HomeMy WebLinkAboutPC Packet 06.25.26If you need accommodations for the Planning Commission meeting please contact
Rachel Juba at (651) 762-6304 or rjuba@ci.hugo.mn.us, thank you.
Agenda
Hugo Planning Commission
Thursday, June 25, 2026
Hugo City Hall
7:00 PM
A. ROLL CALL: Andress, Derr, Fahey, Granger, Klein, Kleissler, Petty
B. PLEDGE OF ALLEGIANCE
C. APPROVAL OF MINUTES
1. January 22, 2026
D. PUBLIC HEARING
1. DRW Property Investments, LLC. – Preliminary Plat and PUD requests for 50
townhome units to be known as “Oneka Lake Reserve,” generally located north
of 150th Street North and west of Goodview Avenue North.
2. Ordinance Amendment -- An amendment to repeal and replace Chapter 90 –
Zoning and Land Use in its entirety and amend the Zoning Map.
E. NEW BUSINESS
F. OLD BUSINESS
1. Update on 165th Street AUAR
G. ADJOURNMENT
Minutes for the Planning Commission Meeting of Thursday, January 22, 2026
Chair Kleissler called the meeting to order at 7:00 pm.
PRESENT: Andress, Derr, Granger, Klein, Kleissler, Petty
ABSENT: Fahey
STAFF: Rachel Juba, Community Development Director
Max Gort, Associate Planner
Pledge of Allegiance.
Approval of Minutes for the Planning Commission Meeting of December 11, 2025
Commissioner Petty made a motion, seconded by Commissioner Klein, to approve the minutes for the
Planning Commission meeting of December 11, 2025.
All ayes.
Motion carried.
New Business – Frenchman Village Sketch Plan
Community Development Director Juba presented background on the request from Maplewood
Development for informal, nonbinding comments on a sketch plan with residential and commercial
uses. The sketch plan is for nine separate parcels totaling approximately 97 acres in size. The property
is generally located south of Frenchman Road/CSAH 8 and west of Forest Blvd/Highway 61. There are
no wetlands on the site, but natural constraints include judicial and private ditches, as well as
floodplain. Juba showed the 2040 Land Use Plan guiding the eastern portion of the property as Mixed
Use (MIX), and the western portion of the property being guided for Commercial (COM) in the
northern half and Low Density Residential (LD) in the southern half. The zoning generally follows the
land use plan, with the area guided MIX being zoned as Central Business (C-1). The mixed use property
is part of the identified downtown area and subject to the Downtown Plan and Design Guidelines.
Juba showed the applicant’s sketch plan with a mixture of single-family homes, attached townhomes,
and commercial areas. While the entire frontage of Frenchman Road is currently guided for
commercial development, the sketch plan reduces the commercial areas to near the intersections with
Oneka Parkway and Highway 61. Filling in this reduced commercial area, the applicant is proposing to
move residential uses further north within the site and utilize areas to the south within the site for
ponding and floodplain mitigation. The residential areas that are near Frenchman Road will have a
landscaped berm with a decorative fence to create a buffer from the major road. The sketch plan
shows the extensions of Victor Path and Fenway Avenue that are required in the 2040 Transportation
Plan. There is some existing regional infrastructure within the property, including a Metropolitan
Council sewer interceptor and associated lift station at the southeast corner of the intersection of
January 22, 2026 PC Minutes
Page 2
Oneka Parkway and Frenchman Road. The applicant is proposing to relocate the sewer interceptor to
align with the development, which will require approval from the Met Council. The sketch plan
currently shows a clubhouse near the lift station. Staff is recommending the applicant consider a
further buffer or a commercial use near the lift station.
The applicant’s proposed land use changes include a reduction of commercially guided property and
increase of residential property along Frenchman Road. The applicant is making the request based on
market conditions, stating that the land was guided for commercial development for a long time and
hasn’t seen that development. The applicant is making an effort to blend the medium density
residential and commercial uses within the parcel guided for mixed use. The applicant has not provided
formal details on the users that may come to the commercial sites.
The sketch plan shows a four-acre public park on the southern edge of the property, and has numerous
trail connections within the development. Park dedication is required of all residential land
development. Staff’s opinion is that the proposed park is in a good location. The Parks Commission
reviewed the sketch plan at their January 21, 2026 meeting, and were generally comfortable with the
proposal, but wanted to request a larger area of land to accommodate further recreational needs in
the area.
The EDA reviewed the sketch plan at their January 20, 2026 meeting, and generally liked the mix of
uses and that the developer is planning for the entire 97 acre property. The EDA wanted to see more
commercial property, but was generally comfortable with the amount proposed.
Juba said that the project is still being evaluated at a very high level and there are several key details to
figure out before a formal development application . Staff’s opinion is that the applicant generally
made an effort to meet the requirements of City Code, the Comprehensive Plan, and the Downtown
Plan and Design Guidelines. Staff recommended that the Planning C ommission provide comments on
the sketch plan, including the requested land use and zoning revisions, the general layout, and the
downtown area.
Commissioner Klein asked if ditches interior to the property could drain to ponds or if ditches could be
widened by creating ponds. Juba said that it’s difficult to say without an engineering analysis. Klein said
he thought about it from a drought standpoint and maintaining pond levels.
Commissioner Klein asked if the development proposal would affect the issue s the City has been
having with the Met Council and the System Statement. Juba said the plan was shared with the Met
Council, and that the plan would meet 2050 density requirements.
Commissioner Granger asked about the general history of the property and other concepts the city has
reviewed. Juba said that the property has been marketed for about 20 years, and that the city has seen
a number of proposals, most of which didn’t plan for the entire site.
Mario Cocchiarella, owner of Maplewood Development, introduced himself as the applicant.
Cocchiarella said he is also the owner Belair Sitework Services. Cocchiarella said that the two biggest
January 22, 2026 PC Minutes
Page 3
complications with the site are working around the floodplain and trying to relocate the sewer
interceptor. Cocchiarella said that the amount of commercial area proposed was appropriate for the
size of the development, and that trail connections have been a very popular amenity in other projects
they’ve done. Cocchiarella said that the entire project would be constructed in one phase.
Commissioner Petty asked if any of the proposed single family homes would be patio homes with an
HOA. Cocchiarella said that they will be standards single-family homes that may have an association.
Petty asked if Lennar would be building the homes, Cocchiarella said Lennar would be the most likely
builder.
Commissioner Andress asked about soil corrections that may be needed in the Low Density Residential
area. Cocchiarella explained that they’d be removing the top few layers of soil, removing unwanted
soils like peat, and filling the land back up with compaction. Details would be included in a future
grading plan. Andress said he’s concerned about the homes proposed to back up to Frenchman Road,
saying that his own house backs up to Highway 61 and he hears highway noise even with some
vegetative buffer. Cocchiarella described the proposed 50-foot wide berm, screening, and fence that
are all intended to reduce noise, and that they’ve found residents may prefer a home near the
development entrance even if it means increased noise. Petty asked about the fencing materials,
Cocchiarella said that it’d be something like a picket fence and maintained by an association.
Chair Kleissler asked why the clubhouse and park are located on opposite sides of the development,
thinking that it would be better to locate them near each other. Juba said they’re separated because
the clubhouse would be a private amenity for the association. Commissioner Klein asked the developer
how he felt about locating a commercial use near the lift station rather than the clubhouse.
Cocchiarella said they’d do it if the city requires it, but that he’d rather keep a residential user on that
side of Oneka Parkway, and that they haven’t had odor complaints from residents in other projects
near lift stations.
Commissioner Klein said he’s impressed to see a project that plans for the whole site, and that he
understands market conditions driving the mix of uses being proposed.
Commissioner Derr said that he wasn’t sure about utilizing county road frontage for residential uses,
when commercial fits much better. Petty brings up previous discussion about a lot of land within the
city being guided for commercial development that hasn’t been built. Petty said she’s skeptical about
how long it may take to fill the commercial spaces proposed. Cocchiarella said that he sees medical
offices being the primary and first tenants, with supplementary tenants being supported by medical
anchors.
Commissioner Andress talked about the potential for cut-through traffic between Frenchman Road and
the Bald Eagle Industrial Park via the extended Fenway Boulevard, and increasing traffic on the
residential portion of Fenway. Andress asked if the developer would consider a resta urant user for the
commercial spaces, Cocchiarella said yes.
January 22, 2026 PC Minutes
Page 4
Chair Kleissler said she felt comfortable with the proposed land use changes and mix of uses, and asked
if the other Planning Commissioners agreed. Several said yes. Kleissler said she generally likes the
downtown area layout proposed.
Commissioner Andress asked about the land use change process. Juba said the developer would apply
for a preliminary plat for the whole site, and go through a comprehensive plan amendment approval
with the Met Council, with all zoning being under the PUD.
Chair Kleissler said she liked the sketch plan.
Old Business – Approve 2026 Goals
Juba shared the draft of the 2026 Planning Commission goals, and explained some minor language
changes. The evaluation of the commercial and industrial design guidelines was kept, which staff would
like to begin work for this year. Juba said the EDA discussed an updated commercial market study,
which the Planning Commission could keep in mind. The 165th Street AUAR is going to the City Council
for ordering soon, and the Planning Commission will continue to receive updates on its progression.
Juba asked if there were any additions from the Planning Commission.
Commissioner Petty made a motion, seconded by Commissioner Klein, to approve the 2026 Planning
Commission Goals as presented.
All ayes.
Motion carried.
Adjournment
Commissioner Klein made a motion, seconded by Commissioner Derr, to adjourn at 7:56 PM.
All ayes.
Motion carried.
Respectfully Submitted,
Max Gort, Associate Planner
RESOLUTION 2026-__
APPROVING A PRELIMINARY PLAT AND PLANNED UNIT DEVELOPMENT
(PUD) FOR ONEKA LAKE RESERVE LLC, FOR “ONEKA LAKE RESERVE”
ON PROPERTY LOCATED NORTH OF 150TH STREET NORTH AND ACROSS
FROM GENERATION AVENUE NORTH
WHEREAS, Oneka Lake Reserve, LLC has requested approval of a preliminary plat and
Planned Unit Development (PUD) to allow 50 townhomes and two outlots on the
property legally described as follows:
Lot 1, Block 1, Oneka Lake Townhomes 2nd Addition
WHEREAS, the Planning Commission has reviewed the preliminary plat and Planned
Unit Development (PUD) at a duly called Public Hearing and recommends approval, and;
NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF
THE CITY OF HUGO, MINNESOTA, that it should and hereby does approve the
request by Oneka Lake Reserve, LLC., for a preliminary plat and planned unit
development (PUD), subject to the following conditions:
1. A preliminary plat and planned unit development general plan are approved to allow
the creation of 50 townhome units and two outlots including a public park, in
accordance with the plans and application received by the City on April 20, 2026,
and revised plans dated May 8, 2026, May 13, 2026, May 26, 2026, May 28, 2026,
June 3, 2026, and June 11, 2026, except as amended by this resolution.
2. The PUD general plan is approved based on the finding that the proposed project is
consistent with the City’s Comprehensive Plan.
3. The preliminary plat approval is contingent upon approval of the requested Planned
Unit Development.
4. The preliminary plat shall include two outlots. Outlot A shall include the common
space between each townhome lot and in the center of the development, as well as the
private street. Outlot B shall consist of the public park.
5. The developer shall comply with all conditions in the City Engineer’s Memo dated
June 17, 2026.
Resolution 2026-
Page 2
6. PUD Flexibility is granted to allow the following:
PUD
Minimum front setback from 150th Street 25 feet
Minimum front yard setback from private drive 15 feet
Minimum side yard setback 15 feet
Minimum side yard setback between buildings 20 feet
Minimum rear setback 25 feet
7. Guest parking shall comply with the Americans with Disabilities Act as may be
applicable.
8. No parking shall be allowed on the private drives.
9. The private drives must comply with City standards for private drives.
10. No signage is proposed at this time. Should signage be desired, the applicant must
apply for a sign permit with details ensuring compliance with ordinance requirements.
11. The developer shall remain in contact with the property owners to the north and east
of the development during the construction of the expanded shared stormwater pond.
12. Prior to approval of the final plat, the applicant must comply with the following
conditions:
a. The developer must obtain all necessary Federal, State, and local Permits.
b. The developer must obtain all necessary stormwater management and WCA
permits from the City.
c. The plans shall be revised to show the lot lines in the preliminary plat submitted
on June 11, 2026.
d. The grading for the expansion of the pond to the north and east shall be further
evaluated to reduce the impact on the adjacent properties, including preserving
trees in that area.
e. The buildings shall comply with the following:
i. The side and rear walls of the buildings shall be designed with the same
elements to reduce building massing as are shown on the front of the
building, including the utilization of all building materials that area used on
the front façade.
Resolution 2026-
Page 3
ii. Building material samples and a color palette must be submitted for city
review and approval.
iii. Garage doors must be painted to match the color of the unit.
iv. Garage doors must be prefinished to minimize maintenance.
v. Updated architectural elevations based on the requirements listed above
shall be submitted for review and approval by staff.
f. Any revisions to the landscape plan shall be submitted for review and approval by
staff.
g. The irrigation plan shall be revised to include irrigation for the park. The revised
irrigation plan shall be submitted for review and approval by staff.
h. All mechanical equipment shall be screened with materials compatible with the
building and project landscaping. The plans must submitted for review and
approval by City staff.
i. A lighting plan must be updated to match the site plan and submitted for review
and approval by City staff. The plan shall include cut-sheets of the street lights
proposed.
j. The stormwater use plans shall be submitted for review and approval by City
staff. A stormwater reuse agreement shall be completed with the Final Plat.
k. A cross walk from the sidewalk on the west side Generation Avenue, north to the
public park shall be added. Installation shall be completed by the developer.
l. Private parking easements shall be dedicated over the areas of guest parking that
extend over the property lines of Lot 4, Block 4 and Lot 1, Block 3.
m. Trail easements shall be dedicated over the areas of bituminous trail that extend
over the property lines of Lots 7, 8, 13, and 14, Block 6.
n. A complete set of revised plans addressing the conditions of approval shall be
submitted for city review and approval.
13. Prior to release of the final plat and resolution for filing at Washington County, the
applicant must comply with the following conditions:
a. The developer is proposing to create an organized homeowner’s association with the
development with written covenants describing each member’s responsibilities,
singly and jointly. The homeowner’s association documents shall be submitted for
review and approval by City staff.
b. The homeowner’s association documents shall include language to ensure that the
enclosed garage spaces are maintained for vehicle parking and that parking of
snowmobiles, boats, RVs and other recreational vehicles in the driveway is
Resolution 2026-
Page 4
discouraged. The covenants should be drafted to prohibit the storage of anything
in the garage or driveway that would prevent the storage and parking of vehicles.
c. The developer/HOA shall be responsible for the maintenance of:
i. The sidewalks, pathways, and private streets,
ii. private utilities,
iii. stormwater reuse irrigation system,
iv. common spaces and landscaping,
v. internal drainage areas in common space,
vi. development signage,
vii. and any proposed fencing or retaining walls.
This shall be included in the homeowners association documents.
d. Cross access agreements shall be provided for the private streets and driveways.
These easements shall be provided for City review and approval and filed with the
final plat.
e. A development agreement will need to be signed and executed in a form
satisfactory to the City.
f. The City’s development fees will apply to this project. The fee amounts will be
calculated and included as part of the Development Agreement.
14. Prior to issuance of building permits, the applicant must comply with the following
conditions:
a. All development fees shall be paid.
b. Final plat and development agreement shall be recorded at Washington County.
c. The development shall meet all of the conditions in the development agreement
regarding issuance of building permits.
ADOPTED by the City Council this 6th day of July, 2026.
______________________________
Tom Weidt, Mayor
ATTEST:
___________________________________
Michele Lindau, City Clerk
17
8
E
9
T
H
S
T
R
E
E
T
|
SU
I
T
E
2
0
0
|
SA
I
N
T
P
A
U
L
,
M
N
|
55
1
0
1
|
65
1
.
2
8
6
.
8
4
5
0
|
WS
B
E
N
G
.
C
O
M
June 17, 2026
Mr. Max Gort
Associate Planner
City of Hugo
14669 Fitzgerald Avenue North
Hugo, MN 55038
Re: Preliminary Plat, Site Plan and Rezoning
Oneka Lake Reserve
WSB Project No. 035687-000
Dear Mr. Gort:
We have reviewed the preliminary plat submittal for the proposed Oneka Lake Reserve
development located north of 150th Street at Generation Avenue. In particular, we have reviewed
the following plans related to this particular request:
• Civil Plan Set dated April 20, 2026, by Elan Design Lab
• Stormwater Management System Calculations and Narrative dated April 20, 2026, by
Elan Design Lab
• Preliminary Plat dated April 20, 2026
Based on the review of the above documents, we offer the following comments related to this
application:
Grading, Street, and Utility Plans
1. The site is proposed to have a single access extending north from the existing tee
intersection of 150th Street North and Generation Avenue North. Two proposed buildings,
one with three units and one with two units abuts and accesses 150th Street North with 5
individual residential driveways. The proposed access locations are acceptable.
2. Water service is available to the development from an existing 8” water service stub
extending north from the intersection of 150th Street North and Generation Avenue North.
The applicant will be required to create an 8” loop within the development for residential
service and fire protection. A watermain stub will be required to be provided to the property
to the west to allow for future connection and system looping to provide overall system
reliability.
3. Streets and storm sewers are proposed to be private, however sanitary sewer and watermain
will be public and contained within drainage and utility easements. This should be clearly
shown on all utility plan sheets.
4. Sanitary sewer service is available to the site from an existing 8” sanitary service stub
extending north from the intersection of 150th Street North and Generation Avenue North.
5. Grading is proposed in the drainage and utility easement area on the properties directly to
the north to expand the size of this stormwater pond. Staff will need to continue to work with
the applicant on the detailed grading of this pond to minimize impacts. Grading will also
connect to the stormwater basin in the NE corner, making one large stormwater basin.
6. Drainage and Utility easements are appropriately shown over all of Outlot A.
Mr. Max Gort
June 17, 2026
Page 2
7. Detailed redline comments have been provided on the plans and sent to the applicants
engineer so they can be addressed in future submittals.
Stormwater Management
8. The stormwater water quality requirements are proposed to be met through expansion of the
permanent wet pond located along the north property line. This work involves working within
the drainage and utility easement along the north property line of this development (borders 3
lots in Sweet Grass Meadows 3rd addition and in the common space of Oneka Lake View
North). The applicant has discussed this work with the adjacent property owners.
9. Water reuse has been evaluated for the pond and is a viable candidate for this development.
Staff have provided comments on the proposed reuse system and will continue to work with
the applicant to refine the plans and provide necessary details.
10. Additional stormwater plan and model comments have been provided to applicant, and they
will need to be addressed in future submittals for documentation and permitting purposes.
11. The large wet pond located along the northern portion of the development will be in a
drainage and utility easement where the city will be responsible for maintenance. The
smaller sub catchments internal to the site that are not needed for stormwater management,
but rather a means to move stormwater across the site will require maintenance to be
provided by the development. A stormwater Maintenance Agreement will be required for this
portion of the site.
Thank you for the opportunity to provide comments on this project. Additional comments may be
necessary following the review of the responses to these. If you have any questions, please do
not hesitate to contact me at 612-360-1278.
Sincerely,
WSB
Mark Erichson, PE
City Engineer
cc: Scott Anderson, Public Works Director (email only)
Liz Finnegan, Senior Engineering Technician (email only)
Rachel Juba, Community Development Director (email only)
April 20th , 2026
City of Hugo Mayor, City council, Parks Commission and Planning Commission
C/O Rachel Juba
Community Development Director
14669 Fitzgerald Ave. N.
Hugo, MN. 55038
Oneka Lake Reserve Subdivision
Greetings,
On behalf of Oneka Lake, LLC, we are pleased to present the proposed Oneka Lake Reserve Planned Unit
Development consisting of 50 attached town homes.
Project Narrative
The subject property is located north of 150th Street North at the extension of Generation Avenue. The
surrounding area includes the Generation Acres townhome development to the south, Oneka Lake View
town homes to the southeast, additional townhome developments to the east, Sweet Grass Meadows single-
family homes to the north, and the Hugo Estates manufactured home park to the west. An industrial park is
located to the northwest, and New Life Church lies to the southwest.
This proposal builds directly upon the previously approved 40-unit preliminary plat and Planned Unit
Development (PUD), which was supported by city staff and approved by the Planning Commission on May 13,
2021. That plan established the overall framework for development of the site and demonstrated consistency
with the Comprehensive Plan and surrounding land uses.
The current proposal represents an evolution of the previously approved concept rather than a redesign,
maintaining the same general layout, setbacks, and circular road system while improving site efficiency, open
space usability, and stormwater management.
Development Program
The development consists of 50 town homes arranged in a mix of 2-unit, 3-unit, and 4-unit buildings. This
variatiea reduees repetitive massing and ereates a mere visually eehesive aad diverse neigi'ltieri'leed
environment. The units are anticipated to be two-story homes with attached 2-car garages and functional
layouts designed to meet current market demand. The mix of unit types supports a broader range of
homeowners and contributes to housing diversity within the City.
Zoning and Density Justification
The property is zoned R-4 (Low Density Multi-Family Residential), which permits townhome development at
densities between 3 and 6 units per acre, with the ability to increase density to 8 units per acre through the Planned
Unit Development (PUD) process. The proposed development achieves a density of approximately 7.5 units per
acre, which is consistent with nearby townhome developments and remains within the allowable density range under
PUD zoning. The increase from 40 to 50 units is achieved through itnproved site efficiency and layout refinement,
not through reductions in setbacks or open space.
Key itnprovements include:
Elimination of internal stormwater ponding, more efficient building placement, smaller building footprint, itnproved
internal circulation and increased usable open space.
The revised plan results in approxitnately 2.8% more pervious surface area than the previously approved 40-unit
plan, along with increased usable open space due to the removal of central ponding and maintains the core design
elements supported in the previously approved 40-unit development while addressing layout efficiencies and overall
site functionality.
Quantitative Zonin-g a-nd-PUD Comparison-
The proposed Planned Unit Development has been evaluated against the underlying R-4 zoning standards as well as
typical development metrics. The following comparison demonstrates that while the proposed plan utilizes PUD
flexibility in litnited areas, it exceeds standard zoning requirements in several key performance categories:
Dimensional Standards Comparison
Standard R-4 Requirement Proposed PUD
Minitnum Site Size 1 acre 6.7 acres
Site Width at Setback 150 ft 440 ft
Site Depth 150 ft 663 ft
Front Yard Setback 25 ft 25 ft
Side Yard Setback 15 ft 25 ft
Rear Yard Setback 25 ft 25 ft
Building Separation 30 ft 20 ft
Maxitnum Building Coverage 40% 21.3% (net of park)
Maxitnum Impervious Surface 70% 52.2% (net of park)
Maxim um Building Height 35 feet 29 feet
Minitnum Unit Size 960 sq ft 1,150 sq ft
Performance-Based Observations
The comparison illustrates that the proposed development: Significantly reduces building coverage compared to
allowed maxitnums, Maintains substantially lower itnpervious surface coverage-improving stormwater
performance, Exceeds minimum unit size requirements-supporting higher quality housing, Provides increased side
yard setbacks-maintaining separation from adjacent properties.
Pg. 2
The proposed building height of approxhuately 29 feet is significantly below the maxhuum pennitted height of35
feet under R-4 zoning. The lower profile of the buildings contributes to a more residential scale and supports a more
gradual transition between differing housing types.
The only variation requested relates to building separation (20 feet vs. 30 feet), which is consistent with typical
single-family spacing within the City and is offset by the substantial reductions in overall site coverage and
increased open space.
Internal Design Standards
Within the development, the following standards are proposed:
• Street width: 24 feet (face-to-face)
• Sidewalks: 5 feet, Walking trails: 6 feet Boulevard
• Boulevard widths: 6ft. walk to curb, 22.5 ft. Property line to curb (with walk), 11.5 ( no walk)
• Building setbacks:
o 19 feet to curb
o 12.5 feet to sidewalk
• Set back between buildings 20 ft., Garage setbacks to curb line: 22 feet minhuum,
Parking Summary
Type Stalls Stalls per Unit
Garage 100 2.0
Private Guest 100 2.0
Shared Guest 25 0.5
Total 225 4.5
Summary of Findings
The proposed PUD demonstrates that: The site is less intensely developed than allowed under standard zoning, The
design results in improved stonnwater perfonnance, The development provides higher-quality housing and greater
open space, The requested flexibility is lhuited and justified by measurable huprovements-Included designated park
area, walking trails and sidewalks, Install of trees and landscaping exceeding city requirements.
The proposed 50-unit plan results in measurable huprovements in site design metrics, including increased pervious
surface area, expanded usable open space, and huproved stonnwater management, demonstrating that the increase in
density is directly tied to improved overall site perfunnance.
Access and Circulation
Access to the development is provided via a private loop street aligned with Generation Avenue. The looped street
design improves traffic flow, internal circulation, and emergency access throughout the site. Pedestrian
infrastructure includes: 5-foot sidewalks along the private street system and 6-foot sidewalk along 150th Street
North
The development includes approxhuately 1,500 linear feet of sidewalks and pedestrian connections, supporting
strong internal connectivity and walkability.
Pg. 3
The private street will be owned and maintained by the homeowner's association, reducing long-term public
maintenance obligations while maintaining full functionality. Street lighting, installed and maintained by Xcel
Energy, is incorporated into the Development and the park area.
Open Space, Park, and Stormwater Management
The revised plan enhances the open space framework established in the previously approved development.
The public park In the Southwest portion of the site has been increased from approximately 0.45 acres to
approximately 0.50 acres. The park will provide recreational opportunities and pedestrian connectivity to
150th Street. Lighting and parking stalls are proposed adjacent to park and the developer has provided water
and sewer access to park for the cities future uses. Additional open space has been incorporated into the
central portion of the development, improving usability and reinforcing a pedestrian-oriented design.
Stormwater management has been significantly improved by eliminating internal ponding and consolidating
stormwater facilities to the northern portion of the site. Stormwater will be managed through a combination
expansion of the existing stormwater pond to the north of this site. The grounds will be irrigated with water
drawn from the stormwater basin rather than relying on potable water from the city system. The development
will be served by publicly owned sanitary sewer and water installed to city standards within an easement. The
storm drainage system will be maintained by the homeowner's association. The expanded stormwater basin
utilizes an existing drainage and utility easement and is designed to meet City and watershed requirements
while improving long-term performance and aesthetics.
The landscaping proposed exceeds city standards and includes leaving existing trees in areas where possible.
Trees at the west property line and park area will remain and the developer proposes additional tree planting
at the north property line.
Neighbor Coordination and Easement Improvements
The developer has proactively notified the 3 adjacent property owners regarding the proposed stormwater
improvements within the existing easement area. Work may include grading and limited tree removal
necessary to accommodate the expanded basin. The developer has committed to restoration, replacement
landscaping, and coordination with affected property owners to minimize impacts.
Parking and Circulation Efficiency
The development provides a total·ofapproximately 22~parking stalls, equating to 4$ stalls per unit. This
includes garage, driveway, and guest parking. This level of parking exceeds typical requirements and supports
both residents and visitors while minimizing the potential for congestion. The 50 town homes can be expected
to generate on average 8 trips per unit per day or 400 total. The park will generate minimal vehicular traffic.
Planned Unit Development (PUD) Criteria and Justification
Section 90-141 of the City_of Hug9 Zoning_Code establishes the criteria required to jµstify the use of
Planned Unit Development (PUD) zoning. The proposed development meets each of these criteria as outlined
below:
Criteria 1 -Consistency with the Comprehensive Plan
Ordinance Language: The establishment of PUD zoning districts in appropriate settings and situations, to
create or maintain a development pattern that complies with the city 1s comprehensive plan.
Response:
The proposed development is consistent with the City's Comprehensive Plan and planned land use
designation for the property. The site is located between a single-family development to the north, town home
developments to the east and south (approximately 6.5 units per acre), and a manufactured home park to the
west (approximately 5.8 units per acre). The proposed density of approximately 7 .5 units per acre is
consistent with surrounding development patterns and represents an appropriate transition between these
uses. The mix of 2·, 3-, and 4-unit buildings provides a gradual transition between lower-density single-family
homes and higher-density attached housing.
Criteria 2-Mixing of Land Uses
Ordinance Language: The mixing ofland uses within a developmentwhen such mixing of land uses eould not
otherwise be accomplished under this chapter.
Response:
The development does not include a mix of land uses but does provide a variation of town home product types
not widely present in the immediate area.
Unlike nearby developments consisting primarily of uniform 4'unit or split'entry townhomes, the proposed
development includes a mix of unit sizes and configurations, including possible units with main-level living
options. This provides additional housing diversity and supports a broader range of residents.
Criteria 3-Flexibility in Design and Development Standards
Ordinance Language: Variations to the strict application of the land use regulations in this chapter in order to
improve site design and operation, while at the same time incorporating design elements that exceed the
city's standards to offset the effect of any variations.
Response:
The proposed development requests limited flexibility from the underlying zoning requirements, primarily
related to building separation, where 20 feet is proposed compared to the standard 30 feet. This variation is
consistent with typical single-family separation distances within the City and allows for a more efficient and
coordinated site layout. The requested flexibility is offset by several enhancements that exceed City
standard,,, including: Increased public park area (approximately 0.50 acres), Expanded and improved open
space, Integrated pedestrian system with sidewalks and walkways, Enhanced landscaping and site design,
Stormwater management exceeding requirements through the use of permanent wet basin along with the
reuse for irrigation. The development maintains all required perimeter setbacks and does not reduce open
space to achieve the increased density.
Criteria 4-Efficient and Creative Use of Land
Ordinance Language: A more creative and efficient approach to land use within the city, while at the same
time protecting and promoting the health, safety, comfort, aesthetics, economic viability, and general welfare
of the city.
Pg.5
Response:
The development represents a more efficient and creative use of the site through the refinement of the
previously approved plan. Key improvements include:
*Elimination of internal stormwater ponding Which provides more useable space.
*Consolidation of stormwater management to the north
*Loop street design improving circulation and emergency access
*Reduced impervious surface through efficient street layout
*The private street system reduces long-term public maintenance costs while maintaining full functionality.
Criteria 5-Preservation and Enhancement of Natural Features and Open Space
Ordinance Language: Preservation and enhancement of natural features and open spaces, including but not
limited to greenway corridors, wooded areas, buffer areas, reduction of impervious surface, and utilization of
joint facilities and utilities.
Response:
While the site does not contain significant natural features, the development enhances open space and
environmental function through:
*Expansion of the public park area
*Creation of central open space for passive recreation
*Expansion of the northern stormwater basin, improving drainage and aesthetics
*Landscape buffering and tree planting
The expanded pond also provides additional separation from properties to the north and contributes to long-
term stormwater performance.
Criteria 6-Efficiency of Public Streets and Utilities
Response:
The development improves infrastructure efficiency through the use of a private street system that will be
constructed to City standards but maintained by the homeowner association.
This approach: Reduces long-term public maintenance costs, Maintains full accessibility and serviceability,
Supports efficient internal circulation.Public utilities, including water and sewer, will be installed and
maintained in accordance with City standards.
Criteria 7 -Establishment of Appropriate Transitions
Ordinance Language: Establishment of appropriate transitions between differing land uses.
Pg.6
Response:
The development provides appropriate transitions to adjacent land uses through: Preservation of trees and
additional landscaping along the west property line, Expansion of the stormwater basin to the north, creating
separation from single-family homes, Use of varied building types to soften transitions between densities.
The surrounding land uses to the east and south are similar in character, further supporting compatibility.
Multi-Family Design Guidelines and Architectural Narrative
Lennar Architectural Narrative
Why this plan/product was selected
Lennar studies market trends and chose a product that is most desired by customers. Our "Everything's
Included" platform includes sought after features in our homes instead of offering them as optional addons.
How it fits the site and surrounding area
The property to the west is developed as a mobile home park and single-family homes, the property to the
north is single family homes in the Sweetgrass Meadows development, and the property to the east is
developed with townhomes. The property to the south is developed as townhomes in the Generation Acres
development.
How it meets or enhances the Intent of the PUD
Lennar homes include a variety of design elements. This town home plan includes the use of both vinyl siding
and shake siding with stone accents at each entry. The garages are recessed to the building entryways to
break up the front of the building. Lennar designed the color packages to avoid monotony and to ensure a
visually appealing streetscape.
Additional design elements and features
Lennar has been the largest developer for over 20 years. Lenna r's homes include: Ring Video Doorbell Pro,
Ring Alarm Security Kit, Honeywell Home T6 Pro Smart Thermostat, Moen Eco-Performance Fixtures,
ENERGY STAR Appliances, LED Lighting, Energy-Efficient Washer and Dryer, WaterSense Fixtures, Low-E
Windows.
Supplemental Design Narrative-City of Hugo Multi-Family Design Guidelines Alignment
While the Lennar narrative outlines the market-driven product selection and included home features, the
following provides additional detail regarding how the proposed architectural design aligns with the City of
Hugo Multi-Family Design Guidelines.
Building Massing and Articulation
The proposed town home buildings incorporate variation in building massing and fa9ade articulation to avoid
long, uninterrupted building planes.
Consistent with City guidelines, the design include: Multiple wall plane offsets, Projecting window elements,
Defined vertical breaks between units, Material transitions between unit groupings. These elements reduce
the perceived scale of the buildings and prevent the "barracks-style" appearance discouraged by the City.
Pg. 7
Roofline Variation
The building elevations incorporate varied rooflines, including multiple front-facing gables and changes in
ridge height across each building.
This approach aligns with City guidance encouraging: Roofline variation, Visual interest along the street, A
more residential architectural character. The proposed design successfully breaks up long root spans and
creates a more dynamic and visually appealing streetscape.
Material Variation and Architectural Detail
The buildings utilize a combination of materials, including: Horizontal lap siding, Shake-style siding, Stone
accents at building bases and entry points This material variation is consistent with City expectations tor
high-quality design and helps avoid flat or monotonous building elevations. The use of stone at the base of
the structure provides visual grounding and enhances overall architectural quality.
Garage Treatment and Streetscape Design
Garage placement and design are addressed in a manner consistent with City guidance to minimize garage
dominance. The proposed design includes: Recessed garage doors set behind the primary fa9ade plane,
architectural detailing above garage openings, integration of windows and materials to balance garage mass
This design approach reduces the visual prominence of garages and supports a more pedestrian-oriented
streetscape.
Pedestrian Orientation and Neighborhood Integration
The building design supports pedestrian-oriented development through: Clearly defined unit entries,
integration with internal sidewalk systems, visual connection between building fronts and the street. These
elements contribute to a cohesive neighborhood environment and align with the City's emphasis on
walkability and community interaction.
Architectural Variety and Neighborhood Character
The combination of 2-unit, 3-unit, and 4-unit buildings further enhances architectural variety across the site.
In addition to building variation, Lenna r's use of multiple color packages ensures that adjacent units do not
repeat identical colors and materials, reducing monotony and enhancing the overall visual character of the
development.
Overall Compliance with City Design Intent
The proposed architectural design meets and supports the intent of the City of Hugo Multi-Family Design
Guidelines by: Providing varied and articulated building elevations, incorporating multiple materials and
design elements, reducing garage dominance, creating a pedestrian-friendly streetscape, enhancing overall
neighborhood character. The proposed design is consistent with and in several areas exceeds the City's
expectations for multi-family residential development.
Lennar is committed to working with the City to incorporate feedback and refine the exterior architectural
design in a manner consistent with City guidelines and expectations.
Pg.8
The proposed development meets all criteria required under Section 90-141 and demonstrates that the use of
PUD zoning results in a more efficient, higher-quality, and better-integrated residential development. The
flexibility requested is limited and is fully offset by measurable improvements in site design, open space,
stormwater management, and overall neighborhood character.
40 Unit vs. 50 Unit Comparison
Category 40 Unit Plan so Unit Plan
Units 40 50
Park Size ~0.45 acres -0.50 acres
Setbacks Established Maintained
Open Space Functional Expanded
Layout Approved More Efficient
Construction 2phases 1 phase
Conclusion
The proposed 50-unit development represents a logical and well-supported progression of the previously
approved plan. The revised layout improves site efficiency, enhances open space, and refines stormwater
management while maintaining compatibility with surrounding uses.
The development provides both private and public open space, incorporates sustainable stormwater
practices, fits well with the surrounding area and will provide the current and future residents of Hugo with an
undersupplied and affordable housing option.
We Believe that the proposed development meets the intent of the Planned Unit Development ordinance,
aligns with the Comprehensive Plan, and provides a high-quality residential neighborhood consistent with the
City's long-term vision.
I am available for any questions or to supply more information if needed.
DRW Property Investments, LLC
Oneka Lake Reserve, LLC
CC: Elan Design lab, Inc.-Steve Johnston, PE-Principal Engineer
Pg.9
From:Don Willenbring
To:Max Gort
Subject:HOA for Oneka lake Reserve
Date:Wednesday, June 17, 2026 3:16:17 PM
Max, Thank you for the information.
In regards to the Oneka Lake Reserve HOA-
The Homeowners Association (HOA) shall be responsible for the ownership, maintenance, repair,
replacement, operation, and management of all common areas and common facilities within the
development, including but not limited to:
• Private streets, drives, and associated signage.
• Sidewalks, trails, pathways, and pedestrian facilities located within common areas.
• Street lighting and decorative lighting located within common areas.
• Stormwater management facilities, including ponds, infiltration basins, rain gardens, drainage
swales
• Water quality and erosion control facilities required by permits or development approvals.
• Common open space, outlots, landscape buffers, berms, and conservation areas not dedicated to a
public entity.
• Landscaping, trees, shrubs, turf, irrigation systems, and related improvements within common
areas.
• Entry monuments, fencing, retaining walls, screening features, decorative structures, and other
community amenities located within common areas.
Hope this is helps!
Thank you,
Don Willenbring
DRW Property Investments, LLC
VIP Realty, LLC
612-363-3915
15
0
T
H
S
T
R
E
E
T
N
GENERATION
AVENUE N
DRW25001
PROJECT NO.
PRELIMINARY PLAT,
SITE PLAN, AND
REZONING REVIEW
04/20/26
NOT FO
R
CONST
R
U
C
T
I
O
N
SHEET
CERTIFICATION
REVISION DATE
ISSUE
PROJECT
D E S I G N
C I V I L E N G I N E E R I N G | L A N D S C A P E A R C H I T E C T U R E
3 1 0 4 T H A V E S O U T H , S U I T E 1 0 0 6
M I N N E A P O L I S , M N 5 5 4 1 5
www.elanlab.comp 612.260.7980
f 612.260.7990
1 2 3 4 5 6
E
D
C
B
A
I hereby certify that this plan, specification
or report was prepared by me, or under my
direct supervision, and that I am a duly
Licensed Professional Engineer under the
laws of the state of MINNESOTA.
Stephen M. Johnston
18914 04/20/2026
NOT FO
R
CONST
R
U
C
T
I
O
N
REGISTRATION NO.
DATE
ONEKA LAKE
RESERVE
HUGO, MN
ONEKA LAKE, LLC
DON WILLENBRING
2120 WUTHERING
HEIGHTS ROAD
EAGAN, MN 55122
651-363-3915
C-000
COVER SHEET
LOCATION MAP PROJECT CONTACTS
NOT TO SCALE
DEVELOPER
CIVIL ENGINEER
STEVE JOHNSTON, PE
T (612) 260-7982
ELAN DESIGN LAB, INC.
310 4TH AVE S, SUITE 1006
MINNEAPOLIS, MN 55415
LANDSCAPE
ARCHITECT
PILAR SARAITHONG, RLA
T (612) 260-7982
LAND SURVEYOR
DAN THURMES, LS
T (651) 275-8969
CORNERSTONE LAND SURVEYING, INC.
1970 NORTHWESTERN AVENUE, SUITE 200
STILLWATER, MN 55082
SHEET INDEX
RESERVE
HUGO - MINNESOTA
APRIL 20, 2026
SITE
NOT TO SCALE
VICINITY MAP
C-000 COVER SHEET
A0 ARCHITECTURAL RENDERING
A1 ARCHITECTURAL COVER
A1.1E ELEVATIONS/ ROOF PLAN
A3.1 FIRST FLOOR PLAN
A3.2 SECOND FLOOR PLAN
C-001 BOUNDARY AND TOPOGRAPHIC SURVEY BY CORNERSTONE
C-002 PRELIMINARY PLAT BY CORNERSTONE
C-003 GENERAL NOTES
C-010 DEMOLITION PLAN
C-101 SITE PLAN
C-200 OVERALL GRADING & EROSION & SEDIMENT CONTROL PLAN
C-201 GRADING PLAN - AREA 1
C-202 GRADING PLAN - AREA 2
C-203 GRADING PLAN - AREA 3
C-204 GRADING PLAN - AREA 4
C-205 SWPPP
C-301 UTILITY PLAN
C-501 DETAILS
C-502 DETAILS
C-503 DETAILS
C-504 DETAILS
C-505 DETAILS
L-101 LANDSCAPE PLAN
L-501 LANDSCAPE DETAILS
IR-1 IRRIGATION PLAN
IR-2 IRRIGATION PLAN
COMMUNITY
DEVELOPMENT
CITY PLANNER
ELAN DESIGN LAB, INC.
310 4TH AVE S, SUITE 1006
MINNEAPOLIS, MN 55415
CITY ENGINEER
CITY OF HUGO
6900 137TH STREET N
HUGO, MN 55038
CITY OF HUGO
14669 FITZGERALD AVENUE N
HUGO, MN 55038
ONEKA LAKE
170TH ST N
24
T
H
A
V
E
N
35E
61
ONEKA LAKE
R
I
C
E
L
A
K
E
EG
G
L
A
K
E
137TH ST N
FRENC
H
M
A
N
R
O
A
D
MAIN ST
165TH ST N
ONE
K
A
L
A
K
E
B
L
V
D
N
E
G
G
L
A
K
E
R
D
N
PRELIMINARY PLAT,
SITE PLAN AND REZONING
REVIEW
RACHEL JUBA
T (651) 762-6304
MARK ERICHSON, PE
T (651) 286-8463
ONEKA LAKE, LLC
2120 WILLENBRING HEIGHTS ROAD
EAGAN, MN 55122
DON WILLENBRING
T (651) 363-3915
150TH ST N
PID#1703121440
BENCHMARKS
ELEVATIONS BASED ON GPS DERIVED VALUES FOR NAVD 88. PROJECT
BENCHMARK SHOWN ON SURVEY.
CONTACT:
ST. CROIX HOME BUILDERS
C/O NORM DUPREE
PO BOX 186
STILLWATER, MN 55082
Ph. 651-303-0471
UNDERGROUND UTILITIES NOTES:
THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD
SURVEY INFORMATION AND EXISTING DRAWINGS. THE SURVEYOR MAKES NO
GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH
UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR
FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN
ARE IN THE EXACT LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT
THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM THE INFORMATION
AVAILABLE. THIS SURVEY HAS NOT PHYSICALLY LOCATED THE UNDERGROUND
UTILITIES. GOPHER STATE ONE CALL LOCATE TICKET NUMBER(S) 182533646.
SOME MAPS WERE RECEIVED, WHILE OTHER UTILITIES DID NOT RESPOND TO
THE LOCATE REQUEST. ADDITIONAL UTILITIES OF WHICH WE ARE UNAWARE
MAY EXIST.
COUNTY/CITY:
REVISIONS:
PROJECT LOCATION:
DATE REVISION
XXXX
CALL BEFORE YOU DIG!
TWIN CITY AREA:TOLL FREE:1-800-252-1166651-454-0002
Gopher State One Call
EXISTING LEGAL DESCRIPTION:
150TH STREET
1. BEARINGS ARE BASED ON COORDINATES SUPPLIED BY THE WASHINGTON
COUNTY SURVEYORS OFFICE (NAD83).
2. UNDERGROUND UTILITIES SHOWN PER GOPHER ONE LOCATES AND
AS-BUILTS PLANS PROVIDED BY THE CITY OF HUGO PUBLIC WORKS
DEPARTMENT.
3. THERE MAY SOME UNDERGROUND UTILITIES, GAS, ELECTRIC, ETC. NOT
SHOWN OR LOCATED.
4. CONTOURS SHOWN PER DNR LIDAR DATA OBTAINED FROM THE MNTOPO
WEBSITE OUTSIDE OF PARCEL BOUNDARIES. FIELD TOPOGRAPHY DATED
1-3-19 INSIDE OF PARCEL BOUNDARIES.
SURVEY NOTES:
CITY O
HUGO
WASHINGTO
COUNT
Lot 1, Block 1, Oneka Lake Townhomes Second Addition,
Washington County, Minnesota. Abstract.
9-11-18 INITIAL ISSUE
CERTIFICATION:
I hereby certify that this plan was prepared by
me, or under my direct supervision, and that I am
a duly Licensed Land Surveyor under the laws of
the state of Minnesota.
Daniel L. Thurmes Registration Number: 25718
Date:__________________
TITLE NOTES:
0
NORTH
40 80
ND18002
SURVND02
EXISTING CONDITIONS
C-001
LAND SURVEYING,
CORNERSTO
PROJECT NO.
FILE NAME
9-11-18
Survey related matters as shown on the Chicago Title Insurance Company Title
Commitment No. 67918 issued on July 16th, 2018.
1.Terms and conditions of Declaration of Restrictions and Covenants for
Wetland Replacement, recorded as Document No. 3611650, which does
not include any forfeiture or reversionary clause.
2.Terms and conditions of Development Agreement recorded as Document
No. 3615491.
3.Easement(s) for drainage, utilities and roadway (Generation Circle)
purposes as shown on the recorded plat. (DRAINAGE AND UTILITY
EASEMENT AND GENERATION CIRCLE AS DEDICATED ON THE PLAT OF
ONEKA LAKE TOWNHOMES ARE SHOWN ON THE SURVEY. NO EASEMENTS
OR PUBLIC RIGHTS OF WAY WERE DEDICATED ON THE PLAT OF ONEKA
LAKE TOWNHOMES 2ND ADDITION. IT IS UNCLEAR IF THE DEDICATED
EASEMENTS AND RIGHT OF WAY WERE VACATED PRIOR TO PLATTING THE
2ND ADDITION. NO DOCUMENTS WERE PROVIDED THAT SHOW ANY
VACATION PROCEEDINGS.)
4.Subject to wetlands as shown on the plat and any associated wetland
regulations.
The following is not included in the hereinbefore described title commitment
but appears to affect the subject property:
An easement for the transmission of electrical energy as described in Book
150, Deeds, page 296, Washington County, Minnesota. (Easement area is
not defined in said document and appears to be blanket in nature.)
LEGEND
UNDERGROUND ELECTRIC
UNDERGROUND CABLE TV
UNDERGROUND FIBER OPTIC
UNDERGROUND TELEPHONE
OVERHEAD UTILITY
UNDERGROUND GAS
SANITARY SEWER
STORM SEWER
WATERMAIN
FENCE
CURB [TYPICAL]
CONTOURS
FOUND MONUMENT 1/2" IP
MARKED RLS 15480
SET 1/2" IRON PIPE
MARKED RLS NO. 25718
CABLE TV PEDESTAL
AIR CONDITIONER
ELECTRIC MANHOLE
ELECTRIC METER
ELECTRIC PEDESTAL
ELECTRIC TRANSFORMER
LIGHT POLE
GUY WIRE
POWER POLE
GAS MANHOLE
GAS METER
TELEPHONE MANHOLE
TELEPHONE PEDESTAL
SANITARY CLEANOUT
SANITARY MANHOLE
CATCH BASIN
STORM DRAIN
FLARED END SECTION
STORM MANHOLE
FIRE DEPT. CONNECTION
HYDRANT
CURB STOP
WATER WELL
WATER MANHOLE
WATER METER
POST INDICATOR VALVE
WATER VALVE
BOLLARD
FLAG POLE
MAIL BOX
TRAFFIC SIGN
UNKNOWN MANHOLE
SOIL BORING
SPOT ELEVATION
TRAFFIC SIGNAL
CONIFEROUS TREE
DECIDUOUS TREE
AREA:
TOTAL AREA AS SHOWN = 291,941 SQ.FT.
DENOTES EXISTING
ACCESS CONTROL AS
SHOWN ON RECORD
PLAT
BUILDING LINE
BITUMINOUS SURFACE
CONCRETE SURFACE
1-8-19 SPOT ELEVATIONS ADDED
Suite #200
1970 Northwestern Ave.
Stillwater, MN 55082
Phone 651.275.8969
dan@cssurvey
.net
6-5-20 PRELIMINARY PLAT
ONEK
LAKE
RESERV
25
'
S
E
T
B
A
C
K
25' REAR BUILDING SETBACK
25
'
S
E
T
B
A
C
K
15' SIDE BUILDING SETBACK
25' REAR BUILDING SETBACK
15' SIDE BUILDING SETBACK
1
2
1
4
OUTLOT B
(PARK)
5
3
11
12
13
5
1 9
8
7
6
6 71234
2 3 4
21
20
19
18 17 16 15 14
10
9
8
7
6
5
4
3
2
1
2
1
2
1 2 3 4
3
4
5
OUTLOT A
8
9
10
6
PID#1703121440
CONTACT:
ST. CROIX HOME BUILDERS
C/O NORM DUPREE
PO BOX 186
STILLWATER, MN 55082
Ph. 651-303-0471
COUNTY/CITY:
REVISIONS:
PROJECT LOCATION:
DATE REVISION
XXXX
CALL BEFORE YOU DIG!
TWIN CITY AREA:TOLL FREE:1-800-252-1166651-454-0002
Gopher State One Call
150TH STREET
CITY O
HUGO
WASHINGTO
COUNT
9-11-18 INITIAL ISSUE
CERTIFICATION:
I hereby certify that this plan was prepared by
me, or under my direct supervision, and that I am
a duly Licensed Land Surveyor under the laws of
the state of Minnesota.
Daniel L. Thurmes Registration Number: 25718
Date:__________________
ONEK
PRELIMINARY PL
0
NO
R
T
H
40 80
ND18002A
SURVND02A
PRELIMINARY PLAT
C-002
LAND SURVEYING,
CORNERSTO
PROJECT NO.
FILE NAME
9-11-18
LOT AREAS
(IN SQUARE FEET)
Suite #200
1970 Northwestern Ave.
Stillwater, MN 55082
Phone 651.275.8969
dan@cssurvey
.net
LAKE
RESERV
ZONED: R4
ZONING
CURRENT ZONING : R4
PROPOSED ZONING : PUD
ZONED: R4
ZO
N
E
D
:
R
4
ZO
N
E
D
:
R
4
ZO
N
E
D
:
C
R
3
ZONED: I-3
ZO
N
E
D
:
R
-
3
ZONED: R-3
OVER ALL OF OUTLOT A
PROPOSED DRAINAGE &
UTILITY EASEMENTS:
DENOTES PROPOSED DRAINAGE
AND UTILITY EASEMENT
LOT 1 BLOCK 1 2,565
LOT 2 BLOCK 1 2,564
LOT 1 BLOCK 2 2,562
LOT 2 BLOCK 2 1,952
LOT 3 BLOCK 2 2,562
LOT 4 BLOCK 2 2,562
LOT 5 BLOCK 2 2,562
LOT 6 BLOCK 2 2,548
LOT 7 BLOCK 2 1,952
LOT 8 BLOCK 2 1,952
LOT 9 BLOCK 2 2,562
LOT 1 BLOCK 3 2,562
LOT 2 BLOCK 3 1,952
LOT 3 BLOCK 3 1,952
LOT 4 BLOCK 3 2,562
LOT 1 BLOCK 4 2,562
LOT 2 BLOCK 4 1,952
LOT 3 BLOCK 4 1,952
LOT 4 BLOCK 4 2,562
LOT 1 BLOCK 5 2,562
LOT 2 BLOCK 5 1,952
LOT 3 BLOCK 5 2,562
LOT 4 BLOCK 5 2,562
LOT 5 BLOCK 5 1,952
LOT 6 BLOCK 5 2,562
LOT 7 BLOCK 5 2,562
LOT 8 BLOCK 5 1,952
LOT 9 BLOCK 5 1,952
LOT 10 BLOCK 5 2,562
LOT 1 BLOCK 6 2,562
LOT 2 BLOCK 6 1,952
LOT 3 BLOCK 6 1,952
LOT 4 BLOCK 6 2,562
LOT 5 BLOCK 6 2,562
LOT 6 BLOCK 6 1,952
LOT 7 BLOCK 6 2,562
LOT 8 BLOCK 6 2,554
LOT 9 BLOCK 6 1,952
LOT 10 BLOCK 6 2,562
LOT 11 BLOCK 6 2,694
LOT 12 BLOCK 6 1,954
LOT 13 BLOCK 6 3,134
LOT 14 BLOCK 6 2,562
LOT 15 BLOCK 6 1,952
LOT 16 BLOCK 6 1,952
LOT 17 BLOCK 6 2,562
LOT 18 BLOCK 6 2,583
LOT 19 BLOCK 6 1,968
LOT 20 BLOCK 6 1,968
LOT 21 BLOCK 6 2,583
OUTLOT A 153,451
OUTLOT B 21,827
TOTAL 291,941
TYPICAL LOT LAYOUT
REFER TO SITE PLAN FOR SPECIFIC LOT
DETAILS AS SETBACKS MAY VARY
LOT LINE
NO SCALE
5
1
2
PR
I
V
A
T
E
S
T
R
E
E
T
DR
A
I
N
A
G
E
&
UT
I
L
I
T
Y
EA
S
E
M
E
N
T
DR
A
I
N
A
G
E
&
UT
I
L
I
T
Y
EA
S
E
M
E
N
T
BL
O
C
K
N
U
M
B
E
R
10
EXISTING LEGAL DESCRIPTION:
The following legal description is as shown on the Near
North Title Group LLC, as agent for Old Republic National
Title Insurance Company Title Commitment File No.
MN2521339 issued on November 28th, 2025:
Lot 1, Block 1, ONEKA LAKE TOWNHOMES 2ND ADDITION,
Washington County, Minnesota.
AREA:
TOTAL AREA AS SHOWN = 291,941 SQ.FT. / 6.70 ACRES
BENCHMARKS
ELEVATIONS BASED ON GPS DERIVED VALUES FOR
NAVD 88. PROJECT BENCHMARK SHOWN ON SURVEY.
UNDERGROUND UTILITIES NOTES:
THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED
FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS.
THE SURVEYOR MAKES NO GUARANTEE THAT THE
UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH
UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED.
THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE
UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT
LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT
THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM THE
INFORMATION AVAILABLE. THIS SURVEY HAS NOT PHYSICALLY
LOCATED THE UNDERGROUND UTILITIES. GOPHER STATE ONE
CALL LOCATE TICKET NUMBER(S) 182533646. SOME MAPS
WERE RECEIVED, WHILE OTHER UTILITIES DID NOT RESPOND TO
THE LOCATE REQUEST. ADDITIONAL UTILITIES OF WHICH WE
ARE UNAWARE MAY EXIST.
1. BEARINGS ARE BASED ON COORDINATES SUPPLIED BY THE
WASHINGTON COUNTY SURVEYORS OFFICE (NAD83).
2. UNDERGROUND UTILITIES SHOWN PER GOPHER ONE
LOCATES AND AS-BUILTS PLANS PROVIDED BY THE CITY OF
HUGO PUBLIC WORKS DEPARTMENT.
3. THERE MAY SOME UNDERGROUND UTILITIES, GAS,
ELECTRIC, ETC. NOT SHOWN OR LOCATED.
4. CONTOURS SHOWN PER DNR LIDAR DATA OBTAINED FROM
THE MNTOPO WEBSITE OUTSIDE OF PARCEL BOUNDARIES.
FIELD TOPOGRAPHY DATED 1-3-19 INSIDE OF PARCEL
BOUNDARIES, SHOWN WITH SPOT ELEVATIONS.
SURVEY NOTES:
PORTIONS OF THIS PROPERTY ALONG THE NORTH LINE OF THIS
LOT MAY LIE WITHIN ZONE A, AREAS DETERMINED TO BE WITHIN
THE 0.2% ANNUAL CHANCE FLOODPLAIN ALL OTHER AREAS ARE
LOCATED IN ZONE X, AREAS DETERMINED TO BE OUTSIDE THE
0.2% ANNUAL CHANCE FLOODPLAIN AS SHOWN ON FEMA FLOOD
INSURANCE RATE MAP NUMBER 27163C0136E HAVING AN
EFFECTIVE DATE OF FEBRUARY 3RD, 2010. NOT BASE FLOOD
ELEVATION SHOWN ON FEMA MAP.
FLOOD INFORMATION:
THERE ARE NO VISIBLE PARKING STALLS DESIGNATED ON
THIS PARCEL INCLUDING 0 HANDICAP STALLS.
EXISTING PARKING:
ZO
N
E
D
:
R
-
3
END UNIT
ZERO SETBACKS
ZERO SETBACKS
10.5
PA
T
I
O
PA
T
I
O
14.5
DRAINAGE &
UTILITY
EASEMENT
10
'
TY
P
12' TYP
36
'
14
.
5
'
10
.
5
'
22
'
MI
N
.
17'
TYP
3' TYP
10'10'32'32'
10
'
TY
P
12' TYP
36
'
14
.
5
'
10
.
5
'
22
'
MI
N
.
17'
TYP
3' TYP
32'32'10'10'32'
36
'
32'
10
'
TY
P
12' TYP
22
'
MI
N
.
17'
TYP
3' TYP
32'32'
14
.
5
'
10
.
5
'
10'10'32'
DRW25001
PROJECT NO.
PRELIMINARY PLAT,
SITE PLAN, AND
REZONING REVIEW
04/20/26
NOT FO
R
CONST
R
U
C
T
I
O
N
SHEET
CERTIFICATION
REVISION DATE
ISSUE
PROJECT
D E S I G N
C I V I L E N G I N E E R I N G | L A N D S C A P E A R C H I T E C T U R E
3 1 0 4 T H A V E S O U T H , S U I T E 1 0 0 6
M I N N E A P O L I S , M N 5 5 4 1 5
www.elanlab.comp 612.260.7980
f 612.260.7990
1 2 3 4 5 6
E
D
C
B
A
I hereby certify that this plan, specification
or report was prepared by me, or under my
direct supervision, and that I am a duly
Licensed Professional Engineer under the
laws of the state of MINNESOTA.
Stephen M. Johnston
18914 04/20/2026
NOT FO
R
CONST
R
U
C
T
I
O
N
REGISTRATION NO.
DATE
ONEKA LAKE
RESERVE
HUGO, MN
ONEKA LAKE, LLC
DON WILLENBRING
2120 WUTHERING
HEIGHTS ROAD
EAGAN, MN 55122
651-363-3915
C-003
GENERAL NOTES
DEMOLITON NOTES
1.PROTECT ALL STRUCTURES AND LANDSCAPE NOT LABELED FOR DEMOLITION FROM DAMAGE DURING CONSTRUCTION. ANY ON-SITE OR
OFF-SITE AREAS DISTURBED DIRECTLY OR INDIRECTLY DUE TO CONSTRUCTION SHALL BE RETURNED TO A CONDITION EQUAL TO OR
BETTER THAN THE EXISTING CONDITION. CONTRACTOR IS SOLELY RESPONSIBLE FOR ANY CIVIL PENALTIES RESULTING FROM THEIR WORK
UNDER THIS CONTRACT.
2.NO DEMOLITION MATERIALS SHALL BE DISPOSED OF ON-SITE. ALL DEBRIS SHALL BE HAULED OFF-SITE TO A DISPOSAL AREA APPROVED BY
APPROPRIATE GOVERNMENTAL AUTHORITIES FOR THE HANDLING OF DEMOLITION DEBRIS. WORK SITE SHALL BE LEFT IN A CONDITION
THAT MINIMIZES EROSION POTENTIAL ON A NIGHTLY BASE.
3.LIMIT CONSTRUCTION ACTIVITIES TO THE CONSTRUCTION LIMITS SHOWN ON THE PLAN. IF WORK NEEDS TO EXTEND TO PUBLIC STREETS
OR RIGHT OF WAY IT IS THE CONTRACTOR'S RESPONSIBILITY TO APPLY FOR ALL PERMITS, PREPARE ALL DRAWING AND PAY ALL FEES AND
COST. ALL CONSTRUCTION ACTIVITIES SHALL COMPLY WITH LOCAL ORDINANCES.
4.CONSTRUCTION ENTRANCE SHALL BE IN PLACE PRIOR TO COMMENCEMENT OF DEMOLITION OPERATIONS. SEE SHEET C-200 FOR ALL
EROSION CONTROL MEASURES AND APPROPRIATE STAGING AND SEQUENCING.
5.PROVIDE NECESSARY BARRICADES, SUFFICIENT LIGHTS, SIGNS AND OTHER TRAFFIC CONTROL METHODS AS MAY BE NECESSARY FOR THE
PROTECTION AND SAFETY OF THE PUBLIC AND MAINTAIN THROUGHOUT THE LIFE OF THE PROJECT.
6.REMOVE ALL VEGETATION WITHIN SITE AS NEEDED TO COMPLETE THE WORK EXCEPT AS NOTED. EXISTING VEGETATION TO REMAIN IF IT
DOES NOT IMPACT CONSTRUCTION ACTIVITIES.
GENERAL NOTES
1.BACKGROUND INFORMATION AND TOPOGRAPHIC SURVEY TAKEN FROM SURVEY PERFORMED BY CORNERSTONE LAND SURVEYING, INC.,
ON SEPTEMBER 11, 2018. ELAN DESIGN LAB CANNOT GUARANTY THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. VERIFY ALL
FIELD CONDITIONS AND UTILITY LOCATIONS PRIOR TO EXCAVATION/CONSTRUCTION. IF ANY DISCREPANCIES OR UNKNOWN UTILITIES
ARE FOUND THAT IMPACT DESIGN OR IMPAIR CONSTRUCTION, THE ENGINEER AND OWNER SHOULD BE IMMEDIATELY NOTIFIED.
3.FOLLOW ALL RECOMMENDATIONS PRESENTED IN GEOTECHNICAL EVALUATION REPORT PREPARED BY NTI ON 7/30/2020 (NO.
20.MSP10728.000) EXCEPT AS MODIFIED IN THESE SPECIFICATIONS OR PLANS, OR AS DIRECTED BY CITY OFFICIALS.
4.CONTRACTOR SHALL BRING ANY CHANGED OR UNFORESEEN CONDITIONS THAT COULD RESULT IN ADDITIONAL COST TO THE ATTENTION
OF THE OWNER AND ENGINEER AS SOON AS THEY ARE DISCOVERED SO THAT THEY CAN BE PROPERLY DOCUMENTED. FAILURE TO
NOTIFY OR COVERING UN-WITNESSED WORK SHALL RESULT IN REJECTION OF CLAIMS FOR ADDITIONAL COMPENSATION.
5.DIMENSIONS SHOWN ON THESE PLANS ARE TO BACK OF CURB AND EXTERIOR FACE OF BUILDING UNLESS NOTED OTHERWISE.
6.ON-SITE CURB TO BE B618 AND SURMOUNTABLE CONCRETE CURB & GUTTER, UNLESS NOTED.
7.ALL PARKING STALLS TO BE PAINTED WITH A 4" WIDE WHITE STRIPING. ACCESSIBLE SYMBOLS TO BE PAINTED IN WHITE AND ACCESSIBLE
ACCESS AISLES AND CROSSWALKS TO BE PAINTED WITH A 4" WIDE WHITE PAINTED STRIPE 18 INCHES ON CENTER AND AT 45 DEGREE
ANGLES TO STALL, WITH 'NO PARKING' MARKED. REFLECTORIZED PAINT SHALL COMPLY WITH MNDOT 3592.
1.VERIFY ALL FIELD CONDITIONS AND UTILITY LOCATIONS PRIOR TO EXCAVATION/CONSTRUCTION. IF ANY DISCREPANCIES OR UNKNOWN
UTILITIES ARE FOUND THAT IMPACT DESIGN OR IMPAIR CONSTRUCTION, THE ENGINEER AND OWNER SHOULD BE IMMEDIATELY
NOTIFIED.
2.ALL WORK TO COMPLY WITH CURRENT MINNESOTA DEPARTMENT OF TRANSPORTATION (MNDOT) STANDARD SPECIFICATIONS FOR
CONSTRUCTION AND CITY OF HUGO SPECIFICATIONS, WHICHEVER IS MORE RESTRICTIVE, UNLESS NOTED.
3.ALL NON-GRANULAR SOILS, AND TOPSOIL SHALL BE REMOVED FROM WITHIN THE PROPOSED PAVEMENT AREAS AND BUILDING PADS. A
GEOTECHNICAL ENGINEER OR THEIR DESIGNATED REPRESENTATIVE SHALL OBSERVE THE PROJECT EXCAVATIONS TO VERIFY THAT
MATERIALS HAVE BEEN PROPERLY REMOVED FROM PROPOSED STRUCTURAL AREAS, THAT ADEQUATE BEARING SUPPORT IS PROVIDED
BY THE EXPOSED SOILS AND THAT STRUCTURAL FILL IS PLACED APPROPRIATELY. THE EXPOSED SOIL AT THE BASE OF FOOTINGS OR
THICKENED SLAB SHALL BE COMPACTED TO 98 PERCENT PROCTOR DRY DENSITY (ASTM D698).
4.VERIFY THAT SOIL IN THE BOTTOM OF ALL SWALES IS FREE DRAINING. REPLACE WITH CLEAN SAND TO ELEVATION 928 AS NEEDED.
5.SALVAGE AND RESPREAD A MINIMUM OF 6" TOPSOIL OVER ALL TURFED AREAS. INSTALL 18" OF TOPSOIL IN SHRUB AND PERENNIAL
BEDS.
6.ON-SITE GRANULAR SOIL IS GENERALLY SUITABLE FOR STRUCTURAL FILL. SILTY OR ORGANIC SOILS SHALL NOT BE USED FOR
STRUCTURAL FILL. PLACEMENT OF STRUCTURAL FILL SHALL BE OBSERVED AND TESTED BY AN EXPERIENCED TECHNICIAN OR
ENGINEER TO VERIFY THAT PROPER COMPACTION HAS BEEN ACHIEVED. STRUCTURAL FILL SHALL BE MOISTURE CONDITIONED (DRIED
OR WETTED) AS APPROPRIATE PRIOR TO PLACEMENT. MOISTURE CONDITIONED ENGINEERED FILL SHALL BE PLACED AND COMPACTED
IN LOOSE LIFTS OF 8 INCHES OR LESS. EACH LIFT OF FILL SHOULD BE COMPACTED BY LARGE VIBRATORY EQUIPMENT UNTIL THE
IN-PLACE SOIL DENSITY IS EQUAL TO OR GREATER THAN THE CRITERIA ESTABLISHED WITHIN THE FOLLOWING TABULATION. IMPORTED
SOIL SHALL BE APPROVED FOR INTENDED USE BY GEOTECHNICAL ENGINEER PRIOR TO BRINGING TO THE SITE.
TYPE OF CONSTRUCTION COMPACTION CRITERIA MOISTURE CONTENT VARIANCE FROM
OPTIMUM (% RESPECTIVE PROCTOR)
NON-ENGINEERED FILL (GREEN SPACE) 95
ENGINEERED FILL BELOW FOUNDATIONS 98
ENGINEERED FILL BELOW FLOOR SLABS 98
7.SIDEWALLS SHALL BE RETAINED BENCHED OR SLOPED TO PROVIDE SAFE WORKING CONDITIONS. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR ASSESSING THE STABILITY OF AND EXECUTING PROJECT EXCAVATIONS USING SAFE METHODS. THE CONTRACTOR
IS ALSO RESPONSIBLE FOR NAMING THE “COMPETENT INDIVIDUAL” AS PER SUBPART P OF 29 CFR 1926.6 (FEDERAL REGISTER - OSHA).
8.CONTRACTOR IS RESPONSIBLE FOR THE DESIGN OF SOIL, UTILITY AND BUILDING RETENTION SYSTEMS.
-3 TO +3% FOR SAND AND GRAVEL SOILS
GRADING SPECIFICATIONS
-3 TO +3% FOR SAND AND GRAVEL SOILS
-3 TO +3% FOR SAND AND GRAVEL SOILS
UTILITY SPECIFICATIONS
1.VERIFY ALL CONNECTIONS TO EXISTING UTILITY SERVICES PRIOR TO CONSTRUCTION. ANY DISCREPANCIES BETWEEN LOCATED UTILITIES
AND THE EXISTING CONDITIONS PLAN SHOULD BE NOTED AND FORWARDED TO THE ENGINEER.
2.PIPE LENGTHS SHOWN ARE MEASURED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE.
3.PIPE MATERIALS:
WATERMAIN 8" PVC (C-900)
HYDRANT LEADS 6" DIP
WATER SERVICE 1" TYPE K COPPER OR POLYETHYLENE SDR-7
SANITARY SEWER 8" PVC (SDR 45)
SANITARY SEWER SERVICE 4" PVC (SDR 26)
STORM SEWER DUAL-WALL HDPE WITH WATER TIGHT JOINTS PVC (SCH 40) OR RCP
DRAIN TILE 4" PERFORATED PVC (SCH 40)
4.ALL UTILITY CONSTRUCTION TO CONFORM WITH STATE, CITY ENGINEER'S ASSOCIATION OF MINNESOTA (CEAM), AND CITY OF HUGO
STANDARD SPECIFICATIONS, WHICHEVER IS MORE RESTRICTIVE.
5.ADJUST ALL STRUCTURES, PUBLIC AND PRIVATE, TO PROPOSED GRADES WHERE DISTURBED. COMPLY WITH ALL REQUIREMENTS OF
UTILITY OWNERS. STRUCTURES BEING RESET TO PAVED AREAS TO MEET OWNERS REQUIREMENTS FOR TRAFFIC LOADING.
6.PROVIDE A MINIMUM 7.5' TO A MAXIMUM OF 10' OF COVER OVER ALL NEW WATERMAIN.
7.SEE DETAIL A5/C-504 FOR WATER LINE THRUST RESTRAINT.
8.SEE DETAILS C1 AND D1/C-504 FOR PIPE BEDDING.
9.DEFLECT WATER MAIN OR SERVICES AT LEAST 18" BELOW AT STORM OR SANITARY CROSSINGS WHERE VERTICAL SEPARATION IS LESS
THAN 18" ABOVE OR BELOW THE PIPE. PROVIDE 4' WIDE INSULATION CENTERED ON ALL CROSSINGS WITH LESS THAN 36" VERTICAL
CLEARANCE.
A1 TYPICAL - 2 UNIT BUILDING
1" = 50'
STREET AND SIDEWALK SPECIFICATIONS
1.PAVEMENT: SEE DETAILS SHEET C-501 FOR BITUMINOUS AND CONCRETE PAVEMENT SECTION.
2.CONCRETE MIX NO. 3F52 (MNDOT 2461) SHALL BE USED FOR HAND PLACED FORMED CURB AND GUTTER, MEDIANS, DRIVEWAYS, CROSS
GUTTERS, SIDEWALKS, PEDESTRIAN RAMPS AND MEDIANS. CONCRETE MIX NO. 3F32, MNDOT SPECIFICATION 2461) SHALL BE USED FOR
AN EXTRUSION MACHINE PLACEMENT OF CONCRETE. IN THE PRODUCTION OF CONCRETE, AN AIR ENTRAINING AGENT SHALL BE ADDED
TO THE MIX ACCORDING TO MNDOT 2461.4.
3.FORM COATING MATERIAL SHALL MEET MNDOT 3902.
4.CONCRETE INSTALLATION SHALL CONFORM WITH MNDOT 2531.
5.SITE CONCRETE FINISHING - CONCRETE SHALL BE STRUCK TRUE TO CROSS SECTION AS SHOWN ON THE PLANS. NO ADDITIONAL
WATER MAY BE ADDED TO AID IN THE FINISHING PROCESS. A LIGHT BROOM FINISH WILL BE REQUIRED AT RIGHT ANGLES TO THE
CENTER LINE ON ALL CONCRETE WORK UNLESS DIRECTED OTHERWISE. ALL EXPOSED EDGES AND JOINTS IN CURB,GUTTER, SIDEWALK
AND STEPS SHALL BE ROUNDED WITH A SUITABLE EDGING TOOL. BEFORE FINAL FINISHING, THE CONTRACTOR SHALL CHECK THE
CONCRETE WITH A TEN (10) FOOT STEEL STRAIGHT EDGE TO ENSURE THERE IS NO VARIATION GREATER THAN 3/16”FROM THE
STRAIGHT EDGE ON TANGENT LINES OR GRADES. IF DEVIATIONS GREATER THAN 3/16” ARE FOUND THE WORK WILL BE CONSIDERED AS
UNACCEPTABLE AND WILL BE REQUIRED TO BE REMOVED AND REPLACED AT NO EXPENSE TO THE OWNER.
6.CONCRETE CURING SHALL BE PERFORMED BY APPLYING A MEMBRANE CURING COMPOUND (TYPE 2, WHITE PIGMENTED, MNDOT 3754)
TO THE EXPOSED SURFACE OF THE CONCRETE WITHIN ONE (1)HOUR AFTER FINISHING THE CONCRETE SURFACES. WHEN THE FORMS
ARE REMOVED IN LESS THAN 72 HOURS
AFTER PLACING THE CONCRETE, THE CURING COMPOUND SHALL BE APPLIED IMMEDIATELY TO THE EXPOSED SURFACES. THE RATE OF
APPLICATION OF CURING COMPOUND SHALL BE 150 SQUARE FEET PER GALLON. THE COMPOUND SHALL APPEAR AS WHITE AS A SHEET
OF PAPER AFTER APPLICATION ON THE CONCRETE SURFACE.
7.PREFORMED EXPANSION JOINTS SHALL MEET MNDOT 3702, AND SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS: AT THE
BEGINNING AND END OF ALL CURB AND GUTTER RADII. WHERE NEW CONCRETE SURROUNDS, ADJOINS, OR ABUTS ANY EXISTING FIXED
OBJECTS SUCH AS FIRE HYDRANTS, BUILDING FOUNDATIONS, CONCRETE DRIVEWAYS, SIDEWALKS, AND OTHER RIGID STRUCTURES.
AFTER EACH LOAD OF CONCRETE WHEN PLACING CURB AND EVERY 100 FEET WHEN PLACING SIDEWALK. CONTRACTION JOINTS WILL
NOT BE SEALED BUT WILL BE REQUIRED AT A SPACING OF 10 FEET ON CURB AND GUTTER AND ON SIDEWALK CONSTRUCTION AS
SHOWN ON THE PLAN. CONTRACTION JOINTS WILL BE CUT TO A DEPTH 1/3 THE THICKNESS OF THE CONCRETE, SURFACE AND BACK OF
ALL CURBS. CONTRACTION JOINTS SHALL BE PLACED SO THAT NO SLAB IS LARGER THAN 100 SQUARE FEET IN AREA. THE CONTRACTOR
IS RESPONSIBLE FOR CONSTRUCTING CONTRACTION JOINTS THAT PREVENT CONCRETE FROM CRACKING AT OTHER LOCATIONS.
8.CONCRETE TESTING INCLUDING SLUMP, AIR ENTRAINMENT, TEMPERATURE AND COMPRESSIVE STRENGTH SHALL BE PERFORMED ON
THE FIRST LOAD OF THE DAY FOR ALL CONCRETE POURS OF AT LEAST 4 CUBIC YARDS. AN ADDITIONAL TEST SHALL BE PERFORMED
FOR EACH 100 CUBIC YARDS OR PORTION THEREOF.
A2 TYPICAL - 3 UNIT BUILDING
1" = 50'A2 TYPICAL - 4 UNIT BUILDING
1" = 50'
BH-1
11/15/04 927.6
BH-5
11/15/04 927.2
BH-3
11/15/04 929.1
BH-4
11/15/04
928.0
SB 8
WTR 926.8*
SB 2
WTR 929.5*
SB 3
WTR 930.0*
SB 4
WTR 930.0*
SB 5
WTR 928.0*
8/3/20 928.0
8/14/20 927.8
10/9/20 927.3
9/9/21 925.2
SB 6
WTR 928.0*
8/3/20 928.1
9/14/20/ 928.2
10/9/20 926.9
9/9/21 925.4
SB 7
WTR 928.9*
8/3/20 928.5
8/14/20 928.9
10/9/20 927.3
9/9/21 925.6
SB 9
WTR 927.6*
SB 1
WTR 927.5*
SB 10
WTR 929.5*
WATER LEVEL
8/1/20 929.0
10/9/20 927.8
WATER LEVEL
8/1/20 929.8
10/9/20 928.6
BH-2
11/15/04 928.2
BH-6
11/15/04 927.9
PROTECT ALL TREES & VEGETATION
WITHIN TREE PROTECTED AREA
SAW CUT & REMOVE
BITUMINOUS
REMOVE CURB & GUTTER
REMOVE CURB & GUTTER
PROTECT WATER SERVICE
PROTECT SANITARY SERVICE
PROTECT UTILITY
SERVICES
REMOVE SANITARY &
WATER SERVICES TO MAIN
RETAIN SANITARY &
WATER SERVICES FOR
POTENTIAL FUTURE
PARK USE
REMOVE TREES
PROTECT TREES
REMOVE FENCE
REMOVE FENCE
PROTECT UTILITY
SERVICES
REMOVE TREE
REMOVE TREE
PROTECT TREES TREE PROTECTION FENCE
SEE SHEET C-201
TREE PROTECTION FENCE
SEE SHEET C-201
REMOVE & REPLACE CURB AND
PAVEMENT AS NEEDED FOR NEW
UTILITY SERVICES
PROTECT SANITARY SEWER
PROTECT WATERMAIN
REMOVE TREES
REMOVE TREES
PROTECT TREE
REMOVE SMALL TREES AND ALL
BRUSH UNLESS NOTED
PROTECT TREES
REMOVE & REPLACE
PAVEMENT AS NEEDED
TREE PROTECTION FENCE
SEE SHEET C-201
PAVEMENT ENCROACHMENT
TO REMAIN
1 DEMOLITION PLAN
1" = 30'
9030
SCALE IN FEET
Know what's below.
Call before you dig.
R
LEGEND
DRW25001
PROJECT NO.
PRELIMINARY PLAT,
SITE PLAN, AND
REZONING REVIEW
04/20/26
NOT FO
R
CONST
R
U
C
T
I
O
N
SHEET
CERTIFICATION
REVISION DATE
ISSUE
PROJECT
D E S I G N
C I V I L E N G I N E E R I N G | L A N D S C A P E A R C H I T E C T U R E
3 1 0 4 T H A V E S O U T H , S U I T E 1 0 0 6
M I N N E A P O L I S , M N 5 5 4 1 5
www.elanlab.comp 612.260.7980
f 612.260.7990
1 2 3 4 5 6
E
D
C
B
A
I hereby certify that this plan, specification
or report was prepared by me, or under my
direct supervision, and that I am a duly
Licensed Professional Engineer under the
laws of the state of MINNESOTA.
Stephen M. Johnston
18914 04/20/2026
NOT FO
R
CONST
R
U
C
T
I
O
N
REGISTRATION NO.
DATE
ONEKA LAKE
RESERVE
HUGO, MN
ONEKA LAKE, LLC
DON WILLENBRING
2120 WUTHERING
HEIGHTS ROAD
EAGAN, MN 55122
651-363-3915
C-010
DEMOLITION
PLANREMOVE BITUMINOUS
REMOVE CURB & GUTTER REMOVE TREE
REMOVE TREE & BRUSH
15
0
T
H
S
T
R
E
E
T
N
GENERATION
AVENUE N
25
'
S
E
T
B
A
C
K
25' REAR BUILDING SETBACK
25
'
S
E
T
B
A
C
K
15' SIDE BUILDING SETBACK
1
2
1
25' REAR BUILDING SETBACK
15' SIDE BUILDING SETBACK
B
U
I
L
D
I
N
G
N
BUILDING H
BUILDING J
BUIL
D
I
N
G
M
BUILDING B
BUILDING L
BUILDING G
BUILDING F
BUILDING K
BUILDING I
BUILDING E BUILDING D
BU
I
L
D
I
N
G
C
BUILDING A
4
OUTLOT B
(PARK)
5
3
11
12
13
5
1
9
8
7
6
6 71234
2 3 4
21
20
19
18
17 16 15 14
10
9
8
7
6
5
4
3
2
1
EXISTING
STORMWATER BASIN
OUTLET 930.2
HWL 931.2
COMMON SPACE
2
BLOCK 1
BUILDING O
BLOCK 2
OUTLOT A1234
BL
O
C
K
2
BLOCK 3BLOCK 4
BLOCK 5
BLOCK 6
OUTLOT A
EXPANDED
STORMWATER
BASIN
FOREBAY
8
9
10
OUTLOT A
OUTLOT A
BLOCK 6
BLOCK 6
5' CROSSWALK,
2' WIDE BARS
SPREAD 5' ON CENTER
C2
C-501
CONCRETE
SIDEWALK
(TYP)
ACCESSIBLE
CURB RAMP
(TYP)
25'
6'
5'
5'
6' CONCRETE
WALK
5' CONCRETE
WALK
5' CONCRETE
WALK
17'
TYP
17
'
TY
P
STOP SIGN
C4
C-502
TYPICAL STREET
SECTION
BITUMINOUS DRIVE
PAVEMENT
SECTION (TYP)
A1
C-501
E5
C-501
ACCESSIBILITY
CURB RAMP
(TYP)
6'
1'
C1
C-502
EXISTING TREESEXISTING TREES
1'
6'9'
8.9'
22
'
CONCRETE
PATIO (TYP)
CONCRETE PATIO
(TYP)
CONCRETE PATIO
(TYP)
3' CONCRETE WAK
(TYP)
CURB TRANSITION
(TYP)
E6
C-501
SIDEWALK
JOINT
(TYP)
A3
C-502
6' CONCRETE
WALK
3' CONCRETE WALK
(TYP)
1
17
'
16
.
5
'
TY
P
25
.
3
4
'
B
-
B
5'
6'
25
.
3
4
'
B
-
B
6'
3
4
R88
'
R25'
R25'
5.
9
7
'
5'
22
'
4
4
25
.
3
4
'
B
-
B
18
'
3
R1
1
2
'
A1
C-003
3 UNIT BUILDING
(TYP)
B1
C-003
2 UNIT BUILDING
(TYP)
BITUMINOUS
TRAIL
BOULDER RETAINING
WALL AT RIP RAP
ACCESSIBLE
CURB RAMP
(TYP)
CURB MODIFICATION
AT CATCH BASIN (TYP)
A1
C-502
B618 CURB
& GUTTER
(TYP)
C1
C-501
8' CURB TRANSITION
FROM B618 TO
SURMOUNTABLE CURB
9'
TYP
R3
.
6
7
'
R
3
.
6
7
'
20
'
6'
5'
18'
9
'
T
Y
P
14
3
.
7
'
20'
45'40.7'
BITUMINOUS PAVEMENT
SECTION (TYP)
E4
C-501
6'
9'
T
Y
P
22'22'
R
3
.
6
7
'
R3.6
7
'
9' TYP
18
'
5.
6
7
'
14
'
25
'
3 4
25'
R88
'
R3.6
7
'
R3.67'
55
.
0
4
'
46.1'
20
'
R56.67'
R33
'
5.67'
18'
17.5'
R3.67
'
R3.
6
7
'
47
.
7
'
25'
25.11'
6'
27.77
'
20.24'
9'
TYP
R
1
1
2
'
R
3
.
6
7
'
R
3
.
6
7
'
17' T
Y
P
18
.
3
'
R15'
R57
'
R33'
43.83'
1
8
'
5
.
6
7
'
22
'
BOULDER
RETAINING WALL
(TYP)
31
.
3
'
28
.
4
'
25
.
2
'
25
'
25.07'
9'
TYP
R11
1
.
6
7
'
17'
T
Y
P
28.87'
29.2
6
'
R111
.
6
7
'
R1
1
1
.
6
7
'
R2
8
8
'
R
3
1
2
'
R15'
19
.
8
9
'
25'
28
.
3
3
'
19.
1
4
'
29.68'
23' F-
F
6'5'
22'
30.
7
'
18
'
R3
.
6
7
'
R
3
.
6
7
'
45.2'
20
'
12'
9' TY
P
1
8
'
21
.
3
'
SURMOUNTABLE
CURB (TYP)
C1
C-501
SURMOUNTABLE
CURB (TYP)
6'
1
2
1
1
1
1
1
1 1
2
1
1
R
1
5
'
1
3
2
2
2
1
1
1
1 1
1
1
2
1
1
1
1
TYPICAL STREET
SECTION AT
150TH STREET
B3
C-501
TYPICAL STREET
SECTION AT PARKING
B1
C-501
COMMON
MAILBOX
25.34' B-B
22.42' F-F
2
2
'
5
'
6
'
2
5
.
3
4
'
B
-
B
1
43.34
'
B
-
B
22
.
4
2
'
F
-
F
23
.
2
1
'
F
-
F
2
24
'
F
-
F
ACCESSIBLE
CURB RAMP
(TYP)
SURMOUNTABLE CURB
BITUMINOUS PAVEMENT
SECTION (TYP)
CONCRETE
FLUME
C4
C-501
D5
C-501
LIGHTING
(TYP)
LIGHTING (TYP)
EXISTING
LIGHT POLE
LIGHTING
(TYP)
R30
'
R1
1
0
'
R80
'
R30'
R
2
'
T
Y
P
R
1
1
0
'
R3.
6
7
'
R3
.
6
7
'
8'
R1
0
0
'
R1
0
0
'
PARK IMPROVEMENTS
TO BE DESIGN AND
CONSTRUCTED BY CITY
BITUMINOUS
TRAIL
A1 SITE PLAN
1" = 30'
9030
SCALE IN FEET
Know what's below.
Call before you dig.
RLEGEND
CONCRETE SIDEWALK OR PAVEMENT
DRW25001
PROJECT NO.
PRELIMINARY PLAT,
SITE PLAN, AND
REZONING REVIEW
04/20/26
NOT FO
R
CONST
R
U
C
T
I
O
N
SHEET
CERTIFICATION
REVISION DATE
ISSUE
PROJECT
D E S I G N
C I V I L E N G I N E E R I N G | L A N D S C A P E A R C H I T E C T U R E
3 1 0 4 T H A V E S O U T H , S U I T E 1 0 0 6
M I N N E A P O L I S , M N 5 5 4 1 5
www.elanlab.comp 612.260.7980
f 612.260.7990
1 2 3 4 5 6
E
D
C
B
A
I hereby certify that this plan, specification
or report was prepared by me, or under my
direct supervision, and that I am a duly
Licensed Professional Engineer under the
laws of the state of MINNESOTA.
Stephen M. Johnston
18914 04/20/2026
NOT FO
R
CONST
R
U
C
T
I
O
N
REGISTRATION NO.
DATE
ONEKA LAKE
RESERVE
HUGO, MN
ONEKA LAKE, LLC
DON WILLENBRING
2120 WUTHERING
HEIGHTS ROAD
EAGAN, MN 55122
651-363-3915
PHASE I PROJECT SUMMARY
C-101
SITE PLANSITE AREA 291,941 SF. (6.70 AC.)
PARK 22,843 SF. (0.52 AC.)
NET AREA 269,098 SF. (6.18 AC.)
BUILDINGS 57,600 SF. (21.4%)
WALK/ PARKING/ DRIVE/ STREET 82,789 SF. (30.8%)
TOTAL IMPERVIOUS 140,389 SF. (52.2%)
PERVIOUS 128,709 SF. (47.8%)
TOTAL 50 UNITS (8 UNITS/ AC)
2 - 2 UNIT BUILDINGS
6 - 3 UNIT BUILDINGS
7 - 4 UNIT BUILDINGS
PROPOSED PARKING 225 STALLS (4.5 STALL/ UNIT)
100 GARAGE PARKING STALLS
100 GUEST PRIVATE PARKING STALLS
25 - 9'X18' SHARED GUEST PARKING STALLS
1PERVIOUS AREA
PARKING STALL COUNTX
2' CURB TAPER FROM 6" TO 4"
2 B618 CURB MODIFICATION AT CATCHBASIN
3 SURMOUNTABLE CURB & GUTTER AT CATCHBASIN
POND STORAGE HWL
BITUMINOUS DRIVE
BITUMINOUS PAVEMENT
BITUMINOUS TRAIL
18’ FIBERGLASS DIRECT BURIED LIGHT POLE
WITH TRADITIONAL STYLE LED FIXTURE, BLACK COLOR
SEE A1/C-203
15
0
T
H
S
T
R
E
E
T
N
GENERATION
AVENUE N
WSB POND 1
NODE 1PP
OUTLET 930.2
OVERFLOW 930.5
HWL 931.2 (EXISTING)
HWL 931.2 (PROPOSED)
1
2
1
X X X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
WSB POND 2
NODE 2PP
OUTLET 930.2
HWL 931.4 (EXISTING)
HWL 931.2 (PROPOSED)
4
OUTLOT B
(PARK)
5
X
X
X
X
X
X
XXXXXXXXXXXXXXXXXXXXX
XXXXX
3
11
12
13
5
1
9
8
7
6
6 71234
2 3 4
21
20
19
18
17 16 15 14
10
9
8
7
6
5
4
3
2
1
2
BLOCK 1
BLOCK 2
OUTLOT A1234
BL
O
C
K
2
BLOCK 3BLOCK 4
BLOCK 5
BLOCK 6
OUTLOT A
>
>
>
>
>
>
>>>>>>>>>>
8
9
10
>>
>>
>>>>>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
FFE 935.05
GFE 934.35
FF
E
9
3
5
.
4
GF
E
9
3
4
.
7
FFE 935.05
GFE 934.35
FFE 934.7
GFE 934.0
FFE 934.9
GFE 934.2
FFE 935.3
GFE 934.6
FFE 935.4
GFE 934.7
FFE 936.2
GFE 935.5
FFE
9
3
6
.
2
GFE
9
3
5
.
5
FFE 935.2
GFE 934.50 FFE 935.2
GFE 934.50
FFE 935.7
GFE 935.0
FFE 935.9
GFE 935.2
FFE 935.7
GFE 935.0
FFE 935.8
GFE 935.10
OUTLOT A
OUTLOT A
BLOCK 6
BLOCK 6
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
XXXX
X
X
X
X X X
EXPANDED WSB POND 1
NODE 3P
ADDITIONAL STORAGE
930.2-931.2 =18,850 CF
WQv 922-929 46,720 CF
FOREBAY
NODE F
HWL 931.2
POND J
OUTLET 930.42
HWL 932.7
POND G
OUTLET 930.18
HWL 932.7
POND B
OUTLET 929.69
HWL 932.7
POND I
OUTLET 930.82
HWL 931.8
93
1
93
2
93
0
92
8
92
6
92
4
92
9
92
7
92
5
93
3
932
933
934
933
932
931
932
931
931
932
933
934
932
935
934
933
932
935
934
934
931 932.
5
933
934
932.5
92
2
92
3
932
93
1
93
2
93
0
92
8
92
6
92
9
92
7
93
3
931
932
930
928
929
927
933
931
932
933
933
93
4
933
934 935 935
93
4
93
5
93
4
93
5
935
935
9
3
5
935
935
93
5
9
3
4
934934934
934
934
93
4
93
4
9
3
4
9
3
4
934933
935
93
4
9
3
4
934
934
9
3
4
93
3
93
4
934
934
934
932
9
3
8
9
3
6
9
3
4
9
3
2
9
2
9
934
934
934
92
7
925
935
935
935
935
>>926
934
934
934
933
934
933
936
937
935
934
934
TREE PROTECTION
FENCE (TYP)
SILT FENCE
(TYP)
SILT FENCE
(TYP)
SILT FENCE
(TYP)
EROSION CONTROL
BLANKET (TYP)
A2
C-503
A1
C-503
SILT FENCE
(TYP)
D1
C-503
TREE PROTECTION
FENCE (TYP)
A4
C-503
CONSTRUCTION
ENTRANCE
C3
C-503
INLET PROTECTION
(TYP)
C6
C-503
DITCH CHECK
(TYP)
PROVIDE EROSION CONTROL SEEDING FOR ACTUAL DISTURBED
AREA WHICH MAY DIFFER FROM WHAT IS SHOWN BASED ON
CONTRACTOR'S MEANS AND METHODS.
SEE A1/C-201 SEE A1/C-202
SEE A1/C-204
INSTALL SILT FENCE
AND MAINTAIN AS
DREDGING
PROGRESSES
INLET
PROTECTION
(TYP)
INLET PROTECTION
(TYP)
INLET
PROTECTION
(TYP)
DITCH CHECK
(TYP)
INLET
PROTECTION
(TYP)
INLET
PROTECTION
(TYP)
INLET
PROTECTION
(TYP)
RIP RAP (TYP)
C1
C-503
TREE PROTECTION
FENCE (TYP)
TURBIDITY
CURTAIN
INLET
PROTECTION
(TYP)INLET
PROTECTION
(TYP)
RIP RAP (TYP)
RIP RAP (TYP)
OVERFLOWA5
C-502
A1 OVERALL GRADING & EROSION & SEDIMENT CONTROL PLAN
1" = 30'
9030
SCALE IN FEET
Know what's below.
Call before you dig.
R
DRW25001
PROJECT NO.
PRELIMINARY PLAT,
SITE PLAN, AND
REZONING REVIEW
04/20/26
NOT FO
R
CONST
R
U
C
T
I
O
N
SHEET
CERTIFICATION
REVISION DATE
ISSUE
PROJECT
D E S I G N
C I V I L E N G I N E E R I N G | L A N D S C A P E A R C H I T E C T U R E
3 1 0 4 T H A V E S O U T H , S U I T E 1 0 0 6
M I N N E A P O L I S , M N 5 5 4 1 5
www.elanlab.comp 612.260.7980
f 612.260.7990
1 2 3 4 5 6
E
D
C
B
A
I hereby certify that this plan, specification
or report was prepared by me, or under my
direct supervision, and that I am a duly
Licensed Professional Engineer under the
laws of the state of MINNESOTA.
Stephen M. Johnston
18914 04/20/2026
NOT FO
R
CONST
R
U
C
T
I
O
N
REGISTRATION NO.
DATE
ONEKA LAKE
RESERVE
HUGO, MN
ONEKA LAKE, LLC
DON WILLENBRING
2120 WUTHERING
HEIGHTS ROAD
EAGAN, MN 55122
651-363-3915
C-200
OVERALL GRADING &
EROSION & SEDIMENT
CONTROL PLAN
LEGEND
TREE PROTECTION FENCE
SILT FENCE - INSTALL BEFORE START OF CONSTRUCTION SOD & LANDSCAPE PLANTING
SEE SHEET L-101
RIP RAP SPILLWAY
DITCH CHECK
STORM STRUCTURE PROTECTION
TURBIDITY CURTAIN
MNDOT SOUTHERN TALLGRASS ROADSIDE (STR)
BROADCAST SEEDING
SEEDING RATE PLS 26 LBS/AC.IMPERVIOUS
PERVIOUS
EXISTING PROPOSED
BUILDING
TOTAL IMPV
NPDES AREA SUMMARY
0 ACRES
PAVEMENT 0.033 ACRES
TOTAL 7.210 ACRES
1.322 ACRES
2.632 ACRES
0.033 ACRES
7.177 ACRES
7.210 ACRES
3.954 ACRES
3.256 ACRES
NO MOW FINE FESCUE LAWN
BROADCAST SEEDING
SEEDING RATE PLS 250 LBS/AC.
MNDOT WET DITCH (W)
BROADCAST SEEDING
SEEDING RATE PLS 20 LBS/AC.
EROSION CONTROL BLANKET - NAG DS150 OR APPROVED EQUAL
ALL OTHER AREAS TO BE STABILIZED WITH SOIL TACKIFIER OR
DISC ANCHORED STRAW AT THE RATE OF 2,000 LBS/AC.
TEMPORARY SEEDING COVER CROP RATE PLS 100 LBS/AC.
SPRING: OAT (O)
FALL: WINTER WHEAT (WW)
SILT FENCE - INSTALL AFTER CONSTRUCTION
BUILDING J
BUILDING F
BUILDING I
BUILDING E BUILDING D
>
>
>
>
>
>
>
>
>>
>>>>>>>>>>>>>>>>
>>
>>
>>
>>
>
>
>>>>>>>>>>
>>
>>
4+00
5+006+00
7+00
7+21.73
6+18.75
6+75
4+65
5+30
FFE 935.05
GFE 934.35
933.19
933.88 HP
933.49
33.88HP
933.16
932.95
932.65
933.25
0.6%0.6%0.6%0.78%0.6%0.6%0.78%
933.88TBC933.34TBC 2.
1
4
%
4.
5
%
933.59TBC 933.88TBC3.
4
5
%
2.
1
4
%
FFE 935.05
GFE 934.35
0.6%
0.
6
%
0.
6
%
FFE 934.7
GFE 934.0
933.34TBC
3.9%
933.45TBC
2.5%
933.34TBC
2.3%
933.53HP
0.
6
%
0.
6
%
933.65SW
3.
9
%
934.03SW2.
1
%
933.72SW3.
6
%
933.85SW3.
0
%
934.02SW
2.
2
%
FFE 935.2
GFE 934.50 GFE 934.50
934.8
934.8
934.8934.6 (TYP)
934.6 (TYP)
934.8934.8
934.5
934.2
933.70933.20
933.95
934.8
934.65
934.65
934.65
934.65
934.65
934.65
934.45(TYP)934.45(TYP)
933.21TBC
4.
1
%
933.16
934.09933.59
933.35
934.25933.75
934.30934.30
934.30 934.30
934.50
934.50
934.10(TYP)
934.30(TYP)
HWL(TYP)
HWL(TYP)
HWL(TYP)
934.55 934.55 934.55
934.25
4:
1
(
T
Y
P
)
4:
1
(
T
Y
P
)
4:1 (TYP)
934.20
934.20
934.7
934.7 934.7
934.40
934.9
933.5 EOF
EOF
933.55
EOF
933.55
934.0
933.5 EOF
CENTERLINE
OF DRAINAGE
SWALE (TYP)
933
932
933
934
93
1
93
2
93
0
92
8
92
6
92
9
92
7
93
3
931
932
930
928
929
927
933
931
932
933
934934
934
934
934
93
4
934
934
934
932
934
92
7
925
>>>>926
930.7
MATCHLINE
SEE SHEET C-203
MA
T
C
H
L
I
N
E
SE
E
S
H
E
E
T
C
-
2
0
2
B6
C-201
>>>>
TW 932BW 931
TW 933.5BW 931
TW 933BW 931
TW 933BW 932
PLACE & BLEND
BOULDER WALL AND
CLASS II RIP RAP.
BOULDER TO MATCH RIP
RAP MATERIAL
C4-A
C-501
C4-B
C-501
A1 GRADING PLAN - AREA 1
1" = 20'
6020
SCALE IN FEET
Know what's below.
Call before you dig.
R
DRW25001
PROJECT NO.
PRELIMINARY PLAT,
SITE PLAN, AND
REZONING REVIEW
04/20/26
NOT FO
R
CONST
R
U
C
T
I
O
N
SHEET
CERTIFICATION
REVISION DATE
ISSUE
PROJECT
D E S I G N
C I V I L E N G I N E E R I N G | L A N D S C A P E A R C H I T E C T U R E
3 1 0 4 T H A V E S O U T H , S U I T E 1 0 0 6
M I N N E A P O L I S , M N 5 5 4 1 5
www.elanlab.comp 612.260.7980
f 612.260.7990
1 2 3 4 5 6
E
D
C
B
A
I hereby certify that this plan, specification
or report was prepared by me, or under my
direct supervision, and that I am a duly
Licensed Professional Engineer under the
laws of the state of MINNESOTA.
Stephen M. Johnston
18914 04/20/2026
NOT FO
R
CONST
R
U
C
T
I
O
N
REGISTRATION NO.
DATE
ONEKA LAKE
RESERVE
HUGO, MN
ONEKA LAKE, LLC
DON WILLENBRING
2120 WUTHERING
HEIGHTS ROAD
EAGAN, MN 55122
651-363-3915
C-201
GRADING PLAN
AREA 1
B6 ENLARGED GRADING PLAN
1" = 10'
LEGEND
MAJOR EXISTING CONTOUR
MINOR EXISTING CONTOUR
MAJOR PROPOSED CONTOUR
MINOR PROPOSED CONTOUR
930.00' ±
MATCH MATCH EXISTING
930.00' HP HIGH POINT
LOW POINT
TOP OF CURB
930.00' LP
930.00' TBC
1086
1085
NOTES
1.SEE SHEET C-003 FOR GRADNIG AND DRAINAGE NOTES.
2.PROVIDE 2.0% SLOPE ON PATIOS. EXPOSE PATIO FOUNDATIONS TO
A MAXIMUM 8" HEIGHT WHERE SLOPE CANNOT BE TIED OUT AT A
MAXIMUM 4:1 SLOPE.
EMERGENCY OVERFLOW
SIDEWALK930.00' SW
EOF
15
0
T
H
S
T
R
E
E
T
N
B
U
I
L
D
I
N
G
N
BUILDING B
BUILDING I
BUILDING D
BU
I
L
D
I
N
G
C
BUILDING A
2+00
3+00
1+24.52 =14+36.45
3+22.8
>>
>>
>>
>>
>>
FF
E
9
3
5
.
4
GF
E
9
3
4
.
7
33.88HP
0.6%
0.6%
933.42
0.6%
933.57TBC2.
1
4
%
3.
6
%
933.46TBC
933.73TBC
933.98TBC
2.0%
4.4
%
4.1
%
933.81SW
3.
2
%
934.16SW
3.8%
934.55SW
1.9%
2.
2
%
FFE 935.2
GFE 934.50
FFE 935.7
GFE 935.0
FFE 935.9
GFE 935.2
FFE 935.7
GFE 935.0
934.8
934.8
935.3
933.09
933.06
932.86
932.70
933.38
935.3
933.38
933.42
933.7
933.85
934.2HPEOF
934.65
934.65
934.45(TYP)
935.0
935.0
935.0
935.0
934.8(TYP)
934.28
933.9
934.7
934.6
3.2%
2.0%
2.1%
2.0%
2.1%
934.65
934.65
934.5
934.2
935.5 935.5
935.3
935.5
935.5
935.1(TYP)
935.3(TYP)
935.3
935.3
935.3
934.4
934.9
934.28
933.92
934.06
933.70
934.55
4:
1
(
T
Y
P
)
934.7
933.05
932.85
932.55EOF
934.9
934.9
935.4
935.0
935.2
935.2
935.2
935.1
933.55
TW 934.5BW 933.0
935.2
935.4
934.5
CENTERLINE OF DRAINAGE
SWALE (TYP)
932
933
933
93
4
933
934 935 935
93
4
93
5
93
4
93
5
935
93
5
9
3
4
934
93
4
9
3
4
934
9
3
4
SE
E
S
H
E
E
T
C
-
2
0
1
MA
T
C
H
L
I
N
E
SEE SHEET C-204
MATCHLINE
3
FFE 935.05
GFE 934.35
A1 GRADING PLAN - AREA 2
1" = 20'
6020
SCALE IN FEET
Know what's below.
Call before you dig.
R
DRW25001
PROJECT NO.
PRELIMINARY PLAT,
SITE PLAN, AND
REZONING REVIEW
04/20/26
NOT FO
R
CONST
R
U
C
T
I
O
N
SHEET
CERTIFICATION
REVISION DATE
ISSUE
PROJECT
D E S I G N
C I V I L E N G I N E E R I N G | L A N D S C A P E A R C H I T E C T U R E
3 1 0 4 T H A V E S O U T H , S U I T E 1 0 0 6
M I N N E A P O L I S , M N 5 5 4 1 5
www.elanlab.comp 612.260.7980
f 612.260.7990
1 2 3 4 5 6
E
D
C
B
A
I hereby certify that this plan, specification
or report was prepared by me, or under my
direct supervision, and that I am a duly
Licensed Professional Engineer under the
laws of the state of MINNESOTA.
Stephen M. Johnston
18914 04/20/2026
NOT FO
R
CONST
R
U
C
T
I
O
N
REGISTRATION NO.
DATE
ONEKA LAKE
RESERVE
HUGO, MN
ONEKA LAKE, LLC
DON WILLENBRING
2120 WUTHERING
HEIGHTS ROAD
EAGAN, MN 55122
651-363-3915
C-202
GRADING PLAN
AREA 2
LEGEND
MAJOR EXISTING CONTOUR
MINOR EXISTING CONTOUR
MAJOR PROPOSED CONTOUR
MINOR PROPOSED CONTOUR
930.00' ±
MATCH MATCH EXISTING
930.00' HP HIGH POINT
LOW POINT
TOP OF CURB
930.00' LP
930.00' TBC
1086
1085
NOTES
1.SEE SHEET C-003 FOR GRADNIG AND DRAINAGE NOTES.
2.PROVIDE 2.0% SLOPE ON PATIOS. EXPOSE PATIO FOUNDATIONS TO
A MAXIMUM 8" HEIGHT WHERE SLOPE CANNOT BE TIED OUT AT A
MAXIMUM 4:1 SLOPE.
3.SHIFT GUTTER LOW POINT TO MATCH "FOXHOLE" INLET. GUTTER
ELEVATION 933.09
EMERGENCY OVERFLOW
SIDEWALK930.00' SW
EOF
BUILDING H
BUILDING L
BUILDING G
BUILDING K
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
8+00
9+00
10+00 11+00
9+57.18
7+21.73
8+75
>>
933.68 LP
934.17HP
0.
6
%
0.
6
%
0.6%
0.8
5
%
0.
8
5
%
FFE 934.9
GFE 934.2
FFE 935.3
GFE 934.6
933.34TBC
3.9%
933.74TBC
2.0%
934.04TBC
2.0%
933.97TBC
2.5%
933.66SW
4.7%
934.25SW
2.0%
FFE 935.4
GFE 934.7
FFE 936.2
GFE 935.5
934.43 SW
4.
9
%
935.02 SW
2.
2
%
935.8
935.0
935.0
934.8(TYP)
935.8
935.6(TYP)
934.8
934.8
932.5
932.35
934.50
934.50
934.50
934.50
934.90
934.90
934.90934.90
935.0
935.0
934.30(TYP)
934.70(TYP)
934.17TBC
933.84TBC
2.2%
933.85933.35
935.8 935.8
934.99
HWL(TYP)
4:1 (TYP)
4:1 (TYP)
934.40
934.40
934.15
934.80
934.80
934.9
934.8
934.55
934.9
935.7
935.7
933.5 EOF
93
1
93
2
93
0
92
8
92
6
92
4
92
9
92
7
92
5
93
3
934
933
932
931
932
931
931
932
933
935
934
933
932
932.5
92
2
92
3
935
934
93
4
93
4
9
3
4
9
3
4
934933
934
93
3
9
3
8
9
3
6
9
3
4
9
3
2
9
2
9
934
934
935
935
MATCHLINE
SEE SHEET C-201
MA
T
C
H
L
I
N
E
SE
E
S
H
E
E
T
C
-
2
0
4
C4-B
C-501
A1 GRADING PLAN - AREA 3
1" = 20'
6020
SCALE IN FEET
Know what's below.
Call before you dig.
R
DRW25001
PROJECT NO.
PRELIMINARY PLAT,
SITE PLAN, AND
REZONING REVIEW
04/20/26
NOT FO
R
CONST
R
U
C
T
I
O
N
SHEET
CERTIFICATION
REVISION DATE
ISSUE
PROJECT
D E S I G N
C I V I L E N G I N E E R I N G | L A N D S C A P E A R C H I T E C T U R E
3 1 0 4 T H A V E S O U T H , S U I T E 1 0 0 6
M I N N E A P O L I S , M N 5 5 4 1 5
www.elanlab.comp 612.260.7980
f 612.260.7990
1 2 3 4 5 6
E
D
C
B
A
I hereby certify that this plan, specification
or report was prepared by me, or under my
direct supervision, and that I am a duly
Licensed Professional Engineer under the
laws of the state of MINNESOTA.
Stephen M. Johnston
18914 04/20/2026
NOT FO
R
CONST
R
U
C
T
I
O
N
REGISTRATION NO.
DATE
ONEKA LAKE
RESERVE
HUGO, MN
ONEKA LAKE, LLC
DON WILLENBRING
2120 WUTHERING
HEIGHTS ROAD
EAGAN, MN 55122
651-363-3915
C-203
GRADING PLAN
AREA 3
LEGEND
MAJOR EXISTING CONTOUR
MINOR EXISTING CONTOUR
MAJOR PROPOSED CONTOUR
MINOR PROPOSED CONTOUR
930.00' ±
MATCH MATCH EXISTING
930.00' HP HIGH POINT
LOW POINT
TOP OF CURB
930.00' LP
930.00' TBC
1086
1085
NOTES
1.SEE SHEET C-003 FOR GRADNIG AND DRAINAGE NOTES.
2.PROVIDE 2.0% SLOPE ON PATIOS. EXPOSE PATIO FOUNDATIONS TO
A MAXIMUM 8" HEIGHT WHERE SLOPE CANNOT BE TIED OUT AT A
MAXIMUM 4:1 SLOPE.
EMERGENCY OVERFLOW
SIDEWALK930.00' SW
EOF
GENERATION
AVENUE N
>>
B
U
I
L
D
I
N
G
N
BUIL
D
I
N
G
M
BUILDING O
1+00
12+00
13+00
14+00
11+75
1+24.52 =14+36.45
>
>
0+40
13+50
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
934.10
933.77
0.6
%
0.6
%
934.09LP
934.61
935.14HP
0.6%
0.6%
0.6%
0.6%
934.97SW2
.
4
%
934.55SW
FFE
9
3
6
.
2
GFE
9
3
5
.
5
934.55SW
1.9%
FFE 935.7
GFE 935.0
FFE 935.8
GFE 935.10
934.41 SW
2.
9
%
934.59 SW
2.
2
%
934.81
935.55935.05
935.8
935.8
935.6(TYP)
935.3
935.1(TYP)935.3
934.41
935.1 HP
935.8
935.31934.81
935.4
935.4
935.4
935.4
935.2(TYP)
933.84
934.28
934.6
935.5
934.4
934.9
934.75
934.99 934.95
934.69
>
>
EOF
935.4
935.2
935.1
935.3
935.3
935.7
935.7
935.25
932
935
934
934
931 932.
5
933
934
932
935
935
9
3
5
935
935
9
3
4
935.6
0.6
%
935
935
4
.
4
%
934
934
934
933
934
933
936
937
935
934
934
15
0
T
H
S
T
R
E
E
T
N
SE
E
S
H
E
E
T
C
-
2
0
4
MA
T
C
H
L
I
N
E
MATCHLINE
SEE SHEET C-202
A1 GRADING PLAN - AREA 4
1" = 20'
6020
SCALE IN FEET
Know what's below.
Call before you dig.
R
DRW25001
PROJECT NO.
PRELIMINARY PLAT,
SITE PLAN, AND
REZONING REVIEW
04/20/26
NOT FO
R
CONST
R
U
C
T
I
O
N
SHEET
CERTIFICATION
REVISION DATE
ISSUE
PROJECT
D E S I G N
C I V I L E N G I N E E R I N G | L A N D S C A P E A R C H I T E C T U R E
3 1 0 4 T H A V E S O U T H , S U I T E 1 0 0 6
M I N N E A P O L I S , M N 5 5 4 1 5
www.elanlab.comp 612.260.7980
f 612.260.7990
1 2 3 4 5 6
E
D
C
B
A
I hereby certify that this plan, specification
or report was prepared by me, or under my
direct supervision, and that I am a duly
Licensed Professional Engineer under the
laws of the state of MINNESOTA.
Stephen M. Johnston
18914 04/20/2026
NOT FO
R
CONST
R
U
C
T
I
O
N
REGISTRATION NO.
DATE
ONEKA LAKE
RESERVE
HUGO, MN
ONEKA LAKE, LLC
DON WILLENBRING
2120 WUTHERING
HEIGHTS ROAD
EAGAN, MN 55122
651-363-3915
C-204
GRADING PLAN
AREA 4
LEGEND
MAJOR EXISTING CONTOUR
MINOR EXISTING CONTOUR
MAJOR PROPOSED CONTOUR
MINOR PROPOSED CONTOUR
930.00' ±
MATCH MATCH EXISTING
930.00' HP HIGH POINT
LOW POINT
TOP OF CURB
930.00' LP
930.00' TBC
1086
1085
NOTES
1.SEE SHEET C-003 FOR GRADNIG AND DRAINAGE NOTES.
2.PROVIDE 2.0% SLOPE ON PATIOS. EXPOSE PATIO FOUNDATIONS TO
A MAXIMUM 8" HEIGHT WHERE SLOPE CANNOT BE TIED OUT AT A
MAXIMUM 4:1 SLOPE.
EMERGENCY OVERFLOW
SIDEWALK930.00' SW
EOF
C-205
SWPPP
DRW25001
PROJECT NO.
PRELIMINARY PLAT,
SITE PLAN, AND
REZONING REVIEW
04/20/26
NOT FO
R
CONST
R
U
C
T
I
O
N
SHEET
CERTIFICATION
REVISION DATE
ISSUE
PROJECT
D E S I G N
C I V I L E N G I N E E R I N G | L A N D S C A P E A R C H I T E C T U R E
3 1 0 4 T H A V E S O U T H , S U I T E 1 0 0 6
M I N N E A P O L I S , M N 5 5 4 1 5
www.elanlab.comp 612.260.7980
f 612.260.7990
1 2 3 4 5 6
E
D
C
B
A
I hereby certify that this plan, specification
or report was prepared by me, or under my
direct supervision, and that I am a duly
Licensed Professional Engineer under the
laws of the state of MINNESOTA.
Stephen M. Johnston
18914 04/20/2026
NOT FO
R
CONST
R
U
C
T
I
O
N
REGISTRATION NO.
DATE
ONEKA LAKE
RESERVE
HUGO, MN
ONEKA LAKE, LLC
DON WILLENBRING
2120 WUTHERING
HEIGHTS ROAD
EAGAN, MN 55122
651-363-3915
PROJECT NAME / LOCATION
PROJECT NAME ONEKA LAKE RESERVE
PROJECT ADDRESS GENERATION AVENUE N & 150TH STREET N
PROPERTY ID 1703121440148
LATTITUDE/LONGITUDE 45.16798N, -92.98322W
EROSION PREVENTION MEASURES - GENERAL
The Contractor (Operator) is responsible for all erosion prevention measures for the project including but are not
limited to the following:
1.The Contractor (Operator) shall plan and implement appropriate construction practice and construction
phasing to minimize erosion and retain vegetation whenever possible
2.All areas not to be disturbed shall be delineated with flags, stakes, signs, or other means necessary to
protect these areas before construction begins on the site.
3.All drainage ditches and/or swales shall have temporary or permanent stabilization within 24 hours of
connecting to a surface water or 24 hours after construction activity in the ditch/swale has temporarily or
permanently ceased.
4.All pipe outlets shall have temporary or permanent energy dissipation within 24 hours of connecting to a
surface water.
5.All exposed soils shall be stabilized as soon as possible to limit soil erosion. In no case shall un-worked areas,
including stockpiles, have exposed soils for more than 7 days without providing temporary or permanent
stabilization.
SEDIMENT CONTROL MEASURES AND TIMING - GENERALS
The Operator (Contractor) is responsible for all sediment control measures for the project. Sediment control
measures include but are not limited to the following:
1.Sediment control measures shall be established on all down gradient perimeters before any up-gradient land
disturbing activities begin. These measures shall remain in place until final stabilization has been established.
2.On slopes with 3:1 or steeper grades there shall be no unbroken slope length greater than 75 feet.
3.All storm drain inlets and culvert inlets shall be protected by an appropriate BMP during construction until
all sources with potential for discharging to the inlet has been stabilized. Inlet and culvert protection shall
conform to the MnDOT Specifications 2573 and 3891.
4.Stockpiles shall be provided with an effective sediment perimeter control and shall not be placed in any type
of surface water or drainageway.
5.Vehicle tracking shall be minimized with effective BMP's. Where the BMP's fail to prevent sediment from
tracking onto streets the Contractor shall conduct street sweeping to remove all tracked sediment.
6.The Operator is responsible for identifying the need for temporary sediment basins based on actual field
conditions to protect downstream resources. Temporary sediment basins shall be constructed before up
gradient vegetation is disturbed and maintained until the risk of damage to downstream resources is
mitigated by other means.
DEWATERING AND BASIN DRAINING ACTIVITIES - GENERAL
The Operator is responsible for adhering to all dewatering and surface drainage regulations, including but not
limited to the following:
1.Whenever possible water from dewatering activities shall discharge to a temporary and/or permanent
sediment basin.
2.If water cannot be discharged to a sedimentation basin, it shall be treated with other appropriate BMP's, to
effectively remove sediment.
3.All discharge points shall be protected from erosion and scour.
4.Discharge water shall be dispersed over an effective energy dissipation measure.
5.All water from dewatering shall be discharged in a manner that does not cause nuisance conditions, erosion,
or inundation of wetlands. Water shall not be discharged to adjacent residential properties. It must be
discharged to the public street.
FINAL STABILIZATION - GENERAL
The Operator is responsible for ensuring final stabilization of the site, including but is not limited to the following:
1.All soil disturbing activities outside of the right-of-way have been completed.
2.All exposed soils have been uniformly stabilized.
3.All drainage ditches, ponds and all storm water conveyance systems have been cleared of sediment and
stabilized to preclude erosion.
Upon approval of the work by Owner and City, the responsibility for the site may be transferred to the City's
Contractor and builders. The original Contractor will remain responsible for establishment of at least 80%
perennial vegetation coverage and the removal of temporary BMP's.
TEMPORARY SEDIMENT BASIN
The Contractor shall limit the amount of the site that is susceptible to erosion at any given time by phasing the
work. Permanent Infiltration facilities can be used as temporary storage basins prior to installing sand and
Infiltrationmedia. Do not excavate beyond design subgrade elevations. After temporary storge need is over, the
permanent Infiltration facilities should be constructed according to plans. Sediment shall be properly removed
from the basins prior to excavation to design subgrade elevations. Do not allow compaction of the soils and
operation of heavy machinery in Infiltration areas.
CONSTRUCTION SEQUENCING - GENERAL
Contractor shall comply with the following sequence. The Contractor may adjust the sequence if needed to
address their means and methods and unanticipated field conditions.
1.Install perimeter erosion and sediment control measures, tree protection fencing, and construction
entrance. Erosion and sediment control BMPs shall be installed and maintained as specified in the general
notes of this SWPPP and the Construction Details.
2.Proceed with demolition per C010.
3.Dredge to expand the existing stormwater basin as shown on the drawings. Stockpile dredged material to
allow it to dry to a suitable store level for use as embankment within the project.
4.Strip and stockpile topsoil. Stabilize with temporary seed and mulch, and surround with an erosion control
blanket.
5.Begin installation of utilities.
6.Begin building construction.
7.Pave street, sidewalks, and driveways.
8.Finish utility installation. As inlets are completed, establish inlet protection.
9.Finish buildings.
11.Flush storm sewer system, remove sediment from sumps.
12.Replace inlet protection that is full, replace any damaged sections of perimeter BMPs until final stabilization
has been achieved.
13.Begin Final Stabilization. Install landscaping, sod, and seed. Monitor vegetation growth, replace dead
vegetation as needed. When 90% of the vegetative cover has been established, remaining erosion and
sediment control BMPs may be removed.
14.File NPDES Notice of Termination (“NOT”) with MPCA within 30 days of final stabilization.
INSPECTION AND MAINTENANCE
All inspections, maintenance, repairs, replacements, and removal are to be considered incidental to the BMP bid
items.
The Contractor (Operator) is responsible for completing required inspections maintenance and observation of
weather conditions and rainfall amounts to ensure compliance with the permit requirements. The Contractor
(Operator) shall observe the construction site once every seven (7) days during active construction and within 24
hours after a rainfall event greater than 0.5 inches in 24 hours.
The Contractor (Operator) shall keep a summary maintenance/construction observation report to be recorded
after each site visit/observation. The Contractor (Operator) shall submit a copy of the written inspections monthly
to the Owner. Records shall include the following:
1.Date and time of inspections
2.Name of person conducting inspection
3.Findings and recommendations for corrective actions if necessary
4.Corrective actions taken
5.Date and number of rainfalls greater than 0.5 inches in 24 hours
6.Record, photograph, and describe the location of any observed discharge (i.e., color, odor, settled or
suspended solids, oil sheen, and other obvious indicators of pollutants)
7.Photographs of dewatering activities and documentation of nuisance conditions resulting from dewatering
activities
8.Record any amendments or changes made to the SWPPP
9.A site map indicating active construction areas and land disturbing activities.
The Contractor (Operator) must keep the SWPPP, all inspection reports and amendments onsite. The Contractor
(Operator) shall designate a specific location to keep the records whenever construction activity is in progress.
All erosion prevention and sedimentation control BMP's must be inspected to ensure integrity and effectiveness.
All nonfunctional BMP's must be repaired, replaced, or supplemented with functional BMP's. The Contractor
(Operator) must investigate and comply with the following inspection and maintenance requirements:
1.All sediment barriers including silt fence, bio-logs, and similar devices must be repaired replaced or
supplemented when they become nonfunctional, or the sediment reaches 1/3 of the barrier height. These
repairs shall be made within 24 hours of discovery.
2.Temporary and permanent sediment basins must be drained, and the sediment removed when the depth of
sediment collected in the basin reaches 1/2 the storage volume. Drainage and removal must be completed
within 72 hours of discovery.
3.Surface waters, including drainage ditches and conveyance systems, must be inspected for evidence of
erosion and sediment deposition. The Operator shall remove all deltas and sediment deposited in surface
waters, including drainage ways, catch basins, and other drainage systems. The Operator shall re-stabilize
the areas where sediment removal results in exposed soil. Removal and stabilization must take place within
7 days of discovery, unless precluded by legal, regulatory or physical constraints. The Contractor (Operator)
is responsible for contacting all local, regional, state and federal authorities and receiving any applicable
permits, prior to conducting any work.
4.Construction site vehicle exit locations shall be inspected daily for evidence of off-site sediment tracking
onto paved surfaces. Tracked sediment must be removed from all paved surfaces within 24 hours of
discovery.
5.The Contractor (Operator) is responsible for the operation and maintenance of temporary and permanent
water quality BMP's. As well as erosion and sediment control BMP's for the duration of the construction
work at the site.
6.If sediment escapes the construction site, all off-site accumulations of sediment must be removed in a
manner and at a frequency sufficient to minimize off-site impacts.
7.All Infiltration areas must be inspected to ensure that no sediment from ongoing construction activities is
reaching the Infiltration areas and these areas are protected from compaction due to construction
equipment driving across the Infiltration area.
8.The Contractor is solely responsible for all costs associated with reconstructing the BMP when the
functionality is compromised by the Contractor's actions or inaction to protect the BMP.
POLLUTION PREVENTION MANAGEMENT MEASURES
The Contractor (Operator) shall be responsible for all pollution prevention management measures. The
Contractor (Operator) is responsible for informing all visitors and/or personnel on-site of the pollution prevention
management measures.
All pollution prevention management measures are to be considered incidental to the overall project bid, unless
otherwise noted. Pollution prevention management measures include but are not limited to the following:
1.The Contractor (Operator) is responsible for the proper disposal, in compliance with MPCA disposal
requirements, of all solid or liquid waste and hazardous materials on-site.
2.Concrete trucks shall not be allowed to wash out or discharge surplus concrete or drum wash water on-site,
unless done in an engineered leak-proof containment system. The engineered system provided by the
Contractor (Operator) must include site drawings for the project file and written assurance that the system
will work as designed and leave no discharge of concrete or concrete residue potential to waters of the state
during a minimum of a 100-year storm event. A sign must be installed adjacent to each washout system to
inform concrete equipment Operators to utilize the proper facilities. The concrete washout containment
system and all related items shall be considered incidental to the project bid.
3.All nonhazardous waste materials shall be collected and stored in a securely lidded metal dumpster or other
approved containment method at the end of each day. Any alternative to a metal dumpster must be
submitted in writing for approval by the project engineer. The dumpster shall be emptied as necessary to
function as intended for debris collection. No construction garbage or waste material shall be buried on-site.
4.A licensed sanitary waste management Contractor shall collect all sanitary waste from the portable units at a
rate necessary to maintain designed function.
5.All fertilizers shall be stored in a covered shelter. Partially used bags shall be transferred to a sealable bin to
reduce the chance of spillage.
6.External washing of trucks and other construction vehicles and engine degreasing are prohibited at the
construction site. All vehicles on-site shall be monitored for leaks and receive regular prevention
maintenance to reduce the chance of leakage. Petroleum products shall be stored in tightly sealed
containers. Which are clearly labeled. Spill kits shall be included with all fueling sources and maintenance
activities. Secondary containment measures shall be installed and maintained by the Operator.
7.Any asphalt substances used on-site shall be applied in accordance with manufacturer's recommendations.
8.All paint containers and curing compounds shall be tightly sealed and stored when not required for use.
Excess paint and/or curing compounds shall not be discharged into the storm sewer system and shall be
properly disposed of according to manufacturer's instruction.
9.Materials and equipment necessary for spill clean-up shall be kept in an enclosed trailer or shed on-site.
Equipment shall include. But not limited to, brooms, mops, dust pans, rags, gloves, goggles, absorbent (kitty
litter) oil absorbent booms and diapers and buckets.
10.All spills shall be contained and cleaned up immediately upon discovery. Spills large enough to reach the
storm water conveyance system shall be reported to the Minnesota duty officer at 1-800-422-0798.
CONTACTS
OWNER
DON WILLENBRING
ONEKA LAKE, LLC
2120 WUTHERING HEIGHTS ROAD
EAGAN, MN 55122
PHONE#
(651) 363-3915
CONTRACTOR/OPERATOR
TBD
NAME/CONTACT
COMPANY
ADDRESS
PHONE#
EMAIL
PREPARER
KALLY HALUPTZOK
ÉLAN DESIGN LAB, INC.
310 4TH AVE S
SUITE 1006
MINNEAPOLIS, MN 55415
612-260-7979
KHALUPTZOK@ELANLAB.COM
SWPPP DESIGN CERTIFICATION
EXPIRES 2027
GENERAL SWPPP RESPONSIBILITIES
The Contractor (Operator) shall provide a knowledgeable and experienced person(s) to oversee the implementation of the
SWPPP and the installation. Inspection and maintenance of the erosion and sediment control BMP's before and during
construction. The responsible individual shall maintain current Construction Installer and Construction Site Manager
certification. Copies of current certification documents must remain on-site with the SWPPP. The Certified person must be
available on-site within 24 hours.
Both the Owner and Contractor (Operator) shall be responsible for the proper termination and/or transfer of the permit.
The Owner will be responsible for the long-term operation and maintenance of the permanent storm water management
system(s).
Unless specifically stated the engineer shall have no responsibility for any SWPPP activities during or after construction.
PROJECT DESCRIPTION
The vacant 6.7 acre project site is located north of 150th Street North at Generation Avenue.
The proposed development includes a 50 attached townhomes, in two, three, and four-unit buildings, served by a private street.
Stormwater management is provided by a series of infiltration basins that overflow to an open water retention pond in the
northeast corner of the site.
SOILS
The generalized soil mapping provided by the USDA/NRCS indicates that approximately 40% of the soils are Isanti fine sand
loam, 40% are Lino loamy fine sand and 20% Lino variant fine sand. All of these soils types consist of, in varying degrees, loamy
fine sand and fine sand. “B” hydrologic soil group (HSG) has been used for all calculations.
The geotechnical investigation and report prepared by NTI that indicates the presence of a thin layer of topsoil over silty sand
(SM), poorly graded sand with silt (SP-SM) and poorly graded sand (SP). Shallow groundwater will be encountered.
RECEIVING WATERS
The site directly drains to a regional NURP pond on the North side of the property. The project is within a mile proximity to
Oneka and Egg Lakes, and Hardwood Creek.
MAP OF SURFACE WATERS
MAP OF MPCA IMPAIRED AND SPECIAL WATERS
PROJECT PLANS
The following plan sheets are hereby incorporated into this SWPPP
DESCRIPTION DATE
C200
SHEET NUMBER
Overall Grading and Erosion and Sediment Control Plans
C201, C202, C203, C204 Grading Plan Areas 1-4
C301 Utility Plan 04/20/2026
C501 - C505 Details
04/20/2026
04/20/2026
04/20/2026
STORMWATER RELATED REVIEWS AND PERMITS
TYPE OF PERMIT REVIEW STATUS
City of Hugo
AGENCY
Site Plan Review, Stormwater Management, Erosion and Pending
Sediment Control, Grading Permit, Building Permit
MPCA Construction Stormwater To be acquired by
contractor
STORMWATER MANAGEMENT SYSTEM OVERVIEW
See Stormwater Management Plan incorporated herein by reference for details on system design, flow rates and volumes
and system capacities. The existing NURP pond to the north will be expanded and will be the primary discharge point from
the site. Stormwater will be utilized for irrigation within the development. See Operations and Maintenance Manual for
post construction system maintenance requirements.
QUANTITIES
QUANTITY *
SILT FENCE
PRACTICE
2,085
DETAIL/SPEC.UNIT
A1/C-503 LF
POST CONSTRUCTION OPERATION AND MAINTENANCE
Maintenance of the storm water management facilities will be the responsibility of an Owner and will be subject to an
agreement with Minnehaha Creek Watershed District.
Owner must make the SWPPP, including all inspection reports, maintenance records, training records and other
information required by this permit, available to federal, state, and local officials within three (3) days upon request
for the duration of the permit and for three (3) years following the NOT.
AMENDMENTS TO THE SWPPP
The SWPPP will be amended as needed and/or as required by provisions of the permit. Amendments will be approved
by both the Owner and Contractor (Operator) and will be attached to the SWPPP as an additional sheet. The SWPPP
and amendments will be kept on site by the Contractor (Operator) whenever construction activity is in progress.
The SWPPP must be amended within 7 days to include additional or modified BMPs as necessary to correct problems
identified or address situations whenever there is a change in design, construction, operation, maintenance, weather
or seasonal conditions having a significant effect on the discharge of pollutants to surface waters or groundwater or
whenever inspections or investigations by the site owner operator, USEPA or MPCA officials indicate the SWPPP is not
effective in eliminating or significantly minimizing the discharge of pollutants to surface waters or groundwater or the
discharges are causing water quality standard exceedances.
*Quantities are minimums and are not intended to be used for purposes of bidding. The contractor shall
provide ESC BMPs as shown on the drawings and shall repair, replace, and supplement BMPs throughout
construction as required to comply with the SWPPP and the construction stormwater permit.
Rice Creek Watershed District
TURBIDITY CURTAIN 155C1/C-503 LF
DITCH CHECK 7C6/C-503 EACH
CONSTRUCTION ENTRANCE 1A4/C-503 EACH
INLET PROTECTION 17C3C-503 EACH
TREE PROTECTION FENCE 440D1/C-503 LF
RIPRAP SPILLWAY 3C1/C-505 EACH
EROSION CONTROL BLANKET 33,660A2/C-503 SF
15
0
T
H
S
T
R
E
E
T
N
GENERATION
AVENUE N
|
|
|
1
2
1
4
OUTLOT B
(PARK)
5
3
11
12
13
5
1
9
8
7
6
6 71234
2 3 4
21
20
19
18
17 16 15 14
10
9
8
7
6
5
4
3
2
1
EXISTING
STORMWATER BASIN
OUTLET 930.2
HWL 931.2
COMMON SPACE
2
BLOCK 1
BLOCK 2
OUTLOT A1234
BL
O
C
K
2
BLOCK 3BLOCK 4
BLOCK 5
BLOCK 6
OUTLOT A
>
>
>
>
>
>
EXPANDED
STORMWATER
BASIN
FOREBAY
>>>>>>>>>>
8
9
10
>>
>>
|
|
|
|
||
||
>>>>>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
||
||
OUTLOT A
OUTLOT A
BLOCK 6
BLOCK 6
>>
S2
CONNECT TOEX. 8" PVC STUBEX INV = 922.6' ±
9
4
'
-
8
"
P
V
C
@
0
.
5
%
99' - 8" PVC@ 0.5%
STA 9+21SAN MH 5RE 933.85IE 927.40 (E)
28
3
'
-
8
"
P
V
C
@
0
.
5
%
189' - 8" PVC @ 0.5%
8" WATER
8"
W
A
T
E
R
8
"
W
A
T
E
R
8" WATER
6" WATER
CB B1RE 932.78IE 929.38
W10
S2
CONNECT TO EXISTING 8"DIP WATER STUB W/ 8"GATE VALVE & 45d BEND
42' - 10" PVC@ 0.28%
ST1
1
3
'
MI
N
S3
W12
W2
W1
CB A5RE 933.33IE 929.79
W3
W4
ST4
S4
W11
14' - 8" PVC
@ 1.0%
CB D3RE 933.60IE 930.85
144' - 15"
H
D
P
E
@
0
.
2
%
CB D4RE 933.60IE 930.92
24' 12" PVC
@0.28%
W8
ST1
W3
W8
W5
STA 3+16.88SAN MH 2RE 933.35IE 924.34 (N)IE 924.24 (S)
CBMH A3RE 932.48IE 929.40
73' - 15" RCP @ 0.4%
ST2
FES B2IE 929.69
ST5
HW J2IE 930.20
STMH D1RE 933.80IE 930.18
ST3
HW G1IE 930.18
ST4
ST1
CB I1RE 933.59IE 930.63
CB F1RE 933.93IE 930.67
15
2
'
1
5
"
H
D
P
E
@
0
.
2
%
CB C1RE 932.99IE 929.61
24' - 10" PVC@ 0.28%
STA 12+17.66SAN MH 6RE 934.84IE 924.15 (E)IE 925.25 (N)
S1
166'
-
8
"
P
V
C
@
0
.
5
%
8" W
A
T
E
R
W10
S1
C3
S2
W10
S2
W10
W10
W8
S4
W11
S3
W12
S3
W12
S3
W12
S3
W12
HW I2IE 930.82
STA 14+22.31SAN MH 5RE 934.48IE 923.20(N&W)IE 923.10(S)
9
4
'
-
8
"
P
V
C
@
0
.
5
%
STA 2+13.37SAN MH 2RE 934.03IE 923.77(N)IE 923.67 (S)
S1
309' - 8" PVC @ 0.5%
S2
W10
S2
W10
S2
W10
S2
W10
S2
W10
S2
W10
S2
W4
W2
W1
W3
W10
S2
W4
W2
W1
W3S2
W10
S2
W10
S2
W10
S2
W10
S2
W10
S2
W10
S2
W10
W8
STA 6+28.95SAN MH 4RE 933.21IE 925.99 (W)IE 925.89 (S)
W10
S2
W10
S2
W10
S2
W10
S2
W10
S2
W10
S2
W10
S2
W10
S2
W10
S2
S2
W10
S2
W10
S2
W10
W3
W8
CB A4RE 933.33IE 929.72ST1
S2
W10
S2
W10
S2
W10
S2
W10
S2
W10
S2
W10
W2
W1
ST1
FES DIE 930.14
ST5
CBMH D2RE 933.59IE 930.56 W6
C7
C10
C9
SAN MH 5RE 934.25IE 924.32 (W)IE 924.22 (E)
S1
C6
W10
S2
W8
C5
W3
10.
5
'
10.5'
1
0
.
5
'
10.
5
'
W7
110
'
1
0
"
P
V
C
@
0
.
5
2
%
W10
S2
W10
S2
HW G2IE 929.90
ST4
C8
CB C2RE 932.99IE 929.67
W10
S2
CB A2RE 932.69IE 929.30
CB A1RE 932.69IE 929.26
C1
C2
ST1
37'
-
8
"
P
V
C
@ 2
.
7
6
%
STA 10+25SAN MH 4RE 934.19IE 926.19(S)
W7
W7
S2
W10
ST1
FES AIE 929.0
88' - 24" RCP @0.30%
24' - 24" HDPE@ 0.14%
84
'
-
1
8
"
H
D
P
E
@
0
.
1
2
%
19
0
'
-
1
5
"
H
D
P
E
@
0
.
1
7
%
HW J1IE 930.42
22' - 8" PVC@1.0%
ST4
28' - 8" PVC@ 1%
W8
W4
24' - 10" PVC @0.28%
10.5'
10
.
5
'
10.5
'
ST2
12.9'
155' - 12" PVC@ 0.22%
ST 5
ST 6
18' - 18" RCP@0.55%
ST 2
C11
C13
C12
3.
5
'
4.
8
'
C4
W10
S2
13'
MIN
.
W10
W8
S2
41' - 24" RCP @0.00%
FES F2IE 927.0
FES F1IE 927.0
ST6
ST5
A1 UTILITY PLAN
1" = 30'
9030
SCALE IN FEET
Know what's below.
Call before you dig.
R
DRW25001
PROJECT NO.
PRELIMINARY PLAT,
SITE PLAN, AND
REZONING REVIEW
04/20/26
NOT FO
R
CONST
R
U
C
T
I
O
N
SHEET
CERTIFICATION
REVISION DATE
ISSUE
PROJECT
D E S I G N
C I V I L E N G I N E E R I N G | L A N D S C A P E A R C H I T E C T U R E
3 1 0 4 T H A V E S O U T H , S U I T E 1 0 0 6
M I N N E A P O L I S , M N 5 5 4 1 5
www.elanlab.comp 612.260.7980
f 612.260.7990
1 2 3 4 5 6
E
D
C
B
A
I hereby certify that this plan, specification
or report was prepared by me, or under my
direct supervision, and that I am a duly
Licensed Professional Engineer under the
laws of the state of MINNESOTA.
Stephen M. Johnston
18914 04/20/2026
NOT FO
R
CONST
R
U
C
T
I
O
N
REGISTRATION NO.
DATE
ONEKA LAKE
RESERVE
HUGO, MN
ONEKA LAKE, LLC
DON WILLENBRING
2120 WUTHERING
HEIGHTS ROAD
EAGAN, MN 55122
651-363-3915
C-301
UTILITY PLAN
KEY NOTES
SANITARY SEWER
WATER MAIN
LEGEND
STORM SEWER>>
DOMESTIC WATER SERVICE
WITH CURB STOP||
SANITARY SEWER SERVICE
CATCH BASIN
STORM OR SANITARY MANHOLE
FLARED END SECTION
GATE VALVE
FIRE HYDRANT
W1
W2
W5
FIRE HYDRANT
6" GATE VALVE
8" X 8" TEE
W6 DEFLECT AT JOINTC4
C-504
C5
C-504
A1
C-504
S1 SANITARY MANHOLE
A2
C-504
S2 NEW 4" PVC SERVICE
A4
C-504
ST1
ST2 CATCH BASIN MANHOLE
WITH SUMP
A1
C-505
A2
C-505
ST3 STORM MANHOLE
WITH SUMP
A5
C-504
W3 8" GATE VALVE
W4 8" X 6" TEE
W7 8" - 22.5° BEND
W8 8" - 45° BEND
W10
NEW 1" SERVICE
GROUP CONSISTING
OF 1" CORP WITH SADDLE
1" COPPER (TYPE K) PIPE
& 1" CURB STOP W/ BOX
W11 EXISTING 1" SERVICE
GROUP TO BE ABANDONED
W12 EXISTING 1" SERVICE
GROUP TO BE USED
S3 EXISTING 4" PVC SERVICE TO BE
USED
S4 EXISTING 4" PVC SERVICE NOT
USED
CATCH BASIN MANHOLE
ST4
ST5
CONCRETE HEADWALL WITH
HAND PLACED RIP RAP ON
DOWNSTREAM END
A4
C-505
C2
C-505
W9 NOT USED
CROSSINGS
C1 BOTTOM STM 929.1 TOP WTR 925.5
C2 BOTTOM STM 929.1 TOP SAN 926.6
C3 BOTTOM STM 929.4 TOP WTR 925.8
C4 BOTTOM STM 929.6 TOP SAN 925.8
C5 BOTTOM WTR 926.2 TOP SAN 923.8
C6 BOTTOM STM 930.7 TOP SAN 923.4
CATCH BASIN WITH SUMP
RCP FLARED END SECTION WITH
RIP RAP
ST6 PILING FOR STORM SEWER
APRONS
C7 BOTTOM STM 930.4 TOP WTR 927.0
C8 BOTTOM STM 930.4 TOP SAN 925.0
C9 BOTTOM STM 930.4 TOP SAN 925.1
C10 BOTTOM STM 930.4 TOP WTR 926.4
C11 BOTTOM STM 929.1 TOP WTR 926.0
C12 BOTTOM STM 929.1 TOP WTR 925.5
C13 BOTTOM STM 929.1 TOP WTR 925.7
HEADWALL
C4
C-505
BU
I
L
D
I
N
G
S
E
T
B
A
C
K
PR
O
P
E
R
T
Y
L
I
N
E
25'1'6'8.2' - 8.4' VARIES
SURMOUNTABLE CURB
1.67%
LO
T
L
I
N
E
10.5'BITUMINOUS DRIVEWAY
PAVEMENT SECTION
PUBLIC
CONCRETE WALK
150TH STREET
VARIES
2% MINIMUM
ELEV 0.70
ELEV 0.60
TBC
ELEV 0.33
ELEV 0.00
0.
3
'
TO
P
S
O
I
L
GA
R
A
G
E
W
A
L
L
GFE ELEV VARIES
HOLD DOWN = GFE - 1.0'
FFE = GFE + 0.7'
22'
GA
R
A
G
E
W
A
L
L
SURMOUNTABLE CURB
1%
LO
T
L
I
N
E
10.5'BITUMINOUS DRIVEWAY
PAVEMENT SECTION
25.34' B-B
12.67'12.67'
2.75%2.75%
6'5'22'
CONCRETE WALK 10.5'
LO
T
L
I
N
E
0.
3
'
TO
P
S
O
I
L
VARIES
2% MINIMUM
ELEV 0.00
ELEV - 0.33 ELEV 0.00 TBC
ELEV 0.00
ELEV 0.10
ELEV 0.15
GA
R
A
G
E
W
A
L
L
GFE ELEV VARIES
HOLD DOWN = GFE - 1.0'
0.
3
'
TO
P
S
O
I
L
FFE = GFE + 0.7'
BU
I
L
D
I
N
G
W
A
L
L
PATIO AND STOOP
FFE = GFE + 0.7'
GFE ELEV VARIES
HOLD DOWN = GFE - 1.0'
FFE = GFE + 0.7'
FFE - 0.5
FFE - 0.6
18' PARKING STALL
VALLEY GUTTER - 0.33'
25.34' B-B
12.67'12.67'
2.75%2.75%VARIES
24' F-F
5'
2%
CONCRETE WALK
MINIMUM 6" TOPSOIL
B618 CURB & GUTTER
OR SURMOUNTABLE CURB
CL
B618 CURB & GUTTER
ELEV - 0.33ELEV 0.00
TOP OF BACK OF CURB
ELEV 0.00 SURMOUNTABLE
ELEV 0.17 B618 CURB
C-501
DETAILS
DRW25001
PROJECT NO.
PRELIMINARY PLAT,
SITE PLAN, AND
REZONING REVIEW
04/20/26
NOT FO
R
CONST
R
U
C
T
I
O
N
SHEET
CERTIFICATION
REVISION DATE
ISSUE
PROJECT
D E S I G N
C I V I L E N G I N E E R I N G | L A N D S C A P E A R C H I T E C T U R E
3 1 0 4 T H A V E S O U T H , S U I T E 1 0 0 6
M I N N E A P O L I S , M N 5 5 4 1 5
www.elanlab.comp 612.260.7980
f 612.260.7990
1 2 3 4 5 6
E
D
C
B
A
I hereby certify that this plan, specification
or report was prepared by me, or under my
direct supervision, and that I am a duly
Licensed Professional Engineer under the
laws of the state of MINNESOTA.
Stephen M. Johnston
18914 04/20/2026
NOT FO
R
CONST
R
U
C
T
I
O
N
REGISTRATION NO.
DATE
ONEKA LAKE
RESERVE
HUGO, MN
ONEKA LAKE, LLC
DON WILLENBRING
2120 WUTHERING
HEIGHTS ROAD
EAGAN, MN 55122
651-363-3915
SIDEWALK PAVEMENT SECTIONC2 NO SCALE
SEE PLAN FOR DIMENSION
B618 CURB & GUTTER AND SURMOUNTABLE CURBC1 NO SCALE
E4 NO SCALE
BITUMINOUS PAVEMENT SECTION
1.5" TYPE SP 9.5 BITUMINOUS WEAR COURSE
MIXTURE (2,C) SPWEA240C (PG 58-28), MNDOT 2360
12" APPROVED SUBGRADE
2.5" TYPE SP 12.5 BITUMINOUS NON-WEAR COURSE
MIXTURE (2,C) SPWEB230C (PG58-28), MNDOT 2360
2357 BITUMINOUS TACK COAT
8" AGGREGATE BASE (CLASS 5 OR
SALVAGED/RECYCLED MATERIAL MEETING
CLASS 5 GRADATION) MNDOT 3138
E5 NO SCALE
3.0" TYPE SP 9.5 BITUMINOUS
WEAR COURSE MIXTURE (2,B)
SPWEA240B (PG 58-26),
MNDOT 2360
COMPACTED SUBGRADE
6" AGGREGATE BASE
(MNDOT 3138 CL5)
24" SELECT GRANULAR MATERIAL) MNDOT
3138.2B2
B3 1" = 5'
TYPICAL CROSS SECTION AT 150TH STREET
A1 1" = 5'
TYPICAL CROSS SECTION
B1 1" = 5'
TYPICAL CROSS SECTION AT PARKING
NOT USED
NOT USED
6' PUBLIC
5' PRIVATE
E6 CURB TRANSITION
NO SCALE
SE
E
P
L
A
N
6" AT CURB
AND GUTTER
CONCRETE CURB
AND GUTTER
MATCH GEOMETRY OF
CURB AND GUTTER
8'-0"
6"
SEE PLAN UNLESS OTH
E
R
W
I
S
E
I
N
D
I
C
A
T
E
D
D5 NO SCALE
BOULDER RETAINING WALL AT RIP RAP
C4 NO SCALE
BOULDER RETAINING WALL
STOOP 934.55 WALK
LO
T
L
I
N
E
12" - 18" BOULDER WALL
1
2
FILL GAP BETWEEN PAVEMENT AND BOULDER WITH
GRAVEL MATCHED BOULDER MATERIAL
6" TOPSOILGRANULAR
BACKFILL
COMPACT
SUBGRADE
FINISHED GRADE
EOF
GEOTEXTILE FABRIC
932.55
6'
GEOTEXTILE
FABRIC
1
2
12" - 18" BOULDER AT 1:1
MAXIMUM SLOPE
GEOTEXTILE
FILTER FABRIC
1
1
4
1
1
1
4
1
RCP FLARED END SECTION
TOP OF RIP RAP BELOW
FES INVERT ELEVATION
CLASS II RIP RAP
GRANULAR BACKFILL
BITUMINOUS DRIVEWAY
PAVEMENT SECTION
SECTION A-A
SECTION B-B
12" - 18" BOULDER AT 1:1
MAXIMUM SLOPE
GEOTEXTILE
FILTER FABRIC
1
1
CLASS II RIP RAP
TOP OF RIP RAP BELOW
FES INVERT ELEVATION
GRANULAR BACKFILL
C-502
DETAILS
C1 SIGNAGE
NO SCALE
C4 ACCESSIBILITY CURB RAMP
NO SCALE
DRW25001
PROJECT NO.
PRELIMINARY PLAT,
SITE PLAN, AND
REZONING REVIEW
04/20/26
NOT FO
R
CONST
R
U
C
T
I
O
N
SHEET
CERTIFICATION
REVISION DATE
ISSUE
PROJECT
D E S I G N
C I V I L E N G I N E E R I N G | L A N D S C A P E A R C H I T E C T U R E
3 1 0 4 T H A V E S O U T H , S U I T E 1 0 0 6
M I N N E A P O L I S , M N 5 5 4 1 5
www.elanlab.comp 612.260.7980
f 612.260.7990
1 2 3 4 5 6
E
D
C
B
A
I hereby certify that this plan, specification
or report was prepared by me, or under my
direct supervision, and that I am a duly
Licensed Professional Engineer under the
laws of the state of MINNESOTA.
Stephen M. Johnston
18914 04/20/2026
NOT FO
R
CONST
R
U
C
T
I
O
N
REGISTRATION NO.
DATE
ONEKA LAKE
RESERVE
HUGO, MN
ONEKA LAKE, LLC
DON WILLENBRING
2120 WUTHERING
HEIGHTS ROAD
EAGAN, MN 55122
651-363-3915
NOTE:
CITY WILL PURCHASE SIGNS AND BILL
OWNER FOR COST. CONTRACTOR IS TO
COORDINATE INSTALLATION.
B3 NO SCALE
MAXIMUM SPACING 100'. ALSO USE WHEN ABUTTING BUILDINGS.
SPACING:5'
6'
WALK
WALK
- 5' C/C
- 6' C/C
1/4"R 1/4"R
JOINT SEALER
NON-BITUMINOUS JOINT FILLEREXPANSION JOINTTOOLED CONTROL JOINT
3"
C
A
P
O
R
4"
S
I
D
E
W
A
L
K
1/2"
1/
2
"
3/8"
1/8"4"
W
A
L
K
SE
E
N
O
T
E
1
FO
R
3
"
C
A
P
1"
FILLER
SEALER
SURFACE
PAVEMENT
JOINT
3/4"
BACKER
MATERIAL
JOINT
3/4"
D
W
MATERIAL
BACKER
D
CONSTRUCTION JOINT
JOINT SEALER
W
BACKER
T
D
CONTRACTION JOINT
MATERIAL
CRACK
INITIAL SAWCUT (1/8")
JOINT BOTTOM
OR INSERT
W = WIDTH OF SEALANT RESERVOIR (1/2" (MIN), 5/8" (MAX))
D = DEPTH OF SEALANT (1.0 TO 1.5W)
T = 1/4 SLAB THICKNESS
BUTTED JOINT
JOINT SEALER
ISOLATION/EXPANSION JOINT
NOTE:
TOP OF SEALANT WILL BE 1/8" TO 1/4" BELOW TOP OF PAVEMENT
SURFACE FOR EXTERIOR PAVEMENTS
1.
JOINT SEALANT
PAVEMENT
SURFACE
PAVEMENT
SURFACE
A3 NO SCALE
SIDEWALK JOINTSURMOUNTABLE CURB & GUTTER AT CATCH BASINA1 NO SCALE A5 NO SCALE
OVERFLOW WEIR
STORMWATER FACILITY
CLASS II RIP RAP
TOE OF SLOPE
SECTION B-B
GEOTEXTILE FABRIC TYPE
IV UNDER RIP RAP
DIRECTION OF FLOW
TOP OF BANK
TOE OF SLOPE
STORMWATER FACILITY
TOP OF BANK
12"
SECTION A-A
B
B
A A
11'4.5
EOF ELEVATION (0.05' +/-)
4.5
SLOPE DOWNSTREAM
END TOWARDS CENTER
TO CONTAIN FLOW
CLASS II RIP RAP
GEOTEXTILE FABRIC TYPE
IV UNDER RIP RAP
4" MINIMUM TOPSOIL
FULLY COMPACTED COHESIVE SOIL
4" MINIMUM TOPSOIL
TOP OF BERM BEYOND
C-503
DETAILS
DRW25001
PROJECT NO.
PRELIMINARY PLAT,
SITE PLAN, AND
REZONING REVIEW
04/20/26
NOT FO
R
CONST
R
U
C
T
I
O
N
SHEET
CERTIFICATION
REVISION DATE
ISSUE
PROJECT
D E S I G N
C I V I L E N G I N E E R I N G | L A N D S C A P E A R C H I T E C T U R E
3 1 0 4 T H A V E S O U T H , S U I T E 1 0 0 6
M I N N E A P O L I S , M N 5 5 4 1 5
www.elanlab.comp 612.260.7980
f 612.260.7990
1 2 3 4 5 6
E
D
C
B
A
I hereby certify that this plan, specification
or report was prepared by me, or under my
direct supervision, and that I am a duly
Licensed Professional Engineer under the
laws of the state of MINNESOTA.
Stephen M. Johnston
18914 04/20/2026
NOT FO
R
CONST
R
U
C
T
I
O
N
REGISTRATION NO.
DATE
ONEKA LAKE
RESERVE
HUGO, MN
ONEKA LAKE, LLC
DON WILLENBRING
2120 WUTHERING
HEIGHTS ROAD
EAGAN, MN 55122
651-363-3915
C1 TURBIDITY CURTAIN
NO SCALE
CONSTRUCTION ENTRANCE
1 1/2"
10"
FLOW
FLOW
FLOW
FLOW
EROSION CONTROL BLANKET
A.BURY THE TOP END OF
THE MATTING STRIPS IN A
TRENCH 6 INCHES OR
MORE IN DEPTH.
B.TAMP THE TRENCH FULL OF SOIL.
SECURE WITH ROW OF STAPLES,
10 INCH SPACING, 4 INCHES
DOWN FROM THE TRENCH.
C.OVERLAP - BURY UPPER END OF
LOWER STRIP AS IN "A" AND "B".
OVERLAP END OF TOP STRIP 18
INCHES AND STAPLE.
D. EROSION STOP - FOLD OF
MATTING BURIED IN SLIT
TRENCH AND TAMPED DOUBLE ROW
OF STAPLES.
NOTES:
1.APPLY LIME, FERTILIZER AND SEED BEFORE LAYING THE NET OR MAT.
2.START LAYING THE NET FROM THE TOP OF THE CHANNEL OR SLOPE AND UNROLL IT DOWN THE GRADE. ALLOW NETTING TO LAY LOOSELY ON THE SOIL
BUT WITHOUT WRINKLES - DO NOT STRETCH. MAT OR BLANKET - TYPE PRODUCT SHOULD PROVIDE AT LEAST 30% COVERAGE OF THE SURFACE WHERE IT
IS APPLIED.
3.TO SECURE THE NET, BURY THE UPSLOPE END IN A SLOT OR TRENCH NO LESS THAN 6 INCHES DEEP, COVER WITH SOIL, AND TAMP FIRMLY AS SHOWN.
STAPLE THE NET EVERY 12 INCHES ACROSS THE TOP END AND EVERY 3 FOOT AROUND THE EDGES AND BOTTOM. WHERE 2 STRIPS OF NET ARE LAID SIDE
BY SIDE, THE ADJACENT EDGES SHOULD BE OVERLAPPED 3 INCHES AND STAPLED TOGETHER. EACH STRIP OF NETTING SHOULD ALSO BE STAPLED DOWN
THE CENTER, EVERY 3 FOOT. DO NOT STRETCH THE NET WHEN APPLYING STAPLES.
4.TO JOIN TWO STRIPS, CUT A TRENCH AND ANCHOR THE END OF THE NEW NET. OVERLAP THE END OF THE PREVIOUS ROLL 18 INCHES, AS SHOWN, AND
STAPLE EVERY 12 INCHES JUST BELOW THE ANCHOR SLOT.
MAINTENANCE:
INSPECT ALL MULCHES PERIODICALLY, AFTER RAINSTORMS TO CHECK FOR RILL EROSION, DISLOCATION, OR FAILURE. WHEN EROSION IS OBSERVED, APPLY
ADDITIONAL MULCH. IF WASHOUT OCCURS, REPAIR THE SLOPE GRADE, RESEED, AND REINSTALL MULCH. CONTINUE INSPECTIONS UNTIL VEGETATION IS
FIRMLY ESTABLISHED.
TYPICAL STAPLES #8
GAUGE WIRE
PRESS ENDS 6 INCHES INTO
THE SOIL AROUND
STRUCTURES AND STAPLE
SECURELY
WHEN USING NETTING IN CHANNELS, ROLL OUT STRIPS OF
NETTING PARALLEL TO THE DIRECTION OF FLOW AND OVER THE
PROTECTIVE MULCH.
ALTERNATE - RUMBLE RACKS
ALTERNATE - FODS MAT
C3
SILT FENCE
NO SCALE
A1 NO SCALE A2 NO SCALE A4 NO SCALE
TREE PROTECTION FENCE
DRIPLINE
4-FT MIN
6-FT. HIGH TEMPORARY ORANGE CONSTRUCTION FENCE SHALL BE PLACED AT
THE DRIPLINE OF THE TREE TO BE SAVED. FENCE SHALL COMPLETELY ENCIRCLE
THE TREE(S). INSTALL FENCE POSTS USING PIER BLOCKS ONLY. AVOID DRIVING
POSTS OR STAKES INTO MAJOR ROOTS.
FOR ROOTS OVER 1-IN DIA. THAT ARE DAMAGED DURING CONSTRUCTION, MAKE
A CLEAN, STRAIGHT CUT TO REMOVE THE DAMAGED PORTION. ALL EXPOSED
ROOTS SHALL BE TEMPORARILY COVERED WITH DAMP BURLAP TO PREVENT
DRYING, AND SHALL BE COVERED WITH SOIL AS SOON AS POSSIBLE.
WORK WITHIN PROTECTION FENCE SHALL BE DONE MANUALLY. NO STOCKPILING
OF MATERIALS, VEHICULAR TRAFFIC, OR STORAGE OF EQUIPMENT OR
MACHINERY SHALL BE ALLOWED WITHIN THE LIMIT OF THE FENCING.
BOTTOM
WATER SURFACE
ANCHOR CABLE
CARRIER FLOAT
STEEL TENSION CABLE
VA
R
I
A
B
L
E
D
E
P
T
H
12
"
ANCHOR CURTAIN WEIGHT
VARIABLE LENGTH
CURTAIN FABRIC
FLOATATION SILT CURTAIN
STILL WATER TYPE
AP
P
R
O
X
.
2
0
'
STREAM, LAKE OR MARSH
PLAN VIEW
SIDE VIEW
CURRENT
D1 NO SCALE
DITCH CHECKC6 NO SCALE
POINT A
POINT B
SEDIMENT LOG
SEDIMENT
LOG WOOD
STAKESFLOW
PLAN
1.SEDIMENT LOG SHALL CONSIST OF STRAW OR FIBERS ENCASED IN AN OUTSIDE OPEN WEAVE
CONTAINMENT FABRIC.
2.SEDIMENT LOG SHALL BE INSTALLED IN ACCORDANCE WITH
THE MANUFACTURER'S INSTRUCTIONS.
3.POINT A SHALL BE HIGHER THAN POINT B TO ENSURE THAT
WATER FLOWS OVER THE CHECKS AND NOT AROUND THE ENDS.
1
TURF REINFORCEMENT MAT
SEE 6/C-501
EROSION CONTROL BLANKET
INSTALL ECB IN ACCORDANCE WITH THE
MANUFACTURER'S INSTRUCTIONS.
NOTES:
SECTION
INLET PROTECTION
ANCHOR
POINT A
C-504
DETAILS
DRW25001
PROJECT NO.
PRELIMINARY PLAT,
SITE PLAN, AND
REZONING REVIEW
04/20/26
NOT FO
R
CONST
R
U
C
T
I
O
N
SHEET
CERTIFICATION
REVISION DATE
ISSUE
PROJECT
D E S I G N
C I V I L E N G I N E E R I N G | L A N D S C A P E A R C H I T E C T U R E
3 1 0 4 T H A V E S O U T H , S U I T E 1 0 0 6
M I N N E A P O L I S , M N 5 5 4 1 5
www.elanlab.comp 612.260.7980
f 612.260.7990
1 2 3 4 5 6
E
D
C
B
A
I hereby certify that this plan, specification
or report was prepared by me, or under my
direct supervision, and that I am a duly
Licensed Professional Engineer under the
laws of the state of MINNESOTA.
Stephen M. Johnston
18914 04/20/2026
NOT FO
R
CONST
R
U
C
T
I
O
N
REGISTRATION NO.
DATE
ONEKA LAKE
RESERVE
HUGO, MN
ONEKA LAKE, LLC
DON WILLENBRING
2120 WUTHERING
HEIGHTS ROAD
EAGAN, MN 55122
651-363-3915
HYDRANTC4 NO SCALE
VALVE BOXC5 NO SCALE
ENGINEERED FILL: SEE
SPECIFICATIONS FOR BACKFILL AND
COMPACTION REQUIREMENTS
ENGINEERED FILL: 1" MAX PARTICLE
SIZE. SEE SPECIFICATIONS FOR
BACKFILL AND COMPACTION
REQUIREMENTS
6" MIN
12" MAX
12
"
6"
LINE OF TRENCH
BEDDING MATERIAL (SEE SPECS)
SHAPE TRENCH TO MATCH BELL
SECTIONS
BEDDING MATERIAL (SEE SPECS)
LINE OF BEDDING IN ROCK (8" SAND
BASE IN ROCK FOUNDATION)4" TYP (8" @ ROCK EXCAVATION)
1
1
D1 PVC/HDPE PIPE BEDDING
NO SCALE
WATER SERVICESA1 NO SCALE
SANITARY MANHOLEA2 NO SCALE
SANITARY SERVICEA4 NO SCALE
CATCHBASIN MANHOLE/ STORM MANHOLE WITH 3' SUMPA5NO SCALE
C2 NO SCALE
THRUST RESTRAINT
USE R-1792-GG CASTING FOR STORM MANHOLE
C-505
DETAILS
DRW25001
PROJECT NO.
PRELIMINARY PLAT,
SITE PLAN, AND
REZONING REVIEW
04/20/26
NOT FO
R
CONST
R
U
C
T
I
O
N
SHEET
CERTIFICATION
REVISION DATE
ISSUE
PROJECT
D E S I G N
C I V I L E N G I N E E R I N G | L A N D S C A P E A R C H I T E C T U R E
3 1 0 4 T H A V E S O U T H , S U I T E 1 0 0 6
M I N N E A P O L I S , M N 5 5 4 1 5
www.elanlab.comp 612.260.7980
f 612.260.7990
1 2 3 4 5 6
E
D
C
B
A
I hereby certify that this plan, specification
or report was prepared by me, or under my
direct supervision, and that I am a duly
Licensed Professional Engineer under the
laws of the state of MINNESOTA.
Stephen M. Johnston
18914 04/20/2026
NOT FO
R
CONST
R
U
C
T
I
O
N
REGISTRATION NO.
DATE
ONEKA LAKE
RESERVE
HUGO, MN
ONEKA LAKE, LLC
DON WILLENBRING
2120 WUTHERING
HEIGHTS ROAD
EAGAN, MN 55122
651-363-3915
A1
RECTANGULAR CATCH BASIN (RCB)
NO SCALE
24"MAX.6"MAX.
"L"
SIZE OF PIPE BARS BOLTS "L"
4"12" TO 42"1"3/4"
6"48" TO 72"1-1/4"1"12"
MIN.
TIE THE LAST 6 JOINTS ON INLET AND OUTLET PIPES AND
BED IN GRANULAR MATERIAL. ANY COVER LESS THAN 2'
OVER TOP OF PIPE SHALL BE GRANULAR MATERIAL.
USE 2 TIE BOLT FASTENERS PER JOINT
INSTALLED AT 60 DEG FROM TOP OR BOTTOM
OF PIPE.
USE 5/8" TIE FOR PIPE SIZES 12" TO 27".
USE 3/4" TIE FOR PIPE SIZES 30" TO 66".
USE 1" TIE FOR PIPE SIZES OVER 72".
NUTS AND WASHERS ARE NOT REQUIRED ON
PIPE SIZE LESS THAN 24".
TRASH GUARDS REQUIRED ON ALL PIPES.
PLACE NONWOVEN GEOTEXTILE FABRIC UNDER
CABLED CONCRETE AND EXTENDING 1' UNDER
FES
A2 CONCRETE HEADWALL
NO SCALE
PROVIDE 3 CLIPS TO FASTEN TRASH GUARD TO F.E.S. HOT DIP
GALVANIZE AFTER FABRICATION.
A4
RECTANGULAR CATCH BASIN (RCB)
NO SCALEWITH SUMP
C1
RIP RAP
NO SCALE C2
RCP FLARED END SECTION
NO SCALE
PILING FOR STORM SEWER APRONSC4 NO SCALE
PERENNIAL PLANTING
(TYP)
TREE GUARDS
(TYP)
DECIDUOUS TREE
PLANTING (TYP)
SHRUB
PLANTING (TYP)
A1
L-501
SOD AT
HARDSCAPE
(TYP)
EXISTING TREES
EXISTING TREES
CONIFEROUS TREE
PLANTING
(TYP)
EDGING AT PLANTING
BED (TYP)
D1
L-501
D3
L-501
E3
L-501
B3
L-501
B1
L-501
C3
L-501
EXISTING TREES
PARK
PARK IMPROVEMENTS TO BE
CONSTRUCTED BY OTHERS
SNOW STORAGE
EXISTING STORM BASIN
EXPANDED
STORMWATER
BASIN
FOREBAY
15
0
T
H
S
T
R
E
E
T
N
GENERATION
AVENUE N
1 LANDSCAPE PLAN
1" = 30'
9030
SCALE IN FEET
Know what's below.
Call before you dig.
R
DRW25001
PROJECT NO.
PRELIMINARY PLAT,
SITE PLAN, AND
REZONING REVIEW
04/20/26
NOT FO
R
CONST
R
U
C
T
I
O
N
SHEET
CERTIFICATION
REVISION DATE
ISSUE
PROJECT
D E S I G N
C I V I L E N G I N E E R I N G | L A N D S C A P E A R C H I T E C T U R E
3 1 0 4 T H A V E S O U T H , S U I T E 1 0 0 6
M I N N E A P O L I S , M N 5 5 4 1 5
www.elanlab.comp 612.260.7980
f 612.260.7990
1 2 3 4 5 6
E
D
C
B
A
NOT FO
R
CONST
R
U
C
T
I
O
N
I hereby certify that this plan was prepared
by me, or under my direct supervision, and
that I am a duly Licensed Landscape
Architect under the laws of the state of
MINNESOTA.
Pilarsinee Saraithong
REGISTRATION NO.XX/XX/2020
DATE
45059
ONEKA LAKE
RESERVE
HUGO, MN
ONEKA LAKE, LLC
DON WILLENBRING
2120 WUTHERING
HEIGHTS ROAD
EAGAN, MN 55122
651-363-3915
L-101
LANDSCAPE PLAN
REQUIRED PROPOSED
VALUE MIN. 1% COST OF IMPROVEMENTS RESIDENTIAL & PARK IMPROVEMENTS ABOVE 1%
1 OVERSTORY DECIDUOUS TREE / UNIT 50 50 - 2.5" DECIDUOUS TREES + SAVED 2 EXISTING TREES + 13 ADDITIONAL POND SCREENING + 12 ADDITIONAL OUTLOT TREES
1 CONIFEROUS TREE/ UNIT 50 50 - 6' HT CONIFEROUS TREES + SAVED 21 EXISTING TREES + 43 ADDITIONAL WEST PROPERTY SCREENING TREES
1 ORNAMENTAL TREE / 1,000 SF OF BUILDING (57,600/1,000)58 58 - 1.5" ORNAMENTAL TREES
OR
1 ORNAMENTAL TREE/ 100 LF SITE PERIMETER (2,207/100)22
1 SHRUB/ 200 SF OF BUILDING (57,600/200)288 448 SHRUBS
1 SHRUB/ 30 LF SITE PERIMETER (2,207/30) 74
LANDSCAPE SUMMARY LEGEND
SOD
EXISTING TREE TO REMAIN
TURF SEEDED
SEE SHEET C-200 FOR SEEDING NOTES
STORMWATER SEEDING
SEE SHEET C-200 FOR SEEDING NOTES
TALL GRASS SEEDING
SEE SHEET C-200 FOR SEEDING NOTES
L-501
LANDSCAPE DETAILS
DRW25001
PROJECT NO.
PRELIMINARY PLAT,
SITE PLAN, AND
REZONING REVIEW
04/20/26
NOT FO
R
CONST
R
U
C
T
I
O
N
SHEET
CERTIFICATION
REVISION DATE
ISSUE
PROJECT
D E S I G N
C I V I L E N G I N E E R I N G | L A N D S C A P E A R C H I T E C T U R E
3 1 0 4 T H A V E S O U T H , S U I T E 1 0 0 6
M I N N E A P O L I S , M N 5 5 4 1 5
www.elanlab.comp 612.260.7980
f 612.260.7990
1 2 3 4 5 6
E
D
C
B
A
NOT FO
R
CONST
R
U
C
T
I
O
N
I hereby certify that this plan was prepared
by me, or under my direct supervision, and
that I am a duly Licensed Landscape
Architect under the laws of the state of
MINNESOTA.
Pilarsinee Saraithong
REGISTRATION NO.XX/XX/2020
DATE
45059
ONEKA LAKE
RESERVE
HUGO, MN
ONEKA LAKE, LLC
DON WILLENBRING
2120 WUTHERING
HEIGHTS ROAD
EAGAN, MN 55122
651-363-3915
D1 DECIDUOUS TREE PLANTING
NO SCALE
TREE WRAP TO FIRST BRANCH
MOUND SUBGRADE
SCARIFY BOTTOM PRIOR
TO PLANTING
CUT AND REMOVE TOP 1/3 BURLAP (MIN.),
WIRE BASKET, AND ALL NYLON CORD
16" POLYPROPYLENE OR POLYETHYLENE,
40 MIL, 1-1/2" WIDE STRAP
PLANTING PIT 2-3 X DIA. OF SOIL BALL
DUG & TILLED PIT 3-5 X DIA. OF SOIL BALL
MULCH DISH
MULCH, EDGING, & DISH RING
(SEE LANDSCAPE NOTES)
ROOT FLARE AT FINISHED GRADE OR
FIRST MAJOR BRANCHING ROOT
AT 1 INCH BELOW SOIL LINE
DOUBLE STRAND 14 GA. WIRE
& 3 STEEL STAKES AT 120 DEGREE
INTERVALS
NOTES
MAINTAIN TREE IN PLUMB POSITION THROUGHOUT THE
WARRANTY PERIOD (SEE SPECIFICATIONS).
TREE STAKING AND ITS METHOD ARE OPTIONAL TO
CONTRACTORS. TWO ALTERNATIVES ARE SHOWN.
ONE FLAG PER WIRE
COMPACT PLANTING SOIL
PLANTING SOIL
(SEE LANDSCAPE NOTES)
MULCH
(SEE LANDSCAPE NOTES)
EDGING
(SEE LANDSCAPE NOTES)
PLANTING SOIL
(SEE LANDSCAPE NOTES)
SCARIFY SIDES AND BOTTOM
PRIOR TO PLANTING
MULCH
(SEE LANDSCAPE NOTES)
SET TOP OF ROOT 1" ABOVE GRADE
MAKE SAUCER AROUND PLANTS
EDGING
(SEE LANDSCAPE NOTES)
SEE PLAN AND PLANT SCHEDULE FOR SPACING
12" MIN.
6"
M
I
N
.
PROVIDE PLANTING BED
12" MIN. AROUND PLANTS
HOLD SODDED AREA 1" BELOW
PAVING SURFACE
PLANTING SOIL
WATER & TAMP TO REMOVE AIR POCKETS
REMOVE ALL POT AND ALL PLASTIC
LOOSEN ROOTS PRIOR TO PLANTING
E3 SHRUB PLANTING
NO SCALE
C3 EDGING AT PLANTING BED
NO SCALE
D3 PERENNIAL PLANTING
NO SCALE
B3 SOD AT HARDSCAPE EDGE
NO SCALE
8' STEEL STAKE INSTALL ON THE SIDE
OF PREVAILING WIND
B1 CONIFEROUS TREE PLANTING
NO SCALE
SCARIFY SIDES OF PIT
PRIOR TO PLANTING
MOUND SUBGRADE
SCARIFY BOTTOM PRIOR
TO PLANTING
CUT AND REMOVE TOP 1/3 BURLAP (MIN.),
WIRE BASKET, AND ALL NYLON CORD
16" POLYPROPYLENE OR POLYETHYLENE,
40 MIL, 1-1/2" WIDE STRAP
PLANTING PIT 2-3 X DIA. OF SOIL BALL
DUG & TILLED PIT 3-5 X DIA. OF SOIL BALL
MULCH DISH
MULCH, EDGING, & DISH RING
(SEE LANDSCAPE NOTES)
ROOT FLARE AT FINISHED GRADE OR
FIRST MAJOR BRANCHING ROOT
AT 1 INCH BELOW SOIL LINE
DOUBLE STRAND 14 GA. WIRE
& 3 STEEL STAKES AT 120 DEGREE
INTERVALS
NOTES
MAINTAIN TREE IN PLUMB POSITION THROUGHOUT THE
WARRANTY PERIOD (SEE SPECIFICATIONS).
TREE STAKING AND ITS METHOD ARE OPTIONAL TO
CONTRACTORS. TWO ALTERNATIVES ARE SHOWN.
ONE FLAG PER WIRE
COMPACT PLANTING SOIL
PLANTING SOIL
WATER & TAMP TO REMOVE AIR POCKETS
8' STEEL STAKE INSTALL ON THE SIDE
OF PREVAILING WIND
SCARIFY SIDES OF PIT
PRIOR TO PLANTING
LOOSEN ROOTS
PRIOR TO PLANTING
18
"
M
I
N
.
SCARIFY SIDES AND BOTTOM
PRIOR TO PLANTING
12" MIN.
PROVIDE PLANTING BED
12" MIN. AROUND PLANTS
MAKE SAUCER AROUND PLANTS
TOPSOIL
(SEE LANDSCAPE NOTES)
PLANTING SOIL
(SEE LANDSCAPE NOTES)
MULCH
(SEE LANDSCAPE NOTES)
EDGING (SEE LANDSCAPE NOTES)
TOP OF EDGING TO BE MAXIMUM
1/2" ABOVE SURFACE MATERIAL
12" MIN.
PROVIDE PLANTING BED
12" MIN. AROUND PLANTS
INSTALL STAKES PER
MANUFACTURER'S INSTALLATION
GUILDLINES
TOP OF MULCH 2" BELOW TOP
OF PAVEMENT
24" MIN. TO PAVEMENT
UV INHIBITOR-TREATED WHITE EXTERIOR
WITH BLACK INNER SURFACE
A1 TREE GUARDS
NO SCALE
3" MIN.- 8" DIAMETER
2-PLY CORRUGATED HDPE GUARDS
36
"
M
I
N
.
OR
T
O
F
I
R
S
T
B
R
A
N
C
H
SET BOTTOM FIRMLY IN SOIL
LANDSCAPE NOTES
1.LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR FINISHED GRADING AND POSITIVE SURFACE
DRAINAGE IN ALL LANDSCAPE AREAS. LANDSCAPE CONTRACTOR MUST ENSURE THAT THE
FINAL GRADES ARE MET AS SHOWN ON GRADING PLAN. IF ANY DISCREPANCIES ARE FOUND,
IMMEDIATELY NOTIFY LANDSCAPE ARCHITECT FOR RESOLUTION.
2.ALL PLANT MATERIALS ARE TO CONFORM WITH STATE & LOCAL CONSTRUCTION STANDARDS
AND THE CURRENT ADDITION OF THE AMERICAN ASSOCIATION OF NURSERYMEN STANDARDS.
ALL PLANT MATERIALS ARE TO BE HEALTHY, HARDY STOCK, AND FREE FROM ANY DISEASES,
DAMAGE, AND DISFIGURATION.
3.QUANTITIES OF PLANTS LISTED ON THE PLAN ARE TO GOVERN ANY DISCREPANCY BETWEEN
THE QUANTITIES SHOWN ON THE PLANT SCHEDULE AND PLAN. PLACE PLANTS IN PROPER
SPACING FOLLOWING LAYOUT FIGURES.
4.TOPSOIL TO BE MNDOT 3877.2B LOAM TOPSOIL BORROW FOR LANDSCAPED AREAS AND
PLANTING BEDS. PROVIDE ROOTING TOPSOIL BORROW MNDOT 3877.2E FOR PLANT
RESTORATION, WATER QUALITY, AND FILTRATION PLANTING.
5.SPREAD PLANTING SOIL AT MINIMUM EIGHTEEN (18) INCH DEEP IN ALL PLANTING BEDS PRIOR TO
PLANTING. THOROUGHLY WATER TWICE TO FACILITATE CONSOLIDATION PRIOR TO PLANTING.
DO NOT OVERLY COMPACT SOIL. PLANTING SOIL TO HAVE A PH BETWEEN 6.5-7.5, BE FREE OF
CHEMICAL CONTAMINANTS, DEBRIS, LARGE ROCKS GREATER THAN 1/ 2" DIAMETER, AND
FRAGMENTS OF WOOD. SUBSOIL SHALL BE SCARIFIED TO A DEPTH OF 4" BEFORE PLANTING
SOIL IS SPREAD.
6.MULCH TO BE SHREDDED HARDWOOD BARK MULCH (MNDOT 3882 TYPE 6), CONSISTED OF RAW
WOOD MATERIAL FROM TIMBER AND BE A PRODUCT OF A MECHANICAL CHIPPER, HAMMER MILL,
OR TUB GRINDER. THE MATERIAL SHALL BE SUBSTANTIALLY FREE OF MOLD, DIRT, SAWDUST,
AND FOREIGN MATERIAL AND SHALL NOT BE IN AN ADVANCED STATE OF DECOMPOSITION. THE
MATERIAL SHALL NOT CONTAIN CHIPPED UP MANUFACTURED BOARDS OR CHEMICALLY
TREATED WOOD, INCLUDING, BUT NOT LIMITED TO, WATER BOARD, PARTICLE BOARD, AND
CHROMATED COPPER ARSENATE (CCA) OR PENTA TREATED WOOD. THE MATERIAL SHALL BE
TWICE-GROUND/ SHREDDED, SUCH THAT; NO INDIVIDUAL PIECE SHALL EXCEED 2 INCHES IN ANY
DIMENSION.
7.APPLY FOUR (4) INCH DEPTH OF SHREDDED HARDWOOD BARK MULCH IN FOUR (4) FOOT
DIAMETER RING AROUND ALL TREES.
8.EDGE ALL SHRUB BEDS WITH 3/16" X 4" MILL FINISHED ALUMINUM EDGING WITH STAKES. ALL
EDGING TO BE COMMERCIAL GRADE.
9.APPLY THREE (3) INCH DEPTH OF SHREDDED HARDWOOD BARK MULCH IN ALL SHRUB AREAS
AND APPLY TWO (2) INCH DEPTH OF SHREDDED HARDWOOD BARK MULCH IN PERENNIAL AREAS.
PRIOR TO MULCHING, APPLY PRE-EMERGENT HERBICIDE TO ALL PLANTING BEDS.
10.APPLY FOUR (3) INCH DEPTH OF 1 - 1 1/2 INCH DARK GRAY TRAP ROCK MULCH OVER
GEOTEXTILE FABRIC IN ALL MAINTENANCE STRIPS.
11.APPLY PRE-EMERGENT TO MULCH IN PLANTING AREAS TO PROHIBIT WEED GROWTH.
APPLICATION RATE TO BE PER MANUFACTURER'S RECOMMENDATIONS. IF WEEDS APPEAR IN
TREATED AREAS DURING THE FIRST YEAR, LANDSCAPE CONTRACTOR TO REMOVE ALL WEEDS
AT NO ADDITIONAL COST.
12.ALL TREES ADJACENT TO VEHICULAR AND PEDESTRIAN CIRCULATION SHALL HAVE LOWER
BRANCH AT 6 FEET MINIMUM ABOVE PAVEMENT.
13.THE ENTIRE LANDSCAPE AREAS SHALL BE IRRIGATED WITH AN UNDERGROUND IRRIGATION
SYSTEM. NO WATER IS ALLOWED ON ANY PAVEMENT, PARKING, WALKWAY, AND BUILDING. THE
IRRIGATION CONTRACTOR IS TO DESIGN AND SUBMIT SHOP DRAWING OF IRRIGATION DESIGN
AND CALCULATIONS TO LANDSCAPE ARCHITECT FOR REVIEW 5 DAYS PRIOR TO PURCHASING
AND INSTALLATION. IRRIGATION DESIGN IS TO MEET ALL CITY AND STATE PLUMBING CODES
AND REQUIREMENTS.
14.FOLLOW LANDSCAPE DETAILS FOR ALL INSTALLATION, UNLESS OTHERWISE NOTED.
15.LANDSCAPE CONTRACTOR SHALL MAINTAIN PLANTS IN HEALTHY CONDITION THROUGHOUT
WARRANTY PERIOD. THE WARRANTY PERIOD IS TWO FULL YEARS FROM DATE OF PROVISIONAL
ACCEPTANCE UNTIL FINAL ACCEPTANCE. WARRANTY PERIOD FOR PLANT MATERIAL INSTALLED
AFTER JUNE 1ST SHALL COMMENCE THE FOLLOWING YEAR.
PLANT SCHEDULE
SUBSTITUTIONS: IF ANY SUBSTITUTIONS ARE REQUIRED, SUBMIT WRITTEN DOCUMENTS AND PROPOSED SUBSTITUTIONS TO
LANDSCAPE ARCHITECT FOR APPROVAL 5 DAYS PRIOR TO PURCHASE AND/OR INSTALLATION. NO MORE
THAN 1/3 OF PROPOSED TREES CAN BE THE SAME SPECIES.
6'H X 5'WHYDRANGEA PANICULATA
'SMNHPPH'
LIMELIGHT
HYDRANGEA
ACER X FREEMANII
'BAILSTON'
MATADOR
MAPLE
B&B 50'H X 25'WTILIA AMERICANA
'BOULEVARD'
2.5" CAL.BOULEVARD LINDEN
QUANT.KEY COMMON NAME SCIENTIFIC NAME SIZE ROOT
COND.
DECIDUOUS TREES
EVERGREEN TREES
MATURE
SIZE
SHRUBS
6' HT.B&B 60'H X 25'WPINUS STROBUSEASTERN
WHITE PINE
3 GAL.2'H X 2'WPOTBERERIS THUNBERGII
'NCBT1'
SUNJOY MINI MAROON
BARBERRY
6' HT.B&B 50'H X 20'WPINUS SYLVESTRISAUSTRIAN PINE
B&B 50'H X 40'WQUERCUS BICOLOR 2.5" CAL.SWAMP WHITE
OAK
PERENNIALS
NEPETA FAASSENII
'WALKER'S LOW'
WALKER'S LOW
CATMINT
HEMEROCALLIS
'RUBY STELLA'
RUBY STELLA
DAYLILY
CALAMAGROSTIS ACUTIFLORA
'KARL FOERSTER'
KARL FOERSTER
FEATHER REED GRASS
3'H X 2'W1 GAL POT
2'H X2'W1 GAL POT
1.5'H X 1.5'W1 GAL POT
HOSTA
'STAINED GLASS'
STAINED GLASS
HOSTA
1.5'H X 3'W1 GAL POT
B&B 40'H X 20'WGLEDITSIA TRICANTHOS
VAR INERMIS 'DRAVES'
2.5" CAL.STREET KEEPER
HONEYLOCUST
352
12
ORNAMENTAL TREES
1.5" CAL.B&B 20'H X 15'WMALUS
'PRAIRIEFIRE'
PRAIRIEFIRE
FLOWERING CRAB
11
320
6' HT.B&B 30'H X 8'WPICEA ABIES
'CURPRESSINA'
CUPRESSINA
NORWAY SPRUCE
10
B&B 45'H X 25'W2.5" CAL.
B&B 25'H X 25'WSYRINGA RETICULATAJAPANESE TREE
LILAC
13
15
AMELANCHIER X GRANDIFLORA
'AUTUMN BRILLIANCE'
AUTUMN BRILLIANCE
SERVICEBERRY
B&B 25'H X 20'W
1.5" CAL.
PRUNUS MAACKIIAMUR CHOKECHERRY B&B 20'H X 20'W
6' CLUMP
B&B 40'H X 20'WGINKGO BILOBA
'PNI2420'
2.5" CAL.PRINCETON SENTRY
GINKGO
60
30
24
11
12
12
POT5 GAL.
3 GAL.3'H X 3'WPOTSPIRAEA JAPONICA
'NEON FLASH'
NEON FLASH
SPIREA
TEXAS X MEDIA
'TAUNTONII'
TAUNTON SPREADING
YEW
4'H X 4'WPOT5 GAL.
12
15
15
12
9
6' HT.B&B 30'H X 15'WTHUJA OCCIDENTALISWHITE CEDAR18
1.75" CAL.B&B 30'H X 20'WPOPULUS TREMULOIDESQUAKING ASPEN
12'H X 8'WSYRINGA VULGARISCOMMON PURPLE
LILAC
POT7 GAL.14
1.5" CAL.B&B 20'H X 15'WCRATAEGUS
CRUS-GALLI INERMIS
THORNLESS COCKSPUR
HAWTHORN
12
6' HT.B&B
45'H X 20'WPICEA GLAUCA
'DENSATA'
12
6' HT.B&B
40'H X 20'WABIES CONCOLORCONCOLOR FIR
33
1.5" CAL.
133
251
80
BLACK HILLS
SPRUCE
A2 1" = 30'
LANDSCAPE FOUNDATION PLANTING - 4 UNIT
4 UNIT PLANTING 3 UNIT PLANTING 2 UNIT PLANTING
|
|
|
>
>
>
>
>
>
>>>>>>>>>>
>>
>>
|
|
|
|
||
||
>>>>>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
||
||
>
>
|
|
|
>
>
>
>
>
>
>>>>>>>>>>
>>
>>
|
|
|
|
||
||
>>>>>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
||
||
>
>
Re-Use Pump
10 1012 12
15
12 12 12 12 15 12 12 15 12
1515
15
12 12
1515
15
15
15
15
15 15
15
15
15
15 15
15
12 12
1515
15
15
15
15
15
15
15
15
15
10
10
10
12
15
15
15
15 15
1212 12 12 15 12 12
15
12 12
15
12
12
12
12
12
15
15
15
12
12
15
12
12
15
1.5 1.5
2.5 2.5
1.5 1.5 1.5
1.52.5
2.52.5
15
15
15
15
8
8
15
15
15
12S
S
12
10
S
S
S
15
15
12
12
10
15
1512
12
12
15
15
12
12
8 8888
1515
15
12
1515
15
12
888888
12
12
15 10
15
1515
15
12
15
1515
1010101015
15151515151515
15
12
12
15
15
15
15
15
12
15 15
1515
12 10 10 12
12 12
15
15
12
12
15
15
15
15 15
12
R
L
R
S
R
L
R
L
L
R
S
15
15 15
12
15 15
1515
15 15
10 10
12 12
12
15
15
12
12
10
1010
12
10
1010
12
10
15 15
15 15
15
1515
15
10
10 10
10
15
15
15
15
15
1515
12
15
15
15
15
15
15
15
15
15
15
12 12
S S
S
L
S S S S S S S S S S S S S S S
S
S
S
S
S
S
S
S
S
15
15
15
15
15 15
15
12
12
12
12
12
15
15
15
12
12
12
12
12
12
12
15
1515
12
1515
15 15
15
1515
15
10 10
1010
15
1515
15
15
12
12
12
12
12
12
12
12
12
12
1212
12
12
15
10 10 10
15 15
15 12
10
15
15 15
12
17
17
17
15
15
15
12
12
12
10
10
17
17
17
15
R
L
S S L R
R
S
S
15
15
15
15
15
15
15
15
15
15
12
12
12
15 15
15
15
15 15 15
15 15
12 12 12
S S 12
12
12 12 12
1515
15
12
1515
15
12
RL L RSS
15
15
15
151515
15 15 15
15
15
12
RL
S
S S
S
1515
15 15
12 12 12
15
12 12 12 12 12 12 12
15
10
12
12
12
1515
15
15
15
12
15
15
L
15
15
15
15
15
15
R
S
S
L
R
15
15
15
12
15
15
15
10
12
15
15
15
15
15
12
S
1212
15
15
15
12
12
15
15
15
15
1515
15
15
15
15
15
15
15
12
12
15
1515
15
15
15
15
10
15
15
15
15
15
R
L
S
S
R
L
L
R
S
S
S
S
15
15
15
15
15
15
15
15
15
15
15
15
15
R
L
R
L
R
S
L
S
S S S S
L
R
S
12
12
15 10
15
10
151515
15
1515
15
15
15
15
12
R
L
10
10
10
10
10
10
1515
1515
15
15 15
15
10 10 10
1010
15
15
15
15
15
15
15
12
12
15
12
12 12
S S
1515
15 15
S
10
10
10
10
10
15
15
15
12
fs mv
114"
114"
1"
1"
1"
1"
1"114"
114"112"112"2"
1"
114"
1"
112"
1"
1"
114"
1"
114"
112"
112"
1"
114"
114"1"
112"
1"
1"
114"
114"1"
112"
1"
1"
1"
114"
114"
112"
1"
1"
114"
114"
1"
1"
114"
112"
112"
1"
114"
112"
1"
114"
114"
1"
1"
1"114"1"
1"
1"
1"
114"
1"
1"
1"
1"
112"
1"
1"
112"
1"
112"
1"
1"
114"
114"
1"
C
dm
td
rs
2"
2"
212"3"
212"112"
1"
1"114"1"
114"
2"
212"
1"
1"
114"
114"
3"
1"
1"
112"
1"
1"
1"
114"
1"
1"
1"
1"
114"
1"114"
212"
112"
1"1"
112"
1"114"
1"
1"
2"2"
2"
2"
2"
2"
2"2"2"
2"
2"
2"2"
2"
2"
2"2"
2"
4"
2"
2"
2"
2"
2"
2"
2"
2"
2"
2"
2"
4"2"
2"
2"
2"
2"2"
2"2"
2"
2"2"
2"
2"
2"
2"
2"
2"
4"
4"
2"
2"
2"
2"
2"
1"
1"
114"
114"
1"
1"
112"1"
114"
1"
1"
114"
1"
1"
114"
1"1"
1"
1"114"
1"1"
114"
114"
114"
2"
1"
112"
112"
114"
114"
1"
114"
112"
3"
114"
1"
1"
1"
114"
1"
114"
1"
1"
1"1"
114"
1"1"
114"
3"
3"
2
30.2112"
112"
3
20.2112"
1
31.5112"
5
24.7112"
6
30.7112"
7
22.5112"
8
33.2112"
9
34.5112"
10
23.7112"
11
19.7112"
12
23.6112"
13
16.1112"
14
19.5112"
15
17.5112"
16
20.2112"
17
30.6112"
18
23.0112"
19
28.5112"
20
24.4112"
21
31.8112"
22
31.2112"
23
21.3112"
24
16.3112"
1"
1"
114"
25
21.8112"
26
30.7112"
27
16.91"28
15.31"
29
9.81"
30
16.11"
31
22.1112"
32
9.81"
33
19.31"
34
25.7112"
35
33.0112"
36
19.9112"
37
31.5112"
114"
112"1"6"
6"
PAGE:
DA
T
E
:
DR
A
W
N
B
Y
:
DE
S
I
G
N
B
Y
:
DE
S
I
G
N
#
:
SCALE:
OF
Ou
t
d
o
o
r
L
i
g
h
t
i
n
g
Ir
r
i
g
a
t
i
o
n
D
o
c
t
o
r
I
n
c
Wa
t
e
r
F
o
u
n
t
a
i
n
s
&
A
e
r
a
t
i
o
n
In
s
t
a
l
l
a
t
i
o
n
&
S
e
r
v
i
c
e
De
s
i
g
n
&
C
o
n
s
u
l
t
i
n
g
Re
-
U
s
e
&
W
e
l
l
W
a
t
e
r
S
y
s
t
e
m
s
Se
r
v
i
n
g
A
r
c
h
i
t
e
c
t
s
,
E
n
g
i
n
e
e
r
s
,
D
e
v
e
l
o
p
e
r
s
,
B
u
i
l
d
e
r
s
&
H
o
m
e
o
w
n
e
r
s
76
3
-
5
7
1
-
7
5
5
5
ir
r
i
g
a
t
i
o
n
d
e
s
i
g
n
s
c
o
m
4-
1
3
-
2
0
2
6
RH
ID
I
DW
-
O
L
R
-
0
1
1 2
1"=30'
Hu
g
o
,
M
N
On
e
k
a
L
a
k
e
R
e
s
e
r
v
e
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY PSI
Hunter PROS-04 Strip Series
Turf Spray, 4in. Pop-Up. Co-molded wiper seal with UV Resistant
Material.
106 30
Hunter PROS-04 8 Series
Turf Spray, 4in. Pop-Up. Co-molded wiper seal with UV Resistant
Material.
13 30
Hunter PROS-04 10 Series
Turf Spray, 4in. Pop-Up. Co-molded wiper seal with UV Resistant
Material.
58 30
Hunter PROS-04 12 Series
Turf Spray, 4in. Pop-Up. Co-molded wiper seal with UV Resistant
Material.
144 30
Hunter PROS-04 15 Series
Turf Spray, 4in. Pop-Up. Co-molded wiper seal with UV Resistant
Material.
311 30
Hunter PROS-04 17 Series
Turf Spray, 4in. Pop-Up. Co-molded wiper seal with UV Resistant
Material.
6 30
Hunter MP Strip PROS-04-PRS40-CV
Turf Rotator, 4in. pop-up with factory installed check valve,
pressure regulated to 40 psi, MP Rotator nozzle on PRS40 body.
LCS=Ivory left strip, SS=Brown side strip, RCS=Copper right
strip.
22 40
Hunter MP1000 PROS-04-PRS40-CV
Turf Rotator, 4in. pop-up with check valve, pressure regulated to
40 psi, MP Rotator nozzle on PRS40 body. M=Maroon adj arc 90
to 210, L=Light Blue 210 to 270 arc, O=Olive 360 arc.
16 40
Hunter MP2000 PROS-04-PRS40-CV
Turf Rotator, 4in. pop-up with factory installed check valve,
pressure regulated to 40 psi, MP Rotator nozzle on PRS40 body.
K=Black adj arc 90-210, G=Green adj arc 210-270, R=Red 360
arc.
20 40
Hunter MP3000 PROS-04-PRS40-CV
Turf Rotator, 4in. pop-up with factory installed check valve,
pressure regulated to 40 psi, MP Rotator nozzle on PRS40 body.
B=Blue adj arc 90-210, Y=Yellow adj arc 210-270, A=Gray 360
arc.
11 40
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY PSI GPM RADIUS
Hunter PGP-04 1.5
Turf Rotor, 4in. Pop-Up. Adjustable to Full Circle.
6 35 1.4 29'
Hunter PGP-04 2.5
Turf Rotor, 4in. Pop-Up. Adjustable to Full Circle.
5 35 2.1 33'
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY
Hunter PGV-100-MB 1"
Plastic Electric Remote Control Valve, for Residential/Light
Commercial Use. Male Thread x Barb Inlet/Outlet. Globe
Configuration, No Flow Control.
6
Hunter PGV-151 Angle 1-1/2"
1-1/2in. Plastic Electric Remote Control Valve, for
Residential/Light Commercial Use. Female NPT Inlet/Outlet, With
Flow Control. Angle Configuration.
30
Hunter HQ-5RC 1"
Quick coupler valve, yellow rubber cover, red brass and stainless
steel, with 1in. NPT inlet, 1-piece body.
5
Landscape Products Inc. BGV
1/2in., 3/4in., 1in., 1-1/4in., 1-1/2in., 2in., 2-1/2in., 3in., 4in. Brass
Gate Valve. Threaded bonnet, Non-rising stem, Pressure rated to
200 psi. Same size as mainline.
4
Hunter ICV-G-R 2"
1in., 1-1/2in., 2in., and 3in. Plastic Electric Master Valve, Globe
Configuration, with NPT Threaded Inlet/Outlet, for
Commercial/Municipal Use. With Reclaimed Water ID, Purple
Handle.
1
Hunter I2C-0800-PL
8 Station Outdoor Modular Controller. No Module Required.
Commercial Use. Plastic Cabinet.
1
Hunter EZ-1
Single Station EZ Decoder for use with EZDM Decoder Module
Only. To be installed on Universal Decoder Stake Kit
(DECSTAKE10).
1
Hunter EZDM
EZDM decoder output module. Plug-in module converts any ICC2
controller to 2-wire decoder system (up to 54 stations maximum).
To be installed on Universal Decoder Stake Kit (DECSTAKE10).
1
Hunter WRF-CLIK
Rain/freeze Sensor, install within 1000 ft of controller, in line of
sight. 22-28 VAC/VDC 100 mA power from timer transformer.
Mount as noted. Includes Gutter Mount.
1
Flomec QS200-20 2"
2in. insertion flowmeter, schedule 80 PVC housing. .92 GPM-138
GPM range, max. operating pressure 150 psi. 2-wire connector
w/ LED indicators for power and pulse. Storage temps -20 F to
+160 F.
1
Re-Use Pump Station 1
Irrigation Lateral Line: Polyethylene Pipe SDR-7 15.7 lf
Irrigation Lateral Line: Polyethylene Pipe SDR-7 1"8,372 lf
Irrigation Lateral Line: Polyethylene Pipe SDR-7 1 1/4"1,046 lf
Irrigation Lateral Line: Polyethylene Pipe SDR-7 1 1/2"357.2 lf
Irrigation Lateral Line: PVC Class 160 SDR 26 1 1/2"95.3 lf
Irrigation Lateral Line: PVC Class 160 SDR 26 2"55.9 lf
Irrigation Mainline: PVC Class 200 SDR 21 1 1/2"83.7 lf
Irrigation Mainline: PVC Class 200 SDR 21 2"67.9 lf
Irrigation Mainline: PVC Class 200 SDR 21 2 1/2"887.0 lf
Irrigation Mainline: PVC Class 200 SDR 21 3"1,102 lf
Pipe Sleeve: PVC Class 160 SDR 26 40.5 lf
Pipe Sleeve: PVC Class 160 SDR 26 2"505.9 lf
Pipe Sleeve: PVC Class 160 SDR 26 4"66.9 lf
ES CS SSRCSLCS
E L R C S
FHTQ
8 8 8 8
Q T H F
10 10 10 10
Q T H F
12 12 12 12
Q T H F
15 15 15 15
HQ
17 17
LCS RCSSS
1000
2000
3000
1.5
2.5
mv
C
td
dm
rs
fs
Re-Use Pump
Valve Number
Valve Flow
Valve Callout
#
##"
IRRIGATION SCHEDULE
0 feet60
1" = 30'
30 90 120
NO
R
T
H
NUMBER MODEL TYPE PRECIP SUN MON TUE WED THU FRI SAT IN./WEEK MIN./WEEK GAL./WEEK GAL./DAY
1 Hunter PGV-151 Angle Turf Spray 1.29 in/h 16 min 16 min 16 min 1 47 1,418 473
2 Hunter PGV-151 Angle Turf Spray 0.81 in/h 25 min 25 min 25 min 1 74 1,493 498
3 Hunter PGV-151 Angle Turf Spray 1.3 in/h 16 min 16 min 16 min 1 47 1,481 494
4 Hunter PGV-151 Angle Turf Spray 0.92 in/h 22 min 22 min 22 min 1 66 1,628 543
5 Hunter PGV-151 Angle Turf Spray 0.98 in/h 21 min 21 min 21 min 1 62 1,900 633
6 Hunter PGV-151 Angle Turf Spray 1.03 in/h 20 min 20 min 20 min 1 59 1,329 443
7 Hunter PGV-151 Angle Turf Spray 1.7 in/h 12 min 12 min 12 min 1 36 1,193 398
8 Hunter PGV-151 Angle Turf Spray 1.21 in/h 17 min 17 min 17 min 1 50 1,726 575
9 Hunter PGV-151 Angle Turf Spray 1.1 in/h 19 min 19 min 19 min 1 55 1,304 435
10 Hunter PGV-151 Angle Turf Spray 0.9 in/h 23 min 23 min 23 min 1 67 1,321 440
11 Hunter PGV-151 Angle Turf Spray 1.27 in/h 16 min 16 min 16 min 1 48 1,131 377
12 Hunter PGV-151 Angle Turf Spray 1.42 in/h 15 min 15 min 15 min 1 43 692 231
13 Hunter PGV-151 Angle Turf Spray 0.98 in/h 21 min 21 min 21 min 1 62 1,207 402
14 Hunter PGV-151 Angle Turf Spray 1.02 in/h 20 min 20 min 20 min 1 59 1,034 345
15 Hunter PGV-151 Angle Turf Spray 1.11 in/h 18 min 18 min 18 min 1 54 1,092 364
16 Hunter PGV-151 Angle Turf Spray 1.21 in/h 17 min 17 min 17 min 1 50 1,528 509
17 Hunter PGV-151 Angle Turf Rotary 0.37 in/h 55 min 55 min 55 min 1 163 3,744 1,248
18 Hunter PGV-151 Angle Turf Spray 1.29 in/h 16 min 16 min 16 min 1 47 1,340 447
19 Hunter PGV-151 Angle Turf Spray 1.27 in/h 16 min 16 min 16 min 1 48 1,170 390
20 Hunter PGV-151 Angle Turf Spray 1.02 in/h 20 min 20 min 20 min 1 60 1,907 636
21 Hunter PGV-151 Angle Turf Spray 1.04 in/h 20 min 20 min 20 min 1 58 1,807 602
22 Hunter PGV-151 Angle Turf Spray 1.18 in/h 17 min 17 min 17 min 1 51 1,086 362
23 Hunter PGV-151 Angle Turf Spray 0.92 in/h 22 min 22 min 22 min 1 65 1,060 353
24 Hunter PGV-151 Angle Turf Spray 0.95 in/h 22 min 22 min 22 min 1 64 1,398 466
25 Hunter PGV-151 Angle Turf Spray 1.12 in/h 18 min 18 min 18 min 1 54 1,656 552
26 Hunter PGV-100-MB Turf Spray 0.82 in/h 25 min 25 min 25 min 1 73 1,231 410
27 Hunter PGV-100-MB Turf Spray 1.15 in/h 18 min 18 min 18 min 1 52 793 264
28 Hunter PGV-100-MB Turf Rotor 0.75 in/h 27 min 27 min 27 min 1 80 784 261
29 Hunter PGV-100-MB Turf Spray 0.91 in/h 23 min 23 min 23 min 1 67 1,081 360
30 Hunter PGV-151 Angle Turf Spray 1.22 in/h 17 min 17 min 17 min 1 50 1,106 369
31 Hunter PGV-100-MB Turf Rotor 0.74 in/h 28 min 28 min 28 min 1 82 804 268
32 Hunter PGV-100-MB Turf Spray 1.01 in/h 20 min 20 min 20 min 1 60 1,158 386
33 Hunter PGV-151 Angle Turf Spray 0.98 in/h 21 min 21 min 21 min 1 62 1,595 532
34 Hunter PGV-151 Angle Turf Spray 1.21 in/h 17 min 17 min 17 min 1 50 1,652 551
35 Hunter PGV-151 Angle Turf Rotary 0.36 in/h 56 min 56 min 56 min 1 167 3,330 1,110
36 Hunter PGV-151 Angle Turf Spray 1.31 in/h 16 min 16 min 16 min 1 46 1,449 483
TOTALS:606 166 606 166 606 166 2,278 51,626 17,209
WATERING SCHEDULE
Generated:2026-04-14 14:28
P.O.C. NUMBER: 01
Water Source Information:
FLOW AVAILABLE
Custom Max Flow:120 GPM
Flow Available 120 GPM
PRESSURE AVAILABLE
Static Pressure at POC:70 PSI
Pressure Available:70 PSI
DESIGN ANALYSIS
Maximum Multi-valve Flow:120 GPM
Flow Available at POC:120 GPM
Residual Flow Available:0 GPM
Critical Station:18
Design Pressure:40 PSI
Friction Loss:4.18 PSI
Fittings Loss:0.42 PSI
Elevation Loss:0 PSI
Loss through Valve:3 PSI
Pressure Req. at Critical Station:47.6 PSI
Loss for Fittings:0.71 PSI
Loss for Main Line:7.06 PSI
Loss for POC to Valve Elevation:0 PSI
Loss for Backflow:0 PSI
Loss for Master Valve:6.5 PSI
Critical Station Pressure at POC:61.9 PSI
Pressure Available:70 PSI
Residual Pressure Available:8.14 PSI
CRITICAL ANALYSIS
PAGE:
DA
T
E
:
DR
A
W
N
B
Y
:
DE
S
I
G
N
B
Y
:
DE
S
I
G
N
#
:
SCALE:
OF
Ou
t
d
o
o
r
L
i
g
h
t
i
n
g
Ir
r
i
g
a
t
i
o
n
D
o
c
t
o
r
I
n
c
Wa
t
e
r
F
o
u
n
t
a
i
n
s
&
A
e
r
a
t
i
o
n
In
s
t
a
l
l
a
t
i
o
n
&
S
e
r
v
i
c
e
De
s
i
g
n
&
C
o
n
s
u
l
t
i
n
g
Re
-
U
s
e
&
W
e
l
l
W
a
t
e
r
S
y
s
t
e
m
s
Se
r
v
i
n
g
A
r
c
h
i
t
e
c
t
s
,
E
n
g
i
n
e
e
r
s
,
D
e
v
e
l
o
p
e
r
s
,
B
u
i
l
d
e
r
s
&
H
o
m
e
o
w
n
e
r
s
76
3
-
5
7
1
-
7
5
5
5
ir
r
i
g
a
t
i
o
n
d
e
s
i
g
n
s
c
o
m
4-
1
3
-
2
0
2
6
RH
ID
I
DW
-
O
L
R
-
0
1
2 2
nts
Hu
g
o
,
M
N
On
e
k
a
L
a
k
e
R
e
s
e
r
v
e
PS TYPICAL SUBMERSIBLE PUMP STATION
150 GPM Pump and Motor, Can be Custom Made or Ordered from your Vendor
FINISH GRADE
MODEL PROS-04-CV SPRAY HEAD
HUNTER SWING JOINT
MODEL SJ-5XX-X
LATERAL TEE OR ELBOW
LATERAL PIPE
PROS SPARY POP-UP SERIES WITH BOTTOM INLET
3" = 1'-0"1 P-CO-TES-HOLT-05
PGV ANGLE VALVE
1" = 1'-0"
18-24" COILED WIRE
WATERPROOF CONNECTORS (2)
REMOTE CONTROL VALVE
MODEL PGV-XXXA
WITH ACCU-SYNC-ADJ
FINISH GRADE
STANDARD VALVE BOX
SCH 80 T.O.E. NIPPLE (2)
BRICK SUPPORTS (4)
3/4" MINUS WASHED GRAVEL
MAIN LINE PIPE & FITTINGS
PVC SLIP UNION
2
P-CO-TES-HOLT-06
WALL MOUNT CONTROLLER
1" = 1'-0"
60
"
S
E
E
C
A
L
L
O
U
T
#
1
18
"
1
2
3
4
5
7
SET CONTROLLER 60" ABOVE FINISHED
GRADE UNLESS OTHERWISE NOTED
1
CONTROLLER AS SPECIFIED, SECURELY
BOLTING CONTROLLER TO WALL OR AS
PER MANUFACTURER SPECIFICATIONS.
INSTALL BACKUP BATTERIES AS
REQUIRED. GROUND AS PER
MANUFACTURER SPECIFICATIONS
2
1/2" DIAMETER RIGID STEEL CONDUIT
FOR 110VAC ELECTRICAL SOURCE.
INSTALL AS PER LOCAL ELECTRICAL
CODES
3
1-1/2" DIAMETER RIGID STEEL CONDUIT
FOR RCV WIRES
4
FINISHED GRADE5
LONG SWEEP ELL6
USE PVC SCH. 40 BELOW GRADE7
6
3
P-CO-TES-HOLT-08
IRRIGATION TRENCHING
1 1/2" = 1'-0"
1
2
NOTES:
1.SEE IRRIGATION LEGEND FOR MAINLINE AND LATERAL
LINE PIPE SIZE AND TYPE.
2.DIRECT BURIAL CONTROL WIRES SHALL BE INSTALLED
IN SCH. 40 PVC ELECTRICAL CONDUIT IF REQUIRED.
3.2-WIRE IRRIGATION WIRE SHALL BE INSTALLED IN SCH.
40 PVC ELECTRICAL CONDUIT.
4.DETECTABLE LOCATOR TAPE SHALL BE LOCATED SIX
INCHES (6") ABOVE THE ENTIRE MAINLINE RUN.
24" MIN.
6"
1'
-
0
"
I
N
P
L
A
N
T
I
N
G
A
R
E
A
FINISHED GRADE1
PAVEMENT2
NON-PRESSURIZED LINE
(LATERAL LINE)
3
DETECTABLE LOCATOR TAPE4
PRESSURIZED LINE (MAINLINE)5
DIRECT BURIAL LOW VOLTAGE
CONTROL WIRES
6
3
4
5
6
1'
-
6
"
I
N
P
L
A
N
T
I
N
G
A
R
E
A
3'
0
"
U
N
D
E
R
N
E
A
T
H
P
A
V
E
M
E
N
T
4
FX-IRRG-FX-AUXEQ-08
THRUST BLOCKING
3/4" = 1'-0"
PLAN VIEWS
SECTION VIEWS
45 DEG. ELBOW TEE 90 DEG. ELBOW
END OF LINE CAPPED LINE
1
UTILITY BOX
1 1
2 2
POURED IN-PLACE CONCRETE, 120 LBS. MINIMUM, TYPICAL1
FINISHED GRADE2
5
P-CO-TES-HOLT-09
PGP POP-UP SERIES ROTOR
3" = 1'-0"
FINISH GRADE
MODEL PGP ROTOR HEAD
HUNTER SWING JOINT
MODEL SJ-7XXX
LATERAL TEE OR ELL
LATERAL PIPE
6
P-CO-TES-HOLT-21
15
0
T
H
S
T
R
E
E
T
N
GENERATION
AVENUE N
25
'
S
E
T
B
A
C
K
25' REAR BUILDING SETBACK
X
XXXXXXXXXXXXXXXX
25
'
S
E
T
B
A
C
K
15' SIDE BUILDING SETBACK
46 3587
643
1
5
2
PARK
7 6 5 4 3
2
1
6
5
4
3
2
1
2 1
9 8
OUTLOT C
OUTLOT B
BUILDING R
7
8
9
1
2
1
2
3
4
10
11
BLOCK 1
BLOCK 2
BLOCK 3
OUTLOT A BLOCK 1
ONEKA LAKE RESERVE
ONEKA LAKE RESERVE
2ND ADDITION
OUTLOT A
25' REAR BUILDING SETBACK
15' SIDE BUILDING SETBACK
BLOCK 4BUILDING O
BUILDING P
BUILDING Q
BUILDING B
BUILDING N
BUILDING J
BUILDING I
BUILDING H
BUILDING M
BUILDING L BUILDING K
BU
I
L
D
I
N
G
G
BUILDING F BUILDING E BUILDING D
BUILDING C
BUILDING A
BLOCK 2
C1
C-502
CONCRETE SIDEWALK
(TYP)
ACCESSIBLE
CURB RAMP
(TYP)
25'
25
'
25'
22
'
TY
P
8'
TY
P
INSTALL 6' WOOD PRIVACY
FENCE ON PROPERTY LINE
22'
8'
20'
5.
6
7
'
5'
6' CONCRETE
WALK
5' CONCRETE
WALK
5' CONCRETE
WALK
18'
TYP 18
'
TY
P
TYP
TYP
T
Y
P
STOP SIGN
25'
4.32'
C4
C-501
TYPICAL STREET
SECTION (TYP)
BITUMINOUS
DRIVE PAVEMENT
SECTION (TYP)
B1
C-501
A1
C-501
ACCESSIBILITY
CURB RAMP
(TYP)
6'
1'
C2
C-501
EXISTING TREESEXISTING TREES
1'
6'9'
8.9'
13
.
5
'
CONCRETE
PATIO (TYP)
CONCRETE PATIO
(TYP)
22
'
CONCRETE PATIO
(TYP)
CONCRETE PATIO
(TYP)
3' CONCRETE WAK
(TYP)
CONCRETE PATIO
(TYP)
CURB TRANSITION
(TYP)
C1
C-501
11.2'
B618 CURB & GUTTER
(TYP)
E1
C-501
SIDEWALK JOINT
(TYP)
A5
C-501
BITUMINOUS PAVEMENT
SECTION (TYP)
A2
C-501
DRIVEWAY DROP
(TYP)
E2
C-501
DRIVEWAY
(TYP)
C5
C-501
6' CONCRETE
WALK
3' CONCRETE WALK
(TYP)
1
1
1
20
'
5.67'
12'
18
'
3
34.5'
20.1'
40.95'
25
'
20'
20
'
20
'
15
.
8
'
20'
20
'
20'
27.7'
27.7'
24' F-F
TY
P
24
'
5'
8.
6
7
'
32
.
8
'
24
'
F
-
F
8.7'
R
3
3
'
R57'
8'
10'
26
'
18
.
1
'
10
7
.
1
'
8'
18'
3
3
3
R88'
R15'
R
1
5
'
R1
1
2
'
R8
8
'
R25'
R25'
25
.
1
'
25
.
3
'
25'
21.
7
'
8'
24'
4.15'
20'
11.1
'
2
2
'
8.67'
5'
22'4.33'
8'
23
.
5
'
8.
7
'
5'
4.
3
'
9.
2
'
20'
20'
R
8
8
'
R
1
0
2
'
R3
3
'R57
'
R4
8
'
R72'
R1
1
2
'
R8
8
'
21.1'
2.8'
22'
2.
7
6
'
22
'
8'
22
.
8
7
'
14
.
6
2
'
TYP3
22'
8'
2
2
'
5
'
8
.
6
7
'
2
4
'
F
-
F
8
'
27'
23.1'
21.1
4
'
3
24
'
8'
15
.
5
'
23
.
5
'
27
.
9
'
2
R1
1
2
'
31
'
2
0
'
15
'
8'
22
'
TY
P
1
TY
P
TYP
SUGGESTED PARK
IMPROVEMENTS TO BE
CONSTRUCTED BY OTHERS
20
'
30
'
22
.
1
'
5'
8.
6
7
'
TY
P
PHASE I
TEMPORARY
CUL-DE-SAC
R10.2
5
'
R2.2
5
'
R
2
.
2
5
'
19
'
19'
END OF 6' WOOD
PRIVACY FENCE
A1
C-003
3 UNIT BUILDING
(TYP)
B1
C-003
2 UNIT BUILDING
(TYP)
BITUMINOUS
TRAIL
POND
6' BENCH ON CONCRETE PAD
(TYP)
ACCESSIBLE
CURB RAMP
(TYP)
TYP
1 TYP
5'
5'
5'
5'
CURB MODIFICATION
AT CATCH BASIN (TYP)
C4
C-502
B612 CURB
& GUTTER
(TYP)
D1
C-501
E2
C-501
DRIVEWAY DROP
(TYP)
5' CURB TRANSITION
FROM B612 TO B618
5' CURB TRANSITION
FROM B612 TO B618
A1 SITE PLAN
1" = 30'
9030
SCALE IN FEET
Know what's below.
Call before you dig.
R
LEGEND
CONCRETE SIDEWALK OR PAVEMENT
SCH18002
PROJECT NO.
NOT FO
R
CONST
R
U
C
T
I
O
N
SHEET
CERTIFICATION
ISSUE DATE
SHEET INDEX
PROJECT
D E S I G N
CIVIL ENGINEERING | LANDSCAPE ARCHITECTURE
3 1 0 4 T H A V E S O U T H , S U I T E 1 0 0 6
M I N N E A P O L I S , M N 5 5 4 1 5
www.elanlab.comp 612.260.7980
f 612.260.7990
1 2 3 4 5 6
E
D
C
B
A
I hereby certify that this plan, specification
or report was prepared by me, or under my
direct supervision, and that I am a duly
Licensed Professional Engineer under the
laws of the state of MINNESOTA.
Stephen M. Johnston
18914 03/12/2021
NOT FO
R
CONST
R
U
C
T
I
O
N
REGISTRATION NO.
DATE
ONEKA LAKE
RESERVE
HUGO, MN
ONEKA LAKE
RESERVE, LLC.
12928 JODY AVE. N
HUGO, MN 55038
651-303-0471
PRELIMINARY PLAT,
SITE PLAN,
VACATION AND
REZONING REVIEW
03/12/2021
PROJECT SUMMARY
C-101
SITE PLAN
SITE AREA 291,941 SF. (6.70 AC.)
PARK 19,684 SF. (0.45 AC.)
NET AREA 272,257 SF. (6.25 AC.)
OUTLOT A 38,668 SF. (0.89 AC.)
OUTLOT A 2ND ADDITON 34,515 SF. (0.79 AC.)
OUTLOT B 2ND ADDITON 22,370 SF. (0.51 AC.)
OUTLOT C 2ND ADDITON 11,215 SF. (0.26 AC.)
LOTS 164,489 SF. (3.78 AC)
BUILDINGS 71,768 SF. (26% NET OF PARK)
WALK/ PARKING/ DRIVE/ STREET 77,764 SF. (29% NET OF PARK)
TOTAL IMPERVIOUS 149,532 SF. (55% NET OF PARK)
PERVIOUS 122,725 SF. (45% NET OF PARK)
SHARED PRIVATE OPEN SPACE (OUTLOT B & C) 33,585 SF. (0.77 AC.)
12.3% OF SITE NET OF PARK
TOTAL 40 UNITS
4 - 3 UNIT BUILDINGS = 12
14 - 2 UNIT BUILDINGS = 28
GROSS DENSITY 6.0 UNITS/ AC.
NET DENSITY 6.4 UNITS/ AC. NET OF PARK
REQUIRED PARKING 2 STALLS/ UNIT PLUS 1 STALL/ 5 UNITS 88 STALLS
PROPOSED PARKING 180 STALLS
80 GARAGE PARKING STALLS
80 GUEST PRIVATE PARKING STALLS
20 - 8'X22' SHARED GUEST PARKING STALLS
1PERVIOUS AREA
PARKING STALL COUNT3
2' CURB TAPER FROM 6" TO 1"
2021 APPROVED PROJECT
Agenda Number D.2
CITY OF HUGO COMMUNITY
DEVELOPMENT DEPARTMENT
PLANNING AND ZONING
APPLICATION STAFF REPORT
TO: Hugo Planning Commission
FROM: Kendra Lindahl, Landform
SUBJECT: Public Hearing. Repeal and Replace Chapter 90 (Zoning and Land Use)
AND
Accept the Multi-Family Design Guidelines
DATE: June 16, 2026 for the Planning Commission Meeting of June 25, 2026
ZONING: N/A
REVIEW DEADLINE: N/A
1. DESCRIPTION OF REQUEST:
City Staff have been working with Landform to provide a repeal and replace of the Zoning
and Land Use Ordinance (Chapter 90) in its entirety and update the Official Zoning Map
in preparation of the 2050 Comprehensive Plan process. The revisions modernize the
allowed uses and development standards, update statutory references, eliminate
inconsistencies, update zoning districts, and update the zoning map.
This update also includes the City of Hugo’s Multi-Family Design Guidelines. The
guidelines were updated to clarify where they apply and provide clearer guidance on
building scale and massing, architectural style, landscaping, open space requirements,
parking, and sustainability features in a clear and user-friendly manner, ensuring ease of
implementation for developers and clarity for City staff.
2. CONTEXT:
In 2024, Staff contracted with Landform Professional Services, LLC to complete an update
to the residential zoning district rules and regulations and update the Multi-Family Design
Guidelines.
Following the award of a Livable Communities Grant from the Metropolitan Council, the
project expanded to include the entirety of Chapter 90 (Zoning and Land Use). Staff held
two joint sessions with the Planning Commission and City Council as well as a developer
roundtable.
Page 2
Major updates to Chapter 90 are discussed in detail below, but the overall changes
include:
- Updating reference to State Statutes and regulations,
- Re-alphabetizing the code section and performance standards,
- Modernizing language and uses,
- Cleaning up and establishing consistent language, word choice, and formatting,
- Removing redundancies and conflicts, and
- Adding uses, rules, and definitions that were missing.
Overall, the proposed code changes will help set a baseline for the 2050 Comprehensive
Plan update that is expected to start soon. As discussed in the joint sessions previously
the major changes are discussed in the following order:
a) Zoning District
b) Zoning Map
c) Uses
d) Performance Standard
e) Multi-Family Design Guidelines
a) Zoning Districts
Every zoning district in the City of Hugo was evaluated to determine if it was accomplishing
the goals it set out within its dimensional standards and the uses that were allowed. Names
were also updated to provide clarity on the differences between the zoning districts as
found in the table below:
BEFORE AFTER
LA Long-term agricultural district (NO CHANGE)
AG Agricultural district (NO CHANGE)
RR Rural residential district (NO CHANGE)
R-1 Large lot single-family residential district (NO CHANGE)
R-3 Single-family detached residential district R-2 Low-density residential district
CR-3 Central residential district R-3 Single- and two-family residential
district
R-4 Low-density multi-family residential district R-4 Medium-density multi-family
residential district
R-5 Medium-density multi-family residential
district
R-5 High-density multi-family residential
district
NS Neighborhood Services REMOVED
C-1 Central business district (NO CHANGE)
C-2 General business district (NO CHANGE)
RC-1 Restricted commercial district (NO CHANGE)
RI-1 Restricted industrial district (NO CHANGE)
I-3 General Industrial district I-1 General Industrial district
BP Business Park district (NO CHANGE)
FUS/FCB Future Urban Service and Future
Central Business District
(NO CHANGE)
None M-U Mixed Use
Page 3
The most significant changes include the addition of the Mixed Use (M-U) district, removal
of the Neighborhood Services (NS) district, and the renaming of the higher density
residential districts. Other name changes were to renumber and reorder districts for clarity.
The Mixed Use (M-U) zoning district is added to provide an alternative to a PUD in areas
that are specifically guided Mixed Use in the Comprehensive Plan. While the areas may
still develop as a PUD, the new standards establish a baseline for development.
Finally, all zones had updates to their uses and dimensional standards including but not
limited to the following:
- Addition of “Interim Uses” specific to each district.
- Removal of minimum lot depth because the lot with and lot size provides adequate
standards.
- Maximum building height was raised to 45 feet for Multi-family uses in the higher-
density residential zones.
- Removal of minimum building sizes in residential districts to reduce redundant or
unnecessary restrictions that may hurt housing affordability.
- Reordering of uses and districts for clarity and consistency
- Reduction in minimum lot widths, lot sizes, and setbacks in some residential
districts. R-4 and R-5 previously did not specify standards by housing type and
now do. These changes are shown in the below:
ZONING DISTRICT LOT SIZE
MINIMUM
LOT WIDTH
MINIMUM
FRONT
SETBACK
REAR
SETBACK
SIDE
SETBACK
R-3 Single-family detached
residential district
R-2 Low-density residential
district
10,400 sq. ft.
10,000 sq. ft.
80 ft.
65 ft.
30 ft. 30 ft. 10 ft.
CR-3 Central residential
district
R-3 Single- and two-family
residential district
SF: 8,400 sq. ft.
TF: 15,000 sq. ft.
SF: 7,500 sq. ft.
TF: 14,000 sq. ft.
SF: 80 ft.
SF: 60 ft.
TF: 100 ft.
25 ft. 25 ft. 10 ft.
7.5 ft.
R-4 Low-density Medium-
density multi-family residential
district
1 Acre
SF: 7,500 sq. ft.
TF: 12,000 sq. ft.
MF: 1 Acre
150 ft.
SF: 55 ft.
TF: 85 ft.
MF: 150 ft.
25 ft.
20 ft.
25 ft. 15 ft.
7.5 ft.
MF: 15 ft.
R-5 Medium High-density
multi-family residential district
1 Acre
SF: 7,500 sq. ft.
TF: 12,000 sq. ft.
MF: 1 Acre
150 ft.
SF: 55 ft.
TF: 85 ft.
MF: 150 ft.
25 ft.
20 ft.
25 ft. 15 ft.
7.5 ft.
MF: 15 ft.
Page 4
b) Zoning Map
Updates to the zoning map are minor, as many of the changes to specific zoning districts
and properties do not change their zoning classification.
The parcels in the existing R-3 district will be zoned R-2, a district that did not exist in the
previous version of the zoning code and which will have the standards of the existing R-3
district. The CR-3 district was renamed to R-3 and all parcels in the current CR-3 will
become R-3. These changes will reduce lot non-conformities in the existing CR-3 zone to
the new R-3 by almost 90%.
The Neighborhood Services (NS) district was eliminated. The 10 parcels in this district are
proposed to be rezoned to either C-1 or C-2 as follows:
- PIDs #2003121330004, #2003121330006, and #2003121330071 are reclassified
as Central Business (C-1).
- PIDs #2903121220004, #2903121220012, #2903121220021, #2903121220010,
#2903121220011, #3103121410010, and #3103121410002 are reclassified as
General Business (C-2).
The remaining changes made to the Zoning Map are updates to naming of the zoning
districts. While names have changed, the color for most parcels does not change. Only
the parcels being rezoned form Neighborhood Services to different commercial zones will
change color and appearance on the Zoning Map. The Zoning Map is adopted as part of
Chapter 90 and the Ordinance to repeal and replace Chapter 90 would also repeal and
replace the Zoning Map.
c) Uses
The existing Chapter 90 contains 164 separate and distinct uses, many of which are only
different due to spelling, word choice, or commas. Many of the uses are also redundant
as they are either hyper-specific or outdated. Where possible, uses were consolidated to
create broad categories. For example, rather than listing video stores as an individual land
use, we have created a retail land use that would cover a variety of retail uses, including
video stores. The broader categories will allow the City to better respond to a changing
marketplace.
Non-Residential Uses
Broad categories created include the following:
- Commercial recreation, indoor or outdoor
- Drive-throughs
- Exterior Storage
- Personal and professional services, including banks, offices and clinics
- Personal health and beauty services
- Public, educational, or religious facilities
- Restaurants
- Retail sales of merchandise
Liquor and alcohol related uses were also updated to reflect similar and nearby cities and
to provide clarity for people looking to build in the City of Hugo. These include adding uses
such as breweries, wineries, distilleries, and assorted related accessory uses.
Page 5
Residential Uses
As updating the Multi-Family Design Guidelines was part of this overall effort, staff was
intentional when reviewing existing residential uses and the distinction between them in
Hugo. The following graphic shows the different residential uses and how they would be
classified in the City Code.
Definitions have been updated to provide clarity and also emphasize items of importance
for the City of Hugo when promoting certain housing types across the City. These are
summarized in the table below:
CURRENT PROPOSED PROPOSED DEFINITION
Single Family detached
residential dwellings
Dwelling, Single-family detached
residential
means a building designed for and
occupied exclusively by one (1)
family.
Twin Homes (duplexes) Dwelling, Two-family means a building designed for
occupancy by two (2) families in
separate dwelling units.
Apartments,
Apartments/Condominiums
Dwelling, Apartment means a building designed with three
(3) or more dwelling units exclusively
for occupancy by three (3) or more
families living independently of each
other, but sharing hallways and main
entrances and exits
Multifamily Residential, not to
exceed 12 units
Combined above
Accessory apartment Dwelling Unit, Accessory apartment (NO CHANGE)
Accessory Dwelling Unit Dwelling unit, Accessory (NO CHANGE)
Townhouses (Single-family
attached)
Dwelling, Townhouses means a single structure consisting
of at least three attached dwelling
units, each unit having its own direct
exterior entrance at or near the
ground level with no sharing of a
common hallway for entry.
Farmhand living quarters (NO CHANGE) (NO CHANGE)
Page 6
Many of the changes provide clarity and a more encompassing definition to help prevent
unspecified or unknown uses from creating issues in the near future. All uses were
reviewed again to ensure clear definitions and clear performance standards if requiring a
conditional or interim use permit.
Finally, updates were made specifically to items that are required by the Municipal
Planning Act regarding Daycares and Residential Facilities. These changes include
updated definitions and clearly allowing them in certain zoning districts as required. This
may be as a principal or accessory uses with or without a conditional use permit.
d) Performance Standards
With the consolidation of uses and change to zones, many of the performance standards
in the code for specific uses needed updating. This includes re-alphabetizing the
standards within their section numbers and updating names to match uses in the zones.
Landscaping was updated to better reflect today’s standards for species list and types of
planting, and outdated references, codes, and language was updated. Rather than a
limited list of preferred landscape materials, we have added a list of prohibited trees and
shrubs. These are invasive or non-native species, have disliked qualities (e.g., smelly and
messy seed pods, prolific seeds, robust thorns, etc.) or are vulnerable to pests or other
environmental conditions.
Specific performance standards were established for each conditional or interim use and
those standards will be evaluated by the City during the review processes.
The changes to the Code appear significant due to the amount of text moving around and
new section numbers, however, many sections of text remained largely unchanged. A
repeal and replace provided the cleanest way to adopt the proposed code changes to
Chapter 90.
e) Multi-Family Design Guidelines
The current Multi-Family Design Guidelines were adopted in December 2005 and have
been used by Staff when developers in Hugo have proposed different types of multi-family
housing. This update is to modernize language, examples, images, and to provide
additional clarity for what types of multi-family housing are preferred in Hugo.
Guidelines are not adopted as part of the City Code and therefore do not have the same
level of authority or regulation. However, the City does choose to use these to
communicate preferences for development. Additional requirements found in the
guidelines are encouraged to be incorporated into development proposals, but the City
and the developer have flexibility with the guidelines that do not exist when applying the
City Code. The City should accept these guidelines so that all who use them are clear on
what they should and should not propose for a multi-family housing development.
Page 7
Building Types
The most significant change to the guidelines content is the creation of definitions of three
building types for multi-family housing. With the proposed changes for the new Chapter
90 (Zoning and Land Use), multi-family housing includes any building with three or more
attached units (townhouses and apartments).
In order to understand the preferences of the City and of developers building in Hugo, the
project team held a Joint Planning Commission and City Council Session and a Developer
Open House to go over proposed updates to the guidelines. During these meetings,
preferences became clear and pointed to a desire for multi-family development at a
smaller scale than what is usually assumed. This led to distinctions based on size rather
than the type of housing.
While reviewing multi-family housing developments that have been promised or built in
the recent years in Hugo, a clear pattern started to develop. This led to the following
classification of building types, all of which are found and defined as the following in the
proposed Multi-Family Design Guidelines:
SMALL
Small buildings are defined as having eight or fewer units per building. These may
be either townhouse or apartment buildings and tend to fit the scale of traditional
single-family homes developments well as a buffer between higher density or
incompatible uses.
MEDIUM
Medium buildings are defined as having nine to eighteen units per building. These
may be either type of multi-family housing and are more compatible as standalone
housing developments or as a buffer between traditional single-family housing a
high density or commercial uses.
Medium buildings that are townhouses are allowed to exceed the maximum of
eight units per building if they utilized stacked units but maintain the same design
features of a townhouse. This means private exterior entrances on the ground
floor, private attached garages, and no common shared areas for access.
LARGE
Large buildings are defined as having nineteen or more units per building. This
would only include apartments not townhouses and is the more common
apartment style multi-family housing found in cities.
The key distinction here is the preference for smaller and medium buildings, like Jack Pine
Place or the rowhomes in Victor Gardens. Defining these uses in the guidelines and using
the same terms in the City Code reduces conflicts. The differences focus not only on unit
count, but also in how the units are designed, specifically where access points are, and
creates more consistency with the Building Code.
Page 8
In order to promote these smaller and medium buildings, specific additions are added to
large buildings to hopefully dissuade developers from building these product types over
the smaller and medium buildings in Hugo. This includes the following:
- At least 33% of each exterior wall shall be composed of brick, natural stone, or
artificial stone. (Other buildings would be required to provide 25%.)
- The ground level of any 3-story building and the first two stories of a building four
stories or taller shall be visually distinct from the upper stories. This distinction shall
be articulated by at least one of the following: an intermediate cornice line; an
awning arcade or portico; a change in building materials, texture, or detailing; a
change in window shape or treatment; or other elements which meet the objective.
(Intended to create a distinct base to anchor these large buildings.)
- A minimum of one-half of the required parking spaces shall be in an underground
parking area or in a parking area below the building.
These standards are not inconsistent with development standards in other cities, but the
higher performance standards required for large buildings may encourage developers to
build small and medium buildings in Hugo.
General Updates
Outside of the building types and flexibility there were numerous other minor updates,
these include:
- Updates to preferred materials and material mixes.
- Ensuring consistency with the guidelines and what is proposed in the new Chapter
90 (Zoning and Land Use).
- Addition of environmental and natural system preservation and stormwater reuse.
- Removing specific measurements and percentages that were not found in the City
Code and that are no longer relevant.
Overall, the document was modernized to make it more accessible and user friendly. The
photos and colors were updated to match the current logo and theme for Hugo.
3. CONCLUSIONS/RECOMMENDATIONS
The proposed changes have been discussed in detail with City Staff and presented to the
Joint Planning Commission and City Council Sessions for feedback at the April 23, 2026
joint meeting. This nearly two-year process encompasses changes that have been
discussed over a much longer period of time. The changes are comprehensive, but many
are administrative in nature focusing on clarity, consistency, and ease of use.
Staff recommends that the Planning Commission recommend approval of the draft
Ordinance to repeal and replace Chapter 90 (Zoning and Land Use) in its entirety, as
found in the attachments. The Zoning Map is adopted as part of the Zoning Ordinance
and is found in the draft Ordinance.
The Multi-Family Guidelines are not adopted as part of the City Code but are accepted by
the City Council and used as guidelines for developers to understand the preferences of
the City of Hugo. For this reason, Staff is asking the Planning Commission to recommend
acceptance of the guidelines as drafted.
Page 9
ATTACHMENTS:
a. Draft Ordinance Repealing and Replacing Chapter 90 (Zoning and Land Use)
b. Proposed Zoning Map
c. Draft Multi-Family Design Guidelines, Dated June 15, 2026
1
CITY OF HUGO,
WASHINGTON COUNTY, MN
ORDINANCE NO. 2026-XX
AN ORDINANCE OF THE CITY OF HUGO, MINNESOTA REPEALING AND
REPLACING CHAPTER 90 (ZONING AND LAND USE) OF THE HUGO CITY CODE
THE CITY OF HUGO ORDAINS:
Section 1. Amendment of the City Code. The existing Chapter 90 (Zoning and Land
Use) of the City Code of Hugo, Minnesota, is hereby repealed and replaced in its
entirety with the new Chapter 90 (Zoning and Land Use), which is found on the attached
Exhibit A.
Effective Date. This Ordinance shall take effect upon its passage.
ADOPTED BY THE HUGO CITY COUNCIL ON JULY 6, 2026.
_________________________________
Tom Weidt, Mayor
Attest:
__________________________________
Michele Lindau, City Clerk
2
Exhibit A
Chapter 90 (Zoning and Land Use)
CITY OF GO
EST.1906
Zoning Map
Proposed
-(LA) Long Term Agricultural
(AG) Agricultural
(RR) Rural Residential
(R-1) Large Lot Single-family Residential
(R-2) Low-density Residential
-(R-3) Single-and Two-family Residential
-(R-4) Medi um-density Multi-family Residential
-(R-5) High-density Multi-family Resi dential
-(RC-I) Restricted Commercial
-(C-1) Central Business
-(C-2) General Business
-(RI-I) Restricted Industrial
-(1-1) General Industrial
-(BP) Business Park
-(FUS) Future Urban Service
-(FCB) Future Central Business
(PUD) Planned Unit Development
Water □MUSA
0.5 'Miles
5/7/2026
NORTH
Multi-Family Design Guidelines
Shaping the community for today and tomorrow
Last Updated: June 15, 2026
DRAFT
TABLE OF CONTENTS
BACKGROUND AND PURPOSE ........................................3
GOALS ............................................................................................4
STANDARDS ................................................................5
OVERVIEW ......................................................................................5
BUILDING MATERIALS .....................................................................7
BUILDING MASSING .......................................................................8
SCREENING ....................................................................................10
SIGNAGE AND LIGHTING .................................................................10
SITE PLANNING ...........................................................11
OVERVIEW ......................................................................................11
PUBLIC SPACES ...............................................................................12
BUILDING AND ENTRANCE PLACEMENT ............................................13
STREET DESIGN ..............................................................................14
PARKING AND ACCESS ......................................................................15
LANDSCAPING AND GREEN SPACE .....................................................17
STORMWATER MANAGEMENT ..........................................................19
SUSTAINABILITY COMMUNITIES .......................................................20
HEALTHY DESIGN ............................................................................20
IMPLEMENTATION ......................................................21
APPLICATION .................................................................................21
DOWNTOWN STANDARDS .................................................................21
Background And Purpose | 3
BACKGROUND AND PURPOSE
The City of Hugo has a
Comprehensive Plan and Zoning
and Land Use Chapter (Chapter
90) in the City Code that are used
to guide and regulate multi-family
residential developments. These
tools have resulted in a mix of
different styles of architecture and
design within the community, with
some developments providing a
higher level of design. The City has
prepared the Multi-Family Design
Guidelines to better articulate the
City of Hugo’s vision for their community and ensure that high-quality units are constructed. These
guidelines will apply to townhouses and apartments (including condominiums and cooperatives).
Every proposed development of multi-family housing in Hugo should utilize these guideline from the
beginning of the site planning process to ensure conformity.
The intent of this document is to utilize the guidelines to supplement the regulations in Chapter
90 (Zoning and Land Use) of the Hugo City Code. Chapter 90 will continue to be the regulatory
enforcement tool; however, the design guidelines are intended to better articulate the City’s design
requirements.
Row Townhouses are a type of multi-family housing. Source: University of Minnesota
A smaller apartment building is a type of multi-family housing option - Historic Legion Post Villas.
Background And Purpose | 4
GOALS
The multi-family design guidelines will be used to implement the goals identified in the City of Hugo’s
Comprehensive Plan. The main objective of developing the design guidelines is to clearly define what
the City envisions for multi-family developments. The guidelines will be a tool that property owners,
developers, architects, land use planners and engineers can utilize to incorporate the City’s goals into
their plans. They will also serve as a basis for uniform and consistent review of development proposals
within Hugo.
Goal 1: Provide for life-cycle housing
Currently, the City of Hugo has a variety of housing options for people of different ages and incomes.
This document contains provisions for lifecycle housing by encouraging quality multi-family housing
options. Developments should include a variety of housing types within the project.
Goal 2: Establish a consistent, high-quality design standard
The City of Hugo has a mix of different types of multi-family developments within the community.
Certain development design elements are preferred over others. The preferred elements should be
carried out through these guidelines and incorporated into all multi-family developments within the
City.
Goal 3: Maintain a harmonious visual environment
Through the Planned Unit Development (PUD) process, the City has been able to require a higher
level of design from developers. The outcome of this higher level of design has been positive.
However, the PUD process is not intended to be used for every project. The City will utilize these
guidelines to ensure that a high level of design is maintained in all projects regardless of whether the
project is completed under standard zoning or PUD. This will result in the homes holding their value
over time.
Goal 4: Communicate expectations for new development
The design guidelines incorporate specific design criteria and graphics to help clearly communicate
the City’s goals. The guidelines are intended to be used in conjunction with the City Code to execute
the community’s vision for development.
Goal 5: Preserve natural resources
The City acknowledges that additional housing is needed to meet community goals, however, the
guidelines are intended to encourage creative site design to provide housing and to preserve natural
resources, including wetlands, trees, etc.
Goal 6: Encourage small multi-family buildings.
The City encourages developers to provide multi-family housing in smaller buildings. Large buildings
are discouraged and some design flexibility will be provided for projects that can accomplish the City’s
development and density goals with smaller buildings.
Standards | 5
OVERVIEW
These standards are the recommendations for the design of multi-family development within Hugo.
The standards within this guide are vital for achieving the City’s goals. The primary purpose of
these standards is to set basic parameters, describe preferences and illustrate design intent. These
guidelines serve as principles within which creative design can and should occur – there is no one
solution, but many options that meet the basic requirements of this document. The standards are
presented to help guide development and allow for individual creativity when designing a project
within Hugo.
The City of Hugo does not have a historic architectural character for residential homes, although
architectural standards have been adopted for certain PUD developments. New developments must
meet the zoning and building code requirements regarding materials and construction methods
allowed. New development site and building design should provide a visual cue that you are in Hugo.
The use of regional building materials and native plants for development is encouraged.
Definitions
The multi-family design guidelines will differentiate between types of housing units and styles. Using
the definitions found in Chapter 90 of the Hugo City Code, multi-family includes both townhouses
and apartments. The key difference between the two is private vs. shared exterior entrances.
STANDARDS
Standards | 6
Small Buildings
Small buildings are defined as having eight or
fewer units per building. These may be either
townhouse or apartment buildings and tend to
fit the scale of traditional single-family homes
developments well as a buffer between higher
density or incompatible uses.
Medium Buildings
Medium buildings are defined as having nine
to eighteen units per building. These may be
either type of multi-family housing and are more
compatible as stand alone housing developments
or as a buffer between traditional single-family
housing an high density or commercial uses.
Medium buildings that are townhouses are
allowed to exceed the maximum of eight units per
building if they utilized stacked units but maintain
the same design features of a townhouse. This
means private exterior entrances on the ground
floor, private attached garages, and no common
shared areas for access.
Large Buildings
Large buildings are defined as having nineteen or
more units per building. This would only include
apartments not townhouses and is the more
common apartment style multi-family housing
found in cities.
Medium Building Examples- Jack Pines Place and Oneka Fields
Small Building Example- Rottlund Homes in Victor Gardens
Large Building Example - Rosemary Apartments
Standards | 7
BUILDING MATERIALS
Buildings should be designed with high-quality and durable construction materials with proven
records of long life-cycle and low environmental impacts on all sides. The following standards are
expected:
1. The buildings should have equal architecture on all
sides consisting of various high-quality materials.
Architectural elements used on the front elevation
(such as brick or stone accents, shutters, etc.)
should be continued on all elevations.
2. The front facade should have a unique design with
doors and windows.
3. At least 25% of a building should be of a higher
quality materials, such as brick, stone, stucco, etc.
4. Metal panels may be allowed as a secondary
material.
5. Avoid low-quality materials such as EIFS, mirrored
materials, or faux windows.
6. A variety of different materials should be provided
on all elevations.
7. The massing of the materials shall be coordinated
with the building architecture.
8. The use of architecture and color to minimize
the impact of garages is encouraged. Specifically,
developers are encouraged to match the garage
door to the unit’s primary exterior color rather than
using only white garage doors.
9. Windows should be different sizes and shapes.
Window shutters are encouraged to add visual
interest.
10. A variety of unit types are encouraged within the
development.
11. A variety materials and colors should be utilized as
part of a master plan.
Building Material Variation helps break up large facades
High-quality materials enhance the appearance of a building
Standards | 8
BUILDING MASSING
Individual units should be articulated to break up the building facade on all elevations. This can be
accomplished by incorporating heavier and more massive elements at the building base and lighter
elements above the base. This can also be achieved through different types of materials, colors and
rooflines, most preferably with a combination of these so that plain, unbroken wall and roof surfaces
are not utilized. Rooflines and building elevations must be broken at a minimum of every 50 feet.
Pitched roofs are preferred to flat roofs.
The applicant must list building materials, roofing materials, and building colors on the plans. The
plans must also identify building articulation, mechanical screening by architectural elements, parapet
variations, entry, accent, and design elements on all sides of the building.
To the maximum extent practicable, developments should limit the number of buildings adjacent to
each other that are the same color, materials, or design.
Buildings are encouraged to be located to avoid a monotonous development. The location of the
garages will directly impact site design and will be discussed in more detail later in these guidelines.
This includes limiting the overuse of the same materials and rooflines to prevent large, unbroken
facades from a similar look and feel.
COLUMNS
CANOPIES
WAINSCOT
CORNER WALL
VARIATION
ROOF LINE
VARIATIONWALL FACE
VARIATION
UPPER WALL
BREAK
Example of different facade elements to break up building massing
Standards | 9
Building Architecture
1. Façade Articulation:
• Minimum 2-foot variation in wall plane every 50 feet.
• Distinct architectural treatment required for ground floor.
• Balconies, bay windows, or other projections required on upper floors.
• Maximum blank wall length: 30 feet horizontal, 15 feet vertical.
• Minimum 15-foot break in building mass required for every 180 feet.
• Maximum townhouse row: 8 units for small buildings, 18 for medium buildings if stacking
units.
2. Windows and Entries
• Minimum 30% window coverage on street-facing facades.
• Individual entries required for townhouse ground-floor units.
• Entry features must include minimum 4-foot projection or recess.
• Windows must have visible trim minimum 4 inches wide.
• Transom or sidelight windows required at main entries.
• Each side or rear elevation should have at least one window or door opening.
• A minimum of 12-inches for building eaves and overhangs.
Additional Requirements for Large Buildings
The City encourages smaller buildings to maintain a rural feel. To help encourage these types of
buildings, Large Buildings have additional requirements they must follow:
1. At least 33% of each exterior wall shall be composed of brick, natural stone, or artificial stone.
2. The ground level of any 3-story building and the first two stories of a building four stories or
taller shall be visually distinct from the upper stories. This distinction shall be articulated by at
least one of the following: an intermediate cornice line; an awning arcade or portico; a change
in building materials, texture, or detailing; a change in window shape or treatment; or other
elements which meet the objective.
3. A minimum of one-half of the required parking spaces shall be in an underground parking area
or in a parking area below the building.
Standards | 10
SCREENING
Special attention should be given to the screening of mechanical equipment. Mechanical equipment
must be accessible for maintenance but screened by placing the mechanical equipment within the
building or using other screening methods, such as fencing or landscaping. This includes screening all
rooftop equipment as required in Section 90.36 Subd. (a).6.a.19 of the City Code.
Ground mounted equipment and utility service structures (such as utility meters, utility lines,
transformers, aboveground tanks) and ground mounted mechanical equipment must be screened from
off-site views utilizing a double row of landscaping, a privacy fence or a wall that is at the same height
as the structure it is screening or six feet, whichever is less to screen from off-site views. A chain link
fence with slats shall not be accepted as screening.
Fences are regulated by Section 90-227 and include provisions for height and setbacks. Below are
some approved materials for fences in multi-family districts:
• Black chain link
• Decorative masonry or block
• Wrought iron
• Brick
• Natural stone, dressed or undressed
• Wood of proven exterior durability, such as
cedar, redwood, or treated wood
• Plastic fencing manufactured to look like
wood fencing.
Fences should be visually pleasing and not create any
safety hazards due to placement or material. Fences
should not be utilized between individual lots but are
encouraged to be located around the perimeter of
the development as a decorative element to unify the
neighborhood.
SIGNAGE AND LIGHTING
Adequate lighting is essential for safety and aesthetics when developing a multi-family property.
However, lighting should be designed not to be a nuisance or danger to surrounding businesses and
neighbors. This includes following the glare and brightness restrictions in Section 90-238 of the City
Code. Lighting should be designed to be an amenity as well as a safety feature. A master sign plan is
desired and should be submitted by the applicant with the development plan.
Mechanical equipment must be screened and not visible from any roadway
Site Planning | 11
OVERVIEW
Creative site planning and quality architecture are crucial to avoiding monotony. This document
discusses various design elements that should be addressed in all new developments, including
setbacks, massing, and architectural styles. Using variation in design will avoid the appearance of
barracks during development.
The standards below will help you create a site plan that enhances Hugo’s character and drives a
creative direction for any site. While each project will have a unique and distinctive character, these
site planning elements will help ensure cohesion across the City to help people know they are in
Hugo. Transitions from proposed to existing developments should be provided to minimize the impact
on adjacent parcels by placing lower-height buildings near property lines with low-density use.
SITE PLANNING
The site should be recognizable and cohesive such as Jacks Pines Place development shown above.
The site plan should show a unified neighborhood and development through building placement and spacing.
Site Planning | 12
PUBLIC SPACES
Developers are encouraged to create a mix of public and
private spaces throughout a project to help contribute to
the City of Hugo. This may include enhanced ground floor
landscaping, seating, or additional pet-oriented amenities.
When developments include the addition of public plazas
and parks, the City and developer should enter into an
agreement on access, maintenance, and security for
such facilities to enhance the number of users and the
amenities utility.
Amenities that create gathering spaces or characterize a
development should be implemented. For example, adding
gazebos in open spaces and benches along trails gives the
development a unified and cohesive character.
A minimum of 10% of the upland area should be preserved
as common open space in townhouse and apartment developments. The common open space should
be easily accessible by all community residents. Tot lots and community gardens are encouraged.
Small or narrow, unusable strips of green space are highly discouraged.
Developers are encouraged to connect adjacent properties and streets, trails, and sidewalks. Private
parks and conservation areas should be contiguous to existing or planned parks and conservation
areas. Public access to these areas is preferred.
Public Spaces should be central and match the development theme
Benches and plazas along paths can delineate public spaces
Site Planning | 13
BUILDING AND ENTRANCE PLACEMENT
Building setbacks are determined by the Zoning and Land Use Chapter in Section 90, Article IV
Division 1. The type of unit and location on the property can be flexible to provide more options for
creative design and prevent repetition and cookie-cutter development.
Buildings should be placed to enhance resident and passerby enjoyment, with parking areas to
the rear or side of the building and main entrances facing the street. This includes positioning
buildings around high-quality natural or built amenities to help create a sense of place for any new
development. Developments should preserve view-sheds and the natural environment such as
wetlands, drainage ways, mature stands of trees, and the like, to the best of their ability.
Buildings should provide a variety of unit types. Some units should include accessibility provisions so
that a percentage of the units built within a single development have at least one entrance to a home
at grade, with a paved accessible route.
Developers are encouraged to include front porches or patios and windows that face all streets.
This will help create a sense of place within the community and promote street safety. Walk-ups are
preferred to shared external staircases in any type of development and individual garages or parking
structures are required to be attached.
Building entrances should be oriented towards the streets with garages and parking to the rear.
Site Planning | 14
STREET DESIGN
Streets should be designed to slow neighborhood
traffic and create a sense of place. The City street
grid is a vital to overall safety and transportation
function in the City, so restoring street connections
that connect to the existing street grid is
encouraged. Disconnected streets and cul-de-sacs
are discouraged.
Pedestrian safety should be a priority when designing
public streets. Enhancements to safety, including
crosswalks, narrowed intersections, lighting, planted
center medians, and landscaped boulevards that
include street trees are encouraged.
Streets should also be designed with snow storage
in mind. Plans should identify snow storage areas
and snow removal plans. Cul-de-sac islands are
encouraged for snow storage. However, plant
materials in the cul-de sac islands must be carefully
chosen to ensure healthy growth and longevity. Cul-
de-sac islands should be irrigated.
PORCHES
STREET
LIGHTING
STREET
TREES
FRONT YARDS
BUILDING
LINE
Example Street Design Elements
Streets should be comfortable for all user types, promoting safe speeds visibility
Site Planning | 15
PARKING AND ACCESS
New multi-family development should comply with the
parking requirements in Section 90-252 of the City Code
and these guidelines.
Section 90-252 of the City Code requires parking stalls
for different types of residential development. Where one
exists, the Homeowner’s Association (HOA) documents
must include language limiting on-street parking. Required
off-street parking should be located within garages or
underground parking structures. All townhouses and
townhouse developments are required to have private
garage access as identified in Section 90-218 Subd. E.
The layout of the building should not place the garage in
front of the home. This will minimize the dominance of
the garage and allow the first view of the unit to be an
architecturally pleasing entrance. The use of color to match
the garage door to the main exterior of the unit is highly
encouraged, as it will also minimize the dominance of the
garage. Garage-forward or “snout-house” townhouses are
highly discouraged as they dominate the view from the
street and sidewalk. Garages are encouraged to face each
other on a drive aisle and should not front onto a public
street. Garage entries should be from rear or side where
possible.
Driveway placement and design can be found in
Section 90-215 of the City Code. In addition to these
requirements, driveways should be placed to enhance
access to the site and prevent conflicts with existing or
planned pedestrian facilities or bike lanes. As with parking
areas, driveways should direct vehicle traffic to the rear
of a site and maintain landscaping and green spaces on the
street side of a development.
Driveways in front of attached garages should be a minimum of 22 feet in length. Different lengths
are encouraged to reduce repetition; however, the driveways must allow for adequate vehicle parking
without obstructing sidewalks, private drives, or public streets. Surface parking areas for guest
parking should be well landscaped and provided throughout the development as the City ordinance
requires.
“Snout houses” that are garage forward should be avoided
Driveways and garages should be placed on the side or rear of buildings
Site Planning | 16
Parking lots should provide landscape islands at each
end of the parking bay and bays in excess of 15 spaces
in length should be divided by intermediate islands.
Trees shall be located in the islands to shade the
parking lot to reduce the heat island effect.
These end landscape islands shall provide at least
adequate of area for planting trees, shrubs and/or
groundcovers. Buffer landscaping should be provided
between parking and living spaces.
Bicycle racks should be provided for all apartments and
may be placed near the entrance if a minimum 5-foot
wide pedestrian access to the building entrance is
maintained. Bicycle parking may occupy a maximum of
two required parking stalls without requiring additional
parking.
Where possible, parking lots should incorporate stormwater management into the parking lot as an
amenity feature. These features, when appropriately designed, can be used to meet the landscape
island requirements.
Any lighting used to illuminate an off-street parking area shall be so arranged as to reflect glare away
from adjoining property, adjacent residential uses and public rights-of-way and be in compliance with
Section 90-238 of the City Code.
Bike Infrastructure
Parking and street areas should offer enhanced groundcover and landscaping to screen and reduce visual impact
Site Planning | 17
LANDSCAPING AND GREEN SPACE
Site design and landscaping should be designed
to work with the existing topography of the
area, wooded areas, wetlands and natural view-
sheds and corridors. Sustainability, in terms of
the landscape, is the ability of plant species to
maintain healthy growth with minimal human
assistance. Selecting plants suited for a specific
condition is key to their sustainability over time.
Benefits of utilizing sustainable plant species
include less time spent towards maintenance, less
maintenance costs, and positive contributions to
the larger environment and its ability to perpetuate
itself.
Development landscaping shall include a full
complement of overstory and understory trees,
shrubbery and ground covers which are hardy and
appropriate for the locations in which they are
planted and provide year-long color and interest.
A list of prohibited species of trees and shrubs
can be found in Section 90-236 of the City Code.
Developments should promote native plants that
add to the wildlife and pollinator habitats found in
Hugo.
All land area not occupied by buildings, parking,
driveways, sidewalks or other hard surfaces
shall be sodded or mulched and landscaped with
approved ground cover, flowers, shrubbery and
trees. Native prairie plantings and bee lawns,
which includes low growing flowers and turf
grasses, are viable options to traditional lawns in
Hugo. The plant composition of these alternatives
are widely varied and can be tailored to suit
specific conditions and aesthetics. The overriding
concept is that they provide habitat, food and
shelter for a variety of animals, birds and insects and they are sustainable with minimal intervention.
An overlooked benefit of prairies and bee lawns is that they visually change with the seasons,
providing a changing view throughout the year. The City supports the use of these ground covers
when a maintenance plan is provided for review and approval by the City.
Rain gardens and colorful year-round plantings should be found throughout
Pollinator gardens and native plants are encouraged throughout a development
Site Planning | 18
Maintenance agreements should be executed for the upkeep and ongoing maintenance of these green
spaces and planned landscaping. This is essential to continue providing residents with high-quality
landscaping and prevent injury or liability for overgrown areas. Well-landscaped open areas should be
provided at the main road entryway to the developments. Gateway or welcoming design elements,
including water or landscape features, signage, and lighting, are encouraged.
All developments are required to dedicate parkland or a fee lieu of land as found in Section 90-324 of
the City Code. In addition, developments should preserve and enhance existing natural features such
as dense woods or vegetation, wetlands, rivers, lakes, streams, and many more. Buildings and related
sidewalks and trails should be placed to take advantage of the views and access to these enhanced
natural features and any newly created green spaces.
High-quality landscaping and green space design may include playgrounds and sports fields
Landscaping along sidewalks and trails helps direct people and provides a visual buffer
Site Planning | 19
STORMWATER MANAGEMENT
Water features and drainage systems are essential components of development in the district. A mix
of ponds, fountains and other water elements provide focal amenities and year round activities within
the framework of an environmentally responsible, visually pleasing strategy to manage stormwater.
Each site has a responsibility to utilize best management practices (BMP) to pretreat run-off, reduce
erosion and encourage infiltration in compliance with City and watershed standards. Water and
landscape should be utilized within multipurpose areas that accommodate both active and passive
recreational use – the following examples illustrate only a few of many possibilities:
1. Pervious pavements, underground
storage and other creative techniques
should be used to meet BMP standards,
particularly in areas where more density
is expected.
2. Stormwater reuse is encouraged, but
not feasible on all sites. Developers
should utilize it in their development
where feasible.
3. Green architecture, expressed through
green roofs, gray water recycling and
other techniques should be included to
reduce the impact of new development
on stormwater systems.
4. Water feature design should include both formal elements (such as reflecting pools or
fountains) and natural/informal forms (such as ponds or fountains) and should explore creative
ways to integrate wet landscapes with active, urban spaces.
All developments should provide a Chloride Management Plan. Studies (see MCES publication
regarding Nine Mile Creek, March 2021) show that chloride (or salt) found in surface waters and
shallow aquifers has been increasing over the past 20 years. One source of the river’s chloride is
the salt applied to our streets, parking lots, driveways and sidewalks in the winter and results in
peak chloride values between March and May. Due to the chloride’s toxicity on the environment,
watershed organizations and regulatory agencies have increased their focus on the urban sources and
some watersheds are implementing practices for reducing salt applications.
Functional and blended stormwater facilities enhance the overall development
Site Planning | 20
SUSTAINABILITY COMMUNITIES
Community design impacts the health of all
those who live, work, worship, play, learn, or
travel in Hugo. Creative design should promote
safety, beauty, community health, and social
development. This includes public green spaces,
trails and paths, access to food options, and many
other things. These things are known to promote
healthier lifestyles and better use of the land for
long-term development.
In addition, green practices during building, such
as alternative energy systems, stormwater reuse,
greywater reuse, and other sustainable practices,
should be pursued to reduce the required
resources for development and the long-term
impacts on Hugo.
HEALTHY DESIGN
Sidewalks, trails, bike lanes, and parks are some
improvements that promote healthy living and
give people options to get around outside vehicle
use. These facilities also create safer routes for
people to access Hugo’s other commercial, social,
or civic uses. More people will access the site
in multi-family developments than single-family
developments on parcels of the same size, which
promotes commercial development nearby.
Ensuring the design provides safe and connected
amenities for residents and visitors will promote
healthy lifestyles and choices.
Electric vehicle charging infrastructure should be
provided for all new multi-family structures.
Landscaping, paths or trails and other amenities promote a healthy community
Natural spaces enhance livability and the overall feel of a development
Implementation | 21
APPLICATION
These design guidelines supplement the City Code requirements and Comprehensive Plan and
provide residents, developers, and city staff with an understanding of the expectations for new multi-
family development.
To ensure uniformity, these guidelines may be amended or updated to reflect market and social
changes to the city of Hugo. Staff will administer the design guidelines as part of the development
review process. Staff will incorporate design review to ensure compliance with the design guidelines
as a standard step in the development review process.
DOWNTOWN STANDARDS
The Hugo Downtown Plan & Design Guidelines contain separate guidelines for the Downtown
District. While these guidelines take a more compressive approach to development in the core of
Hugo, they also have additional standards for multi-family developments that only apply in these
areas. These differences include mixed-use and ground-floor retail and activation, as well as different
lot placement and parking requirements. These Multi-family Design Guideline standards are in
addition to the Downtown Plan & Design Guidelines; however, they do not take precedent over any
of those guidelines for design elements and requirements where applicable.
IMPLEMENTATION
The Downtown Standards are additional guidelines for areas within Downtown Hugo.
Financing for this project was provided by the Metropolitan Council
Metropolitan Livable Communities Fund.