Loading...
HomeMy WebLinkAbout2015.02.02 RESO 2015-07RESOLUTION 2015-7 APPROVING A SITE PLAN O'REILLY AUTO ENTERPRISES, LLC, IN THE CENTRAL BUSINESS ZONING DISTRICT ON PROPERTY LOCATED AT 14777 FOREST BOULEVARD NORTH WHEREAS, O'Reilly Auto Enterprises, LLC, has requested approval of a site plan for an approximately 7,000 square foot retail building and is legally described as follows: See Attached WHEREAS, the Planning Commission has reviewed said site plan and recommends approval. NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF HUGO, MINNESOTA, that it should and hereby does approve site plan for O'Reilly Auto Parts, under the following conditions: 1. A site plan is approved in accordance with the plans submitted on January 9, 2015, except as amended by this resolution. 2. Prior to the installation of any signs, the applicant shall obtain a sign permit. Prior to the issuance of a building permit: 1. All items on the Engineer's memo and "red -line" detailed engineering comments that have been sent directly to the applicant's engineer dated January 14, 2015, shall be addressed. 1. All items in the MnDOT comment letter shall be addressed. 2. An easement shall be dedicated for right of way for the future expansion of TH 61. 3. A City permit shall be issued for any work completed in the 147t" Street right-of- way. ArchitecturelBuildiug Material 3. The applicant shall provide a material sample in the proposed color for the E.I.F.S proposed for review and approval by staff. 4. The applicant shall provide details for the spandrel glass for review and approval by staff. 5. The applicant shall remove the trellis from the building plans. Resolution 2015-7 Page 2 6. The elevations shall be revised to include a stone sill, or comparable material, between the rock -face block and brick to provide a transition between the different materials. 7. The application shall provide details for the awning for review and approval by staff. 8. The trash enclosure elevation shall be revised to include the rock -face block. as well as, the brick used on the building. Landscaping/Gateway Elenxents 4. The applicant shall continue to work with staff on revisions to the landscape plan. The final design shall be reviewed and approved by staff. 5. The applicant shall add trees in the landscaped areas along 147"' Street. 6. The applicant shall continue to work with staff on what is included for the gateway elements and the design. The final design shall be reviewed and approved by staff. Prior to issuance of a Certificate of Occupancy: 7. Landscaping shall be fully installed per approved landscape plan. 8. All roof top mechanical equipment must be screened from view of adjacent properties. Staff shall perform an inspection when equipment is installed to ensure compliance with City code. ADOPTED by the City Council this 2nd day of February, 2015. �Z/_ei Tom Wei t, Mayor ATTEST: Michele Lindau, City Clerk 11