HomeMy WebLinkAboutParks Packet 06.21.23Page 1 of 2
Parks Commission Agenda
June 21, 2023
Agenda
Parks, Recreation, and Open Space Commission
Meeting of June 21, 2023
Hugo City Hall, 7:00 pm
7:00 pm 1. Approve Minutes from April 19, 2023 Meeting
7:02 pm 2. North Star Wetland Bank
7:20 pm 3. Bernin Park Master Plan
7:35 pm 4. Updates
1. Park Entrance Signs
2. Park Rules Signs
3. Jolly Pops Concert
8:00 pm 5. Adjournment
Page 2 of 2
Parks Commission Agenda
June 21, 2023
Background
Parks, Recreation, and Open Space Commission
Meeting of June 21, 2023
Hugo City Hall, 7:00 pm
Approve Minutes from June 21, 2023 Meeting
Staff recommends approval of the minutes of the Parks Commission meeting of June 21, 2023.
PLEASE SEE THE ATTACHED MINUTES.
North Star Wetland Bank
A the City Council meeting of June 12, 2023, a proposal from WSB to complete the prospectus phase of the
North Star Wetland Bank was approved. The Council also approved additional hydrology monitoring and the
purchase of data loggers at their May 15, 2023 meeting. WSB provided a proposal memo outlining the input
from the TEP and recommending that next steps, drafting the prospectus, be taken. WSB also provided a
cost estimating memo.
THE PROPOSAL AND COST ESTIMATING MEMOS ARE ATTACHED.
Bernin Park Master Plan
At the meeting of February 15, 2023, the Parks Commission reviewed the 2004 Bernin property master plan.
A proposal from WSB and associates was approved at the March 15, 2023 meeting to update the illustrations
of the 2004 plan. The Parks Commission also set the date for a neighborhood meeting regarding future park
construction to be June 27, 2023. The updated plan has been received. Notices have been sent for the
community meeting. Staff will provide an update on the Bernin Park Master Plan.
THE 2023 BERNIN PARK MASTER PLAN AND THE NOTIFICATION LETTER ARE ATTACHED.
Updates on ongoing projects
Staff will provide updates on ongoing projects.
THE JOLLY POPS FLYER IS ATTACHED.
THE PARKS PLAN CAN BE FOUND AT: https://www.ci.hugo.mn.us/2040compplan
Page 1 of 2
Parks Commission Minutes
April 19, 2023
Minutes
Parks, Recreation, and Open Space Commission
Meeting of April 19, 2023
Hugo City Hall, 7:00 pm
Present: Valerie Boyd, Meredith St. Pierre, Ranell Tennyson, Cathy Moore-Arcand, Mat Rauschendorfer
Absent: Emily McGinnity, Jim Compton Sr.
Staff Present: Scott Anderson, Public Works Director
Shayla Denaway, Parks Planner
Rick Kieffer, Public Works Park Supervisor
Debi Close, Parks Secretary
1. Approval of Minutes from the February 15 and March 15, 2023 Meetings
Tennyson made a motion, Moore-Arcand seconded to approve the minutes of the February 15 and March 15,
2023 Parks Commission Minutes.
All ayes.
Motion approved.
2. Introduction to Parks Lead Worker
Scott Anderson, Public Works Director updated on the new position created for a Parks Lead Worker
that was approved by the City Council on February 6, 2023. This position is responsible for managing
the parks with a hands on direction to maintain the Park goals. Rick Kieffer has 18 years of experience at
the City of Hugo in the Public Works department giving special attention to the parks in the recent few
years. Anderson introduced Kieffer as the new Parks Lead Worker.
3. Neighborhood Park Improvement Plan
The Capital Improvement Plan allocated $90,000 for Neighborhood Park Upgrades.
Tennyson made a motion, Moore-Arcand seconded to approve the Hanifl Fields Athletic Park Shelter be
painted and stained at a cost of estimate of $14,000 with the remaining funds to be used to make concrete
repairs at Victor Square Park.
Page 2 of 2
Parks Commission Minutes
April 19, 2023
All ayes
Motion approved.
4. Updates on ongoing projects
1. Park Sign Replacement plan
Staff has continued researching pylon signs and potential vendors for the park sign replacement plan.
2. Bernin Property Planning
WSB and Associates is working on the Bernin Park master plan graphics. The next step is reviewing the
drafted plan and scheduling a community workshop in June.
3. North Star Wetland Bank & Trails
A draft prospectus has been prepared for TEP review for the North Star Wetland Bank and scheduled to be
reviewed on April 28, 2023. After the review is completed, the TEP recommendations will be discussed at the
June Parks Commission meeting. This meeting will also review the drafted cost estimates determined with
WSB and Associates.
Plan A: Wetland hydrology would be restored by constructing ditch plugs with construction grade clay,
topsoil, and vegetation. One plug would be located at the intersection of the eastern lateral ditch and the
east west main ditch. Two plugs would also be installed on the southern ditches. An outlet control structure
with a set elevation would be installed at the southwestern edge of the parcel where the ditch connects to
JD3.
Plan B: The western and central north/south lateral ditches would be filled. A ditch plug would be installed on
the south ditch. An OCS with a set elevation would be installed at the southwestern edge of the parcel where
the ditch connects to JD3.
4. Lions Volunteer Park Veterans Memorial
The Hugo American Legion Commander met with staff to discuss construction of a memorial at Lions
Volunteer Park in the area identified in the park’s plan. The Legion will put together a committee to discuss
fundraising, design, and management.
5. Adjournment
Rauschendorfer made a motion, Moore-Arcand seconded to adjourn the meeting at 7:50pm.
All ayes.
Motion approved.
G:\.Clients All\Hugo\Proposals\North Star Wetland Bank\Prospectus\PROPOSAL_North Star Wetland Bank Prospectus -
052323.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM May 23, 2023
Shayla Denaway
City of Hugo
14669 Fitzgerald Ave N
Hugo, MN 55038
Re: Proposal to Develop North Star Wetland Bank Prospectus
Dear Shayla Denaway:
WSB is providing this proposal to develop a prospectus (concept plan) for the North Star
Wetland Bank based on the previously submitted draft prospectus completed in May
2023 and reviewed by the Technical Evaluation Panel (TEP) and Interagency Review
Team (IRT).
The IRT provided the following essential comments on the draft prospectus. Below each
comment is the site investigation necessary to address these:
1. Comment: It is possible that broader regional issues, beyond the sponsor’s
control, are affecting water levels on this site. Looking at well data in Attachment
D the sponsor needs to consider how blocking the relatively shallow ditches on
this site is expected to restore the historical and natural hydrology regime. Many
wells are far beyond the expected drainage effect of the relatively shallow
ditches, yet they show a water table much lower than would be expected. The
historical hydrology regime would likely have a water table within 12 inches of the
surface well into the growing season if not throughout the growing season. If
regional factors beyond the sponsor’s control are affecting site hydrology and
hydrology performance standards cannot be achieved then wetland bank credits
cannot be released, regardless of projections in the Mitigation Plan. The sponsor
is assuming that regional issues beyond their control are not a prevailing factor
and this site’s shallow ditches are having a significant drainage effect several
hundred feet away.
Action: Discussion during the TEP meeting on April 28, 2023 with the city water
resources engineers indicated that the sub-watershed provides adequate
amounts of water to the site. It was noted that the 2022 growing season was dry
and well data may not be representative of the site under normal conditions as
well. During a site visit on May 25, 2023, we saw surface water around 6-12
inches in all of the ditches on site. Monitoring wells have been installed for the
2023 growing season and we will continue monitoring to get additional data on
the subsurface water level.
G:\.Clients All\Hugo\Proposals\North Star Wetland Bank\Prospectus\PROPOSAL_North Star Wetland Bank Prospectus -
052323.docx
2. Comment: Multiple wetland delineations have been completed on the site and
these delineation results contradict credit estimations provided in the Draft
Prospectus. While a degraded wetland is present, there is no delineation
confirming that areas adjacent to ditches are fully drained and non-wetland.
Therefore, there is no justification for 100 percent Re-establishment credit as
suggested.
Action: Existing wetland delineations were completed at the edges of the wetland
complex. No investigation has been conducted around the linear ditches or
throughout the middle of the complex. Additional delineation will need to be
completed throughout the site to determine whether the areas adjacent to the
ditches have retained wetland characteristics. The results of the wetland
delineation of the interior of the site will determine whether Restoration or
Enhancement credits are to be pursued.
3. Comment: The drainage present appears to be modest, with most ditches two
feet or less deep. This suggest the extent of hydrology degradation caused by
the ditches (and therefore restoration potential) is significantly less than shown in
the Draft Prospectus. If no drain tile is found a more appropriate hydrology
restoration zone would be limited only to corridors along ditches being disabled.
Areas beyond this relatively narrow drainage effect corridor would not be eligible
for Restoration credit (Re-establishment or Rehabilitation) but could be eligible
for Enhancement credit.
Action: There may be locations within the property that enhancement credit will
be requested, but not the whole property. We need to complete a level 2
delineation to determine the actual existing wetlands within the entire project
limits because the previous delineations only demarked external boundaries.
With the new 2023 hydrology monitoring data, we’ll have a better idea of the
scope and effect of the existing ditches. During site visit on May 25, 2023, we
identified areas of spoil piles that will be defined in level 2 delineation as upland
that we will propose to remove for restoration credit.
4. Comment: Hydrology monitoring should be continued (possibly expanded) to
document baseline hydrology information in the beginning of the growing season
and to help the sponsor write appropriate hydrology performance standards for
this partially drained existing wetland. Hydrology information provided only
documented mid-summer to fall hydrology conditions.
Action: Wells have been installed on site for the 2023 growing season.
5. Comment: If the federal Enhancement credit action is used, the sponsor will face
significant challenges when controlling the monotypic reed canary grass areas
and other non-native or invasive species. Successfully controlling reed canary
grass, and other species, on a site this large and achieving acceptable native-
dominated plant community performance standard will be extremely difficult and
resource intensive, both in the short- and long-terms. Significant site preparation
and management work will be required, supplemental native seeding may be
G:\.Clients All\Hugo\Proposals\North Star Wetland Bank\Prospectus\PROPOSAL_North Star Wetland Bank Prospectus -
052323.docx
grass, and other species, on a site this large and achieving acceptable native-
dominated plant community performance standard will be extremely difficult and
resource intensive, both in the short- and long-terms. Significant site preparation
and management work will be required, supplemental native seeding may be
required, a detailed vegetation establishment and management plan will need to
be developed and implemented, and a detailed and fully funded long-term
management plan to sustain a native-dominated plant community into the future
should also be required. There are other similar Enhancement wetland bank
projects in this area that provide vegetation establishment and management plan
examples for the short term, vegetation enhancement performance standard
examples that could be used, and long-term management plans and funding
mechanisms that could be adapted by the bank sponsor if they choose to
proceed. This enhancement work will be very resource intensive, success is not
guaranteed, a suitable funding mechanism should be established, and vegetation
improvements must be sustained long into the future and after annual monitoring
is completed.
Action: During the soil investigation site visit on May 25, 2023, it was noted that
there are numerous areas dominated with native species and the site is not
monotypic for reed canary grass. A multi-year vegetation management plan will
be developed during the prospectus phase including steps to control nuisance
vegetation and to establish native cover. If Enhancement credit is to be pursued,
the city will need to discuss a funding mechanism for long-term vegetation
maintenance.
Project tasks within this scope include:
1. Project management
2. Topographic Survey with 2-person Survey Crew
3. NHIS and SHPO Data Review Requests
4. Additional Existing Vegetation Survey
5. CAD Based Concept Plans (60%)
6. Draft Conservation Easement Description/Title Review/Exhibit
7. Hydrologic and Hydraulic Analysis
8. Prospectus Document Report and Application Submittal
9. TEP/IRT Meeting
10. Prospectus Comment Response
11. Level 2 Wetland Delineation
1. Project management includes tracking the project budget and ensuring that
project tasks are being completed on time and on budget along with
miscellaneous administrative tasks.
2. A topographic survey with 2-person crew will provide elevations of cross
sections across ditches as well as spot shots throughout the site to calibrate the
LiDAR topography for this area. This task assumes 12 cross sections and 26
spot shots. It provides the level of detail needed to effectively plan wetland credit
actions based on elevations and drainage patterns influenced by topographic
G:\.Clients All\Hugo\Proposals\North Star Wetland Bank\Prospectus\PROPOSAL_North Star Wetland Bank Prospectus -
052323.docx
relief that may not be represented in existing level 1 data sets. This information
will also be used to further refine construction cost estimates.
3. Both a Natural Heritage Information System (NHIS) and a MN State Historic
Preservation Office (SHPO) review will be required to ensure the project can
move forward without encountering ecological, historical, and or cultural issues
that can greatly influence the design, viability, and schedule of the project. WSB
staff will submit for review under both these programs. This task does not include
field surveys.
4. Completing an additional existing vegetation survey will be needed to
characterize the vegetative community at survey plots that were established
during the 2022 growing season. These data determine the floristic quality and
abundance of invasive species to quantitatively show “functional lift” from existing
to proposed conditions with respect to both wetland and upland vegetation.
5. The concept plan from the draft prospectus will be refined into a CAD based
concept (60%) plan based on topography, hydrology data, hydraulic modelling,
and soils data collected for the stie.
6. A draft conservation easement description and title review will be completed
for the parcel.
7. Hydrologic and hydraulic analysis will be completed for the site based on
existing conditions and the proposed site plan. WSB staff will model existing site
hydrology and model proposed bank design alternatives to determine if
hydrology can be maintained to meet performance standards while effectively
moving excess water downstream so as not to negatively impact adjacent
properties and infrastructure.
8. The Prospectus document will be drafted based on the data collected under
this phase of the banking process and will be submitted to the TEP and Board of
Water and Soil Resources/US Army Corps of Engineers Interagency Review
Team (IRT) for review and comment.
9. WSB will attend a TEP/IRT meeting to discuss the prospectus application.
10. This task includes TEP/IRT comment coordination with the project team and
TEP/IRT members. If the TEP/IRT requests that the comments be addressed in
the prospectus document prior to moving on to the Mitigation Banking
Instrument, a separate scope of work will be provided for that work.
11. A level 2 wetland delineation will be completed for the site including sample
points along each ditch, at historic spoil piles and throughout the interior of the
site. This will give a true depiction of the wetland complex and will determine
whether this project can receive Restoration or Enhancement credits.
G:\.Clients All\Hugo\Proposals\North Star Wetland Bank\Prospectus\PROPOSAL_North Star Wetland Bank Prospectus -
052323.docx
Prospectus Phase Project Schedule
Prospectus Phase Project Budget
Project Element Cost
Task 1 $7,438
Task 2 $3,041
Task 3 $524
Task 4 $4,370
Task 5 $9,228
Task 6 $3,621
Task 7 $5,937
Task 8 $9,128
Task 9 $1,172
Task 10 $3,332
Task 11 $7,235
Project Total $55,026
Task No.Task Name MayJuneJulyAugustSeptemberOctoberNovemberDecemberJanuary1 Project Management
2 Topographic Survey w/ 2-Person Survey Crew
3 NHIS Data Review Request
3 SHPO Data Review Request
4 Existing Vegetation Survey
5 CAD Based Concept Plans (60%)
6 Draft Conservation Easement Description/Title Review/Exhibit
7 Hydrologic and Hydraulic Analysis
8 Prospectus Document Report and Application Submittal
9 Onsite TEP/IRT Review Meeting
10 Address TEP/IRT Comments on Prospectus
11 Level 2 weltand delineation
Authorized under
separate scope Hydrology Monitoring
Authorized under
separate scope Soil Investigation and Site Characteristics On-Site
G:\.Clients All\Hugo\Proposals\North Star Wetland Bank\Prospectus\PROPOSAL_North Star Wetland Bank Prospectus -
052323.docx
We are requesting approval for Tasks 1-11 for a total not-to-exceed cost of $55,026.
If you have any questions on this proposal or other questions related to completing the
wetland bank prospectus, please contact me at rrobsertson@wsbeng.com or (651)-392-
4900.
Thank you for the opportunity to continue to collaborate with you and the City of Hugo on
this legacy project.
Sincerely,
WSB & Associates, Inc.
Roxy Robertson
Senior Environmental Scientist
Alison Harwood
Director of Natural Resources
G:\.Clients All\Hugo\Proposals\North Star Wetland Bank\Prospectus\PROPOSAL_North Star Wetland Bank Prospectus -
052323.docx
ACCEPTANCE:
The City of Hugo hereby accepts the WSB proposal of $55,026 for Tasks 1-11 outlined
in this letter.
City of Hugo
Name
Title
Date
K:\020552-000\Admin\Docs\3. Phase 4_Cost Estimating\Hugo North Start Cost Estimating 052223.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Memorandum
To: Shayla Denaway, City of Hugo
From: Roxy Robertson, WSB
Cc: Tony Havranek
Mark Erichson
Date: May 22, 2023
Re: North Star Wetland Bank Development Cost Estimate
WSB Project No. 020552-000
Introduction
The City of Hugo is interested in creating a wetland bank along the west side of Hwy 61 at the
North Star Elementary School. The wetland banking process generally consists of the following
application steps prior to approval from regulating agencies (Board of Water and Soil Resources
(BWSR), Wetland Conservation Act (WCA), and Army Corps of Engineers (USACE)).
1. Draft Prospectus (Scoping Document)
2. Prospectus (Concept Plan)
3. Draft Mitigation Banking Instrument (MBI)/Final MBI (Full Application)
Initial assessment phases of this project resulted in the completion of the existing vegetation
surveys, 2022 hydrology monitoring, a draft prospectus application, and coordination with the
Technical Evaluation Panel (TEP) and interagency review team (IRT). The draft prospectus
included a proposal to restore approximately 19 acres of wetland, rehabilitate approximately 98
acres of wetland, and provide approximately 5 acres of upland buffer for a total wetland bank
area of 123 acres with a credit potential of around 70 credits. We removed the acres in the
northwest corner of the parcel to avoid the need for two conservation easements. At this point,
the city may move onto the Prospectus step of the application process for the wetland bank bu t
has requested that WSB evaluate the proposed costs for development and construction of the
wetland bank to determine cost and benefits of the project.
Wetland Bank Concept
WSB developed two concepts in the draft prospectus that utilize slightly different construction
methods to restore hydrology.
1. Option 1
Wetland hydrology would be restored by construction of 2-3 ditch plugs in the western
and central north-south lateral ditches. Ditch plugs consist of clay core trenches
compacted with construction-grade clay topped with topsoil and vegetation. Ditch plugs
are keyed into the banks to prevent water from moving around them at high flows. One
ditch plug would be constructed at the intersection of the eastern lateral ditch and the
east-west main ditch channel. Two to three plugs would also be constructed in the
southern ditch. An outlet control structure (OCS) with a set elevation would be installed at
the southwestern edge of the parcel where the ditch connects to JD 3.
Shayla Denaway
May 22, 2023
Page 2
K:\020552-000\Admin\Docs\3. Phase 4_Cost Estimating\Hugo North Start Cost Estimating
052223.docx
2. Option 2
The western and central north-south lateral ditches would be filled. One ditch plug would
be constructed at the intersection of the eastern lateral ditch and the east-west main ditch
channel. One ditch plug would be constructed at the western extent of the south ditch. An
OCS with a set elevation would be installed at the southwestern edge of the parcel where
the ditch connects to JD 3.
Construction Cost Estimate Methods
The cost for construction of the project, not including the restoration or monitoring tasks, was
estimated with both material and labor costs factored in.
Earthmoving for ditch plug construction was estimated assuming clay fill would have to be
brought in from offsite since onsite soils may not be suitable for plug construction. It is assumed
that ten ditch plugs will be necessary to create desirable hydraulic conditions. Two outlet control
structures were estimated to provide finer water surface level control as needed for the wetlands.
Construction is proposed to occur over the winter months, so erosion control blankets were
estimated on all ditch plug grading areas, sediment control logs at the bottom of the ditch plug
grading areas, and silt fence downgradient of the outlet control structures until vegetation can be
established with the restoration efforts in the following months. A mobilization cost was estimated
assuming approximately 9% of construction cost total. With the project still at a preliminary stage,
a 20% contingency was added to the construction subtotal in case of unforeseen construction
costs and an additional 10% contingency was added for future indirect costs the project may
require.
Restoration and monitoring tasks were estimated as the cost to complete the initial install during
construction. The restoration costs included site-wide herbicide application, burning/mowing, and
seeding. Restoration recommendations will be refined during design. The breakdown of costs
between these areas in included in Appendix C.
Table 1 shows the projected credit allocations for the North Star Wetland Bank from the draft
prospectus. Table 2 shows potential revenue from the bank based on the draft prospectus
concept, and under a concept of fewer acres meeting performance standards and fewer credits
are achieved. Note that enhancement may give a similar credit allocation (33-50%) to those listed
in Table 1, but acreages may vary depending on the results of a level 2 wetland delineation of the
internal areas of the site (Table 3).
Table 1. Projected credit allocations.
Credit Area Proposed Credit
Action
Credit
Allocation
Acres Credit Amount
Wetland Restoration via
Re-establishment
(3)
100 19.6 19.6000
Wetland Restoration via
Rehabilitation (4B)
50 98.71 49.3550
Upland Upland Buffer 25 5.12 1.2800
Total 123.43 70.235
Shayla Denaway
May 22, 2023
Page 3
K:\020552-000\Admin\Docs\3. Phase 4_Cost Estimating\Hugo North Start Cost Estimating
052223.docx
Table 2. Revenue potential based on draft prospectus credit allocation and performance of
the site.
Assumption: Receive credit allocation for full acreage of site
Credit Cost (/SF) Credit Cost (/ac) Total Credits Credit Sales
$1.00 $43,560.00 70.2350 $3,059,436.60
$1.50 $65,340.00 70.2350 $4,589,154.90
$2.00 $87,120.00 70.2350 $6,118,873.20
Assumption: Receive credit for fewer acres.
Credit Cost (/SF) Credit Cost (/ac) Total Credits Credit Sales
$1.00 $43,560.00 50.000 $2,178,000
$1.50 $65,340.00 50.000 $3,267,000
$2.00 $87,120.00 50.000 $4,356,000
Table 3. Projected credit allocations if whole site is delineated wetland.
Credit Area Proposed Credit
Action
Credit
Allocation
Acres Credit Amount
Wetland Restoration via
Re-establishment
(3)
100 19.6 19.6000
Wetland Enhancement (4B) 33 98.71 32.5743
Upland Upland Buffer 25 5.12 1.2800
Total 123.43 53.4543
Wetland Bank Development and Construction Cost Estimate
WSB has been requested by the City of Hugo to development a holistic cost estimate
representing the costs necessary to complete the wetland bank application and developme nt
process, construction, and monitoring. The wetland bank process includes the submittal of a draft
prospectus document, prospectus document, and mitigation banking instrument. The cost
estimate breakdown is included in Appendix B and is based on the draft prospectus concept.
The cost estimate does not include the fees or construction costs. Most of the fees are outlined at
the bottom of the budget spreadsheet in Appendix B. Basic construction estimates are included
in Appendix C.
Task 1: Draft Prospectus (Scoping Document)
The city has completed this task by submitting the draft prospectus document detailing the project
concept plan. Comments were received from the IRT regarding the proposed project.
Task 2: Prospectus Document
1. Soil and site characteristics investigation.
Shayla Denaway
May 22, 2023
Page 4
K:\020552-000\Admin\Docs\3. Phase 4_Cost Estimating\Hugo North Start Cost Estimating
052223.docx
2. Topographic survey with WSB drone technology: Topographic survey to develop current
existing elevation data for the wetland bank site.
3. GIS based conceptual construction plans, vegetative plans, and monitoring pl ans for the
project.
4. Prospectus document and application: existing conditions, historical conditions, draft
project goals and outcomes, ecological suitability and sustainability, draft vegetation plan,
draft construction plan and draft monitoring plan, NHIS and SHPO data requests.
5. Draft site exhibit and conservation easement description boundary: Location of the site
and legal description including existing easements and historical data review.
6. Technical Evaluation Panel review meeting: correspondence with landowners, Local
Government Unit (LGU), BWSR, Soil and Water Conservation District (SWCD), and
USACE.
7. Hydrologic and hydraulic analysis: evaluate the watershed, subwatersheds, and
movement of water to the site based on modelling and surrounding land use. Evaluate
the wetland condition based on the proposed construction elements.
8. Hydrology monitoring: install water level data loggers and wells to conduct pre-
construction hydrology data of the bank site.
9. Respond to TEP/IRT Comments.
Task 3: Mitigation Banking Instrument (DMBI and MBI)
1. Site exhibit and final conservation easement description boundary: Location of the site
and legal description including existing easements and historical data.
2. CAD based final construction plans, vegetative plans, and monitoring plans for the
project.
3. Engineers Estimate: develop a construction estimate based on final design.
4. Mitigation Banking Instrument and application: existing conditions, historical conditions,
final project goals and outcomes, ecological suitability and sustainability, final vegetation
plan, final construction plan and final monitoring plan, final hydrologic and hydraulic
analysis.
5. LGU TEP field review and meeting, final wetland bank plan meeting correspondence with
LGU and USACE.
6. Level 2 wetland delineation. This delineation may be completed later upon further
establishment of the bank.
7. Respond to TEP/IRT Comments.
8. Bidding documents and administration.
Task 4: Wetland Bank Construction
1. Site Construction: includes contractor mobilization for grading, ditch plugs, and outlet
control structure installation. A detailed breakdown of the preliminary construction cost is
included in Appendix C.
2. Year 1 Restoration: Vegetation management will include a site-wide herbicide application
on invasives and selected tree removal in the spring or fall. Another site-wide herbicide
application would be completed during the late summer followed by either a controlled
burn or mowing in the fall or following spring. The site would be seeded with native
vegetation and supplemental plantings of trees and shrubs would be installed in the
wooded areas. Site construction would occur in the late fall or winter following initial
vegetation management to increase the amount of water on the site and to create less
desirable growing conditions for reed canary grass to reestablish.
Task 5: Wetland Bank Monitoring/Maintenance
1. Required five years of bank monitoring (years 1-5): vegetation surveys, hydrology
monitoring, maintenance recommendations, and annual summary reports.
2. Mitigation Certification: Certifying the bank with the TEP for final credit deposit.
3. Years 2-5 Restoration Maintenance: This includes vegetation maintenance that may be
necessary to establish native vegetation and meet performance standards. These
Shayla Denaway
May 22, 2023
Page 5
K:\020552-000\Admin\Docs\3. Phase 4_Cost Estimating\Hugo North Start Cost Estimating
052223.docx
maintenance measures may include mowing, supplemental seeding, spot herbicide
treatments, and prescribed burning.
Project Fees*
Title Opinion/Commitment $450
Initial Easement Acquisition $1,000
Title Insurance $3,000
Final Easement Acquisition $2,400
Initial Wetland Bank Deposit/Establishment Fee $1,000
Wetland Credit Deposit Fee (Per Deposit) $1,000
Data Logger Purchase $4,500
*other project fees may apply
Summary
The North Star Wetland Bank site has the potential to create/restore approximately 123 acres of
wetland and upland buffer. Based on the concept plan, the bank may produce up to 70.235
credits that the city will have available to sell assuming that all performance standards are met,
and all credits are released to the city.
Our initial cost estimate for establishing the bank is:
Engineering: Draft Prospectus $6,500
Engineering: Prospectus $59,000-$64,000
Engineering: MBI $61,000-$66,000
Project Fees $12,000-$15,000
Preliminary Construction Estimate: Ditch plugs, outlet control
structure, erosion control, mobilization
$60,000-$65,000
Preliminary Construction Estimate: Restoration $250,000-$300,000
Engineering: Construction Monitoring/Administration $35,000-$40,000
Engineering: 5 Years of Monitoring/Reports $35,000-$40,000
Long-Term Restoration Maintenance $10,000-$20,000/yr.
K:\020552-000\Admin\Docs\3. Phase 4_Cost Estimating\Hugo North Start Cost Estimating 052223.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Appendix A - Draft Prospectus Concept Figure
""""""""""""""""""""""""""""
"
""
"
"
"
"
"
"""
##
9
1
4906 926916920916
928926
922928
9209
1
4
910 91890691
6
912912912
912906908924914922922
924920 920906910918918908916914912
910Document Path: K:\020552-000\GIS\Maps\Northstar_DraftProspectus\Fig3_Proposed Project Plan_A Date Saved: 3/31/2023¯1 inch = 450 feet
0 450
FeetNorth Star Wetland Bank
Hugo, MN
Figure 3a - Project Plan (Option 1)
Proposed Easement Boundary
Proposed Wetland Boundary
Proposed Upland Buffer (5.12 ac)
Proposed Rehabilitation (98.71 ac)
Proposed Restoration (19.6 ac)
Potential Future ELC Trail
StormSewer
Utility Easement
LiDAR Contours
#Outlet Control Structure
"Ditch Plug
Project Plan (Option 1)
"""""
"""""""""""""""""""""""""
"
"
##
9
1
4906 9269169
2
0
916
928926
922928
9209
1
4
910 91890691
6
912912912
912906908924914922922
924920 920906910918918908916914912
910Document Path: K:\020552-000\GIS\Maps\Northstar_DraftProspectus\Fig3_Proposed Project Plan_B Date Saved: 3/31/2023¯1 inch = 450 feet
0 450
FeetNorth Star Wetland Bank
Hugo, MN
Figure 3b - Project Plan (Option 2)
Proposed Easement Boundary
Proposed Upland Buffer (5.12 ac)
Proposed Restoration (19.6 ac)
Proposed Rehabilitation (98.71 ac)
Proposed Wetland Boundary
Potential Future ELC Trail
StormSewer
Utility Easement
LiDAR Contours
Ditch Fill
#Outlet Control Structure
"Ditch Plugs
Project Plan (Option 2)
K:\020552-000\Admin\Docs\3. Phase 4_Cost Estimating\Hugo North Start Cost Estimating 052223.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Appendix B - Wetland Bank Cost Estimate 2023
1 Wetland Bank Plan - Draft Prospectus (Scoping Document)Roxy Robertson Luke Lunde Jeff Rolfson Amy Anderson Sam Phillips Dan Horejsi Chaldelia Browne Kyle Blazek Shawn Williams Blondo Monica Jakes
1.1 Project Management 5 5 655.00$
1.2 Site Visit 8 8 1,048.00$
1.3 Develop Draft Prospectus 22 3 25 3,188.00$
1.4 Meeting with City 7 7 917.00$
1.5 TEP Meeting 5 5 655.00$
Total Estimated Hours and Fee for Wetland Services 47 0 0 0 0 0 0 0 0 0 0 3 50 6,463.00$
2 Wetland Bank Plan - Prospectus Document
2.1 Project Management 36 8 6 50 7,438$
2.2 Soil Investigation and Site Characteristics 4 6 4 14 2,054$
2.2 Topographic Survey: Cross sections and LiDAR Calibration 3 11 14 3,041$
2.4 Onsite TEP/IRT Review Meeting 4 3 3 10 1,172$
2.5 Prospectus Document Report and Application Submittal 20 8 36 12 2 78 9,128$
2.6 CAD Based Concept Plans (60%)8 4 2 10 40 4 68 9,228$
2.7 Draft Conservation Easement Description/Title Review/Exhibit 1 2 18 4 25 3,621$
2.8 NHIS Data Review Request 2 2 262$
2.9 SHPO Data Review Request 2 2 262$
2.10 Hydrologic and Hydraulic Analysis 6 2 5 30 43 5,937$
2.11 Existing Vegetation Survey 8 2 32 42 4,370$
2.12 Hydrology Monitoring (Installation of water level meters/data collection)5 2 60 67 6,581$
2.13 Prospectus Comment Response 10 6 8 24 3,332$
2.14 Level Two Wetland Delineation 20 2 40 2 64 7,235$
Total Estimated Hours and Fee for Wetland Services 102 42 21 13 47 11 40 75 60 16 0 6 415 63,661$
3 Wetland Bank Plan - Mitigation Bank Instrument
3.1 Project Management 10 6 16 2,465$
3.2 Develop Vegetation Management/Monitoring Plan/Performance Standards 12 4 20 36 4,330$
3.3 Hydrology Monitoring (Installation of water level meters/data collection)5 2 5 60 72 7,398$
3.4 CAD Based Design Plans (100%) and Project Manual 3 21 80 8 112 15,695$
3.5 Engineers Estimate 6 16 22 3,471$
3.6 MBI Report and Application Submittal 18 4 26 20 4 72 8,921$
3.7 Finalize Conservation Easement Description and Easement Exhibit 16 20 4 40 7,917$
3.8 TEP/IRT Meeting 4 6 10 1,136$
3.9 Address TEP/IRT Comments 4 10 4 18 2,232$
3.10 Bidding Documents and Administration 4 2 2 16 12 36 4,733$
3.11 MBI Comment Response 10 6 10 26 3,757$
Total Estimated Hours and Fee for Wetland Services 67 18 16 11 63 20 80 61 60 20 0 28 434 62,057$
4 Wetland Bank Construction
4.1 Preconstruction Meeting 4 1 4 4 13 1,776$
4.2 Construction Administration 1 8 12 21 3,739$
4.3 Construction Staking 1 2 16 19 4,662$
4.4 Construction Observation 40 40 40 120 16,979$
4.5 As-Built Survey and Project Closeout 8 8 1 8 16 41 7,972$
4.6 15% Credit Release 6 2 8 16 2,227$
Total Estimated Hours and Fee for Wetland Services 59 0 0 11 66 16 0 4 0 40 0 0 230 37,355$
275 60 37 35 176 47 120 140 120 76 0 37 1123
Hourly Billing Rate 2023 131$ 173$ 152$ 223$ 123$ 235$ 136$ 93$ 93$ 131$ 100$ 102$
Hourly Billing Rate 2024 Estimate 138$ 182$ 160$ 234$ 129$ 247$ 143$ 98$ 98$ 138$ -107$
Hourly Billing Rate 2025 Estimate 144$ 191$ 168$ 246$ 136$ 259$ 150$ 103$ 103$ 144$ -$ 112$
Total Cost 169,536$
Completed under separate scope or optional task
Total Estimated Hours for Design, Bidding and Construction
Registered
Land
Surveyor
Registered
Engineer
Two Person
Survey Crew
Task
Description Sr. Environmental
Scientist
Environmental
Scientist
Total Labor Cost
Project
Manager
Environmental
Scientist
Office
Tech II Total
Hours
CAD DesignerQuality
Review
Graduate
Engineer
Archaeological
Sub-Consultant
ESTIMATE OF HOURS AND COST
WETLAND BANK PLAN SERVICES
Fees are estimated and are subject to change due to annual inflation rates, change in materials costs, project schedule, etc.
9:39 AM
6/6/2023 K:\020552-000\Admin\Docs\3. Phase 4_Cost Estimating\Hugo North Star Proj Budget Wksht_2023 Updated 052223
K:\020552-000\Admin\Docs\3. Phase 4_Cost Estimating\Hugo North Start Cost Estimating 052223.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Appendix C – Construction Estimate Cost Breakdown
Line Item Unit Quantity Unit Price Total Price
1 Site-wide herbicide application AC 90 $500.00 $45,000
2 Selected tree removal AC 5 $1,800.00 $9,000
3 Site-wide herbicide application AC 90 $500.00 $45,000
4 Mow or Burn AC 100 $200.00 $20,000
5 Site-wide herbicide application AC 90 $500.00 $45,000
6 Site Prep/Seeding AC 100 $800.00 $80,000
7 Supplemental trees/shrubs AC 2
$244,000
$48,800
$292,800
Engineer's Estimate of Cost - Northstar Wetland Bank Project
05.23.2023
WSB Project Number 020552-000
CONSTRUCTION SUBTOTAL
CONTINGENCY TOTAL (20%)
SUBTOTAL
Line Item Unit Quantity Unit Price Total Price
1 MOBILIZATION L S 1 $4,000.00 $4,000
2 CLAY EMBANKMENT C Y 170 $65.00 $11,050
3 TOPSOIL C Y 70 $40.00 $2,800
4 EROSION CONTROL BLANKET S Y 535 $4.00 $2,140
5 SEDIMENT CONTROL LOG L F 400 $4.00 $1,600
6 STABILIZED CONSTRUCTION EXIT EA 1 $1,500.00 $1,500
7 OUTLET CONTROL STRUCTURE EA 2 $10,000.00 $20,000
8 SILT FENCE L F 50 $5.00 $250
$43,340
$8,668
$52,008
$5,201
$57,209
INDIRECT COSTS TOTAL (10%)
GRAND TOTAL
Engineer's Estimate of Cost - Northstar Wetland Bank Project
05.23.2023
WSB Project Number 020552-000
CONSTRUCTION SUBTOTAL
CONTINGENCY TOTAL (20%)
SUBTOTAL
Bernin Park Master Plan
Hugo, Minnesota
May 2023 | WSB Project number: 022530-000 Scale in Feet
0’200’100’50’
LAKE OVERLOOK
LAKE OVERLOOK
ACCESSIBLE LAKE OVERLOOK
ACCESSIBLE LAKE OVERLOOK
OPEN SPACE / FREE PLAY MEADOW BOARDWALK
EXISTING PLAY AREA& SHELTER / PLAZA W/ LOOP TRAIL
UTILITY EASEMENT
5’ EXISTING SIDEWALK
FISHING DOCK
PRESERVED MATURE TREES
FUTURE PARKING10 CARS - PARK ENTRY
STATE OF MN DNRPROPERTY WITH LAKE ACCESS
ACCESSIBLE PRAIRIE & WETLAND OVERLOOK
PRAIRIE FRINGE BUFFER
PRESERVE ICE RIDGE
PRESERVE WETLAND, TYP.
50’ ST
O
R
M
E
A
S
E
M
E
N
T
ONEKA LAKEONEKA LAKE
PONDPOND
ONEKA LAKE ONEKA LAKE
PARKPARK
BERNIN PARKBERNIN PARK
GREEN AVE.GREEN AVE.GOODVIEW AVE.GOODVIEW AVE.152ND ST. N152ND ST. N
FUTURE TRAIL & PARK EXPANSION LEGEND
PAVED TRAIL
CRUSHED GRAVEL TRAIL
MOWED TRAIL
8’ PAVED TRAILS
BOARDWALK
NATURAL TRAIL (AGGREGATE,
WOODCHIPS OR MOWED PATH
NATIVE PRAIRIE
WETLAND
TURF GRASS
ICE RIDGE
14669 Fitzgerald Avenue North, Hugo, MN 55038 • (651) 762-6300 • www.ci.hugo.mn.us
June 7, 2023
RE: Park at 6540 Greene Avenue
Dear Resident,
The City of Hugo purchased the former tree farm property (6540 Greene Avenue) from Bruce and Ginny
Bernin in 2002 for a future passive park. The Bernins rented their home back from the city and remained in it
until the Bernin estate decided to terminate the lease in August 2022. The estate also sold the adjacent
parcel at 15230 Greene Avenue to the City in 2022. You may have seen that the buildings were evaluated and
removed last fall. The Hugo Parks, Recreation, and Open Space Commission is planning to turn the properties
into a passive park.
The park was master planned in 2004, following neighborhood meetings. It included the active park area,
now constructed and known as Oneka Lake Park. The portion of the property that was formerly owned by
the Bernins is to remain a passive park and include trails, a small parking lot, a fishing dock and overlooks.
The graphics of the 2004 master plan have been updated and can be found at
https://www.ci.hugo.mn.us/BerninPark.
You are invited to share your input on the master plan and future park at a neighborhood meeting on
Tuesday, June 27 from 5:00 pm-7:00 pm at Hugo City Hall (14669 Fitzgerald Avenue North). There will be a
presentation at 5:30 pm and city staff will be available for the remainder of the open house for questions and
comments.
Feel free to contact me at 651-762-6342 with any questions. Also, I am happy to discuss the plan for the park
if you are not able to attend the meeting.
Sincerely,
Shayla Denaway
Parks Planner
CC: Hugo City Council
Hugo Parks, Recreation, and Open Space Commission
Scott Anderson, Public Works Director
Hardwood Creek Library
19955 Forest Road N
Forest Lake
651-275-7300
WashCoLib.org
Friday, August 11
3:00—5:00 p.m.
Hardwood Creek
Library
Lions Volunteer
Park in Hugo
Program support provided by:
The Jolly Pops combine upbeat, original music with a host of
children’s standards for a concert that is entertaining for both kids and
adults. The perfomance promises to be an awesome good time that
includes music, movement, and fun (and possibly some puppets!)
This program will be held outdoors at the newly renovated Lions
Volunteer Park in Hugo, behind City Hall at 5524 Upper 146th St N.
Please bring a blanket or chairs to sit on, and dress for the weather!
This program is funded with money from Minnesota’s Arts and
Cultural Heritage Fund.
Connect with us on social media: @WashCoLib
Jolly Pops Concert at
Hugo Lions Park