HomeMy WebLinkAbout2020 Parks Annual ReportPARKS REPORT
Commissioners:
Dave Strub, Chair
Cathy Moore-Arcand, Vice Chair
Nicole Schmid
Roger Clarke
Mat Rauschendorfer
Ranell Tennyson
Shawn Haag
Arcand Park Playground (Photo by Ultimate Recreation)
Arcand Park Opened
The Parks, Recreation, and Open Space Commission opened a new neighborhood park in 2020, now named Arcand Park.
The Adelaide Landing residential development was first conceptualized in 2016. Construction of this new neighborhood
park in the Hugo system was made possible through park dedication. The Parks Commission accepted 7.7 acres of land
and $1,128 per unit in fees for the residential development of 324 homes. The park was master planned in 2019 and
envisioned to serve the adjacent neighborhoods, as well as Adelaide Landing, with more recreation amenities offered than
typical Hugo neighborhood parks. Features of the park include a sizable playground, a large-capacity park shelter, two pick-
leball courts, basketball half-court, open play field, and an off-road paved trail network.
Neighborhood Selects Playground
In the spring of 2020, residents were invited to vote on four playground options. Through two virtual meetings and social
media, valuable input was gathered from residents. A playground was selected that featured a zipline, climbing net, toddler
play area, swings, and slide structure was selected from Ultimate Recreation, a vendor not used in Hugo parks before.
Park Named in Honor of Former Property Owners
Residents also submitted their ideas for a name for the new park. The City Council selected “Arcand Park” in honor of
Arthur Arcand, the former owner and farmer of the property. A grand opening was held on October 7. The warm, sunny
weather allowed for great participation in the celebration and appropriate social distancing.
ANNUAL REPORT OF THE PARKS, RECREATION, AND OPEN SPACE COMMISSION 2020
Goodveiw Avenue Trail Study
The City of Hugo was awarded a $10,000 Active Living Partnership from Living
Healthy Washington County, through the Statewide Health Improvement Program.
With the funding, studying the feasibility of a priority trail corridor along Goodview
Avenue was made possible. The study was authorized by May 4 Parks Commis-
sion meeting. The road has wetlands on both sides which were delineated. This
informed the trail concepts presented by WSB and Associates at the August 19
meeting. The concepts included an alternate on-road route on Geneva for the
northern segment versus a trail on Goodview. For the southern segment, trails on
both sides or a wider trail on the west side of the road were presented as options.
The Commission’s preference was presented at their September 16 meeting of an
8’ wide trail with 5’ wide boulevard on the west side of the entire corridor. Cost
estimates were provided. The Commission voted to accepted Goodview Avenue
Feasibility Study but did not recommend construction at this time.
Covid-19 Response
As the Covid-19 pandemic arose in spring 2020, use and attention to Hugo’s
parks and trails system grew. However, the majority of the programs and special
events that the City offers were cancelled, including the Tour de Hugo. As people
were instructed to stay at home and away from others, outdoor recreation became
a safe outlet for many. Use of Hugo’s network of trails and sidewalks increased.
Additional attention was paid to Hugo’s playgrounds. While a few cities opted to
“close” playgrounds, Hugo’s playgrounds remained open. The Mayor Tom Weidt
put out this message to Hugo’s park users in March and it has continued to be
impactful through the end of 2020:
Within our parks, areas such as playgrounds, picnic tables, sport courts, and the skate park
can be difficult to use safely and follow the CDC’s recommendations. Many residents are
choosing to avoid these areas all together. There are some residents that may be upset that
parks have not been closed. There are other residents that would ignore any order to not
use them. Every time you choose to go somewhere, pause to think about the risks that you
are taking for you and your neighborhood. If you choose to proceed, be sure to follow the
Governor’s guidelines. Everyone is counting on you to use good judgement. As I have said
before, take seriously the direction to stay at home and practice social distancing with those
around you. Please do your best to be a good neighbor. Share what you can, help them
when you can, and we will make it through this as safely as possible.
JD 3 Project
The Rice Creek Watershed District
(RCWD) started a ditch maintenance
project in 2020 that impacted several
city-owned properties, trails, and
parks.
As the Drainage Authority, RCWD is
required to maintain a network of
Judicial Ditches. This includes JD 3
which goes through the Victor
Gardens neighborhood and Clearwa-
ter Creek Preserve adjacent to City
trails. JD 3 also extends north near
Oneka Parkway through Frog Hollow
Park and beyond.
The work included removal of vegeta-
tion and trees to allow for a mainte-
nance corridor, excavation of the
channel, and culvert replacement.
Construction is on going and addition-
al restoration is anticipated to happen
in 2021.
Signage Placed in Hugo Parks in Spring 2020
Ditch in Clearwater Creek Preserve
Ditch near Frog Hollow Park
Andrew Olson
Memorial
At the July 15 meeting,
the Parks Commission
approved a memorial to
be installed in Oneka
Lake Park in honor of
Andrew Olson. Olson
passed away unexpect-
edly in February 2020.
Logan Jensen requested
the memorial in honor of
his late friend and fellow
Boy Scout which
includes a tree, bench,
and plaque.
Public Works
Facility Under
Construction
at Irish Avenue
Park
The existing Public Works
Facility is in need of
expansion. Following a
feasibility study, the
Council directed staff to
look into construction of a
new facility at Irish Ave-
nue Park. A site plan
was drafted in early 2020
with construction starting
in fall 2020. The facility
will be located on the
southern portion of the
park and provide a future
park access off of County
Road 8.
Neighborhood meetings
were held to discuss the
plans during which there
was interest in master
planning Irish Avenue
Park. The Parks Com-
mission continues to
receive updates on the
project.
Site Layout Options for Lions Park
Lions Park Moving Forward
The City Council and Parks Commission reviewed a Feasibility Study for Lions
Park at a workshop on June 29. The study included minor changes to the master
plan to ensure that the park aligns with the Hugo Gardens development and antic-
ipated road improvement projects. Updated cost estimates of construction were
presented and the Council and Commission discussed funding options. The
Feasibility Study was adopted by the Council at their July 20 meeting.
A remote community workshop was held on October 7, with a few participants
joining the zoom meeting and in-person at City Hall. An online survey tool was
used during the meeting and was made available online in the weeks following.
Design development of the park kicked off in the fall with the formation of stake-
holder committees made up of volunteers from Hugo Commissions and residents.
WSB and HCM Architects were selected to help with the design. One committee
was formed to design the large playground and youth play areas. A second com-
mittee was charged with designing the large multi-purpose pavilion which is
intended to accommodate large community events, multiple small gatherings at a
time, performances, and more. Committee meetings were held on October 29
and November 24. All meetings are being held remotely via zoom. An additional
meeting will be held in January 2021. Following approval of a schematic design,
construction documents will be drafted and bids are anticipated to be awarded in
the spring of 2021. Construction is likely to start in early summer 2021.
Lions Park Pavilion Design Concepts
Contact Us
(651) 762-6300
Hugo City Hall
14669 Fitzgerald Avenue
North
Hugo, MN 55038
Staff Liaison:
Shayla Denaway
(651) 762-6342
Visit us on the web at
www.ci.hugo.mn.us
Development Projects
Oneka Commons Sketch Plan
At the January 19 meeting, the Commission reviewed a sketch plan for Oneka
Commons, located south of CR 8. As of the end of 2020, the developers have not
indicated that they will be moving forward with the mixed-use project.
Hugo Gardens
At their May 20 meeting, the Parks Commission accepted park dedication for 84
apartment units in in seven buildings located west of Lions Park called “Hugo Gar-
dens”. The park dedication fee of $87,414 was calculated with consideration of
the 2.11 acres of land previously dedicated in the LaValle Fields PUD. Cosntruc-
tion on the roads and utilities started in fall 2020.
Oneka Lake Reserve
At the July 15 meeting, park dedication was approved for Oneka Lake Reserve
that included .65 acres of park land and $26,400 in fees. The developer proposed
to construct amenities on the small park, located off of 150th Street, including a
gazebo, small playground, picnic tables, and sidewalk track. Construction was not
started in 2020.
Hugo Garden Apartment Renderings