My WebLink
|
Help
|
About
|
Sign Out
Home
2026.04.06 RESO 2026-8 Feasibility Study and set PH for BEIP Area St. Imp Project
Hugo
>
City Council
>
City Council Resolutions
>
2026 CC Resolutions
>
2026.04.06 RESO 2026-8 Feasibility Study and set PH for BEIP Area St. Imp Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2026 1:05:10 PM
Creation date
4/7/2026 1:05:10 PM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Date
4/6/2026
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. 2026-8 <br /> CITY OF HUGO <br /> WASHINGTON COUNTY,MINNESOTA <br /> A RESOLUTION RECEIVING THE FEASIBILITY REPORT AND <br /> SETTING THE PUBLIC HEARING FOR THE <br /> 2026 BALD EAGLE INDUSTRIAL PARK STREET IMPROVEMENT PROJECT <br /> WHEREAS,pursuant to the resolution of the Council adopted February 27, 2025, a report was <br /> prepared by WSB, with reference to the improvement of the following roadways: <br /> • 130th Street N from Europa Trail to Forest Blvd N/Trunk Highway 61 (TH 61) <br /> • Farnham Avenue N from the south terminus to 130th Street N <br /> • Fenway Blvd N from 130th Street N to 140th Street N <br /> • 140th Street from Fenway Blvd N to Forest Blvd/TH 61 <br /> • Fenway Blvd Court N from Fenway Blvd to its eastern terminus <br /> WHEREAS, the following improvements are proposed: <br /> • Full-depth pavement removal,paving, mill and overlay improvements, spot curb and gutter <br /> replacement, trail improvements, street lighting improvements, and minor utility <br /> improvements <br /> and to assess benefited properties for all or a portion of the improvement,pursuant to Minnesota <br /> Statutes, Chapter 429; and <br /> WHEREAS, the City Council has been advised by the City Engineer that said street <br /> improvements are feasible, and should best be made as proposed, and the City Engineer's report <br /> to this effect has heretofore been received by Council, and filed with the City Clerk on April 6, <br /> 2026; and <br /> WHEREAS,the City Council deemed it necessary and expedient that the City of Hugo, <br /> Minnesota, construct certain improvements, to-wit: 2026 Bald Eagle Industrial Park Street <br /> Improvement Project, in the City as described in and in accordance with the feasibility report <br /> prepared by the City Engineer; and <br /> WHEREAS,the statute provided that no such improvements shall be made until the Council has <br /> held a public hearing on such improvements following mailed notice and publication thereof in <br /> the official newspaper stating time and place of the hearing, the general nature of the <br /> improvement, the estimated costs thereof, and the area proposed to be assessed, in accordance <br /> with the law; and <br /> NOW THEREFORE BE IT RESOLVED,by the City Council of the City of Hugo, that the <br /> public hearing be scheduled to consider: 2026 Bald Eagle Industrial Park Street Improvement <br /> Project, to be held on Monday, May 4, 2026, at 7:00 o'clock p.m. or as soon thereafter as <br /> possible, at Hugo City Hall, 14669 Fitzgerald Avenue North. <br />
The URL can be used to link to this page
Your browser does not support the video tag.