Loading...
HomeMy WebLinkAbout2024 ANNUAL BUS TOUR20 21 22 23 24 25 26 27 28 29 30 11 12 13 10 1 9 2 8 7 3 4 5 37 33 36 35 34 38 38 38 3938 38 31 6 15 14 17 16 18 19 32 Homes by Legacy Builders31 www.landform.net580 Dodge Ave., Suite 15 Elk River, Minnesota 55330(763) 441-2072 ||||LP LP LP LP LP LP LP LP LP LP LP LP LP PLOTTED:COMM. NO. DRAWING NO. ----17004 ONEKA PRAIRIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: ATJRAT 04/11/2023 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE SOUTHWIND HOLDINGS, LLC CONSTRUCTION DOCUMENTS 51317 ADAM THIELE, PEPRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.04/11/2023 1 5/15/23 REVISED PER CITY COMMENTS 2 5/31/23 REVISED PER CITY COMMENTS 3 6/12/23 REVISED PER CITY COMMENTS SITE PLAN 4 N 0 50'100' LEGENDLEGEND PROPERTY LIMITS DELINEATED WETLAND EXISTING FENCE PROPOSED EASEMENTS PROPOSED CONCRETE C&G MODULAR BLOCK RETAINING WALL LIGHT POST (LP) STORMWATER POND 1 STORMWATER POND 2 FILTRATI O N B A S I N 3 ONEKA PARKWAY45'R20'STREET "A"F A I R O A K S A V E N U E STREET "C" R 2 0 ' R20' R 2 0 ' R20' STREET "A" STREET "B" 8' BITUMINOUS TRAIL MATCH STREET SECTION TO EXISTING STREETCONNECT TO EXISTING BITUMINOUS TRAIL 8' BITUMINOUS TRAIL 10' BITUMINOUS TRAIL 10' BITUMINOUS TRAIL 10' BITUMINOUS TRAIL 5' CONCRETE WALK 5' CONCRETE WALK 8' BITUMINOUS TRAIL 8' BITUMINOUS TRAIL54'ROW54'ROW54' ROW 54' ROW 54'ROWR20'R20'R20'R20'R20'R20'TERMINATE STREET AND TRAIL END CURB WITH BEAVERTAIL INSTALL BARRICADE AND "FUTURE THRU STREET" SIGNAGE PROPOSED LIFT STATION PLAN BY OTHERS TERMINATE STREET AND TRAIL INSTALL BARRICADE AND "FUTURE THRU STREET" SIGNAGE END CURB WITH BEAVERTAIL TRANSITION MATCH STREET SECTION TO EXISTING STREET CONNECT TO EXISTING BITUMINOUS TRAIL BARRICADE "NO CONSTRUCTION ACCESS" TEMPORARY CUL-DE-SAC 5' CONCRETE WALK DRIVEWAY TO BE BUILT TO MATCH FUTURE BITUMINOUS TRAIL AND CURB PER FAIROAKS TYPICAL SECTION END CURB WITH BEAVERTAIL TRANSITION SITEENTRANCE/EXITWOODWASTEGRAVELLEAVES & GRASSPILE EXPANSION AREA15.0'10.0'JERSEY BARRIERTRAFFIC CONESEXISTINGATTENDANT STANDAPPROXIMATEEDGE OF GRAVELFOOD WASTEDROP-OFF BINS135'EXPANSION 205'EXPANSIONPROPOSED SITE BOUNDARY WITHEXPANSION (APPROXIMATELY 2.6ACRES OF NEW PROPERTY; 4.6 ACRESOF TOTAL AREA FOR EXPANDED SITE)ESTIMATED EXISTING SITE BOUNDARY(APPROXIMATELY 2 ACRES)COPYRIGHT © BURNS & McDONNELL ENGINEERING COMPANY, INC.Figure 2Hugo Yard Waste Drop-OffSite Expansion Layout B2018 Washington CountyZ:\CLIENTS\ENS\WASHINGTONCO\101596_PHASE3\SUPPORT\DATA\CAD\HUGO 150 FT EXPANSION LAYOUT.DWG 7/18/2018 3:02 PM KLANDRISTNORTH0SCALE IN FEET25'50' Tax Deductible donations are being received by the Forest Lake Historical Society, which is serving as the temporary fiscal host for the project until the new non- profit is formed. If you are interested in business sponsor packages, contact us at: hopkinsschool.heritagecenter@gmail.com. Making Progress Together! to advance the Hopkins Schoolhouse & Heritage Center Getting involved supports our mission of promoting community engagement and leadership by honoring the heritage of Hugo, Forest Lake, and the surrounding area. We highlight historic examples of citizens who made a difference in the community and offer a place for community members to gather. The community engagement and leadership to restore the schoolhouse is a tangible example of what is possible when citizens get involved to bring positive change. Please join us!Donate Today Please consider joining us as a volunteer. We are currently recruiting for both board positions and hands-on roles. If you have time and talent to give, please reach out! hopkinsschool.heritagecenter@gmail.com. www.hopkinsschoolhouse.org 2024 Goals Completed to-date: Complete painting of soffit on porch Pour new front steps Begin raising funds for interior restoration Scheduled for Q-4 2024: Install new windows throughout building Replace siding and doors Install basic electrical and connect to grid Volunteer Visit Us Subscribe for Updates Or by mail to: Forest Lake Historical Society 107 South Shore Drive Forest Lake, MN 55025 SITE DATAR E V I E W C O P Yof CONCEPT PLAN AREVISIONS1.2.3.4.5.6.DRAWN BY:ISSUE DATE:C#03/08/2024THE SHORES of ONEKA LAKE APARTMENTS Hugo, Minnesota f:\jobs\8861 - 8880\8869-04 - oneka apartments\cad c3d\survey\8869.04_sba.dwgSave Date:03/08/24 FILE NO:XXX11FENWAY LAND COMPANY 13925 Fenway Boulevard North Hugo, Minnesota 55038NORTH 159TH STREETNORTHGOODVIEW AVENUE 6.6.24 fenway land co.©whit ten associates, inc. BUILDING MATERIALS VINYL BOARD & BATTEN & TRIM VINYL LAP SIDING hugo, mn STONE VENEER THE SHORES OF LAKE ONEKAHugo, MN | 05/04/22 PondPond PondPond PondPond PondPond PondPond PondPond WetlandWetland WetlandWetland LakeLakeExisting DitchExisting DitchWetlandWetland WetlandWetland WetlandWetland 109 Single Family 69 Villa Lots 40 Twinhome Units Total Number of Lots 218 Total Apartment Units 100 Total Units 318 Total Site Area (AC.) 131.66 Gross Density (Units / AC.) 2.42 FUTURE APARTMENTSFUTURE APARTMENTS(BY OTHERS)(BY OTHERS) SITE DATA N 0 300150 COLORS SHOWN DO NOT REFLECT ACTUAL PLAYGROUND COLORS ofof3890 Pheasant Ridge Drive NE, Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comf:\jobs\8001 - 8020\8015 - goodview\cad c3d\engineering\prelim plans\8015_cvr.dwgSave Date:10/22/19environmentalengineeringsurveying···13Revisions:1.Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota10/22/1910/22/19Brian J. Krystofiak, P.E.25063BJKFENWAY LAND COMPANY13925 Fenway Boulevard NorthHugo, Minnesota 55038RICE LAKE RESERVEHugo, MinnesotaRice Lake ReserveHugo, MinnesotaKnow what'sbelow.before you dig.CallRCOVER1 VICINITY MAP SITENo. 8015KRO 2" SCH 80 2" SCH 802" SCH 80 2" SCH 80 2" SCH 80 2" SCH 802" SCH 80 2" SCH 80 2" SCH 80 2" SCH 802" SCH 80 2" SCH 80 2" SCH 80 2" SCH 802" SCH 80 2" SCH 80 NORMAL WATER LEVEL: 973.00 100-YR HWL: 978.30 EOF: 980.00 WATER QUALITY VOLUME: 701,969 CF TOTAL STORAGE VOLUME: 2,237,154 CF LOWER SCHOOL ±33,590 SF EXISTING LOWER SCHOOL GOGGINS LAKE OHW: 965.5 EXISTING DNR MONITORING WELL EXISTING HOME EXISTING SHED EXISTING FENCING SEPTIC SEPTICKELLER AVE122ND ST C403 C404 C405 C406 34 34 33 48 1210 34 UTILITY BUILDING, SEE ARCHITECTURAL PLANS 20' WIDE GRAVEL ACCESS PATH CITY OF HUGO / MAY TOWNSHIP LINE EXISTING FARM HOUSE , BUILDINGS, AND PAVEMENT TO REMAIN 26' SITE ENTRANCE LEGEND PROPERTY LINE CONCRETE SIDEWALK STORMWATER BASIN Know what'sbelow. before you dig.Call R NORTH PROPOSED SEPTIC FIELD ISSUES & REVISIONS COMMISSION NO: DRAWN BY: CHECKED BY: SHEET 767 N. EUSTIS STREET, SUITE 190 ST. PAUL, MINNESOTA 55114 651.642.9200 WWW.POPEDESIGN.COM POPE DESIGN GROUP DATE 160061004 GAR MCB MICHAEL C. BRANDT, P.E. 03/29/2024 462661DATE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. MN LIC. NO. NOT FOR CONSTRUCTION SCHEMATIC PRICING4-14-23 1 CITY SUBMITTAL11-30-23 © 2023 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONCITY & BCWD RESUBMITTAL 03-29-24 C402 OVERALL PHASE I SITE PLAN ASPHALT PAVEMENT SITE FENCING GRAVEL PARKING AREA PHASE I PARKING TOTAL REQUIRED PHASE I PARKING (PER CITY OF HUGO CODE, 1 SPACE PER 100 LOWER SCHOOL STUDENTS + 1 SPACE PER 4 UPPER SCHOOL STUDENTS + 1 SPACE PER CLASSROOM) 64 SPACES PROPOSED PHASE I PARKING 205 SPACES PHASE I CAMPUS PROJECTIONS PROJECTED PHASE I STUDENT POPULATION 336 PHASE I LOWER SCHOOL STUDENTS 186 PHASE I MIDDLE SCHOOL STUDENTS 0 PHASE I HIGH SCHOOL STUDENTS 150 PHASE 1 STAFF COUNT 35 TOTAL NUMBER OF PHASE I CLASSROOMS 24 PROPERTY SUMMARY TOTAL PROPERTY AREA 82.19 AC / 3,580,153 SF DISTURBED AREA 77.88 AC / 3,392,436 SF EXISTING IMPERVIOUS AREA 3.20 AC / 139,392 SF / 3.89% EXISTING PERVIOUS AREA 78.99 AC /3,440,761 SF / 96.11% PROPOSED IMPERVIOUS AREA 5.79 AC / 252,057 SF / 7.0% PROPOSED PERVIOUS AREA 76.40 AC / 3,328,096SF / 93.0% AREA OF WETLAND IMPACT 0.00 AC / 0 SF SITE DATA EXISTING ZONING AG PROPOSED ZONING AG PROPOSED LAND USE CONDITIONAL USE PERMIT - PRIVATE SCHOOL FRONT YARD BUILDING SETBACK 40' SIDE YARD BUILDING SETBACK 20' REAR YARD BUILDING SETBACK 50' ROW PARKING SETBACK 10' RESIDENTIALLY ZONED PROPERTY PARKING SETBACK 10' ALL OTHER PROPERTY LINE PARKING SETBACK 5' FENWAY BLVD NORTHFENWAY BLVD NORTH416 16 11 6 16 16 16 16 16 9 14 122 22 22 22 22 11 29 16 12 5 161 61 POND 1 NWL=924.0 HWL=926.9 BTM=918.0 POND 2 NWL=919.0 HWL=920.6 BTM=914.0 FFE=933.0 7 24.0' 9.0' TYP 18.0' TYPB612 C&G (TYP.)24.0' 9.0' TYP 18.0' TYP 24.0' 24.0' 24.0' 24.0' 24.0' 18.0' TYP 18.0' TYP 32.0'24.0' 10.0' 24.0' 9.0' TYP 18.0' TYP 10.0' CONCRETE SIDEWALK (TYP.) MATCH EXISTING BITUMINOUS PAVEMENT CONCRETE PAVEMENT ADA SIGN TYP SEE DETAIL TYPICAL ADA PARKING STALLS SEE DETAIL 47.4' 47.4' 24.0' 9.0' TYP 18.0' TYP 24.0' 24.0' 24.0' 24.0' 24.0' 24.0' 24.0' 25.0' 5.0' 10.5' B612 C&G (TYP.) 33.0' PROPOSED SUBSTATION AREA PROJECT PROPOSED IN-PROCESSING BUILDING PROJECT GRAVEL PARKING AREA PROPOSED TRANSMISSION LINES (SEE PLANS PREPARED BY OTHERS) 24' TYP 5'R 5'R 5'R 5'R 5'R 5'R 5'R 5'R 5'R 5'R 5'R 5'R 5'R 5'R 5'R5'R5'R5'R 25'R 25'R 5'R 20'R 26'R 23'R 5'R 5'R 5'R 50'R 50'R 20'R 20'R 20'R 20'R 20'R 20'R 20'R 20'R 20'R 20'R 10'R 15'R 15'R 10'R 44'R 15'R 25'R 25'R 50'R 5'R 5'R 5'R 5'R 5'R 4.5'R 5'R 5'R 5'R 5'R 5'R 5'R 5'R 5'R 5'R 5'R 5'R 5'R 4.5'R 4.5'R 4.5'R 4.5'R 4.5'R CONCRETE APRON SEE CITY DETAIL 24.0' PROPOSED IN-PROCESSING BUILDING CONCRETE PAVEMENT FUTURE SOLAR TRAINING AREA FLAT CURB FLAT CURB 18.0' PATIO FUTURE WIND TURBINE TRAINING AREA PROPOSED FENCE AND GATE TO MATCH EXISTING PROPOSED SUBSTATION SEE PLANS PREPARED BY OTHERS PROPOSED TRAINING AREAPROPOSED SUBSTATION AREACONCRETE SIDEWALK (TYP.) POLE HEIGHT=85' POLE HEIGHT=79' POLE HEIGHT=70' POLE HEIGHT=70' POLE HEIGHT=105' POLE HEIGHT=57' POLE HEIGHT=43' POLE HEIGHT=48' POLE HEIGHT=55' POLE HEIGHT=61' POLE HEIGHT=62' POLE HEIGHT=52' POLE HEIGHT=64' POLE HEIGHT=57' POLE HEIGHT=61' POLE HEIGHT=83' POLE HEIGHT=57' POLE HEIGHT=52' POLE HEIGHT=52' POLE HEIGHT=52' POLE HEIGHT=57' POLE HEIGHT=57' POLE HEIGHT=66' POLE HEIGHT=71' POLE HEIGHT=52' C ADD f iles pr epar ed by t he Cons ult ant for this p roject ar e instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of t his p r ojec t by ot her s w it hou t wr i t te n ap pr ov al b y t he C onsultant . With t he Cons ultant's appr oval, ot hers may be per mit t ed t o ob t ain cop ies of t he C AD D dr aw ing files f or information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Plotted: 08 /04 / 2022 5:38 PMW:\2022\22012\CADD DATA\CIVIL\_dwg Sheet Files\C2-1 - SITE PLANOUCKSL CADD QUALIFICATION QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS XCEL HUGO - TRAINING FACILITY 13620 Fenway Blvd N, Hugo, MN 55038 XCEL ENERGY 414 NICOLLET MALL, MINNEAPOLIS, MN 55401 08/05/22 PRELIM CITY SUBMITTAL Nathan W. Ekhoff - LA Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota. 52050 Project Lead Drawn By Checked By Loucks Project No.22012 JJD CEF NWE 08/05/22 C3-1 C8-1 to C8-3 C1-1 EXISTING CONDITIONS C4-1 C2-1 L2-1 L3-1 GRADING PLAN CIVIL DETAILS UTILITY PLAN SITE PLAN LANDSCAPE DETAILS LANDSCAPE PLANS C1-2 DEMOLITION PLAN C3-2 SWPPP PLAN C3-3 SWPPP NOTES L1-1 TREE INVENTORY N SCALE IN FEET 0 50 100 1.ALL PAVING, CONCRETE CURB, GUTTER AND SIDEWALK SHALL BE FURNISHED AND INSTALLED IN ACCORDANCE WITH THE DETAILS SHOWN PER THE DETAIL SHEET(S) AND STATE/LOCAL JURISDICTION REQUIREMENTS. 2.ACCESSIBLE PARKING AND ACCESSIBLE ROUTES SHALL BE PROVIDED PER CURRENT ADA STANDARDS AND LOCAL/STATE REQUIREMENTS. 3.ALL CURB DIMENSIONS SHOWN ARE TO THE FACE OF CURB UNLESS OTHERWISE NOTED. 4.ALL BUILDING DIMENSIONS ARE TO THE OUTSIDE FACE OF WALL UNLESS OTHERWISE NOTED. 5.TYPICAL FULL SIZED PARKING STALL IS 9' X 18' UNLESS OTHERWISE NOTED. 6.ALL CURB RADII SHALL BE 5.0' UNLESS OTHERWISE NOTED. 7.SEE SITE ELECTRICAL PLAN FOR SITE LIGHTING. 8.REFER TO ARCHITECTURAL SITE PLAN FOR BUILDING SETBACKS. DENOTES CONCRETE PAVEMENT DENOTES HEAVY DUTY BITUMINOUS PAVEMENT DENOTES LIGHT DUTY BITUMINOUS PAVEMENT SITE NOTES PAVEMENT LEGEND PARKING STALL COUNT ACCESSIBLE PARKING STALL 2 LEGEND CATCH BASIN STORM SEWER SANITARY SEWER WATERMAIN STORM MANHOLE SANITARY MANHOLE HYDRANT GATE VALVE SPOT ELEVATION SIGN LIGHT POLE POWER POLE WATER MANHOLE / WELL CONTOUR CONCRETE CURB UNDERGROUND ELECTRIC CONCRETE TELEPHONE PEDESTAL UNDERGROUND TELEPHONE UNDERGROUND GAS OVERHEAD UTILITY CHAIN LINK FENCE BUILDING RETAINING WALL NO PARKING UNDERGROUND FIBER OPTIC SANITARY SEWER SERVICE WATER SERVICE ELECTRIC METER GAS METER TREE LINE EXISTING PROPOSED 972 DRAINTILE FORCEMAIN 373PARKING SETBACK LINE BUILDING SETBACK LINE 2 FENCE FLARED END SECTION POST INDICATOR VALVE BENCHMARK SOIL BORING 3DIRECTION OF FLOW 1.0% 972.5 WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TOLL FREE: 1-800-252-1166 TWIN CITY AREA: 651-454-0002 Gopher State One Call CALL BEFORE YOU DIG! SITE PLAN C2-1 CURRENT ZONING:BUSINESS PARK PROPOSED ZONING:BUSINESS PARK PROPERTY AREA:1,226,373 SF / ±28.1 AC PROPOSED BUILDING AREA:70,488 sf / ±1.6 ac (5.7%) ALLOWED UP TO 40% PROPOSED IMPERVIOUS AREA:514,677 sf / ±11.8 ac (41.9%) ALLOWED UP TO 80% SITE DATA CODE REQUIRED PARKING FOR PROPOSED BUILDING 34,740 OFFICE BUILDING / 200 =173 PARKING STALLS 6200 TRAINING LABS / 500 =13 PARKING STALLS TOTAL =186 PARKING STALLS PROPOSED PARKING PROVIDED EXISTING STALLS REMOVED =22 PROPOSED STALLS =351 NEW TOTAL PARKING PROVIDED =329 OFF-STREET PARKING CALCULATIONS BUILDING SETBACKS: FRONT 30 FT MINIMUM SIDE EQUAL TO HEIGHT OF BUILDING (NOT LESS THAN 10 FT) MINIMUM REAR 30 FT MINIMUM OFF-STREET PARKING AND DESIGN STANDARD REQUIREMENTS OFF-STREET PARKING SETBACKS: FRONT 10 FT MINIMUM SIDE 5 FT MINIMUM REAR 5 FT MINIMUM MINIMUM PARKING LAYOUT DIMENSIONS (90 DEGREE PATTERN): PARKING SPACE WIDTH = 9 FT PARKING SPACE LENGTH = 18 FT DRIVE LANE WIDTH = 24 FT DEVELOPMENT AND DESIGN STANDARDS NOTE: EXISTING CONDITIONS INFORMATION SHOWN IS BASED ON A SURVEY PREPARED BY CORNERSTONE LAND SURVEYING INC., DATED 06/14/2022. DENOTES GRAVEL PAVEMENT Project ForSheet Issues / RevisionsProject No.Drawn ByChecked ByDateNOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice.© Copyright RSP Architects 2019. All rights reserved.Consultants1220 Marshall Street NEMinneapolisMinnesota 55413-1036612.677.7100612.677.7499 faxwww.rsparch.comRSP Architects7/29/2022 11:35:20 AMC:\Users\rpomerleau\Documents\A21_ Hugo_Nuclear InProcessing_razieh.pomerleau.rvt3D VIEWS6263.315.03RDPGS08/05/22Xcel EnergyHugo NuclearIn-ProcessingA602NORTHEAST CORNERSOUTHEAST CORNERSOUTHWEST CORNERNORTHWEST CORNERPLANNING AND ZONING REVIEWNo.DateDescription 5616 147TH STREET NORTH, HUGO Date Issued: 09/09/22 PREMIER BANK