HomeMy WebLinkAboutParks Packet 04.19.23Page 1 of 2 Parks Commission Agenda April 19, 2023 Agenda Parks, Recreation, and Open Space Commission Meeting of April 19, 2023 Hugo City Hall, 7:00 pm 7:00 pm 1. Approve Minutes from February15 and March 15, 2023 Meetings 7:02 pm 2. Introduction to Parks Lead Worker 7:20 pm 3. Neighborhood Park Improvement Plan 7:45 pm 4. Updates on ongoing projects 1. Park Sign Replacement Plan 2. Bernin Property Planning 3. North Star Wetland Bank and Trails 4. Lions Volunteer Park Memorial 8:15 pm 5. Adjournment Page 2 of 2 Parks Commission Agenda April 19, 2023 Background Parks, Recreation, and Open Space Commission Meeting of April 19, 2023 Hugo City Hall, 7:00 pm Approve Minutes from February 15 and March 15, 2023 Meetings Staff recommends approval of the minutes of the Parks Commission meetings of February 15 and March 15, 2023. PLEASE SEE THE ATTACHED MINUTES. Introduction to Parks Lead Worker The City Council, at their February 6, 2023 meeting, approved a job description for a Public Works Parks Lead Worker and gave authorization to hold interviews and select an internal candidate to fill the position. AT the Council meeting of April 3, the Council approved Rick Kieffer as the Parks Lead Worker. Staff will introduce Kieffer. THE PUBLIC WORKS ORGANIZATIONAL CHART IS ATTACHED. Neighborhood Park Improvement Plan The Parks Commission approved $90,000 for Neighborhood Park Upgrades in their Capital Improvement Plan. Annually, staff evaluates the City’s Parks and proposes needed improvements. This year, staff is recommending that the exterior of the shelter at Hanifl Fields Athletic Park be painted and stained at a cost of $14,000. Staff is recommending that the remaining funds be allocated to concrete repairs at Victor Square Park. Staff will present a plan for neighborhood park improvements for discussion. AN ESTIMATE FROM W.R. BAXLEY IS ATTACHED. Updates on ongoing projects Updates on multiple ongoing projects will be provided. Staff has continued research on pylon park signs and potential vendors for the Park Sign Replacement Plan. WSB and Associates are working on the Bernin Park master plan rendering. A draft prospectus has been prepared for TEP review for the North Star Wetland Bank. Staff has been approached by the Commander of the Hugo American Legion regarding a memorial in Lions Volunteer Park. Staff will provide updates. THE DRAFT PROSPECTUS IS ATTACHED. THE PARKS PLAN CAN BE FOUND AT: https://www.ci.hugo.mn.us/2040compplan Page 1 of 2 Parks Commission Minutes February 15, 2023 Minutes Parks, Recreation, and Open Space Commission Meeting of February 15, 2023 Hugo City Hall, 7:00 pm Present: Valerie Boyd, Jim Compton Sr., Emily McGinnity, Meredith St. Pierre, Ranell Tennyson. Absent: Cathy Moore-Arcand, Mat Rauschendorfer Staff Present: Scott Anderson, Public Works Director Shayla Denaway, Parks Planner Debi Close, Parks Secretary St. Pierre called the meeting to order at 7:00 pm. 1. Approval of Minutes from the January 18, 2023 Meeting Tennyson made a motion, Compton seconded to approve the minutes of the January 18, 2023 Parks Commission Minutes. All aye. Motion approved. 2. Update on North Star Wetland Bank Shayla Denaway, Parks Planner updated on the North Star wetland bank. Assessments were conducted through October 2022, with hydrology monitoring wells indicating that the wetlands are partially or fully drained. The vegetation assessment indicated was low quality vegetation with mostly nonnative invasive species. Blocking ditches and preventing drainage could restore the wetland hydrology. A draft prospectus is being prepared to be submitted to the Technical Evaluation Panel. Permits and approvals could take up to two years. The wetland banking project is estimated at $970,000. Trail construction cost are estimated at $1,700,000. – $2,000,000. City Council directed staff at the February 6, 2023 meeting to start discussions with White Bear Lake Area Schools on drafting an agreement regarding the land. Page 2 of 2 Parks Commission Minutes February 15, 2023 3. Bernin Property Master Plan Denaway presented the master plan approved by the Parks Commission in 2004 for the Bernin property at 6540 Green Avenue North. The purchase agreement stipulates the land shall be used for passive park purposes only. The master plan included: picnic shelter, walking/biking trails, fishing pier, benches, car parking lot, evergreen stand, restoring the Oak Savannah trees, fishing dock, preservation of the ice ridge and wetlands. The master plan also included the playground and active improvements that were constructed (Onkea Lake Park). The DNR grant funding for the purchase of the property had requirements: Protect the natural/scenic resources, keep it safe for public use, manage vegetation, make it available to the public following standard park hours, and seek state approval on any improvements to the property. City Staff was directed to contact Washington Conservation District and also start discussion with the DNR on the long term vision for their boat launch. Staff also anticipated engaging neighbors to start planning and a community workshop. Scott Anderson, Public Works Director updated on the property that ground work is needed at the former home site and that there are wells that need to be sealed. 4. Other Tennyson reminded that the YMCA Forest Lake branch is kicking off their 2023 donation campaign. 8. Adjournment McGinnity made a motion, Boyd seconded to adjourn the meeting at 8:02pm. All ayes. Motion approved. Page 1 of 3 Parks Commission Minutes February 15, 2023 Minutes Parks, Recreation, and Open Space Commission Meeting of March 15, 2023 Hugo City Hall, 7:00 pm Present: Meredith St. Pierre, Ranell Tennyson, Cathy Moore-Arcand, Mat Rauschendorfer, Jim Compton Sr. Absent: Valerie Boyd, Emily McGinnity Staff Present: Scott Anderson, Public Works Director Shayla Denaway, Parks Planner Amber Lozier, Accounting Clerk St. Pierre called the meeting to order at 7:04 pm. 1. Approval of Minutes from the February 15, 2023 Meeting Tennyson made a motion, Compton seconded to table the minutes of the February 15, 2023 Parks Commission Minutes until the next meeting. All aye. Motion approved. 2. Bernin Property Master Plan Shayla Denaway, Parks Planner reviewed the Bernin Property Master Plan and discussed current considerations regarding the Master Plan. Denaway suggested that commissioners may want revisit trail surfacing, and pointed out that the playground area has changed since the Master Plan was approved. Denaway presented the proposal from WSB & Associates, Inc to update the master plan maps and renderings. Next steps were presented to the Commission for their consideration, including Council approval and public engagement plan, workshop to be held in June 2023, park naming, construction plan drafts in 2024, and construction in 2025. Denaway clarified where trail connections would be. Moore-Arcand asked if residents were expressing any concerns about the current plan. Denaway reported talking with a few neighbors, but that concerns have been minimal as most of them new about the previously approved plan. Page 2 of 3 Parks Commission Minutes February 15, 2023 Rauschendorfer brought up the naming of the park, and questioned what issues might arise out of that process. Denaway discussed the plan to engage with the public, DNR and Bernin family. Denaway confirmed naming will be discussed after public engagement. Rauschendorfer reminded the Commission that the naming policy has not been used by the City Council. Commissioners discussed how to move forward with naming the park. Tennyson suggested removing the naming discussion from the plan, and presenting the Master Plan to the public with the name Bernin Park. Rauschendorfer asked if Oneka Lake Park would be merged the Bernin property, and Denaway clarified the differences in rules of use between passive and active parks, and suggested that if the commission would like to merge the parks, they would have to make both parks either passive or active. Tennyson made a motion, Rauschendorfer seconded to approve the WSB & Associates, Inc proposal and next steps. All ayes. Motion approved. 3. Park Sign Replacement Plan Denaway presented pictures of current park signs and discussed the condition of current park signage, stating that eight (8) park signs need replacement. Denaway then presented the City’s sign ordinance (Sec 90- 625) and restrictions held within the sign ordinance. Public property signage does not need permitting, but approval from Council is required. Denaway then presented various signage options, including pylon, monument style and alternatives to pylon and monument signage, with pictures of the standard and non-standard signage being used in other city parks. Denaway discussed common communication needs for each of the Parks, mentioning that messaging needs are not high in most of the City’s parks. She suggested a phased approach to replacement. Denaway then presented the commission’s options for a sign replacement plan. These include working with a vendor that offers standard, predesigned signage or requesting proposals from firms that offer custom signage. Commissioners discussed advantages and disadvantages of both options, including the simplicity of using standard signage, and the custom signage coming with integrated landscaping designs. Tennyson suggested utilizing a uniform signage design for all parks but in a variety of sizes. St. Pierre and Tennyson suggested using a timeless design versus a modern or trendy design. St. Pierre mentioned the need to keep in mind the goal of the signage, which is to inform the public of the information they need to know about the park. Moore-Arcand mentioned the possibility of including biographical information on the signage of family-named parks. St. Pierre mentioned that detailed signage would need more maintenance to ensure that the information is not lost by fading and weathering. St. Pierre suggested placing QR codes on signage that would lead park users to informational pages on the City website. Page 3 of 3 Parks Commission Minutes February 15, 2023 Commissioners discussed advantages and disadvantages of the different styles of signage. Commissioners prefer the metal pylon style because of cost benefits and lower maintenance needs. Commissioners also prefer a consistent design throughout all park signage that utilizes updated City logos and natural coloring. Tennyson made a motion, Moore-Arcand seconded to implement a park sign replacement plan utilizing proposals from custom sign vendors with design services. All ayes. Motion approved. 4. Recreation Program Update Denaway updated the commission on the upcoming recreation programs being offered by and throughout the City. YMCA will be offering summer programs again this year, including Park Play Days, and has requested funding again this year. Washington County Library will be implementing programming outside of County facilities, with a performance by the Jolly Pops planned at the Peder Pedersen Pavilion. Kidz N Biz will be held in September again this year. Planning for that event is in process. Denaway presented an update on the Sledding Party turnout. 5. Other Scott Anderson, Public Works Director, informed the Commission of the reorganization of the Public Works Department. There is now a position of Parks Lead Worker. Anderson informed that new Parks Lead Worker will be introduced to Commissioners when that position has been filled. 6. Adjournment Moore-Arcand made a motion, Compton seconded to adjourn the meeting at 8:19pm. All ayes. Motion approved. Pu b l i c Wo r k s Di r ec t o r Fi n an c e/Pu b l i c Wo r k s A d m i n i s t r at i v e A s s i s t an t Ut i l i t i es L ead Wo r k er St r eet s L ead Wo r k er Par k s L ead Wo r k er Pu b l i c Wo r k s Su p er v i s o r Sen i o r En g i n eer i n g Tec h n i c i an Pu b l i c Wo r k s Wo r k er Pu b l i c Wo r k s Wo r k er Pu b l i c Wo r k s Wo r k er Pu b l i c Wo r k s Wo r k er Pu b l i c Wo r k s Wo r k er Pu b l i c Wo r k s Wo r k er Pu b l i c Wo r k s Wo r k er Pu b l i c Wo r k s Wo r k er Mec h an i c Pu b l i c Wo r k s Seas o n al Wo r k er s Pu b l i c Wo r k s Dep ar t m en t 2023 W.R. Baxley Painting and Design 17424 Staples St Ne Ham Lake, MN 55304 612-240-2452 DATE 5-31-2022 COMPANY CONTACT JOB PAYMENT TERMS DUE DATE Myron Baxley Hugo Soccer Complex Cash, Check or Credit Upon Receipt Power wash complete exterior of building and use cleaner on areas that are discolored. $1,917.00 Paint siding and trim 2 coats SW Super Paint Satin $4,892.00 1.Stain Pine under shelter and 2 Entry’s SW Super Deck oil $4,959.50 2.(Option) Stain 2 coats on pine with Super Deck Premium translucent. This option will give you double the Life. $6,959.00 Total Pric with line 1. $11,768.50 We appreciate the opportunity for your business! Estimate Wetland Mitigation Proposal Draft Prospectus This is an optional review phase relying on limited, easily obtained, and readily available information to give mitigation sponsors early feedback from the reviewing agencies before a significant project investment is made. This template is available as an optional method to provide information that will assist with the review. It can be prepared with, or without, help from wetland consultants and comments or recommendations made will be commensurate with information provided. This document can be provided to the Wetland Conservation Act (WCA) Local Government Unit (LGU) and/or Corps of Engineers as indicated in the “Program Review Requested” section below. PROJECT NAME Project Type North Star Wetland Bank ☒Wetland Bank ☐In Lieu Fee Site ☐Project Specific (PRM) SPONSOR INFORMATION Agent Information (only if agent will represent sponsor) Sponsor’s Full Name Authorized Agent’s Name and Title (if applicable) Shayla Denaway Roxy Robertson, Sr. Environmental Scientist Company Company City of Hugo WSB Street Address Street Address 14669 Fitzgerald Ave N 178 9th St E, Unit 200 City State Zip Code City State Zip Code Hugo MN 55038 St. Paul MN 55101 Phone (Primary) Phone (Secondary) Phone (Other) Phone (Primary) Phone (Secondary) Phone (Other) 651-762-6300 651-392-4900 E-mail Address E-mail Address SDenaway@ci.hugo.mn.us rrobertson@wsbeng.com PROJECT LOCATION (Include a Site Location Map as Figure 1) County Est. Easement Size (acres) Watershed Name/No. or HUC 8 Bank Service Area Washington 123 20 - Mississippi River BSA 7 Latitude: Longitude: Section No. Township No. Range No. °N 45.170500 °W -92.995631 17 31 21 PROGRAM REVIEW REQUESTED (Select one) ☒State and Federal Review (Send to LGU and Corps) ☐State Review Only (Send to LGU only) ☐Federal Review Only (Send to Corps only) Draft Prospectus Document Page 2 07/07/2020 Site Description Historical Conditions: As best you can, describe your site’s historical condition and summarize any natural or man-made alterations to uplands and wetlands. For example, wetland restoration projects should estimate the site’s historical wetland location and type and describe when and how drainage has affected these wetlands. The site is located in Hugo, MN along Hwy 61 at the North Star Elementary School (Figure 1, Appendix A). Historic conditions of the site are shown in aerial photographs dating back to 1938. The land plat map from 1847 also depicts most of the SW1/4 of Section 17 as wetland. Historic aerial photographs identify that the site hydrology has been altered by drainage and conversion to cropland or rangeland since at least 1938 (Appendix B). Ditches were in place at this time in an attempt to create more tillable agricultural land. In the 1938 and 1947 aerials, much of the surrounding landscape shows saturated soils and uncropped portions of wetland, especially on land to the north of the site. Based on these characteristics and the information from the original 1847 plat map, the extent of the historic wetland appears to be larger than the proposed easement area and was likely a marsh or wooded swamp consistent with uncropped wetland areas visible to the north of the site in 1938 and 1947. Alterations to the site prior to 1938 included construction of an east-west ditch, with an inlet from a stream east of Hwy 61 and an outlet into Judicial Ditch 3 (also DNR PWI unnamed stream No. M-059-008-005-002) on the southwest part of the property. This ditch bisects the historic wetland on this site. Three perpendicular, lateral ditches were constructed north-south, and two other east-west ditches were present in early photographs on the south end of the property. The alteration of hydrology on the site has allowed for cropping and or haying use of the northern part of the site in past years. Vegetation throughout the property has been disturbed and altered by haying and or cropping in the drained portions of the wetland throughout the years. In the 1938 aerial, the northern portion of the site was used for cropping and the southern portion of the site was hayed or left fallow due to what appears to be a shrub carr wetland. By 1953, the southern portion of the site exhibits more vegetation clearing. The soil survey (Figure 4, Appendix A) identifies nearly all hydric soils within the proposed easement boundary. A majority of the site is mapped as Seelyeville muck which has a drainage class of very poorly drained with an organic parent material. Other dominant soil types within the site are Bluffton loam and Isanti loamy find sand. Both are described as very poorly drained soils. Bluffton loam is associated with depressional areas on moraines and Isanti loamy fine sand is associated with outwash plains. Soils that are mapped within the proposed site (historic wetland area) are hydric and conducive to supporting wetland conditions if hydrology is restored. Current Conditions: Describe your site’s current condition and land use, identify important site features (e.g. ditches, tile, borrow sites, building sites, utilities, etc.), and show these features on Figure 2. Land use nearby to the site is primarily residential, however all the parcel lines are buffered with a non- residential land use. To the west are stormwater ponds associated with Waters Edge South development, to the north is wetland and upland forested area, to the east is Hwy 61, and the southern parcel line is a cemetery. The North Star Elementary School is located immediately to the northeast with stormwater ponds adjacent to the wetland. The northern two thirds of the site are fallow with the last notable agricultural use appearing in the late 90s. Figure 2, Appendix A depicts the existing drainage features on and near the site. Water inputs at a crossing under Hwy 61 along the east edge into a linear ditch. The ditches through the wetland are present. The three north- south ditches have an approximate slope grade of 0.15%. The eastern-most north-south ditch is approximately 8 feet wide and 13 inches deep, and the central north-south ditch is approximately 20 feet wide with currently unknown depth due to frozen conditions. The central east-west ditch includes a 10-foot drop in elevation from Draft Prospectus Document Page 3 07/07/2020 east to west of approximately 918 down to 908, slope grades are approximately 0.50%. This ditch is wide and shallow with an approximate width of 3-4 feet and a depth of 5 inches near the inlet. Near the ditch intersections this east-west ditch may get up to 3 feet deep depending on wet conditions. Water generally flows from the north part of the site to the south (to the east-west ditch) where it is then directed to the west. Water at the central and southern portions of the site flow to the west. Rice Creek Watershed District (RCWD) floodplain, FEMA floodplain, and FEMA floodway are all mapped within the site. Judicial Ditch 3 (JD 3) is present along the western boundary of the parcel and is also a DNR Public Watercourse (PWI No. M-059-008-005-002). There are a few easements (drainage and utility) nearby or within the property. The easement for JD 3 runs along the western property boundary. Adjacent to JD 3 is also a utility easement for a Metropolitan Council sewer line. There is also a powerline in the upper northwest corner and north side of the property with an approximately easement width of 60 ft. A few stormwater inputs into the wetland were encountered from surrounding infrastructure along the southeast. No apparent drainage easements were found for the inputs, but further investigation is needed during the next project phase. An open water area near the inlet at Hwy 61 appears to be a constructed stormwater pond, but the City and MnDOT do not have records of a BMP at this location. A vegetation meander survey was conducted during the 2022 growing season and documented a mostly monotypic plant community consisting mostly of invasive species like reed canary grass mixed with a few native sedges, grasses, and shrubs such as wool grass and red osier dogwood (Appendix C). Much of the area north of the east-west ditch is dominated by native sedges and shrubs. A wooded area at the south end of the site has both native and invasive/nuisance woody trees. Hydrology monitoring wells were installed in eight locations from July 2022 through October 2022 and did not show hydrology for 14 consecutive days or more within 12 inches of the soil surface. The antecedent precipitation for this site was considered normal, however the U.S. Drought Monitor showed that Minnesota experienced a drought during the 2022 growing season. At most well locations, the maximum elevation of the water table was about two feet below the ground surface, with water elevations closer to the ground surface near the east-west ditch. Results from hydrology monitoring, review of historic aerial photos, and soil survey information indicate hydraulic alteration due to the existing ditch system and or subsurface tile drainage. Drain tiles may be present within the site given the past agricultural use. A tile investigation will need to be conducted during the prospectus phase. Partial or full drainage of the wetland from alterations to site hydrology have created ideal growing conditions for invasive monotypic vegetation. The City has established the project’s restoration and rehabilitation goals from the results of the initial hydrology monitoring and vegetation survey. Photos of the existing conditions are included in Appendix D. Existing Wetlands: Describe any existing wetlands on your site, the wetland vegetation present, and any alterations to the wetland. Show the existing wetlands and important features on Figure 2. Several level 2 wetland delineations have been completed in portions of the property. Level 2 delineation was completed at: • the western boundary and northwest corner by WSB in 2021. • the southwest part of the site near the cemetery by WSB in 2020. • A level 1 boundary was completed for the remainder of the site in association with the delineation from 2021. Draft Prospectus Document Page 4 07/07/2020 Wetland boundaries are shown on Figure 2, Appendix A. Much of the site is existing, partially drained wetland. There are small areas of upland at the far north and south ends of the site. Project Plans Thoroughly describe actions you will undertake to restore, enhance, or create wetland on your site. Support this narrative with a simple drawing or sketch showing where these actions will occur (Figure 3). For projects that preserve and protect existing high-quality wetlands, review the BWSR/Corps joint “Guidance on Evaluating Potential Wetland Preservation Sites …” and briefly describe how your proposal could satisfy eligibility requirements in the guidance. This document is available on BWSR and Corps websites. Figures 3a and 3b, Appendix A display two options for hydraulic wetland restoration. The goal of this project is to restore the historic hydrology of the currently drained historic wetland community, manage invasive vegetation monocultures, and establish native vegetation in perpetuity. Figure 3a, Appendix A shows Option 1, where the wetland hydrology would be restored by constructing 2-3 ditch plugs in the western and central north-south lateral ditches. Ditch plugs consist of clay core trenches compacted with construction-grade clay topped with topsoil and vegetation. Ditch plugs are keyed into the banks to prevent water from moving around them at high flows. One ditch plug would be constructed at the intersection of the eastern lateral ditch and the east-west main ditch channel. 2-3 plugs would also be constructed in the southern ditch. An outlet control structure (OCS) with a set elevation would be installed at the southwestern edge of the parcel where the ditch connects to JD 3. Figure 3b, Appendix A shows Option 2. The western and central north-south lateral ditches would be filled. One ditch plug would be constructed at the intersection of the eastern lateral ditch and the east-west main ditch channel. One ditch plug would be constructed at the western extent of the south ditch. An OCS with a set elevation would be installed at the southwestern edge of the parcel where the ditch connects to JD 3. A number of steps must be completed prior to selecting once of these options. Topographic survey, hydraulic assessment, easement encumbrance review, subsurface drainage assessment, and soil investigation. As part of the hydraulic assessment a topographic survey will be completed in addition to subsurface tile review and a soil investigation to determine if sandy subsoils are present below the organic soils on site. Hydrology modelling will be utilized (in the prospectus phase) to determine existing conditions that include the scope and effect from JD 3 on the wetland, as well as proposed conditions to determine where the ditch plugs can be placed without causing adverse effects to upstream or downstream properties. Modeling data will be used to design the ditch plug placement and the runout elevation at the OCS. The project will restore historic hydrology to the site creating saturated conditions that are undesirable for invasive species such as reed canary grass. Vegetation management will include a site-wide herbicide application on invasives in the spring. Selected tree removal will also occur at this time in the wooded areas of the site to eliminate invasive and nuisance trees. Another site-wide herbicide application would be completed during the late summer followed by either a controlled burn or mowing in the fall. The site would be seeded with native vegetation in the fall and supplemental plantings of trees and shrubs would be installed in the wooded areas. Site construction would occur in late fall or winter following initial vegetation management to increase the amount of water on the site and to create less desirable growing conditions for reed canary grass to reestablish. Post construction, the city would continue vegetation management (herbicide applications, burn/mow, supplemental seeding, etc.) in perpetuity to maintain the quality of the wetland bank. Bank performance standards and a vegetation management plan will be developed during future phases of this project. The native vegetative Draft Prospectus Document Page 5 07/07/2020 communities to be established in the wetland bank include shallow marsh, wet meadow, shrub carr (existing), and upland buffer. In both options, the City in partnership with the school district would like to utilize the wetland bank as an Environmental Learning Center by including trails through the wetland bank. These trails would allow the elementary school kids access to outdoor learning opportunities. There is discussion about the trails being constructed on an upland berm or as boardwalk, but the City would like to discuss options with the TEP and IRT during the prospectus phase of this project. Locations of potential trails are shown on the Figures 3a and 3b in Appendix A. Issues to Address The following is a list of items, issues, and features that may constrain your wetland replacement project, affect easement acquisition, or need additional information in later phases: ☒Yes ☐ No Do any existing or former wetlands on your site extend outside your project boundary? ☐Yes ☒ No Could your project increase surface or ground water levels on neighboring properties? ☐Yes ☒ No To the best of your knowledge, are there any public drainage systems or private drainage easements or agreements on the property? ☐Yes ☒ No Could your project impair or nullify existing drainage systems on neighboring properties? ☒Yes ☐ No Are wetlands on, or adjacent to, your site dominated by problematic invasive or nonnative species like reed canary grass or cattail? ☐Yes ☒ No Are there any existing permanent conservation easements on, or adjacent to, your project area (e.g. RIM, WRP, U.S. Fish and Wildlife, Land Trust, etc.)? ☐Yes ☒ No Is any part of your project area currently enrolled in CRP or another state or federal conservation program (EQIP, WHIP, CSP, other)? ☒Yes ☐ No To the best of your knowledge, are there pipelines, utilities, other easements, or legal restrictions on your property? ☐Yes ☒ No Are your property’s mineral rights owned by someone other than you? ☒Yes ☐ No Are any airports located within 5 miles of your project? ☐Yes ☒ No Are any existing wells in your project boundary and are there high capacity wells (e.g. irrigation wells) within 1 mile of your property? ☐Yes ☒ No To the best of your knowledge, has the project area, or an area within 200 feet of the project area, been used to store or dispose of hazardous substances, pollutants, or contaminants (including agricultural chemicals or fertilizer); or been used as a private or public dumpsite? If the answer to any questions above is “yes”, please describe or explain each situation and summarize your plan(s) to address the issue at future phases. The proposed wetland bank site is a part of a larger historic wetland that extends to the north into an area surrounded by residential development. Hydrology modelling will be conducted to ensure that project design doesn’t have adverse impacts to adjacent properties. Draft Prospectus Document Page 6 07/07/2020 There are two open water areas that show up on aerial photographs, one near the stormwater ponds at the school and one near the Hwy 61 right-of-way. A review of historic aerial photographs shows that the pond near Hwy 61 was created between 1953 and 1964. The pond by the school was created between 1964 and 1974. Both ponds appear to have been created by the farmer however there does appear to be a constructed berm around the pond near Hwy 61 and further investigation and discussion with MnDOT is needed to determine is this is a stormwater treatment basin. Most of the site is partially drained due to extensive ditching throughout. Low and fluctuating levels of water in the wetland have caused reed canary grass to grow. Based on an initial vegetation survey conducted during the 2022 growing season, there are also areas of the wetland with less invasive species and a mix of native hydrophytic plants. The results from this survey are included in Appendix C. As briefly described above, site management will be critical while establishing the vegetation on this site and during future ongoing maintenance of the site. There are two linear easements that are mapped through or near the site as described above. The judicial ditch 3 has a drainage easement along the western boundary of the parcel as well as a Metropolitan Council sewer line. There is also an above ground transmission line in the northwest corner and northern boundary of the site. The proposed conservation easement boundary excludes known easements. Correspondence with FSA will occur due to the site proximity to Benson Airport approximately 3.5 miles to the south of the wetland bank site. Project Expectations Estimate how many wetland acres your project will restore, enhance, create, or preserve and briefly describe why your project is eligible to use these credit actions. If you are unfamiliar with state and federal credit actions, reviewers may be able to identify likely credit actions applicable to your project. If you have estimated your site’s credit potential, provide this estimate and describe the basis for this estimate. The proposed conditions of the site include abandoning constructed ditches and establishing a runout elevation of the wetland that will allow the restoration of historic hydrologic conditions. The proposed restored wetland will re-establish subsurface hydrology to existing hydric soils and re-establish native plant communities through seeding and vegetative management. Credit Area Proposed Credit Action Credit Allocation Acres Credit Amount Wetland Restoration (3) 100 19.6 19.6000 Wetland Rehabilitation (4B) 50 98.71 49.3550 Upland Upland Buffer 25 5.12 1.2800 Total 123.43 70.235 Other Information Include any other project or property information you want agencies to know or consider as they evaluate your wetland replacement project. For example, are there known or anticipated plans for other portions of your property or adjacent properties? Draft Prospectus Document Page 7 07/07/2020 Figures to Include Figure 1. Site Location Map: Provide a Site Location Map showing your project’s location relative to known features or landmarks (e.g. lakes, rivers, cities, highways, county boundaries, etc.). Figure 2. Project/Easement Boundary: Show your project/easement boundary and relevant existing features on a recent aerial photo. If your county has an online property mapping application with parcel boundaries this is a good tool to use. Figure 3. Project Illustration: Provide a simple drawing or sketch of proposed work, showing enough detail for reviewers to understand your project plans. Draft Prospectus Document Page 9 07/07/2020 APPENDIX A - Figures Anoka Chisago HennepinIsanti RamseyWashingtonDocument Path: K:\020552-000\GIS\Maps\Northstar_DraftProspectus\Fig1_Project Location Date Saved: 3/29/2023¯1 inch = 1 mile 0 1 MilesNorth Star Wetland Bank Hugo, MN Figure 1 - Site Location Project Location Project Site """""""""" """"""""" " " " """"""""""""" """""""""""""""&&&&&&&&&!( !( !( !( !( !( !( !(!( !( !( !( !( !( !(!(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !(!(!(!( !(!(!( !(!(!( !(!( !(!( !(!( !( !(!( !( !( !( !(!( !( !( !( !( !( !(!(!( !(!( !(!( !(!( !(!(!( !(Document Path: K:\020552-000\GIS\Maps\Northstar_DraftProspectus\Fig2_Proposed Easement and Existing Conditions Date Saved: 3/29/2023¯1 inch = 550 feet 0 550 FeetNorth Star Wetland Bank Hugo, MN Figure 2 - Proposed Easement and Existing Conditions Proposed Easement Boundary (140 ac) Delineated Wetland Boundary Subwatershed Easement Lines Private Ditch Public Ditch (JD 3) !(Discharge Points &Drainage Direction LiDAR Topography Storm Sewer """""""""""""""""""""""""""" " "" " " " " " """ ## 9 1 4906 926916920916 928926 922928 9209 1 4 910 91890691 6 912912912 912906908924914922922 924920 920906910918918908916914912 910Document Path: K:\020552-000\GIS\Maps\Northstar_DraftProspectus\Fig3_Proposed Project Plan_A Date Saved: 3/31/2023¯1 inch = 450 feet 0 450 FeetNorth Star Wetland Bank Hugo, MN Figure 3a - Project Plan (Option 1) Proposed Easement Boundary Proposed Wetland Boundary Proposed Upland Buffer (5.12 ac) Proposed Rehabilitation (98.71 ac) Proposed Restoration (19.6 ac) Potential Future ELC Trail StormSewer Utility Easement LiDAR Contours #Outlet Control Structure "Ditch Plug """"" """"""""""""""""""""""""" " " ## 9 1 4906 9269169 2 0 916 928926 922928 9209 1 4 910 91890691 6 912912912 912906908924914922922 924920 920906910918918908916914912 910Document Path: K:\020552-000\GIS\Maps\Northstar_DraftProspectus\Fig3_Proposed Project Plan_B Date Saved: 3/31/2023¯1 inch = 450 feet 0 450 FeetNorth Star Wetland Bank Hugo, MN Figure 3b - Project Plan (Option 2) Proposed Easement Boundary Proposed Upland Buffer (5.12 ac) Proposed Restoration (19.6 ac) Proposed Rehabilitation (98.71 ac) Proposed Wetland Boundary Potential Future ELC Trail StormSewer Utility Easement LiDAR Contours Ditch Fill #Outlet Control Structure "Ditch Plugs 162 161 75 1813B 123 159113 158C 162 481123 158B 75 123 225 225 540 1813B 123 113 162 75 161 123 544 1813B 75 75 1813B 75 158C 161 75 158C 75 161 162 541 158B 158B 543158C Document Path: K:\020552-000\GIS\Maps\Northstar_DraftProspectus\Fig4_Soil Survey Date Saved: 3/29/2023¯1 inch = 550 feet 0 550 FeetNorth Star Wetland Bank Hugo, MN Figure 4 - Soil Survey Proposed Easement Boundary Wetland Boundary Hydric Soil Not Hydric Soil Map Unit Symbol Map Unit Name Hydric Rating Hydric Criteria 75 Bluffton loam 100 Hydric 113 Webster loam 100 Hydric 123 Dundas fine sandy loam 95 Predominantly hydric 158B Zimmerman fine sand, 1 to 6 percent slopes 2 Predominantly not hydric 158C Zimmerman fine sand, 6 to 12 percent slopes 4 Predominantly not hydric 159 Anoka loamy fine sand, 0 to 3 percent slopes 0 Not hydric 161 Isanti loamy fine sand, depressional 92 Predominantly hydric 162 Lino loamy fine sand 5 Predominantly not hydric 225 Nessel fine sandy loam, 1 to 4 percent slopes 3 Predominantly not hydric 481 Kratka fine sandy loam 97 Predominantly hydric 540 Seelyeville muck 100 Hydric 544 Cathro muck 97 Predominantly hydric 1813B Lino variant loamy fine sand, 2 to 6 percent slopes 0 Not hydric 912918917912912 912916912 912 912929912 929913912 912 912 912 AE AE AE AE AE AE AE AE A AE AE AE AEAE AE AE AE A AE AEAE AE AE AEAE Document Path: K:\020552-000\GIS\Maps\Northstar_DraftProspectus\Fig5_Floodplain and Floodway Date Saved: 3/29/2023¯1 inch = 700 feet 0 700 FeetNorth Star Wetland Bank Hugo, MN Figure 5 - Floodplain and Floodway Proposed Easement Boundary Private Ditch Public Ditch (JD 3) RCWD Floodplains (June 2021) FEMA Floodplain and Floodway Base Flood Elevations FLOODWAY FLD_ZONE A AE AH AO FLD_ZONE 0.2 PCT ANNUAL CHANCE FLOOD HAZARD X PROTECTED BY LEVEE Draft Prospectus Document Page 10 07/07/2020 APPENDIX B – Historic Aerials Document Path: K:\020552-000\GIS\Maps\Northstar_DraftProspectus\HistoricAerialsPhotos Date Saved: 3/21/2023¯1 inch = 450 feet 0 450 FeetNorth Star Wetland Bank Hugo, MN Historic Aerial - 1847 Plat Map Proposed Easement Boundary Document Path: K:\020552-000\GIS\Maps\Northstar_DraftProspectus\HistoricAerialsPhotos Date Saved: 3/21/2023¯1 inch = 450 feet 0 450 FeetNorth Star Wetland Bank Hugo, MN Historic Aerial - 1938 Proposed Easement Boundary Document Path: K:\020552-000\GIS\Maps\Northstar_DraftProspectus\HistoricAerialsPhotos Date Saved: 3/21/2023¯1 inch = 450 feet 0 450 FeetNorth Star Wetland Bank Hugo, MN Historic Aerial - 1947 Proposed Easement Boundary Document Path: K:\020552-000\GIS\Maps\Northstar_DraftProspectus\HistoricAerialsPhotos Date Saved: 3/21/2023¯1 inch = 450 feet 0 450 FeetNorth Star Wetland Bank Hugo, MN Historic Aerial - 1953 Proposed Easement Boundary Document Path: K:\020552-000\GIS\Maps\Northstar_DraftProspectus\HistoricAerialsPhotos Date Saved: 3/21/2023¯1 inch = 450 feet 0 450 FeetNorth Star Wetland Bank Hugo, MN Historic Aerial - 1964 Proposed Easement Boundary Document Path: K:\020552-000\GIS\Maps\Northstar_DraftProspectus\HistoricAerialsPhotos Date Saved: 3/21/2023¯1 inch = 450 feet 0 450 FeetNorth Star Wetland Bank Hugo, MN Historic Aerial - 1980 Proposed Easement Boundary Document Path: K:\020552-000\GIS\Maps\Northstar_DraftProspectus\HistoricAerialsPhotos Date Saved: 3/21/2023¯1 inch = 450 feet 0 450 FeetNorth Star Wetland Bank Hugo, MN Historic Aerial - 1997 Proposed Easement Boundary Document Path: K:\020552-000\GIS\Maps\Northstar_DraftProspectus\HistoricAerialsPhotos Date Saved: 3/21/2023¯1 inch = 450 feet 0 450 FeetNorth Star Wetland Bank Hugo, MN Historic Aerial - 2000 Proposed Easement Boundary Document Path: K:\020552-000\GIS\Maps\Northstar_DraftProspectus\HistoricAerialsPhotos Date Saved: 3/21/2023¯1 inch = 450 feet 0 450 FeetNorth Star Wetland Bank Hugo, MN Historic Aerial - 2010 Proposed Easement Boundary Document Path: K:\020552-000\GIS\Maps\Northstar_DraftProspectus\HistoricAerialsPhotos Date Saved: 3/21/2023¯1 inch = 450 feet 0 450 FeetNorth Star Wetland Bank Hugo, MN Historic Aerial - 2019 Proposed Easement Boundary Document Path: K:\020552-000\GIS\Maps\Northstar_DraftProspectus\HistoricAerialsPhotos Date Saved: 3/21/2023¯1 inch = 450 feet 0 450 FeetNorth Star Wetland Bank Hugo, MN Historic Aerial - 2022 Proposed Easement Boundary Draft Prospectus Document Page 11 07/07/2020 APPENDIX C – Hydrology and Vegetation Survey K:\020552-000\Admin\Docs\Memo - 2022 Data Summary and Recommendation - 111622.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM Memorandum To: Brian Bear, City of Hugo Copy: Tony Havranek, WSB Rebecca Haug, WSB From: Roxy Robertson, WSB Date: November 16, 2022 Re: City of Hugo Northstar Wetland Bank 2022 Data Summary and Recommendation WSB Project No. 20552 1. INTRODUCTION The wetland bank development and approval process requires the city (applicant) to summarize the existing environmental setting, including detailed information about soils, hydrology, and vegetation composition. This memorandum summarizes the results of the vegetation assessment and hydrology monitoring conducted during the 2022 growing season. The purpose of the vegetation assessment is to understand the existing vegetation quality throughout the site, the potential functional lift from the wetland restoration, and which non-native invasive species could/should be managed in the future vegetation performance plan. The hydrology monitoring gives an understanding of the existing groundwater levels and provides a baseline for functional lift. 2. VEGETATION ASSESSMENT A. Methodology WSB followed the US Department of Agriculture (USDA) Forest Service FIREMON Cover/Frequency (CF) method to assess the vegetation in the field. The CF method is used to assess changes in plant species cover and frequency for a m acro plot. This method uses multiple quadrats to sample within plot variation and quantify statistically valid changes in plant species cover, height, and frequency over time (Caratti 2006). The vegetation assessment includes Floristic Quality Assessments (FQA) for various locations within the site. FQAs are measurements of either a natural area's habitat condition or quality, or a natural community’s condition or quality within a specific site. FQAs are widely used by government agencies and natural resource professionals to inform land management decisions. This FQA method assigns plant species a rating that reflects the species’ basic conservatism (hardiness and suitability) that the species exhibits for natural habitats. A native species that needs very specific conditions in the environment to exist is given a high rating. A pervasive species that exhibits adaptation to a broad spectrum of environmental variables is given a low rating. Utilizing this method, a Floristic Quality Index (FQI) and Native Mean C are derived for each wetland. Brian Bear, City of Hugo November 16, 2022 Page 2 K:\020552-000\Admin\Docs\Memo - 2022 Data Summary and Recommendation - 111622.docx The FQI is an indication of native vegetative quality for an area: generally, 1-19 indicates low vegetative quality, 20-35 indicates high vegetative quality, and above 35 indicates “Natural Area” quality. Wetlands with an FQI of 20 or greater are considered high-quality aquatic resources. WSB completed a comprehensive meander survey throughout the site, and at the various sample locations. Every species observed was recorded and entered into the assessments. B. Macro Plot Site Selection Three macro plots were selected at the site to be representative of the wetland vegetation communities. Each macro plot was sited to provide a representative vegetation composition. Locations of macro plots are shown on Attachment A. C. Cover/Frequency Survey The FIREMON Cover/Frequency (CF) method was used to assess the changes in plant species cover and frequency within the selected macro plots. This method was selected because the aerial coverage data can be used to estimate species coverage throughout the entir e site. Macro plots were 66-feet long by 66-feet wide, divided into five evenly spaced transects. Along each transect, 5 evenly spaced sampling quadrats were placed at 12, 24, 36, 48, and 60 feet along the transect. Quadrats were 20 inches by 20 inches in size and all vegetation data was collected from the rooted vegetation within each quadrat. Cover was assessed by visually estimating the percent of a quadrat occupied by vertical projection of vegetation onto the ground. Data for plant species frequency was recorded as the nested rooted frequency (NRF) of a species within subplots of each quadrant. The NRF essentially estimated the percent area of the quadrat that contained each species using subplots of 1:25:50:100 percent ratios of the quadrat. All transects within each microplot were surveyed on the same day. The name, status (dead or alive), cover class, NRF, and plant height were recorded for every species observed within each quadrat. D. Analysis Data collected from each macro plot was entered into the Universal FQA Calculator (Freyman et al. 2015), an open-source tool available to the public to evaluate collected data. The FQI is based on coefficient of conservatism (C) values, which according to the Minnesota Pollution Control Agency (MPCA), is a numerical value ranging from 0-10 of a species’ fidelity to specific habitats and tolerance to disturbance. Plants that have narrow habitat requirements and little tolerance for disturbance will have high C values. C values were obtained from the Universal FQA Calculator and the outputs are included in Attachment B. A mean C (𝐶) value was calculated for each macro plot by summing the C values and dividing by the total number of species observed. The 𝐶 represents the average conservatism of the plant community. By repeating surveys and calculating the 𝐶 over time, temporal changes in floristic quality can be evaluated (a decrease in 𝐶 is equivalent to a decrease in habitat quality). FQI was calculated from the 𝐶 by multiplying by the square root of the total number of species observed. This gives a weighted species richness estimate that uses the square root transformation of N to limit the influence of area alone on species richness (Swink and Wilhelm, 1979, 1994). D. Results The FQA Summary is included in Table 1. In summary, all wetlands contain low vegetative quality as listed in the “Total FQI” column in Table 1. FQA detailed results are included as Attachment 2. Brian Bear, City of Hugo November 16, 2022 Page 3 K:\020552-000\Admin\Docs\Memo - 2022 Data Summary and Recommendation - 111622.docx Table 1. Site Floristic Quality Assessment (FQA) Results Summary Plot ID Native Species Richness N Total FQI Native FQI Total Mean C Native Mean C A 22 19.2 19.7 4.1 4.3 B 2 0.7 1.0 0.5 1.0 C 7 5.0 5.8 1.9 2.6 3. HYDROLOGY MONITORING A. Methodology and Site Selection Nine hydrology monitoring wells were installed throughout the wetland, seven being spread throughout the site, one logger was installed within the ditch, and one reference data logger was installed in a wetland to west of the site on July 6, 2022 as shown in Attachment C. Wells were installed per the BWSR guidance Hydrologic Monitoring of Wetlands. One-inch and one-and-half- inch diameter wells were installed that consisted of a slotted well screen positioned at least 2 feet below the ground level and an unslotted riser that rose above the ground surface. The total well depths ranged from 2-3 feet. Within each well, a data logger was used to measure pressure (PSI), temperature (C), and depth of water (feet above the sensor). Each measurement was logged once per hour. Well data was downloaded once mid-season and again at the end of the growing season (October 4, 2022). B. Results Graphs showing the hydrology monitoring results are included in Attachment D. The data logger in well 6 malfunctioned and the data was lost. Table 2. Hydrology Monitoring Data Summary Well ID Ground surface elevation (ft) Maximum water elevation (ft) Events (14 consecutive days or more within 12 inches of ground surface) Days within 12 inches of ground surface 1 912.3 910.5 0 0 2 916.3 916.2 0 16 3 908.1 906.4 0 0 4 908.7 906.3 0 0 5 911.1 911.0 0 9 6 NA NA NA NA 7 910.6 908.9 0 0 Reference 915.5 914.0 0 0 Climate conditions were evaluated using on site data and precipitation data from the State Climatology Office. Antecedent precipitation records for each month as well as on site data are included in Attachment E. Antecedent precipitation (three months prior) for each month of the growing season is outlined in Table 3. Table 3. Antecedent Precipitation for 2022 Growing Season Monitoring Month 3 Month Prior Antecedent Precipitation Onsite Precipitation Recorded July Normal 0.99 in August Drier than Normal 4.40 in Brian Bear, City of Hugo November 16, 2022 Page 4 K:\020552-000\Admin\Docs\Memo - 2022 Data Summary and Recommendation - 111622.docx Monitoring Month 3 Month Prior Antecedent Precipitation Onsite Precipitation Recorded September Normal 0.61 in October Normal NA (data only collected through 10/4/22) Based on the data, the wetland at locations 2 and 5 are showing wetland hydrology at some point during the growing season between July and October, typical of a fresh wet meadow wetland. It is likely that the wetland in well locations 1, 3, 4, and 7 would show wetland hydrology after spring runoff, typical of a seasonally flooded wetland but further hydrology monitoring would be needed in early spring to evaluate whether these areas meet wetland hydrology. The climatic conditions throughout the growing season were generally normal, however according to the U.S. Drought Monitor, Minnesota overall has experienced a drought during the 2022 season and was in a severe drought (D2) by August and an extreme drought (D3) by November 2022. The U.S. Drought Monitor is jointly produced by the National Drought Mitigation Center at the University of Nebraska-Lincoln, the United States Department of Agriculture, and the National Oceanic and Atmospheric Administration. 4. DATA SUMMARY AND RECOMMENDATIONS The existing vegetative composition of the site is low quality based on the FQI results and species richness. Diversifying the vegetation composition and reducing the number of invasive species on site would provide a functional lift to the vegetation in the wetland areas. Similarly, the hydrology data has indicated wetland hydrology in a portion of the site. Early spring hydrology data may also indicate wetland hydrology throughout the entire site if collected during a normal precipitation year. The data suggest that the wetland areas at well sites 1, 3, 4, and 7 are likely functioning as non-wetland or a seasonally flooded wetland type, possibly partially drained or fully drained by the adjacent ditches. Well sites 2 and 5 are functioning as a seasonally flooded wetland or fresh wet meadow but are also possibly partially drained. Elimination of adjacent ditches and restoration of wetland hydrology could potentially restore a large portion of the site to either seasonally flooded/fresh wet meadow or fresh wet meadow/shallow marsh, allowing water to be within 12 inches of the soil surface or inundated for 14 or more consecutive days within the growing season. Based on the data, actions that could generate wetland replacement credits at this site are listed in Table 4. Option A is if well sites 1, 3, 4, and 7 are fully drained. Option B is if the entire project area wetland is considered partially drained. Acreages are estimates to give an idea of what a wetland bank at this site could generate but would be further refined during the prospectus phase of the wetland banking process. Table 4. Actions To Generate Wetland Credits Action Percent of Acreage Receiving Credit Acres of Site Estimated Credit Potential Establish upland buffer adjacent to a wetland 25 Option A: 16.5 Option B: 16.5 Option A: 4.125 Option B: 4.125 Restoration of a completely drained/filled wetland 100 Option A: 97 Option B: 4 Option A: 97 Option B: 4 Restoration of a partially drained or filled wetland without cropping history 50 Option A: 30 Option B: 123 Option A: 15 Option B: 61.5 Option A Total Credits: 116.125 Option B Total Credits: 69.625 Brian Bear, City of Hugo November 16, 2022 Page 5 K:\020552-000\Admin\Docs\Memo - 2022 Data Summary and Recommendation - 111622.docx Based on the findings from the data collected during the 2022 growing season, there is potential to generate wetland bank credits at this site. It is our recommendation that the city completes the draft prospectus phase of the wetland banking application process to receive comments and feedback from the Technical Evaluation Panel about this site. If you have questions, please contact Roxy Robertson at rrobertson@wsbeng.com or 651-343- 8730. Attachment A: Vegetation Survey Map Attachment B: FQA Results Attachment C: Monitoring Well Location Figure Attachment D: Hydrology Monitoring Graph Results Attachment E: Antecedent Precipitation Records Citation Caratti, John F. 2006. Cover/Frequency (CF). In: Lutes, Duncan C.; Keane, Robert E.; Caratti, John F.; Key, Carl H.; Benson, Nathan C.; Sutherland, Steve; Gangi, Larry J. 2006. FIREMON: Fire effects monitoring and inventory system. Gen. Tech. Rep. RMRS-GTR-164-CD. Fort Collins, CO: U.S. Department of Agriculture, Forest Service, Rocky Mountain Research Station. p. CF-1- 15 Freyman, W.A., L.A. Masters, and S. Packard. 2015. The Universal Floristic Quality Assessment (FQA) Calculator: an online tool for ecological assessment and monitoring. Methods in Ecology and Evolution 7(3): 380–383 Swink, F.A., and Wilhelm, G.S. 1979, Plants of the Chicago region (3d ed.): Lisle, Ill., Morton Arboretum. Swink, F.A. and Wilhelm, G.S. 1994, Plants of the Chicago region (4th ed.): Indianapolis, Ind., Indiana Academy of Science, 921 p. Brian Bear, City of Hugo November 16, 2022 Page 6 K:\020552-000\Admin\Docs\Memo - 2022 Data Summary and Recommendation - 111622.docx ATTACHMENT A: Vegetation Survey Map Macro Plot A Macro Plot B Macro Plot CFarnhamAveN149thStNOneka Pkwy NFinaleAveNFoxhillAveN148th St N 1 4 7 t h S t N Foster Dr N 150th St N 152nd St N Forest Blvd NFlayAveNF a l k D r N FrenchDrNFreedomDrNDocument Path: K:\020552-000\GIS\Maps\WetlandBankMacroPlots\NorthstarWetlandBank Date Saved: 8/5/2022¯ 1 inch = 450 feet 0 450 FeetNorthstar Wetland Bank City of Hugo Vegetation Survey Project Location Parcel Boundary Meander Survey Photo Point Macro Plot Brian Bear, City of Hugo November 16, 2022 Page 7 K:\020552-000\Admin\Docs\Memo - 2022 Data Summary and Recommendation - 111622.docx ATTACHMENT B: FQA Results Brian Bear, City of Hugo November 16, 2022 Page 8 K:\020552-000\Admin\Docs\Memo - 2022 Data Summary and Recommendation - 111622.docx ATTACHMENT C: Monitoring Well Location Figure Brian Bear, City of Hugo November 16, 2022 Page 9 K:\020552-000\Admin\Docs\Memo - 2022 Data Summary and Recommendation - 111622.docx ATTACHMENT D: Hydrology Monitoring Graph Results 0.000.200.400.600.801.001.201.401.601.802.00910.0910.5911.0911.5912.0912.5Precip. (in)Water Elevation (ft)2022 Northstar Wetland Bank Monitoring Location 1 Daily Precip (in)Water LevelGround Surface 0.000.200.400.600.801.001.201.401.601.802.00913.0913.5914.0914.5915.0915.5916.0916.5917.0Precip. (in)Water Elevation (ft)2022 Northstar Wetland Bank Monitoring Location 2 Daily Precip (in)Water LevelGround Surface 0.000.200.400.600.801.001.201.401.601.802.00905.0905.5906.0906.5907.0907.5908.0908.5909.0Precip. (in)Water Elevation (ft)2022 Northstar Wetland Bank Monitoring Location 3 Daily Precip (in)Water LevelGround Surface 0.000.200.400.600.801.001.201.401.601.802.00905.0905.5906.0906.5907.0907.5908.0908.5909.0Precip. (in)Water Elevation (ft)2022 Northstar Wetland Bank Monitoring Location 4 Daily Precip (in)Water LevelGround Surface 0.000.200.400.600.801.001.201.401.601.802.00908.0908.5909.0909.5910.0910.5911.0911.5912.0Precip. (in)Water Elevation (ft)2022 Northstar Wetland Bank Monitoring Location 5 Daily Precip (in)Water LevelGround Surface 0.000.200.400.600.801.001.201.401.601.802.00908.0908.5909.0909.5910.0910.5911.0Precip. (in)Water Elevation (ft)2022 Northstar Wetland Bank Monitoring Location 7 Daily Precip (in)Water LevelGround Surface Brian Bear, City of Hugo November 16, 2022 Page 10 K:\020552-000\Admin\Docs\Memo - 2022 Data Summary and Recommendation - 111622.docx ATTACHMENT E: Antecedent Precipitation Records 11/16/22, 3:02 PM Precipitation Documentation Worksheet Using Gridded Database https://climateapps.dnr.state.mn.us/gridded_data/precip/wetland/worksheet.asp?passXutm83=491191&passYutm83=5002394&passcounty=Anoka&p…1/1 Minnesota State Climatology Office State Climatology Office - DNR Division of Ecological and Water Resources home | current conditions | journal | past data | summaries | agriculture | other sites | about us Precipitation Worksheet Using Gridded Database Precipitation data for target wetland location: county: Anoka township number: 31N township name: Linn Lakes range number: 22W nearest community: Lino Lakes section number: 17 Aerial photograph or site visit date: Friday, July 1, 2022 Score using 1991-2020 normal period values are in inches A 'R' following a monthly total indicates a provisional value derived from radar-based estimates. first prior month: June 2022 second prior month: May 2022 third prior month: April 2022 estimated precipitation total for this location:1.60 4.63 3.70 there is a 30% chance this location will have less than:3.45 3.34 1.92 there is a 30% chance this location will have more than:4.90 4.89 3.13 type of month: dry normal wet dry normal wet monthly score 3 * 1 = 3 2 * 2 = 4 1 * 3 = 3 multi-month score: 6 to 9 (dry) 10 to 14 (normal) 15 to 18 (wet)10 (Normal) Other Resources: retrieve daily precipitation data view radar-based precipitation estimates view weekly precipitation maps Evaluating Antecedent Precipitation Conditions (BWSR) 11/16/22, 3:02 PM Precipitation Documentation Worksheet Using Gridded Database https://climateapps.dnr.state.mn.us/gridded_data/precip/wetland/worksheet.asp?passXutm83=491191&passYutm83=5002394&passcounty=Anoka&p…1/1 Minnesota State Climatology Office State Climatology Office - DNR Division of Ecological and Water Resources home | current conditions | journal | past data | summaries | agriculture | other sites | about us Precipitation Worksheet Using Gridded Database Precipitation data for target wetland location: county: Anoka township number: 31N township name: Linn Lakes range number: 22W nearest community: Lino Lakes section number: 17 Aerial photograph or site visit date: Monday, August 1, 2022 Score using 1991-2020 normal period values are in inches A 'R' following a monthly total indicates a provisional value derived from radar-based estimates. first prior month: July 2022 second prior month: June 2022 third prior month: May 2022 estimated precipitation total for this location:1.62R 1.60 4.63 there is a 30% chance this location will have less than:2.70 3.45 3.34 there is a 30% chance this location will have more than:4.94 4.90 4.89 type of month: dry normal wet dry dry normal monthly score 3 * 1 = 3 2 * 1 = 2 1 * 2 = 2 multi-month score: 6 to 9 (dry) 10 to 14 (normal) 15 to 18 (wet)7 (Dry) Other Resources: retrieve daily precipitation data view radar-based precipitation estimates view weekly precipitation maps Evaluating Antecedent Precipitation Conditions (BWSR) 11/16/22, 3:03 PM Precipitation Documentation Worksheet Using Gridded Database https://climateapps.dnr.state.mn.us/gridded_data/precip/wetland/worksheet.asp?passXutm83=491191&passYutm83=5002394&passcounty=Anoka&p…1/1 Minnesota State Climatology Office State Climatology Office - DNR Division of Ecological and Water Resources home | current conditions | journal | past data | summaries | agriculture | other sites | about us Precipitation Worksheet Using Gridded Database Precipitation data for target wetland location: county: Anoka township number: 31N township name: Linn Lakes range number: 22W nearest community: Lino Lakes section number: 17 Aerial photograph or site visit date: Thursday, September 1, 2022 Score using 1991-2020 normal period values are in inches A 'R' following a monthly total indicates a provisional value derived from radar-based estimates. first prior month: August 2022 second prior month: July 2022 third prior month: June 2022 estimated precipitation total for this location:5.05R 1.62R 1.60 there is a 30% chance this location will have less than:3.24 2.70 3.45 there is a 30% chance this location will have more than:4.83 4.94 4.90 type of month: dry normal wet wet dry dry monthly score 3 * 3 = 9 2 * 1 = 2 1 * 1 = 1 multi-month score: 6 to 9 (dry) 10 to 14 (normal) 15 to 18 (wet)12 (Normal) Other Resources: retrieve daily precipitation data view radar-based precipitation estimates view weekly precipitation maps Evaluating Antecedent Precipitation Conditions (BWSR) 11/16/22, 3:03 PM Precipitation Documentation Worksheet Using Gridded Database https://climateapps.dnr.state.mn.us/gridded_data/precip/wetland/worksheet.asp?passXutm83=491191&passYutm83=5002394&passcounty=Anoka&p…1/1 Minnesota State Climatology Office State Climatology Office - DNR Division of Ecological and Water Resources home | current conditions | journal | past data | summaries | agriculture | other sites | about us Precipitation Worksheet Using Gridded Database Precipitation data for target wetland location: county: Anoka township number: 31N township name: Linn Lakes range number: 22W nearest community: Lino Lakes section number: 17 Aerial photograph or site visit date: Saturday, October 1, 2022 Score using 1991-2020 normal period values are in inches A 'R' following a monthly total indicates a provisional value derived from radar-based estimates. first prior month: September 2022 second prior month: August 2022 third prior month: July 2022 estimated precipitation total for this location:0.87R 5.05R 1.62R there is a 30% chance this location will have less than:1.65 3.24 2.70 there is a 30% chance this location will have more than:4.40 4.83 4.94 type of month: dry normal wet dry wet dry monthly score 3 * 1 = 3 2 * 3 = 6 1 * 1 = 1 multi-month score: 6 to 9 (dry) 10 to 14 (normal) 15 to 18 (wet)10 (Normal) Other Resources: retrieve daily precipitation data view radar-based precipitation estimates view weekly precipitation maps Evaluating Antecedent Precipitation Conditions (BWSR) Temperature Dew Point Humidity Speed Pressure Precip. Accum. Date High Avg Low High Avg Low High Avg Low High Avg Low High Low Sum 7/6/22 0:00 79.0 °F 71.1 °F 63.5 °F 70.0 °F 64.7 °F 59.4 °F 90 %81 %66 %5.0 mph 0.0 mph 0.0 mph 30.01 in 29.88 in 0.00 7/7/22 0:00 85.4 °F 75.6 °F 64.5 °F 76.4 °F 68.4 °F 61.8 °F 95 %79 %56 %0.0 mph 0.0 mph 0.0 mph 29.98 in 29.89 in 0.00 7/8/22 0:00 79.7 °F 74.0 °F 68.9 °F 69.4 °F 66.5 °F 62.8 °F 90 %78 %61 %9.0 mph 0.2 mph 0.0 mph 30.15 in 29.95 in 0.00 7/9/22 0:00 83.9 °F 73.8 °F 63.6 °F 68.8 °F 61.7 °F 57.3 °F 91 %68 %48 %7.0 mph 0.2 mph 0.0 mph 30.21 in 30.05 in 0.00 7/10/22 0:00 81.5 °F 74.6 °F 68.4 °F 71.9 °F 66.1 °F 58.7 °F 87 %75 %65 %12.0 mph 0.4 mph 0.0 mph 30.06 in 29.69 in 0.02 7/11/22 0:00 82.8 °F 74.0 °F 65.2 °F 71.3 °F 63.8 °F 56.5 °F 94 %73 %46 %16.0 mph 1.5 mph 0.0 mph 29.84 in 29.68 in 0.00 7/12/22 0:00 83.0 °F 70.6 °F 61.3 °F 65.5 °F 60.2 °F 56.5 °F 93 %72 %43 %10.0 mph 0.6 mph 0.0 mph 29.91 in 29.81 in 0.16 7/13/22 0:00 72.2 °F 63.9 °F 56.7 °F 64.8 °F 59.2 °F 54.8 °F 95 %85 %69 %5.0 mph 0.0 mph 0.0 mph 30.08 in 29.90 in 0.04 7/14/22 0:00 84.3 °F 71.5 °F 54.6 °F 67.6 °F 61.0 °F 52.0 °F 93 %72 %45 %11.0 mph 0.5 mph 0.0 mph 30.11 in 29.95 in 0.00 7/15/22 0:00 86.1 °F 76.0 °F 65.8 °F 73.8 °F 67.3 °F 62.8 °F 92 %75 %56 %11.0 mph 0.2 mph 0.0 mph 30.00 in 29.88 in 0.01 7/16/22 0:00 85.7 °F 75.9 °F 65.6 °F 72.9 °F 67.0 °F 63.5 °F 95 %76 %50 %5.0 mph 0.1 mph 0.0 mph 30.01 in 29.89 in 0.00 7/17/22 0:00 87.9 °F 77.1 °F 66.8 °F 73.3 °F 66.8 °F 62.2 °F 93 %73 %46 %5.0 mph 0.0 mph 0.0 mph 29.91 in 29.82 in 0.00 7/18/22 0:00 95.6 °F 82.8 °F 68.8 °F 74.8 °F 69.4 °F 65.1 °F 90 %66 %42 %7.0 mph 0.2 mph 0.0 mph 29.87 in 29.68 in 0.00 7/19/22 0:00 91.4 °F 81.4 °F 74.4 °F 73.3 °F 65.1 °F 54.1 °F 77 %59 %39 %17.0 mph 1.0 mph 0.0 mph 29.68 in 29.44 in 0.00 7/20/22 0:00 85.4 °F 77.3 °F 70.8 °F 66.5 °F 62.1 °F 56.9 °F 77 %61 %39 %14.0 mph 2.1 mph 0.0 mph 29.68 in 29.43 in 0.00 7/21/22 0:00 83.2 °F 74.5 °F 66.6 °F 64.5 °F 59.8 °F 54.8 °F 86 %62 %39 %11.0 mph 0.7 mph 0.0 mph 29.80 in 29.67 in 0.00 7/22/22 0:00 91.3 °F 78.3 °F 66.6 °F 69.0 °F 62.3 °F 58.1 °F 86 %60 %41 %6.0 mph 0.2 mph 0.0 mph 29.83 in 29.75 in 0.00 7/23/22 0:00 75.5 °F 68.6 °F 60.5 °F 68.9 °F 64.6 °F 58.5 °F 95 %88 %72 %12.0 mph 0.2 mph 0.0 mph 29.90 in 29.70 in 0.63 7/24/22 0:00 77.7 °F 68.2 °F 57.8 °F 63.9 °F 58.5 °F 53.4 °F 93 %73 %47 %12.0 mph 0.7 mph 0.0 mph 30.03 in 29.75 in 0.00 7/25/22 0:00 77.4 °F 65.2 °F 51.1 °F 58.6 °F 53.4 °F 48.7 °F 94 %69 %41 %5.0 mph 0.1 mph 0.0 mph 30.10 in 29.95 in 0.00 7/26/22 0:00 73.7 °F 68.1 °F 61.6 °F 67.6 °F 62.5 °F 57.1 °F 91 %83 %66 %6.0 mph 0.0 mph 0.0 mph 29.96 in 29.75 in 0.12 7/27/22 0:00 79.3 °F 70.0 °F 60.5 °F 64.8 °F 58.3 °F 50.9 °F 94 %69 %42 %13.0 mph 0.8 mph 0.0 mph 29.85 in 29.77 in 0.00 7/28/22 0:00 74.9 °F 64.8 °F 56.5 °F 58.3 °F 54.6 °F 52.3 °F 87 %71 %50 %10.0 mph 0.7 mph 0.0 mph 29.98 in 29.83 in 0.00 7/29/22 0:00 78.0 °F 65.7 °F 55.4 °F 62.8 °F 56.6 °F 51.6 °F 93 %74 %46 %5.0 mph 0.1 mph 0.0 mph 30.08 in 29.98 in 0.00 7/30/22 0:00 87.1 °F 72.7 °F 55.8 °F 66.9 °F 60.2 °F 53.5 °F 94 %68 %39 %9.0 mph 0.2 mph 0.0 mph 30.12 in 29.95 in 0.00 7/31/22 0:00 83.6 °F 74.6 °F 65.4 °F 71.2 °F 64.8 °F 57.8 °F 87 %72 %57 %15.0 mph 0.5 mph 0.0 mph 29.97 in 29.66 in 0.01 8/1/22 0:00 81.3 °F 72.9 °F 63.6 °F 66.3 °F 60.6 °F 57.3 °F 83 %67 %47 %7.0 mph 0.2 mph 0.0 mph 29.88 in 29.71 in 0.00 8/2/22 0:00 92.3 °F 77.3 °F 59.6 °F 77.3 °F 67.7 °F 56.4 °F 92 %74 %58 %15.0 mph 0.8 mph 0.0 mph 29.88 in 29.49 in 0.00 8/3/22 0:00 84.7 °F 75.1 °F 62.6 °F 76.7 °F 62.9 °F 55.8 °F 89 %68 %38 %13.0 mph 0.8 mph 0.0 mph 29.94 in 29.52 in 0.02 8/4/22 0:00 82.6 °F 69.8 °F 53.9 °F 63.9 °F 57.8 °F 51.2 °F 93 %69 %40 %6.0 mph 0.1 mph 0.0 mph 30.04 in 29.94 in 0.00 8/5/22 0:00 89.6 °F 77.6 °F 65.0 °F 69.7 °F 64.9 °F 60.1 °F 87 %67 %45 %12.0 mph 0.5 mph 0.0 mph 30.00 in 29.82 in 0.00 8/6/22 0:00 78.5 °F 72.9 °F 67.6 °F 74.5 °F 69.1 °F 65.8 °F 94 %88 %70 %6.0 mph 0.1 mph 0.0 mph 29.98 in 29.85 in 0.26 8/7/22 0:00 73.3 °F 66.6 °F 59.1 °F 66.7 °F 62.5 °F 56.5 °F 95 %87 %76 %7.0 mph 0.0 mph 0.0 mph 30.02 in 29.93 in 1.08 8/8/22 0:00 73.9 °F 62.7 °F 54.9 °F 63.4 °F 56.8 °F 52.9 °F 95 %82 %56 %4.0 mph 0.0 mph 0.0 mph 30.09 in 29.96 in 0.01 8/9/22 0:00 82.9 °F 69.0 °F 53.9 °F 65.1 °F 58.9 °F 51.9 °F 95 %73 %45 %4.0 mph 0.0 mph 0.0 mph 30.11 in 30.01 in 0.00 8/10/22 0:00 80.8 °F 69.7 °F 59.0 °F 67.0 °F 60.7 °F 55.3 °F 94 %75 %45 %4.0 mph 0.0 mph 0.0 mph 30.18 in 30.05 in 0.00 8/11/22 0:00 80.3 °F 68.0 °F 55.9 °F 63.2 °F 56.4 °F 52.8 °F 95 %69 %42 %7.0 mph 0.2 mph 0.0 mph 30.22 in 30.13 in 0.00 8/12/22 0:00 71.5 °F 65.5 °F 59.7 °F 61.4 °F 57.4 °F 53.8 °F 92 %76 %61 %17.0 mph 0.8 mph 0.0 mph 30.25 in 29.94 in 0.57 8/13/22 0:00 67.5 °F 63.6 °F 59.9 °F 61.8 °F 58.5 °F 55.8 °F 90 %84 %77 %7.0 mph 0.1 mph 0.0 mph 30.02 in 29.89 in 0.00 8/14/22 0:00 71.6 °F 62.9 °F 56.5 °F 63.9 °F 58.0 °F 52.8 °F 95 %84 %70 %6.0 mph 0.1 mph 0.0 mph 30.08 in 30.00 in 0.00 8/15/22 0:00 76.4 °F 66.1 °F 53.9 °F 65.9 °F 59.7 °F 51.6 °F 95 %81 %63 %7.0 mph 0.1 mph 0.0 mph 30.10 in 30.05 in 0.00 8/16/22 0:00 81.2 °F 69.4 °F 61.9 °F 68.0 °F 61.5 °F 58.6 °F 94 %78 %50 %6.0 mph 0.1 mph 0.0 mph 30.15 in 30.08 in 0.00 8/17/22 0:00 82.3 °F 70.0 °F 63.2 °F 69.0 °F 62.6 °F 59.0 °F 92 %78 %55 %6.0 mph 0.1 mph 0.0 mph 30.15 in 30.00 in 0.02 8/18/22 0:00 75.6 °F 68.2 °F 62.2 °F 68.1 °F 63.6 °F 59.6 °F 93 %86 %67 %14.0 mph 0.1 mph 0.0 mph 30.00 in 29.73 in 0.56 8/19/22 0:00 75.5 °F 65.5 °F 60.7 °F 67.9 °F 61.6 °F 58.8 °F 95 %87 %68 %9.0 mph 0.1 mph 0.0 mph 29.84 in 29.75 in 0.12 8/20/22 0:00 74.2 °F 66.0 °F 60.7 °F 68.6 °F 62.4 °F 57.8 °F 95 %89 %76 %5.0 mph 0.0 mph 0.0 mph 30.03 in 29.83 in 0.01 8/21/22 0:00 79.8 °F 66.8 °F 54.8 °F 68.3 °F 59.7 °F 52.5 °F 95 %80 %53 %2.0 mph 0.0 mph 0.0 mph 30.09 in 30.02 in 0.00 8/22/22 0:00 79.3 °F 66.8 °F 54.0 °F 66.1 °F 58.6 °F 52.0 °F 95 %77 %46 %1.0 mph 0.0 mph 0.0 mph 30.09 in 29.99 in 0.00 8/23/22 0:00 83.4 °F 69.8 °F 55.4 °F 67.3 °F 59.5 °F 53.2 °F 95 %73 %42 %6.0 mph 0.0 mph 0.0 mph 30.01 in 29.90 in 0.00 8/24/22 0:00 76.2 °F 69.9 °F 65.3 °F 69.9 °F 64.6 °F 60.3 °F 93 %84 %67 %5.0 mph 0.1 mph 0.0 mph 29.97 in 29.90 in 0.08 8/25/22 0:00 75.3 °F 66.2 °F 59.0 °F 67.2 °F 61.6 °F 57.0 °F 95 %86 %65 %3.0 mph 0.0 mph 0.0 mph 30.09 in 29.95 in 0.00 8/26/22 0:00 79.8 °F 67.1 °F 53.1 °F 65.0 °F 57.3 °F 51.1 °F 95 %73 %47 %5.0 mph 0.1 mph 0.0 mph 30.11 in 29.95 in 0.00 8/27/22 0:00 75.9 °F 69.2 °F 63.7 °F 71.0 °F 64.8 °F 58.6 °F 94 %86 %75 %14.0 mph 1.2 mph 0.0 mph 29.95 in 29.70 in 1.12 8/28/22 0:00 76.7 °F 70.9 °F 65.1 °F 71.6 °F 67.7 °F 63.0 °F 95 %90 %82 %9.0 mph 0.5 mph 0.0 mph 29.79 in 29.51 in 0.46 8/29/22 0:00 76.8 °F 69.9 °F 62.9 °F 68.5 °F 60.8 °F 54.9 °F 93 %74 %50 %12.0 mph 0.9 mph 0.0 mph 29.85 in 29.52 in 0.09 8/30/22 0:00 77.0 °F 67.5 °F 58.4 °F 60.7 °F 55.7 °F 51.3 °F 85 %67 %45 %12.0 mph 0.6 mph 0.0 mph 30.03 in 29.85 in 0.00 8/31/22 0:00 85.4 °F 71.6 °F 59.1 °F 67.9 °F 61.2 °F 56.2 °F 93 %72 %42 %6.0 mph 0.1 mph 0.0 mph 30.01 in 29.89 in 0.00 9/1/22 0:00 88.1 °F 74.6 °F 59.4 °F 72.5 °F 65.4 °F 57.7 °F 96 %76 %48 %6.0 mph 0.1 mph 0.0 mph 29.93 in 29.75 in 0.00 9/2/22 0:00 86.3 °F 76.0 °F 62.7 °F 71.7 °F 64.9 °F 53.9 °F 84 %69 %57 %7.0 mph 0.3 mph 0.0 mph 30.03 in 29.76 in 0.00 9/3/22 0:00 71.8 °F 62.4 °F 52.9 °F 60.6 °F 54.0 °F 47.3 °F 92 %75 %56 %4.0 mph 0.0 mph 0.0 mph 30.24 in 30.03 in 0.00 9/4/22 0:00 72.8 °F 59.4 °F 45.2 °F 59.7 °F 51.3 °F 43.0 °F 94 %76 %51 %7.0 mph 0.2 mph 0.0 mph 30.26 in 30.09 in 0.00 9/5/22 0:00 75.9 °F 63.4 °F 52.0 °F 61.3 °F 54.6 °F 49.7 °F 95 %75 %54 %7.0 mph 0.3 mph 0.0 mph 30.14 in 30.04 in 0.00 9/6/22 0:00 80.7 °F 68.6 °F 58.0 °F 68.0 °F 60.6 °F 52.5 °F 93 %77 %56 %7.0 mph 0.1 mph 0.0 mph 30.12 in 30.05 in 0.00 9/7/22 0:00 85.4 °F 73.9 °F 61.4 °F 73.6 °F 66.5 °F 59.7 °F 96 %79 %52 %3.0 mph 0.0 mph 0.0 mph 30.17 in 29.97 in 0.00 9/8/22 0:00 84.8 °F 75.6 °F 67.4 °F 67.6 °F 64.9 °F 62.4 °F 86 %71 %51 %13.0 mph 0.6 mph 0.0 mph 29.97 in 29.59 in 0.00 9/9/22 0:00 73.9 °F 62.6 °F 57.6 °F 65.7 °F 59.4 °F 55.4 °F 95 %90 %73 %7.0 mph 0.0 mph 0.0 mph 30.02 in 29.66 in 0.23 9/10/22 0:00 69.5 °F 59.8 °F 51.2 °F 61.4 °F 54.6 °F 48.0 °F 98 %84 %48 %4.0 mph 0.0 mph 0.0 mph 30.17 in 30.00 in 0.01 9/11/22 0:00 69.8 °F 56.5 °F 45.0 °F 58.2 °F 49.0 °F 43.1 °F 95 %79 %43 %4.0 mph 0.0 mph 0.0 mph 30.21 in 30.03 in 0.00 9/12/22 0:00 71.3 °F 57.9 °F 45.1 °F 57.1 °F 50.8 °F 43.2 °F 94 %79 %47 %9.0 mph 0.0 mph 0.0 mph 30.03 in 29.87 in 0.00 9/13/22 0:00 76.9 °F 60.9 °F 46.9 °F 60.3 °F 52.5 °F 44.7 °F 94 %77 %43 %0.0 mph 0.0 mph 0.0 mph 29.97 in 29.87 in 0.00 9/14/22 0:00 75.3 °F 63.2 °F 49.1 °F 63.0 °F 56.4 °F 47.0 °F 95 %80 %56 %10.0 mph 0.9 mph 0.0 mph 30.09 in 29.97 in 0.00 9/15/22 0:00 84.8 °F 72.5 °F 61.7 °F 65.6 °F 60.0 °F 57.1 °F 89 %66 %46 %13.0 mph 0.6 mph 0.0 mph 30.02 in 29.87 in 0.00 9/16/22 0:00 77.2 °F 68.7 °F 64.9 °F 65.6 °F 62.1 °F 59.1 °F 94 %80 %64 %10.0 mph 0.2 mph 0.0 mph 29.93 in 29.85 in 0.00 9/17/22 0:00 80.6 °F 71.0 °F 63.9 °F 67.9 °F 64.1 °F 61.5 °F 94 %80 %57 %10.0 mph 0.2 mph 0.0 mph 29.87 in 29.71 in 0.00 9/18/22 0:00 71.4 °F 65.4 °F 56.3 °F 64.6 °F 59.9 °F 52.5 °F 90 %83 %72 %6.0 mph 0.2 mph 0.0 mph 29.96 in 29.72 in 0.00 9/19/22 0:00 79.1 °F 65.2 °F 50.1 °F 63.1 °F 55.2 °F 47.5 °F 95 %72 %45 %7.0 mph 0.1 mph 0.0 mph 30.01 in 29.82 in 0.00 9/20/22 0:00 85.5 °F 71.6 °F 62.3 °F 74.6 °F 66.0 °F 57.7 °F 95 %83 %64 %7.0 mph 0.2 mph 0.0 mph 29.83 in 29.68 in 0.19 9/21/22 0:00 64.0 °F 57.3 °F 48.3 °F 61.8 °F 49.9 °F 45.4 °F 94 %77 %57 %12.0 mph 0.7 mph 0.0 mph 30.18 in 29.82 in 0.01 9/22/22 0:00 61.1 °F 50.9 °F 42.3 °F 49.2 °F 44.1 °F 40.1 °F 94 %80 %48 %4.0 mph 0.0 mph 0.0 mph 30.34 in 30.17 in 0.00 9/23/22 0:00 55.5 °F 51.6 °F 47.3 °F 50.1 °F 46.6 °F 42.1 °F 93 %83 %71 %11.0 mph 0.2 mph 0.0 mph 30.18 in 29.88 in 0.16 9/24/22 0:00 64.9 °F 56.8 °F 51.4 °F 58.4 °F 53.3 °F 49.4 °F 95 %89 %74 %9.0 mph 0.3 mph 0.0 mph 29.88 in 29.74 in 0.01 9/25/22 0:00 66.5 °F 57.7 °F 51.7 °F 54.4 °F 47.5 °F 38.0 °F 93 %71 %45 %15.0 mph 1.4 mph 0.0 mph 29.95 in 29.79 in 0.00 9/26/22 0:00 59.4 °F 49.8 °F 39.4 °F 45.7 °F 38.7 °F 34.0 °F 89 %67 %40 %10.0 mph 0.7 mph 0.0 mph 30.08 in 29.93 in 0.00 9/27/22 0:00 55.4 °F 44.1 °F 34.4 °F 40.9 °F 36.4 °F 31.9 °F 92 %76 %45 %4.0 mph 0.0 mph 0.0 mph 30.44 in 30.07 in 0.00 9/28/22 0:00 59.0 °F 45.0 °F 29.7 °F 42.1 °F 35.3 °F 27.7 °F 94 %72 %44 %5.0 mph 0.1 mph 0.0 mph 30.57 in 30.43 in 0.00 9/29/22 0:00 67.5 °F 53.8 °F 40.5 °F 44.9 °F 38.9 °F 34.5 °F 84 %60 %34 %10.0 mph 0.3 mph 0.0 mph 30.44 in 30.19 in 0.00 9/30/22 0:00 70.5 °F 57.6 °F 49.5 °F 52.7 °F 46.2 °F 40.5 °F 82 %66 %47 %7.0 mph 0.2 mph 0.0 mph 30.23 in 30.11 in 0.00 10/1/22 0:00 65.4 °F 57.1 °F 53.9 °F 55.6 °F 50.9 °F 47.9 °F 92 %80 %58 %6.0 mph 0.1 mph 0.0 mph 30.30 in 30.14 in 0.01 10/2/22 0:00 71.7 °F 60.0 °F 51.2 °F 54.1 °F 51.1 °F 48.4 °F 93 %74 %45 %9.0 mph 0.5 mph 0.0 mph 30.38 in 30.25 in 0.00 10/3/22 0:00 74.6 °F 63.4 °F 56.7 °F 55.8 °F 52.0 °F 49.5 °F 82 %68 %45 %10.0 mph 0.2 mph 0.0 mph 30.28 in 30.15 in 0.00 10/4/22 0:00 74.8 °F 64.0 °F 55.3 °F 56.7 °F 50.8 °F 47.1 °F 81 %63 %46 %6.0 mph 0.1 mph 0.0 mph 30.16 in 30.01 in 0.00 10/5/22 0:00 71.6 °F 62.0 °F 54.7 °F 60.3 °F 54.5 °F 50.0 °F 88 %77 %61 %5.0 mph 0.1 mph 0.0 mph 30.02 in 29.95 in 0.00 10/6/22 0:00 56.2 °F 50.1 °F 42.7 °F 53.6 °F 42.1 °F 34.2 °F 92 %75 %52 %10.0 mph 0.3 mph 0.0 mph 30.47 in 29.95 in 0.02 Draft Prospectus Document Page 12 07/07/2020 APPENDIX D - Photos Draft Prospectus Document Page 13 07/07/2020 Photo 1 Date: 3/28/2023 Direction Photo is Taken: East Photo Location: Looking east towards Hwy 61. Photo 2 Date: 3/28/2023 Direction Photo is Taken: West Photo Location: At Hwy 61 inlet looking west along east- west ditch. Photo 3 Date: 3/28/2023 Direction Photo is Taken: South Photo Location: Looking at potential pond area near Hwy 61. Draft Prospectus Document Page 14 07/07/2020 Photo 4 Date: 3/28/2023 Direction Photo is Taken: Southeast Photo Location: Looking at potential pond area near Hwy 61. Photo 5 Date: 3/28/2023 Direction Photo is Taken: Northwest Photo Location: Looking east into floodplain forest lobe of Wetland 1 with remainder of basin behind Photo 6 Date: 3/28/2023 Direction Photo is Taken: West Photo Location: At slope toe of school stormwater ponds looking west. Draft Prospectus Document Page 15 07/07/2020 Photo 7 Date: July 2022 Direction Photo is Taken: Photo Location: Photo 8 Date: 3/28/2023 Direction Photo is Taken: West Photo Location: Looking west along east-west ditch. Photo 9 Date: 3/28/2023 Direction Photo is Taken: North Photo Location: Intersection of east-west ditch and eastern north-south ditch. Draft Prospectus Document Page 16 07/07/2020 Photo 10 Date: 3/28/2023 Direction Photo is Taken: North Photo Location: Looking north along eastern north-south ditch. Photo 11 Date: 3/28/2023 Direction Photo is Taken: North Photo Location: Looking north towards area west of eastern-most north-south ditch. Area is cattails. Photo 12 Date: 3/28/2023 Direction Photo is Taken: Photo Location: Draft Prospectus Document Page 17 07/07/2020 Photo 13 Date: 3/28/2023 Direction Photo is Taken: Northwest Photo Location: Looking at central north-south ditch. Photo 14 Date: July 2022 Direction Photo is Taken: Photo Location: Photo 15 Date: 3/28/2023 Direction Photo is Taken: West Photo Location: Looking at inlet from post office parking lot.