HomeMy WebLinkAbout2021 Parks Annual ReportPARKS REPORT
Commissioners:
Roger Clarke, Chair
Cathy Moore-Arcand, Vice Chair
Nicole Schmid
Mat Rauschendorfer
Ranell Tennyson
Emily McGinnity
Meredith St. Pierre
Relocated Play Equipment in Beaver Ponds Park
Lions Park Construction Started
The Parks, Recreation, and Open Space Commission hit the ground running in 2021. At the first meeting of the year, the
schematic design for Lions Park was approved following extensive public engagement in 2020. Development of the design
and cost estimates were approved. Over the first few months of the year, the design of the pavilion and the park site was
finalized. A workshop was held by the City Council in February to review the overall vision of the pavilion. The building car-
ries the outside in with expansive windows and opening doors, a sloping roof, and continuity of grey brick and sandstone
throughout the park. WSB and HCM Architects continued to refine the plans including lighting, landscaping, and the final
construction details.
Community Workshop Held
On April 14, a workshop was held with the Parks Commission and City Council to share the final construction plans with the
neighborhood and overall community. Resident questions were addressed and there was overall support of the designs.
Beaver Ponds Park Playground is Replaced
With the 20+ year old playground equipment in Beaver Ponds in need of replacement, and the 3 year old equipment in Lions
Park being no longer needed, a re-installation was a favorable option. St. Croix Recreation was hired to re-install the equip-
ment. A short 4 week construction timeline was followed for the removals, installation of new curb and drainage, equipment
installation, and replacement of surfacing. The picnic tables, benches, sidewalks, and landscaping were also replaced and
repaired as needed. Beaver Pond residents expressed gratitude and a positive response to their improved park.
ANNUAL REPORT OF THE PARKS, RECREATION, AND OPEN SPACE COMMISSION 2021
Park Dedication Fee Increased
One of the implementation steps of the 2040 Comprehensive Plan was to review
the Park Dedication Policy. The Commission reviewed the policy at their Septem-
ber 15 meeting. The Commission agreed that the policy continued to provide for
expansion of the parks system with development and that the policy was in keep-
ing with state statues. However, the Commission asked the Council for authoriza-
tion to evaluate the fee charged with residential development. The fee had not
been changed since 2005 and had not been evaluated since 2010.
At the October 13 meeting, the Commission reviewed research on the expense of
the planned park system growth, fee comparisons to cities of a similar population
and similar growth rates, as well as the park dedications received in recent years.
The Commission recommended a fee increase of $1,000. The City Council
approved the recommended fee increase by resolution at their November 15
meeting. The new fee of $3,400 per unit will be effective in 2022, but not applied
to developments approved in 2021 or earlier. The Council asked for the fee to be
reviewed again in 2022.
Santa Party
The City of Hugo has held very few programs since spring 2020. Programs held
in partnership with the Washington County Library and YMCA shifted to be held
primarily outdoors but continued to offer activity options to Hugo families.
A resident offered the idea that the City hold a holiday lighting party with Santa.
The Commission discussed this and brainstormed other programming ideas at
their September 15 meeting.
A Santa Party was held in City Hall on Wednesday, December 1. The Hugo Fire
Department volunteered to assist and collected food and toys for their drive bene-
fiting the Hugo Good Neighbors Food Shelf. City Hall was lit. Goodie bags were
distributed to the 20 kids who attended. Santa looks forward to visiting the new
pavilion in Lions Park in 2022.
Sunset Lake
Property
The Commission discussed concepts
for the city-owned property on Sunset
Lake in 2019 through early 2020. A
contentious neighborhood meeting
was held. Staff continued to receive
complaints about fishing from the
adjacent roads and lack of access to
the property.
At the meeting of March 17, the Com-
mission requested to review the
concepts and authorized “opening up
of the property”. In the spring, staff
removed brush and small tree growth
which provided physical access and a
views of Sunset Lake.
Santa with the Fire Department and Councilmember Strub
Sunset Lake Property Before
Sunset Lake Property After
Thank you
Volunteers!
At the February 15 meet-
ing, the Commission
welcomed new members
Emily McGinnity and
Meredith St. Pierre
(Alternate). Following the
retirement of Coun-
cilmember Chuck Haas,
Parks Chair Dave Strub
was appointed to the City
Council and was no long-
er able to serve on the
Parks Commission.
St. Pierre was appointed
as Commissioner. Com-
missioner Roger Clarke
steeped up and was
appointed as Parks Chair.
Trail Studies
At the April 20 meeting,
the Commission
approved a proposal from
WSB to study the feasibil-
ity of a trail between
Oneka Parkway, the
Hardwood Creek Trail,
and Lions Park on prop-
erties owned by the City
and WBLAS.
At the meeting of Novem-
ber 17, the Commission
heard a presentation from
Washington County with
concepts for construction
an extension of the Hard-
wood Creek Regional
Trail from 130th Street to
120th Street.
Aerial of Lions Park and Downtown Street Project
Lions Park Construction
The final Lions Park plans were approved and bids were authorized in May. Bid
openings were held in June for the three separate projects. Contracts were
awarded at the Council meeting of June 21 to Peterson Companies for the storm-
water project and park site/street improvement projects. All of the alternates were
approved including the northwest parking lot and pedestrian lighting. Schreiber
Mullaney was awarded the contract for construction of the pavilion. Council also
asked for quote for the planned future phase of the playground which was initially
postponed due to cost. Phase 2 was a challenge course for teens. At their meet-
ing of July 19, Council approved the quote, but asked that the Parks Commission
select the surfacing. The Commission selected artificial turf for phase 2 at their
July 21 meeting.
A ground breaking was held on July 6 and construction started the following week.
Peterson Companies handled removals and began grading on the park. The
grading work within the park had a dramatic appearance because material was
sourced within the park for the base of the new 147th Street extension and swap-
ping of materials provided substantial cost savings and improved both projects.
The City Hall parking lot, downtown streets, sport courts, and more were finished
in the fall. The pavilion started taking shape in November. Electrical work includ-
ing street lights and bollards will continue, but construction of the rest of the park
will pause over the winter. The pavilion will be under construction with a comple-
tion date of April 1, 2022 after which site work will resume in the park.
New 147th Street Extension, Steel Framing of the New Pavilion
Contact Us
(651) 762-6300
Hugo City Hall
14669 Fitzgerald Avenue
North
Hugo, MN 55038
Staff Liaison:
Shayla Denaway
(651) 762-6342
Visit us on the web at
www.ci.hugo.mn.us
Development Projects
121st Street Subdivision
At the meeting of February 17, a sketch plan was reviewed from Drengson May
Enterprises for 7 new residential lots and improvement of 121st Street. Park dedi-
cation fees were proposed to be paid.
Oneka Lake Reserve
At the April 21 meeting, which was the first Commission meeting held in-person in
over a year, the Commission reviewed the Oneka Lake Reserve PUD application.
The Commission approved dedication of .45 acres and fees for the 40 unit town-
home development north of Oneka Lake Boulevard.
The Meadows of Hugo
The Commission approved a park dedication proposal for Hugo Meadows at the
February 17 meeting. The development included 87 single family lots and trail
connections to the future passive park to the west. Golden Valley Land Company
proposed to pay fees to satisfy park dedication.
The Meadows at Hugo Sketch Plan