HomeMy WebLinkAbout2015.08.03 RESO 2015-38RESOLUTION 2015-38 APPROVING PUD GENERAL PLAN FOR D.R.HORTON, ICN IMMESOTA FOR "CLEARWATER COVE" ON PROPERTY LOCATED SOUTH OF FRENCHMAN ROAD (CSAH 9) AND EAST OF EVERTON AVENUE NORTH WHEREAS, D.R. Horton, Inc — Minnesota has requested approval of a PUD general plan to allow 89 single family residential lots and 7 outlots on the 40.5 acre property legally described as follows: (See Attached) WHEREAS, the Planning Commission has reviewed the PUD general plan at a duly called Public Hearing and recommends approval, and; NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF HUGO, MINNESOTA, that it should and hereby does approve the request by D.R. Horton, Inc—Minnesota, subject to the following conditions: 1. A PUD general plan is approved to allow the creation of 89 single family residential lots and 7 outlets. The development shall be constructed in accordance with the plans and application received by the City on June 18, 2015, except as amended by this resolution. 2. Approval is contingent upon City Council approval of the requested rezoning of the 40.5 acre property and preliminary plat. 3. The PUD general plan is approved based on the finding that the proposed project is consistent with the City's Comprehensive Plan. 4. The applicant shall comply with all conditions in the City Engineer's letter dated July 16, 2015. 5. PUD flexibility is granted to allow: a) Flexibility to allow a minimum lot size of 8,103 square feet, where 10,400 square feet is required. b) Flexibility to allow a minimum lot width of 65 feet, were 80 feet is required by ordinance. c) Flexibility to allow a minimum front setback of 25 feet, where 30 feet is required. d) Flexibility to allow a minimum side yard setback of 7.5 feet, where 15 feet is required. e) Flexibility to allow building coverage on each lot to be 35%, where 30% is required. Resolution 2015-38 Page 2 f) Flexibility from the shoreland district requirements as below: 6. The preliminary phasing plan is generally approved. a. Phase I shall include: i. A 110 foot wide roadway and utility easement shall be dedicated to the City for the portion of Oneka Parkway not within the plat for construction of the road. it. The park equipment shall be fully installed per plans approved by the City. The 0.47 acres (Outlot F) shall be dedicated to the City. iii. The 8 foot wide bituminous public trail connection from Victor Gardens as shown in phase 1 shall be installed. b. Phase 2 shall include: i. The entire length of Oneka Parkway, from CSAR 8 to the development, shall be constructed as an urban section roadway to City standard, with sidewalk and trail, with the first layer of bituminous prior to issuance of a Certificate of Occupancy for the 1 st building. ii. The 8 foot wide bituminous public trail as shown in Phase 2 shall be installed. c. Phase 3 shall include: i. The 8 foot wide bituminous public trail as shown in Phase 3 shall be installed. The trail shall end at the cul-de-sac connections. An escrow shall be established with the City to extend the trail to the south plat boundary at the time deemed necessary by the City. 7. The building setbacks for the PUD are as follows: Minimum Setbacks Front 25 feet Front (Lots 7-12, Blk 2 and 35 feet Required Proposed Minimum Lot Size 15,000 square feet 8,103 square feet Minimum Lot Width 80 feet 65 feet Maximum Build Height 25 feet 35 feet 6. The preliminary phasing plan is generally approved. a. Phase I shall include: i. A 110 foot wide roadway and utility easement shall be dedicated to the City for the portion of Oneka Parkway not within the plat for construction of the road. it. The park equipment shall be fully installed per plans approved by the City. The 0.47 acres (Outlot F) shall be dedicated to the City. iii. The 8 foot wide bituminous public trail connection from Victor Gardens as shown in phase 1 shall be installed. b. Phase 2 shall include: i. The entire length of Oneka Parkway, from CSAR 8 to the development, shall be constructed as an urban section roadway to City standard, with sidewalk and trail, with the first layer of bituminous prior to issuance of a Certificate of Occupancy for the 1 st building. ii. The 8 foot wide bituminous public trail as shown in Phase 2 shall be installed. c. Phase 3 shall include: i. The 8 foot wide bituminous public trail as shown in Phase 3 shall be installed. The trail shall end at the cul-de-sac connections. An escrow shall be established with the City to extend the trail to the south plat boundary at the time deemed necessary by the City. 7. The building setbacks for the PUD are as follows: Minimum Setbacks Front 25 feet Front (Lots 7-12, Blk 2 and 35 feet Resolution 2015-38 Page 3 Lots 1-6, B1k 3) Side 7.5 feet Rear 30 feet 8. A stormwater re -use system, as shown in the plans, shall be constructed with the development. The final plans shall be reviewed and approved by staff. The system will be installed by the applicant, and owned/operated/maintained by the homeowner's association. 9. The applicant has indicated that an HOA will be established for the development to own/operate/maintain community areas, landscaping, and the water re -use system. The HOA documents shall be reviewed and approved by staff prior to the recording of the final plat for the Phase 1. 10. The applicant must comply with the following, prior to Final Plat and Final PUD Plan application: Landscaping and Righting a. The landscape plan shall be revised to include the number, size, and type of trees and shrubs in each proposed location. b. The landscape plan shall be revised to show boulevard trees along Oneka Parkway to match the existing landscaping north on the parkway. c. The final landscape plans must be submitted for review and approval by staff. Signage d. Final design of the entrance signage for the development shall be reviewed and approved by staff. e. The applicant shall enter into an easement agreement for access and maintenance of the landscaping and signage with in Outlot B and D. f The applicant shall obtain an access and maintenance easement for the development pillar sign on Lot 1, Block 6. Streets/Access g. The plans shall be revised to show Oneka Parkway as an urban section road to street standards, including the 8 foot bituminous trail on the east side and the 5 foot sidewalk on the west side. The final plans must be submitted for review and approval by staff. Resolution 2015-38 Page 4 ADOPTED by the City Council this 3rd day of August, 2015. / A��4 - AQ� Tom Weidt, Mayor AT ST: Michele Lindau, City Clerk Proposed Property Description (Parcel BL PUD REQUEST - That part of the North Half of the Southwest Quarter of the Southeast Quarter and that part of the Northwest Quarter of the Southeast Quarter of Section 19, Township 31 North, Range 21 West, Washington County, Minnesota, EXCEPT that part lying southeasterly, northerly and easterly of the following described line; Commencing at the southwest corner of the Southwest Quarter of the Northeast Quarter of said Section 19; thence North 00 degrees 26 minutes 04 seconds East, assumed bearing along the west line of said Southwest Quarter of the Northeast Quarter, a distance of 189.61 feet; thence South 76 degrees 59 minutes 41 seconds East a distance of 728.26 feet; thence North 40 degrees 04 minutes 44 seconds East a distance of 558.07 feet to the centerline of Frenchman Road; thence South 78 degrees 18 minutes 56 seconds East along said centerl'ne a distance of 85.26 feet; thence South 40 degrees 04 minutes 44 seconds West along the enterline of Branch No. 3 of Judicial Ditch No. 3 a distance of 610.25 feet to the point of beginning of the line to be described; thence continuing South 40 degrees 04 minutes 44 seconds West, along said ditch a distance of 108.51 feet; thence South 56 degrees 02 minutes 44 seconds West along said ditch a distance of 543.00 feet; thence southwesterly along a non-tangential curve concave to the southeast having a central angle of 44 degrees 14 minutes 52 seconds, a radius of 334.00 feet for an arc distance of 257.94 feet to the west line of said Northwest Quarter of the Southeast Quarter, the chord of said curve bears South 76 degrees 09 minutes 20 seconds West; thence northeasterly along said last described curve and its easterly extension and along a non- tangential curve concave to the southeast having a central angle of 48 degrees 25 minutes 51 seconds, a radius of 334.00 feet for an arc distance of 282.32 feet, the chord of said curve bears North 78 degrees 14 minutes 49 seconds East; thence South 77 degrees 32 minutes 15 seconds East, tangent to said curve, a distance of 15.61 feet; thence southeasterly along a tangential curve concave to the southwest having a central angle of 13 degrees 09 minutes 03 seconds, a radius of 500.00 feet for an arc distance of 114.76 feet; thence South 64 degrees 23 minutes 12 seconds East, tangent to said curve, a distance of 172.43 feet; thence South 66 degrees 38 minutes 56 seconds East, a distance of 272.32 feet; thence South 65 degrees 27 minutes 28 seconds East, a distance of 397.47 feet; thence southeasterly along a tangential curve concave to the southwest having a central angle of 76 degrees 14 minutes 49 seconds, a radius of 270.00 feet for an arc distance of 359.30 feet; thence South 10 degrees 47 minutes 21 seconds West, tangent to said curve, a distance of 420.88 feet; thence South 13 degrees 24 minutes41 seconds West, a distance of 303.92 feet; thence South 15 degrees 56 minutes 32 seconds West, a distance of 249.70 feet to the south line of said North Half of the Southwest Quarter of the Southeast Quarter and said line there terminating. Area: 1,808,176 sf or 41.51 ac