918.5 915.31 915.5 4 3 WO 923.0 N 7.4%926.2 918.5 918.5 915.31 915.5 5 3 WO 923.0 N 7.4%926.2 918.5 918.5 915.31 915.5 6 3 WO 923.7 N 5.8%926.2 918.5 918.5 915.31 915.5 7 3 WO 924.0 N 5.1%926.2 918.5 918.5 915.31 915.5 8 3 WO 924.1 N 4.9%926.2 918.5 918.5 916.06 915.5 9 3 WO 924.0 N 5.1%926.2 918.5 918.5 916.06 915.5 10 3 WO 923.7 N 5.8%926.2 918.5 918.5 916.06 915.5 11 3 SWO 923.5 N 4.2%925.3 923.0 923.0 916.06 915.5 12 3 SWO 923.3 N 6.3%926.0 923.7 923.7 916.06 915.5 13 3 SWO 923.0 N 8.1%926.5 924.2 924.2 NA 14 3 FB 923.0 N 7.4%926.2 918.5 926.2 NA 15 3 SWO 923.5 N 7.9%927.3 925.0 925.0 NA 16 3 SWO 923.0 N 7.9%926.4 924.1 924.1 NA 1 4 WO+926.8 N 7.0%929.8 922.8 922.8 919.91 920.5 2 4 WO 928.3 N 6.3%931.0 923.3 923.3 919.91 920.5 1 5 SWO 922.0 N 7.0%925.0 922.7 922.7 917.63 918.8 2 5 SWO 925.3 N 5.1%927.5 925.2 925.2 917.63 918.8 3 5 SWO 926.3 N 5.8%928.8 926.5 926.5 917.63 918.8 4 5 SWO 925.8 N 7.9%929.2 926.9 926.9 917.63 925.7 5 5 FB 925.2 N 7.9%928.6 920.9 928.6 NA 925.7 6 5 FB 924.6 N 7.9%928.0 920.3 928.0 NA 925.7 7 5 FB 924.5 N 7.9%927.9 920.2 927.9 NA 925.7 8 5 FB 924.8 N 7.4%928.0 928 928 NA 925.7 1 6 SWO 921.3 N 5.3%923.6 921.3 921.3 917.63 918.8 2 6 SWO 921.9 N 4.0%923.6 921.3 921.3 917.63 918.8 1 7 SWO 919.7 N 6.3%922.4 920.1 920.1 914.76 917.7 2 7 SWO 921.1 N 4.2%922.9 920.6 920.6 914.76 917.7 3 7 SWO 920.3 N 5.6%922.7 920.4 920.4 914.76 917.7 4 7 SWO 920.2 Y 4.3%922.5 920.2 920.2 914.76 917.7 5 7 SWO 922.0 Y 4.0%924.2 921.9 921.9 914.76 917.7 6 7 SWO 921.0 Y 4.0%923.2 920.9 920.9 914.76 917.7 1 8 SWO 919.4 N 6.0%922.0 919.7 919.7 914.76 917.7 2 8 SWO 920.8 N 5.1%923.0 920.7 920.7 914.76 917.7 3 8 SWO 922.0 N 4.9%924.1 921.8 921.8 914.76 917.7 4 8 SWO 922.4 N 4.2%924.2 921.9 921.9 914.76 917.7 5 8 SWO 921.7 N 5.8%924.2 921.9 921.9 914.76 917.7 6 8 SWO 923.3 Y 5.3%925.9 923.6 923.6 914.76 917.7 7 8 SWO 924.3 Y 4.0%926.5 924.2 924.2 914.76 917.7 8 8 SWO 924.7 Y 5.3%927.3 925 925 914.76 917.7 9 8 SWO 924.5 Y 4.0%926.7 924.4 924.4 914.76 917.7 10 8 SWO 924.5 Y 4.0%926.7 924.4 924.4 914.76 917.7 11 8 WO++925.1 Y 8.0%928.5 922.2 922.2 914.76 917.7 12 8 WO 925.7 Y 6.0%928.5 920.8 920.8 914.76 917.7 13 8 WO 926.3 Y 4.0%928.5 920.8 920.8 914.76 917.7 14 8 WO 925.7 Y 5.3%928.3 920.6 920.6 914.76 917.7 15 8 WO+922.6 Y 7.7%925.9 918.9 918.9 914.76 917.7 SWO = SPLIT ENTRY WALKOUT BASEMENT WO = WALKOUT BASEMENT LO = LOOKOUT BASEMENT FB = FULL BASEMENT GFE = GARAGE FLOOR ELEVATION LFE = LOW FLOOR ELEVATION LOE = LOW OPENING ELEVATION EOF = EMERGENCY OVERFLOW ELEVATION + DENOTES DROPPING GARAGE 1 COURSE ++ DENOTES DROPPING GARAGE 2 COURSES 915.6 ||WELL/CISTERN? 918.9 MAP8 919.4 ASH7919.2 ASH7919.1 ASH14 9 2 0 . 2 B O X 1 1 - 6 922.6 BOX7 924.0 BOX10 929.0BOX6930.2 BOX6 930. 1 BOX 6 931.2 BOX10 930.2 BOX10-2930.3ASH10930.5ASH12930.4 ASH10-2 928.8 BOX7 928.4 CHE10 927.9BOX10928.6BOX8928.1BOX8928.2 ELM12 930.4 BOX14930.6 OAK15 931.1 BOX6-5930.7BOX6-2930.6BOX6-2930.8BOX6931.3 BOX8 930.7 BOX6 926.4 BOX6-2 926.2 BOX7 926.4 CHE6 926.0 BOX8 926.0 BOX18 926.4 BOX7 926.8 BOX10 927.1 BOX10 927.2 BOX10 926.6 BOX6 927.4 BOX7-2 927.1 BOX8-2 925.4 COT7 925.6 BOX15-2 926.2 BOX15 925.9 BOX9 925.7 BOX9 925.3 BOX9 924.5 BASS7-3 924.1 BOX14923.7 BOX14924.3 BOX15924.0 BOX6 923.9 NUT14 924.8 BOX14 923.2 BOX6 924.2 BOX10925.1 BOX11 925.5 BOX9924.4 BOX9 924.2 BOX7 923.0 BOX10 922.9 ELM7 923.1 BOX10 921.6 COT33 921.6 COT16 922.3 BOX7 923.0 BOX7 922.6 BOX13 923.7 BOX7 923.8 BOX9923.8BOX10923.9 BOX14 922.9 BOX17 922.7 BOX13923.4 ASH9 927.5 BOX18 921.9 BOX8922.8 BOX13 922.0 BOX6 920.9 BOX6 921.0 BASS7921.8 ELM18-2922.3 BOX18 922.1ELM7921.4 BASS7-2 921.2 BOX10 919.8 ELM7 919.8 ASH14 920.2 BOX9921.2BOX6920.6 BOX14 918.6 BOX14918.3 BOX20 918.9 BOX8919.5 BOX15 915.2 BOX9-2 913.0 BOX11 912.9 BOX7 912.6 BOX8 911.9 WIL8 912.9 BOX6 913.2 BOX8 913.3 BOX8 913.8 BOX7 915.1 BOX7 917.1 ELM6915.2 ELM8 913.4 ELM7 913.5 ELM8 918.9 ASH6-4 918.9 ELM8 920.0 BOX7 918.9 BOX6 920.3 COT12 919.5 BOX6918.4BOX9918.6 BOX6919.1 BOX7 918.6 BOX6 919.8 COT14 920.8 BOX6 920.2 BOX8 920.5 BOX12 920.6 BOX9 919.4 BOX7-3921.3 ASH7 920.8 BOX6 919.3 BOX7 918.7 BOX9-2 918.3 BOX9 918.0 BOX7918.4 BOX8 9 1 9 . 5 BO X 7 919.0 BOX6 920.7 BOX7 920.8 BOX7 919.3 BOX9 918.1 BOX7 919.4 BOX8 919.1 BOX6 918.9 BOX7920.5BOX9-2918.6 BOX7 917.6 BOX6-3917.2BOX7917.4 BOX7 917.6 BOX7 917.4 BOX11 917.2 BOX7-3 917.5 BOX6918.3BOX8918.7 BOX8 918.7BOX7-2918.0BOX8 917.0COT11-2917.4 BOX7917.0COT11918.1 BOX9 916.7 BOX7 917.6 BOX6-2 915.1 BOX9-2 915.1 BOX9 916.6 MAP9 917.2 SPR9 917.6 SPR9 918.1 SPR10 918.2 SPR9 918.0 SPR10 917.8 SPR7 919.6 WAL22 921.2MAP8917.5 APP10 915.8 ASH18 915.2 MAP8-5 913.9 APP10914.5 COT20 915.4 SPR12 915.0 PIN12 913.6 APP8 913.7 ASH19 914.4 APP8 913.8 ASH13 913.5 ASH14 915.0 ASH12 919.0 BIR10-3 919.6 SPR7 918.8 BOX9 919.2 SPR10 920.8 SPR10 918.7 SPR10918.6 SPR15 921.0 APP14 916.4 SPR10 916.6 SPR8 916.1 SPR7 915.6 SPR9 915.8 SPR9914.3BOX6914.2BOX11-2909.2 BOX7-3914.9COT7913.4 COT6 913.4 POP11 913.5 POP9 913.4 POP8 913.7 POP7 916.0 BOX10 916.0 ASH7 916.4 ASH14 916.5 BUCK6 916.2 ASH9-3 916.9 ELM7 917.1 ASH8-3 917.2 ASH8-3 917.6 ASH6917.9 ASH6-3 918.7 ASH7 918.4 ASH7 918.2 ELM6 918.3 ASH14918.4 ASH10-2 9 1 8 . 5 A S H 1 1 - 2 918.3 ASH8 917.9 ELM7 918.5 MAP7 918.2 ASH15 91 4 916 914 916918922 922 924 926 928 930 932 930 930930 928926924922920916928926924 922 920 918 912 914916918 920922924 922 924 926 924 922 920 918 916 914916916914912914916918920914916918 916918920922924926928 930 932922920918 915915 918 9 1 9 920 9219 1 5 925 921923925918915913911911913915917917915PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS 3 N 0 50'100' LEGENDLEGEND PROPERTY LIMITS DELINEATED WETLAND EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING WATERMAIN EXISTING SANITARY SEWER EXISTING FENCE EXISTING HYDRANT AND GV EXISTING SANITARY MANHOLE REMOVE EXISTING BUILDING STRUCTURE REMOVE EXISTING GRAVEL REMOVE EXISTING CONCRETE REMOVE TREE 966 965 EXISTING CONDITIONS & DEMOLITION PLAN ABANDON EXISTING WELL(S) PER STATE REGULATIONS PROTECT EXISTING TREES TO REMAIN PROTECT EXISTING TREES TO REMAIN REMOVE STORAGE BUILDING & ALL APPURTENANCES REMOVE EXISTING HOUSE & ALL APPURTENANCES INCLUDING SEPTIC SYSTEM REMOVE GRAVEL SURFACING THROUGHOUT GRADING AREA NOTE: EXISTING SURVEY DATA PROVIDED BY E.G. RUD ABANDON EXISTING WELL PER STATE REGULATIONS REMOVE FENCE REMOVE FENCE REMOVE FENCE REMOVE TREE (TYP) REMOVE RETAINING WALL REMOVE 12" CMP CULVERT ||||LP LP LP LP LP LP LP LP LP LP LP LP LP PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS SITE PLAN 4 N 0 50'100' LEGENDLEGEND PROPERTY LIMITS DELINEATED WETLAND EXISTING FENCE PROPOSED EASEMENTS PROPOSED CONCRETE C&G MODULAR BLOCK RETAINING WALL LIGHT POST (LP) STORMWATER POND 1 STORMWATER POND 2 FILTRATI O N B A S I N 3 ONEKA PARKWAY45'R20'STREET "A"F A I R O A K S A V E N U E STREET "C" R 2 0 ' R20' R 2 0 ' R20' STREET "A" STREET "B" 8' BITUMINOUS TRAIL MATCH STREET SECTION TO EXISTING STREETCONNECT TO EXISTING BITUMINOUS TRAIL 8' BITUMINOUS TRAIL 10' BITUMINOUS TRAIL 10' BITUMINOUS TRAIL 10' BITUMINOUS TRAIL 5' CONCRETE WALK 5' CONCRETE WALK 8' BITUMINOUS TRAIL 8' BITUMINOUS TRAIL54'ROW54'ROW54' ROW 54' ROW 54'ROWR20'R20'R20'R20'R20'R20'TERMINATE STREET AND TRAIL END CURB WITH BEAVERTAIL INSTALL BARRICADE AND "FUTURE THRU STREET" SIGNAGE PROPOSED LIFT STATION PLAN BY OTHERS TERMINATE STREET AND TRAIL INSTALL BARRICADE AND "FUTURE THRU STREET" SIGNAGE END CURB WITH BEAVERTAIL TRANSITION MATCH STREET SECTION TO EXISTING STREET CONNECT TO EXISTING BITUMINOUS TRAIL BARRICADE "NO CONSTRUCTION ACCESS" TEMPORARY CUL-DE-SAC 5' CONCRETE WALK DRIVEWAY TO BE BUILT TO MATCH FUTURE BITUMINOUS TRAIL AND CURB PER FAIROAKS TYPICAL SECTION END CURB WITH BEAVERTAIL TRANSITION ||927.9BOX10928.6BOX8928.1BOX8930.4 BOX14930.6 OAK15 931.1 BOX6-5930.7BOX6-2930.6BOX6-2930.8BOX6923.8 BOX9923.8BOX10923.9 BOX14 913.0 BOX11 912.9 BOX7 912.6 BOX8 911.9 WIL8 912.9 BOX6 913.2 BOX8 913.3 BOX8 913.8 BOX7 915.1 BOX7 914.2BOX11-291 4 916 914 916918922 922 924 926 928 930 932 930 930930 928926924922920916928926924 922 920 918 912 914916918 920922924 922 924 926 924922920 918 916 914916916914912914916918920914916918 916918920922924926928 930 932922920918 915915 918 9 1 9 920 9219 1 5 925 921923925918915913911911913915917917915||927.9BOX10928.6BOX8928.1BOX8930.4 BOX14930.6 OAK15 931.1 BOX6-5930.7BOX6-2930.6BOX6-2930.8BOX6923.8 BOX9923.8BOX10923.9 BOX14 913.0 BOX11 912.9 BOX7 912.6 BOX8 911.9 WIL8 912.9 BOX6 913.2 BOX8 913.3 BOX8 913.8 BOX7 915.1 BOX7 914.2BOX11-291 4 916 914 916918922 922 924 926 928 930 932 930 930930 928926924922920916928926924 922 920 918 912 914916918 920922924 922 924 926 924922920 918 916 914916916914912914916918920914916918 916918920922924926928 930 932922920918 915915 918 9 1 9 920 9219 1 5 925 9219239259189159139119119139159179179150+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 7+940 + 0 0 1+00 2+00 2+17 92 5 9249 2 3 9 2 4 9 2 5 928922 921 920 91 9 91 8923924925926927927 1+002+003+004+005+006+007+008+009+00PC: 0+65.65 Mid: 0+81.73 PT: 0+97.81 PC: 1+60.75 Mid: 1+76.58 PT: 1+92.42 915 920 925 930 916 917 918 919 921 922 923 924 926927928 929 931932 1+002+003+004+005+006 + 0 0 7 + 0 08+009+0010+00PC: 3+68.55PT: 6+47.36PC: 6+64.30PT: 9+50.32 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+0 0 12+0013+0014+0015+001 6 + 0 0 1 6 + 1 0 BP: 0+00.00PC: 6+96.31PRC: 7+65.36PRC: 9+31.98PT: 13+67.31 PC: 14+62.12PT: 15+49.76EP: 16+09.80 HP 918.4 HP 922.7 HP 926.1 HP 923.8 HP 924 .1 HP 926.7 HP 922.3 LP 91 7 . 4 LP 922.3 LP 924.7 LP 918.6 LP 923.1 LP 917.7925.77 HP 925.0 R 923.00920.50 HP 927.5 HP 9 2 6 . 4 EO F 9 2 5 . 7917.36913.23913.24913.25910.53 918.54921.05921.90920.26917.69919.58915.58 915.96918.41920.54923.25922.15920.18 920.69 915.72 921.1 8 921.44 922. 1 3 922.95923.11922.11920.8591 5 . 7 0 913.06 914.49915.32915.79917.09917.90918.39919.20919.69923.28925.95 9 2 5 . 9 1 925.48924.59925.55926.23926.77927.05924.67919.45918.78921.37922.41918.74 HP 919.2917.91917.88916.59916.55921.15921.93918.78919.15 912.15 910.00 9 18 .9 0 918.59 922.76917.83 919.81 924.05 926.97 926.87926.26925.64924.93 925.48925.96 930.75 932.00931.83926.32 928.17 925.92 923.51 917.72 925.6 2 925.82 923.71 909.14 909.39 909.46 910.01 914.1091 6 . 4 7 923.1 0 923.98 923.68 924.07 924.90 HP 9 2 4. 7 92 5 . 0 3 924.91924.4 9 924.58 923.98 923.70 924.14 924.16 922.89 921.909 2 5 . 0 0 9 2 6 . 1 0 9 2 6 . 5 0926.60 9 2 6 . 7 5926.30926.50 915.00 915.00915.00 913.96 912.61 911.94 909.93 909.91 927.43929.53929.91928.23928.89921. 4 5 920.31 920.12 910.67 910.72 910.99 911.15 911.41 917.37922.49 924.56 924.81 925.00 EOF 9 1 8. 6 4 EOF 917.50921.00921.53 916.60916.90 916.90 915.00 915.00 915.00 920.50 920.50 917. 5 0 920.53 EOF92 3 . 5 8 922.11EOF 9 2 5. 6 8 926.11 921.54 9209209209 2 0 9169189189189229 2 2 922 92 4 9269269 2 6 9 2 8 9209169189189 1 8 900 900910 910902 902904 904906 906908 908912912 912914914 914916 920920920922922922924924924926926 910 920 912 9 1 4 916918922 924 926910 920930930 904906 908 912 914 916 918 92 2 924 926928928924 928 928 930 920 918918920922916 918 918912 914 916920 910 910 912 914 916918926922 914 912912916910908918 914 916 916 926922 926 926928 926926 916 922 918 916 910 918 916922 9229229 1 8 9 1 8 91 6 920926916 916920 922 9249 18 .5 0 HP 923. 0 R 921.77 R 920.82 R 920.82 R 923.15 R 922.07 R 922.07 R 923.63 R 923.72 R 924.64R 925.05 R 924.45 R 924.43 R 918.30 R 918.30 R 918.41 R 917.35R 917.35 R 917.09 R 917.09 R 918.21 R 917.41 R 917.42 R 922.87R 922.87 R 921.74 R 920.56 R 920.58 R 920.67 R 920.63 R 920.26 R 919.82 R 919.14 R 919.14 R 916.55 R 916.78 FES-701 INV 915.50 FES-703 INV 912.50 EOF HP 92 9 . 8 HP 926.2 HP 926.3 HP 926.5 R 917.03 PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS N 0 50'100' GRADING PLAN 5 WO++ 916.6 L1-B1 922.9 WO++ 917.2 L2-B1 923.5 WO++ 916.6 L3-B1 922.9 SWO 917.3 L4-B1 921.0 WO++917.5 L1-B2 923.8 LO++ 919.4LF 916.4L-4-B2922.7LO++ 919.4LF 916.4L5-B2922.7WO 916.9SEWOL6-B2920.9922.4 L1-B7 SWO 920.1 922.9 L2-B7 SWO 920.6 922.7 L3-B7 SWO 920.4 922.0 L1-B8 SWO 919.7 923.0 L2-B8 SWO 920.7 924.1 L3-B8 SWO 921.8 924.2 L4-B8 SWO 921.9 924.2 L5-B8 SWO 921.9 SWO 920.9 L6-B7 923.2 SWO 921.9 L5-B7 924.2 SWO 920.2 L4-B7 922.5 WO 920.6 L14-B8 928.3 WO 920.8 L13-B8 928.5 WO 920.8 L12-B8 928.5 WO++922.0 L11-B8 928.3 SWO 924.4 L10-B8 926.7 923.6 L1-B6 SWO 921.3 923.6 L2-B6 SWO 921.3 925.0 L1-B5 SWO 922.7 927.5 L2-B5 SWO 925.2 928.8 L3-B5 SWO 926.5 929.2 L4-B5 SWO 926.9 928.6 L5-B5 LF 920.9 FB 927.9 L7-B5 LF 920.2 FB 928.0 L8-B5 LF 920.3 FB WO 918 .5L1-B3926.2WO 918 .8L2-B3926.5 SWO 924.4 L9-B8 926.7 SWO 925.0 L8-B8 927.3926.5L7-B8SWO 924.2925.9L6-B8SWO 923.6WO+ 922.8L1-B4929.8WO 923.3L2-B4931.0WO 918.5L3-B3926.2WO 918.5L4-B3926.2WO 918.5L5-B3926.2WO 918.5L6-B3926.2WO 918.5L7-B3926.2WO 918.5L8-B3926.2WO 9 1 8 . 5 L9- B 3 926 . 2 W O 9 1 8 . 5 L 1 0 - B 3 9 2 6 . 2 SWO 923.0L11-B3925.3SWO 923.7L12-B3926.0SWO 924.2L13-B3926.5SWO 924.1L16-B3926.4POND 1 NWL 911.50 HWL 914.56 BOT 898.50 IRR 906.55 LEGEND PROPERTY LIMITS EXISTING CONTOUR PROPOSED CONTOUR SPOT ELEVATION DRAINAGE ARROW MAINTENANCE ACCESS PATH FLOODPLAIN FILL 966 966 WO+ 918.9 L15-B8 925.9 928.0 L6-B5 LF 920.3 FB HWL 917.58 HWL 914.57 HWL 914.4 PER RCWD FLOODPLAIN LO 920.1 LF 917.1 L2-B2 924.8 LO+ 921.5 LF 918.5 L3-B2 925.5 GENERAL GRADING NOTES: 1.PROPOSED SPOT ELEVATIONS ARE TO TOP OF FINISHED SURFACE UNLESS OTHERWISE NOTED IN LEGEND. 2.TAKE ALL NECESSARY PRECAUTIONS TO PROTECT EXISTING UTILITIES. LOCATIONS OF UTILITIES SHOWN BASED ON SURVEY AND AS-BUILT INFORMATION AND MAY NOT REPRESENT ACTUAL CONDITIONS. CONTRACTOR IS RESPONSIBLE FOR UTILIZING UTILITY LOCATES PRIOR TO STARTING ANY WORK. 3.NOTIFY CITY OF HUGO AT LEAST 24 HOURS BEFORE CONSTRUCTION OF STORMWATER BMP'S. 4.STORMWATER BASINS SHALL BE PROTECTED FROM ALL EXPOSED SOIL DURING CONSTRUCTION ACTIVITIES. 5.ALL CONSTRUCTION SHALL COMPLY WITH RECOMMENDATIONS OF THE GEOTECHNICAL EXPLORATION REPORT PREPARED BY HAUGO GEOTECHNICAL SERVICES AND DATED JUNE 6, 2022. 6.EROSION AND SEDIMENT CONTROL BMPS SHALL BE INSTALLED PRIOR TO BEGINNING ANY EARTH DISTURBING ACTIVITIES, INCLUDING DEMOLITION AND TREE CLEARING. CALL 48 HOURS BEFORE DIGGING: TWIN CITY AREA (651)454-0002 MINNESOTA TOLL FREE 1-800-252-1166 GOPHER STATE ONE CALL MAINTENANCE ACCESS MAINTENANCE ACCESS MAINTENANCE ACCESS FILTRATION BASIN 3 NWL 916.30 HWL 916.39 BOT 915.00 800.1 HWL 914.4 PER RCWD COMPENSATORY STORAGE VOLUME = 2,800 CY *FLOODPLAIN FILL = 2,800 CUBIC YARDS COMPENSATORY STORAGE PROVIDED = 2,800 CUBIC YARDS SEE EXCAVATED AREA WITHIN OUTLOT D (WETLAND C) FOR COMPENSATORY STORAGE AREA EOF 920.2 EOF 914.9 EOF 916.5 POND 2 NWL 917.00 HWL 919.81 BOT 903.00 IRR 910.00FBLF 918.5L14-B3926.2SWO 925.0L15-B3927.3IRRIGATION PUMP PAD INTAKE ELEV. 906.55 IRRIGATION PUMP PAD INTAKE ELEV. 910.00 FLOODPLAIN FILL* (TYP) FLOODPLAIN FILL* (TYP) WETLAND 100YR HWL 917.6 WETLAND PROVIDES ADDITIONAL STORMWATER STORAGE FOR POND 1 DURING LARGER RUNOFF EVENTS. 100YR HWL = 914.56 TW 916 BW 914 TW 918 BW 916 RETAINING WALL OUTSIDE D&U EASEMENT REQUIRED AT TIME OF HOME CONSTRUCTION EOF 919.2 SOUTHEAST SIDE OF LOT 2 WILL REQUIRE LOOKOUT ||911.9 WIL8 ||911.9 WIL8 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 7+940 + 0 0 1+00 2+00 2+17 1+002+003+004+005+006+007+008+009+00PC: 0+65.65 Mid: 0+81.73 PT: 0+97.81 PC: 1+60.75 Mid: 1+76.58 PT: 1+92.42 1+002+003+004+005+006 + 0 0 7 + 0 08+009+0010+0010+83PC: 3+68.55PT: 6+47.36PC: 6+64.30PT: 9+50.32 EP: 10+82.69 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+0 0 12+0013+0014+0015+001 6 + 0 0 1 6 + 1 0 BP: 0+00.00PC: 6+96.31PRC: 7+65.36PRC: 9+31.98PT: 13+67.31 PC: 14+62.12PT: 15+49.76EP: 16+09.80915.00 915.00 915.00 920.50 920.50EOFDUAL LAYER SILT FENCEDUAL LAYER SILT FENCE DUAL LAYER SILT FENCE DUAL LAYER SILT FENCE DUAL LAYER SILT FENCE DUAL LAYER SILT FENCE INSTALL & MAINTAIN SILT FENCE PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS N 0 50'100' 6 LEGEND PROPERTY LIMITS CONSTRUCTION LIMITS EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR INLET PROTECTION DRAINAGE ARROW SILT FENCE 966 965 966 965 x LP ROCK CONSTRUCTION ENTRANCE RIPRAP ROCK CONSTRUCTION ENTRANCE EROSION CONTROL NOTES: 1.THE TOTAL DISTURBED AREA IS EQUAL TO 21 ACRES. AN NPDES CONSTRUCTION PERMIT IS REQUIRED. 2.EROSION AND SEDIMENT CONTROL BMPS SHALL BE INSTALLED PRIOR TO BEGINNING ANY EARTH DISTURBING ACTIVITIES, INCLUDING DEMOLITION AND TREE CLEARING. 3.DISTURBED AREAS SHALL BE TEMPORARY SEEDED WITH MNDOT SEED MIX 22-112, EXCEPT FOR STORMWATER TREATMENT BASINS WHICH SHALL BE FINAL SEEDED WITH MNDOT SEED MIX 33-261. 4.DUAL-LAYER SILT FENCE SHALL BE INSTALLED IN ALL AREAS WHERE GRADING OCCURS WITHIN 50FT OF DELINEATED WETLANDS. DUAL LAYER SILT FENCE EROSION CONTROL PLAN IF CONSTRUCTION ACCESS IS ALLOWED ON FAIROAKS, CONTRACTOR SHALL INSTALL ROCK CONSTRUCTION ENTRANCE STORM WATER POLLUTION PREVENTION PLAN NARRATIVE - PAGE 1 OF 2 ACREAGE SUMMARY AREA ACRES PROPERTY 24.8 DISTURBED 21.3 IMP. PRE-CONSTRUCTION 1.07 IMP. POST-CONSTRUCTION 9.48 NEW IMP.8.41 PERVIOUS AT COMPLETION 15.32 PROJECT DESCRIPTION/LOCATION ONEKA PRAIRIE IS LOCATED IN THE CITY OF HUGO IN WASHINGTON COUNTY, BOUNDED BY EMPRESS AVE N, EVERTON AVE N AND 165TH ST N. THE PROPERTY IS LOCATED IN RICE CREEK WATERSHED, AND ENCOMPASSES 24.8 ACRES. THE PLANNED SCOPE OF THE PROJECT INCLUDES: ·THE INSTALLATION OF EROSION CONTROL MEASURES AS REQUIRED FOR THE MASS GRADING OF THE SITE FOR THE CONSTRUCTION OF NEW ROADS, AND HOUSES. ·GRADING AS REQUIRED FOR THE INSTALLATION OF THE NEW HOUSES, SIDEWALKS, ROADS, AND STORMWATER PONDS. ·THE CONSTRUCTION OF 4 STORMWATER PONDS. ·INSTALLATION OF SANITARY SEWER, WATERMAIN, AND STORM SEWER. ·PLACEMENT OF CONCRETE AS REQUIRED TO ESTABLISH CURB, GUTTER, AND SIDEWALKS THROUGHOUT THE SITE. ·CONSTRUCTION OF NEW ROADS. RECEIVING WATERS THESE WATERS ARE LOCATED WITHIN ONE MILE (AERIAL RADIUS) OF THE PROJECT LIMITS AND RECEIVE RUNOFF FROM THE PROJECT SITE. DUE TO THE PROXIMITY OF THE RECEIVING WATERS, THE BMPS DESCRIBED IN APPENDIX A OF THE NPDES PERMIT MAY APPLY TO ALL AREAS OF THE SITE. HARDWOOD CREEK HAS AN APPROVED TMDL FOR DISSOLVED OXYGEN AND FISHES BIO, NOT FOR CONSTRUCTION RELATED ACTIVITIES SOIL TYPES SOIL TYPES TYPICALLY FOUND ON THIS PROJECT ARE SANDY LEAN CLAY AND CLAYEY LEAN SAND (GENERALLY TYPE B SOILS), WITH LESSER AMOUNTS OF POORLY GRADED SAND WITH SILT AND SILTY SAND (GENERALLY TYPE C SOILS), PER GEOTECHNICAL REPORT DATED 06/06/2022 GEOTECHNICAL REPORT IS TO BE KEPT ON SITE AS PART OF THE SWPPP AND IS TO BE MADE AVAILABLE UPON REQUEST. LONG TERM MAINTENANCE AND OPERATION SOUTHWIND HOLDINGS HAS ENTERED INTO A MAINTENANCE AGREEMENT WITH THE CITY OF HUGO THAT IDENTIFIES THE AGENCY THAT IS RESPONSIBLE FOR ONGOING MAINTENANCE, AND HOW RESPONSIBILITY WILL BE TRANSFERRED TO OTHER AGENTS, OR PRIVATELY MAINTAINED. PROJECT PERSONNEL AND TRAINING THIS SWPPP WAS PREPARED BY PERSONNEL THAT ARE CERTIFIED IN THE DESIGN OF CONSTRUCTION SWPPP. COPIES OF THE CERTIFICATIONS ARE ON FILE WITH THE ENGINEER. PROVIDE A CERTIFIED EROSION CONTROL SUPERVISOR IN GOOD STANDING WHO IS KNOWLEDGEABLE AND EXPERIENCED IN THE APPLICATION OF EROSION PREVENTION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES. THE EROSION CONTROL SUPERVISOR WILL WORK WITH THE PROJECT ENGINEER / SWPPP DESIGNER TO OVERSEE THE IMPLEMENTATION OF THE SWPPP AND THE INSTALLATION, INSPECTION, AND MAINTENANCE OF THE EROSION PREVENTION AND SEDIMENT CONTROL BMPS BEFORE, DURING, AND AFTER CONSTRUCTION UNTIL THE NOTICE OF TERMINATION (NOT) HAS BEEN FILED WITH THE MPCA. PROVIDE PROOF OF CERTIFICATION AT THE PRECONSTRUCTION MEETING. WORK WILL NOT BE ALLOWED TO COMMENCE UNTIL PROOF OF CERTIFICATION HAS BEEN PROVIDED TO THE PROJECT ENGINEER. PROVIDE AT LEAST ONE CERTIFIED INSTALLER FOR EACH CONTRACTOR OR SUBCONTRACTOR THAT INSTALLS THE PRODUCTS LISTED IN SPECIFICATION SECTION 2573.3.A.2 CERTIFIED INSTALLERS. PROVIDE PROOF OF CERTIFICATION AT THE PRECONSTRUCTION MEETING. WORK WILL NOT BE ALLOWED TO COMMENCE UNTIL PROOF OF CERTIFICATION HAS BEEN PROVIDED TO THE PROJECT ENGINEER. CHAIN OF RESPONSIBILITY THE OWNER AND CONTRACTOR ARE CO-PERMITTEES FOR THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) CONSTRUCTION PERMIT. THE CONTRACTOR IS RESPONSIBLE TO COMPLY WITH ALL ASPECTS OF THE NPDES CONSTRUCTION PERMIT AT ALL TIMES UNTIL THE NOTICE OF TERMINATION (NOT) HAS BEEN FILED WITH THE MPCA THE CONTRACTOR WILL DEVELOP A CHAIN OF COMMAND WITH ALL OPERATORS ON THE SITE TO ENSURE THAT THE SWPPP WILL BE IMPLEMENTED AND STAY IN EFFECT UNTIL THE CONSTRUCTION PROJECT IS COMPLETE, THE ENTIRE SITE HAS UNDERGONE FINAL STABILIZATION, AND A NOTICE OF TERMINATION (NOT) HAS BEEN SUBMITTED TO THE MPCA. PROJECT CONTACTS THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTATION OF THE SWPPP AND INSTALLATION, INSPECTION, AND MAINTENANCE OF THE EROSION PREVENTION AND SEDIMENT CONTROL BMPS BEFORE, DURING, AND AFTER CONSTRUCTION UNTIL THE NOTICE OF TERMINATION (NOT) HAS BEEN FILED. *CERTIFIED FOR DESIGN OF CONSTRUCTION SWPPP BY UNIVERSITY OF MINNESOTA, EXPIRES 5/31/23 MPCA DUTY OFFICER 24 HOUR EMERGENCY NOTIFICATION: 651-649-5451 OR 800-422-0798 SITE INSPECTION AND MAINTENANCE CONTRACTOR SHALL PROVIDE NAME, CONTACT INFO, AND TRAINING DOCUMENTATION FOR THE PERSON RESPONSIBLE FOR SWPPP IMPLEMENTATION AND INSPECTION/MAINTENANCE OF BMPS. INSPECT THE ENTIRE CONSTRUCTION SITE A MINIMUM OF ONCE EVERY SEVEN DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES WITHIN A 24 HOUR TIME FRAME. INSPECT ALL TEMPORARY AND PERMANENT WATER QUALITY MANAGEMENT, EROSION PREVENTION AND SEDIMENT CONTROL BMPS UNTIL THE SITE HAS UNDERGONE FINAL STABILIZATION AND THE N.O.T. HAS BEEN SUBMITTED. INSPECT SURFACE WATER INCLUDING DRAINAGE DITCHES FOR SIGNS OF EROSION AND SEDIMENT DEPOSITION. INSPECT CONSTRUCTION SITE VEHICLE EXIT LOCATIONS FOR EVIDENCE OF TRACKING ONTO PAVED SURFACES. INSPECT SURROUNDING PROPERTIES FOR EVIDENCE OF OFF SITE SEDIMENT ACCUMULATION. RECORD ALL INSPECTIONS AND MAINTENANCE ACTIVITIES IN WRITING WITHIN 24 HOURS. SUBMIT INSPECTION REPORTS IN A FORMAT THAT IS ACCEPTABLE TO THE PROJECT ENGINEER. FOR PROJECTS THAT DISCHARGE TO PROHIBITED WATERS, CONDUCT ROUTINE SITE INSPECTIONS AT A MINIMUM OF ONCE EVERY 72 HOURS (3 DAYS). INCLUDE THE FOLLOWING IN THE RECORDS OF EACH INSPECTION AND MAINTENANCE ACTIVITY: A.DATE AND TIME OF INSPECTIONS B.NAME OF PERSONS CONDUCTING INSPECTIONS C.FINDINGS OF INSPECTIONS, INCLUDING RECOMMENDATIONS FOR CORRECTIVE ACTIONS D.CORRECTIVE ACTION TAKEN, INCLUDING DATES, TIMES, AND PARTY COMPLETING MAINTENANCE ACTIVITIES E.DATE AND AMOUNT OF ALL RAINFALL EVENTS GREATER THAN 0.5 INCH IN 24 HOURS F.DOCUMENTS AND CHANGES MADE TO THE SWPPP REPLACE, REPAIR OR SUPPLEMENT ALL NONFUNCTIONAL BMPS BY IN THE TIME PROVIDED BELOW: A.REPAIR, REPLACE, OR SUPPLEMENT PERIMETER CONTROL DEVICES WHEN IT BECOMES NONFUNCTIONAL OR SEDIMENT REACHES 12 THE HEIGHT OF THE DEVICE. COMPLETE REPAIRS BY B.THE END OF THE NEXT BUSINESS DAY FOLLOWING DISCOVERY. C.REPAIR OR REPLACE INLET PROTECTION DEVICES WHEN THEY BECOME NONFUNCTIONAL OR SEDIMENT REACHES 12 THE HEIGHT AND/OR DEPTH OF THE DEVICE. COMPLETE REPAIRS BY THE END OF THE NEXT BUSINESS DAY FOLLOWING DISCOVER. D.DRAIN AND REMOVE SEDIMENT FROM TEMPORARY AND PERMANENT SEDIMENT BASINS ONCE THE SEDIMENT HAS REACHED 12 THE STORAGE VOLUME. COMPLETE WORK WITHIN 72 HOURS OF DISCOVERY. E.REMOVE ALL DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATER INCLUDING DRAINAGE WAYS, CATCH BASINS, AND OTHER DRAINAGE SYSTEMS. RESTABILIZED ANY AREAS THAT ARE DISTURBED BY SEDIMENT REMOVAL OPERATION. SEDIMENT REMOVAL AND STABILIZATION MUST BE COMPLETED WITHIN 7 DAYS OF DISCOVERY. PREPARE AND SUBMIT A SITE MANAGEMENT PLAN FOR WORKING IN SURFACE WATERS. F.REMOVE TRACKED SEDIMENT FROM PAVED SURFACES BOTH ON AND OFF SITE WITHIN 24 HOURS OF DISCOVERY. STREET SWEEPING MAY HAVE TO OCCUR MORE OFTEN TO MINIMIZE OFF SITE IMPACTS. LIGHTLY WET THE PAVEMENT PRIOR TO SWEEPING G.MAINTAIN ALL BMPS UNTIL WORK HAS BEEN COMPLETED, SITE HAS GONE UNDER FINAL STABILIZATION, AND THE NOTICE OF TERMINATION (NOT) HAS BEEN SUBMITTED TO THE MPCA. AREA SUMMARY SPECIAL SITE NOTES IF SITE REQUIRES PERMANENT STORMWATER MANAGEMENT HYDROLOGIC AND WATER QUALITY MODELING DATA IS AVAILABLE UPON REQUEST. THE SWPPP COORDINATOR MUST BE AVAILABLE FOR AN ONSITE INSPECTION WITHIN 72 HOURS UPON REQUEST BY THE MPCA AND SHALL BE RESPONSIBLE FOR THE FOLLOWING: ·SUBMIT THE NPDES PERMIT APPLICATION AND COMPLY WITH ALL REQUIREMENTS ·IMPLEMENT THE SWPPP. ·OVERSEE INSTALLATION AND MAINTENANCE PRACTICES AND REPAIRS IDENTIFIED IN THE SWPPP. ·IMPLEMENT AND OVERSEE EMPLOYEE TRAINING AND RECORD IN OR WITH THE SWPPP. ·CONDUCT OR PROVIDE FOR INSPECTION AND MONITORING ACTIVITIES AND MAINTAIN LOGS AS PERMIT REQUIRES. ·IDENTIFY OTHER POTENTIAL POLLUTANT SOURCES NOT LISTED IN THE SWPPP AND ADD THEM. ·IDENTIFY ANY DEFICIENCIES IN THE SWPPP AND CORRECT THEM. ·ENSURE THAT CHANGES TO CONSTRUCTION PLANS ARE ADDRESSED IN THE SWPPP. ·FILE THE NOTICE OF TERMINATION UPON PROJECT COMPLETION. AFTER THE NOTICE OF TERMINATION HAS BEEN FILED, THE OWNER SHALL BE RESPONSIBLE FOR ASSIGNING RESPONSIBILITY FOR PERMANENT MAINTENANCE MEASURES. PERMITS THE FOLLOWING PERMITS APPLY TO THIS PROJECT: NOTE: IF THE 25' BUFFERS ARE MAINTAINED FORM THE WETLANDS, ADDITIONAL PERMITS WILL NOT BE REQUIRED. LOCATION OF SWPPP REQUIREMENTS THE REQUIRED SWPPP ELEMENTS MAY BE LOCATED IN MANY PLACES WITHIN THE PLAN SET. PLAN VIEW OF THE GRADING PLAN MEASURES CAN BE FOUND ON C5 - GRADING PLAN SWPPP AMENDMENTS A QUALIFIED INDIVIDUAL MUST COMPLETE ALL SWPPP CHANGES. CHANGES INVOLVING THE USE OF A LESS STRINGENT BMP MUST INCLUDE A JUSTIFICATION DESCRIBING HOW THE REPLACEMENT BMP IS EFFECTIVE FOR THE SITE CHARACTERISTICS. PERMITTEES MUST AMEND THE SWPPP TO INCLUDE ADDITIONAL OR MODIFIED BMPS AS NECESSARY TO CORRECT PROBLEMS IDENTIFIED OF ADDRESS SITUATIONS WHENEVER THERE IS A CHANGE IN DESIGN, CONSTRUCTION OPERATION, MAINTENANCE, WEATHER, OR SEASONAL CONDITIONS HAVING A SIGNIFICANT EFFECT ON THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR GROUNDWATER. PERMITTEES MUST AMEND THE SWPPP TO INCLUDE ADDITIONAL OR MODIFIED BMPS AS NECESSARY TO CORRECT PROBLEMS IDENTIFIED OR ADDRESS SITUATIONS WHENEVER INSPECTIONS OR INVESTIGATIONS BY THE SITE OWNER OR OPERATOR, USEPA OR MPCA OFFICIALS INDICATE THE SWPPP IS NOT EFFECTIVE IN ELIMINATING OR SIGNIFICANTLY MINIMIZING THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR GROUNDWATER OR THE DISCHARGES ARE CAUSING WATER QUALITY STANDARD EXCEEDANCES OR THE SWPPP IS NOT CONSISTENT WITH THE OBJECTIVES OF A USEPA APPROVED TMDL. ALL AREAS DISTURBED BY CONSTRUCTION WILL RECEIVE SEED OR SOD ACCORDING TO THE PLANS AND SPECIFICATIONS AND WITHIN THE SPECIFIED VEGETATIVE TIME SCHEDULE. FINAL STABILIZATION WILL OCCUR WHEN THE SITE HAS A UNIFORM VEGETATIVE COVER WITH A DENSITY OF 70% OVER THE ENTIRE DISTURBED AREA COMPARED TO EXISTING CONDITIONS. ALL TEMPORARY SYNTHETIC EROSION PREVENTION AND SEDIMENT CONTROL BMPS MUST BE REMOVED AS PART OF THE SITE FINAL STORM WATER POLLUTION PREVENTION PLAN NARRATIVE - PAGE 1 OF 2 1-MILE RADIUS AROUND PROJECT HARDWOOD CREEK ONEKA LAKE WATERS WITHIN 1 MILE RADIUS NAME OF WATER BODY TYPE (LAKE, RIVER, WETLAND, DITCH, ETC) APPENDIX A SPECIAL WATER (YES OR NO) IMPAIRED WATER WITHIN 1 MILE OF PROJECT SITE (YES OR NO) APPROVED TMDL RECEIVING WATERS (YES OR NO) HARDWOOD CREEK NO YES YES YES CONTACT INFORMATION ORGANIZATION CONTACT NAME PHONE SOUTHWIND HOLDINGS LARRY ALM ANDERSON ENGINEERING (SWPPP DESIGN)JARED RICHNER*763-412-4000 [CONTRACTOR] AGENCY TYPE OF PERMIT PERMIT # AND DATES MINNESOTA POLLUTION CONTROL AGENCY (MPCA) NPDES CONSTRUCTION PERMIT CITY OF HUGO GRADING PERMIT CITY OF HUGO BUILDING PERMIT PROJECT SITE PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS SWPPP - PG 1 7 STORM WATER POLLUTION PREVENTION PLAN NARRATIVE - PAGE 2 OR 2 STABILIZATION TIME FRAMES ALL AREAS DISTURBED BY CONSTRUCTION WILL RECEIVE SEED OR SOD ACCORDING TO THE PLANS AND SPECIFICATIONS AND WITHIN THE SPECIFIED VEGETATIVE TIME SCHEDULE. FINAL STABILIZATION WILL OCCUR WHEN THE SITE HAS A UNIFORM VEGETATIVE COVER WITH A DENSITY OF 70% OVER THE ENTIRE DISTURBED AREA COMPARED TO EXISTING CONDITIONS. ALL TEMPORARY SYNTHETIC EROSION PREVENTION AND SEDIMENT CONTROL BMPS MUST BE REMOVED AS PART OF THE SITE FINAL STABILIZATION. ALL SEDIMENT MUST BE CLEANED OUT OF CONVEYANCES AND TEMPORARY SEDIMENTATION BASINS IF APPLICABLE. 1.INITIATE INLET STABILIZATION IMMEDIATELY WHEN CONSTRUCTION HAS TEMPORARILY OR PERMANENTLY CEASED ON ANY PORTION OF THE SITE. COMPLETE STABILIZATION WITHIN THE TIME FRAME LISTED. IN MANY INSTANCES THIS WILL REQUIRE STABILIZATION TO OCCUR MORE THAN ONCE DURING THE COURSE OF THE PROJECT. TEMPORARY SOIL STOCKPILES WITHOUT SIGNIFICANT CLAY OR SILT AND STOCKPILED AND CONSTRUCTED ROAD BASE ARE NOT APPROPRIATE AND THEREFORE EXEMPT FROM THE STABILIZATION REQUIREMENT. 2.APPLICATION OF MULCH, HYDROMULCH, TACKIFIER AND POLYACRYLAMIDE ARE NOT ACCEPTABLE STABILIZATION METHODS IN THESE AREAS. 3.STABILIZE ALL AREAS OF THE SITE PRIOR TO THE ONSET OF WINTER, ANY WORK STILL BEING PERFORMED WILL BE SNOW MULCHED, SEEDED, AND BLANKETED WITHIN THE TIME FRAMES IN THE NPDES PERMIT. 4.TOPSOIL BERMS MUST BE STABILIZED IN ORDER TO BE CONSIDERED PERIMETER CONTROL BMPS. USE RAPID STABILIZATION METHOD 2, 3, OR 4 AS DIRECTED BY THE ENGINEER. THE SEED MIX USED IN THE RAPID STABILIZATION MAY BE SUBSTITUTED AS FOLLOWS: A.SINGLE YEAR CONSTRUCTION BETWEEN MAY 1 - AUGUST 1, SEED WITH SEED MIXTURE 21.111 B.SINGLE YEAR CONSTRUCTION BETWEEN AUGUST 1 AND OCTOBER 31, SEED WITH SEED MIXTURE 21-112 C.MULTI YEAR CONSTRUCTION 22-111 5.KEEP DITCHES AND EXPOSED SOILS IN AN EVEN ROUGH GRADED CONDITION IN ORDER TO BE ABLE TO APPLY EROSION CONTROL MULCHES, HYDROMULCHES AND BLANKETS. GENERAL SWPPP NOTES FOR CONSTRUCTION ACTIVITY 1.CONTRACTOR SHALL AMEND THE SWPPP AND DOCUMENT ANY AND ALL CHANGES TO THE SWPPP AND ASSOCIATED PLAN SHEETS WITHIN 7 DAYS UPON IMPLEMENTATION. STORE THE SWPPP AND ALL AMENDMENTS ON SITE AT ALL TIMES. 2.PREPARE AND SUBMIT A SITE MANAGEMENT PLAN FOR THE ENGINEER'S ACCEPTANCE FOR CONCRETE MANAGEMENT, CONCRETE SLURRY APPLICATION AREAS, WORK IN AND NEAR AREAS OF ENVIRONMENTAL SENSITIVITY, AREAS IDENTIFIED IN THE PLANS AS "SITE MANAGEMENT PLAN AREA", ANY WORK THAT WILL REQUIRE DEWATERING, AND AS REQUESTED BY THE ENGINEER. SUBMIT ALL SITE MANAGEMENT PLANS TO THE ENGINEER IN WRITING. ALLOW ALL MINIMUM OF 7 DAYS FOR THE ENGINEER TO REVIEW AND ACCEPT SITE MANAGEMENT PLAN SUBMITTALS. WORK WILL NOT BE ALLOWED TO COMMENCE IF A SITE MANAGEMENT PLAN IS REQUIRED UNTIL ACCEPTANCE HAS BEEN GRANTED BY THE ENGINEER. THERE WILL BE NO EXTRA TIME ADDED TO THE CONTRACT DUE TO THE UNTIMELY SUBMITTAL. 3.IT IS THE DESIGNER'S INTENT THAT THE CONTRACTOR BUILD PONDS AND INSTALL EROSION CONTROL BMPS BEFORE PUTTING THEM INTO ACTIVE SERVICE TO THE MAXIMUM EXTENT PRACTICABLE. 4.BURNING OF ANY MATERIAL IS NOT ALLOWED WITHIN PROJECT BOUNDARY. 5.DO NOT DISTURB AREAS OUTSIDE OF THE CONSTRUCTION LIMITS. DELINEATE AREAS NOT TO BE DISTURBED PRIOR TO STARTING GROUND DISTURBING ACTIVITIES. IF IT BECOMES NECESSARY TO DISTURBED AREAS OUTSIDE OF THE CONSTRUCTION LIMITS OBTAIN WRITTEN PERMISSION FROM THE PROJECT ENGINEER PRIOR TO PROCEEDING. PRESERVE ALL NATURAL BUFFERS SHOWN ON THE PLANS. 6.ROUTE STORMWATER AROUND UNSTABILIZED AREAS OF THE SITE WHENEVER FEASIBLE. PROVIDE EROSION CONTROL AND VELOCITY DISSIPATION DEVICES AS NEEDED TO KEEP CHANNELS FROM ERODING AND TO PREVENT NUISANCE CONDITIONS AT THE OUTLET. 7.DIRECT DISCHARGES FROM BMPS TO VEGETATED AREA WHENEVER FEASIBLE. PROVIDE VELOCITY DISSIPATION DEVICES AS NEEDED TO PREVENT EROSION. 8.THE EROSION PREVENTION AND SEDIMENT CONTROL BMPS SHALL BE PLACED AS NECESSARY TO MINIMIZE EROSION FROM DISTURBED SURFACES AND TO CAPTURE SEDIMENT ON SITE. ALL EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO COMMENCEMENT OF ANY REMOVAL WORK AND/OR GROUND DISTURBING ACTIVITIES COMMENCE. 9.ESTABLISH SEDIMENT CONTROL DEVICES ON ALL DOWN GRADIENT PERIMETERS AND UP GRADIENT OF ANY BUFFER ZONES BEFORE AND UP GRADIENT LAND DISTURBING ACTIVITIES BEGIN. MAINTAIN SEDIMENT CONTROL DEVICES UNTIL CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 10.LOCATE PERIMETER CONTROL ON THE CONTOUR TO CAPTURE OVERLAND, LOW-VELOCITY SHEET FLOWS DOWN GRADIENT OF ALL EXPOSED SOILS AND PRIOR TO DISCHARGING TO SURFACE WATERS. PLACE J-HOOKS AT A MAXIMUM OF 100 FOOT INTERVALS. 11.PROVIDE PERIMETER CONTROL AROUND ALL STOCKPILES. PLACE BMP A MINIMUM 5 FEET FROM THE TOE OF SLOPE WHERE FEASIBLE. DO NOT PLACE STOCKPILES IN NATURAL BUFFER AREAS, SURFACE WATERS OR STORMWATER CONVEYANCES. 12.DISCHARGE TURBID OR SEDIMENT LADEN WATER TO TEMPORARY SEDIMENT BASINS WHENEVER FEASIBLE. IN THE EVENT THAT IT IS NOT FEASIBLE TO DISCHARGE THE SEDIMENT LADEN WATER TO A TEMPORARY SEDIMENT BASIN, THE WATER MUST BE TREATED SO THAT IT DOES NOT CAUSE A NUISANCE CONDITION IN THE RECEIVING WATERS OR TO DOWNSTREAM LANDOWNERS. CLEAN OUT ALL PERMANENT STORMWATER BASINS REGARDLESS OF WHETHER USED AS TEMPORARY SEDIMENT BASINS OR TEMPORARY SEDIMENT TRAPS TO THE DESIGN CAPACITY AFTER ALL UP GRADIENT LAND DISTURBING ACTIVITY IS COMPLETED. 13.PROVIDE SCOUR PROTECTION AT ANY OUTFALL OF DEWATERING ACTIVITIES. 14.PROVIDE STABILIZATION IN ANY TRENCHES CUT FOR DEWATERING OR SITE DRAINING PURPOSES. POLLUTION PREVENTION 1.PROVIDE A SPILL KIT AT EACH WORK LOCATION ON THE SITE. 2.STORE ALL BUILDING MATERIALS THAT HAVE THE POTENTIAL TO LEACH POLLUTANTS, PESTICIDES, HERBICIDES, INSECTICIDES. FERTILIZERS, TREATMENT CHEMICALS, AND LANDSCAPE MATERIALS UNDER COVER WITH SECONDARY CONTAINMENT. 3.PROVIDE A SECURE STORAGE AREA WITH RESTRICTED ACCESS FOR ALL HAZARDOUS MATERIALS AND TOXIC WASTE. RETURN ALL HAZARDOUS MATERIALS AND TOXIC WASTE TO THE DESIGNATED STORAGE AREA AT THE END OF THE BUSINESS DAY UNLESS INFEASIBLE. STORE ALL HAZARDOUS MATERIALS AND TOXIC WASTE (INCLUDING BUT NOT LIMITED TO OIL, DIESEL FUEL, GASOLINE, HYDRAULIC FLUIDS, PAINT, PETROLEUM BASED PRODUCTS, WOOD PRESERVATIVES, ADDITIVES, CURING COMPOUNDS, AND ACIDS) IN SEALED CONTAINERS WITH SECONDARY CONTAINMENT. CLEAN UP SPILLS IMMEDIATELY. 4.STORE, COLLECT AND DISPOSE OF ALL SOLID WASTE. 5.POSITION ALL PORTABLE TOILETS SO THAT THEY ARE SECURE AND CANNOT BE TIPPED OR KNOCKED OVER. PROPERLY DISPOSE OF ALL SANITARY WASTE. 6.FUEL AND MAINTAIN VEHICLES IN A DESIGNATED CONTAINED AREA WHENEVER FEASIBLE. USE DRIP PANS OR ABSORBENT MATERIALS TO PREVENT SPILLS OR LEAKED CHEMICALS FORM DISCHARGING TO SURFACE WATER OR STORMWATER CONVEYANCES. PROVIDE A SPILL KIT AT EACH LOCATION THAT VEHICLES AND EQUIPMENT ARE FUELED OR MAINTAINED AT. 7.LIMIT VEHICLE AND EQUIPMENT WASHING TO A DEFINED AREA OF THE SITE. CONTAIN RUNOFF FROM THE WASHING AREA TO A TEMPORARY SEDIMENT BASIN OR OTHER EFFECTIVE CONTROL. PROPERLY DISPOSE OF ALL WASTE GENERATED BY VEHICLE AND EQUIPMENT WASHING. ENGINE DEGREASING IS NOT ALLOWED ON THE SITE. 8.PROVIDE EFFECTIVE CONTAINMENT FOR ALL LIQUID AND SOLID WASTES GENERATED BY WASHOUT OF CONCRETE, STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS. LIQUID AND SOLID WASHOUT WASTES MUST NOT CONTACT THE GROUND. DESIGN THE CONTAINMENT SO THAT IT DOES NOT RESULT IN RUNOFF FROM THE WASHOUT OPERATIONS OR CONTAINMENT AREA. 9.CREATE AND FOLLOW A WRITTEN DISPOSAL PLAN FOR ALL WASTE MATERIALS. INCLUDE IN THE PLAN HOW THE MATERIAL WILL BE DISPOSED OF AND THE LOCATION OF THE DISPOSAL SITE. SUBMIT PLAN TO THE ENGINEER. 10.USE METHODS AND OPERATIONAL PROCEDURES THAT PREVENT CONCRETE DUST, PARTICLES, CONCRETE WASH OUT, AND OTHER CONCRETE WASTES FROM LEAVING SITE, DEPOSITING IN EXISTING OR FUTURE VEGETATED AREAS, AND FROM ENTERING STORMWATER CONVEYANCE SYSTEMS, INCLUDING INLETS, DITCHES AND CURB FLOW LINES. USE METHODS AND OPERATIONAL PROCEDURES THAT PREVENT SAW CUT SLURRY AND PLANING WASTE FROM LEAVING SITE AND FROM ENTERING STORMWATER CONVEYANCE SYSTEMS INCLUDING DITCHES AND CULVERTS. RECORD RETENTION THE SWPPP, ALL CHANGES TO IT AND INSPECTION AND MAINTENANCE RECORDS MUST BE KEPT ON-SITE DURING CONSTRUCTION. THE OWNER MUST RETAIN A COPY OF THE SWPPP ALONG WITH THE FOLLOWING RECORDS FOR THREE (3) YEARS AFTER SUBMITTAL OF THE NOTICE OF TERMINATION (NOT). 1.ANY OTHER PERMITS REQUIRED FOR THE PROJECT. 2.RECORDS OF ALL INSPECTION AND MAINTENANCE CONDUCTED DURING CONSTRUCTION 3.ALL PERMANENT OPERATIONS AND MAINTENANCE AGREEMENT THAT HAVE BEEN IMPLEMENTED INCLUDING ALL RIGHT OF WAY, CONTRACTS, COVENANTS AND OTHER BINDING REQUIREMENTS REGARDING PERPETUAL MAINTENANCE; AND 4.ALL REQUIRED CALCULATIONS FOR DESIGN OF THE TEMPORARY AND PERMANENT STORMWATER MANAGEMENT SYSTEMS. SWPPP SCHEDULE OF INSTALLATION & MAINTENANCE DESCRIPTION OF PERMANENT STORMWATER TREATMENT SYSTEMS STORMWATER IS TREATED BY FOUR STORMWATER PONDS THROUGHOUT THE SITE. SEE STORMWATER MANAGEMENT PLAN REPORT. CALCULATIONS FOR TEMPORARY & PERMANENT STORMWATER TREATMENT SYSTEMS SEE STORMWATER MANAGEMENT PLAN REPORT. ESTIMATED BMPS QUANTITIES STORM WATER POLLUTION PREVENTION PLAN NARRATIVE - PAGE 2 OR 2 AREA TIME FRAME NOTES LAST 200 LINEAL FEET OF DRAINAGE DITCH OR SWALE WITHIN 24 HOURS OF CONNECTION TO SURFACE WATER OR PROPERTY EDGE 1, 2, 3 REMAINING PORTIONS OF DRAINAGE DITCH OR SWALE 7 DAYS 1, 3 PIPE AND CULVERT OUTLETS 24 HOURS STOCKPILES 7 DAYS 1 ITEM INSTALLATION INSPECTION & MAINTENANCE REMOVAL SILT FENCE PRIOR TO COMMENCEMENT OF EARTHWORK OPERATIONS. INSPECT & MAINT. AFTER EACH RUN-OFF EVENT. REMOVE SEDIMENTS AS REQUIRED. AFTER TRIBUTARY DRAINAGE AREA IS RESTORED. ROCK CONST. ENTRANCE PRIOR TO COMMENCEMENT OF EARTHWORK OPERATIONS. INSPECT REGULARLY. MAINTAIN AS NEEDED.PRIOR TO PAVING. OUTLET SKIMMER STRUCTURE AFTER POND GRADING IS COMPLETED. INSPECT REGULARLY. MAINTAIN AS NEEDED.PERMANENT. RIP-RAP & FILTER UPON COMPLETION OF POND GRADING, CONC. SWALE CONST. AND OUTLET INSTALLATION. INSPECT & MAINTAIN AT LEAST ANNUALLY AND AFTER HEAVY RAINFALL EVENT. PERMANENT. DETENTION POND DURING EARTHWORK OPERATIONS. AFTER HEAVY RAINFALL EVENTS. REMOVE SEDIMENTS AS NEEDED.PERMANENT. SEED & MULCH AFTER POND GRADING IS COMPLETED. INSPECT & MAINTAIN AFTER HEAVY RAINS. REPLACE WASH-OUT AREAS IMMEDIATELY NO REMOVAL NECESSARY. INLET PROTECTION UPON INLET CONSTRUCTING WHEN 1/3 CAPACITY OF BMP IS REACHED AFTER TRIBUTARY AREAS ARE FULLY RESTORED BMP ORIGINAL ESTIMATE MODIFICATION DATE ENERGY DISSIPATER TEMP. DIVERSION DIKES CHECK DAMS TEMP SEEDING PERMANENT SEEDING PERMANENT SODDING MULCHES (SPECIFY TYPES) CAT 3 EROSION CONTROL BLANKET SOIL TACKIFIERS SILT FENCING EROSION CONTROL MATS STORM DRAIN INLET PROTECTION TEMPORARY OR PERMANENT SEDIMENTATION BASINS CONSTRUCTION ENTRANCE DEWATERING (TREATMENT LOCATION, SCHEMATIC, & SAMPLING PLAN REQUIRED CONCRETE TRUCK WASHOUT PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS SWPPP - PG 2 8 RIM=920.5 INV.=912.7 ||IRON PIPE79.64O CBMH-113 CBMH-114 CBMH-105 CBMH-104 RIM 917.35 INV 913.53 (18" OUT) INV 913.79 (15" IN) 32 LF 18" RCP @ 0.32%35 LF 18" RCP @ 0.58% 51 LF 15" RCP @ 0.61% SMH-402 SMH-421 CBMH-103 1+00 2+00 3+00 4+00 5+00PC: 0+65.65PT: 0+97.81PC: 1+60.75PT: 1+92.429 1 8 . 1 6 918.24917.50917.97917.939 1 8 . 1 3 9 1 7 . 5 6 9 1 7 . 4 7 91 7 . 5 8 9 1 8 . 0 4 918.07917. 9 9 917.9 2917.87917.41917.49918.14 91 8 . 3 5 9 1 8 . 1 2 918.3391 8 . 5 5 9 1 8 . 4 5 918.29918.09 918.4 5 918. 5 5 918.50 918.40 L =3 2.2,R =3 0 0.0 L=31.7,R =3 0 0.090'10'CBMH-106 890 900 910 920 930 885 890 895 900 905 910 915 920 925 930 -1.44% 0.50%-0.69%PVIS: 0+60.71PVIE: 920.46PVI STA = 4+52.07 PVI ELEV = 918.51 A.D. = -1.19% K = 83.84 100.00' VC BVCS: 4+02.07BVCE: 918.26EVCS: 5+02.07EVCE: 918.17HIGH PT. STA = 4+43.99 HIGH PT ELEV = 918.37 PVI STA = 2+62.27 PVI ELEV = 917.56 A.D. = 1.94% K = 46.50 90.00' VC BVCS: 2+17.27BVCE: 918.21EVCS: 3+07.27EVCE: 917.79LOW PT. STA = 2+84.02 LOW PT ELEV = 917.73 920.80+50 919.89917.61+00 919.18917.4918.46916.92+00 917.85916.4917.76915.43+00 918.00914.2918.25913.74+00 918.37915.3918.18917.25+00 917.83916.75+50 272 LF 24" RCP @ 0.23%SMH-421SMH-402CBMH-105RIM 917.35INV 913.43 (E)INV 912.93 (N)PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTSN STREET & STORM SEWER - ONEKA PARKWAY - STA 0+00 TO 5+50 BEGIN ONEKA PARKWAY STA 0+60 PROPOSED ℄ PROFILE EXISTING GRADE @ ℄ SEE SHEET 15 SEE SHEET 10SEE SHEET 11 0 20'40' 9 3 35 PROPOSED STREET & UTILITY EASEMENT EXISTING EASEMENT 9 1 4 . 8 915.3 OOOORLS 66179 1 4 . 2 B O X 1 1 - 2 CBMH-114 CBMH-107 CBMH-108 RIM 916.78 INV 911.66 (27" OUT) INV 911.66 (27" IN) FES-109 INV 911.5053 LF 27" RCP @ 0 .30% 32 LF 27" RCP @ 0.30% SMH-401 6+00 7+00 8+00 9+00 91 7 . 5 8 917.41917.49918.14 91 8 . 3 5 918.50 918.40 CBMH-106 880 890 900 910 920 875 880 885 890 895 900 905 910 915 920 925 -0.69%PVIS: 8+80.00PVIE: 915.55917.83916.75+50 917.49915.66+00 917.14914.8916.79914.67+00 916.45913.3916.10912.58+00 915.76914.3915.19+00 126 LF 27" RCP @ 0.30%SMH-401CBMH-107RIM 916.55INV 911.76 (E)INV 911.76 (S)CBMH-106RIM 917.42INV 912.60 (E)INV 912.30 (S)INV 912.14 (N)910 920 900 905 910 915 920 920 910 915 920 32 LF 27" RCP @ 0.30%53 LF 27" RCP @ 0.30% FES-109 INV 911.50CBMH-108RIM 916.78SUMP 908.70INV 911.66 (E)INV 911.66 (W)CBMH-107RIM 916.55INV 911.76 (E)INV 911.76 (S)CBMH-106RIM 917.42INV 912.60 (E)INV 912.30 (S)INV 912.14 (N)CBMH-114RIM 917.41INV 912.80 (W)INV 912.80 (SE)32 LF 18" RCP @ 0.63% PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTSN STREET & STORM SEWER - ONEKA PARKWAY - STA 5+50 TO 10+00 PROPOSED ℄ PROFILE EXISTING GRADE @ ℄ END ONEKA PARKWAY STA 0+75 0 20'40' TERMINATE CURB WITH 3' BEAVERTAIL (TYP.) 10 TERMINATE STREET AND TRAIL INSTALL BARRICADE AND "FUTURE THRU STREET" SIGNAGE PROPOSED STREET & UTILITY EASEMENT EXISTING EASEMENT SEE SHEET 93 35 INSTALL CLASS 5 AGGREGATE BASE MATERIAL TO PROVIDE ACCESS FROM EXISTING GRAVEL DRIVE PROVIDE 10' CLASS 5 TRANISTION TO PROTECT EDGE OF PAVEMENT PROFILE VIEW: CBMH-114 TO CBMH-106 PROFILE VIEW: CBMH-107 TO FES-109 12" DIP WM 6" PVC FORCEMAIN FES REQUIRES SHEET PILE FOUNDATION PER CITY DETAIL HU-SD-7 DEPRESS CURB PER CITY DETAIL HU-STR-12 END BIT TRAIL STA 8+40 PAVING FOR LIFT STATION NOT IN SCOPE OF THIS PROJECT 2+003+00PC: 1+60.75 Mid: 1+76.58 PT: 1+92.42 CBMH-103 CBMH-102 CB-101 RIM 918.30 INV 915.25 (12" OUT) CBMH-104 FES-701 RIM 917.02 INV 915.50 (15" OUT) FES-702 RIM 916.52 INV 915.00 (15" IN)74 LF 15" RCP @ 0.68%28 LF 12" RCP @ 0.39% 226 LF 15" RCP @ 0.40%51 LF 15 " RCP @ 0 .61% SMH-421 SMH-422 0+00 1+00 2+00 3+00 4+00 5+00 910 920 930 940 900 905 910 915 920 925 930 935 940 -3.58% 5.34% -0.91% 2.00% 5.28%PVIS: 0+14.30PVIE: 917.80PVI STA = 1+29.25 PVI ELEV = 923.19 A.D. = -8.86% K = 8.47 75.00' VC BVCS: 0+91.75BVCE: 921.21EVCS: 1+66.75EVCE: 921.85HIGH PT. STA = 1+36.46 HIGH PT ELEV = 922.39 PVI STA = 4+45.44 PVI ELEV = 926.98 A.D. = -6.25% K = 12.01 75.00' VC BVCS: 4+07.94BVCE: 924.98EVCS: 4+82.94EVCE: 926.64HIGH PT. STA = 4+72.04 HIGH PT ELEV = 926.69 PVI STA = 2+76.08 PVI ELEV = 917.94 A.D. = 8.91% K = 6.73 60.00' VC BVCS: 2+46.08BVCE: 919.01EVCS: 3+06.08EVCE: 919.54LOW PT. STA = 2+70.15 LOW PT ELEV = 918.58 916.60+00 919.01917.3921.61921.31+00 922.28916.2920.66915.22+00 918.88914.5919.24915.23+00 921.89917.0924.55918.94+00 926.49921.2926.48923.45+00CBMH-103RIM 918.41INV 914.10 (E)INV 914.10 (NW)CBMH-102RIM 918.30INV 915.14 (S)INV 915.00 (W)15"SMH-421SMH-422CBMH-103RIM 918.41INV 914.10 (E)INV 914.10 (NW)CBMH-102RIM 918.30INV 915.14 (S)INV 915.00 (W)226 LF 15" RCP @ 0.40% 51 LF 15" RCP @ 0.61% PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS N STREET & STORM SEWER - STREET A - STA 0+00 TO 4+50 PROPOSED ℄ PROFILE EXISTING GRADE @ ℄SEE SHEET 12SEE SHEET 90 20'40' 11 1 35 2+003+00CBMH-404 CBMH-405 CBMH-402 RIM 924.45 INV 918.60 (18" OUT) INV 918.90 (15" IN) CBMH-403 119 LF 15" RCP @ 0.50%28 LF 18" RCP @ 0.89%SMH-423 SMH-424 SMH-410 5+00 6+00 7+00 8+00 9+00 9 2 5 . 0 6 925.47 925.489 2 4 . 9 6 925.1192 6 . 0 4926.04925.0092 5 . 1 1 9 2 5 . 6 8 925.35925. 6 3 926.22926.00 9 2 5 . 8 8 L =6 9.1,R =3 0 0 .4 L =16 6 .6 ,R =8 6 4 .8 9 2 5 . 6 4 925.21 925.75 900 910 920 930 940 895 900 905 910 915 920 925 930 935 940 -0.91% 0.50%0.42%-0.51%-1.44%PVIS: 8+82.02PVIE: 925.45PVI STA = 7+09.26 PVI ELEV = 924.59 A.D. = 1.41% K = 53.29 75.00' VC BVCS: 6+71.76BVCE: 924.93EVCS: 7+46.76EVCE: 924.77LOW PT. STA = 7+20.12 LOW PT ELEV = 924.71 926.48923.45+00 926.03924.5925.58924.66+00 925.12924.8924.75923.87+00 924.79924.0925.04924.68+00 925.29925.2925.49925.69+00 924.83926.59+50CBMH-403RIM 924.43INV 918.35 (E)INV 918.35 (S)139 LF 24" RCP @ 0.32%CBMH-404RIM 925.05INV 917.90 (W)INV 917.90 (E)83 LF 24" RCP @ 0.34%CBMH-405RIM 924.64INV 917.62 (W)INV 917.62 (E)SMH-423SMH-424SMH-410PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS N STREET & STORM SEWER - STREET A - STA 4+50 TO 9+00 PROPOSED ℄ PROFILE EXISTING GRADE @ ℄SEE SHEET 11SEE SHEET 1312 0 20'40' 1 35 SEE STORM PROFILE ON SHEET 21 FAIROAKS ℄ 0+001 + 0 0 CBMH-405 CBMH-406 CBMH-407 CBMH-203 CBMH-205 CBMH-204 STMH-608 RIM 920.00 INV 917.00 (12" OUT) INV 915.00 (12" IN) FES-408 FES-206 FES-607 190 LF 12" RCP @ 1.33%58 LF 12" RCP @ -17.20%131 LF 15" RCP @ 0.71 % SMH-411 SMH-412 SMH-413 SMH-441 10+ 0 0 11+00 12+00 13+00925.489 2 4 . 9 6 925.11L =4 3 5 .3 ,R =2 7 5 .0 L =4 3 5 .3 ,R =275900 910 920 930 895 900 905 910 915 920 925 930 935 -1.44% 1.21% PVI STA = 11+40.07 PVI ELEV = 922.10 A.D. = 2.65% K = 28.35 75.00' VC BVCS: 11+02.57BVCE: 922.64EVCS: 11+77.57EVCE: 922.55LOW PT. STA = 11+43.32 LOW PT ELEV = 922.35 924.83926.59+50 924.11926.210+00 923.39924.9922.68923.411+00 922.35922.2922.82922.112+00 923.43922.512+50CBMH-406RIM 923.63INV 917.30 (W)INV 917.29 (S)12" RCP CBMH-204RIM 922.07INV 917.50 (NE)INV 917.15 (SE)101 LF 15" RCP @ 0.89%CBMH-203RIM 923.15INV 918.40 (N)INV 918.40 (SW)SMH-413SMH-412SMH-41171 LF 24" RCP @ 0.45% 920 930 910 915 920 925 930 920 930 910 915 920 925 930CBMH-406RIM 923.63INV 917.30 (W)INV 917.29 (S)50 LF 24" RCP @ 0.36% 28 LF 24" RCP @ 0.39%CBMH-407RIM 923.72SUMP 914.18INV 917.18 (N)INV 917.18 (SE)FES-408INV 917.000CBMH-204RIM 922.07INV 917.50 (NE)INV 917.15 (SE)28 LF 21" RCP @ 0.25% 34 LF 21" RCP @ 0.24%FES-206INV 917.00CBMH-205RIM 922.07SUMP 914.08INV 917.08 (NW)INV 917.08 (SE)PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS N STREET & STORM SEWER - STREET A - STA 9+00 TO 12+50 PROPOSED ℄ PROFILE EXISTING GRADE @ ℄SEE SHEET 12SEE SHEET 14SEE STORM PROFILE ON SHEET 21 SEE S H E E T 12 13 0 20'40' 5 35 1 35 SEE STORM PROFILES NEXT TO ROAD PROFILE BELOW FES REQUIRES SHEET PILE FOUNDATION PER CITY DETAIL HU-SD-7 CBMH-203 CBMH-202 CB-201 RIM 922.87 INV 919.47 (15" OUT) 28 LF 15" RCP @ 0.50% 131 LF 1 5 " R C P @ 0 . 7 1 % SMH-441 SMH-442 SMH-443 SMH-444 13+00 14+00 15+00 16+0016+10L =8 7 .6 ,R =1 1 0 .5 L=435.3,R=275.0 910 920 930 940 900 905 910 915 920 925 930 935 940 1.21%-1.30%0.57%PVIS: 15+50.32PVIE: 924.00923.43922.512+50 923.76921.913+00 923.33922.3923.16924.614+00 923.43922.7923.71922.915+00 924.00922.4919.616+00 16+50SMH-444SMH-443SMH-442SMH-441CBMH-202RIM 922.87INV 919.33 (E)INV 919.33 (S)131 LF 15" RCP @ 0.71%CBMH-203RIM 923.15INV 918.40 (N)INV 918.40 (SW)PVI STA = 12+97.07 PVI ELEV = 924.00 A.D. = -2.51% K = 29.94 75.00' VC BVCS: 12+59.57BVCE: 923.54EVCS: 13+34.57EVCE: 923.51HIGH PT. STA = 12+95.74 HIGH PT ELEV = 923.76 PVI STA = 13+73.90 PVI ELEV = 923.00 A.D. = 1.86% K = 40.24 75.00' VC BVCS: 13+36.40BVCE: 923.49EVCS: 14+11.40EVCE: 923.21LOW PT. STA = 13+88.59 LOW PT ELEV = 923.15 PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTSN STREET & STORM SEWER - STREET A - STA 12+50 TO 16+00SEE SHEET 13R = 3 0 'R=45'R=90' 14 0 20'40'1 35 INV.= 9 1 2. 55+006+00CBMH-113 CBMH-114 CBMH-112 CB-111 RIM 917.09 INV 914.20 (12" OUT) FES-703 RIM 914.56 INV 912.50 (21" OUT) FES-704 RIM 913.56 INV 911.50 (21" IN)28 LF 12" RCP @ 0.50%89 LF 21" RCP @ 1.12%126 LF 27" RCP @ 0.30%0+00 1+00 2+00 3+00 4+00 SMH-402 900 910 920 930 890 895 900 905 910 915 920 925 930 -3.35% 3.51%2.64% 2.71%PVIS: 0+14.34PVIE: 917.74PVI STA = 1+77.00 PVI ELEV = 922.10 A.D. = -6.06% K = 12.38 75.00' VC BVCS: 1+39.50BVCE: 921.08EVCS: 2+14.50EVCE: 920.84HIGH PT. STA = 1+73.03 HIGH PT ELEV = 921.54 PVI STA = 4+22.92 PVI ELEV = 920.00 A.D. = -1.65% K = 45.55 75.00' VC BVCS: 3+85.42BVCE: 918.68PVI STA = 3+33.44 PVI ELEV = 916.86 A.D. = 6.86% K = 8.75 60.00' VC BVCS: 3+03.44BVCE: 917.86EVCS: 3+63.44EVCE: 917.91LOW PT. STA = 3+32.74 LOW PT ELEV = 917.37 917.00+00 918.68917.4920.01918.11+00 921.32917.8921.24914.92+00 919.65913.4917.98912.53+00 917.54911.5919.17913.54+00 920.49916.24+50CBMH-112RIM 917.09INV 914.06 (S)INV 913.90 (W)289 LF 18" RCP @ 0.31%CBMH-113RIM 918.21INV 913.01 (E)INV 913.00 (NW)35 LF 18" RCP @ 0.58%CBMH-114RIM 917.41INV 912.80 (W)INV 912.80 (SE)SMH-402SMH-403PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS N STREET & STORM SEWER - STREET B - STA 0+00 TO 4+50SEE SHEET 16PROPOSED ℄ PROFILE EXISTING GRADE @ ℄SEE SHEET 90 20'40' 15 1 35 4 35 1 35 21" RCP CB-301 CBMH-306 CBMH-304 CBMH-302 CBMH-303 5+00 6+00 7+00 7+9 4 PC: 6+12.32PT: 7+44 .98 L =13 2.7 ,R =15 0 .7 900 910 920 930 890 895 900 905 910 915 920 925 930 935 1.86% 0.50% -1.31%PVIS: 7+45.08PVIE: 920.88PVIS: 7+68.08PVIE: 921.00EVCS: 4+60.42EVCE: 920.70PVI STA = 5+84.00 PVI ELEV = 923.00 A.D. = -3.18% K = 23.62 75.00' VC BVCS: 5+46.50BVCE: 922.30EVCS: 6+21.50EVCE: 922.51HIGH PT. STA = 5+90.49 HIGH PT ELEV = 922.71 920.49916.24+50 921.44918.35+00 922.36917.4922.69916.66+00 922.13915.4921.48914.17+00 920.91913.98+00CBMH-303RIM 920.58INV 917.20 (SE)INV 917.20 (N)32 LF 12" RCP @ 1.09%CBMH-304RIM 920.67INV 916.85 (NW)INV 916.85 (NE)INV 916.85 (S)SMH-405SMH-404PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS N STREET & STORM SEWER - STREET B - STA 4+50 TO 7+79SEE SHEET 15PROPOSED ℄ PROFILE EXISTING GRADE @ ℄SEE SHEET 180 20'40' 16 1 35 RIM=929.2INV.=916.7INV.=925.4INV.=924.9|931.1BOX6-5930.7 BOX6-2 930 . 6 BO X 6 - 2 930.8 BOX6 9+00PRC: 9+31.98 CBMH-404 RIM 925.05 CBMH-405 RIM 924.64 EX SMH SMH-451 SMH-410 SMH-409 SMH-408 1+00 2+00 3+00 4+00 5+00PC: 3+68.55926.04926.04 925.02 925.06 ???925.41925.11 9 2 5 . 2 5 9 2 5 . 65 925.63925.2 2 925.48925.80 9 2 5 . 0 3 92 4 . 8 3 925.11 929. 0 7 9 2 9 . 1 5 L =2 7 8 .8 ,R =3 0 0 .0 900 910 920 930 890 895 900 905 910 915 920 925 930 935 -1.95% 1.00% -1.64%PVIS: 0+73.57PVIE: 929.52PVI STA = 3+63.86 PVI ELEV = 926.34 A.D. = -2.64% K = 22.70 60.00' VC BVCS: 3+33.86BVCE: 926.04EVCS: 3+93.86EVCE: 925.85HIGH PT. STA = 3+56.55 HIGH PT ELEV = 926.15 PVI STA = 2+80.00 PVI ELEV = 925.50 A.D. = 2.95% K = 20.36 60.00' VC BVCS: 2+50.00BVCE: 926.08EVCS: 3+10.00EVCE: 925.80LOW PT. STA = 2+89.64 LOW PT ELEV = 925.70 929.50+50 929.01930.71+00 928.03928.9927.06927.22+00 926.08926.2925.72926.13+00 926.14925.7925.74923.64+00 924.92921.6924.10917.35+00 24" RCP EX SMHSMH-451SMH-410SMH-409PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTSN STREET & STORM SEWER - FAIROAKS AVENUE - STA 0+00 TO 5+00SEE SHEET 18R= 2 0 ' R=20' R= 2 0 'R=20'SEE SHEET 12 SEE SHEET 13 0 20'40' 17 2 35 7+007+94CB-301 RIM 921.74 CBMH-306 RIM 920.63 CBMH-304 RIM 920.67 CBMH-307 RIM 920.26 CBMH-302 RIM 920.56 CBMH-303 RIM 920.58 CBMH-312 RIM 919.82 CB-310 RIM 919.14 CBMH-311 RIM 919.14 28 LF 12" RCP @ 0.50% 28 LF 12" RCP @ 1.61% SMH-408 SMH-407 SMH-406 SMH-431 SMH-432 SMH-433 SMH-434 5+00 6+00 7+00 8+00 9+00 10 + 0 0 PC: 6+64 .30PT: 6+47 .36PT: 9+50.32919.73920.00919.79919.37919.60920.00 919.22 920.56 920.70 920.92 920.56920.71920.67919.44919.4 1 919.2 5 919. 2 4 921.10 921.00 921.50 921.40 L =2 8 6 .0 ,R =2 9 9 .8 L =2 7 8 .8 ,R =3 0 0 .0 900 910 920 930 890 895 900 905 910 915 920 925 930 -1.64% -0.57% PVI STA = 6+88.67 PVI ELEV = 921.00 A.D. = 1.07% K = 69.99 75.00' VC BVCS: 6+51.17BVCE: 921.62EVCS: 7+26.17EVCE: 920.79924.10917.35+00 923.28915.4922.46914.46+00 921.64914.0920.98914.27+00 920.65915.4920.36914.98+00 920.08914.5919.79914.89+00 919.51916.0919.22917.610+00 84 LF 12" RCP @ 0.49% 112 LF 12" RCP @ 0.43% 75 LF 15" RCP @ 0.58% 32 LF 12" RCP @ 1.09% 28 LF 12" RCP @ 0.71% 30 LF 12" RCP @ 2.52%SMH-406SMH-407SMH-431SMH-432SMH-433CBMH-312RIM 919.82INV 915.38 (SE)INV 915.38 (N)CBMH-307RIM 920.26SUMP 911.00INV 916.42 (SE)INV 914.00 (W)INV 914.97 (NW)CBMH-304RIM 920.67INV 916.85 (NW)INV 916.85 (NE)INV 916.85 (S)CBMH-303RIM 920.58INV 917.20 (SE)INV 917.20 (N)CBMH-302RIM 920.56INV 917.40 (NW)INV 917.65 (E)CB-301RIM 921.74INV 918.40 (W)CBMH-311RIM 919.14INV 915.86 (S)INV 915.86 (E)SMH-434SMH-408PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTSN STREET & STORM SEWER - FAIROAKS AVENUE - STA 5+00 TO 10+00SEE SHEET 17R=47'R=30'R=47'END CURB WITH BEAVERTAIL END BITUMINOUS TRAIL STA 9+01 END CURB WITH BEAVERTAIL STA 8+89 MAINTAIN VALLEY IN BITUMINOUS PAVEMENT FOR DRAINAGE CONVEYANCER=20'R=20' SEE S H E E T 16 0 20'40' 18 INSTALL BARRICADES AND "FUTURE THRU STREET" SIGNAGE 2 35 END FAIROAKS STREET STA 9+72 GRADE BEYOND PAVEMENT TO PROPERTY LINE AT 3:1 SLOPE MAX EXTEND ASPHALT AROUND CATCHBASIN FRAME AND DIRECT RUNOFF INTO STRUCTURE. TAPER ASPHALT EITHER SIDE OF CURB HOOD TO PROTECT FRAME UNTIL ROAD EXTENSION. EOF 919.25 EOF 919.25 12+000 + 0 0 1+00 2+00 2+17PC: 0+31.16PT: 1+09.53SMH-414 SMH-415 SMH-413 CB-502 RIM 921.77 INV 918.00 (12" OUT) CBMH-205 CBMH-204 CBMH-504 RIM 920.82 SUMP 914.22 INV 917.22 (15" IN) INV 917.22 (15" OUT) CBMH-503 RIM 920.82 INV 917.50 (12" IN) INV 917.36 (15" OUT) STMH-608 FES-206 FES-505 RIM 918.52 INV 917.00 (15" IN) FES-607 18 LF 12" RCP @ 2.76% 28 LF 15" RCP @ 0.50% 64 LF 15" RCP @ 0.35% L=78.4, R=120.7 900 910 920 930 890 895 900 905 910 915 920 925 930 -2.02% -0.50%PVIS: 0+00.00PVIE: 922.60PVIS: 0+33.92PVIE: 921.91PVIS: 2+17.36PVIE: 921.00922.60921.90+00 921.83924.0921.58927.51+00 921.34924.7921.09921.22+00 2+18SMH-415SMH-414SMH-413CBMH-504SUMP 914.22RIM 920.82INV 917.22 (N)INV 917.22 (SW)PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS N SEE SHEET 13STREET & STORM SEWER - STREET C - STA 0 TO 3+00 19 0 20'40' TERMINATE STREET AND TRAIL INSTALL BARRICADE AND "FUTURE THRU STREET" SIGNAGE TERMINATE CURB WITH 3' BEAVERTAIL (TYP.) 5 3 5 SEE SHEET 21 FOR STORM SEWER PROFILE 6 END STREET "C" STA 2+07 GRADE BEYOND PAVEMENT TO PROPERTY LINE AT 3:1 SLOPE ||930.6OAK15911.9WIL8||930.6OAK15911.9WIL8190 LF 12" RCP @ 1.33%57 LF 12" HDPE @ 0.88%39 LF 12" RCP @ 7.64%22 LF 12" RCP @ 2.26%COCOSTMH-608RIM 920.00INV 917.00 (12" OUT)INV 915.00 (12" IN)FES-610INV 914.00STMH-602RIM 916.00INV 913.00 (12" OUT)FES-611INV 905.00FES-603INV 912.50STMH-308RIM 915.04INV 912.00 (18" IN)INV 912.00 (18" OUT)STMH-612RIM 914.00INV 908.00 (12" IN)INV 911.40 (12" OUT)FES-309INV 911.50FES-613INV 910.9088 LF 18" HDPE @ 0.57%209 LF 18" HDPE @ 0.96%CB-401RIM 923.00INV 919.50 (15" OUT)119 LF 15" RCP @ 0.50%CBMH-402RIM 924.45INV 918.60 (18" OUT)INV 918.90 (15" IN)FES-109INV 911.50CBMH-108RIM 916.78INV 911.66 (27" OUT)INV 911.66 (27" IN)CBMH-107RIM 916.55INV 911.76 (27" OUT)INV 911.76 (27" IN)CBMH-106RIM 917.42INV 912.60 (18" IN)INV 912.30 (24" IN)INV 912.14 (27" OUT)CBMH-114RIM 917.41INV 912.80 (18" OUT)INV 912.80 (18" IN)CBMH-113RIM 918.21INV 913.01 (18" IN)INV 913.00 (18" OUT)CBMH-105RIM 917.35INV 913.43 (18" IN)INV 912.93 (24" OUT)CBMH-104RIM 917.35INV 913.53 (18" OUT)INV 913.79 (15" IN)CBMH-103RIM 918.41INV 914.10 (15" IN)INV 914.10 (15" OUT)CBMH-102RIM 918.30INV 915.14 (12" IN)INV 915.00 (15" OUT)CB-101RIM 918.30INV 915.25 (12" OUT)FES-701INV 915.50FES-702INV 915.00CBMH-403RIM 924.43INV 918.35 (24" OUT)INV 918.35 (18" IN)CBMH-404RIM 925.05INV 917.90 (24" IN)INV 917.90 (24" OUT)CBMH-405RIM 924.64INV 917.62 (24" IN)INV 917.62 (24" OUT)CBMH-406RIM 923.63INV 917.30 (24" IN)INV 917.29 (24" OUT)CBMH-407RIM 923.72INV 917.18 (24" IN)INV 917.18 (24" OUT)FES-408INV 917.00FES-607INV 905.00FES-206INV 917.00CBMH-204RIM 922.07INV 917.50 (15" IN)INV 917.15 (21" OUT)CBMH-205RIM 922.07INV 917.08 (21" IN)INV 917.08 (21" OUT)CBMH-503RIM 920.82INV 917.50 (12" IN)INV 917.36 (15" OUT)CBMH-504RIM 920.82INV 917.22 (15" IN)INV 917.22 (15" OUT)FES-505INV 917.00CB-502RIM 921.77INV 918.00 (12" OUT)STMH-609RIM 917.03INV 914.48 (12" IN)INV 914.48 (12" OUT)CBMH-203RIM 923.15INV 918.40 (15" IN)INV 918.40 (15" OUT)CBMH-202RIM 922.87INV 919.33 (15" IN)INV 919.33 (15" OUT)CB-201RIM 922.87INV 919.47 (15" OUT)CBMH-311RIM 919.14INV 915.86 (12" OUT)INV 915.86 (12" IN)CB-310RIM 919.14INV 916.00 (12" OUT)CBMH-312RIM 919.82INV 915.38 (12" OUT)INV 915.38 (12" IN)CBMH-304RIM 920.67INV 916.85 (15" OUT)INV 916.85 (12" IN)INV 916.85 (12" IN)CBMH-306RIM 920.63INV 917.30 (12" OUT)CBMH-303RIM 920.58INV 917.20 (12" IN)INV 917.20 (12" OUT)CBMH-302RIM 920.56INV 917.40 (12" OUT)INV 917.65 (12" IN)CB-301RIM 921.74INV 918.40 (12" OUT)CBMH-112RIM 917.09INV 914.06 (12" IN)INV 913.90 (18" OUT)CB-111RIM 917.09INV 914.20 (12" OUT)FES-703INV 912.50FES-704INV 911.50CBMH-307RIM 920.26SUMP 911.00INV 916.42 (15" IN)INV 914.00 (18" OUT)INV 914.97 (12" IN)PLOTTED:COMM. NO.DRAWING NO.----17004ONEKA PRAIRIE13605 1st Avenue N. #100Plymouth, MN 55441 | ae-mn.comP 763.412.4000 | F 763.412.4090Anderson Engineering of Minnesota, LLCDRAWING TITLECHECKED BY:DRAWN:DESIGNED:ATJRAT04/11/2023REVISION LOGDESCRIPTION OF REVISIONSNO.DATESOUTHWIND HOLDINGS, LLCCONSTRUCTION DOCUMENTS51317ADAM THIELE, PEPRINT NAME:SIGNATURE:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATEOF MINNESOTA.DATE:LICENSE NO.04/11/20231 5/15/23 REVISED PER CITY COMMENTS2 5/31/23 REVISED PER CITY COMMENTSN050'100'STORM PLAN20STORMWATER POND 2FILTRATION BASIN 4STORMWATER POND 1GENERAL CONSTRUCTION NOTES:1.ALL CONSTRUCTION SHALL COMPLY WITH CITY OF HUGO REQUIREMENTS AND LATEST EDITION OF CEAM CONSTRUCTIONSPECIFICATIONS.2.STORM SEWER PIPE WITHIN RIGHT-OF-WAY SHALL BE RCP CL3. STORM SEWER PIPE OUTSIDE OF THE RIGHT-OF-WAY, EXCEPTFOR POND OUTLETS, SHALL BE DUAL-WALL HDPE.3.INSULATE WATERMAIN AT ALL PROPOSED STORM SEWER CROSSINGS.4.INSTALL DRAINTILE AT BACK OF CURB AND CONNECT TO CATCH BASIN STRUCTURES PER CITY DETAIL HU-SD-9.5.RIPRAP AT ALL FLARED END SECTION OUTLETS SHALL BE INSTALLED PER CITY DETAIL HU-SD-8. RIPRAP SHALL BE INSTALLEDWITHIN 24 HOURS OF COMPLETION OF UPSTREAM PIPE CONNECTIONS.6.CURB INLET FRAME AND GRATES SHALL BE NEENAH R-3067-V.7.POND OUTLET STRUCTURES SHALL HAVE HAALA POND SKIMMER STANDARD STYLE GRATES INSTALLED IN DIAMETER NOTED ONPLANS.LEGENDPROPERTY LINEPROPOSED STORM SEWERPROPOSED STORM MANHOLEPROPOSED CATCH BASINPROPOSED FLARED END SECTIONRIPRAP4" DRAINTILE4" COINV 913.54" COINV 913.5INV 913.00 (4" IN)SEE STORM PROFILE 1ON SHEET 21SEE STORM PROFILE 2ON SHEET 21SEE STORM PROFILE 3ON SHEET 21SEE STORM PROFILE 4ON SHEET 21SEE STORM PROFILE 5ON SHEET 21SEE STORM PROFILE 6ON SHEET 21SEE STORM PROFILE 7ON SHEET 22SEE STORM PROFILE 8ON SHEET 22SEE STORM PROFILE 9ON SHEET 22SEE STORM PROFILE 10ON SHEET 22SEE STORM PROFILE 11ON SHEET 22SEE STORM PROFILE 12ON SHEET 22SEE STORM PROFILE 13ON SHEET 22SEE STORM PROFILE 14ON SHEET 22 910 920 900 905 910 915 920 -0+25 904.42915.00+00 913.89911.20+75FES-611RIM 906.25INV 905.00 (E)39 LF 12" RCP @ -7.64%STMH-612RIM 914.00INV 908.00 (W)INV 911.40 (E)22 LF 12" RCP @ 2.26%FES-613RIM 912.15INV 910.90 (W)910 920 930 900 905 910 915 920 925 930 -0+25 914.01923.60+00 917.37921.4919.06920.61+00 921.97921.6922.38923.32+00 915.75922.73+00 36 LF 12" RCP @ 1.33%STMH-609RIM 917.03INV 914.48 (SE)INV 914.48 (N)190 LF 12" RCP @ 1.33%STMH-608RIM 920.00INV 917.00 (NW)INV 915.00 (S)FES-607RIM 906.33INV 905.00 (N)FES-607RIM 906.33INV 905.00 (N)FES-607RIM 906.33INV 905.00 (N)FES-607RIM 906.33INV 905.00 (N)58 LF 12" RCP @ -17.20%FES-607RIM 906.33INV 905.00 (N)FES-607RIM 906.33INV 905.00 (N)FES-607RIM 906.33INV 905.00 (N)FES-607RIM 906.33INV 905.00 (N)FES-607RIM 906.33INV 905.00 (N)8" SAN 8" WM 910 920 930 905 910 915 920 925 930 -0+25 912.53913.50+00 916.62915.60+76FES-603RIM 913.84INV 912.50 (E)57 LF 12" RCP @ 0.88%STMH-602RIM 916.00INV 913.00 (W)910 920 930 905 910 915 920 925 930 -0+25 912.00911.10+00 915.69911.2915.33913.71+00 916.24916.9917.98916.82+00 920.55915.8920.25915.43+00 3+25FES-309RIM 913.29INV 911.50 (E)88 LF 18" RCP @ 0.57%STMH-308RIM 915.04INV 912.00 (E)INV 912.00 (W)209 LF 18" RCP @ 0.96%CBMH-307RIM 920.26SUMP 911.00INV 916.42 (SE)INV 914.00 (W)INV 914.97 (NW)920 930 940 910 915 920 925 930 935 940 -0+25 928.20+00 925.18925.8925.30924.61+00 924.67923.51+75 119 LF 15" RCP @ 0.50%CBMH-402RIM 924.45INV 918.60 (N)INV 918.90 (S)28 LF 18" RCP @ 0.89%CBMH-403RIM 924.43INV 918.35 (E)INV 918.35 (S)8" WM 8" SAN 910 920 930 900 905 910 915 920 925 930 CBMH-503RIM 920.82INV 917.50 (NE)INV 917.36 (S)28 LF 15" RCP @ 0.50% 18 LF 12" RCP @ 2.76%CB-502RIM 921.77INV 918.00 (SW)CBMH-504RIM 920.82SUMP 914.22INV 917.22 (N)INV 917.22 (SW)64 LF 15" RCP @ 0.35%FES-505RIM 918.52INV 917.00 (NE)922.41923.00+00 921.01921.0920.81920.71+00 916.66920.51+37 8" WM 8" SAN PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS STORM PROFILES FG EG 21 FG EG FG EG FG EG SCALE:4 STORM PROFILE 4 SCALE:3 STORM PROFILE 3 SCALE:2 STORM PROFILE 2 SCALE:1 STORM PROFILE 1 FGEG SCALE:5 STORM PROFILE 5 SCALE:6 STORM PROFILE 6 FG EG 920 930 910 915 920 925 930 -0+25 922.87924.20+00 0+35CB-201RIM 922.87INV 919.47 (W)CBMH-202RIM 922.87INV 919.33 (E)INV 919.33 (S)28 LF 15" RCP @ 0.50% 8" WM 8" SAN 910 920 930 905 910 915 920 925 930 -0+25 919.14917.10+00 0+35 28 LF 12" RCP @ 0.50%CBMH-311RIM 919.14INV 915.86 (S)INV 915.86 (E)CB-310RIM 919.14INV 916.00 (W)8" WM 8" SAN 910 920 930 905 910 915 920 925 930 CBMH-304RIM 920.67INV 916.85 (NW)INV 916.85 (NE)INV 916.85 (S)CBMH-306RIM 920.63INV 917.30 (SW)28 LF 12" RCP @ 1.61% 8" WM 8" SAN 900 910 920 890 895 900 905 910 915 920 28 LF 12" RCP @ 0.50% CB-111 RIM 917.09 INV 914.20 (N)CBMH-112RIM 917.09INV 914.06 (S)INV 913.90 (W)8" WM 8" SAN 900 910 920 930 890 895 900 905 910 915 920 925 930 -0+25 911.29911.80+00 917.32911.41+00FES-703RIM 914.56INV 912.50 (N)FES-704RIM 913.56INV 911.50 (S)89 LF 21" RCP @ 1.12% 8" WM 8" SAN 910 920 930 900 905 910 915 920 925 930 -0+25 918.30914.80+00 0+35CB-101RIM 918.30INV 915.25 (N)CBMH-102RIM 918.30INV 915.14 (S)INV 915.00 (W)28 LF 12" RCP @ 0.39% 8" WM 8" SAN 910 920 930 905 910 915 920 925 930 -0+25 915.00+00 918.95914.81+00FES-701RIM 917.02INV 915.50 (N)FES-702RIM 916.52INV 915.00 (S)74 LF 15" RCP @ 0.68% 8" WM 8" SAN 910 920 930 900 905 910 915 920 925 930 -0+25 917.35915.30+00 0+50CBMH-105RIM 917.35INV 913.43 (E)INV 912.93 (N)CBMH-104RIM 917.35INV 913.53 (W)INV 913.79 (SE)32 LF 18" RCP @ 0.32% 8" WM 8" SAN PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS STORM PROFILES 22 SCALE:4 STORM PROFILE 10 SCALE:3 STORM PROFILE 9 SCALE:2 STORM PROFILE 8 SCALE:1 STORM PROFILE 7 SCALE:5 STORM PROFILE 11 SCALE:6 STORM PROFILE 12 SCALE:7 STORM PROFILE 13 SCALE:8 STORM PROFILE 14 EG EG EG EG EG EG EG EG FG FG FG FG FG FG FG FG |IRON PIPE0+000+00BP: 0+00.00 CBMH-103 CBMH-113 CBMH-114 CBMH-105 CBMH-104 SMH-421 SMH-4021+00 2+00 3+00 4+00 5+00 890 900 910 920 930 885 890 895 900 905 910 915 920 925 930 920.80+50 919.89917.61+00 919.18917.4918.46916.92+00 917.85916.4917.76915.43+00 918.00914.2918.25913.74+00 918.37915.3918.18917.25+00 917.83916.75+50SMH-421RIM 918.06INV 909.19 (N)INV 909.29 (E)SMH-402RIM 918.02INV 892.90 (E)INV 906.50 (S)INV 892.80 (N)INV 892.90 (W)274 LF 8" PVC SDR 35 @ 0.91%DROP INV 892.90 (S)CBMH-105PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTSNCONNECT TO EXISTING WM STUB 12" VALVE & BOX 11.25° DIP BEND 11.25° DIP BEND 12x8 DIP TEE 12" VALVE & BOX 8" VALVE & BOX 12x8 DIP CROSS 8" VALVE & BOX 12" VALVE & BOX 8" VALVE & BOX WATERMAIN & SANITARY SEWER - ONEKA PARKWAY - STA 0+00 TO 5+00 12" DIP CL 50 WM MAINTAIN 7.5' MIN. COVER DEPTH SEE SHEET 24STUB 8" DIP CL52 WM FOR FUTURE CONNECTION 8" DIP PLUG STUB SANITARY SEWER FOR FUTURE CONNECTION 8" PVC CAP SEE SHEET 29 SEE SHEET24SEE SHEET 25 0 20'40' INSTALL OUTSIDE DROP STRUCTURE PER CITY STANDARD DETAIL SS-2 LAST 20FT OF PIPE UP TO MANHOLE SHALL BE DIP 238" DIP CL 52 WM8" DIP CL 52 WMLEGEND DENOTES SANITARY SERVICE INVERT AT D&U EASEMENT 10' OUTSIDE R.O.W. DENOTES SANITARY SERVICE WYE DISTANCE FROM DOWNSTREAM MANHOLE. DENOTES FINISHED GRADE ELEVATION OF SANITARY SERVICE AT D&U EASEMENT. WYE = X+XX XXX.X XXX.X 11.25° DIP BEND 11.25° DIP BEND LOWER WATERMAIN TO MAINTAIN 18" MINIMUM VERTICAL SEPARATION CONNECT FORCEMAIN TO EXISTING MANHOLE USING FLEXIBLE WATERTIGHT MANHOLE CONNECTOR INSIDE EXISTING PENETRATION FROM REMOVED SANITARY STUB 6" PVC C900 FORCEMAIN 6" PVC C900 FORCEMAIN 12" DIP CL50 WM NOTE: INSULATE WATERMAIN OR WATER SERVICES WHEN SEPARATION BETWEEN STORM SEWER IS LESS THAN 36" 9 1 4 . 8 915.3 OOORLS 66179 1 4 . 2 B O X 1 1 - 2 6+00 7+00 8+00 9+00 CBMH-114 CBMH-107 CBMH-108 FES-109 SMH-401 PROPOSED LIFT STATION 6+00 7+00 8+00 9+00 72 LF 10" PVC @ 0.42%880 890 900 910 920 870 875 880 885 890 895 900 905 910 915 920 917.83916.75+50 917.49915.66+00 917.14914.8916.79914.67+00 916.45913.3916.10912.58+00 915.76914.3915.19+00SMH-401RIM 915.84INV 891.50 (S)INV 879.95 (E)INV 880.05 (N)292 LF 8" PVC SDR 26 @ 0.42% 39 LF 10" PVC SDR 26 @ 0.41%DROP INV 880.10 (S)CBMH-107CBMH-106PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTSN WATERMAIN & SANITARY SEWER - ONEKA PARKWAY - STA 5+00 TO 9+00 INSULATE WM/STORM CROSSING HYDRANT 12x6 DIP TEE 6" GV & BOX STUB WM FOR FUTURE CONNECTION 12" DIP PLUGSEE SHEET 23STUB SANITARY SEWER FOR FUTURE CONNECTION 10" PVC CAP 0 20'40' INSTALL OUTSIDE DROP STRUCTURE PER CITY STANDARD DETAIL SS-2 INV 880.21 1 REFERENCE NOTES: 1 LIFT STATION DESIGN AND CONSTRUCTION TO BE BY OTHERS UNDER SEPARATE CITY CONTRACT. STUB 10" PVC PIPE TO LOCATION OF PROPOSED LIFT STATION AND CAP. INSTALL 4x4 WOOD POST AT STUB LOCATION. 2 FORCEMAIN TO BE INSTALLED AT SAME TIME AS ONEKA PARKWAY UTILITIES. CONTRACTOR SHALL STUB FORCEMAIN TO LOCATION SHOWN AND CAP. INSTALL 4x4 WOOD POST AT STUB LOCATION. 24 12" DIP CL50 WM MAINTAIN 7.5' MIN. COVER DEPTH LEGEND DENOTES SANITARY SERVICE INVERT AT D&U EASEMENT 10' OUTSIDE R.O.W. DENOTES SANITARY SERVICE WYE DISTANCE FROM DOWNSTREAM MANHOLE. DENOTES FINISHED GRADE ELEVATION OF SANITARY SERVICE AT D&U EASEMENT. WYE = X+XX XXX.X XXX.X 45° BENDS (2) 2 6" PVC C900 FORCEMAIN 6" PVC C900 FORCEMAIN 12" DIP CL50 WM NOTE: INSULATE WATERMAIN OR WATER SERVICES WHEN SEPARATION BETWEEN STORM SEWER IS LESS THAN 36" 100 2+003+00PC: 1+60.75 Mid: 1+76.58 PT: 1+92.42 0+00 1+00 2+00 3+00 4+00 5+00BP: 0+00.00CBMH-103 CBMH-102 CB-101 CBMH-104 FES-701 FES-702 SMH-422SMH-421 358 LF 8" PVC @ 0.40%344 LF 8" PVC @ 0.46% 911.8 WYE = 3+23 921.8 914.9 WYE = 0+30 924.9 917.7 WYE = 1+34 927.7 911.4 WYE = 0+70 921.4 912.5 WYE = 1+69 922.5 910.4 WYE = 0+59 920.4 913.1 WYE = 1+58 923.1 910.6 WYE =2+23 920.6 912.0 WYE = 3+37 922.0 916.1 WYE = 0+49 926.1 917.5 WYE = 1+43 927.5 910 920 930 900 905 910 915 920 925 930 935 0+00 919.01919.0921.61921.61+00 922.28922.3920.66920.72+00 918.88918.9919.24919.23+00 921.89921.9924.55924.64+00 926.49926.5926.48926.55+00CBMH-103CBMH-10215"SMH-421RIM 918.06INV 909.19 (N)INV 909.29 (E)358 LF 8" PVC SDR 35 @ 0.40%SMH-422RIM 922.32INV 910.72 (W)INV 910.82 (E)CBMH-104PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS N WATERMAIN & SANITARY SEWER - STREET A - STA 0+00 TO 5+00 HYDRANT 8x6 DIP TEE 6" GV & BOX HYDRANT 8x6 DIP TEE 6" GV & BOX 8" DIP CL 52 WM SEE SHEET 260 20'40' S W S W S W S W S W S W S W S W S WSW 25 MAINTAIN 7.5' MIN. COVER DEPTH LEGEND DENOTES SANITARY SERVICE INVERT AT D&U EASEMENT 10' OUTSIDE R.O.W. DENOTES SANITARY SERVICE WYE DISTANCE FROM DOWNSTREAM MANHOLE. DENOTES FINISHED GRADE ELEVATION OF SANITARY SERVICE AT D&U EASEMENT. WYE = X+XX XXX.X XXX.X LOWER WATERMAIN TO PROVIDE VERTICAL SEPARATION FOR SANITARY SERVICE TO LOT 1 BLOCK 5SEE SHEET 23NOTE: INSULATE WATERMAIN OR WATER SERVICES WHEN SEPARATION BETWEEN STORM SEWER IS LESS THAN 36"RISER915.08" DIP CL 5 2 W M LOWER WATER SERVICE TO PROVIDE 18" MIN. SEPARATION FROM STORM SEWER AND INSULATE 2+003+005+00 6+00 7+00 8+00 9+00 10+00PC: 6+96.31PRC: 7+65.36PRC: 9+31.98CBMH-404 CBMH-405 CBMH-402 CBMH-403 CBMH-406 SMH-451 SMH-410SMH-424 SMH-411 SMH-423 917.9WYE = 12+13927.9917.7 WYE = 1+34 927.7 917.4 WYE = 1+98 927.4 916.7 WYE = 2+70 926.7 916.3 WYE = 3+29 926.3 915.6 WYE = 0+22 925.6 916.5 WYE = 1+25 926.5 917.5 WYE = 1+43 927.5 917.1 WYE = 2+10 927.1 916.0 WYE = 2+78 926.0 915.7 WYE = 0+02 925.7 915.6 WYE = 0+35 925.6 916.1 WYE = 1+31 926.1 900 910 920 930 940 890 895 900 905 910 915 920 925 930 935 940 926.48926.55+00 926.03926.0925.58925.66+00 925.12925.1924.75924.77+00 924.79924.8925.04925.08+00 925.29925.3925.49925.59+00 924.83924.8924.11924.110+00 344 LF 8" PVC SDR 26 @ 0.46%SMH-423RIM 924.74INV 912.50 (E)INV 912.40 (W)138 LF 8" PVC SDR 35 @ 0.43%SMH-424RIM 925.24INV 913.10 (W)SMH-410RIM 925.78INV 898.62 (E)INV 898.52 (N)94 LF 8" PVC SDR 26 @ 0.40%SMH-411RIM 924.25INV 899.10 (E)INV 899.00 (W)CBMH-403CBMH-404CBMH-405PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS N WATERMAIN & SANITARY SEWER - STREET A - STA 5+00 TO 10+00 HYDRANT 8x6 DIP TEE 6" GV & BOX INSULATE WM/STORM CROSSING 11.25° BEND 11.25° BEND 11.25° BEND 8" DIP CL 52 WM 8x8 DIP CROSS 8" VALVE & BOX 8" VALVE & BOX 8" VALVE & BOX 11.25° BEND SW S W S W S W S W S W S W S W S W S W S W S W SEE SHEET 25SEE SHEET 27SEE SHEET 31 FOR INFORMATION ON FAIROAKS AVENUE WATER AND SANITARY SEWER 26 0 20'40' MAINTAIN 7.5' MIN. COVER DEPTH LEGEND DENOTES SANITARY SERVICE INVERT AT D&U EASEMENT 10' OUTSIDE R.O.W. DENOTES SANITARY SERVICE WYE DISTANCE FROM DOWNSTREAM MANHOLE. DENOTES FINISHED GRADE ELEVATION OF SANITARY SERVICE AT D&U EASEMENT. WYE = X+XX XXX.X XXX.X HYDRANT 8x6 DIP TEE 6" GV & BOX NOTE: INSULATE WATERMAIN OR WATER SERVICES WHEN SEPARATION BETWEEN STORM SEWER IS LESS THAN 36" 8" DIP CL 52 WM 0+001 0 + 0 0 11 + 0 0 12+00 13+00 14+0 0 15+00PT: 13+67 .31PC: 14+62 .12 CBMH-406 CBMH-407 CBMH-203 CBMH-202 CB-201 CBMH-205 CBMH-204 STMH-608 FES-408 FES-206 FES-607 SMH-411 SMH-441 SMH-443 SMH-442 SMH-412 SMH-413 9 9 L F 8 " P V C @ 0 . 4 0% 95 L F 8 " P V C @ 0 . 4 0 % 80 LF 8" PVC @ 0.41%70 LF 8" P V C @ 0 . 4 0 % 136 L F 8" P V C @ 0. 4 0 %102 LF 8" PVC @ 0.40% 914.1 WYE = 0+53 924.1 914.5 WYE = 0 + 2 6 924.5 914.4 WYE = 0 + 6 8 924.4 915.0 WYE = 1 + 2 9 925.0 914.9 WYE = 0 + 6 0 924.9 914.9 WYE = 0 + 2 0 924.9 915.1 WYE = 0 + 3 4 925.1 914.1 WYE = 0+34 924.1 900 910 920 930 890 895 900 905 910 915 920 925 930 924.11924.110+00 923.39923.4922.68922.711+00 922.35922.4922.82922.812+00 923.43923.4923.76923.813+00 923.33923.3923.16923.214+00 923.43923.414+50CBMH-406CBMH-204CBMH-203CBMH-20299 LF 8" PVC SDR 26 @ 0.40% 95 LF 8" PVC SDR 26 @ 0.40% 60 LF 8" PVC SDR 35 @ 0.41%70 LF 8" PVC SDR 35 @ 0.40% 136 LF 8" PVC SDR 35 @ 0.40%SMH-412RIM 922.82INV 899.60 (NE)INV 899.50 (W)SMH-413RIM 922.62INV 910.64 (NE)INV 899.98 (SW)INV 900.08 (SE)SMH-441RIM 923.58INV 911.06 (N)INV 910.96 (SW)SMH-442RIM 923.50INV 911.45 (N)INV 911.34 (S)DROP INV 900.08 (NE)PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTSN WATERMAIN & SANITARY SEWER - STREET A - STA 10+00 TO 15+00 INSULATE WM/STORM CROSSING 8" 11.25° BEND 8" 11.25° BEND 11.25° BEND 11.25° BEND 11.25° BEND 8 " D I P C L 5 2 W M HYDRANT 8x6 DIP TEE 6" GV & BOX INSULATE WM/STORM CROSSING 8" DI P C L 5 2 W M 8" DIP TEE 8" VALVE & BOX8" VALVE & BOX INSULATE WM/STORM CROSSING INSULATE WM/STORM CROSSING 8" 11.25° BEND8" 11.25° BEND SEE SHEET 28SEE SHEET 26SEE SHEE T 33 27 0 20'40' S W S W S W S W S W S W S W INSTALL OUTSIDE DROP STRUCTURE PER CITY STANDARD DETAIL SS-2 LAST 20' OF PIPE BEFORE MANHOLE SHALL BE DIP MAINTAIN 7.5' MIN. COVER DEPTH LEGEND DENOTES SANITARY SERVICE INVERT AT D&U EASEMENT 10' OUTSIDE R.O.W. DENOTES SANITARY SERVICE WYE DISTANCE FROM DOWNSTREAM MANHOLE. DENOTES FINISHED GRADE ELEVATION OF SANITARY SERVICE AT D&U EASEMENT. WYE = X+XX XXX.X XXX.X 12" NOTE: INSULATE WATERMAIN OR WATER SERVICES WHEN SEPARATION BETWEEN STORM SEWER IS LESS THAN 36" 8" DIP CL 52 WM 15+00 16+0016+10PC: 14+62.12P T : 1 5 + 4 9 . 7 6 E P : 1 6 + 0 9 . 8 0 STMH-602 FES-603 SMH-444 SMH-443 102 L F 8 " P V C @ 0. 4 0 % 915.0 WYE = 0+ 3 8 925.0 915.3 WYE = 0 + 7 7 925.3 9 1 4 . 2WY E = 0 + 8 9 9 2 4 . 2 914.7WYE = 0+82924.7915.1WYE = 0+66925.1914.6 WYE = 0+27 924.6 915.0 WYE = 1+29 925.0 910 920 930 900 905 910 915 920 925 930 935 923.43923.414+50 923.71923.715+00 924.00924.016+00 16+12 102 LF 8" PVC SDR 35 @ 0.40%SMH-443RIM 923.53INV 912.09 (NW)INV 911.99 (S)SMH-444RIM 924.11INV 912.50 (SE)PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTSN WATERMAIN & SANITARY SEWER - STREET A - STA 15+00 17+00 8" 22.5° BEND HYDRANT 6" GV & BOX 6" REDUCER 8" DI P C L 5 2 W M 28 0 20'40'SEE SHEET 27S W S W S WSW S W SWSWMAINTAIN 7.5' MIN. COVER DEPTH LEGEND DENOTES SANITARY SERVICE INVERT AT D&U EASEMENT 10' OUTSIDE R.O.W. DENOTES SANITARY SERVICE WYE DISTANCE FROM DOWNSTREAM MANHOLE. DENOTES FINISHED GRADE ELEVATION OF SANITARY SERVICE AT D&U EASEMENT. WYE = X+XX XXX.X XXX.X 8" DIP CL 52 WM NOTE: INSULATE WATERMAIN OR WATER SERVICES WHEN SEPARATION BETWEEN STORM SEWER IS LESS THAN 36" 0+00 1+00 2+00 3+00 4+00 5+00CBMH-113 CBMH-114 CBMH-112 CB-111 FES-703 FES-704 SMH-403 SMH-402 309 LF 8" PVC SDR 26 @ 0.40%304 LF 8" PVC SDR 26 @ 0.40% 912.1 WYE = 1+28 922.1 910.0 WYE = 0+60 920.0 911.6 WYE = 2+24 921.6 909.5 WYE = 2+88 919.5 910.5 WYE = 1+39 920.5 910.5 WYE = 0+68 920.5 912.3 WYE = 1+40 922.3 910.3 WYE = 2+41 920.3 910.0 WYE = 0+84 920.0 911.5 WYE = 1+46 921.5 890 900 910 920 880 885 890 895 900 905 910 915 920 925 -0+50 917.00+00 918.68917.4920.01918.11+00 921.32917.8921.24914.92+00 919.65913.4917.98912.53+00 917.54911.5919.17913.54+00 920.49916.24+50CBMH-114SMH-402RIM 918.02INV 892.90 (E)INV 906.50 (S)INV 892.80 (N)INV 892.90 (W)CBMH-112CBMH-113309 LF 8" PVC SDR 26 @ 0.40%SMH-403RIM 917.75INV 894.44 (E)INV 894.13 (W)21" 48 LF 8" PVC SDR 26 @ 0.40% CAP END OF PIPE INV 893.14 PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS N WATERMAIN & SANITARY SEWER - STREET B - STA 0+00 TO 5+00 HYDRANT 8x6 DIP TEE 6" GV & BOX INSULATE WM/STORM CROSSING HYDRANT 8x6 DIP TEE 6" GV & BOX 8" DIP CL52 WM 29 0 20'40'SEE SHEET 30S W S W S W S W S W S W S W S W S W LOWER WATERMAIN TO MAINTAIN 18" MIN. VERTICAL SEPARATION LEGEND DENOTES SANITARY SERVICE INVERT AT D&U EASEMENT 10' OUTSIDE R.O.W. DENOTES SANITARY SERVICE WYE DISTANCE FROM DOWNSTREAM MANHOLE. DENOTES FINISHED GRADE ELEVATION OF SANITARY SERVICE AT D&U EASEMENT. WYE = X+XX XXX.X XXX.X 8" DIP C L 5 2 W M 6" PVC C900 FORCEMAIN NOTE: INSULATE WATERMAIN OR WATER SERVICES WHEN SEPARATION BETWEEN STORM SEWER IS LESS THAN 36"RISER909.0RISER908.0RISER911.0RISER910.0RISER910.0RISER908.0RISER908.0RISER908.0RISER909.0LOWER WATER SERVICE TO PROVIDE 18" MIN. SEPARATION FROM STORM SEWER AND INSULATE 5+00 6+00 7+00 7+9 4 CB-301 CBMH-306 CBMH-304 CBMH-302 CBMH-303 SMH-404 SMH-405 SMH-406 910.5 WYE = 1 + 3 9 920.5 913.4 WYE = 2 + 1 8 923.4 913.7 WYE = 0 + 3 0 923.7 911.5 WYE = 1 + 4 6 921.5 913.0 WYE = 2 + 1 2 923.0 913.5 WYE = 0 + 0 3 923.5 912.9 WYE = 0 + 5 7 922.9 900 910 920 930 890 895 900 905 910 915 920 925 930 920.49916.24+50 921.44918.35+00 922.36917.4922.69916.66+00 922.13915.4921.48914.17+00 920.91913.98+00 304 LF 8" PVC SDR 26 @ 0.40%SMH-404RIM 922.61INV 895.74 (E)INV 895.64 (W)SMH-405RIM 921.40INV 896.22 (NE)INV 896.11 (W)91 LF 8" PVC SDR 26 @ 0.40% 75 LF 8" PVC SDR 26 @ 0.39%CBMH-303CBMH-304SMH-406PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS N WATERMAIN & SANITARY SEWER - STREET B - STA 5+00 TO 7+79 8" DI P C L 5 2 W M 22.5° DIP BEND 11.25° DIP BEND 11.25° DIP BEND 30 0 20'40'SEE SHEET 29S W S W S W S W S W S W LEGEND DENOTES SANITARY SERVICE INVERT AT D&U EASEMENT 10' OUTSIDE R.O.W. DENOTES SANITARY SERVICE WYE DISTANCE FROM DOWNSTREAM MANHOLE. DENOTES FINISHED GRADE ELEVATION OF SANITARY SERVICE AT D&U EASEMENT. WYE = X+XX XXX.X XXX.X S W SEE SHEET 32NOTE: INSULATE WATERMAIN OR WATER SERVICES WHEN SEPARATION BETWEEN STORM SEWER IS LESS THAN 36"RISER909.0RISER910.0RISER912.0RISER911.0RISER912.0RISER910.0 |9+00PRC: 9+31.98 CBMH-404 CBMH-405 EX SMH SMH-451 SMH-410 SMH-424 SMH-409 SMH-408 SMH-407 917.9 WYE = 1+24 927.9 919.4 WYE = 0+61 929.4 915.5 WYE = 0+24 925.5 WYE = 0 + 0 6 924.2 913.3 WYE = 0 + 3 4 923.3 915.8 WYE = 0 + 3 5 925.8 1+00 2+00 3+00 4+00 5+00 900 910 920 930 940 890 895 900 905 910 915 920 925 930 935 940 929.50+50 929.01930.71+00 928.03928.9927.06927.22+00 926.08926.2925.72926.13+00 926.14925.7925.74923.64+00 924.92921.6924.10917.35+00 923.28915.45+50 132 LF 8" PVC SDR 35 @ 0.40% 62 LF 8" PVC SDR 26 @ 0.40%SMH-408RIM 923.96INV 897.46 (S)INV 897.36 (NW)64 LF 8" PVC SDR 26 @ 0.40%SMH-409RIM 925.01INV 897.82 (S)INV 897.72 (N)173 LF 8" PVC SDR 26 @ 0.41%SMH-410RIM 925.78INV 898.62 (E)INV 898.52 (N)SMH-451RIM 926.69INV 917.23 (S)EX SMHRIM 929.23INV 916.70 (N)24" RCP PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTSN WATERMAIN & SANITARY SEWER - FAIROAKS AVENUE - STA 0 TO 5+00 8" DIP CL52 WM CONNECT TO EX. WM 8" GV & BOX 11.25° DIP BEND 11.25° DIP BEND 11.25° DIP BEND INSULATE WM/STORM CROSSING CONNECT TO EXISTING SANITARY STUB INV 916.75 HYDRANT 8x6 DIP TEE 6" GV & BOX 8x8 DIP CROSS 8" VALVE & BOX 8" VALVE & BOX 8" VALVE & BOX SEE SHEET 320 20'40' 31 LOWER WATERMAIN TO MAINTAIN 18" MIN. VERTICAL SEPARATION SW SW SW S W S W SEE SHEET 26 FOR INFORMATION ON STREET A WATERMAIN AND SANITARY SEWER MAINTAIN 7.5' MIN. COVER DEPTH LOWER WATERMAIN TO MAINTAIN 18" MIN. VERTICAL SEPARATION LEGEND DENOTES SANITARY SERVICE INVERT AT D&U EASEMENT 10' OUTSIDE R.O.W. DENOTES SANITARY SERVICE WYE DISTANCE FROM DOWNSTREAM MANHOLE. DENOTES FINISHED GRADE ELEVATION OF SANITARY SERVICE AT D&U EASEMENT. WYE = X+XX XXX.X XXX.X 8" DIP CL52 WM NOTE: INSULATE WATERMAIN OR WATER SERVICES WHEN SEPARATION BETWEEN STORM SEWER IS LESS THAN 36"RISER913.0RISER914.0RISER912.0 913.8BOX7915.1BOX77+007+946+00 7+00 8+00 9+00 10 + 0 0PT: 6+47 .36PC: 6+64 .30PT: 9+50.32CB-301 CBMH-306 CBMH-304 CBMH-307 CBMH-302 CBMH-303 CBMH-312 CB-310 CBMH-311 SMH-407 SMH-405 SMH-406 SMH-431 SMH-432 SMH-433 SMH-434 911 . 3 WY E = 0 + 1 1 921 . 3 910 . 7 WY E = 0 + 2 1 920 . 7 910 . 0 WY E = 0 + 0 3 920 . 0 914.2 WYE = 0+06 924.2 6+00 7+00 8+00 9+00 10 + 0 0 900 910 920 930 890 895 900 905 910 915 920 925 930 923.28915.45+50 922.46914.46+00 921.64914.0920.98914.27+00 920.65915.4920.36914.98+00 920.08914.5919.79914.89+00 919.51916.0919.22917.610+00 10+50SMH-433RIM 919.90INV 908.14 (N)INV 908.04 (S)65 LF 8" PVC SDR 35 @ 0.40%SMH-432RIM 920.28INV 907.78 (N)INV 907.68 (SE)64 LF 8" PVC SDR 35 @ 0.40%SMH-431RIM 920.64INV 907.42 (NW)INV 907.31 (SE)58 LF 8" PVC SDR 35 @ 0.40%SMH-406RIM 921.30INV 907.00 (NW)INV 896.51 (SW)INV 896.61 (SE)101 LF 8" PVC SDR 26 @ 0.39%SMH-407RIM 922.93INV 897.11 (SE)INV 897.01 (NW)CB-301CBMH-303CBMH-304CBMH-307CBMH-312CBMH-311CBMH-30277 LF 8" PVC SDR 35 @ 0.40% 26 LF 8" PVC SDR 35 @ 0.40%SMH-434RIM 919.44INV 908.45 (S)INV 908.55 (N)DROP INV 896.61 (NW)PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTSN8" DIP C L 5 2 W M INSULATE WM/STORM CROSSING STUB WM FOR FUTURE CONNECTION 8" DIP PLUG HYDRANT 8x6 DIP TEE 6" GV & BOX 8x8 DIP TEE 8" VALVE & BOX 8" VALVE & BOX 8" VALVE & BOX 11.25° DIP BEND 11.25° DIP BEND 11.25° DIP BEND 11.25° DIP BEND 11.25° DIP BEND 11.25° DIP BEND 11.25° DIP BEND S W S W S W SW INSTALL OUTSIDE DROP STRUCTURE PER CITY STANDARD DETAIL SS-2 MAINTAIN 7.5' MIN. COVER DEPTH 0 20'40' 32 WATERMAIN & SANITARY SEWER - FAIROAKS AVENUE - STA 5+00 TO 10SEE SHEET 31LEGEND DENOTES SANITARY SERVICE INVERT AT D&U EASEMENT 10' OUTSIDE R.O.W. DENOTES SANITARY SERVICE WYE DISTANCE FROM DOWNSTREAM MANHOLE. DENOTES FINISHED GRADE ELEVATION OF SANITARY SERVICE AT D&U EASEMENT. WYE = X+XX XXX.X XXX.X NOTE: INSULATE WATERMAIN OR WATER SERVICES WHEN SEPARATION BETWEEN STORM SEWER IS LESS THAN 36" HYDRANT 8x6 DIP TEE 6" GV & BOX RISER913.0 0 + 0 0 1+00 2+00 2+1712+00CBMH-203 CB-502 CBMH-205 CBMH-204 CBMH-504 CBMH-503 STMH-608 FES-206 FES-505 SMH-413 SMH-414 SMH-415 0 + 0 0 1+00 2+00 2+17 900 910 920 930 890 895 900 905 910 915 920 925 930 -2.02% -0.50%922.60921.90+00 921.83924.0921.58927.51+00 921.34924.7921.09921.22+00 2+18SMH-413RIM 922.62INV 910.64 (NE)INV 899.98 (SW)INV 900.08 (SE)SMH-414RIM 921.54INV 900.61 (E)INV 900.51 (NW)SMH-415RIM 921.06INV 901.00 (W)INV 901.10 (E)96 LF 8" PVC @ 0.41% 107 LF 8" PVC @ 0.40% 12 LF 8" PVC @ 0.42%CBMH-504PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS N WATERMAIN & SANITARY SEWER - STREET C - STA 0 TO 3+00 11.25° DIP BEND 8" DIP CL 52 WM STUB WM FOR FUTURE CONNECTION 8" DIP PLUG INSTALL AIR-RELEASE SYSTEM PER CITY DETAIL HU-W-6 11.25° DIP BEND 11.25° DIP BENDSEE SHEET 27STUB SANITARY SEWER FOR FUTURE CONNECTION 8" PVC CAP 0 20'40' 33SW8" DIP CL 52 WM BASEMENT FLOOR 3' HOLD DOWN AT SETBACK GFE 2:1 FINISHED GRADE 25'25'27' 10' SUITABLE BEARING SOIL (TYP.) ENGINEERED FILL1:11: 1 SUITABLE BEARING SOIL (TYP.) ENGINEERED FILL PER GRADING PLAN 13'14' ENGINEERED FILL 18' CL ROADWAY R.O.W 3' HOLD DOWN ELEVATION TO MATCH LOW FLOOR ELEVATION UNLESS OTHERWISE NOTED BEGIN HOLD DOWN AT D AND U EASEMENT 10' 27'25'25' BEGIN HOLD DOWN D AND U EASEMENT 3' HOLD DOWN AT SETBACK 2: 1 FINISHED GRADE BASEMENT FLOOR SUITABLE BEARING SOIL (TYP.) ENGINEERED FILL 1:1 1: 1 SUITABLE BEARING SOIL (TYP.) ENGINEERED FILL PER GRADING PLAN 18' 13'14' ENGINEERED FILL CL ROADWAY R.O.W GFE 3' HOLD DOWN ELEVATION TO MATCH LOW OPENING ELEVATION UNLESS OTHERWISE NOTED CONTINUE 2' HOLD DOWN THROUGHOUT HOUSE PAD AREA D AND U EASEMENT (TYP) FFEGFE BASIN HOLD DOWN D AND U EASEMENT 10' 27'25'25'15'2' HOLDDOWN AT SETBACK BASEMENT FLOOR 13'14' SUITABLE BEARING SOIL (TYP.) ENGINEERED FILL1:11 : 1 SUITABLE BEARING SOIL (TYP.) ENGINEERED FILL PER GRADING PLOT ENGINEERED FILL CL ROADWAY R.O.W 3' PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS GRADING DETAILS 34 1 34 FULL BASEMENT (FB) NTS 2 34 LOOK OUT (LO) NTS 3 34 WALK OUT (WO) NTS 27' 15' 2% R/W R/W SEE DETAIL 6, TYPICAL PAVEMENT SECTION SURMOUNTABLE C&G 27' 15' 2% 6' BOULEVARD 5' CONC. WALK 54' ROW 4%2% SEE GRADING PLAN BEYOND R/W GRADE VARIES SEE GRADING P L A N 27' 15' 2% R/W R/W SEE DETAIL 6, TYPICAL PAVEMENT SECTION SURMOUNTABLE C&G 27' 15' 2% 8' BITUMINOUS TRAIL 4.5' BOULEVARD 54' ROW 2% 1' OFF R/W 4% 1.2' OFFSET 17.17' 2% R/W SEE DETAIL 6, TYPICAL PAVEMENT SECTION B618 CONCRETE C&G 17.17' 2% 12.5' BOULEVARD 6' CONC. WALK R/W 90' ROW 12.5' BOULEVARD 10' BITUMINOUS TRAIL VARIES VARIES 3:1 MAX -2%3%3%2% 27' 15' 2% R/W R/W SEE DETAIL 6, TYPICAL PAVEMENT SECTION SURMOUNTABLE C&G 27' 15' 2% 54' ROW 6' BOULEVARD -2% 5' CONC. WALK 3:1 MAX 3:1 MA X 3' BOULEVARD 27' 15' 2% R/WR/W SEE DETAIL 6, TYPICAL PAVEMENT SECTION SURMOUNTABLE C&G 27' 15' 2% 8' BITUMINOUS TRAIL 4.5' BOULEVARD 54' ROW 2% 1' OFF R/W 4% 1.2' OFFSET PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS DETAIL A 1 1 2" TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,C) SPWEA240C (PG 58-28), MNDOT 2360 2357 BITUMINOUS TACK COAT 2 1 2 " TYPE SP 12.5 BITUMINOUS NON-WEARING COURSE MIXTURE (2,C) SPWEB230C (PG58-28), MNDOT 2360 8" AGGREGATE BASE (CLASS 5 OR SALVAGED/RECYCLED MATERIAL MEETING CLASS 5 GRADATION), MNDOT 3138 24" SELECT GRANULAR EMBANKMENT, MNDOT 3149 MINIMUM PAVEMENT DESIGN STANDARD: ACTUAL PAVEMENT DESIGN SHALL BE BASED ON SUBGRADE SOIL R VALUE AND PROJECTED ESAL (TRAFFIC) 12" APPROVED SUBGRADE 1 35 STREET SECTION - STREET A, STREET B NTS TYPICAL PAVEMENT SECTIONS 35 2 35 STREET SECTION - FAIROAKS AVE NTS 3 35 STREET SECTION - ONEKA PARKWAY NTS 4 35 STREET SECTION - STREET A, STREET B (WETLAND SECTION) NTS 5 35 STREET SECTION - STREET A STA 9+22 TO 11+53, STREET C NTS 6 35 TYPICAL PAVEMENT SECTION NTS PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS DETAILS 36 PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS DETAILS 37 PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS DETAILS 38 PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS DETAILS 39 PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS DETAILS 401 C16 FILTRATION BASIN - TYP SECTION NTS 4:1 SLOPE MAX FILTRATION MEDIA MPCA MIX TYPE C 12"4" PERF. HDPE 1 4" WASHED PEA GRAVEL 4: 1 S L O P E M A X 3 : 1 S LOPE MAX 6" CLAY LINER 12" TOPSOIL POND BOTTOM SEE GRADING PLAN EXTEND CLAY LINER A MINIMUM OF 1FT ABOVE NORMAL WATER LEVEL 10' 10:1 SAFETY BENCH NORMAL WATER LEVEL SEE GRADING PLAN INTAKE PIPE FOR IRRIGATION PUMPS INTAKE INVERT SEE GRADING PLAN 2 C16 STORMWATER POND - TYPICAL SECTION NTS HAALA PS60-72S SKIMMER GRATE 12" RCP INLET 12" RCP OUTLET KEYED PRECAST WEIR SEE WEIR SECTION FOR MORE INFO 60" 1 C16 POND OUTLET STRUCTURE - POND 1 & 2 NTS 60" WEIR SECTION PROVIDE PRECAST WEIR WALL WITH ORIFICE MANHOLE SECTION WEIR ORIFICE POND 1 - 10" DIA - INV=911.50 POND 2 - 8" DIA - INV=917.00 TOP OF WEIR WALL POND 1 = 913.50 POND 2 = 919.90 POND 1 INV=908.00 POND 2 INV=915.00 POND 1 INV=911.40 POND 2 INV=917.00 POND 1 RIM=914.00 POND 2 RIM=920.00 GEOTEXTILE FABRIC ||90 918.9 MAP8 919.4 ASH7919.2 ASH7919.1 ASH14 930.3ASH10930.5ASH12930.4 ASH10-2 930.6 OAK15 911.9 WIL8 WETLAND WETLAND ||90 918.9 MAP8 919.4 ASH7919.2 ASH7919.1 ASH14 930.3ASH10930.5ASH12930.4 ASH10-2 930.6 OAK15 911.9 WIL8 WETLAND WETLAND TOT LOT BENCH, TYP. 6' WALK TRASH 1 Qb 1 CA2 1 Uw 1 Co 1 Uw 1 Tr 1 Qr 1 CA2 1 Qb 1 Qr 1 Qr 1 Co 1 Tr 1 Uw 1 CA2 1 Co 1 Qr 1 CA2 1 CA2 1 Tr 1 Co 1 CA2 1 Qr 1 Co 1 Co 1 Tr 1 Uw 1 Qb 1 Qb 1 CA2 1 Qr 1 Tr 1 Uw 1 CA2 1 Qb 1 Co 1 Tr 1 Co 1 Uw 1 CA2 1 Qr 1 Qb Qr 1 Co 1 Qb 1 1 Co 1 Qb CA2 1 Tr 1 1 Tr Co 1 1 Tr Qr 1 Tr 1 Uw 1 Tr 1 1 CA2 1 Qb 1 CA2 CA2 1 Qb 1 1 Qr 1 Co Qr 1 Uw 1 Qb 1 Tr 1 Qr 1 Qr 1 Co 1 1 Co1 Tr 1 Qr Tr 1 1 Tr 1 Uw 1 CA2 1 Co 1 Qb Qr 1 1 Qr 1 CA2 1 Uw 1 Uw 1 Qb 1 CA2 1 Qr 1 Co 1 Tr 1 Qb 1 Co 1 CA2 1 CA2 1 Qr 1 Uw Qb 1 1 Qr 1 Co 1 CA2 1 CA2 1 Uw 1 Qb 1 Qb 1 Tr 1 Uw 1 CA2 1 Co 1 Co 1 CA2 1 Tr 1 Pd1 Qb 1 Pd Pd 1 Ab 3 Ab 2 Qr 1 Co 1 2 Pn 1 Qb Uw 3 Uw 1 Tr 1 1 Uw 1 Qb Qb 1 Co 1 1 Qr 1 Uw Pd 1 1 Qr PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS N 0 50'100' LANDSCAPE PLAN 41 CODE REVIEW 1.TWO OVERSTORY DECIDUOUS SHADE TREES SHALL BE IN THE FRONT YARD OF EACH HOME SITE. 39 3 39 2 39 1 LEGEND PROPERTY LIMITS CONSTRUCTION LIMITS ADJACENT PROPERTY BUILDING SETBACKS PARKING SETBACK DRAINAGE AND UTILITY EASEMENT PROPOSED CONCRETE C&G PROPOSED TREE PROPOSED SHRUB SHREDDED HARDWOOD MULCH NC 17 SP 1 SP 1 PP 3 ET 5 ET 5 NC 17 SP 1 SP 1 PP 3 ET 5 ET 5 NC 17 ET 5 ET 5 SP 1 NC 17 ET 5 ET 5 SP 1 SP 1 PP 3 SP 1 PP 3 4 SP 16 NC 8 ET 8 FE 15 FE 27 CA SP 4 NC 16 ET 8 FE 8 FE 15 CA 27 LEGEND PROPERTY LIMITS CONSTRUCTION LIMITS ADJACENT PROPERTY BUILDING SETBACKS PARKING SETBACK DRAINAGE AND UTILITY EASEMENT PROPOSED CONCRETE C&G PROPOSED SHRUB SHREDDED HARDWOOD MULCH PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS LANDSCAPE 42 SCALE:1 SOUTH ENTRANCE PLANT BEDS 1" = 10'SCALE:2 NORTH ENTRANCE PLANT BEDS 1" = 10'SCALE:3 TOT LOT PLANT BEDS 1" = 10' STREET A STREET B STREET BFAIROAKS AVEONEKA PKWY NONEKA PKWY NNNN ENLARGEMENTS PLANT BED EDGER SEE DETAIL 2/40 PLANT BED EDGER SEE DETAIL 2/40 PLANT BED EDGER SEE DETAIL 2/40 PLANT BED EDGER SEE DETAIL 2/40 PLANT BED EDGER SEE DETAIL 2/40 PLANT BED EDGER SEE DETAIL 2/40 PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS LANDSCAPE 43 SCALE:1 SHRUB PLANTING DETAIL N.T.S. DETAILS MIN. 6" LAWN SURFACE UNDISTURBED OR COMPACTED SOIL PLANTING SOIL LINE OF PLANTING PIT WHEN PLANTED INDIVIDUALLY UNDISTURBED OR COMPACTED SOIL 3" DEPTH SHREDDED HARDWOOD MULCH PAVED SURFACE, IF APPLICABLE NOTE: -3" DP. SHREDDED HARDWOOD MULCH SHALL BE USED IN ALL LANDSCAPE PLANTINGS AREAS AND UNDER TREES ISOLATED FROM PLANTING AREAS UNLESS IDENTIFIED OTHERWISE. -MULTI-STEM TREES SHALL NOT RECEIVE STAKING. THEY SHALL CONFORM TO ALL OTHER DECIDUOUS TREE PLANTING REQUIREMENTS. 2"12"-18"CENTER TREE IN HOLE, UPRIGHT SINGLE STRAIGHT LEADER TREE TIE SECURED TO STAKE. SECURE TO TREE WITH ANTI-CHAFFING MATERIAL. ALLOW FOR MOVEMENT OF TREE. WRAP TREE WITH TREE WRAPPING MATERIAL AS SPECIFIED TO 1ST BRANCH LAWN OR PLANTING BED EDGE (SPADE EDGE IN ALL LAWN AREAS) 6" MIN. DIA. EARTH SAUCER (2) TREE STAKES DRIVEN A MIN. 2' BELOW GRADE (NW & SW) 3" DEPTH HARDWOOD MULCH 3" HEIGHT TAMPED WATER BASIN AT EDGE OF EARTH SAUCER FINISHED GRADE REMOVE BURLAP, TWINE, ROPE AND WIRE FROM TOP HALF OF ROOTBALL PLANTING SOIL MOUND MIN. 6" UNDISTURBED OR COMPACTED SOIL AFTER EXPOSING TREE ROOT FLAIR, PLANT SO ROOT FLAIR IS AT 2" ABOVE ADJACENT FINISH GRADE NORTHWEST PREVAILING WINDS SOUTHEAST PREVAILING WINDS TREE TIE SECURED TO STAKE. SECURE TO TREE WITH ANTI-CHAFFING MATERIAL. ALLOW FOR MOVEMENT OF TREE. (2) TREE STAKES DRIVEN A MIN. 2' BELOW GRADE (NW & SE) PLAN VIEW OF TREE STAKING NOT TO SCALE 3 X ROO T B A L L HARDWOOD MULCH LAWN 2" NOTE: -3" DP. SHREDDED HARDWOOD MULCH SHALL BE USED IN ALL LANDSCAPE PLANTINGS AREAS AND UNDER TREES ISOLATED FROM PLANTING AREAS UNLESS IDENTIFIED OTHERWISE. UNDISTURBED OR COMPACTED SOIL PLANTING SOIL MOUND MIN. 6" REMOVE BURLAP, TWINE, ROPE AND WIRE FROM TOP HALF OF ROOTBALL FINISHED GRADE LAWN OR PLANTING BED EDGE (SPADE EDGE IN ALL LAWN AREAS) 6' MIN. DIA. EARTH SAUCER 3" HEIGHT TAMPED WATER BASIN AT EDGE OF EARTH SAUCER TREE TIE SECURED TO DUCKBILL ANCHOR WITH TURNBUCKLE. SECURE TO TREE WITH ANTI-CHAFFING MATERIAL. ALLOW FOR MOVEMENT OF TREE. 3" DEPTH HARDWOOD MULCH SINGLE STRAIGHT LEADER CENTER TREE IN HOLE, UPRIGHT AFTER EXPOSING TREE ROOT FLAIR, PLANT SO ROOT FLAIR IS AT 2" ABOVE ADJACENT FINISH GRADE NORTHWEST PREVAILING WINDS SOUTHEAST PREVAILING WINDS PLAN VIEW OF TREE STAKING NOT TO SCALE 3 X ROO T B A L L HARDWOOD MULCH LAWN TREE TIE SECURED TO DUCKBILL ANCHOR WITH TURNBUCKLE. SECURE TO TREE WITH ANTI-CHAFFING MATERIAL. ALLOW FOR MOVEMENT OF TREE. LAWN PLANTING BE D BOUNDARY BETWEEN LAWN AND PLANTING AREA AS SHOWN ON PLAN BLACK PLASTIC LANDSCAPE EDGING 5" WIDE, 1" V-HOOK AT BASE AND 1" DIA. BEAD ON TOP 9" MIN. LANDSCAPE EDGING STAKE 45° EVERY 5' 3" DP. MULCH PLANTING SOIL SUBGRADE 6" DEEP SHOVEL CUT NOTE: -FOR MULTIPLE PIECES OF EDGING, CONNECT WITH 6" MIN. PLUG. STAKE EACH SIDE OF THE EDGING 12" MAX FROM THE POINT OF CONNECTION. 45° SCALE:2 PLANT BED EDGER DETAIL N.T.S. SCALE:3 DECIDUOUS TREE PLANTING DETAIL N.T.S. SCALE:4 EVERGREEN TREE PLANTING DETAIL N.T.S. TREES CODE QTY COMMON / BOTANICAL NAME CONT CAL Ab 6 BALSAM FIR B&B 6` HT. ABIES BALSAMEA CA2 23 AMERICAN HORNBEAM B&B 2 - 1/2" CAL. CARPINUS CAROLINIANA Co 23 COMMON HACKBERRY B&B 2 - 1/2" CAL. CELTIS OCCIDENTALIS Pd 5 BLACK HILLS WHITE SPRUCE B&B 6` HT. PICEA GLAUCA 'DENSATA' Pn 3 AUSTRIAN PINE B&B 6` HT. PINUS NIGRA Qb 22 SWAMP WHITE OAK B&B 2 - 1/2" CAL. QUERCUS BICOLOR Qr 23 RED OAK B&B 2 - 1/2" CAL. QUERCUS RUBRA Tr 20 REDMOND AMERICAN LINDEN B&B 2 - 1/2" CAL. TILIA AMERICANA 'REDMOND' Uw 21 NEW HORIZON ELM B&B 2 - 1/2" CAL. ULMUS JAPONICA X PUMILA 'NEW HORIZON' SHRUBS CODE QTY COMMON / BOTANICAL NAME CONT SIZE CA 54 TINY TORTUGA TURTLEHEAD POT 1 GAL. CHELONE OBLIQUA 'ARMTIPP02' TM ET 56 KISMET YELLOW CONEFLOWER POT 1 GAL. ECHINACEA X 'TNECHKY' TM FE 46 ELIJAH BLUE FESCUE POT 1 GAL. FESTUCA GLAUCA 'ELIJAH BLUE' NC 100 CATMINT POT 1 GAL. NEPETA FAASSENII PP 12 DWARF MUGO PINE POT 5 GAL. PINUS MUGO 'PUMILIO' SP 16 PRAIRIE PETITE COMMON LILAC POT 3 GAL. SYRINGA VULGARIS 'PRAIRIE PETITE' PLANT SCHEDULE GENERAL LANDSCAPE NOTES PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS LANDSCAPE 44 DETAILS 1.LANDSCAPE CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO SUBMITTING A BID TO BECOME COMPLETELY FAMILIAR WITH SITE CONDITIONS. 2.ALL ROUGH AND FINISH GRADING TO BE DONE BY OTHERS. 3.NO PLANTING SHALL BE INSTALLED UNTIL ALL GRADING, BUILDING, CONSTRUCTION & UTILITY WORK HAS BEEN COMPLETED IN THE AREAS TO BE PLANTED. 4.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY ALL UNDERGROUND CABLES, CONDUITS, WIRES, ETC., ON THE PROPERTY. 5.IF THERE IS A DISCREPANCY BETWEEN THE NUMBER OF PLANTS SHOWN ON THE PLAN AND THE NUMBER OF PLANTS SHOWN IN THE PLANT LIST, THE NUMBER OF PLANTS SHOWN ON THE PLAN WILL TAKE PRECEDENCE. 6.ALL PROPOSED PLANT MATERIAL SHALL BE LOCATED CAREFULLY AS SHOWN ON THE PLAN. IF THE CONTRACTOR BELIEVES AN ERROR HAS BEEN MADE REGARDING SPACING OR LOCATION OF THE PLANT MATERIAL INDICATED ON THE PLAN, NOTIFY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. 7.THE CONTRACTOR IS RESPONSIBLE FOR COMPLETE MAINTENANCE OF THE PLANT MATERIAL (WATERING, SPRAYING, FERTILIZING, MOWING, ETC.) UNTIL THE WORK HAS BEEN ACCEPTED, BY THE OWNER. 8.THE CONTRACTOR IS RESPONSIBLE FOR ALL REPAIRS TO PROPERTY DAMAGE FROM PLANTING OPERATIONS AT NO COST TO THE OWNER. 9.ALL NEWLY PLANTED PLANT MATERIAL SHALL BE GUARANTEED THROUGH ONE CALENDAR YEAR STARTING FROM THE DATE OF ACCEPTANCE ESTABLISHED BY THE OWNER. 10.THE CONTRACTOR SHALL MEET WITH THE OWNER OR OWNERS REPRESENTATIVE ON SITE WHEN THEY FEEL THE PROJECT IS COMPLETE ACCORDING TO THE CONTRACT DOCUMENTS. IF ALL WORK IS SATISFACTORY AND COMPLETE ACCORDING TO THE CONDITIONS OF THE CONTRACT DOCUMENTS, THEN THE OWNER MUST DECLARE THE PROJECT COMPLETE. THIS DECLARATION WILL CONSTITUTE AS THE BEGINNING OF THE ONE (1) YEAR WARRANTEE PERIOD FOR ALL PLANT MATERIAL. THE OWNER SHALL PROVIDE A LETTER WITH SIGNATURE STATING THE DATE OF ACCEPTANCE. 11.WIND BURN OR OTHERWISE DAMAGED PLANT MATERIAL WILL NOT BE ACCEPTED. 12.THE PRACTICE OF STAKING SHOULD NOT ALLOW NAILS, SCREWS, WIRES, ETC. TO PENETRATE THE OUTER SURFACE OF THE TREES. 13.THE CONTRACTOR WILL BE RESPONSIBLE FOR THE REMOVAL OF ALL TREE STAKES, GUYS, STRAPS AND TRUNK PROTECTION MEASURES FOLLOWING THE COMPLETION OF THE WARRANTEE PERIOD OR AS DIRECTED BY THE OWNER. 14.LANDSCAPE CONTRACTOR IS REQUIRED TO PROVIDE THE OWNER WITH MAINTENANCE INFORMATION DURING THE GUARANTEE PERIOD RELATING TO WATERING, FERTILIZING, PRUNING, PEST CONTROL, AND RELATED ITEMS. THIS WILL BE PREPARED AND DELIVERED TO THE OWNER AFTER PROVISIONAL INSPECTION APPROVAL HAS BEEN GIVEN BY THE OWNER AND/OR LANDSCAPE ARCHITECT. 15.INSTALL CORRUGATED PLASTIC TREE GUARDS, WHITE IN COLOR, WITH THE SIZE OF TUBE 1" DIA. (MIN.) LARGER THAN THE CALIPER OF THE TREE TO BE PROTECTED. 16.CONTRACTOR TO FURNISH & STALL PLASTIC EDGING AS SHOWN ON THE PLANS & DETAILS. PLASTIC EDGING SHALL BE MEDIUM DENSITY POLYETHYLENE WITH U.V. INHIBITOR, BLACK IN COLOR, WITH A TOTAL DEPTH OF 5” (1” DIA. TOP AND 4” SHAFT WITH 1.5” V EVERY 3-1/2 FEET OF EDGING. 17.LANDSCAPE BED MULCH SHALL BE SHREDDED HARDWOOD MULCH. MULCH SHALL BE INSTALLED AT A DEPTH OF 3" WITH NO WEED BARRIER LANDSCAPE FABRIC. 18.3" DEPTH SHREDDED HARDWOOD MULCH SHALL BE INSTALLED UNDER ALL TREES AND SHRUBS THAT ARE ISOLATED FROM GROUNDCOVER AREAS AND GENERAL SHRUB MASSES. 19.CALIPER OF TREES UP TO AND INCLUDING 4" SHALL BE MEASURED AT 6" ABOVE GROUND LEVEL, AND 12" ABOVE GROUND LEVEL FOR LARGER SIZES. 20.FOR BALLED & BURLAP PLANT MATERIAL, REMOVE THE TOP HALF OF THE BURLAP FROM THE ROOT BALL. WIRE CAGES, STRAPS, ETC. SHALL BE REMOVED FROM THE TOP HALF OF THE ROOTBALL BEFORE INSTALLATION. 21.ALL CONTAINER MATERIAL SHALL HAVE BEEN GROWN IN CONTAINER FOR A MINIMUM OF 6 MONTHS PRIOR TO INSTALLATION. 22.SHRUBS AND GROUNDCOVER SHALL BE PLANTED A MINIMUM OF ONE HALF THEIR ON-CENTER SPACING FROM PAVING EDGE UNLESS OTHERWISE NOTED. 23.DECIDUOUS SHRUBS SHALL HAVE MINIMUM OF FIVE (5) CANES AT SPECIFIED HEIGHT UNLESS OTHERWISE NOTED IN PLANT SCHEDULE. 24.ALL PERENNIAL BEDS TO RECEIVE ROCK MULCH SHALL HAVE LANDSCAPE FABRIC INSTALLED WITH HOLES FOR PLANTS CUT 2.5 TIMES THE DIAMETER OF THE CONTAINER. 25.ANNUALS TO BE PLANTED NO LATER THAN 15 JUNE AS PER PLAN. ANY ANNUAL PLANTING DONE AFTER JUNE 15 MUST HAVE PLANT MATERIAL APPROVED BY OWNER / LANDSCAPE ARCHITECT. 26.LANDSCAPE CONTRACTOR SHALL PROVIDE AND INSTALL NURSERY GROWN PLANT MATERIAL CONFORMING TO THE REQUIREMENTS AND RECOMMENDATIONS OF THE LATEST EDITION OF ANSI Z60.1 STANDARDS UNLESS OTHERWISE NOTED IN THE PLANS OR SPECIFICATIONS. PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS ONEKA PARKWAY - CROSS SECTIONS FINISHED GRADE (TYP) EXISTING GRADE (TYP) 45 K:\021158-000\Admin\Permits\21.26 Goodview Estates\CombinedUpdatedApp\Memo - Hugo City Council - 21.26GoodviewEstates_Replacement and Sequencing Approval_053023.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Memorandum To: Tom Weidt, City of Hugo Mayor Becky Petryk, City of Hugo Council Member Phil Klein, City of Hugo Council Member David Strub, City of Hugo Council Member Mike Miron, City of Hugo Council Member CC: Rachel Juba, Community Development Director From: Tony Havranek, WSB Date: May 30, 2023 Re: City Project No. 21.26- Goodview Estates, Wetland Replacement Plan Amendment I have drafted this memo regarding a MN Joint Application Form for Activities Affecting Water Resources in Minnesota to impact additional wetland areas associated with the Goodview Estates Project. Hugo City Council approved a wetland replacement plan for the project on August 1, 2022. This approval included impacts to 0.53 acres of wetland and required replacement with wetland bank credits using wetland bank #1722 which is in the same major watershed and bank service area. Additional design requirements for storm water and lot size resulted in an additional 0.11 acres of wetland since the original approval. MN Rule 8420.0255 required a new application and subsequent notice of application and decision as the new impacts: •Increased by more than 10% •Were part of a different wetland, and •Were more than 500 feet from the location of the previously approved wetland impacts Proposed impacts are within relatively low quality wetlands and the application satisfies requirements under the wetland conservation act (WCA). The Hugo WCA Technical Evaluation Panel (TEP) have not provided comments or a recommendation to date, but the application was discussed at a TEP meting held on April 28, 2023, at which no recommendation was made to deny. Based on the application materials submitted by the applicant and subsequent review of those materials against MN Rule 8420, the Wetland Conservation Act (WCA), the applicant has met all of the rule requirements for wetland impact sequencing and replacement. I recommend approval of this application for wetland impacts sequencing and replacement. G.19 Hugo City Council May 30, 2023 Page 2 K:\021158-000\Admin\Permits\21.26 Goodview Estates\CombinedUpdatedApp\Memo - Hugo City Council - 21.26GoodviewEstates_Replacement and Sequencing Approval_053023.docx Attachments: Goodview Estates Wetland Impact Figure showing previously approved wetland impacts and proposed 123456789101112131415161312111098765417123121234567891012345672456789OUTLOTA81OUTLOTBWETLAND B0.38-ACRE IMPACTWETLAND C0.05-ACRE IMPACTWETLAND F 0.17-ACRE IMPACTWETLAND G0.05-ACRE IMPACTCULVERTREPLACEMENTCULVERTREPLACEMENTNO IMPACT(WETLAND A)241312 Agenda Number: G.20 CITY OF HUGO PLANNING AND ZONING APPLICATION STAFF REPORT TO: Bryan Bear, City Administrator FROM: Max Gort, Associate Planner SUBJECT: Benjamin and Kindra Lesnau – Encroachment agreement to allow a sport court within a drainage and utility easement on property located at 16212 Empress Avenue North. DATE: June 7th, 2023 for the City Council meeting of June 12, 2023 ZONING: Planned Unit Development (PUD) LAND USE: Low Density Residential (LD) 60-DAY REVIEW DEADLINE: August 5, 2023 1.DESCRIPTION OF REQUEST: The applicant has requested an encroachment agreement to allow construction of a sport court within a drainage and utility easement on property located at 16212 Empress Avenue North. The Senior Engineering Technician has reviewed the location of the sport court and is comfortable with the request. 2.CONCLUSION/RECOMMENDATION: Staff has reviewed the request and recommends that the City Council approve the encroachment agreement for the property located at 16212 Empress Avenue North. ATTACHMENTS: 1.Location Map 2.Encroachment Agreement Resolution 3.Encroachment Agreement 4.Survey Document Path: S:\Mapping\Site Maps\2023 Site Maps\8,5x11_portraitborder Date Saved: 6/7/20230 5025 Feet¯16212 Empress Ave N. Location Map Hugo, Minnesota Parcel Boundary selection Parcel Boundary Roads 1 in = ~81 feet RESOLUTION 2023-XX APPROVING AN ENCROACHMENT AGREEMENT TO ALLOW CONSTRUCTION OF A SPORT COURT AND CONCRETE WITHIN A DRAINAGE AND UTILITY EASEMENT ON THE PROPERTY LOCATED AT 16212 EMPRESS AVENUE NORTH WHEREAS, an application has been filed by Benjamin and Kindra Lesnau that requests approval of an encroachment agreement to allow construction of a sport court within a drainage and utility easement on the property located at 16212 Empress Avenue North, legally described as follows; Lot 3, Block 5, Oneka Place 4th Addition, Washington County, Minnesota WHEREAS, the City Council has fully considered the request for the encroachment agreement. NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF HUGO, MINNESOTA, that it should and hereby does approve the encroachment agreement on property located at 16212 Empress Avenue North. ADOPTED by the City Council this 12th day of June, 2023. ________________________________________ Tom Weidt, Mayor ATTEST: _________________________________ Michele Lindau, City Clerk ENCROACHMENT AGREEMENT THIS AGREEMENT is made this 12th day of June, 2023 by and between the CITY OF HUGO, a Minnesota municipality (hereinafter “City”) and, Benjamin and Kindra Lesnau (hereinafter “Owners”), and their successors in title. WHEREAS, the City has an easement for drainage and utility purposes (the “Easement”) along the westerly, northerly, and easterly portion of the Owner’s property, which is legally described as: Lot 3, Block 5, Oneka Place 4th Addition, Washington County, Minnesota; and, WHEREAS, Owner is desirous of constructing a sport court and concrete partially within the easement area; and, WHERAS, the City will permit the placement of a sport court and concrete in the area described herein subject to the terms and conditions hereof. NOW, THEREFORE, in consideration of the premises and for good and valuable consideration, the receipt of which is acknowledged, the City will permit the encroachment on its easement as set forth herein and subject to the conditions set forth below: 1.Owner and their successors in title may install and maintain a sport court and concrete within the Easement, and the sport court and concrete shall be constructed in accordance with the plans on file with the City of Hugo. 2.No plantings, trees, permanent improvements or structures other than the sport court and concrete may be maintained or placed in the easement area. 3.Owner shall maintain the sport court and concrete in good repair and shall not permit it to be expanded, lengthened or to impair the City’s easement or its rights thereunder in any respect. 4.The encroachment granted to Owner herein is subject to the existing easement rights of the City as granted in various easements. 5.The City will notify Owner if it requires removal or relocation of the sport court and/or concrete or any part of it. Thereafter, Owner shall remove the sport court and/or concrete according to the direction of the City and if Owner fails to do so, the City may enter upon the land and remove as much of the sport court and/or concrete as required and cast it upon the adjoining lands. In such an event, the City shall not be liable to Owner for any costs, loss or damage whatsoever, and may assess the property for all of its costs incurred in removing the sport court and/or concrete, and Owner waive all formalities, requirements and defenses arising from or relating to Minnesota Statutes Section 429 relating to or arising from the work done by the City. 6.To the fullest extent permitted by law, Owner agrees to release, defend, protect, indemnify, save and hold harmless the City, its agents, directors, employees, shareholders and contractors against any and all claims, costs and liabilities, including the costs of defense for damages, injury or death arising from or in any way connected to the installation, maintenance, repair, removal and/or presence of the sport court and/or concrete, regardless of whether such harm is to Owner, the City, the employees or officers, guests or invitees of either or any other person or entity, except Owner shall not be liable under this paragraph for loss or damage to the extent resulting from the negligence of the indemnified parties. 7.The permission granted herein is limited exclusively to the proposed sport court and concrete within the specified portion of the easement area of the City’s Easement. Owner shall not alter the grade or permit such alteration anywhere upon the land upon which the City has reserved its easement rights without proper express written consent of the City. 8.Owner shall, at all times, use their best efforts to conduct all of their activities on said Easement in such a manner as to not interfere with or impede the operation of the City’s Easement and related activities in any manner whatsoever, and shall follow the direction of the City. 9.This Agreement shall run with the land and inure to the benefit and be binding upon the parties hereto, their heirs, successors and assigns. 10.Owner shall be responsible for the costs of recording this Agreement with the Washington County Recorder. WHEREUPON, the parties have set their hands this day of , 2023. CITY OF HUGO By By Tom Weidt, Mayor Michele Lindau, City Clerk STATE OF MINNESOTA ) ) ss. COUNTY OF WASHINGTON) On this _____ day of __________________, 2023, before me, a Notary Public, personally appeared TOM WEIDT and MICHELE LINDAU, of the City of Hugo, a Minnesota municipality within the State of Minnesota, and that said instrument was signed on behalf of the City of Hugo by the authority of the City Council of the City of Hugo, and TOM WEIDT and MICHELE LINDAU acknowledge said instrument to be the free act and deed of said City of Hugo. __________________________________________ Notary Public Benjamin Lesnau, Owner _____________________________________ Kindra Lesnau, Owner STATE OF MINNESOTA ) ) ss. (Individual Notary) COUNTY OF WASHINGTON) On this _____ day of __________________, 2023, before me, a Notary Public, personally appeared Benjamin and Kindra Lesnau, a married couple, who signed the foregoing instrument and acknowledged said instrument to be his free act and deed. __________________________________________ Notary Public THIS INSTRUMENT DRAFTED BY: David K. Snyder Johnson & Turner, P.A. 56 East Broadway Avenue, Suite 206 Forest Lake, MN 55025 (651) 464-7292 K:\019275-000\Admin\Meeting\Council Meeting\061223 approve plans authorize AFB\LTR - Approve Plans and Specifications and Auth AFB.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM June 6, 2023 Honorable Mayor and City Council City of Hugo 14669 Fitzgerald Avenue North Hugo, MN 55038 Re: TH 61 & 159th Street Reconstruction SP 8206-53 Approve Plans and Specifications and Authorize the Advertisement for Bids WSB Project No. 019275-000 Dear Mayor and Council, Previously the Council had authorized staff to prepare plans and specifications for TH 61 & 159th Street Reconstruction. The TH 61 & 159th Street Reconstruction project consists of the following: The City has collaboratively worked with the development team for the Shores of Oneka Lake regarding access to TH 61. The developer is responsible for costs associated with the construction of the roundabout and have prepared pans that are currently in the final review stages with the Minnesota Department of Transportation. MNDOT does not allow a developer to lead a project of this nature on their highway system coupled with the successful Local Partnership Program Grant the City received for this project totaling $710,000 that requires this to be a City led project. The City will be required to publicly bid the project. The development agreement for this project outlines cost responsibilities indicating the development is responsible for all costs excluding the $710,000 grant received from MNDOT. Staff recommends approval of the resolution approving plans and specifications and authorizing advertisement for bids for TH 61 & 159th Street Reconstruction. If you have any questions or items you wish to discuss, you can contact me at 612.360.1278. Sincerely, WSB Mark Erichson, PE Director of Municipal Program Delivery Attachment cc: Bryan Bear, City Administrator, City of Hugo Scott Anderson, Public Works Director, City of Hugo Liz Finnegan, Senior Engineering Technician, City of Hugo S:\Office_SHARED\Resolutions\2023 Resolutions\2023- Approve Plans Specs for Roundabout.docx RESOLUTION NO. 2023- A RESOLUTION APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING ADVERTISEMENT FOR BIDS TH 61 & 159TH STREET RECONSTRUCTION WHEREAS, The City has collaboratively worked with the development team for the Shores of Oneka Lake regarding access to TH 61. The developer is responsible for costs associated with the construction of the roundabout and have prepared pans that are currently in the final review stages with the Minnesota Department of Transportation. MNDOT does not allow a developer to lead a project of this nature on their highway system coupled with the successful Local Partnership Program Grant the City received for this project totaling $710,000 that requires this to be a City led project. The City will be required to publicly bid the project. The development agreement for this project outlines cost responsibilities indicating the development is responsible for all costs excluding the $710,000 grant received from MNDOT. Staff is recommending approval of the plans and specifications and Authorizing the advertisement for bids. The project is intended to be completed this construction season NOW THEREFORE BE IT RESOLVED BY THE COUNCIL OF THE CITY OF HUGO: 1. Such plans and specifications, a copy of which is on file at City Hall, are hereby approved. 2. The City Clerk shall prepare and cause to be inserted in the official City newspaper and the Finance and Commerce an advertisement for bids upon the making of such improvement under such approved plans and specifications. 3. The advertisement shall be published in each of said publications at least once not less than three (3) weeks before the date set for opening bids, shall specify the work to be done, and shall state that bids will be received on-line through QuestCDN vBid™ until the date and time set for opening bids. Immediately following expiration of the time for receiving bids, representatives of the City of Hugo will publicly view at an online bid opening meeting. Any bidder whose responsibility is questioned during consideration of the bid will be given an opportunity to address the Council on the issue of responsibility. No bids will be considered unless accompanied by a bid security in an amount of 5 percent of the bidder’s maximum bid price. This resolution was adopted by the City Council of the City of Hugo on the 12th day of June 2023, by a vote of Ayes and Nays. ________________________ Tom Weidt, Mayor ATTEST: ___________________________________ Michele Lindau, City Clerk K:\021811-000\Admin\Meeting\Council Meeting\061223 approve plans authorize AFB\LTR - Approve Plans and Specifications and Auth AFB.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM June 6, 2023 Honorable Mayor and City Council City of Hugo 14669 Fitzgerald Avenue North Hugo, MN 55038 Re: Lift Station No. 12 Approve Plans and Specifications and Authorize the Advertisement for Bids WSB Project No. 021811-000 Dear Mayor and Council, Previously the Council had authorized staff to prepare plans and specifications for the Lift Station No. 12. Lift Station No. 12 will be a new sanitary lift station located on the east side of the extension of Oneka Parkway approximately 550 feet south of 165th Street. It will initially serve the Oneka Prairie residential development and eventually other sanitary sewer extensions to the west, north, and east. The lift station includes buried precast concrete structures, submersible pumps, flow meter, valves, piping, controls, and site work. Plans and Specifications have been prepared for the Lift Station No. 12 and are ready to be advertised for bidding. Staff is requesting approval of the plans and specifications for the project and authorization to advertise for bids. Staff will place the advertisement for bids which is required to run for a minimum of 21 days. Plans and Specifications are available for your review at City Hall. Consideration of awarding a construction contract will occur at a future City Council meeting. Staff recommends approval of the resolution approving plans and specifications and authorizing advertisement for bids for Lift Station No. 12. If you have any questions or items you wish to discuss, you can contact me at 612.360.1278. Sincerely, WSB Mark Erichson, PE Director of Municipal Program Delivery Attachment cc: Bryan Bear, City Administrator, City of Hugo Scott Anderson, Public Works Director, City of Hugo Liz Finnegan, Senior Engineering Technician, City of Hugo S:\Office_SHARED\Resolutions\2023 Resolutions\2023- Approve Plans Specs for Lift Station No. 12.docx RESOLUTION NO. A RESOLUTION APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING ADVERTISEMENT FOR BIDS LIFT STATION NO. 12 WHEREAS, pursuant to direction by the Council, WSB has prepared plans and specifications for Lift Station No. 12 and has presented such plans and specifications to the Council for approval; NOW THEREFORE BE IT RESOLVED BY THE COUNCIL OF THE CITY OF HUGO: 1. Such plans and specifications, a copy of which is on file at City Hall, are hereby approved. 2. The City Clerk shall prepare and cause to be inserted in the official City newspaper and the Finance and Commerce an advertisement for bids upon the making of such improvement under such approved plans and specifications. 3. The advertisement shall be published in each of said publications at least once not less than three (3) weeks before the date set for opening bids, shall specify the work to be done, and shall state that bids will be received on-line through QuestCDN vBid™ until the date and time set for opening bids. Immediately following expiration of the time for receiving bids, representatives of the City of Hugo will publicly view at an online bid opening meeting. Any bidder whose responsibility is questioned during consideration of the bid will be given an opportunity to address the Council on the issue of responsibility. No bids will be considered unless accompanied by a bid security in an amount of 5 percent of the bidder’s maximum bid price. This resolution was adopted by the City Council of the City of Hugo on the 12th day of June 2023, by a vote of Ayes and Nays. ________________________ Tom Weidt, Mayor ATTEST: ___________________________________ Michele Lindau, City Clerk SOLAR ENERGY SYSTEMS ORDINANCE 2016-47523-XXX CITY OF HUGO WASHINGTON COUNTY, MN ORDINANCE RELATING TO AND REGULATING ACCESSORY SOLAR ENERGY SYSTEMS AND SOLAR FARMS TITLE: An ordinance adding and amending Chapter 90, Article I, Sec. 90-1. – Definitions, Chapter 90, Article IV - Zoning District Regulations, and Chapter 90, Article VI- Requirements for Specific Uses and Performance Standards. SOLAR ENERGY SYSTEMS ORDINANCE: Chapter 90, Article I, Sec. 90-1. – Definitions Add the following: Accessory Solar Energy Systems means a solar energy system that is composed of a single or multiple solar panels where the system is deemed accessory to the primary land use. An accessory solar energy system is intended to primarily reduce on-site consumption of utility power for an active existing use/structure. Excess electrical power generated and not presently needed for on-site use may be provided to the utility company. Ground Mounted Solar Energy System means a solar energy system that is structurally mounted to the ground, generally upon a pole or rack mount. A ground mounted system may be a fixed or tracking system. Roof Mounted Solar Energy System means a solar energy system that is structurally mounted to the roof of a structure. These systems are generally affixed with a racking system and may be flush or angled. Solar Access means unobstructed access to the solar resource on a lot or building, including access across adjacent parcel air rights, for the purpose of capturing direct sunlight to operate a solar energy system. Solar Array means a group of solar panels wired together. Solar Energy Easement means an easement that limits the height or location, or both, of permissible development on the burdened land in terms of a structure or vegetation, or both, for the purpose of providing access for the benefited land to wind or sunlight passing over the burdened land. Solar Energy System means a system whose primary purpose is to harvest energy by transforming solar energy into another form of energy or transferring heat from a collector to another medium using mechanical, electrical, or chemical means. Solar Farm means a solar energy system that is composed of multiple solar panels where the primary land use, whether by footprint or visual impact or both, of the parcel is for a solar array. A solar farm produces energy for wholesale to subscribers. I.3 Ordinance 2016-475 Solar Energy Solar Hot Water System means a system that heats or preheats water for building heating systems or other hot water needs, including residential domestic hot water and hot water for commercial processes. Solar Panel means a panel designed to absorb the sun’s rays as a source of energy for generating electricity or heating. Solar Resource means a view of the sun from a specific point on a lot or building that is not obscured by any vegetation, building, or object for a minimum of four hours between the hours of 9:00 AM and 3:00 PM Standard time on any day of the year. Chapter 90, Article IV – Zoning District Regulations Add from Sec. 90-93. – Long term agricultural district (LA) through Sec. 90-110 – Future central business district (FCB) (d) Conditional uses / Interim uses. and (d)(#) Solar energy systems (refer to section 90-278). Chapter 90, Article VI – Requirements for Specific Uses and Performance Standards Add Sec. 90 – 278. – Solar energy systems. (a) Unlawful unless conditions met. It is unlawful for any person to construct, erect, install, or maintain a solar energy system in the city, except in conformance with this section. (b) Purpose and intent. The purpose of this section is to allow for the generation of renewable energy within the City of Hugo. Promoting the safe, effective, and efficient use of solar energy, may reduce the onsite consumption of fossil fuels and utility-supplied electric energy while avoiding adverse impacts on the community at large. (c) General standards for all solar energy systems. Solar energy systems must conform to all of the following standards: (1) A building permit shall be required for the erection of solar energy system. Prior to the issuance of a building permit, the operator must provide evidence of an agreement with the local utility. Off-grid systems shall be exempt from providing evidence of an agreement with the local utility. (2) It shall be the responsibility of the property owner to secure any solar energy easements, if applicable, to protect solar access for the system (as per MN Statute Section 500.30). (3) Solar energy system components shall be labeled with the manufacturers name and address, model number, and serial number. (4) All exterior electrical or other service lines shall be buried underground. The collection system may be placed overhead near substations or points of interconnection to the electrical grid. Exceptions may be granted in instances where shallow bedrock, water courses, or other elements of the natural landscape interfere with the ability to bury lines. (5) All solar energy systems shall be in compliance with the adopted City and State building code, electrical code, and plumbing code, as amended and receive any necessary permits or approvals from any regulatory agency having jurisdiction. Ordinance 2016-475 Solar Energy (d) Solar farms. (1) Solar farm interim use permits. An interim use permit application must be submitted for approval by the Planning Commission and City Council before a permit is issued for a solar farm. The information required and the procedure to be followed for all solar farm interim use permit applications shall be the same as that required for a conditional use permit set forth in subsections 90-37(a) and (b). In addition, the applicant shall submit supplementary information pertaining to the nature of the solar farm including: a. Total square footage of the solar energy system. b. Total energy production for the site. c. To scale horizontal and vertical (elevation) drawings. d. Drawings must show the location of the system on the property including the property lines and proposed fencing or vegetative buffer. e. Decommissioning plan. (2) Performance standards for solar farms. Solar farms shall be erected and maintained to meet the following standards. a. Solar farms shall be located on a minimum lot size of 10 acres within the Long Term Agricultural (LA), Agricultural (AG), Rural Residential (RR), and Future Urban Service (FUS) zoning districts. Solar farms may also be located in any other zoning district only in the floodplain, as long as all other conditions are met. b. Solar farms shall be 50 100 feet from all property lines, 200 feet from all and public road rights-of-way, and 200 feet any principle structure on adjacent properties. c. Solar farms shall be limited to a size of 5 acres, measured by the exterior edges of the solar array. dc. Ground mounted solar energy systems shall not exceed 15 feet in height at any point when oriented at maximum tilt. ed. Solar farms shall be enclosed by approved perimeter fencing or adequate vegetative buffer for screening. The primary form of buffer for screening shall be at least 6-foot tall vegetation. Exception may be granted if the natural landscape provides screening from all public right of ways and neighboring properties. f. All ground areas within the perimeter fencing of a solar farm that are not occupied by equipment or access paths shall be planted with deep rooted, native pollinator plantings. g. Solar farm applications shall include a vegetation establishment and management plan which shall be reviewed and approved by staff. he. The owner/ operator of the solar farm shall provide the City with evidence that the solar energy system is functioning properly. This shall be provided at any time deemed necessary by the City. Ordinance 2016-475 Solar Energy if. The owner/operator shall submit a decommissioning plan for the solar farm to ensure that the owner/operator properly removes the equipment and facilities upon the end of the project life, abandonment, expiration, or termination of the interim use permit. If the solar energy system remains nonfunctional or inoperative for a continuous period of 12 months, the system shall be deemed abandoned and shall constitute a public nuisance. The owner shall remove the abandoned system at their expense after a demolition permit has been obtained within 90 days after notice has been given. Removal includes the entire structure including transmission equipment, structures and foundations, and the restoration of soil and vegetation. The owner/operator shall provide a current-day decommissioning cost estimate, and shall post financial security in a form acceptable by the City. This estimate must include an inflationary escalator, in an amount determined by the City, which will allow the City to remove the solar farm from the property after the 90-day period has elapsed. (3) Criteria of approval of a solar farm. An application for a solar farm interim use permit may be granted only upon finding that all of the following criteria have been met: a. The applicant owns the property or has secured a proper lease agreement on the property, unless the City Council determines that unique conditions or circumstances warrant special arrangement. b. The proposed solar farm is allowed as a principle use in the respective zoning district and conforms to this chapter. c. The proposed solar farm is keeping with the spirit and intent of this chapter. d. The construction of a solar farm shall not impede the City’s ability to implement its comprehensive plan. e. The proposed solar farm is compatible with the present character of the surrounding area. f. The proposed solar farm shall have a set date in which the permit shall be reviewed or terminated. g. The proposed solar farm shall be subject to any conditions that the City Council deems appropriate for the permission of the use. (4) Conditions of approval. In permitting a new solar farm interim use permit or amending an existing solar farm interim use permit, the Planning Commission may recommend and the City Council may impose additional conditions and requirements to protect the health, safety, and welfare of the surrounding area and the community at large, mitigate unfavorable consequences of activities resulting from the solar farm, enforce laws and regulations, and ensure compliance with the conditions of the permit. These conditions may include, but are not limited to, the following: a. Limitations on period of use and operation. b. Buffering and screening measures. Ordinance 2016-475 Solar Energy c. Approval periods between one to twenty-five years.Additional setbacks. d. Approval periods between one to twenty-five years. (5) Renewal of a solar farm interim use permit. Because of its temporary nature, an interim use permit for a solar farm shall not be renewed. Continuation of a solar farm beyond the date of expiration of its interim use permit requires approval of a new interim use permit. (6) Interim use permit nontransferable. Solar farm interim use permits do not run with the land. The permit is not transferable from person-to-person, and shall expire if there is a change in ownership of the property, unless the following conditions are met: a. The new permit holder must own the property or have a written lease agreement with the property owner stating the land will continue to be used for the production of energy via a solar farm. b. The new permit holder shall abide by all requirements of the original permit, including, but not limited to, posting financial security to the City for decommissioning, as outlined in subsection 2 (f). c. The transfer of the permit must be approved by the city and filed accordingly. (7) Basis for denial. In order to recommend denial of an interim use permit, the Planning Commission must find that the proposed use will not meet one or more of the conditions found in subsection (3) of this section. (8) Suspension and revocation. a. The City Council may suspend or revoke an interim use permit upon failure of the interim use, or the interim use permit holder, owner, operator, tenant, or user, to comply with City Codes, the laws of the State of Minnesota, the approved plans, or the conditions of approval, or by which that activities allowed under the permit adversely affect the public health, safety, or welfare. b. A suspension or revocation of an interim use permit shall be preceded by written notice to the permit holder and a hearing before the city council. The notice shall provide at least ten days’ notice of the time and place of the hearing and shall state the nature of the violations. The notice shall be mailed to the permit holder at the most recent address listed on the application. (9) Expiration and termination. An interim use permit shall expire and the interim use permit shall terminate at the earlier of: a. The expiration date established by the City Council at the time of approval, but in no case more than 25 years from the date of approval. b. Occurrence of any event identified in the interim use permit for the termination of the use. c. Upon an amendment to the City Code that no longer allows the interim use. (10) Issuance of permit. The Community Development Director or designee shall, within ten days of City Council approval of any interim use permit, provide one copy of the Ordinance 2016-475 Solar Energy completed permit to the applicant, the City Clerk, and for permits issued in the floodplain district or shoreland district, to the Commissioner of the Department of Natural Resources. (e) Accessory Solar Energy Systems (1) Accessory solar energy systems building permit. A building permit application must be submitted and approved by the Building Official before an accessory solar energy system is installed. The information required and the procedure to be followed for all accessory solar energy system applications shall be the same as that required for a building permit. In addition, the applicant shall submit supplementary information pertaining to the nature of the accessory solar energy system including: a. Total square footage of the solar energy system. b. Total energy production for the site. c. To scale horizontal and vertical (elevation) drawings. d. Drawings must show the location of the system on the building or on the property including the property lines and proposed screening, if required. (2) Accessory commercial or industrial solar energy systems building permit. All commercial or industrial solar energy systems will require submittal for approval by the Community Development Director or designee before a permit is issued for any accessory solar energy system. This submittal process will require the same application and supplementary information required in e (1). Denial of a building permit request may be appealed to the Planning Commission by following the procedures outlined in 90-37.1. (3) Performance standards for accessory solar energy systems. Accessory solar energy systems shall be erected and maintained to meet the following standards. a. Setbacks for accessory solar energy systems are as follows: 1. Ground or pole mounted solar energy system panels shall conform to all setback requirements for accessory uses in the district in which they are located. 2. Roof mounted solar energy systems shall abide by all manufacturer specifications and requirements. b. Coverage requirements for accessory solar energy systems are as follows: 1. Ground mounted solar energy systems are considered accessory structures. The size of the system (sq. ft.) will be calculated as part of the maximum combined number and size of accessory structures allowed by lot size. The number and size of accessory structures permitted are as follows: Lot size Maximum number of accessory structures allowed Maximum combined size of accessory structures (square feet) Ordinance 2016-475 Solar Energy Under 1.5 acre 1 260 1.5 to 2.99 acres 2 1,500 3 to 4.99 acres 2 2,000 5 to 9.99 acres 2 3,500 10 or more acres 3 5,000 2. Roof mounted systems are not accessory structures and are excluded from size and number calculations for accessory structures. 3. A variance application may be submitted if the ground mounted solar energy system exceeds the limits for maximum combined size of accessory structures, but does not meet the definition of a solar farm. c. Height requirements for accessory solar energy systems are as follows: 1. Ground or pole mounted solar energy systems shall not exceed 15 feet in height when oriented at maximum tilt. 2. Roof mounted solar energy systems shall not project vertically more than the height requirements of the district in which they are located. d. Screening requirements for accessory solar energy systems are as follows: 1. Residential roof mounted solar energy systems are not required to be screened by this ordinance. 2. Commercial or industrial roof mounted solar energy systems shall be installed such that it is compatible with the building architecture. Architectural standards as found in the commercial and industrial guidelines, a PUD, or other architectural conditions shall apply. e. Except in the agricultural and long-term agricultural zoning districts, no ground or pole mounted solar energy system shall be located or protrude in front of the principle building on the site, in relation to any public street. f. Roof mounted solar energy systems shall not extend beyond the perimeter of the building on which the system is mounted or built. Exterior piping for solar hot water systems shall be allowed to extend beyond the perimeter of the building. g. If the solar energy system remains nonfunctional or inoperative for a continuous period of 12 months, the system shall be deemed abandoned and shall constitute a public nuisance. The owner shall remove the abandoned system at their expense Ordinance 2016-475 Solar Energy within 90 days. Removal includes the entire structure including transmission equipment, structures and foundations, and the restoration of soil and vegetation. (4) Criteria for approval of an accessory commercial or industrial solar energy system. An application for an accessory commercial or industrial solar energy system permit may be granted only upon a finding that all the following criteria have been met: a. The applicant owns the property or has a leasing contract with the owner of the property. b. The proposed solar energy system conforms to this chapter. d. The proposed solar energy system shall be subject to, by agreement with the property owner or lease holder, any conditions that the City deems appropriate for permission of the use. Passed and adopted by the City Council of the City of Hugo this 4th day of January, 2016. ___________________________ Tom Weidt, Mayor Attest: __________________________ Michele Lindau, City Clerk CITY OF HUGO COUNTY OF WASHINGTON ORDINANCE NO. 2023-______ AN INTERIM ORDINANCE EXTENDING A TEMPORARY MORATORIUM ON NEW DEVELOPMENT OF SOLAR FARM SOLAR ENERGY SYSTEMS AND DIRECTING A STUDY TO BE CONDUCTED NOW, THEREFORE, the City Council of the City of Hugo does ordain: SECTION 1. BACKGROUND. WHEREAS, the City Council adopted an Ordinance 2016-475 SOLAR ENERGY SYSTEMS on January 4, 2016; WHEREAS, the Planning Commission and City Council have adopted goals for 2023 to review and study the Solar Energy Systems ordinance in regards to Solar Farms to ensure the ordinance adequately addresses the public health, safety and general welfare of the community; WHEREAS, the City has determined that a study shall be conducted to review the ordinance to determine whether to revise or add any regulation or restrictions, including siting and location of use, performance standards, and screening of Solar Farms. WHEREAS, the City has determined that the section of the ordinance regarding Accessory Solar Energy Systems adequately addresses the public health, safety, and general welfare of the community, and are exempt from the moratorium. Such systems are for accessory use and predominantly serve on-site users. WHEREAS, to provide adequate time for study, analysis, and the finalization of City Code amendments regarding Solar Farms or to preserve the status quo within the City, the City desires to enact an interim ordinance on the applications for and the issuance of permits for Solar Farms. WHEREAS, pursuant to Minn. Stat. § 462.355, subd. 4, the City is authorized to enact by ordinance a moratorium to regulate, restrict or prohibit any use within the jurisdiction to protect the public health, safety, and welfare. Specifically, the City is authorized to enact a moratorium ordinance to allow it to undertake a study to determine whether to revise or add any regulations or restrictions, including siting and location of use, performance standards, and screening of Solar Farms. WHEREAS, on February 6, 2023, the City Council adopted an interim Ordinance #2023-522 to place a moratorium on solar farm solar energy systems. WHEREAS, Ordinance #2023-522 is set to expire August 6, 2023. Ordinance 2023- ____ Page 2 of 3 WHEREAS, the ordinance review committee has been studying the ordinance and needs additional time to hold a public hearing on the proposed ordinance revisions. SECTION 2. FINDINGS. 1. The City Council finds there is a need to study the Solar Farm section of the ordinance to determine whether to revise or add any regulations or restrictions, including siting and location of use, performance standards, and screening of Solar Farms. This ordinance does not have an effect of imposing limitations or restrictions to the application of Accessory Solar Energy Systems. 2. The study will address issues including, but not limited to the following: 1) The particular districts and locations such use shall be allowed; 2) The concentration and density of such uses in the City; 3) Performance standards for such uses in the City; and; 3) The effects of such uses on other uses and the surrounding area. 3. The study will allow the City Council to determine the appropriate changes, if any, that it should make to City ordinances. 4. The City Council, therefore, finds that there is a need to adopt a City-wide moratorium of the applications for and the issuance of permits for Solar Farms. SECTION 3. MORATORIUM. 1. No individual, establishment, organization, or business may apply for applications for approval or the issuance of permits for Solar Farms for six (6) months from August 6, 2023. 2. No application or permit of any kind, by any individual, establishment, organization, or businesses involved in Solar Farms within the City of Hugo shall be accepted, considered, or issued for six (6) months from August 6, 2023. 3. Planning or zoning applications related to Solar Farms or applications from individuals, establishments, organizations, or businesses involved in Solar Farms within the City of Hugo shall not be accepted, considered, or issued for six (6) months from August 6, 2023. SECTION 4. STUDY. The City Council directs City staff to study the Solar Farm section of the ordinance to determine whether to revise or add any regulations or restrictions, including siting and location of use, performance standards, and screening of Solar Farms. Upon completion of the study, the City Council, together with such commission as the City Council deems appropriate, or as may be required by law, will consider the advisability of adopting new ordinances or amending its current ordinances. SECTION 5. ENFORCEMENT. The City may enforce this Ordinance by mandamus, Ordinance 2023- ____ Page 3 of 3 injunctive relief, or other appropriate civil remedy in any court of competent jurisdiction. The City Council hereby authorizes the City Administrator, in consultation with the City Attorney, to initiate any legal action deemed necessary to secure compliance with this Ordinance. A violation of this Ordinance is also subject to the City’s general penalty in City Code § Sec. 1 - 18 subd. (b). SECTION 6. TERM. Unless earlier rescinded by the City Council, the moratorium established under this Ordinance shall remain in effect until six (6) months from August 6, 2023, at which point, it will automatically expire. SECTION 7. EFFECTIVE DATE. This Ordinance shall be in full force and effect from and after its passage by the City Council. This ordinance is effective upon adoption. ADOPTED by the City Council this 12th day of June, 2023 ______________________________ Tom Weidt, Mayor ATTEST: _____________________________ Michele Lindau, City Clerk G:\.Clients All\Hugo\Proposals\North Star Wetland Bank\Prospectus\PROPOSAL_North Star Wetland Bank Prospectus - 052323.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM May 23, 2023 Shayla Denaway City of Hugo 14669 Fitzgerald Ave N Hugo, MN 55038 Re: Proposal to Develop North Star Wetland Bank Prospectus Dear Shayla Denaway: WSB is providing this proposal to develop a prospectus (concept plan) for the North Star Wetland Bank based on the previously submitted draft prospectus completed in May 2023 and reviewed by the Technical Evaluation Panel (TEP) and Interagency Review Team (IRT). The IRT provided the following essential comments on the draft prospectus. Below each comment is the site investigation necessary to address these: 1. Comment: It is possible that broader regional issues, beyond the sponsor’s control, are affecting water levels on this site. Looking at well data in Attachment D the sponsor needs to consider how blocking the relatively shallow ditches on this site is expected to restore the historical and natural hydrology regime. Many wells are far beyond the expected drainage effect of the relatively shallow ditches, yet they show a water table much lower than would be expected. The historical hydrology regime would likely have a water table within 12 inches of the surface well into the growing season if not throughout the growing season. If regional factors beyond the sponsor’s control are affecting site hydrology and hydrology performance standards cannot be achieved then wetland bank credits cannot be released, regardless of projections in the Mitigation Plan. The sponsor is assuming that regional issues beyond their control are not a prevailing factor and this site’s shallow ditches are having a significant drainage effect several hundred feet away. Action: Discussion during the TEP meeting on April 28, 2023 with the city water resources engineers indicated that the sub-watershed provides adequate amounts of water to the site. It was noted that the 2022 growing season was dry and well data may not be representative of the site under normal conditions as well. During a site visit on May 25, 2023, we saw surface water around 6-12 inches in all of the ditches on site. Monitoring wells have been installed for the 2023 growing season and we will continue monitoring to get additional data on the subsurface water level. G:\.Clients All\Hugo\Proposals\North Star Wetland Bank\Prospectus\PROPOSAL_North Star Wetland Bank Prospectus - 052323.docx 2. Comment: Multiple wetland delineations have been completed on the site and these delineation results contradict credit estimations provided in the Draft Prospectus. While a degraded wetland is present, there is no delineation confirming that areas adjacent to ditches are fully drained and non-wetland. Therefore, there is no justification for 100 percent Re-establishment credit as suggested. Action: Existing wetland delineations were completed at the edges of the wetland complex. No investigation has been conducted around the linear ditches or throughout the middle of the complex. Additional delineation will need to be completed throughout the site to determine whether the areas adjacent to the ditches have retained wetland characteristics. The results of the wetland delineation of the interior of the site will determine whether Restoration or Enhancement credits are to be pursued. 3. Comment: The drainage present appears to be modest, with most ditches two feet or less deep. This suggest the extent of hydrology degradation caused by the ditches (and therefore restoration potential) is significantly less than shown in the Draft Prospectus. If no drain tile is found a more appropriate hydrology restoration zone would be limited only to corridors along ditches being disabled. Areas beyond this relatively narrow drainage effect corridor would not be eligible for Restoration credit (Re-establishment or Rehabilitation) but could be eligible for Enhancement credit. Action: There may be locations within the property that enhancement credit will be requested, but not the whole property. We need to complete a level 2 delineation to determine the actual existing wetlands within the entire project limits because the previous delineations only demarked external boundaries. With the new 2023 hydrology monitoring data, we’ll have a better idea of the scope and effect of the existing ditches. During site visit on May 25, 2023, we identified areas of spoil piles that will be defined in level 2 delineation as upland that we will propose to remove for restoration credit. 4. Comment: Hydrology monitoring should be continued (possibly expanded) to document baseline hydrology information in the beginning of the growing season and to help the sponsor write appropriate hydrology performance standards for this partially drained existing wetland. Hydrology information provided only documented mid-summer to fall hydrology conditions. Action: Wells have been installed on site for the 2023 growing season. 5. Comment: If the federal Enhancement credit action is used, the sponsor will face significant challenges when controlling the monotypic reed canary grass areas and other non-native or invasive species. Successfully controlling reed canary grass, and other species, on a site this large and achieving acceptable native- dominated plant community performance standard will be extremely difficult and resource intensive, both in the short- and long-terms. Significant site preparation and management work will be required, supplemental native seeding may be G:\.Clients All\Hugo\Proposals\North Star Wetland Bank\Prospectus\PROPOSAL_North Star Wetland Bank Prospectus - 052323.docx grass, and other species, on a site this large and achieving acceptable native- dominated plant community performance standard will be extremely difficult and resource intensive, both in the short- and long-terms. Significant site preparation and management work will be required, supplemental native seeding may be required, a detailed vegetation establishment and management plan will need to be developed and implemented, and a detailed and fully funded long-term management plan to sustain a native-dominated plant community into the future should also be required. There are other similar Enhancement wetland bank projects in this area that provide vegetation establishment and management plan examples for the short term, vegetation enhancement performance standard examples that could be used, and long-term management plans and funding mechanisms that could be adapted by the bank sponsor if they choose to proceed. This enhancement work will be very resource intensive, success is not guaranteed, a suitable funding mechanism should be established, and vegetation improvements must be sustained long into the future and after annual monitoring is completed. Action: During the soil investigation site visit on May 25, 2023, it was noted that there are numerous areas dominated with native species and the site is not monotypic for reed canary grass. A multi-year vegetation management plan will be developed during the prospectus phase including steps to control nuisance vegetation and to establish native cover. If Enhancement credit is to be pursued, the city will need to discuss a funding mechanism for long-term vegetation maintenance. Project tasks within this scope include: 1. Project management 2. Topographic Survey with 2-person Survey Crew 3. NHIS and SHPO Data Review Requests 4. Additional Existing Vegetation Survey 5. CAD Based Concept Plans (60%) 6. Draft Conservation Easement Description/Title Review/Exhibit 7. Hydrologic and Hydraulic Analysis 8. Prospectus Document Report and Application Submittal 9. TEP/IRT Meeting 10. Prospectus Comment Response 11. Level 2 Wetland Delineation 1. Project management includes tracking the project budget and ensuring that project tasks are being completed on time and on budget along with miscellaneous administrative tasks. 2. A topographic survey with 2-person crew will provide elevations of cross sections across ditches as well as spot shots throughout the site to calibrate the LiDAR topography for this area. This task assumes 12 cross sections and 26 spot shots. It provides the level of detail needed to effectively plan wetland credit actions based on elevations and drainage patterns influenced by topographic G:\.Clients All\Hugo\Proposals\North Star Wetland Bank\Prospectus\PROPOSAL_North Star Wetland Bank Prospectus - 052323.docx relief that may not be represented in existing level 1 data sets. This information will also be used to further refine construction cost estimates. 3. Both a Natural Heritage Information System (NHIS) and a MN State Historic Preservation Office (SHPO) review will be required to ensure the project can move forward without encountering ecological, historical, and or cultural issues that can greatly influence the design, viability, and schedule of the project. WSB staff will submit for review under both these programs. This task does not include field surveys. 4. Completing an additional existing vegetation survey will be needed to characterize the vegetative community at survey plots that were established during the 2022 growing season. These data determine the floristic quality and abundance of invasive species to quantitatively show “functional lift” from existing to proposed conditions with respect to both wetland and upland vegetation. 5. The concept plan from the draft prospectus will be refined into a CAD based concept (60%) plan based on topography, hydrology data, hydraulic modelling, and soils data collected for the stie. 6. A draft conservation easement description and title review will be completed for the parcel. 7. Hydrologic and hydraulic analysis will be completed for the site based on existing conditions and the proposed site plan. WSB staff will model existing site hydrology and model proposed bank design alternatives to determine if hydrology can be maintained to meet performance standards while effectively moving excess water downstream so as not to negatively impact adjacent properties and infrastructure. 8. The Prospectus document will be drafted based on the data collected under this phase of the banking process and will be submitted to the TEP and Board of Water and Soil Resources/US Army Corps of Engineers Interagency Review Team (IRT) for review and comment. 9. WSB will attend a TEP/IRT meeting to discuss the prospectus application. 10. This task includes TEP/IRT comment coordination with the project team and TEP/IRT members. If the TEP/IRT requests that the comments be addressed in the prospectus document prior to moving on to the Mitigation Banking Instrument, a separate scope of work will be provided for that work. 11. A level 2 wetland delineation will be completed for the site including sample points along each ditch, at historic spoil piles and throughout the interior of the site. This will give a true depiction of the wetland complex and will determine whether this project can receive Restoration or Enhancement credits. G:\.Clients All\Hugo\Proposals\North Star Wetland Bank\Prospectus\PROPOSAL_North Star Wetland Bank Prospectus - 052323.docx Prospectus Phase Project Schedule Prospectus Phase Project Budget Project Element Cost Task 1 $7,438 Task 2 $3,041 Task 3 $524 Task 4 $4,370 Task 5 $9,228 Task 6 $3,621 Task 7 $5,937 Task 8 $9,128 Task 9 $1,172 Task 10 $3,332 Task 11 $7,235 Project Total $55,026 Task No.Task Name MayJuneJulyAugustSeptemberOctoberNovemberDecemberJanuary1 Project Management 2 Topographic Survey w/ 2-Person Survey Crew 3 NHIS Data Review Request 3 SHPO Data Review Request 4 Existing Vegetation Survey 5 CAD Based Concept Plans (60%) 6 Draft Conservation Easement Description/Title Review/Exhibit 7 Hydrologic and Hydraulic Analysis 8 Prospectus Document Report and Application Submittal 9 Onsite TEP/IRT Review Meeting 10 Address TEP/IRT Comments on Prospectus 11 Level 2 weltand delineation Authorized under separate scope Hydrology Monitoring Authorized under separate scope Soil Investigation and Site Characteristics On-Site G:\.Clients All\Hugo\Proposals\North Star Wetland Bank\Prospectus\PROPOSAL_North Star Wetland Bank Prospectus - 052323.docx We are requesting approval for Tasks 1-11 for a total not-to-exceed cost of $55,026. If you have any questions on this proposal or other questions related to completing the wetland bank prospectus, please contact me at rrobsertson@wsbeng.com or (651)-392- 4900. Thank you for the opportunity to continue to collaborate with you and the City of Hugo on this legacy project. Sincerely, WSB & Associates, Inc. Roxy Robertson Senior Environmental Scientist Alison Harwood Director of Natural Resources G:\.Clients All\Hugo\Proposals\North Star Wetland Bank\Prospectus\PROPOSAL_North Star Wetland Bank Prospectus - 052323.docx ACCEPTANCE: The City of Hugo hereby accepts the WSB proposal of $55,026 for Tasks 1-11 outlined in this letter. City of Hugo Name Title Date K:\020552-000\Admin\Docs\3. Phase 4_Cost Estimating\Hugo North Start Cost Estimating 052223.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Memorandum To: Shayla Denaway, City of Hugo From: Roxy Robertson, WSB Cc: Tony Havranek Mark Erichson Date: May 22, 2023 Re: North Star Wetland Bank Development Cost Estimate WSB Project No. 020552-000 Introduction The City of Hugo is interested in creating a wetland bank along the west side of Hwy 61 at the North Star Elementary School. The wetland banking process generally consists of the following application steps prior to approval from regulating agencies (Board of Water and Soil Resources (BWSR), Wetland Conservation Act (WCA), and Army Corps of Engineers (USACE)). 1. Draft Prospectus (Scoping Document) 2. Prospectus (Concept Plan) 3. Draft Mitigation Banking Instrument (MBI)/Final MBI (Full Application) Initial assessment phases of this project resulted in the completion of the existing vegetation surveys, 2022 hydrology monitoring, a draft prospectus application, and coordination with the Technical Evaluation Panel (TEP) and interagency review team (IRT). The draft prospectus included a proposal to restore approximately 19 acres of wetland, rehabilitate approximately 98 acres of wetland, and provide approximately 5 acres of upland buffer for a total wetland bank area of 123 acres with a credit potential of around 70 credits. We removed the acres in the northwest corner of the parcel to avoid the need for two conservation easements. At this point, the city may move onto the Prospectus step of the application process for the wetland bank bu t has requested that WSB evaluate the proposed costs for development and construction of the wetland bank to determine cost and benefits of the project. Wetland Bank Concept WSB developed two concepts in the draft prospectus that utilize slightly different construction methods to restore hydrology. 1. Option 1 Wetland hydrology would be restored by construction of 2-3 ditch plugs in the western and central north-south lateral ditches. Ditch plugs consist of clay core trenches compacted with construction-grade clay topped with topsoil and vegetation. Ditch plugs are keyed into the banks to prevent water from moving around them at high flows. One ditch plug would be constructed at the intersection of the eastern lateral ditch and the east-west main ditch channel. Two to three plugs would also be constructed in the southern ditch. An outlet control structure (OCS) with a set elevation would be installed at the southwestern edge of the parcel where the ditch connects to JD 3. Shayla Denaway May 22, 2023 Page 2 K:\020552-000\Admin\Docs\3. Phase 4_Cost Estimating\Hugo North Start Cost Estimating 052223.docx 2. Option 2 The western and central north-south lateral ditches would be filled. One ditch plug would be constructed at the intersection of the eastern lateral ditch and the east-west main ditch channel. One ditch plug would be constructed at the western extent of the south ditch. An OCS with a set elevation would be installed at the southwestern edge of the parcel where the ditch connects to JD 3. Construction Cost Estimate Methods The cost for construction of the project, not including the restoration or monitoring tasks, was estimated with both material and labor costs factored in. Earthmoving for ditch plug construction was estimated assuming clay fill would have to be brought in from offsite since onsite soils may not be suitable for plug construction. It is assumed that ten ditch plugs will be necessary to create desirable hydraulic conditions. Two outlet control structures were estimated to provide finer water surface level control as needed for the wetlands. Construction is proposed to occur over the winter months, so erosion control blankets were estimated on all ditch plug grading areas, sediment control logs at the bottom of the ditch plug grading areas, and silt fence downgradient of the outlet control structures until vegetation can be established with the restoration efforts in the following months. A mobilization cost was estimated assuming approximately 9% of construction cost total. With the project still at a preliminary stage, a 20% contingency was added to the construction subtotal in case of unforeseen construction costs and an additional 10% contingency was added for future indirect costs the project may require. Restoration and monitoring tasks were estimated as the cost to complete the initial install during construction. The restoration costs included site-wide herbicide application, burning/mowing, and seeding. Restoration recommendations will be refined during design. The breakdown of costs between these areas in included in Appendix C. Table 1 shows the projected credit allocations for the North Star Wetland Bank from the draft prospectus. Table 2 shows potential revenue from the bank based on the draft prospectus concept, and under a concept of fewer acres meeting performance standards and fewer credits are achieved. Note that enhancement may give a similar credit allocation (33-50%) to those listed in Table 1, but acreages may vary depending on the results of a level 2 wetland delineation of the internal areas of the site (Table 3). Table 1. Projected credit allocations. Credit Area Proposed Credit Action Credit Allocation Acres Credit Amount Wetland Restoration via Re-establishment (3) 100 19.6 19.6000 Wetland Restoration via Rehabilitation (4B) 50 98.71 49.3550 Upland Upland Buffer 25 5.12 1.2800 Total 123.43 70.235 Shayla Denaway May 22, 2023 Page 3 K:\020552-000\Admin\Docs\3. Phase 4_Cost Estimating\Hugo North Start Cost Estimating 052223.docx Table 2. Revenue potential based on draft prospectus credit allocation and performance of the site. Assumption: Receive credit allocation for full acreage of site Credit Cost (/SF) Credit Cost (/ac) Total Credits Credit Sales $1.00 $43,560.00 70.2350 $3,059,436.60 $1.50 $65,340.00 70.2350 $4,589,154.90 $2.00 $87,120.00 70.2350 $6,118,873.20 Assumption: Receive credit for fewer acres. Credit Cost (/SF) Credit Cost (/ac) Total Credits Credit Sales $1.00 $43,560.00 50.000 $2,178,000 $1.50 $65,340.00 50.000 $3,267,000 $2.00 $87,120.00 50.000 $4,356,000 Table 3. Projected credit allocations if whole site is delineated wetland. Credit Area Proposed Credit Action Credit Allocation Acres Credit Amount Wetland Restoration via Re-establishment (3) 100 19.6 19.6000 Wetland Enhancement (4B) 33 98.71 32.5743 Upland Upland Buffer 25 5.12 1.2800 Total 123.43 53.4543 Wetland Bank Development and Construction Cost Estimate WSB has been requested by the City of Hugo to development a holistic cost estimate representing the costs necessary to complete the wetland bank application and developme nt process, construction, and monitoring. The wetland bank process includes the submittal of a draft prospectus document, prospectus document, and mitigation banking instrument. The cost estimate breakdown is included in Appendix B and is based on the draft prospectus concept. The cost estimate does not include the fees or construction costs. Most of the fees are outlined at the bottom of the budget spreadsheet in Appendix B. Basic construction estimates are included in Appendix C. Task 1: Draft Prospectus (Scoping Document) The city has completed this task by submitting the draft prospectus document detailing the project concept plan. Comments were received from the IRT regarding the proposed project. Task 2: Prospectus Document 1. Soil and site characteristics investigation. Shayla Denaway May 22, 2023 Page 4 K:\020552-000\Admin\Docs\3. Phase 4_Cost Estimating\Hugo North Start Cost Estimating 052223.docx 2. Topographic survey with WSB drone technology: Topographic survey to develop current existing elevation data for the wetland bank site. 3. GIS based conceptual construction plans, vegetative plans, and monitoring pl ans for the project. 4. Prospectus document and application: existing conditions, historical conditions, draft project goals and outcomes, ecological suitability and sustainability, draft vegetation plan, draft construction plan and draft monitoring plan, NHIS and SHPO data requests. 5. Draft site exhibit and conservation easement description boundary: Location of the site and legal description including existing easements and historical data review. 6. Technical Evaluation Panel review meeting: correspondence with landowners, Local Government Unit (LGU), BWSR, Soil and Water Conservation District (SWCD), and USACE. 7. Hydrologic and hydraulic analysis: evaluate the watershed, subwatersheds, and movement of water to the site based on modelling and surrounding land use. Evaluate the wetland condition based on the proposed construction elements. 8. Hydrology monitoring: install water level data loggers and wells to conduct pre- construction hydrology data of the bank site. 9. Respond to TEP/IRT Comments. Task 3: Mitigation Banking Instrument (DMBI and MBI) 1. Site exhibit and final conservation easement description boundary: Location of the site and legal description including existing easements and historical data. 2. CAD based final construction plans, vegetative plans, and monitoring plans for the project. 3. Engineers Estimate: develop a construction estimate based on final design. 4. Mitigation Banking Instrument and application: existing conditions, historical conditions, final project goals and outcomes, ecological suitability and sustainability, final vegetation plan, final construction plan and final monitoring plan, final hydrologic and hydraulic analysis. 5. LGU TEP field review and meeting, final wetland bank plan meeting correspondence with LGU and USACE. 6. Level 2 wetland delineation. This delineation may be completed later upon further establishment of the bank. 7. Respond to TEP/IRT Comments. 8. Bidding documents and administration. Task 4: Wetland Bank Construction 1. Site Construction: includes contractor mobilization for grading, ditch plugs, and outlet control structure installation. A detailed breakdown of the preliminary construction cost is included in Appendix C. 2. Year 1 Restoration: Vegetation management will include a site-wide herbicide application on invasives and selected tree removal in the spring or fall. Another site-wide herbicide application would be completed during the late summer followed by either a controlled burn or mowing in the fall or following spring. The site would be seeded with native vegetation and supplemental plantings of trees and shrubs would be installed in the wooded areas. Site construction would occur in the late fall or winter following initial vegetation management to increase the amount of water on the site and to create less desirable growing conditions for reed canary grass to reestablish. Task 5: Wetland Bank Monitoring/Maintenance 1. Required five years of bank monitoring (years 1-5): vegetation surveys, hydrology monitoring, maintenance recommendations, and annual summary reports. 2. Mitigation Certification: Certifying the bank with the TEP for final credit deposit. 3. Years 2-5 Restoration Maintenance: This includes vegetation maintenance that may be necessary to establish native vegetation and meet performance standards. These Shayla Denaway May 22, 2023 Page 5 K:\020552-000\Admin\Docs\3. Phase 4_Cost Estimating\Hugo North Start Cost Estimating 052223.docx maintenance measures may include mowing, supplemental seeding, spot herbicide treatments, and prescribed burning. Project Fees* Title Opinion/Commitment $450 Initial Easement Acquisition $1,000 Title Insurance $3,000 Final Easement Acquisition $2,400 Initial Wetland Bank Deposit/Establishment Fee $1,000 Wetland Credit Deposit Fee (Per Deposit) $1,000 Data Logger Purchase $4,500 *other project fees may apply Summary The North Star Wetland Bank site has the potential to create/restore approximately 123 acres of wetland and upland buffer. Based on the concept plan, the bank may produce up to 70.235 credits that the city will have available to sell assuming that all performance standards are met, and all credits are released to the city. Our initial cost estimate for establishing the bank is: Engineering: Draft Prospectus $6,500 Engineering: Prospectus $59,000-$64,000 Engineering: MBI $61,000-$66,000 Project Fees $12,000-$15,000 Preliminary Construction Estimate: Ditch plugs, outlet control structure, erosion control, mobilization $60,000-$65,000 Preliminary Construction Estimate: Restoration $250,000-$300,000 Engineering: Construction Monitoring/Administration $35,000-$40,000 Engineering: 5 Years of Monitoring/Reports $35,000-$40,000 Long-Term Restoration Maintenance $10,000-$20,000/yr. K:\020552-000\Admin\Docs\3. Phase 4_Cost Estimating\Hugo North Start Cost Estimating 052223.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Appendix A - Draft Prospectus Concept Figure """""""""""""""""""""""""""" " "" " " " " " """ ## 9 1 4906 926916920916 928926 922928 9209 1 4 910 91890691 6 912912912 912906908924914922922 924920 920906910918918908916914912 910Document Path: K:\020552-000\GIS\Maps\Northstar_DraftProspectus\Fig3_Proposed Project Plan_A Date Saved: 3/31/2023¯1 inch = 450 feet 0 450 FeetNorth Star Wetland Bank Hugo, MN Figure 3a - Project Plan (Option 1) Proposed Easement Boundary Proposed Wetland Boundary Proposed Upland Buffer (5.12 ac) Proposed Rehabilitation (98.71 ac) Proposed Restoration (19.6 ac) Potential Future ELC Trail StormSewer Utility Easement LiDAR Contours #Outlet Control Structure "Ditch Plug Project Plan (Option 1) """"" """"""""""""""""""""""""" " " ## 9 1 4906 9269169 2 0 916 928926 922928 9209 1 4 910 91890691 6 912912912 912906908924914922922 924920 920906910918918908916914912 910Document Path: K:\020552-000\GIS\Maps\Northstar_DraftProspectus\Fig3_Proposed Project Plan_B Date Saved: 3/31/2023¯1 inch = 450 feet 0 450 FeetNorth Star Wetland Bank Hugo, MN Figure 3b - Project Plan (Option 2) Proposed Easement Boundary Proposed Upland Buffer (5.12 ac) Proposed Restoration (19.6 ac) Proposed Rehabilitation (98.71 ac) Proposed Wetland Boundary Potential Future ELC Trail StormSewer Utility Easement LiDAR Contours Ditch Fill #Outlet Control Structure "Ditch Plugs Project Plan (Option 2) K:\020552-000\Admin\Docs\3. Phase 4_Cost Estimating\Hugo North Start Cost Estimating 052223.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Appendix B - Wetland Bank Cost Estimate 2023 1 Wetland Bank Plan - Draft Prospectus (Scoping Document)Roxy Robertson Luke Lunde Jeff Rolfson Amy Anderson Sam Phillips Dan Horejsi Chaldelia Browne Kyle Blazek Shawn Williams Blondo Monica Jakes 1.1 Project Management 5 5 655.00$ 1.2 Site Visit 8 8 1,048.00$ 1.3 Develop Draft Prospectus 22 3 25 3,188.00$ 1.4 Meeting with City 7 7 917.00$ 1.5 TEP Meeting 5 5 655.00$ Total Estimated Hours and Fee for Wetland Services 47 0 0 0 0 0 0 0 0 0 0 3 50 6,463.00$ 2 Wetland Bank Plan - Prospectus Document 2.1 Project Management 36 8 6 50 7,438$ 2.2 Soil Investigation and Site Characteristics 4 6 4 14 2,054$ 2.2 Topographic Survey: Cross sections and LiDAR Calibration 3 11 14 3,041$ 2.4 Onsite TEP/IRT Review Meeting 4 3 3 10 1,172$ 2.5 Prospectus Document Report and Application Submittal 20 8 36 12 2 78 9,128$ 2.6 CAD Based Concept Plans (60%)8 4 2 10 40 4 68 9,228$ 2.7 Draft Conservation Easement Description/Title Review/Exhibit 1 2 18 4 25 3,621$ 2.8 NHIS Data Review Request 2 2 262$ 2.9 SHPO Data Review Request 2 2 262$ 2.10 Hydrologic and Hydraulic Analysis 6 2 5 30 43 5,937$ 2.11 Existing Vegetation Survey 8 2 32 42 4,370$ 2.12 Hydrology Monitoring (Installation of water level meters/data collection)5 2 60 67 6,581$ 2.13 Prospectus Comment Response 10 6 8 24 3,332$ 2.14 Level Two Wetland Delineation 20 2 40 2 64 7,235$ Total Estimated Hours and Fee for Wetland Services 102 42 21 13 47 11 40 75 60 16 0 6 415 63,661$ 3 Wetland Bank Plan - Mitigation Bank Instrument 3.1 Project Management 10 6 16 2,465$ 3.2 Develop Vegetation Management/Monitoring Plan/Performance Standards 12 4 20 36 4,330$ 3.3 Hydrology Monitoring (Installation of water level meters/data collection)5 2 5 60 72 7,398$ 3.4 CAD Based Design Plans (100%) and Project Manual 3 21 80 8 112 15,695$ 3.5 Engineers Estimate 6 16 22 3,471$ 3.6 MBI Report and Application Submittal 18 4 26 20 4 72 8,921$ 3.7 Finalize Conservation Easement Description and Easement Exhibit 16 20 4 40 7,917$ 3.8 TEP/IRT Meeting 4 6 10 1,136$ 3.9 Address TEP/IRT Comments 4 10 4 18 2,232$ 3.10 Bidding Documents and Administration 4 2 2 16 12 36 4,733$ 3.11 MBI Comment Response 10 6 10 26 3,757$ Total Estimated Hours and Fee for Wetland Services 67 18 16 11 63 20 80 61 60 20 0 28 434 62,057$ 4 Wetland Bank Construction 4.1 Preconstruction Meeting 4 1 4 4 13 1,776$ 4.2 Construction Administration 1 8 12 21 3,739$ 4.3 Construction Staking 1 2 16 19 4,662$ 4.4 Construction Observation 40 40 40 120 16,979$ 4.5 As-Built Survey and Project Closeout 8 8 1 8 16 41 7,972$ 4.6 15% Credit Release 6 2 8 16 2,227$ Total Estimated Hours and Fee for Wetland Services 59 0 0 11 66 16 0 4 0 40 0 0 230 37,355$ 275 60 37 35 176 47 120 140 120 76 0 37 1123 Hourly Billing Rate 2023 131$ 173$ 152$ 223$ 123$ 235$ 136$ 93$ 93$ 131$ 100$ 102$ Hourly Billing Rate 2024 Estimate 138$ 182$ 160$ 234$ 129$ 247$ 143$ 98$ 98$ 138$ -107$ Hourly Billing Rate 2025 Estimate 144$ 191$ 168$ 246$ 136$ 259$ 150$ 103$ 103$ 144$ -$ 112$ Total Cost 169,536$ Completed under separate scope or optional task Total Estimated Hours for Design, Bidding and Construction Registered Land Surveyor Registered Engineer Two Person Survey Crew Task Description Sr. Environmental Scientist Environmental Scientist Total Labor Cost Project Manager Environmental Scientist Office Tech II Total Hours CAD DesignerQuality Review Graduate Engineer Archaeological Sub-Consultant ESTIMATE OF HOURS AND COST WETLAND BANK PLAN SERVICES Fees are estimated and are subject to change due to annual inflation rates, change in materials costs, project schedule, etc. 9:39 AM 6/6/2023 K:\020552-000\Admin\Docs\3. Phase 4_Cost Estimating\Hugo North Star Proj Budget Wksht_2023 Updated 052223 K:\020552-000\Admin\Docs\3. Phase 4_Cost Estimating\Hugo North Start Cost Estimating 052223.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Appendix C – Construction Estimate Cost Breakdown Line Item Unit Quantity Unit Price Total Price 1 Site-wide herbicide application AC 90 $500.00 $45,000 2 Selected tree removal AC 5 $1,800.00 $9,000 3 Site-wide herbicide application AC 90 $500.00 $45,000 4 Mow or Burn AC 100 $200.00 $20,000 5 Site-wide herbicide application AC 90 $500.00 $45,000 6 Site Prep/Seeding AC 100 $800.00 $80,000 7 Supplemental trees/shrubs AC 2 $244,000 $48,800 $292,800 Engineer's Estimate of Cost - Northstar Wetland Bank Project 05.23.2023 WSB Project Number 020552-000 CONSTRUCTION SUBTOTAL CONTINGENCY TOTAL (20%) SUBTOTAL Line Item Unit Quantity Unit Price Total Price 1 MOBILIZATION L S 1 $4,000.00 $4,000 2 CLAY EMBANKMENT C Y 170 $65.00 $11,050 3 TOPSOIL C Y 70 $40.00 $2,800 4 EROSION CONTROL BLANKET S Y 535 $4.00 $2,140 5 SEDIMENT CONTROL LOG L F 400 $4.00 $1,600 6 STABILIZED CONSTRUCTION EXIT EA 1 $1,500.00 $1,500 7 OUTLET CONTROL STRUCTURE EA 2 $10,000.00 $20,000 8 SILT FENCE L F 50 $5.00 $250 $43,340 $8,668 $52,008 $5,201 $57,209 INDIRECT COSTS TOTAL (10%) GRAND TOTAL Engineer's Estimate of Cost - Northstar Wetland Bank Project 05.23.2023 WSB Project Number 020552-000 CONSTRUCTION SUBTOTAL CONTINGENCY TOTAL (20%) SUBTOTAL What is the Law Enforcement Torch Run?: The Law Enforcement Torch Run for Special Olympics began in 1981 in Wichita, Kansas when Police Chief Richard LaMunyon saw an urgent need to raise funds for, and increase awareness of, Special Olympics. The idea for the Torch Run was to provide local law enforcement officers with an opportunity to volunteer with Special Olympics in the communities where the officers lived and worked. After three successful years in Kansas, Chief LaMunyon presented his idea to the International Association of Chiefs of Police, which endorsed Special Olympics as its official charity through the Torch Run. Law enforcement from all 50 United States, 10 Canadian provinces and territories and 35 nations carry the “Flame of Hope” in honor of Special Olympics athletes in their area and around the world. The “Flame of Hope” symbolizes courage and celebration of diversity and the inclusion of all people around the world. The Torch Run is the largest grassroots fundraiser and public awareness vehicle for Special Olympics in the world. This international program has raised over $600 million to support Special Olympics programs. More than 97,000 law enforcement personnel from thousands of agencies around the world have been “Guardians of the Flame” and carried the “Flame of Hope.” Tips for Selling T-Shirts/Getting Involved in Final Leg: •Get your local community involved! The Final Leg can have not only the local police departments and sheriff’s offices involved, but also the local fire department, ambulance, administration, family members, retired officers, and so many more come out and support the Law Enforcement Torch Run and Special Olympics! •If people are unable to run, they can still purchase an LETR T-Shirt or Baseball hat for $20! Have them come out and line the street to cheer on those officers running through. •Contact people to take pictures! Whether it is asking for a volunteer photographer to follow the leg or if people can take pictures with their phones, any pictures to help document the Flame of Hope coming through helps! •Let your local media know! Spread the word to local newspapers, radio stations and news stations that the torch will be coming through your community. Contact your leg leader for details of timing and where your rest stops will be. •Spread the word on social media! Use your Facebook, Twitter, Instagram and other outlets to spread the word! Use the hashtags #SOMN, #SOMNLETR #MNFINALLEG •Hang fliers around your department and local community areas (i.e. libraries, local YMCA, City Halls) to let the public know the Final Leg is coming! Law Enforcement Torch Run for Special Olympics Minnesota 900 2nd Ave. South Suite 300 Minneapolis, MN 55402 Tel 612.333.0999 Fax 612.333.8782 Email torchrun@somn.org www.somn.org Minnesota 16/8/2023 3:06 PMMeetings in green are posted/scheduled meetings.Su Mo Tu We Th Fr Sa1234567891011 12 13 14 15 16 1718 19 20 21 22 23 2425 26 27 28 29 30June 2023Su Mo Tu We Th Fr Sa12345678910111213141516 17 18 19 20 21 2223 24 25 26 27 28 2930 31July 2023June 2023May 28293031Jun 12345678910Good Neighbor Days6:30pm BOZA7:00pm Planning Comm11121314151617Good Neighbor Days6:00pm Admin Review 7:00pm City Council 11:00am Premier Bank Ground Brking (5616 147th St)181920212223245:30pm EDA6:30pm Hist CommLMC Annual Conference (Duluth)7:00pm Parks Comm6:30pm BOZA7:00pm Planning Comm11:15am Torch Run (CityHall)252627282930Jul 15:00pm Bernin Park Meeting (Oneka Room) SUNDAYMONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSATURDAY 26/8/2023 3:06 PMMeetings in green are posted/scheduled meetings.Su Mo Tu We Th Fr Sa12345678910111213141516 17 18 19 20 21 2223 24 25 26 27 28 2930 31July 2023Su Mo Tu We Th Fr Sa12345678910111213 14 15 16 17 18 1920 21 22 23 24 25 2627 28 29 30 31August 2023July 2023Jun 252627282930Jul 1234567891011121314157:00pm City Council 6:30pm BOZA7:00pm Planning Comm161718192021225:30pm EDA6:30pm Hist Comm7:00pm Parks Comm232425262728297:00pm City Council 6:30pm BOZA7:00pm Planning Comm3031Aug 12345SUNDAYMONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSATURDAY             The following items were distributed at  the Council meeting.  Agenda Number: G.21 CITY OF HUGO PLANNING AND ZONING APPLICATION STAFF REPORT TO: Bryan Bear, City Administrator FROM: Max Gort, Associate Planner SUBJECT: Drake and Kelsey Myhrman – Encroachment agreement to allow a retaining wall within a drainage and utility easement on property located at 13144 Geneva Avenue North DATE: June 9, 2023 for the City Council meeting of June 12, 2023 ZONING: Planned Unit Development (PUD) LAND USE: Low Density Residential (LD) 60-DAY REVIEW DEADLINE: August 8, 2023 1.DESCRIPTION OF REQUEST: The applicant has requested an encroachment agreement to allow construction of a retaining wall within a drainage and utility easement on property located at 13144 Geneva Avenue North. The Senior Engineering Technician has reviewed the location of the retaining wall and is comfortable with the request. 2.CONCLUSION/RECOMMENDATION: Staff has reviewed the request and recommends that the City Council approve the encroachment agreement for the property located at 13144 Geneva Avenue North. ATTACHMENTS: 1.Location Map 2.Encroachment Agreement Resolution 3.Encroachment Agreement 4.Site Plan Document Path: S:\Mapping\Site Maps\2023 Site Maps\8,5x11_portraitborder Date Saved: 6/9/20230 5025 Feet¯13144 Geneva Ave. N. Location Map Hugo, Minnesota Parcel Boundary selection Parcel Boundary Roads 1 in = ~81 feet RESOLUTION 2023-XX APPROVING AN ENCROACHMENT AGREEMENT TO ALLOW CONSTRUCTION OF A RETAINING WALL AND CONCRETE WITHIN A DRAINAGE AND UTILITY EASEMENT ON THE PROPERTY LOCATED AT 13144 GENEVA AVENUE NORTH WHEREAS, an application has been filed by Drake and Kelsey Myhrman that requests approval of an encroachment agreement to allow construction of a retaining wall within a drainage and utility easement on the property located at 13144 Geneva Avenue North, legally described as follows; Lot 12, Block 2, Adelaide Landing 6th Addition, Washington County, Minnesota WHEREAS, the City Council has fully considered the request for the encroachment agreement. NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF HUGO, MINNESOTA, that it should and hereby does approve the encroachment agreement on property located at 13144 Geneva Avenue North. ADOPTED by the City Council this 12th day of June, 2023. ________________________________________ Tom Weidt, Mayor ATTEST: _________________________________ Michele Lindau, City Clerk ENCROACHMENT AGREEMENT THIS AGREEMENT is made this 12th day of June, 2023 by and between the CITY OF HUGO, a Minnesota municipality (hereinafter “City”) and, Drake and Kelsey Myhrman (hereinafter “Owners”), and their successors in title. WHEREAS, the City has an easement for drainage and utility purposes (the “Easement”) along the westerly, northerly, and easterly portion of the Owner’s property, which is legally described as: Lot 12, Block 2, Adelaide Landing 6th Addition, Washington County, Minnesota; and, WHEREAS, Owner is desirous of constructing a retaining wall partially within the easement area; and, WHERAS, the City will permit the placement of a retaining wall in the area described herein subject to the terms and conditions hereof. NOW, THEREFORE, in consideration of the premises and for good and valuable consideration, the receipt of which is acknowledged, the City will permit the encroachment on its easement as set forth herein and subject to the conditions set forth below: 1.Owner and their successors in title may install and maintain a retaining wall within the Easement, and the retaining wall shall be constructed in accordance with the plans on file with the City of Hugo. 2.No plantings, trees, permanent improvements or structures other than the retaining wall may be maintained or placed in the easement area. 3.Owner shall maintain the retaining wall in good repair and shall not permit it to be expanded, lengthened or to impair the City’s easement or its rights thereunder in any respect. 4.The encroachment granted to Owner herein is subject to the existing easement rights of the City as granted in various easements. 5.The City will notify Owner if it requires removal or relocation of the retaining wall or any part of it. Thereafter, Owner shall remove the retaining wall according to the direction of the City and if Owner fails to do so, the City may enter upon the land and remove as much of the retaining wall as required and cast it upon the adjoining lands. In such an event, the City shall not be liable to Owner for any costs, loss or damage whatsoever, and may assess the property for all of its costs incurred in removing the retaining wall, and Owner waive all formalities, requirements and defenses arising from or relating to Minnesota Statutes Section 429 relating to or arising from the work done by the City. 6.To the fullest extent permitted by law, Owner agrees to release, defend, protect, indemnify, save and hold harmless the City, its agents, directors, employees, shareholders and contractors against any and all claims, costs and liabilities, including the costs of defense for damages, injury or death arising from or in any way connected to the installation, maintenance, repair, removal and/or presence of the retaining wall, regardless of whether such harm is to Owner, the City, the employees or officers, guests or invitees of either or any other person or entity, except Owner shall not be liable under this paragraph for loss or damage to the extent resulting from the negligence of the indemnified parties. 7.The permission granted herein is limited exclusively to the proposed retaining wall within the specified portion of the easement area of the City’s Easement. Owner shall not alter the grade or permit such alteration anywhere upon the land upon which the City has reserved its easement rights without proper express written consent of the City. 8.Owner shall, at all times, use their best efforts to conduct all of their activities on said Easement in such a manner as to not interfere with or impede the operation of the City’s Easement and related activities in any manner whatsoever, and shall follow the direction of the City. 9.This Agreement shall run with the land and inure to the benefit and be binding upon the parties hereto, their heirs, successors and assigns. 10.Owner shall be responsible for the costs of recording this Agreement with the Washington County Recorder. WHEREUPON, the parties have set their hands this day of , 2023. CITY OF HUGO By By Tom Weidt, Mayor Michele Lindau, City Clerk STATE OF MINNESOTA ) ) ss. COUNTY OF WASHINGTON) On this _____ day of __________________, 2023, before me, a Notary Public, personally appeared TOM WEIDT and MICHELE LINDAU, of the City of Hugo, a Minnesota municipality within the State of Minnesota, and that said instrument was signed on behalf of the City of Hugo by the authority of the City Council of the City of Hugo, and TOM WEIDT and MICHELE LINDAU acknowledge said instrument to be the free act and deed of said City of Hugo. __________________________________________ Notary Public Drake Myhrman, Owner _____________________________________ Kelsey Myhrman, Owner STATE OF MINNESOTA ) ) ss. (Individual Notary) COUNTY OF WASHINGTON) On this _____ day of __________________, 2023, before me, a Notary Public, personally appeared Drake and Kelsey Myhrman, a married couple, who signed the foregoing instrument and acknowledged said instrument to be his free act and deed. __________________________________________ Notary Public THIS INSTRUMENT DRAFTED BY: David K. Snyder Johnson & Turner, P.A. 56 East Broadway Avenue, Suite 206 Forest Lake, MN 55025 (651) 464-7292