Loading...
HomeMy WebLinkAbout2026.05.18 CC Packet A. CALL TO ORDER B. ROLL CALL C. PLEDGE OF ALLEGIANCE D. APPROVAL OF MINUTES 1. May 4, 2026, City Council Meeting E. APPROVAL OF AGENDA F. APPOINTMENTS/PRESENTATIONS 1. Hugo Good Neighbor Days June 5-7, 2026 2. Washington County Sheriff’s Department Annual Report – Sheriff Dan Starry 3. Introduction of New Washington County Deputy Andrew Schommer, and New Hugo Detective Tyler Jarrett G. CONSENT AGENDA All matters listed under the Consent Agenda are considered to be routine by the City Council and will be enacted by one motion and a roll call vote. If a member of the City Council or the public wishes to discuss an item, that item will be removed from the Consent Agenda and will be considered separately. 1. Approve Claims Roster 2. Approve Quote for Gravel Contract 3. Approve Amended State Building Code Agreement with Scandia 4. Approve Special Event Permit for Blacksmith Lounge for 2026 Events 5. Approve Temporary Liquor License for Hugo Lions Club for Tough Mudder on June 27, 2026 Mayor: Tom Weidt Councilmembers: Becky Petryk, Ward 1 Ben Krull, Ward 2 Dave Strub, Ward 3 Mike Miron, At Large City Council Agenda Monday, May 18, 2026 Address: 14669 Fitzgerald Ave. N. Hugo, MN 55038 Phone: 651-762-6300 Website: www.ci.hugo.mn.us H. PUBLIC HEARING 1. Nothing Scheduled I. UNFINISHED BUSINESS 1. Discussion of Equipment CIP and Approve Purchase of Brush/Rescue Combination Truck J. NEW BUSINESS 1. Nothing Scheduled K. VISITOR PRESENTATIONS 1. Nothing Scheduled L. COUNCIL PRESENTATIONS 1. Nothing Scheduled M. ADMINISTRATIVE PRESENTATIONS 1. League of MN Cities Annual Conference June 24-26, 2026 N. ADJOURNMENT BACKGROUND MEMO FOR THE CITY COUNCIL MEETING ON MAY 18, 2026 D.2 May 4, 2026, City Council Meeting Staff recommends Council approve the above minutes as presented. F.1 Hugo Good Neighbor Days June 5-7, 2026 The Hugo Lions Club will be holding their annual Hugo Good Neighbor Days Community Festival June 5-7, 2026, at the Lions Volunteer Park. Lions Club members will be in attendance to answer any questions the Council may have and will request the Council co-sponsor the event by waiving the Special Event Permit and providing Washington County deputies to be present during the event, as in the past. F.2 Washington County Sheriff’s Department Annual Report – Sheriff Dan Starry Sheriff Dan Starry will present to Council the 2025 Annual Report. F.3 Introduction of New Washington County Deputy Andrew Schommer, and New Hugo Detective Tyler Jarrett Sheriff Dan Starry will introduce new Hugo’s new deputy and detective. G. 1 Approve Claims Roster Staff recommends Council approve the Claims Roster as presented. G.2 Approve Quote for Gravel Contract Staff received quotes for Class 5 modified gravel to be placed on our rural gravel roads. Staff received two out of the three quotes requested. Dresel Contracting and Miller Excavating submitted bids and Dresel Trucking did not. Dresel Contracting provided the low quote of $14.69 per ton delivered price. The City will need approximately 5,280 tons for a total contract of $77,563.20. The roads included in this year’s re-graveling project are Ingersoll Avenue, 175th Street, Inwood Avenue, and 180th Street. Staff recommends Council approve the contract with Dresel Contracting to provide Class 5 modified gravel at $14.69 per ton. G.3 Approve Amended Agreement with Scandia for Administration of the State Building Code In February 2015, the City Council approved a contract with the City of Scandia for the administration of the State Building Code. Under this agreement, the City of Hugo has provided plan review, inspection, scheduling, and reporting services for all building permits issued by Scandia. Revisions to the agreement have been prepared to remove plan review and inspection services for state-licensed facilities, as the City of Hugo no longer maintains state delegation for these activities. Additionally, the agreement has been updated to reflect the mileage rate to follow the current IRS mileage rate for business. Staff recommends approval of the amended agreement with the City of Scandia for administration of the State Building Code. G.4 Approve Special Event Permit for Blacksmith Lounge for 2026 Events The Blacksmith Lounge, 17205 Forest Boulevard North, has applied for a Special Event Permit for their 2026 events to be held between Memorial Day and end of September. Events include four auctions, seven car shows, one motorcycle swap meet, and one White Bear Lake Hockey fundraising event. A Special Event Permit approved by Council is required because there will be alcohol served outside and there may be up to 200 people in attendance. Staff recommends Council approve the Special Event Permit for the Blacksmith Lounge. G.5 Approve Temporary Liquor License for Hugo Lions Club for Tough Mudder on June 27, 2026 The Hugo Lions Club has submitted a temporary liquor license application to serve beer and seltzers at the Tough Mudder event to be held at Wild Wings Game Farm on June 27, 2026. The request for approval of a Special Event Permit for the event will be on the next Council agenda. Staff recommends Council approve the temporary liquor license for the Lions Club for the Tough Mudder on June 27, 2026, subject to approval of the Special Event Permit. I.1 Discussion of Equipment CIP and Approve Purchase of Brush/Rescue Combination Truck As part of the City's 2026 Focus Goals, the City Council set a goal to evaluate the equipment CIP to accommodate future Fire Department trucks. Fire Chief Jim Compton Jr. has appointed a truck committee who has completed a thorough review of the Fire Department's fleet. They have advised that certain vehicles should be phased out and replaced with new vehicles with different capabilities, due to the changing needs of the Department. They also believe a new strategy should equate to long term cost savings for the city. The Fire Chief will present recommendations concerning the City's equipment CIP. At the end of his presentation, the Chief will recommend the purchase of a new brush/rescue combination truck to replace the aging brush truck that is currently scheduled for replacement in 2026. M.2 League of MN Cities Annual Conference June 24-26, 2026 The League of MN cities will be holding their 2026 annual conference in Rochester on June 24- 26, 2026. Staff recommends Council schedule it as a meeting if they wish to attend. N. Adjournment MINUTES City Council Meeting City Hall Council Chambers Monday, May 4, 2026 7:00 p.m. Call to Order Acting Mayor Miron called the meeting to order at 7:00 p.m. Roll Call and Pledge of Allegiance COUNCIL PRESENT: Krull, Miron, Petryk, Strub COUNCIL ABSENT: Weidt OTHERS PRESENT: City Administrator Bryan Bear, City Engineer Mark Erichson, City Attorney Dave Snyder, Community Development Director Rachel Juba, City Clerk Michele Lindau Approve Minutes for the April 18, 2026, Kidz ‘n Biz Event Strub made motion, Krull seconded, to approve the minutes for the Kidz ‘n Biz Event held on April 18, 2026, as presented. All Ayes. Motion carried. Approve Minutes for the April 20, 2026, City Council Meeting Krull made motion, Strub seconded, to approve the minutes for the City Council meeting held on April 20, 2026, as presented. All Ayes. Motion carried. Approve Minutes for the April 23, 2026, Joint Workshop on Zoning Codes Strub made motion, Krull seconded, to approve the minutes for the Joint Workshop with the Planning Commission on Zoning Codes held on April 23, 2026, as presented. All Ayes. Motion carried. Approval of Agenda Miron made motion, Petryk seconded, to approve the agenda as amended to reschedule the City Administrator’s performance review. All Ayes. Motion carried. Council Meeting Minutes for May 4, 2026 Page 2 of 6 Approval of Consent Agenda Miron made motion, Petryk seconded, to approve the following Consent Agenda: 1. Approve Claims Roster 2. Approve Annual Performance Review for Parks Planner Shayla Denaway 3. Approve Annual Performance Review for Public Works Parks Lead Worker Rick Kieffer 4. Approve Hiring of Public Works Summer Seasonal Positions 5. Approve Donation to the Hugo Fire Department from the Hugo American Legion 6. Approve Resolution Approving Cannabis Microbusiness Registration for Mi Sota Essence Cannabis, LLC 7. Approve Water Surface Use Permit for Slalom Course on Sunset Lake All Ayes. Motion carried. Approve Claims Roster Adoption of the Consent Agenda approved the Claims Roster as presented. Approve Annual Performance Review for Parks Planner Shayla Denaway Shayla Denaway was hired on May 11, 2009, as the Economic Development/Parks Intern. On May 3, 2010, Council approved promoting Shayla to Parks Planner. Approval of the Consent Agenda approved the annual performance review for Parks Planner Shayla Denaway. Approve Annual Performance Review for Public Works Parks Lead Worker Rick Kieffer Rick Kieffer was rehired by the City of Hugo as a Public Works Worker on May 31, 2005, returning after a short period of time in the private sector. In April 2023 Rick was promoted to Public Works Parks Lead Worker. Approval of the Consent Agenda approved the annual performance review for Public Works Parks Lead Worker Rick Kieffer. Approve Hiring of Public Works Summer Seasonal Positions At the April 6, 2026, Council meeting, Council approved the hiring of five seasonal employees. Since that meeting, one of the seasonal employees received an offer for a summer internship in the field of his education goals and will not be joining the City. Also, a regular full-time employee is expected to be out on medical leave for much of the summer. Staff requested Council approval to hire two seasonal employees for the Public Works Department. Approval of the Consent Agenda approved the rehiring of last year’s seasonal employee, Adler Siebenaler and the hiring of new seasonal, Ben Clausen. Council Meeting Minutes for May 4, 2026 Page 3 of 6 Approve Donation to the Hugo Fire Department from the Hugo American Legion The Hugo American Legion would like to donate $1,000 to the Hugo Fire Department from pull- tab proceeds for equipment. All donations to the Fire Department must be approved by the Council. Approval of the Consent Agenda approved the donation of $1,000 to the Hugo Fire Department. Approve Resolution Approving Cannabis Microbusiness Registration for Mi Sota Essence Cannabis, LLC. The applicant, Mi Sota Essence Cannabis, LLC, had requested approval of a cannabis microbusiness registration that would allow for cultivation, production of consumer products, and retail operations. The business is proposed to operate under the name Carma Cannabis. The microbusiness’ primary use would be cultivation of cannabis flower and production of consumer products with cannabis flower, with an accessory use of retail sales of products manufactured on site. The applicant had received preliminary license approval from the Minnesota Office of Cannabis Management (OCM) and was requesting this registration to hold one of the two available retail registrations within the City while they develop their final plans of record and apply for full state license approval. The registration would not become effective until the applicant received full state license approval. Approval of the Consent Agenda approved RESOLUTION 2026-11 APPROVING A CANNABIS MICROBUSINESS REGISTRATION FOR MI SOTA ESSENCE CANNABIS, LLC. Approve Water Surface Use Permit for Slalom Course on Sunset Lake Dave Strub made application to the City of Hugo for a Water Surface Use Permit to allow water skiing on the slalom course on Sunset Lake. The Washington County Sheriff’s Department issues the permit after City Council approval. Adoption of the Consent Agenda approved the application for a Water Surface Use Permit for a slalom water skiing course on Sunset Lake. Improvement Hearing for 2026 Bald Eagle Industrial Park Area Street Project On February 27, 2025, the City Council authorized the preparation of a feasibility study for the 2026 Bald Eagle Industrial Park Area Street Improvement Project. City Council accepted the completed study at the November 17, 2025, Council meeting. At the April 6, 2026, City Council meeting, Council called for a Public Hearing to be held this evening, May 4, 2026. City Engineer Mark Erichson reviewed the project location showing which streets and trails in the Bald Eagle Industrial Park area were proposed to be improved and explained how roadways are rated on their condition every three years. That information is used to develop the City’s five-year Capital Improvement Plan (CIP). The project identified for this year includes the streets in the BEIP area. He displayed photos of existing conditions showing deterioration of the roadways and patching stating the desire to address the issues before they become too costly. Mark explained the proposed improvements involve partial reconstruction for the majority of the project noting that the lighting along Fenway Boulevard is not included in the bid because the contract with Xcel Energy is still being worked on. He reviewed the proposed trail improvements, which would not be included in the assessed cost. Other minor improvements Council Meeting Minutes for May 4, 2026 Page 4 of 6 included mill and overlay for Fenway Boulevard Court North and a portion of 130th Street North and the demolition of the building and removal of the watermain at Watertower Park. Erichson explained that the assessment process follows Minnesota State Statute Chapter 429 that requires two public hearings, both of which will be held this evening. Many other meetings had been held previously with businesses and residents in the project area. The total project cost have been identified to be $4,678,426 with the amount to be funded by assessments at $1,021,356.84. Assessments can be prepaid or spread over ten-year period at an interest rate of 4.55%. He explained the senior citizen deferral process noting that interest does occur. Written objections can be provided at this hearing and notice of appeal can be filed within 30 days after adoption of the assessment. Parcels would be assessed according to the City’s Assessment Policy last reviewed in 2013 pointing out that costs have increased leaving the City to take a larger share of the project costs. Rates would be $4,100 per unit for the partial reconstruction and $2,100 per unit for the urban roadway overlay. Commercial and industrial properties are based on a front footage basis. He presented a map that showed the assessment area. Erichson talked about the public engagement done with a majority of the businesses regarding construction impacts in addition to neighborhood meetings and meetings with residents on properties that are not being assessed. There will be full closure on some roads and a proposed one-way traffic loop to always guarantee access to TH61. Construction is expected to last three months. Staff will be working closely with businesses on access to their properties. If the improvements and award of contract were approved this evening, construction would take place from June through September 2026. Krull made motion, Petryk seconded, to open the public hearing on ordering the project. Fred Rau, 4949 130th Street North asked about pedestrian options on 130th Street noting the communal mailboxes are down the street and he had concerns regarding traffic. Erichson explained there were options to add a trail but there is limited roadway, so widening it to meet City standards was preferred. Erichson stated that it will be monitored; Washington County Sheriff’s deputies will be on site while the roadway is new to set the standard for those who use it and will issue citations if necessary. Dan Cornell, 4859 130th Street North asked if the road will be open to local traffic only. Erichson replied that 130th, 132nd, and 134th Streets will be closed at Fenway Boulevard. Residents in those neighborhoods will have to exit west due to limit the amount of traffic going through the construction zone to exit at 140th and TH61. Mailings will be sent to property owners during construction to keep them informed of construction related matters. Miron made motion, Petryk seconded, to close the public hearing. All Ayes. Motion carried. Council Meeting Minutes for May 4, 2026 Page 5 of 6 Petryk made motion, Strub seconded, to approve RESOLUTION 2026-12 ORDERING THE PROJECT FOR 2026 BALD EAGLE INDUSTRIAL PARK AREA STREET IMPROVEMENT PROJECT. Roll call vote- Ayes: Krull, Petryk, Strub, Miron Nays: None Assessment Hearing for 2026 Bald Eagle Industrial Park Area Street Project Petryk made motion, Strub seconded, to open the assessment hearing. All Ayes. Motion carried. Erichson commented that the Finance Director would be sending out letters later this week to property owners regarding options for payments noting that property owners who wished to pay the assessment before it is certified to the Couty had until November 15, 2026, to do so. There were no other comments, and Miron made motion, Krull seconded, to close the public hearing. Petryk made motion, Krull seconded, to approve RESOLUTION 2026–13 ADOPTING ASSESSMENTS FOR THE 2026 BALD EAGLE INDUSTRIAL PARK AREA STREET IMPROVEMENT PROJECT. Roll call vote- Ayes: Petryk, Strub, Krull, Miron Nays: None Motion carried. Approve Resolution Receiving Bids and Awarding the Contract for the 2026 Bald Eagle Industrial Park Area Street Project City Engineer Mark Erichson explained that four bids for the 2026 Bald Eagle Industrial Park Area Street Improvement Project were received on April 29, 2026. The bid range for the project was from $3,774,283.50 to $5,095,769.33 with the engineer’s estimate being $4,337,315.60. The bids included the base bid, alternate 1 (140th Street trail), Alternate 2 (Fenway Boulevard trail), Alternate 3 (additional driveway at Wilson Tool) and provisional items that are uniform for all bidders. Wilson Tool had requested the City exclude the award of alternate 3 as they do not want to move forward with the driveway addition at this time. Staff recommended the Council award a contract for the base bid, alternate 1, alternate 2, and provisional items in the amount of $3,572,331.00 to Bituminous Roadways, Inc. based on the results of the bids received. Council Meeting Minutes for May 4, 2026 Page 6 of 6 Krull made motion, Petryk seconded to approve RESOLUTION 2026-14 RECEIVING BIDS AND AWARDING A CONTRACT FOR THE 2026 BALD EAGLE INDUSTRIAL PARK AREA STREET IMPROVEMENT PROJECT. Roll call vote- Ayes: Strub, Krull, Petryk, Miron Nays: None Motion carried. Schedule Commissioner Interviews City Administrator Bryan Bear asked Council to discuss scheduling interviews for vacant positions on the commissions and recommended waiting until July in hopes there will be additional candidates. He asked Council to encouraged others to apply. Miron made motion, Krull seconded, to schedule commissioner interviews for Wednesday, July 22, 2026, at 6 p.m. All Ayes. Motion carried. Reschedule Annual Performance Review for City Administrator Bryan Bear on Monday, May 4, 2026 The performance review for City Administrator Bryan Bear scheduled for this evening was postponed due to the inability of the full Council to attend. Strub made motion, Petryk seconded, to reschedule the performance review to Monday, May 18, 2026, at 6:00 p.m., one hour prior to the City Council meeting. All Ayes. Motion carried. Adjournment Strub made motion, Krull seconded, to adjourn at 7:44 p.m. All Ayes. Motion carried. Respectfully Submitted, Michele Lindau, City Clerk City of Hugo Claims May 18, 2026 G. 1 Vendor Invoice Amount Description Department Abdo Financial Solutions LLC 523119 3,210.00$ Accounting Assistance Finance Dept Abdo Financial Solutions LLC 524025 2,126.25$ Accounting Assistance Finance Dept Amazon Capital Services 1WDF-7NHK-9DM1 111.41$ Breakroom Supplies Public Works Amazon Capital Services 1WDF-7NHK-9DM1 65.57$ Markers & Rubber Bands Public Works Amazon Capital Services 1WDF-7NHK-9DM1 62.07$ Copy Paper Public Works Amazon Capital Services 1WDF-7NHK-9DM1 48.10$ Trash Can Liners Public Works Amazon Capital Services 1WDF-7NHK-9DM1 10.38$ Restroom Repair Supplies (PPP)Parks Dept Ancom Communications 132866 2,019.00$ Pager Batteries Fire Dept Ancom Communications 132925 1,911.00$ Pagers & Maintenance Plans (3)Fire Dept Ascentek Inc 4133411 86.25$ Used Oil Filters Disposal Public Works Aspen Mills 375080 44.00$ Tie, Tie Clip & Patches Fire Dept Baker Tilly Municipal Advisors LLC BT3595998 4,500.00$ Arbitrage Compliance Report Finance Dept Catalyst Graphics Inc 49390 721.51$ Utility Bill Mailing (Autodraft)Water & Sewer Catalyst Graphics Inc 49391 1,002.95$ Utility Bill Mailing (Regular)Water & Sewer Cintas Corporation 5332411410 162.29$ First Aid Supplies Public Works Cintas Corporation 5332411410 163.03$ First Aid Supplies Gen Gov't Bldgs Clarey's Safety Equipment Inc 222291 642.88$ Calibration Equipment for Gas Monitors Fire Dept CohnReznick LLP 90253500 10,300.00$ 2025 Audit Interim Billing Finance Dept CohnReznick LLP 90253500 $ 11,487.50 Accounting Assistance Finance Dept Companion Animal Control LLC April 314.23$ Callout Fees & Mileage Animal Control Companion Animal Control LLC April 500.00$ Boarding & Rescue Fees Animal Control Compton, Jim Jr. CLAIM 391.40$ Chief Vehicle Heating Costs Fire Dept Compton, Jim Jr. CLAIM 1,184.04$ FDIC Conference Lodging Fire Dept Compton, Jim Jr. CLAIM 214.55$ FDIC Conference Fuel Fire Dept Compton, Jim Jr. CLAIM 124.12$ FDIC Conference Expenses Fire Dept Denaway, Shayla CLAIM 562.74$ Summer Concert Series - Signs & Banners (Smart Sign)Parks Dept Direct Bore Inc 7759 4,675.00$ PW Septic System - Install Electrical Conduit Public Works Electro Watchman Inc 459625 541.25$ Access Control System Tech Support - Well House No. 4 Water Utility Electro Watchman Inc 460443 1,716.77$ Electrical Work - Automatic Door Openers (FH)Fire Dept Electro Watchman Inc 460480 278.75$ Security Camera Repair Parks Dept Emans, Colin CLAIM 489.25$ Chief Vehicle Heating Costs Fire Dept Forest Lake NAPA April 628.71$ Auto Parts & Shop Supplies Various Gopher State One Call 6040490 425.25$ April Service Charges Water & Sewer Hawkins Inc 7390287 50.00$ Water Chemicals (Cylinder Charge)Water Utility Hoernemann, Ross CLAIM 195.70$ Chief Vehicle Heating Costs Fire Dept Hoistad, Joel CLAIM 85.00$ Building Official License Renewal Fee Building Inspections Hotsy Equipment of Minnesota 28488 322.86$ Pressure Washer Annual Maintenance Fire Dept Innovative Office Solutions LLC IN5108087 255.78$ File Folders Administration Innovative Office Solutions LLC IN5109106 120.93$ Breakroom Supplies (CH)Gen Gov't Bldgs Innovative Office Solutions LLC IN5109106 56.38$ Labels Administration Innovative Office Solutions LLC IN5109778 68.53$ Breakroom Supplies (CH)Gen Gov't Bldgs Innovative Office Solutions LLC IN5109778 20.60$ Correction Tape Administration Innovative Office Solutions LLC IN5111296 346.68$ Restroom Supplies (PPP)Parks Dept Innovative Office Solutions LLC IN5114161 516.24$ Toner Cartridges Building Inspections Innovative Office Solutions LLC IN5114161 238.70$ Copy Paper Administration Innovative Office Solutions LLC IN5114161 78.92$ Trash Can Liners (CH)Gen Gov't Bldgs Innovative Office Solutions LLC IN5114161 47.00$ Breakroom Supplies (CH)Gen Gov't Bldgs Instrumental Research, Inc.7068 135.00$ Water Bacteria Testing Water Utility Interstate Battery System of Minneapolis 110063288 154.95$ Battery - Emergency Generator (PW Bldg)Public Works Interstate Battery System of Minneapolis 110063106 (60.00)$ Core Credit - Unit #346-21 Street Dept Interstate Battery System of Minneapolis 110063106 (60.00)$ Core Credit - Unit #317-06 Street Dept Jensen, David CLAIM 489.25$ Chief Vehicle Heating Costs Fire Dept Jensen, David CLAIM 1,184.04$ FDIC Conference Lodging Fire Dept Jensen, David CLAIM 158.29$ FDIC Conference Expenses Fire Dept Johnson/Turner March 5,560.00$ Prosecution Fees (Flat Fee)General Legal Johnson/Turner March 340.00$ Disbursements (Prosecution Costs)General Legal Johnson/Turner March 8,925.50$ Civil Legal Fees - See Attached Breakdown General Legal Killmer Electric Co Inc W26791 239.23$ PW Septic System - Service Locates Public Works Laughlin's Pest Control 77702 100.68$ May Pest Control Service Gen Gov't Bldgs Leonard, Ted CLAIM 397.96$ Reimb. Tree Replacement - Dellwood & 125th Street Imp Street Reconstruction LRS Portables of Minnesota MP298232 130.00$ Toilet Rental - Oakshore Park Parks Dept LRS Portables of Minnesota MP298233 130.00$ Toilet Rental - Oneka Park Parks Dept LRS Portables of Minnesota MP298234 130.00$ Toilet Rental - Beaver Ponds Park Parks Dept LRS Portables of Minnesota MP298235 130.00$ Toilet Rental - Diamond Point Park Parks Dept LRS Portables of Minnesota MP298236 130.00$ Toilet Rental - Frog Hollow Parks Dept LRS Portables of Minnesota MP298237 260.00$ Toilet Rental - Hanifl Park West Parks Dept LRS Portables of Minnesota MP298238 130.00$ Toilet Rental - Valjean Park Parks Dept LRS Portables of Minnesota MP298239 130.00$ Toilet Rental - Arbre Park Parks Dept LRS Portables of Minnesota MP298240 130.00$ Toilet Rental - Heritage Ponds Park Parks Dept LRS Portables of Minnesota MP298241 130.00$ Toilet Rental - McCollar Park Parks Dept LRS Portables of Minnesota MP298242 130.00$ Toilet Rental - Arcand Park Parks Dept LRS Portables of Minnesota MP298243 70.00$ Toilet Rental - Irish Ave Park Parks Dept LRS Portables of Minnesota MP298244 260.00$ Toilet Rental - Hanifl Park East Parks Dept Marco INV15198919 77.54$ May Copier Maintenance Building Inspections Martin Marietta Materials 49069635 974.75$ Asphalt Street Dept Martin Marietta Materials 49082232 807.67$ Asphalt Street Dept Menards 77039 29.98$ Axe (Tree Trimming)Street Dept Page 1 City of Hugo Claims May 18, 2026 G. 1 Vendor Invoice Amount Description Department Metro-INET 3455 13,019.00$ May Computer Service Various Minnesota Cleaning Services Inc 0526HH03 788.67$ May Cleaning Services Gen Gov't Bldgs Minnesota Cleaning Services Inc 0526HH04 119.99$ May Cleaning Services - Hanifl Parks Dept Minnesota Cleaning Services Inc 0526HH05 780.00$ May Cleaning Services - PW Facility Public Works Minnesota Cleaning Services Inc 0526HH05 485.33$ May Cleaning Services Fire Dept Minnesota Cleaning Services Inc 0526HH05 260.00$ May Cleaning Services - Rice Lake Room Gen Gov't Bldgs Minnesota Department of Health 4959 23.00$ Water Operator Renewal - Smith Water Utility MN Fire Service Certification Board 15500 131.00$ Fire Instructor I Certification Exam - Verplaetse Fire Dept Nadeau, Ryan CLAIM 195.70$ Chief Vehicle Heating Costs Fire Dept Niebur Tractor & Equipment 01-218813 47.05$ Parts - Unit #343-20 Parks Dept Oxygen Service Company 3648967 155.09$ Welding Supplies Public Works Palmquist, Jason CLAIM 195.70$ Chief Vehicle Heating Costs Fire Dept Pomp's Tire Service Inc 150201684 75.13$ Tire Repair - Unit #340-07 Street Dept Pomp's Tire Service Inc 150201707 628.54$ Tires - Unit #343-20 Parks Dept Pomp's Tire Service Inc 150202063 389.84$ Tires - Unit #329-11 Street Dept Pye-Barker Fire & Safety IVN00376178 372.60$ Annual Monitoring of City Hall Alarm System Gen Gov't Bldgs Schaeffer Manufacturing Company WXD1197-INV1 575.64$ Shop Supplies Public Works Shred Right 71078 1,450.00$ Shredding Event Recycling Signature Lighting Inc 1530 1,470.54$ Streetlight Repairs Street Dept Stabner Electric LLC 5550 151.75$ Electrical Work - CH Restroom Light Gen Gov't Bldgs Thul Specialty Contracting Inc 3449 39,525.00$ Catch Basin Repairs - Seal, Grout & Concrete Stormwater Fund Total Control Systems Inc 12082 1,215.00$ Quarterly SCADA Cradlepoints - Lift Stations (9) Sewer Utility Total Control Systems Inc 12082 540.00$ Quarterly SCADA Cradlepoints - Wells (4) Water Utility Total Control Systems Inc 12082 270.00$ Quarterly SCADA Cradlepoints - Towers (2) Water Utility Total Control Systems Inc 12082 496.80$ SCADA Training (New Employees) Water & Sewer Uline 207455615 156.57$ Foamboard Administration UniFirst Corporation 1410222791 133.28$ Uniforms, Supplies & Floor Mat Services (PW) Public Works UniFirst Corporation 1410223036 159.13$ Restroom Supplies & Floor Mat Services (CH) Gen Gov't Bldgs UniFirst Corporation 1410224499 131.44$ Uniforms, Supplies & Floor Mat Services (PW) Public Works UniFirst Corporation 1410226175 135.84$ Uniforms, Supplies & Floor Mat Services (PW) Public Works US Bank Corporate Payment Systems 201042657 25.00$ Federal Motor Carrier Safety Queries Public Works Verizon Wireless 6141846707 23.33$ Cellular Phone Charges Public Works Verizon Wireless 6141846708 865.82$ Cellular Phone Charges Various Washington County 2026-U-175 100.00$ Right of Way Permit - 2026 Bald Eagle Industrial Park Improvements Street Reconstruction Wright, Gregory April 1,645.00$ April Cleaning Services (PPP) Parks Dept WSB & Associates January 103,457.25$ Engineering Fees - See Attached Breakdown Various WSB & Associates February 115,201.25$ Engineering Fees - See Attached Breakdown Various Ziegler Companies IN002367861 720.06$ Parts - Unit #340-07 Street Dept Ziegler Companies IN002375511 51.48$ Parts - Unit #340-07 Street Dept Ziegler Companies IN002378713 35.84$ Parts - Unit #340-07 Street Dept 359,633.57$ Total Claims for May 18, 2026 Page 2 Project Budget Tracking For the period 1/1/2026 - 1/31/2026 Project Name WSB Project # Project Manager Current Invoice Fee Type JTD Billed Budget Comments Client Invoice Reviewer 2026 LGU Services Havranek, Anthony 2,590.25 2,590.25 Juba, Rachel HUGO - 165th Street Area Study Harwood, Alison 6,024.25 124,828.00 142,200.00 Juba, Rachel HUGO - 2024 125th Street and Dellwood Ridge Neighborhood Street Improvement Project Erichson, Mark 570.00 304,411.10 315,167.00 Anderson, Scott HUGO - 2026 Bald Eagle Industrial Park Area Street Improvement Project Erichson, Mark 72,994.75 305,589.99 392,516.42 Anderson, Scott HUGO - 2026 General Engineering Services Erichson, Mark 6,993.75 6,993.75 91,640.00 Bear, Bryan HUGO - 2026 GIS Services Pittman, Bryan 482.00 482.00 15,000.00 Bear, Bryan HUGO - Fable Hill Bridge Hornby, Paul 1,788.25 86,398.44 Anderson, Scott HUGO - Forest Road Bridge Hornby, Paul 5,665.50 97,948.50 Anderson, Scott HUGO - Kwik Trip - 159th Street Keller, Kris 1,267.50 6,970.75 Juba, Rachel HUGO - Lavalle LOMR Review Fallon, Kendra 376.25 4,902.50 Juba, Rachel HUGO - MS4 Support Bonnell Roe, Kory 930.00 13,454.50 Juba, Rachel HUGO - Shores of Oneka Lake 5th Keller, Kris 1,425.00 10,009.25 Juba, Rachel HUGO - WCA 25.11 Haven Homes 4330 170th St.Havranek, Anthony 482.00 2,745.75 1,350.00 Juba, Rachel HUGO - WCA- 25.13 Busy B Boundary and Type Havranek, Anthony 1,626.75 2,498.75 1,499.84 Juba, Rachel HUGO - WCA 25.15- Forest Road Bridge Havranek, Anthony 120.50 120.50 1,499.84 Juba, Rachel HUGO - WCA 25.16- Fable Hill Pkwy Bridge Havranek, Anthony 120.50 120.50 1,499.84 Juba, Rachel Final Totals 103,457.25 R-032173-000 Not to Exceed R-032174-000 Not to Exceed R-031981-000 Not to Exceed R-031660-000 Not to Exceed R-028491-000 Hourly R-024016-000 Hourly R-020977-000 Hourly R-032337-000 Hourly R-022684-000 Hourly R-023811-000 Hourly R-032740-000 Hourly R-031774-000 Hourly R-028436-000 Not to Exceed R-023540-000 Hourly R-028899-000 Not to Exceed R-032972-000 Hourly Page 1 of 1 (6&52: +RXUO\VXSSRUWDV QHFHVVDU\ Project Budget Tracking For the period /1/2026 -//2026 Project Name WSB Project # Project Manager Current Invoice Fee Type JTD Billed Budget Comments Client Invoice Reviewer 2026 LGU Services Havranek, Anthony $ 2,215.25 $ 4,805.50 $ - Juba, Rachel HUGO - 165th Street Area Study Harwood, Alison $ 5,813.75 $ 130,641.75 $ 142,200.00 Juba, Rachel HUGO - 2025 Duck Pass, Palme Long Lake Estate, and Ingersoll Neighborhood Improvement Project Erichson, Mark $ 213.00 $ 107,710.60 $ 178,177.00 Anderson, Scott HUGO - 2026 Bald Eagle Industrial Park Area Street Improvement Project Erichson, Mark $ 86,966.50 $ 392,556.49 $ %XGJHW WKURXJK FRQVWUXFWLRQSKDVH Anderson, Scott HUGO - 2026 General Engineering Services Erichson, Mark $ 6,622.25 $ 13,616.00 $ 91,640.00 Bear, Bryan HUGO - Fable Hill Bridge Hornby, Paul $ 2,143.25 $ 88,541.69 Anderson, Scott HUGO - Forest Road Bridge Hornby, Paul $ 5,097.25 $ 103,045.75 Anderson, Scott HUGO - Kwik Trip - 159th Street Keller, Kris $ 1,443.75 $ 8,414.50 Juba, Rachel HUGO - Lavalle LOMR Review Fallon, Kendra $ 2,926.75 $ 7,829.25 - Juba, Rachel HUGO - MS4 Support Bonnell Roe, Kory $ 1,496.50 $ 14,951.00 Juba, Rachel HUGO - Shores of Oneka Lake 5th Keller, Kris $ 142.50 $ 10,151.75 Juba, Rachel HUGO - WCA- 25.13 Busy B Boundary and Type Havranek, Anthony $ 60.25 $ 2,559.00 $ 1,499.84 Juba, Rachel HUGO - WCA 25.15- Forest Road Bridge Havranek, Anthony $ 60.25 $ 180.75 $ 1,499.84 Juba, Rachel Final Totals $ 115,201.25 R-032174-000 Not to Exceed R-031981-000 Not to Exceed R-028491-000 Hourly R-024016-000 Hourly R-020977-000 Hourly R-032337-000 Hourly R-022684-000 Hourly R-023811-000 Hourly R-031774-000 Hourly R-028436-000 Not to Exceed R-026750-000 Hourly R-028899-000 Not to Exceed R-032972-000 Hourly Page 1 of 1 &TDSPX &TDSPX (VFURZ AC40 CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY) 11/25/2025 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT. If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Customer CareNAME: West Bend Insurance Company PHONE (866) 926-4244 FAX (262)365-2200A/C No Ext: FAX No 1900 South 18th Avenue E-MAIL customercare@wbmi.comADDRESS: West Bend WI 53095 INSURERS)AFFORDING COVERAGE NAIC# INSURERA: West Bend Insurance Company 15350 INSURED INSURER B: Hugo Lions Club INSURER C: PO Box 321 INSURER D INSURER E- Hugo MN 55038-0321 INSURER F COVERAGES CERTIFICATE NUMBER: CL25112581727 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAYBE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONSAND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. IPOLICY EXP LTR TYPE OF INSURANCE INSD WVD POLICY NUMBER MM/DDY EFF MM/DDIYYYY LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE 1,000,000 CLAIMS-MADE Fx_]OCCUR PREMISES jEaoccurrenrei $ 100,000 MED EXP(Any one person) $ Excluded A Y A108567 01/01/2026 01/01/2027 PERSONAL&ADV INJURY $ 1,000,000 GEN'LAGGREGATE LIMITAPPLIES PER:GENERAL AGGREGATE $ 2,000,000 X POLICY EJ JECT PRO LOC PRODUCTS-COMP/OPAGG $ 2,000,000 OTHER: AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ Ea accident ANY AUTO BODILY INJURY(Per person) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY(Per accident) $ HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY Per accidentli UMBRELLA LIAB OCCUR EACH OCCURRENCE EXCESS LIAB HCLAIMS-MADE AGGREGATE DED I I RETENTION$ 1 WORKERS COMPENSATION PER OTH- AND EMPLOYERS'LIABILITY YIN STATUTE ER ANY PROPRIETOR/PARTNER/EXECUTIVE NIA E.L.EACH ACCIDENT OFFICER/MEMBER EXCLUDED? Mandatory In NH) E.L.DISEASE-EA EMPLOYEE $ If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ Liquor Liability Each Common Cause 1,000,000 A Y A108575 01/01/2026 01/01/2027 'Aggregate limit 1,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space Is required) Certificate holder is listed as additional insured for General Liability per form WB1890 and Liquor Liability per farm NS0280. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN City of Hugo ACCORDANCE WITH THE POLICY PROVISIONS. 14669 Fitzgerald Ave N AUTHORIZED REPRESENTATIVE Hugo MN 55038 Ro" / ,--,, 1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD City of Hugo Fire Department 5323 140th Street North Hugo, Minnesota 55038 PH: (651) 762-6362 FAX: (651) 429-3212 To: Bryan Bear, City Administrator From: Jim Compton, Jr., Fire Chief Date: May 14, 2026, for the City Council Meeting on May 18, 2026 Subject: Fire Department Equipment Capital Improvement Plan (CIP) _______________________________________________________________________________ City Council Goals Update In the 2026 City of Hugo Focus Goals under Public Safety, it was approved to evaluate the equipment CIP to accommodate future Fire Department trucks. A truck committee was put together, consisting of Deputy Chief Dave Jensen, Chief Engineer Tom Kaspszak, Lieutenants Ryan Nadeau and Bob Bieniek, and Firefighter Tom Robinson. The committee was directed to evaluate the feasibility of consolidating trucks to minimize the City of Hugo's costs and streamline department operations. Direction to the committee was given to complete a full fleet evaluation which included maintenance costs, number of fire apparatus, and replacement options. The committee has met several times to discuss the future needs of apparatus within the Fire Department. They requested quotes from several fire truck manufacturers to gain a clear understanding of the potential cost to replace our apparatus. CIP Background The equipment CIP is scheduled for 5-year cycles and budgeted annually. Current CIP practices are to replace with new trucks on schedules of 30 years for the large apparatus, 20 years for small apparatus, and 10 years for chief squads. The large apparatus includes a ladder, a pumper/tanker, a tender (tanker), and a heavy rescue. Small apparatuses include two brush pick-up trucks and a utility pick-up truck. Chief squads include two pick-up trucks and one SUV. Assuming the 30-year replacement schedule, the equipment CIP would need to accommodate replacement of the tender in 2032 and the heavy rescue in 2034. The CIP includes the replacement of a brush truck this year. Analysis Incorporation of a re-chassis strategy into CIP: As part of this evaluation, the possibility of a re-chassis of our large apparatus was explored. What that means is we would take the stainless-steel truck box, fire pump, and tank off the back of the chassis and put it on a new chassis, saving approximately 30-40% of the total cost of buying new. Currently, manufacturers are telling us they would re-chassis one time in a truck’s life. This strategy would include a re-chassis every 25 years and a completely new built truck every 50 years. This changes the CIP from a completely newly built truck every 30 years. By doing this re-chassis model, the City of Hugo could consider lowering the expected replacement costs to large fire apparatus for years to come. 2 Truck Consolidation Model: Past replacement practices of the Fire Department have been to maximize the use of our apparatus and consolidate two trucks into one for multipurpose trucks. Examples: In 2019 with Ladder 1 by buying a pumper/ladder vs an engine and a ladder and in 2008 by building Engine 1 as a pumper/tanker instead of an engine and a tender. Both trucks reduced trucks in our fleet. We intend to follow that practice again with two more trucks, consolidating three trucks into two. By doing this consolidation model, the City of Hugo could consider lowering the expected replacement costs to large fire apparatus and it should be expected that overall annual and long-term operating costs will be reduced. Upfront savings would also be up to $1.5 million dollars by not building a second large apparatus and long-term costs are even greater. Pumper/Tanker: Much thought was given to combining Rescue 1 and Tender 1 into a pumper/tanker with heavy rescue capabilities. The pumper/tanker would resemble our current Engine 1, which plays a significant role in rural water operations. I have consulted with our ISO representative, and it is believed that by doing this we should expect better use of points towards our ISO audit. The cost of a newly built pumper/tanker is currently $1.2- $1.5 million. Brush/Rescue: Combining part of Rescue 1 and Brush 2 into a brush/light rescue truck has been considered. The Fire Department no longer has a need for a dedicated rescue truck. The needed rescue capabilities can be consolidated with a brush truck. This truck would have a tank and pump for brush fires along with storage cabinets for medical and light rescue equipment. By doing this, we would again be consolidating our resources and utilizing a smaller truck to respond to many of our emergency calls. In 2025, the fire department responded to 204 medical calls and 7 brush fires. With this proposed brush/light rescue truck, we could have used it to respond to at least 43% of our emergency calls last year. The intent is to limit the use of larger, very expensive fire apparatus to minimize costs to the City of Hugo. The recommended brush/rescue truck is a 2024 Ford F550 diesel with a 300-Gallon slide-in brush skid unit, a pump, and fully enclosed compartments for equipment storage. It is being manufactured by CET in Canada. This is a new build that was delayed due to another department canceling an order. We have been in discussions with Fire Safety USA to purchase this truck for $250,000.00 and can expect to take delivery in July of 2026. Research has shown us that similar trucks would cost over $310,000.00 and take up to two years for delivery. I have spoken with the finance director, who indicated there are sufficient funds available in the CIP for this purchase. It should also be anticipated up to $6,000.00 in additional costs for radio mounting, graphics, undercarriage protection, and miscellaneous items to make this truck operational. Maintenance: The City’s Mechanic, Steve Garcia, is recommending the City consider replacing our fire apparatus on a different schedule due to Minnesota winters and the deterioration of the undercarriage and exposed components. The staff is recommending rescheduling each of our large apparatus to a 25- year max life schedule and adding a re-chassis of each model at that time if manufacturers would allow it. One thing to note is that Steve conducts an annual vehicle assessment to rate our equipment, and our heavy rescue truck has been declining in his rating, currently at 3.5 out of 5. By moving to a consolidation model, it should be expected that overall maintenance costs will go down. Steve recommends we sell Rescue 1 now to maximize its resale value before it declines further. 3 Summary Due to the changing needs of the Department, and for cost efficiency, the future fleet of trucks should be modified. Instead of replacing the tender in 2032 and the heavy rescue in 2034, a new pumper/tanker truck would be purchased and delivered in 2029. The existing tender would be sold in 2029. Secondly, instead of replacing a brush truck with another dedicated brush truck in 2026, a new brush/rescue combination truck would be purchased in 2026. The existing heavy rescue truck and existing brush truck would both be sold this year. Recommendations 1. Authorize the purchase a “demo” brush/rescue truck from Fire Safety USA. 2. Direct staff to return to the Council with a recommended plan to advertise and sell Rescue 1, unit ID 7102-04 and Brush 2, unit ID 6103-06. 3. Authorize staff to adjust the CIP for future large Fire Department apparatus to include a re- chassis after a 25-year interval with full replacement at 50 years. 4. Authorize the Hugo Fire Department truck committee to create a formal specification for a new build pumper/tanker for delivery in 2029. Future changes to our operations, call type changes, future city-wide development, additional fire stations, staffing models, the ability to re-chassis, etc., could all affect the types and number of apparatuses in our fleet. City Council input would be necessary to determine the model and direction of the fire department going forward. 1 FIRE APPARATUS PURCHASE CONTRACT AGREEMENT This Agreement (“Agreement”) is made this 30th day of April 2025, by and between Fire Safety USA, Inc., 3253 19th Street NW, Rochester, MN, 55901, (hereinafter ''Company'') and the Hugo Fire Department MN (hereinafter ''Buyer''). 1.) Purchase: The Company agrees to sell, and the Buyer agrees to purchase, the fire apparatus and equipment described in the Company's Proposal and the Specifications attached hereto and hereby incorporated by reference (the "Apparatus"), all in accordance with the terms and conditions of this Agreement. Changes to the Specifications attached hereto will only be executed by the Company if documented by a Change Order signed by both parties. In the event of any conflict between the Company's Proposal and the Buyer's Specifications, the Company's proposal shall prevail. 2.) Purchase Price: The Buyer agrees to pay a purchase price of Two Hundred Fifty Thousand Dollars and Zero Cents. [$ 250,000.00]. CET Fire Brush Truck 15587 Rev. May 11th 2026 / All Drawings and Specifications. Unless otherwise specified, this Purchase Price is exclusive of all Federal, State or local taxes of any nature. Any such taxes are the sole responsibility of the Buyer unless specifically added to the Purchase Price, at which time they will be paid by the Company; provided, however, if the Buyer claims the Order is exempt from any tax, Buyer agrees to furnish the applicable exemption certificate to the Company and to hold the Company harmless from any damage which may result from the Company ultimately having any such tax assessed against it. PAYMENTS Buyer agrees that the terms of payment shall include 90% payment due before the truck leaves the CET factory and the remaining 10% due upon delivery and acceptance of the new apparatus. All payments from Customer shall be made payable to Fire Safety USA, Inc. and no other payee shall be named. 3.) Pre-Build: If included in the specifications, a pre-build conference will be conducted to ascertain and confirm customer requirements with respect to the Apparatus ordered by Buyer. Both parties agree that the pre-build conference will be conducted no later than thirty (30) business days from execution of this Agreement. 4.) Delivery: The Buyer shall be kept updated throughout the purchase process with estimated delivery timelines. It is agreed that such delivery is subject to delays caused by war, acts of god, hurricane, labor shortages or strikes, inability to obtain materials, and other causes reasonably beyond the control of the Company and that the Company will not be liable for, and this Agreement may not be terminated on account of, such delays. Buyer will be notified no less than fourteen (14) business days in advance of the delivery date. 2 5.) Final Inspection - Customer Factory Inspection: A final inspection shall be performed at the Company’s dealership location prior to delivery to the customer. In the event that the buyer fails to make a final inspection by the date agreed upon by both Company and Buyer, Company reserves the right to arrange for delivery of the Apparatus to the Buyer, and to charge the Customer the full invoice price for the Apparatus, which shall be paid for in the manner specified in paragraph 2. 6.) Buyer’s Cancellation for Convenience. If Buyer tenders any cancellation hereunder, Buyer shall nevertheless accept delivery of all products which are completed at the time of cancellation. Those products which constitute work- in-process inventory at the time of cancellation shall be paid for by Buyer at a price equal to the completed percentage of the product multiplied by the price specified in Paragraph 2. Buyer also shall pay promptly to Company the costs of settling and paying claims arising out of the termination of work under Company’s subcontracts or vendors, plus an additional 15% to defray Company’s accounting, legal, and clerical costs arising out of the cancellation. 7.) Title: The Company and Buyer agree that the Manufacturer’s Statement of Origin shall remain with the Company until the Company has been paid in full. Provided that the Company has been paid in full, the Manufacturer’s Statement of Origin shall remain with the Company until the Apparatus is in the physical custody of the Buyer, or Statement of Origin will be utilized to apply for a Motor Vehicle Title, depending on applicable law(s) in destination state. Statement of Origin or Title Application documentation will be sent to customer within ten business days after delivery of the vehicle. Upon pick up by Buyer, responsibility for title application, ownership and risk of loss shall pass from Company to Buyer. 8.) Warranty: The Company warrants each new Apparatus manufactured against defects in material and workmanship for a period of ONE YEAR from the in-service date per the Warranty Registration Card. Warranties beyond this may be applicable to certain components of the Apparatus as described in the Statements of Warranty previously provided to the Buyer. This warranty is in favor of the original user/purchaser, in accordance with the Company's preprinted Statements of Warranty which are either attached to the Agreement or have otherwise been delivered to Buyer. Buyer hereby acknowledges receipt of the Company's preprinted Statements of Warranty. With respect to any Apparatus not manufactured by the Company, such items shall not be warranted by the Company but shall be subject to the warranty provided by the manufacturer. These warranties are in lieu of all other warranties, whether express or implied, and THE COMPANY EXPRESSLY DISCLAIMS ALL OTHER SUCH WARRANTIES, INCLUDING WITHOUT LIMITATION ANY IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. 9.) Notices: The parties to this Agreement designate Hugo Fire Department as representative of the Buyer and Fire Safety USA, Inc. as representative of the Company for purposes of all communications regarding this Agreement. 10.) Waiver of Jury Trial: The parties to this Agreement agree that any dispute arising hereunder, if brought before a court having proper jurisdiction, shall be adjudicated in a bench trial and the parties expressly waive any right to have such matter(s) tried before a jury. 3 11.) Entire Agreement: This Agreement, including its attachments and exhibits, constitutes the entire understanding between the parties relating to the subject matter contained herein and supersedes all prior discussions and Agreements. No agent or representative of the Company has authority to make any representations, statements, warranties or Agreements not herein expressed and all modifications or amendments of this Agreement, including its attachments and exhibits, must be in writing signed by an authorized representative of each of the parties hereto. 12.) Acceptance by Company: This Agreement shall not constitute a valid and binding obligation of the Company until accepted in writing by an officer of the Company at its offices in Rochester, Minnesota. When requested by the Company, the Buyer shall furnish a satisfactory written opinion of the Buyer's attorney that the Buyer has the power to make the Agreement, that the individual signing is authorized to sign on behalf of the Buyer, and that this Agreement is a valid, legal and enforceable obligation of the Buyer. IN WITNESS WHEREOF, The Company and the Buyer have caused this Agreement to be executed by their duly authorized representatives as of the date set forth by each. BUYER: COMPANY: HUGO FIRE DEPARTMENT, MN FIRE SAFETY USA, INC. By:___________________________________ By:______________________________________ Ryan Clarey, Fire Safety USA, Inc. Title:__________________________________ Title: Dealer Principal . Date:__________________________________ Date:_____________________________________ FIRE SAFETY USA, INC. 3253 19TH STREET NW ROCHESTER, MN 55901 TOLL-FREE: 1-877-699-3473 PHONE: 507-529-8444 FAX: 507-529-8111 WWW.FIRESAFETYUSA.COM Proposal Pricing for Hugo Fire Department, MN 2026 CET Custom Brush / Light Rescue Ford F-550 Crew Cab 4x4 Chassis 2024 MY with Custom Poly Rescue Body Upgraded Warning Package Price includes complete specification. $250,000.00 Delivery: July 2026 Authorized Signature: Date: Quote valid through May 31st, 2026 1 CET Fire Brush Truck Custom Made for Hugo Fire Department, MN Revised May 11th, 2026 Customer Approval: ___________________________________________ _____________________ Signature Date ___________________________________________ Print Name 2 _________ Initial Table of Contents Ford Cab & Chassis ........................................................................................................ 4 The power train should consist of the following: ........................................................... 4 Exterior (XL): ............................................................................................................... 4 Interior / Comfort (XL): ................................................................................................. 5 Safety & Security: ........................................................................................................ 6 Ford Warranty: ............................................................................................................. 7 Inside Doors Reflective ................................................................................................... 7 Black 3” round Side Step Nerf Bars ................................................................................. 7 Ranch Hand Legend Black Grille Guard .......................................................................... 7 Rear Hitch Class III ......................................................................................................... 7 Removable Warn Winch VR EVO 10 Winch (10,000 lbs.) ............................................... 7 Super Single Wheels ....................................................................................................... 8 3” Chassis Lifting Kit........................................................................................................ 8 Front Fender Flares......................................................................................................... 8 Poly Body ........................................................................................................................ 8 Standard Features .......................................................................................................... 8 Material ........................................................................................................................... 8 Body & Compartments Mounting ..................................................................................... 8 Left (Driver) Side Body Module ....................................................................................... 9 Right (Passenger) Side Body Module .............................................................................. 9 Transverse Compartment ................................................................................................ 9 Rear Storage Compartment ............................................................................................ 9 Compartment Doors ........................................................................................................ 9 Adjustable Shelf Tracking .............................................................................................. 10 Six (6) Adjustable Shelves............................................................................................. 10 Left (Driver) Side Storage Hose Tray ............................................................................ 10 Right (Passenger) Side Pre-Connect Hose Tray ........................................................... 10 Three (3) SCBA Wheel Well Bottle Storages ................................................................. 11 Black Rubber Fenderettes ............................................................................................. 11 Black Rubber Rub Rail .................................................................................................. 11 Fuel Fill Bezel................................................................................................................ 11 Subframe ...................................................................................................................... 11 Body Header Panel ....................................................................................................... 11 Body Threshold Panel ................................................................................................... 11 Handrails ....................................................................................................................... 11 Six (6) Rear Folding Steps ............................................................................................ 11 Tow Eyes ...................................................................................................................... 12 Paint .............................................................................................................................. 12 Wheel Chocks ............................................................................................................... 12 Rear Mud Flaps ............................................................................................................. 12 Rear Chevron ................................................................................................................ 12 Electrical Components .................................................................................................. 12 DOT Lighting ................................................................................................................. 13 Console ......................................................................................................................... 13 Emergency Lighting....................................................................................................... 14 Siren & Speaker ............................................................................................................ 15 Traffic Advisor Arrow Stick ............................................................................................ 15 Two (2) Side 46” Brow LED Scene Light ....................................................................... 15 Two (2) Rear Surface Mount LED Scene Lights ............................................................ 15 Battery Charger ............................................................................................................. 15 Compartment Lights Switches ....................................................................................... 15 3 _________ Initial Door Ajar ....................................................................................................................... 15 Back-Up Alarm .............................................................................................................. 15 CET Fire Pumps Mfg Drop-In-Unit ................................................................................. 16 Tank .............................................................................................................................. 16 Fill tower and tank cover ............................................................................................... 16 Tank Capacity ............................................................................................................... 16 Sump ............................................................................................................................ 16 Tank Outlets .................................................................................................................. 16 3/4" Tank Drain ............................................................................................................. 16 Tank Mounting Blocks ................................................................................................... 16 Skid Base ...................................................................................................................... 17 Mounting ....................................................................................................................... 17 Enclosed Drop-In Unit ................................................................................................... 17 CET Fire Pump, PFP-25hp-DSL-MR ............................................................................. 17 Engine ........................................................................................................................... 18 Pump Controls .............................................................................................................. 18 Electric Primer ............................................................................................................... 18 Plumbing and Valves ..................................................................................................... 18 Steel Suction Piping - 2-1/2" - One (1) Fire Type Swing-Out Valve................................ 18 Tank to Pump “T” Handle Control .................................................................................. 19 Steel Discharge Piping .................................................................................................. 19 1" Tank Fill .................................................................................................................... 19 One (1) 1-1/2" Discharge to Rear .................................................................................. 19 One (1) 1" Discharge to Pre-Connected Hose Tray ....................................................... 19 Testing .......................................................................................................................... 19 General Warranty .......................................................................................................... 20 CET Fire Pump Warranty .............................................................................................. 20 CET Water Tank Limited Lifetime Warranty .................................................................. 21 Manufacturer’s discretion .............................................................................................. 21 EXCLUSIVE CET POLYPROPYLENE BODY ............................................................... 22 FIVE (5) YEAR PAINTLIMITED WARRANTY ................................................................ 23 4 _________ Initial Ford Cab & Chassis Unit shall be installed on a Ford F-550, 2024, 4-door Crew Chassis Cab, dual rear wheels, 4 x 4. • Cab to be Ford Red Race (PQ) • The wheel base should be 179” wheelbase, Cab to Axle (C.A.) should be 60” • GVWR: 19,500 lbs. • GAWR front: 7,500 lbs. • GAWR rear: 14,706 lbs. Payload Plus Upgrade Package (68M) includes: o Increases GVWR from 18,000 lbs. to 19,500 lbs. o Increases max rear GAWR to 14,706 lbs. o Low deflection/high capacity rear springs o Upgraded frame o Upgraded rear-axle • Extra Heavy-Duty Front-End Suspension (67P) The power train should consist of the following: • 6.7L Power Stroke® Diesel V8 (99T) o Torque: 825 lb-ft @ 2,000 RPM o Horsepower: 330 hp @ 2,600 RPM o On perator Commanded Regeneration (OCR) • Engine Block Heater • Engine Idle Shutdown Timer – Programmable • Transmission – Ten-Speed Automatic Transmission 10R140 with Neutral Idle and Selectable Drive Modes: Normal, Tow/Haul, Eco, and Slippery Roads • Front, mono beam axle w/coil spring suspension • Power Take Off Provision • Transmission Mounted Live Drive and stationary mode PTO • Electronic-Shift-On-the-Fly (ESOF) 4x4 System • Alternator – 400 amp. (12V 250A + 24V 150A) • Dual battery System 12 volts, 650 CCA, 68 Amp-hr. • Hood release • Horn – dual electric • Oil minder system • Rapid-Heat Supplemental Cab Heater • Shock absorbers – heavy-duty gas • Springs, rear auxiliary • Stabilizer bar – front and rear • Steering – power • Steering damper • Brake System – 4-Wheel Anti-Lock System (ABS) • 4.30 Ratio Limited Slip Axle (X4L) Exterior (XL): • Daytime running lights • Lamps – Roof marker/clearance – LED • Bumper – front, black painted • Fender vents – front • Door handles – Black • Fuel Tank – 151 litre (40 gallons) aft axle 5 _________ Initial • Plastic Urea Tank – 27 Litre (7.2 Gallon) • Glass – solar-tinted o Rear-window o side rear-windows • Grille – black painted • Scuff plates – front, color-coordinated • Splash Guards/Mud Flaps – Front • "Three Blink" Lane change signal • Tow hooks – front (2) • Trailer wiring – 7 wire harness w/relays, blunt cut & labeled • Upfit Integration System • Wheels o 19.5" Argent Painted Steel • Tire o 225/70Rx19.5G BSW All-Position (TGJ) • Windshield Wipers – intermittent - interval control • The chassis exhaust system shall be extended to the rear of the right rear wheel. • Manually telescoping/folding trailer tow with power/heated glass, heated convex spotter mirror, Integrated Clearance Lamps/Turn Signals Interior / Comfort (XL): • 4.2” Productivity Screen in IP Cluster: Includes menus for Gauge Setup, Trip Computer, Fuel Economy and Towing/Off-Road Applications • SYNC® 4 o Enhanced Voice Recognition Communication and Entertainment o 911 Assist® o 8” LCD Center Stack screen o Information On Demand Panel o Wireless Phone Connection o Cloud Connected o AppLink® ▪ Apple CarPlay® and Android Auto™ Compatibility o Smart-Charging USB-C port – one (1) o Digital Owner’s Manual • Audio o AM/FM stereo MP3 player o Six (6) speakers • Convenience o 12V Auxiliary powerpoint o Coat hooks, RH/LH colour-coordinated o Dash top tray o Dome lamp w/dual map lights (front & rear w/Crew Cab), RH/LH door activated & I/P switch operated w/delay o Grab handles – driver & passenger – front and rear o Hood Release o Inside Air conditioning – manual • Door-trim – armrest/grab handle and reflector • Headliner – colour-coordinated moulded cloth • Air conditioning vents – black w/black ring • Cabin Air Particulate Filter • Floor covering – black, full length vinyl 6 _________ Initial • Mirror – rearview 11.5" day/night • Outside Temperature Display • Front Seats – vinyl 40/20/40 split bench • Power Equipment Group – 1st row (front seat) windows with one-touch up/down • Power door locks with backlit switches and accessory delay • Remote keyless entry • Power Equipment Group – power 2nd row (rear seat) windows • Rear Seats - 60/40 vinyl flip-up/fold-down bench seat with 3 head restraints • Overhead console with dual storage bins and map lights • Scuff plates – front, colour-coordinated • Steering wheel – black urethane with tilt and telescoping steering wheel/column; includes three (3) button message control • Sun visors – color-coordinated vinyl, driver w/pocket, passenger w/uncovered mirror insert with 6-inch overhead • Upfitter switches – 6 located in Overhead Console • Window – Rear, fixed • AutoLamp – Auto On/Off Headlamps • FordPass™ Connect (5G) – Required Ford Subscription (Subscription not include) o Wi-Fi® hotspot connects up to 10 devices o Remotely start, lock and unlock vehicle o Schedule specific times to remotely start vehicle o Locate parked vehicle Safety & Security: • Airbags o Driver and Passenger frontal and side airbag/curtain o Passenger side airbag deactivation switch • Belt-Minder®, chime & flashing warning lights on I/P if belts not buckled • Child tethers (Regular Cab front centre-seat and passenger, SuperCab front- passenger and all rear-seating positions and Crew Cab all rear-seating positions) • Roll Stability Control™ • Safety Belts – Manual, Colour-coordinated safety belts w/height adjustment (front- outboard seating positions only) • SecuriLock® Passive Anti-Theft System (PATS) • SOS Post-Crash Alert System™ • Trailer Sway Control • Trailer Brake Controller o Fully integrated trailer brake controller, factory installed and warranted by Ford. o Controller to be able to adapt its output based on the status of the Anti-lock o Braking System (ABS). o Provides instant visual / audible warning in case of accidental trailer disconnect o Includes the following user controls / indicators: o +/- gain adjustment buttons o trailer connection indicator o Gain setting display o Output bar graph o Manual control lever. • Engine control module o Stationary Elevated Idle Control (SEIC) 7 _________ Initial • FORD CO-PILOT360™ TECHNOLOGY o AutoLamp – Auto On/Off Headlamps o Automatic High Beam o Audible Lane Departure Warning o Cruise Control (Steering-Wheel Mounted) o Pre-Collision Assist Ford Warranty: • 36 months 36,000 miles Basic • 60 months 60,000 miles Powertrain • 60 months Unlimited miles Corrosion Perforation • 60 months 60,000 miles Road Assistance • 60 months 60,000 miles Road Transmission • 36 months 36,000 miles Road Accessories • 60 months 100,000 miles Diesel Engine Inside Doors Reflective All driving and crew compartment doors shall have at least 96 in² of reflective material affixed to the inside of each door. The Chevron shall be Red and Black. Black 3” round Side Step Nerf Bars One (1) set of 3" round tube side steps straight nerf bars with step pads. Steps shall be constructed from steel and come black. Ranch Hand Legend Black Grille Guard The OEM bumper shall be removed and replaced with a Ranch Hand Legend model GGF231BL1 black powder coated front Grille Guard contoured to follow the shape of the grille and body. The bumper shall be protected vehicle’s grille area and the vehicle’s headlamps. The grille guard is made with 12-gauge tubing and has punched grille inserts specifically designed to match the make and model of the truck. A quick connector and battery power lead shall be run to connect the winch. Rear Hitch Class III A rear mounted Class III 2” trailer hitch receiver shall be securely attached to the chassis frame and shall include the 7-pin wiring trailer harness. A quick connector and battery power lead shall be run to connect the winch shall be run to the rear. Removable Warn Winch VR EVO 10 Winch (10,000 lbs.) There shall be a 10,000 lbs. WARN VR EVO 10 removable electric winch. The winch shall have a 0.354” of 90 ft wire rope with a large latched hook. The wire rope shall be constructed of aircraft wire rope and galvanized to help resist corrosion. Feature of the winch will include a 3-stage planetary gear system for fast line speed, cam action clutch disengages planetary gear system for free spooling and automatic load holding brake for strength and reliability. A quick connector and battery power lead to connect the winch shall be run for mounting of the winch. 8 _________ Initial Super Single Wheels OEM shall be removed the stock Ford Tires / Rims and be supplied “Super Single” conversion kit on the front and rear axle of the apparatus; the tires shall be Founders Off Road 36 x 13.50 – 19.5; the black painted rims shall be 19.5” x 9.75”. 3” Chassis Lifting Kit A 3” lifting kit shall be provided and installed on the Ford chassis truck to match the super single wheels. Front Fender Flares 8” black plastic fender flares shall be installed instead of OEM Ford front fenders. Brand name shall be BuckStop. Poly Body The poly body shall consist of a left and right sides module with doors. In addition, there shall be a formed metal header panel and threshold panel. These components shall be assembled to form the modular body and shall be supported by a steel sub frame weldment. All components of the body shall be bolted together to allow for easy replacement. Threaded inserts shall be installed into all blind mounting holes. All other fasteners shall be in stainless steel. Standard Features • Rust and corrosion free body module • Lightweight material allows for increased payload • Compartments constructed with ½” high impact resistant copolymer sheet • Modular construction offers easy replacement or repair of side packs Material The material used to construct the body side modules and doors shall be extruded copolymer polypropylene. Materials that deteriorate when exposed to sunlight, extreme weather or operational conditions shall not be used or shall have a means of protection against such conditions that will not prevent compliance with performance standards. Protective coatings that chip, crack, or scale with age or extremes of climatic conditions or by exposure to heat or cold shall not be used Body & Compartments Mounting All compartments shall be ventilated through an integrated positive pressure vent system allowing for movement of air between compartments. Vent outlet at the front of the side compartment modules shall provide a water-resistant entry and exit for air. The compartment floors shall be of sweep out design for easy cleaning and have provision for drainage of moisture. Compartments floors and shelves shall be covered with Plastic Tiles. The tiles shall be black with yellow angled leading edges. 9 _________ Initial Left (Driver) Side Body Module There shall be a multi-compartment body module constructed from ½” polypropylene provided to form three (3) compartments on the left (driver) side of the body. There shall be a single door compartment ahead of the rear wheels, a single door compartment over the rear wheels and a single door compartment behind the rear wheels. Inside compartment dimensions shall be as follows: Width Height Depth Compartment ahead rear wheels L1 34” 54-1/2” 22-1/4” Compartment over rear wheels L2 45” 33-1/2” 22-1/4” Compartment behind rear wheels L3 25-1/2” 54-1/2” 22-1/4” Opening door compartment dimensions shall be as follows: Width Height Compartment ahead rear wheels L1 27” 42-1/4” Compartment over rear wheels L2 43” 21-1/4” Compartment behind rear wheels L3 21” 42-1/4” Right (Passenger) Side Body Module There shall be a multi-compartment body module constructed from ½’’ polypropylene provided to form three (3) compartments on the curb side of the body. There shall be a single door compartment ahead of the rear wheels, a single door compartment over the rear wheels and a single door compartment behind the rear wheels. Width Height Depth Compartment ahead rear wheels R1 34” 54-1/2” 22-1/4” Compartment over rear wheels R2 45” 33-1/2” 22-1/4” Compartment behind rear wheels R3 25-1/2” 54-1/2” 22-1/4” Opening door compartment dimensions shall be as follows: Width Height Compartment ahead rear wheels R1 27” 42-1/4” Compartment over rear wheels R2 43” 21-1/4” Compartment behind rear wheels R3 21” 42-1/4” Transverse Compartment A transverse compartment will communicate at the top of the two compartments (L1 -R1) ahead rear wheels. The approximate compartment dimensions shall be 13-1/2” wide x 36” high with clear door opening of 12-13/16” wide x 27-3/4” high. Rear Storage Compartment One (1) integrated to the platform compartment with opening 5’’ high x 22’’ wide x 104’’ long for suction hose storage and folding ladders or pike poles. A flip down horizontally hinges door is furnished at the rear. The interior compartment is made from polished 3003-H14 alloy smooth plate. Steel frame underneath Drop-In-Unit shall not be acceptable. Compartment Doors Compartment doors shall be equipped with Amdor brand roll-up doors complete with the following features: • Door ajar switch • Two (2) LED Lumabar WHITE lights 10 _________ Initial • Aluminum double wall slats with continuous ball & socket hinge joint and recessed slat seal • double wall reinforced bottom panel with stainless steel lift bar latching system • Reusable slat shoes with positive snap-in securement • One-piece aluminum door track / side frame, top gutter with non-marring seal, non- marring side seals, bottom seal, with all wear component material to be Type 6 Nylon. • Roll-up doors shall be anodized gray. Adjustable Shelf Tracking Each compartment shall have four (4) aluminum tracks fastened to the interior sidewalls to provide an adjustable mounting surface for shelving. Six (6) Adjustable Shelves There shall be six (6) adjustable shelving formed from .125 thick smooth aluminum sheet. Each shelf shall be fastened to the tracking using four (4) adjustable shelf clips and stainless-steel hardware. The shelves location shall be: One (1) in L1 One (1) in R1 One (1) in L2 One (1) in R2 One (1) in L3 One (1) in R3 Left (Driver) Side Storage Hose Tray One (1) storage hose tray shall be supplied and installed on top of left (driver) side compartment. Dimensions of the storage tray shall be 110” long X 22-3/4” wide X 8” high. Black canvas with snaps shall be installed on top of the storage tray along with rear protective net. The area shall be designed to prevent the accumulation of water and allow for ventilation to aid in drying hose in the storage area. The external face of the hose tray shall be painted black. Right (Passenger) Side Pre-Connect Hose Tray One (1) pre-connect hose tray shall be supplied and installed on top of right (passenger) side compartment. Dimensions of the storage tray shall be 110” long X 22-3/4’’ wide X 8” high. The hose tray shall have a 1” NH elbow pre-connected to the discharge of the pump. The exact location of the elbow shall be determined at the pre-construction meeting. Black canvas with snaps shall be installed on top of the storage tray along with rear protective net. The area shall be designed to prevent the accumulation of water and allow for ventilation to aid in drying hose in the storage area. The external face of the hose tray shall be painted black. 11 _________ Initial Three (3) SCBA Wheel Well Bottle Storages Three (3) SCBA bottle storages shall be installed above the rear wheel well. The shall have One (1) on the left (driver) side of the polybody and Two (2) one the right (passenger) side of the polybody, one (1) storage forward and one (1) backward of the rear wheels. Each bottle storage shall have a polished aluminum hinged door with latch assembly. The external face of the door shall be painted black. Black Rubber Fenderettes The rear wheel wells shall be radius cut with black rubber fenderettes installed at well opening. Black Rubber Rub Rail A Poly black rubber rub rail shall be bolted on both sides of the body below the compartment to protect the body from minor scrapes. Fuel Fill Bezel A fuel fill bezel shall be supplied and installed behind the rear wheels on the driver side of the poly body. Subframe A stainless-steel subframe weldment shall be fabricated from tubing and formed sheet metal to provide a mounting platform for the body side modules and the floor. There shall be outriggers extending out and down from the sub frame to provide support to th e side pack floors. There shall be a minimum of four (4) outriggers supporting each side module. There shall be common attachment points along the length of the sub frame for mounting it to the truck chassis. The finish on the subframe shall be painted black. Body Header Panel A formed .125” high smooth aluminum panel shall be provided at the front of the body and shall extend the full width and height of the body to provide full frontal protection to the body side modules. The header panel shall be fastened to both body side modules. Steel cross members shall be installed at front. The header shall be covered by Black Bed Liner. Body Threshold Panel Rear body side modules shall be jointed with a middle bottom bolted aluminum sheet reinforced on four sides. Handrails Two (2) 12’’ access handrails shall be provided at the rear of the body, one (1) on each side. Handrails shall be constructed of or covered with a slip-resistant, non-corrosive material. Handrails shall be between 1in. and 1-5/8 in. in diameter and have a minimum clearance between the handrails and any surface of at least 2 in. Six (6) Rear Folding Steps The rear of the body shall have Six (6) non-skid folding steps, three (3) on each side. The rear steps shall be made so it can be folded up for use in rough terrain. All steps shall sustain a minimum static load of 500 lbs. (227 kg) without deformation (NFPA 1906 & 1901 compliant). The steps shall be black. 12 _________ Initial Tow Eyes Two (2) tow eyes shall be attached directly to the frame structure to provide a means to allow recovery from the front and rear. Hardware shall have a clear and unobstructed access. Paint The paint or coating, including any primer, shall be applied in accordance with the paint or coating manufacturer’s recommendation. Body Modules shall be thoroughly washed with grease cutting solvents prior to any sanding. After the body has been sanded and the minor imperfections corrected, the body shall be washed again with a solution to remove any contaminants on the surface. The first coating to be applied is a universal plastics adhesion promoter followed with three coats of primer. The primer coat is to be hand sanded with 320 grit sandpaper to insure maximum gloss of the paint. The polybody paint shall be one (1) color red to match the chassis cab color. All exposed ferrous metal surfaces that are not plated or stainless steel shall be cleaned and prepared and shall be painted or coated. The interior of the body compartments shall be left in their natural color of white. Wheel Chocks Medium Kochek Wheel Chocks with storage brackets shall be provided and mounted underneath the flatbed behind the chassis cab. Rear Mud Flaps Rear rubber mud flaps are provided. A bracket attached to the side of the muffler pipe end is installed to prevent any damaged that can occur to the mud flap. Rear Chevron 6” reflective red & Black chevron stripes shall be applied at rear of apparatus covering the entire area (rear door included). Electrical Components A 12-volt electrical system is supply. The wiring is secured in place, readily accessible and protected against heat, water and physical damage. Electrical harness lines shall be mechanically attached to the frame or body structure of the apparatus. All wiring will be run in heat and moisture resistant plastic convoluted split loom. Electrical harness lines shall be furnished with protective looms, grommets, or other devices at each point where they pass through body panels or structural members or wherever they lie against a sharp metal edge. A through-the-frame connector shall be permitted to be used in place of metal protective looms or grommets. Switches, relays, terminals, and connectors shall have a direct current (dc) rating of 125 percent of maximum current for which the circuit is protected. 13 _________ Initial Conductor insulation will conform to S.A.E. requirements. All circuit are protected by automatic reset circuit breakers. All wiring furnished will conform to the national Electric Code. All circuits will be wired in conformance with S.A.E. J1292, Automobile wiring standard. All wiring will be function worded schematically. An electric diagram will be remit upon delivery. DOT Lighting Clearance, marker, license plate lights and reflectors will be furnished per D.O.T. A pair of four (4) Whelen 600 series LED lamp modules shall be provided. Each module shall include a stop light, a backup light, a turn light and an emergency light mounted in a Black plastic housing. Two (2) LED Amber marker/clearance lights with black housing and clear lens will be installed on the front side of the bed, one (1) each side. Two (2) LED Red marker/clearance lights with black housing and clear lens will be installed on the rear side of the bed, one (1) each side. Three (3) LED Red marker/clearance lights with black housing and clear lens will be installed at the rear center of the bed. Amber & Red reflectors shall be installed around the perimeter of the bed as per DOT requirement. License plate light shall be an Eon light with black housing that has a light output equivalent to a 10-watt halogen lamp. Eon light to have a 50,000 hr LED life. Console One CET fire application custom console installed between seats with rocker switch. To be quickly identified and visible to the driver and passenger while seated, the rocker switches shall be installed on the top face of the console designed with a 40° angle. This area shall be able to hold at least two rows of rocker switch. All switches shall be appropriately identified by panel mounted legends. The first lighted rocker switch shall be a red Master Optical Warning switch. A master body disconnect automatic switch, normally open contacts, shall be provided to disconnect all electrical loads not provided by the chassis manufacturer. The starter solenoids shall be connected directly to the batteries. All rocker switches to have a green “On” indicator that is visible from the driver’s position shall be provided. The console has an area to accommodate department map books, clipboards etc. The console has an area for one (1) radio heads & Siren installation. All electrical components like breaker, relays, wiring etc. will be installed inside this customized console and protected with an aluminium box. This console will be design to easily gain access to those breakers, relays, wiring, etc. Controls and switches that are expected to be operated by the driver while the apparatus is in motion shall be within convenient reach for the driver. Console shall be painted black scratch free Herculiner finish. 14 _________ Initial Emergency Lighting One (1) 54” LED Whelen Liberty II We-Can X Lightbar, model # BJ2DDDD with smoke dome shall be mounted on the roof of the chassis cab and controlled by one (1) switch on the cab console. • 4 x Red and White SUPER LED Corners • 6 x Red and White SUPER LED Inner Driver’s side • 2 x Front White Take Down SUPER LED Center Inner • 1 x White Alley SUPER LED Driver’s side • 1 x White Alley SUPER LED Passenger’s side • 1 x Opticom Center Inner For Blocking Right-of-Way Mode of operation, white Super LED Inner lights (2) shall be turned off when the transmission is on Park position. Mounted on front chassis grill, Two (2) Whelen Ion-T series Super LED, one (1) each side, red with clear lens with a black flange. Mounted on sides of the chassis, Two (2) Whelen Ion-T series Super LED, one (1) each side, red with clear lens with a black flange. Mounted on lower sides of the body over the rear wheels, Two (2) Whelen M4 series Linear Super LED, one (1) each side, red with clear lens with a black flange. Mounted on upper sides of the body, Four (4) Whelen M6 series Linear Super LED, two (2) each side, red with clear lens with a black flange. Mounted in the upper rear of the body, Two (2) Whelen M6 series Linear Super LED, one (1) each side, red with clear lens with a black flange. Mounted in the DOT modules at the rear of the polybody (see above), Two (2) Whelen 600 series Super LED, Red with clear lens. All emergency lights shall be connected and controlled by one (1) switch on Whelen control head CCTL7 the cab console. The Opticom module shall be controlled by one (1) switch on Whelen control head CCTL7 the cab console. 15 _________ Initial Siren & Speaker One (1) Whelen CenCom Core amplifier control module, model #C399 shall be provided and installed in the cab console. The Whelen control head, model #CCTL7, shall be provided and installed on the cab console. The control head shall be included: 4-position slide switch and 21 push-buttons and microphone with extension cable. One (1) Whelen, model #SA315P, 100-watt speaker, shall be provided and mounted on the front bumper with a mounting bracket. Traffic Advisor Arrow Stick There shall be one (1) Whelen Model #TAL85 LED traffic advisor mounted on the rear upper section of the apparatus body. The traffic advisor shall be controlled in the cab center console. A Whelen TACTL5 control head shall be installed in the cab console. Two (2) Side 46” Brow LED Scene Light Two (2) FireTech 46” brow LED light, model #FT-B-46-B shall be provided and installed on each side of the upper body. The light shall have 39 LEDs, 19,008 raw lumens, 4 circuits and Black aluminum housing. Each light shall be controlled by a switch located on the cab console. Two (2) Rear Surface Mount LED Scene Lights Two (2) surface mount Fire Tech Hiviz Guardian Junior series scene lights with Black flange shall be installed at the rear of the polypody, one (1) each corner. The lights shall be connected to a switch in the cab console. Battery Charger One (1) Kussmaul Auto Charge 1000PLC, 15 amps @ 12VCD, single battery system, #091-215-12, shall be provided and installed in the chassis cab on the floor, under the rear seat on the driver side. One (1) Kussmaul single bar graph display, #091 -199-001, and one (1) Kussmaul 20 amps @ 120 VAC super auto eject, #091 -55-20-120, shall be provided and installed on rear of the body on the left (driver) side. Compartment Lights Switches One (1) switch per compartment shall be installed so the compartment light(s) shall come on only when compartment door is open. Door Ajar One (1) door ajar warning light shall be provided and installed in the console to indicate an open body compartment door. The light shall be properly marked with a sign “Warning Door Ajar”. Back-Up Alarm One (1) back-up alarm that meets the type D (87 dBA) requirements of SAEJ994 shall be provided at the rear of the apparatus. It will activate when the transmission is placed in reverse. 16 _________ Initial CET Fire Pumps Mfg Drop-In-Unit Tank The water tank shall be constructed of 1/2" thick polypropylene sheet. The material shall be of a certified, high quality, non-corrosive, stress relieved thermos plastic and black in colour with a textured finish. The skid type booster tank shall be of a standard configuration and shall be so designed to have complete modular slide in capability. All joints and seams are to be fully welded and electronically tested for maximum strength. The unit shall incorporate transverse partitions manufactured for 1/2" polypropylene which shall interlock with a series of longitudinal partitions constructed of 1/2" polypropylene. All swash partitions shall be so designed to allow for maximum water and air flow between compartments and are fully welded to each other as well as to the inside of the tank. The rear side wall of the tank shall have a standard built in Clear sight gauge tube 1/2" diameter. Tank will be baffles in accordance with NFPA bulletin 1900 requirements, latest version. Fill tower and tank cover The tank shall be equipped with a combination vent/overflow and manual fill tower. The fill tower shall be an 8" round by 6" high with a moulded drop-on type cover. The cover shall be attached to the tower with a rope to prevent loss. The tower shall be located in the right rear corner of the tank. There shall be a vent / overflow installed inside and to the extreme rear of the tower approximately 2" down from the top. This vent / overflow shall be of a standard schedule 40 polypropylene pipe with minimum ID of 3". The vent / overflow shall be piped internally and exit out at the passenger side tank wall with a 1" extension past the wall. The tank cover shall be constructed of 1/2" thick polypropylene, black in color, UV stabilized. Tank Capacity The tank shall have a capacity of 300 U.S. gallons of water. The tank shall be covered by the ALL-OUT No-Fault Life Time Warranty. Sump There shall be one (1) sump as standard per tank. The sump shall be integral to the tank floor and be a minimum of 1/2" deep recessed into the floor. The sump shall not be visible from or protrude through the bottom of the tank. Tank Outlets There shall be two standard tank outlets located in the same vertical plane on the driver side rear wall of the tank. One (1) 2-1/2" female NPT tank to pump suction fitting and one (1) 1-1/2" female NPT tank fill fitting with flow deflector 3/4" Tank Drain There shall be a 3/4" tank drain to the rear right side of the tank with a plug. Tank Mounting Blocks The cover shall incorporate two (2) booster reel mounting blocks that shall be to accommodate two (2) each sliding nut fasteners. These mounting blocks shall be welded to the covers running from the rear edge of the tank forward. 17 _________ Initial Skid Base There shall be a full width skid base manufactured of 3/4" polypropylene welded to the tank. This base shall be 48" wide by 91" long and shall extend 34" past the tank in the rear to allow for pump mounting. The pump mounting area shall be supported by ½" polypropylene gussets 15" high by 32" long. The gussets shall be equipped with 2" holes to assist in lifting the unit. Mounting The Drop-In-Unit shall be mounted in a manner that allows access to the engine, pump, and auxiliary systems for routine maintenance. The Drop-In-Unit shall not be welded or otherwise permanently secured to other components. The mounts shall allow for the skid to be secured directly to a truck bed without the need for any skid frame work underneath. Enclosed Drop-In Unit Aluminum structures shall be provided to enclose the top and rear of the drop-in unit portion. The structure shall be fixed on side and front transverse compartments. Smooth aluminum plate sheets shall be covered the top of the structure. The External aluminum face shall be covered by Black Bed Liner. The external rear aluminum face shall be in smooth material, painted black and covered by chevron red and black. One (1) access door shall be provided on the top to give access to the tank towers. One (1) Amdor brand roll-up door shall be installed at the rear to give access of the pump. CET Fire Pump, PFP-25hp-DSL-MR The pump shall be a CET DI-PFP-25hpDSL-MR single stage centrifugal pump, bolted directly to the engine, with a 2.5" Victaulic suction inlet and a 1.5" flange discharge outlet. The volute and pump head shall be made from aluminum alloy, high strength. The impeller shall be a bronze enclosed type for maximum efficiency, fully machined and balanced. The engine crankshaft shall serve as the pump shaft, with the impeller mounted directly on the crankshaft. The shaft seal shall be self-adjusting, self-lubricating, and mechanical type. The pump piping shall be flexible to prevent any breakage caused by vibration. The pump shall be capable of a maximum discharge volume of 315 GPM at 10 PSI, and a maximum discharge pressure of 175 PSI while pumping 105 GPM. In the center of the performance curve, the pump shall be capable of pumping 230 GPM at 100 PSI and 145 GPM at 150 PSI. The performances are based on a maximum altitude of 500ft and any higher elevation will lower the pump performance. The standard engine performance drops 3% for every 1000 ft. 18 _________ Initial Engine The pump shall be driven by a 3-cylinder, diesel engine powered, Kubota 25 horsepower engine. The engine shall be water cooled, with a 12-volt electric start. The engine shall be connected to the battery of the chassis cab and shall be connected to the fuel tank of the chassis cab with a low-pressure 12VDC fuel pump. Pump Controls A control panel shall be supplied and installed on the pump. A control panel shall be supplied and installed on the pump located at the rear of the skid unit. The control panel shall be manufactured from aluminum and completely covered with a black plastic plate. The Control Panel shall consist of a unkeyed start switch, 2.5" diameter pump discharge and pump intake liquid filled pressure gauges, primer control, throttle lever and illumination for controls with the installation of one tube light. All pump controls and gauges shall be properly marked with white letters engrave in the black plastic plate. Electric Primer A liquid filled electric primer will be installed on the suction side of the pump to facilitate priming in place of the standard exhaust priming system. The electric primer shall be capable of 20' lift. Plumbing and Valves Intake and discharge piping shall not interfere with the routine maintenance of the pump, engine, or auxiliary systems and shall not unduly restrict the servicing of these components. Steel Suction Piping - 2-1/2" - One (1) Fire Type Swing-Out Valve All piping on the suction side shall be made of steel (welded joints) painted red. The suction piping, the pump and the discharge shall be tested to 400 PSI. The suction piping shall consist of a 2-1/2" tank to pump line with a 2-1/2" flexible rubber hump hose to minimize flex and vibration between the pump and the tank. RIGID PIPING SHALL NOT BE ACCEPTABLE. Between the tank and the pump there shall be a 2-1/2" fire type swing-out valve. This valve shall remain open to pump from the tank. 19 _________ Initial This pipe shall have a tee into the suction side of the pump and shall continue to the rear of the truck for overboard suction. The overboard suction connection shall have a 2-1/2" NST male adapter and a 2-1/2" NST-F cap with retaining cable. To draft, the tank to pump valve shall be closed, a suction hose connected to the overboard suction connection and placed in a static water supply, and the primer activated. Tank to Pump “T” Handle Control Attached to the handle of the fire grade tank to pump valve shall be a "T" handle control / rod that shall extend to the end of the pump platform to allow for ease of use to open / close the fire grade tank to pump valve. Steel Discharge Piping All piping shall be steel piping or high-pressure flexible hose. A 2.5" X 2.5" square steel manifold shall be piped directly to the discharge outlet of the pump. Attached to this discharge manifold, by means of welded steel pipe nipples, shall be all the discharge valves. All piping shall be painted red to match the pump. The discharge shall be equipped with a drain valve at the lowest point. 1" Tank Fill There shall be a 1" valve piped from the discharge manifold as a means for refilling the tank. The valve shall be a fire type quarter turn swing-out valve handle and 1" NPT threads, and shall be connected to the tank fill port by 1" high pressure flexible hose. One (1) 1-1/2" Discharge to Rear There shall be one (1) 1.5" valve piped from the discharge manifold to the rear of the truck for connection of forestry hose. The valve shall be a fire type quarter turn swing-out valve with 1-1/2" NST threads. The valve shall be furnished with a 1-1/2" NST cap and chain. One (1) 1" Discharge to Pre-Connected Hose Tray One (1) 1" valve piped from the discharge manifold to the pre-connected hose tray. The valve shall be a fire type quarter turn swing-out valve with a handle and be connected to the pre-connected hose tray by high-pressure flexible plumbing. Testing The pump shall be tested after the pump and all its associated piping and equipment have been installed on the fire apparatus. The tests shall be conducted at the manufacturer’s approved facility. The testing shall include at least the pumping tests, the priming device test, the vacuum test. The water tank-to-pump flow teat, and the piping integrity test. 20 _________ Initial General Warranty CET warrants to the original purchaser that CET will, at its election, either replace or repair any part of the new equipment sold to the purchaser hereunder which has been given no abnormal use; and which has received proper maintenance; and which is determined by CET to be defective in material or workmanship; and which has, within one (1) year after delivery to the purchaser be returned at the purchaser's expense, with transportation charges prepaid, to CET factory OR which has, within one (1) year after delivery to the purchaser, been pre-approved by CET for a third-party to perform the work. All problems shall be reported to CET in writing and damaged parts shall be returned to CET. CET Fire Pump Warranty CET warrants to the original purchaser that CET will, at its election, either replace or repair any part of the Pump sold to the purchaser hereunder which has been given no abnormal use; and which has received proper maintenance; and which is determined by CET to be defective in material or workmanship; and which has, within three (3) years after delivery to the purchaser be returned at the purchaser's expense, with transportation charges prepaid, to CET factory OR which has, within three (3) years after delivery to the purchaser, been pre-approved by CET for a third-party to perform the work. All problems shall be reported to CET in writing and damaged parts shall be returned to CET. Exclusions from warranty: 1. CET incurs no liability under this warranty or otherwise for parts, accessories or components not manufactured by it, but purchased for assembly into the equipment, but CET will assign to the Purchaser whatever warranty rights are extended by the supplier of such part, accessory or component 2. CET incurs no liability under this warranty or otherwise, for equipment which has been abused, altered or improperly maintained, or for equipment which has been returned for inspection or repair more than ten (10) days after defect complained of has been or should have been discovered by the Purchaser, or Equipment which is operated after the defect has been discovered. 3. CET incurs no liability for alteration or repairs unless the Purchaser first receives CET / written consent or approval. CET will not be responsible for work or repairs made or done by others. 4. CET incurs no liability for design alterations, parts, accessories or components which are not standard but are specified by the Purchaser for incorporation into the equipment. Interpretation CET shall not be liable for transportation charges either in shipment to or by it and shall not be liable for loss of use, or consequential damage of any kind in connection with the sales, alteration, repair or replacement of any equipment or part thereof. Liability under this warranty shall be limited to replacement or repair and in any event shall not exceed the purchase price paid. This warranty is not transferable by the Purchaser. CET reserves the right to make changes in design or add any improvements to the Equipment at any time without incurring any obligation to install or modify same on other equipment previously supplied. There are no other warranties, conditions or representations, expressed or implied, except the above. 21 _________ Initial CET Water Tank Limited Lifetime Warranty CET Fire Pumps, Mfg. warrants each CET water and/or foam tank to be from manufacturing defects in material and workmanship for the service life of the original vehicle. Every CET tank shall be thoroughly inspected and tested for leaks before leaving our facility and must be installed in accordance with the CET Fire Pumps, Mfg. installation guidelines. CET will repair or, at its option, replace the tank with a new tank. CET will cover, within the first (3) three years, customary and reasonable costs to remove, repair, re-install, with travel expenses. From year three (3+) only repairs will be covered under this warranty. From year three (3+) CET will cover costs associated with the repair of the water tank only. Cost of removal, re-installation, travel to the repair location, shipping costs to and from the factory, will not be covered under this warranty. All such costs will be customers responsibility. This warranty will not cover tanks that have been improperly installed, misused, or abused. The serial number must not have been altered, defaced or removed. CET will not cover any unauthorized third-party repairs or alterations. Any of these actions may void this warranty. After 10 years of service life, CET will repair the tank, under warranty, only at a CET facility. Only the cost of the tank repair specifically, will be covered under this warranty, at this CET location. There are no warranties, expressed or implied, which extend beyond the description of the face, hereof. There is no express or implied warranty of merchantability or a warranty of fitness for a particular purpose. Additionally, this warranty is in lieu of all other obligations or liabilities on the part of CET Fire Pumps, Mfg. This warranty contains the entire warranty. It is the sole warranty and price agreements or representation, whether oral or written, are either merged herein or expressly canceled. CET Fire Pumps, Mfg. neither authorizes any person supposing to act on its behalf to change, nor assume for it, any warranty or liability concerning its product. In no event will CET Fire Pumps, Mfg. be liable for an amount in excess of the present purchase price, for any loss or damage, whether direct or indirect, incidental, consequential, or otherwise arising out of failure of its product. This warranty gives you the specific legal rights, and you may also have other rights which vary from state to state. Some states do not allow exclusion or limitation of incidental or consequential damage, so the above limitation or exclusion may not apply to you. Since some states do not allow limitations on the length of an implied warranty, the above limitation may not apply to you. The warranty is transferable within the United States and Canada at the discretion of CET Fire Pumps, Mfg. by notifying CET Fire Pumps, Mfg. within thirty (30) days of the vehicle transfer date. At that time, CET will, at it discretion, provide a transfer of ownership form. Manufacturer’s discretion Materials, parts, or procedures used are subject to change at manufacturer's discretion at any time to provide equal or better products. 22 _________ Initial EXCLUSIVE CET POLYPROPYLENE BODY LIMITED LIFETIME WARRANTY CET Fire Pumps MFG. warrants that each CET Polypropylene Body has been designed and manufactured to provide superior performance and reliability and to be free from any defects in material and workmanship under the following conditions: The CET Polypropylene Body must be installed and maintained in accordance with CET Fire Pumps MFG. recommendations. CET will repair, or, at our option, replace any component of the Polypropylene Body that proves to be defective in material and/or workmanship. This warranty will not cover any Polypropylene Body that has been improperly installed, misused or abused, and the serial number must not have been altered, defaced or removed. Polypropylene Body that are not stored, painted or installed properly which results in the body suffering UV damage will not be covered by this agreement. CET will not cover any unauthorized third -party repairs or alterations. Any of these actions may void the warranty. This warranty is can be transferable beyond the original owner. The new owner must notify CET of it intension to transfer ownership with 45 days of the transfer date. Rust and Corrosion CET warranties all of the polypropylene components to be free from rust and corrosion for the service life of the vehicle. Material and Workmanship CET warranties all of the polypropylene components to be free from defects in material and workmanship for the service life of the polypropylene body. Mechanical Hardware CET warranties that all hardware such as stainless -steel hinges, latches, door or body hardware installed and furnished by CET to be free from defects in material and workmanship for a period of one year. Electrical Lighting CET warranties that any electrical package with lighting sold and installed by CET will be free from defects in material and workmanship for a period of one year. Warranty Period Year 1-5: CET will cover cost associated with the repair of the polypropylene body. Year 5+: CET will cover cost associated with the repair of the polypropylene body less the travel cost to the repair location or any shipping cost to and from the factory should that be required. THERE ARE NO WARRANTIES, EXPRESSED OR IMPLIED, WHICH EXTEND BEYOND THE DESCRIPTION OF THE FACE HEREOF. THERE IS NO EXPRESSED OR IMPLIED WARRANTY OF MERCHANTABILITY OR A WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE. ADDITIONALLY, THIS WARRANTY IS IN LIEU OF ALL OTHER OBLIGATIONS OR LIABILITIES ON THE PART OF CET FIRE PUMPS MFG. This warranty contains the entire warranty. It is the sole warranty and price agreements or representation, whether oral or written, are either merged herein or expressly canceled. CET FIRE PUMPS MFG. neither assumes, nor authorizes any person supposing to act on its behalf, to change, nor to assume for it, any warranty or liability concerning its product. IN NO EVENT WILL CET FIRE PUMPS MFG. BE LIABLE FOR AN AMOUNT IN EXCESS OF THE PRESENT PURCHASE PRICE PLUS INSTALLATION AND REMOVAL COST OF THE POLYPROPYLENE BODY, FOR ANY LOSS OR DAMAGE, WHETHER DIRECT OR IN-DIRECT, INCIDENTAL, CONSEQUENTIAL, OR OTHERWISE ARISING OUT OF FAILURE OF ITS PRODUCT. This warranty gives you specific legal rights, and you also may have other rights which vary from state to state. Some states do not allow exclusion or limitation of incidental or consequential damage, so the above limitation or exclusion may not apply to you. Some states do not allow limitation on how long an implied warranty lasts, so the above limitation may not apply to you. 23 _________ Initial FIVE (5) YEAR PAINTLIMITED WARRANTY LIFETIME WARRANTY AGAINST RUST AND CORROSION LIMITED WARRANTY Except as provided below, and provided the vehicle shall have been placed in service within thirty (30) days after it leaves CET Fire Pumps MFG inc (as established by the recorded date on the reverse side of this document), for a period of five (5) years after delivery to the original purchaser. CET Fire Pumps MFG Inc warrants to the user that its body is free of blistering, peeling, bubbling, or any other adhesion defect caused by defective manufacturing methods or paint material selection for exterior surfaces of the poly body of the vehicle. This limited warranty shall apply only if the vehicle is properly maintained and used in service which is normal to the particular vehicle. Normal service means service which does not subject the vehicle to stresses or impacts greater than normally result from the careful use of the vehicle. If the buyer discovers a defect or nonconformity it must notify CET Fire Pumps MFG inc. in writing within thirty (30) days after the date of discovery. This limited warranty is not transferable by the first user, and is applicable to the vehicle in the following percentage costs of warranty repair, if any: Five (5) Year Paint Limited Warranty 0 – 36 months -100% 37 – 60 months - 50% This limited warranty applies only to exterior body paint. Paint on the vehicle’s undercarriage, cab and body interior is warranted only under the CET Fire Pumps MFG Inc General One (1) Year Limited Warranty. In addition to the foregoing, and subject to all of the terms and conditions of the Limited Warranty, except cost allocations, CET Fire Pumps MFG Inc. warranties all of the polypropylene components to be free from rust and corrosion for the service life of the vehicle. CET Fire Pumps MFG Inc makes no warranty whatsoever as to (1) Integral parts, components, attachments or trade accessories not manufactured by CET Fire Pumps MFG Inc, but instead, the applicable warranties, if any, of the respective manufacturers thereof shall apply; (2) Any vehicle, chassis or component, part, attachment or accessory damaged by misuse, neglect or accident; (3) Any vehicle chassis or component, part, attachment or accessory shall have been repaired, altered or assembled in any way by others than CET Fire Pumps MFG Inc, which, in sole judgment of CET Fire Pumps MFG Inc, affects the performance, stability or purpose for which it was manufactured; (4) Products or parts which are not defective but which may wear out and have to be replaced during the warranty period. CET Fire Pumps MFG Inc assumes no responsibility for the assembly of it parts or sub - assembly into finished products unless the assembly is performed by CET Fire Pumps MFG Inc DISCLAIMERS OF WARRANTIES THE WARRANTIES SET FORTH IN PARAGRAPH 1 ARE THE EXCLUSIVE WARRANTIES GIVEN BY CET FIRE PUMPS MFG INC. CET FIRE PUMPS MFG INC HEREBY DISCLAIMS AND EXCLUDES ALL OTHER WARRANTIES, WHETHER EXPRESS, IMPLIED OR STATUTORY, INCLUDING ANY WARRANTY OF MERCHANTABILITY, ANY WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE, AND ANY IMPLIED WARRANTIES OTHERWISE ARISING FROM COURSE OF DEALING OR USAGE OF TRADE. BUYERS REMEDIES If the product fails to conform to the warranties set forth in paragraph 1 and such nonconformity is not due to misuse or improper maintenance, buyer shall notify CET Fire Pumps MFG Inc as provided in paragraph 1, and shall make the product available for inspection by CET Fire Pumps MFG Inc or its designated agent. At the request of CET Fire Pumps MFG Inc any defective part shall be returned to CET Fire Pumps MFG Inc for examination, with transportation charges prepaid and assumed by shipper. Within a reasonable time CET Fire Pumps MFG Inc shall provide, at its option, one of the following (a) repair or replacement of any nonconforming or defective parts; or (b) full refund of the purchase price. Repair or replacement shall be made only by a facility approve d in advance by CET Fire Pumps MFG Inc. THIS REMEDY SHALL BE THE EXCLUSIVE AND SOLE REMEDY FOR ANY BREACH OF WARRANTY. 24 _________ Initial EXCLUSION OF CONSEQUENTIAL AND INCIDENTAL DAMAGES Warranty Exclusions: • Hazing, chalking or loss of gloss caused by improper care, abrasive polishes, cleaning agents, heavy -duty pressure washing or aggressive mechanical wash systems. • Paint deterioration caused by abuse, accidents, acid rain, chemical fallout or acts of nature. • Exception is made for Axalta supplied anti-graffiti coatings systems cleaned with Axalta approved cleaning products. • Accidents, scratches, chips, bruises and gloss reduction due to normal vehicle use and maintenance. • Custom finishes; exotic finishes or any finish not conforming to standard refinish procedures. • Finishes on vehicles used for competitive purposes • Failures resulting from product misuse or abuse. • Repairs done over previously refinished areas or appropriate substrate. • Claims presented without proper Warranty documentation • Failure on finished utilizing products not approved by Axalta for use in systems applied on vehicles covered under the warranty. • Failure on finishes performed by Non- Axalta Certified Refinish Technicians • Failure on finishes performed by Non- Axalta Certified Repair Centers • Failure on finishes performed by Axalta Certified Refinisher that has let their certification expire. IN NO EVENT SHALL CET FIRE PUMPS MFG INC BE LIABLE FOR AN INCIDENTAL, SPECIAL, INDIRECT OR CONSEQUENTIAL DAMAGES, WHETHER RESULTING FROM NONDELIVERY OR FROM THE USE, MISUSE OR INABILITY TO USE THE PRODUCT OR FROM DEFECTS IN THE PRODUCT OR FROM THE NEGLIGENCE OF CET FIRE PUMPS MFG INC OR FROM TORT. This exclusion applies regardless of whether such damages are sought for breach of warranty, breach of contract, negligence or strict liability or tort or under any other legal theory. WARRANTY WORK EXECUTED BY ANY ONE OTHER THEN CET FIRE PUMPS MFG INC WILL NOT BE COVERED, UNLESS APPROVED PRIOR TO ANY WARRANTY WORK BEING DONE BY AN AUTHORIZED CET FIRE PUMPS MFG INC REPRESENTATIVE. NOTE: Surety Bond, if a part of the sale of the vehicle, to which this limited warranty is provided, applies only to the General One-Year Warranty for such vehicle, and not to any other warranty made by CET Fire Pumps MFG Inc. or any CET Fire Pumps MFG Inc. Supplier. 25 _________ Initial 3" BETWEEN CAB C.A. 60" 5'-9" 27 14 " WHELEN SUPER LED M6 SERIES EMERGENCY LIGHTING WHELEN SUPER LED M6 SERIESEMERGENCY LIGHTING WHELEN SUPER LED M4 SERIES EMERGENCY LIGHTING BROW LIGHT FT-B-46-B 95 12 " 110" ALUMINUM PRE-CONNECT HOSE TRAY 110" x 22-3/4" x 8"H W/ CANVAS & NET ALUMINUM HOSE TRAY 110" x 22-3/4" x 8"H W/ CANVAS & NET 95 12 " APPROX 60" WHELEN SUPER LED 600 SERIES DOT MUD FLAPS CHEVRON REAR STORAGE COMPARTMENT 104" x 24" x 5"H HITCH RECEIVER CLASS III (6) NFPA FOLDING STEPS AUTO-CHARGE (4) 12" HANDRAILS TRAFFIC ADVISORTAL85 WHELEN SUPER LED600 SERIES EMERGENCY LIGHTING (2) FIRE TECH HIVIZ GUARDIAN JR. SERIES SCENE LIGHT (2) WHELEN SUPER LED M6 SERIES EMERGENCY LIGHTING TOW EYES WHEEL CHOCKS No: WARNINGBY: THIS DOCUMENT REMAINS THE PROPERTYOF C.E.T. FIRE PUMPS MFG. ALL REPRODUCTION WITHOUT WRITTENAGREEMENT FROM C.E.T. FIRE PUMPS MFGIS TOTALLY PROHIBITED. CREATED TITLE : M.V.C.E.T. BRUSH TRUCK BY: 2023-02-14 FA-1968-0701E M.V. HUGO FD, MN FA-1968-0701E DATE: DATE: VERIFIED 2023-02-14 PAGE 1 OF 2 last saved by: mvigneault 23 avril 2026 08:15:05 L3L2L1 DRIVER SIDE ADJUSTABLE SHELF ADJUSTABLE SHELF ADJUSTABLE SHELF SCBA STORAGE R3 R2 R1 PASSENGER SIDEADJUSTABLE SHELF ADJUSTABLE SHELF ADJUSTABLE SHELF (2) SCBA STORAGES REAR SIDE SKID UNIT SEE DRAWING: DP-7339-0701C B1 INSIDE COMPARTMENTS DIMENSIONS WIDE HEIGHT DEEP L1-R1 34"54-1/2"22-1/4" L2-R2 45"33-1/2"22-1/4" L3-R3 25-1/2"54-1/2"22-1/4" TRANSVERSE L1-R1 13-1/2"36"- OPENING DOOR DIMENSIONS WIDE HEIGHT L1-R1 27"42-1/4" L2-R2 43"21-1/4" L3-R3 21"42-1/4" B1 48"27-1/4" TRANSVERSE L1-R1 12-13/16"27-3/4" No: WARNINGBY: THIS DOCUMENT REMAINS THE PROPERTYOF C.E.T. FIRE PUMPS MFG. ALL REPRODUCTION WITHOUT WRITTENAGREEMENT FROM C.E.T. FIRE PUMPS MFGIS TOTALLY PROHIBITED. CREATED TITLE : M.V.C.E.T. BRUSH TRUCK BY: 2023-02-14 FA-1968-0701E M.V. HUGO FD, MN FA-1968-0701E DATE: DATE: VERIFIED 2023-02-14 PAGE 2 OF 2 last saved by: mvigneault 23 avril 2026 08:15:05 APPROVED DATE APPROVED BY 91" 48" 34" OVERFLOW OUTLET 90 LONG SUCTION W/ 2-1/2" FIRE GRADEVALVE W/ CAP & CHAINW/ "T" HANDLE 31 14 " 37 78 " DI-PFP-25hpKBT-MR W/ ELECTRIC PRIMER 1" FIRE GRADE VALVEPRE-CONNECT 1-1/2" NPT-M NIPPLEW/ CAP 1" FIRE GRADE VALVETANK FILL 1-1/2" FIRE GRADE VALVEW/ CAP & CHAINSERVICE LINE REV.DATE BY C 2026-04-23 M.V. B 2025-09-02 M.V. A 2024-06-25 M.V. WARNING BY: THIS DOCUMENT REMAINS THE PROPERTYOF C.E.T. FIRE PUMPS MFG. ALL REPRODUCTION WITHOUT WRITTENAGREEMENT FROM C.E.T. FIRE PUMPS MFGIS TOTALLY PROHIBITED. CREATED TITLE : M.V. 300 U.S. GAL. WATER 2023-02-14 DP-7339-0701C HUGO FD, MN DP-7339-0701C DATE:C TANK TYPE *DRAWING MAY DIFFER FROM REALITY. APPROXIMATEWET WEIGHT - Lbs PAGE 1 OF 1 APPROXIMATEDRY WEIGHT - Lbs - U.S. GAL. F.C. No: QUOTE # OPP # 25297 1 5/14/2026 1:36 PM Su Mo Tu We Th Fr Sa 12345678910 11 12 13 14 15 1617 18 19 20 21 22 2324 25 26 27 28 29 3031 May 2026 Su Mo Tu We Th Fr Sa 1234567 8 9 10 11 12 1314 15 16 17 18 19 2021 22 23 24 25 26 2728 29 30 June 2026May 2026 Apr 26 27 28 29 30 May 1 2 3 4 5 6 7 8 9 7:00pm City Council 10 11 12 13 14 15 16 Mother's Day 6:30pm BOZA 7:00pm Planning Comm 17 18 19 20 21 22 23 6:00pm Bryan's review (Hugo Conference Room) 7:00pm City Council 1:00pm Hist Comm 5:30pm EDA 7:00pm Parks Comm 24 25 26 27 28 29 30 Memorial Day 7:00pm Concert in the Park 6:30pm BOZA 7:00pm Planning Comm 31 Jun 1 2 3 4 5 6 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 2 5/14/2026 1:36 PM Su Mo Tu We Th Fr Sa 1234567 8 9 10 11 12 1314 15 16 17 18 19 2021 22 23 24 25 26 2728 29 30 June 2026 Su Mo Tu We Th Fr Sa 123456789101112 13 14 15 16 17 1819 20 21 22 23 24 2526 27 28 29 30 31 July 2026June 2026 May 31 Jun 1 2 3 4 5 6 7:00pm City Council Good Neighbor Days 7 8 9 10 11 12 13 Good Neighbor Days 6:30pm BOZA 7:00pm Planning Comm 14 15 16 17 18 19 20 7:00pm City Council 1:00pm Hist Comm 5:30pm EDA 7:00pm Parks Comm Juneteenth 21 22 23 24 25 26 27 Father's Day 6:30pm BOZA 7:00pm Planning Comm 28 29 30 Jul 1 2 3 4 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY