Loading...
HomeMy WebLinkAbout1989.03.06 ORD 1989-256 , ORDINANCE 89-256 AN ORDINANCE REGULATING THE LOCATION, DESIGN, INSTALLATION, USE AND MAINTENANCE, REQUIRING PERMITS AND INSPECTION OF INDIVIDUAL SEWAGE TREATMENT SYSTEMS WITHIN THE CITY OF HUGO. The City Council of the City of Hugo, Washington County, Minnesota, ordains as follows: 1 . ADOPTION - The attached document , entitled "CHAPTER 263 - INDIVIDUAL SEWAGE TREATMENT SYSTEMS" is adopted by this reference, and shall ' � govern all applications for individual sewage treatment systems filed with the City after it' s effective date. 2. REPEAL - Existing Chapter 262 Article II , Sections 25-38 of the Hugo City Code, entitled "ON-SITE SEWER SYSTEMS" is hereby repealed , PROVIDED, HOWEVER, all applications for individual sewage treatment systems pending prior to the effective date shall be governed by the provisions thereof until the later of : a) rejection of the application ; b) granting of the application ; c ) completion by applicant of all obligations undertaken pursuant thereto; and d ) final disposition of any litigation pertaining to any such application or contractural relationship established thereunder. . EFFECTIVE' DATE This Ordinance shall be effective upon adoption by the City and publication as required by law. 4. CITY CODE' - At it ' s effective date, this Ordinance shall be incorporated in the Hugo City Code. Upon roll call , the following members voted AYE: McAllister , Jesinski , Olson , Vail , Atkinson Upon roll call , the following members voted NAY: NONE Whereupon said Ordinance was adopted and ' Fassed this 6th day of March , 1988. (' '/ / '//- ` � ' ' tkin-an , Mayor / / ATTEST: / �N� 2 .. 1 . .___.c..e_e . . ____........... Mary }� Crea er, Cit��Clerk �� Pub ' hed in he Forest Lake Times this_ ay of_ , 1989.. ' NOTICE OF INDIVIDUAL SEWAGE TREATMENT SYSTEM ORDINANCE he Hugo City Council adopted and passed Ordinance 1989-256 entitled "AN ORDINANCE REGULATING THE LOCATION, DESIGN, INSTALLATION, USE AND MAINTENANCE, REQUIRING PERMITS AND INSPECTION OF INDIVIDUAL SEWAGE TREATMENT SYSTEMS WITHIN THE CITY OF HUGO" on March 6, 1989, a complete copy of which is on file and available for inspection by the public during regular office hours in the office of the City Clerk , Hugo City Hall , 5524 Upper 146th Street, Hugo, MN. In compliance with M.S.A. 412.919, Subd . 4, the Hugo City Council has directed the following Summary of said Ordinance be published : . SUMMARY Consistent with the City' s Comprehensive Plan , Hugo has established a policy of controlling the use of Individual Sewage Treatment Systems (septic systems) because the uncontrolled use of said systems adversely affects the public health, safety , and general welfare by contributing to water pollution and impairing land values as noted in the Intent and Purpose of the Ordinance. Said Ordinance repeals former Chapter 262, Article II for On-site Sewer Systems. Ordinance provides for expanded definitions, and general provision which include include, but are not limited to, the following : applicability , general requirements, site evaluation , and construction and materials. The Ordinance also provides for alternative systems, permitted alternative systems, operation and oaintenance, general administration , certification , licensing and permits; ?nforcement f the Ordinance, and the effects and said Ordinance. The Jrdinance uprades current City standards, and allows for enforcement of by the City Of Hugo or Washington County as per designation of the Hugo City CouncilOrdinance prohibits certain installations, requires soil borings and percolation tests, specifies construction materials, specifies sewage and septic tanks, restricts sewage tank location , provides for maintenance requirements, prescribes setback distances, addresses replacement of existing systems, and modification to standard systems; permits certain mound systems, prohibits certain holding tanks, addresses floodplain systems, requires inspections and fees, as well licensing of ' installers; provides for Board of Adjustrent and Appe�� s, and enforcement of Ordinance. / /' . or kinsGn , Mayor ' / / ATTEST: /26a-/ce. 4---.2.,./ „,„ ' Mar Creager, C Clerk Published in the Forest Lake Times this 30tb day of March, 1989. ORDINANCE 89-256 CHAPTER 262 . INDIVIDUAL SEWAGE TREATMENT SYSTEM ORDINANCE AN ORDINANCE REGULATING THE LOCATION, DESIGN, INSTALLATION, USE AND MAINTENANCE OF INDIVIDUAL SEWAGE TREATMENT SYSTEMS WITHIN THE CITY OF HUGO. PURSUANT TO THE AUTHORITY GRANTED IN MINNESOTA STATUTES, SECTIONS 145.915 AND 394.21 ET SEQ. , THE CITY COUNCIL OF THE CITY OF HUGO, MINNEOSTA, DOES ORDAIN: SECTION 1 . TITLE 101 . Short Title. This Ordinance shall 'be -known , cited and referred to as the Individual Sewage Treatment System Ordinance, except as referred to herein, where it shall be known as, "this Ordinance" . SECTION 2. INTENT AND PURPOSE 201 . This Ordinance is adopted for the purpose of : ( 1 ) Protecting the health, safety, and welfare of the residents of the community, present and future. (2) Regulating the location , design , installation , use and maintenance of individual sewage treatment systems so as to prevent contamination of the surface and ground waters within the city. (3) Protecting the individual water supply wells of the community from contamination by inadequate, improperly designed, located , installed or maintained individual sewage treatment systems. (4) Providing for the orderly development of the rural areas of the community which are not served nor planned to be served by central public waste treatment facilities so as to preclude the installation of " central public systems. 1 I SECTION 3. DEFINITIONS 301 . Rules. 301 .01 . In the event of conflicting provisions in the text of this Ordinance, and/or other ordinances, the more restrictive provisions shall apply. The Zoning Administrator shall determine which is more "restrictive" and appeals from .such .determination shall be made in the manner provided herein . 301 .02. Words used in the present tense shall include the past and future tense; the singular includes the plural and the plural includes the singular. The word "shall " is mandatory, and the word "may" is permissive. 301 .03. Unless otherwise specified all distances shall be measured horizontally. 302. Definitions. 302.01 . For the purpose of this Ordinance, certain terms, words and phrases are hereby defi-ri-ed as follows: ( 1 ) Agent. Washington County Planning Department and Code Enforcement . (2) Aeration . The bringing about of intimate contact between air and a liquid by spraying the liquid irk he air, bubbling air through the liquid or agitating liquid surface in air. (3) Aeration tank . A tank or container into which liquid or sewage is subjected to aeration . (4) Alternative System. An Individual Sewage Treatment System, other than the Standard -System -defi-ned herein . ( 5) Applicant. Authorized person , firm or corporation making application for required permit(s) for a Sewage. Treatment System, and shall include the owner(s) and such other parties as may be specifically authorized for specific requirements. (6) Baffle. A device permanently attached or integral to the Sewage Tank to provide proper operation of the Sewage Tank and maximum retention of solids. (7) Bedrock . That layer of parent materials which by its composition and structure, as compared to soil , is inadequate to provide adequate filtration and treatment. of Sewage Tank Effluent. (8) Bedroom' Any room within a dwelling unit which, by virtue of its design and location , might reasonably be used as a sleeping room. (9) Building Drain . That part of the lowest piping of the drainage system-whi-cti receives the Sewage discharge inside the walls of the building and conveys it to the Building Sewer which begins at least one foot outside the building line. ( 10) Building Sewer. That part of the drainage system which extends from the Building Drain and conveys its • discharge to an Individual Sewage Treatment System. (11 ) Capacity. The internal liquid volume of a Sewage Tank below the outlet level . ( 12) Cesspool . An underground pit into which raw household Sewage or other untreated liquid waste is discharged and from which the liquid is allowed to seep into the surrounding soil . See 402.04 . ( 13) City. The City of Hugo, Minnesota ( 14) City Council . The Governing Body of the City duly elected and serving pursuant to Minnesota Statutes' (15) Distribution Pipe. Perforated pipe or spaced agricultural drain tile which is used to distribute Sewage Tank Effluent in a Soil Treatment System. (16) DNR. The- Minnesota Department of Natural Resources' (17) Dosinq Chamber. A separate tank or chamber which receives effluent from the Sewage Tank and serves as a reservoir for the Dosing Device. ( 18) Dosinq Device. A pump, siphon , or other device which mechanically discharges Sewage Tank Effluent from the Dosing Chamber to the Soil Treatment System. ( 19) Dwelling Unit. A residential building , or portion thereof, intended for occupancy by an individual or a family, but not including hotels, motels, boarding rooms or rooming houses, tourist homes, or trailers located in a mobile home park . (20) Filter Material . Clean rock , crushed igneous rock or similar durable and decay-resistent material free from dust, sand , silt or clay which is insoluble in Sewage Tank Effluent. The size shall range from three-fourths inch and two and one—half inches. (21 ) Flood Plain . The area adjoining a river, stream, channel , lake, or low area which is subject to periodic ,-` flooding , as presently defined or as may be defined by a cognizant governmental body or agency, and subject to ! regulations of Chapter 320, Article II-Flood Plain Management of the City Code, as it may be amended from time to time. (22)Governing Body. See City Council . (23) Grey Water. Liquid waste from a dwelling or other establishment produced by bathing , laundry, culinary operations and from floor drains, and specifically excluding Toilet Waste. (24) Holding Tank . A Watertight Sewage Tank for the temporary storage of Sewage until it is transported to an approved point for treatment and disposal . (25) Individual Sewage Treatment System. A Sewage Treatment System or part thereof , serving a dwelling or Other Establishment, or group thereof , consisting of one or more Septic Tanks and a Soil Treatment System. (26) Lot. A Parcel of land , either platted or unplatted , upon which a principal building , including a Dwelling Unit, is or may be placed , and separated from other Parcels by a separate legal description . (27) MHD. The Minnesota Department of Health. (28) Mottling . A zone of chemical oxidation and reduction activity within the soil , appearing as patches of red , brown, orange or gray or combinations thereof . (29) Mound System. An Alternative Sewage Treatment System designed with the soil treatment area built above existing grade to overcome the limitations of water table, Bedrock, or -soil -permeability. (30) MPCA. The Minnesota Pollution Control Agency. (31 ) Natural Soil . Soil which exists undisturbed in its natural state. Fill shall be considered as natural soil after it has been in place for a minimum of twelve ( 12) months. (32) Ordinary High Water Mark . A mark delineating the highest water level which has been maintained for a sufficient period of time to leave evidence upon the landscape. In the case of controlled outlet waters, the outflow elevation of the control structure. (33) Other Establishment. Any public or private structure other than a dwelling , which generates Sewage. ` ~ (34 ) Owner. The person (s) , firm( s) , and or corporation (s) , or other legal entities having fee title to a Lot, or the contract purchaser of a Lot acting with consent of the fee title holder' J (35) Parcel . See Lot . (36) Percolation . The movement or flow of water or liquid through the interstices or-the pores of a soil or other porous medium. (• 7 ) Percolation Rate. The calculated time rate of drop of a water level in a test hole as specified in Section (38) Permitting Authority. The City or its duly designated Agent. (39) Plastic Limit. A soil moisture content, below which the soil may be manipulated for the purpose of installing a Soil Treatment System. (40) Sand . A soil texture composed by weight of at least eight-five (85) percent of soil particles ranging in size between 0.05 and 2.0 mm. (41 ) Seepage Pit ( leaching pit or drywell ) . A lined -un-derground pit into which- Sewage Tank Effluent or other liquid waste is discharged and from which seepage into the soil occurs through the bottom and sidewall openings. (42) Septaqe. Those accumulated solids and liquids removed from a Sewage Tank or holding Tank during regular periods of maintenance. (43) Sewage. Any water carried domestic waste, exclusive of footing and roof drainage, from any dwelling , industrial , agricultural , commercial establishment , or other structure. Domestic waste includes but is not limited to liquid waste produced by bathing , laundry, and culinary operations, and liquid waste from toi lets and floor drains, and specifically excludes animal waste and commercial process waste. (44) Sewage Flow Rate. Flow rates as determined by actual metered water use or as estimated on the basis of use and er�occupancy. (45) See Tank . A Watertight tank used for the retention of Sewage, Including , but is not limited to Septic Tanks, Holding Tanks, and pumping chambers. (46) Sewage Tank Effluent. That liquid which flows from a Septic Tank under normal operation . (47) Septic Tank . A sound , durable, Watertight Sewage Tank designed and constructed to receive the discharge of Sewage from a Building Sewer, separate solids from liquid , digest organic matter and store liquids through a period of detention . r= • � l (48) Shoreland . The perimeter of any lake in whole or in • . ` part within the City, subject to setback , usage, and/or other use regulations of any cognizant governmental body or agency. (49) Site. The area bounded by the dimensions required for the proper location of the Soil Treatment System. ( 50) Site, Previsoulv Developed . A lot or parcel upon which a dwelling or other establishment is in existence as of the enactment of this Ordinance. ( 51 ) Slope. The ratio of vertical rise or fall to horizontal distance. ( 52) Soil Characteristics, Limiting . Those soil characteristics which preclude the installation of a Standard System, including but not limited to proximity to bedrock or watertable, and percolation rates which are excessively fast or excessively slow. f53) T-he alteration ofnatural soil conditions by means including but not limited to placement of fill , removal of soil or alteration of topography. ( 54) Soil Survey. The U.S. Department of Agriculture, Soil Conservation Service, Soil Survey of Washington County, • 1977. ( 55) Soil Textural Classification. Where soil particle sizes or textures are specified in this Ordinance, they refer to the soil textural classification found in the Soil Survey Manual , Handbook No. 18, U.S. Department of Agriculture, 1951 . ( 56)- Soil Treatment Area. - Thatarea of trench -or bed bottom which is in direct contact with the filter material of the Soil Treatment System. ( 57) Soil Treatment System. A system whereby Sewage Tank Effluent is treated and disposed of below the ground surface by filtration and percolation through the soil . ( 58) Standard System. An individual Sewage Treatment System employing a Building Sewer, Sewage Tank and the Soil Treatment System commonly known as a drainfield or leachfield ' ( 59) Surface Discharge. The discharge of any sewage onto the surface of any land, or the escape of any sewage • discharged into an Individual Sewage Treatment System • onto the surface of any land . 6 2� ,A 2 (60) Surface Water Flooding . The one hundred ( 100 ) year Floodplain along rivers and streams as defined by the Federal Emergency Management Agency, or in the absence of such data, as determined by the largest flood of record . On lakes, highwater levels as determined or recorded by the DNR and/or the Federal Emergency Management Agency. (61 ) Ten Year Flood . That flood which can be expected to occur, on an average, of once in ten ( 10) years; or the level to which flood waters have a ten ( 10) percent chance of rising in any given year. ( 58) Toilet Waste. Fecal matter, urine, toilet paper and any water used for flushing . (59) Valve Box . Any device which can stop Sewage Tank Effluent from flowing to a portion of the Soil Treatment System. (60) Water TabLe. The- hig-hestele*ation of the soil where all voids are filled with water, as evidenced by soil Mottling , the presence of water, or other information . (61 ) Watertiqht. Constructed and maintained to prevent inflow of water or outflow of effluent. (62) Zoning Administrator. The City of Hugo Zoning Administrator, deputy zoning administrator or his designated agent. (63) Zoning Map. The official map adopted by the City which delineates the zoning district and Flood Plain boundaries, as it may be amended by the City Council from tixr�� to-time. 7 �N�- �� � SECTION 4. GENERAL PROVISIONS 401 . Applicability . 401 .01 . Administration by state agencies. ( 1 ) Individual Sewage Treatment Systems which serve a single facility generating greater than fifteen thousand ( 15,000) gallons per day shall make application for and obtain a state disposal system permit from the MPCA. (2) Collector systems which serve fifteen ( 15) dwellings or five thousand ( 5,000) gallons per day, whichever is less, shall make application for and obtain a state disposal system permit from the MPCA. (3) Individual Sewage Treatment Systems serving facilities licensed or otherwise regulated by the State of Minnesota shall -ma4*s ,appli-cation for and obtain permits and/or approvals from the appropriate state agency. (4) Any individual Sewage Treatment System requiring approval by the State of Minnesota shall also comply '- - : ! with this Ordinance and all other applicable local codes and ordinances. 401 .02. Administration under this Ordinance. All Individual Sewage Treatment Systems installed subsequent to the adoption of this Ordinance and all alterations, extensions, modifications or repairs to existing systems irrespective of the date of original installation shall be regulated in accordance with all requirements of this Ordinance. Existing systems which show evidence of Sewage Tank Effluent discharge to the ground surface, ground or surface waters or other evidence of failure to-adequately treat the Sewage Tank Effluent shall be replaced , reconstructed or repaired within ninety (90) days of notice and order to comply by the Zoning AdministraThe. 402. General Requirements. 402.01 . Surface Discharge. Unless specifically permitted by the MPCA, Sewage, Sewage Tank Effluent, or seepage from a Soil Treatment System shall not be discharged to the ground surface, abandoned wells, bodies of surface water, or into any rock or soil formation the structure of which is not conducive to purification by filtration or into any well or other excavation in the ground . 8 2 402.0 2. Treatment Required . The Sewage Treatment System, or systems, shall be designed , installed and maintained , to receive all Sewage from the dwelling , building , or Other Establishment served . Footing or roof drainage shall not enter any part of the system. 402.03. System Components. The Sewage Treatment System shall consist of a Building Sewer, Sewage Tank and Soil Treatment System. All Sewage shall be treated in a Sewage Tank or Toilet Waste treatment device, and the Sewage Tank Effluent shall be discharged to the Soil Treatment System. 402.04. Prohibited Installations. Cesspools shall not be installed . 40 .05. Location . Sewage Treatment Systems and each component thereof shall be located and installed to insure that, with proper maintenance, it will function in a sanitary manner, will not create a nuisance nor contaminate any domestic water supply well . Location shall consider Lot size and configuration , proposed structures and other improvements, topography, surface drainage, soil conditions, depth to groundwater, geology, -existing and proposed water supply wells, accessibility for maintenance, and expansion or replacement of the system. Installation of Systems in low swampy areas, drainage swales or area subject to recurrent flooding is prohibited . Systems shall not be located within utility or drainage easements nor with dedicated public or private rights-of-way. 402.06. Clear Water Waste. Uncontaminated clear water waste from geothermal heat pump installations shall not be introduced into individual sewage treatment systems. Such waste may be discharged to the ground surface or to a body of water, however in no case shall surface discharge be permitted where such discharge encroaches on an adjoining property or public way. Where subsurface disposal is provided , such installation shall be separated from the required sewage treatment site and shall be designed and sized as prescribed for a standard soil treatment system. 403. Site Evaluation. 403.01 . Prior to the issuance of a building permit, a permit to _rtTt_ t install an Individual Sewage Treatment System must be obtained and a field investigation may be conducted by the Zoning Administrator of all proposed sites_. for Sewage Treatment Systems, at which time they shall be evaluated as to: ( 1 ) Depth to the highest known or calculated ground water table, zone of periodic saturation , or Bedrock . 2) Soil conditions, properties and permeability. (= ) Slope. (4 ) The existence of low lands, surface drainage swales, local surface depressions and rock outcrops. 0 h _ A r �� ( 5) All legal setback requirements from: existing and proposed buildings; property lines; Sewage Tanks; Soil Treatment Systems; water supply wells, buried water and utility lines; the Ordinary High Water Mark of lakes, rivers, streams, flowages, or other bodies of surface water; and the location of all existing Sewage Treatment Systems and water supply wells on adjoining Lots within one hundred ( 100) feet of the proposed Soil Treatment System. (6) Surface water flooding probability. 403.02' Soil Testing. Applicants for Sewage Treatment System permits will be required to submit soil test data derived from soil borings and Percolation Tests for each proposed site or installation . 403.03. Conduct of Tests. All testing shall be conducted in accordance with the requirements of this Ordinance and shall be done by qualified personnel , certified under the MPCA training and certification program. Exception : Testing may be done by any individual on a lot proposed for his personal residenee -or-presently occupied by him. Any such testing which results in data which is inconsistent with actual soil conditions may be rejected by the Zoning Administrator and professional testing required . 403.04. Soil Borings. At a minimum, four (4) satisfactory soil borings per site shall be made, outlining the perimeter of a minimum area of five thousand (5,000) square feet per lot for a permit application . Larger areas may be required where conditions of use, soils, topography or vegetation require. Soil borings shall be made as follows: ( 1 ) Borings shall be by auger or excavation and shall be staked and protected until notification that field evaluation has been completed . (2) Borings or excavations shall be made to a minimum depth of eight (8) feet below existing or proposed grade, or until bedrock or watertable is encountered , whichever is less. (3) A soil texture description shall be recorded by depth and notations made where texture changes occur. (4) Particular effort shall be made to determine the highest known water table or zone of periodic saturation by observation and recording the first occurrence of mottling in the soil , or if mottling is not encountered , the open holes in clay or loam soils shall be observed after standing undisturbed a minimum of sixteen ( 16) hours, at which time, depth to standing water, if present, shall be measured . 10 2 A � . ( 5) If one ( 1 ) or more borings encounters unsuitable or limiting conditions, additiohal borings shall be made in order to outline an adequate area of suitable soil conditions. If the minimum site area cannot be identified by suitable borings, work should be suspended and the data submitted to the Zoning Administrator. 403.05. Percolation Tests. For all sites, after soil borings have outlined the minimum area of suitable soils, Percolation Tests shall be made as follows: ( 1 ) Test hole locations and dimensions: a. Within the outlined area, a minimum of two (2) percolation tests, evenly spaced shall be made. Where soil conditions vary within the tested area, one ( 1 ) additional percolation test shall be made in each soil type. b. Each test hole shall be six (6) to eight (8) inches in diameter, have vertical sides, and be bored or-dug- to the depth 'of the bottom of the proposed drainfield trench. c . Hole diameter and soil texture descriptions shall be recorded noting depths where texture changes occur. (2) Preparation of the test hole: a. The bottom and sides of the hole shall be carefully scratched to remove any smearing and to provide a natural soil surface. b. All loose material shall be removed from the bottom of the test hole and two (2) inches of cuoe=quar±er .(1/4) -to three-quarters (3/4) inch gravel shall be placed in the hole to protect the bottom from scouring . (3) Soil saturation and swelling : a. The hole shall be carefully filled with clear water to a minimum depth of twelve ( 12) inches above the hole bottom and maintained at this depth for not less than four (4) hours. (Failure to adequately saturate the test hole may result in rejection of the test. ) b. The soil shall then be allowed to swell for at least sixteen ( 16 ) but not more than thirty (30) hours. In soils classified as sand , the saturation and swelling procedure shall not be required and the test may proceed if one ( 1 ) filling of the hole has seeped away in less than ten ( 10) minutes, L11 A91 (4) Percolation Rate measurement : a. In sandy soils adjust the water depth to eight (8) inches above the soil at the bottom of the test | | hole. From a fixed reference point , the drop in water level shall be measured in inches to the nearest one-eigth ( 1/8) inch at ten ( 10) minute intervals. If eight (8) inches of water seeps away in less than ten ( 10) minutes, a shorter time interval may be used . But in no case shall the depth of water exceed eight (8) inches. The test shall continue until three (3) consecutive measurements vary by no more than ten ( 10) percent. b. In other than sandy soils, adjust the water depth to eight (8) inches over the soil at the bottom of the test hole. From a fixed reference point, the drop in water level shall be measured in inches to the nearest one-eight ( 1/8) inch at thirty (30) minute intervals, refilling after each measurement to maintain an eight (8) inch starting head . The test shall -c-ontinue until three (3) consecutive measurements vary by no more than ten ( 10) percent. The rate may also be measured by observing the time it takes the water level to drop one ( 1 ) inch from an eight (8) inch reference „ point, provided a constant water depth of at least eight (8) inches has been maintained for at least four (4) hours immediately prior to the measurement. ( 5) Calculation of Percolation Rates: a. Divide the time interval by the drop in water level to obtain the percolation rate in minutes per inch. b. Percolation rates shall be determined for each test hole and recorded on worksheets showing all measurements and calculations' (6) Percolation tests shall not be run where frost exists at and below the test hole bottom. 404 . Construction and Materials. ' 404.01 . Building Sewers. The design , construction , and location of and the materials permitted for use in building sewers shall be as regulated by the Minnesota State Building Code as it may be amended ' � ! 12 2 Pr , 404.02. Sewage Tanks. All tanks, regardless of material or method of construction shall be: ! ( 1 ) Watertight. (2) So designed and constructed as to withstand all lateral earth pressures under saturated soil conditions with the tank empty. (3) So designed and constructed as to withstand a minimum of seven (7) feet of saturated earth cover above the tank top. (4) Not subject to excessive corrosion or decay. ( 5) Any tank installed where the water table is closer than three (3) inches to the bottom of the excavation at the time of installation shall be required to have an integrally cast bottom. 404.03. Septic Tanks. All tanks, regardless of material or method of construction , shall be designed to conform to the following criteria: ( 1 ) The liquid depth of any Septic Tank or compartment thereof shall not be less than thirty (30) inches. A liquid depth greater than six and one-half (6 1/2) feet shall not be considered in determining tank capacity. (2) No tank or compartments thereof shall have an inside horizontal dimension less than twenty-four (24) inches. (3) The inlet and outlet of each tank shall be submerged by means of a baffle device. (4) The space in the tank between the design liquid level and the top of the inlet and outlet baffles shall not izeless than twenty (20) percent of the total design liquid capacity, except that in horizontal cylindrical tanks this space shall be not less than fifteen ( 15) percent of the total design liquid capacity. ( 5) Baffle Devices. Shall be constructed of acid resistant concrete, acid resistant fiberglass or plastic and shall be integrally cast with the tank , affixed with a permanent waterproof adhesive or affixed with stainless steel connectors, top and bottom. Where a sanitary tee is used as a baffle device, it shall be joined to the inlet or outlet pipe with a permanent waterproof adhesive. (6) The inlet baffle shall extend below the design liquid level a minimum of six (6) inches but not more than twenty (20) percent of the total design liquid depth, and a minimum of one ( 1 ) inch above the crown of the inlet sewer. 13 � 2 �� � (; ) The outlet baffle and baffles between compartments 414 shall extend below the design liquid level a distance equal to forty (40) percent of the design liquid depth, except in horizontal cyl. .i.ndrical tanks where this • dimension shall be thirty-five (35) percent of the design liquid depth. Baffles shall extend above the design liquid level as required in 404.03(4) , however in no case shall they extend less than six (6) inches above the design liquid level . (8) There shall be a minimum of one ( 1 ) inch between the underside of the top of the tank and the highest point of the inlet and outlet baffles. (9) The inlet invert shall be not less than three' (3) inches above the outlet invert. ( 10) Sanitary tees used as baffles shall be a minimum of four (4) inches in diameter. Inlet baffles shall be not less than six (6) inches or more than twelve ( 12) inches measured from the end of the inlet pipe to the nearest edge of the baffle. Outlet baffles shall be six (6) inches, measured from the end of the outlet pipe to the nearest edge of the baffle. ( 11 ) Access to the Septic Tank shall be as follows: There shall be one or more manholes, at least twenty (20) inches least dimension located within • six (6) feet of all walls of the tank . The manhole shall extend through the cover to a point within twelve (12) inches below finished grade. The manhole cover shall be covered by at least six (6) inches of earth. b. There shall be an inspection pipe of at least four-. (4) inches diameter or a manhole over both the inlet and outlet baffle device. The inspection pipe shall extend through the cover and be capped flush with or above finished grade. ty downward prosection of the center line of the inspection pipe shall be directly in line with the center line of the inlet and outlet baffle device. ( 1.2) Compartmentation of Septic Tanks, Septic Tanks larger than three thousand (3,000) gallons and fabricated as a single unit shall be divided into two (2) or more compartments as follows: a. When divided into two (2) compartments, not less than one-half nor more than two-thirds (2/3) of the total volume shall be in the first compartment , at the inlet side of the tank . 14 b' When divided into three (3) or more compartments, one-half ( 1/2) of the total volume shall be in the first compartment and the other half equally divided in the other compartments.c . Connections between compartments shall be baffled as specified for inlet and outlet baffle devices. d . Adequate venting shall be provided between compartments by baffles or by an opening of at least fifty ( 50) square inches at the top of the compartment wall . e' Adequate access to each compartment shall be provided by one or more manholes as specified in 404.03, ( 11 ) (a) . ( 13) Multiple Tanks. Where more than one ( 1 ) tank is used to obtain the required liquid volume, they shall be installed as follows: a. Multiple tanks shall be connected in series. b. Each tank shall comply with all provisions of this section . c . No more than four (4 ) tanks in series can be used to achieve the required liquid volume. d . The first tank shall be no smaller in volume than any subsequent tanks in series. 404.04. Tank Capacity. The required volume or liquid capacity of a septic tank shall be determined on the basis of estimated sewage flows as follows: ( 1 ) Dwellings. The Septic Tank capacity shall be determined-1ry thenumber ^of bedrooms contemplated or provided in the dwelling unit served and shall be at least as large as the capacities given below: Number of Bedrooms Tank Liquid Capacities (Gallons) 2 or less 1 ,000 3 or 4 1 ,200 5 or 6 1 , 500 7, 8, or 9 2,000 For ten ( 10) or more Bedrooms, the Septic Tank shall be sized as an Other Establishment. For multiple family dwellings containing two (2) or more dwelling units, the size shall be the sum of the individual dwelling unit requirements. 15 2 (2) Other Establishments ' The liquid capacity of a Septic Tank serving an establishment or use other than a dwelling shall be sufficient to provide a Sewage detention period of not less than thirty-six (36 ) hours in the tank for Sewage flows less than fifteen hundred ( 1 , 500) gallons per day, but in no instance shall the liquid capacity be less than one thousand ( 1 ,000) gallons. For Sewage flows of fifteen hundred ( 1 , 500) gallons per day or more, the minimum liquid capacity shall equal one thousand one hundred twenty-five ( 1 , 125) gallons plus seventy-five (75) percent of the daily Sewage flow. 404.05. Sewage Tank Location . The location of each Sewage Tank shall be according to the following : ( 1 ) The Sewage Tank shall be placed so as to be accessible for maintenance pumping for removal of liquids and accumulated solids. (2) The Sewage Tank shall be installed on undisturbed or compacted soils capable of bearing the weight of the tank , its contents -and 'covering earth. (3) Sewage Tanks shall be set back as specified in Table IV. (4) Sewage Tanks shall not be placed in areas subject to flooding or in Floodplains delineated by the Floodplain � ~ Ordinance as it may be amended from time to time. Exception: Where Ten ( 10) Year Flood information is available, Sewage Tanks may be installed within the ten ( 10) year floodplain floodway zone "A" in accordance with all provisions of Section 502.06. 404.06. Maintenance. Each Septic Tank installed under this Ordinance as well as all existing .Septic Tanks, shall be maintained in proper operating condition at all times. ( 1 ) The owner of each septic tank shall be responsible for maintenance of the tank and may be required to report its condition to the city. (2) Accumulated septage shall be removed from each tank prior to the time when the sludge layer reaches a point twelve ( 12) inches below the bottom of the outlet baffle or when the bottom of the scum layer reaches a point three (3) inches above the bottom of outlet baffle. (3) Pumping for removal of Septage from Septic Tanks shall be performed only by persons certified and licensed by the City or it ' s agent. See Section S. 16 Pr _ / . ' (4 ) Disposal of Septage shall be only at approved disposal sites or facilities' Dumping or spreading of Septage on the surface of the ground is prohibited except where surface disposal sites have been specifically approved and permitted . ( 5) The Zoning Administrator shall maintain appropriate records of Septage pumping and disposal activities and shall require such reporting by licensees as is reasonable and necessary to insure that adequate maintenance and disposal is being accomplished . (6) In any instance where it is determined that maintenance practices or procedures are inadequate or improper, the Zoning Administrator shall require the owner to comply with the provisions of this Ordinance within thirty (30) days of notice served upon the owner. 404.07' Aerobic Tanks. Aerobic tanks shall comply with the requirements set forth for Sewage Tanks in this Ordinance, and with the following : ( 1 ) The Tank , including each-individual unit or compartment shall be readily accessible for inspection and maintenance and shall be provided with secured covers. (2) The Raw Sewage Flow from the Building Sewer shall be intercepted by a trash trap prior to its entering the aeration compartment. The trash trap shall have a net holding capacity of not less than twenty (20) percent of the average daily Sewage flow. The invert level of the inlet to the trap shall be above the liquid level and shall discharge directly into the trap. The outlet from the trap to the aeration compartment shall have a deep baffle or shall be equipped with a tee or long ell . (3) The trash trap shall be_readily �_ccessible for inspection and effective cleaning and shall be so constructed as to prevent unauthorized access. (4) The aeration compartment shall have a minimum holding capacity of five hundred ( 500) gallons or one hundred twenty ( 120) gallons per bedroom, whichever is greater. ( 5) The method of aeration shall be mechanical , diffused air, or both. The method used shall maintain aerobic conditions at all times. (6 ) The settling compartment shall have a minimum net holding capacity equal to twenty (20) percent of the : volume of the aeration compartment. The design shall : provide for effective settling and continuous return of � settled sludge to the aeration compartment ' 17 2 L 1 ( 7 ) A minimum one ( 1 ) year warranty and an initial. two ( 2 ) year service c._ontrac_t which specifies regular inspection calls and effluent quality checks shall he provided as a part of the purchase agreement. Copies of the warranty and service contract shal 1. be filed with the permit application submitted to the Zoning Administrator. (8) All other features of Aerobic Tanks not specifically mentioned in this Ordinance shall comply with National Sanitation Foundation Standard No. 40 (November 1970) . 404.08. Distribution and Dosing of Effluent. The distribution and dosing of Sewage effluent to the Soil Treatment System shall be as follows: (1 ) Gravity Distribution. a. Level or Slightly Sloping Ground . Sewage Tank effluent may be distributed by a distribution box provided that the final ground surface elevation of the lowest trench in the system is at least one ( 1) foot -above -the -out-]-et inverts ..of the distribution box . Distribution boxes shall be constructed and installed according to the following: ( 1 ) The box shall be watertight, with a removable cover and shall be constructed of durable materials not subject to excessive= corrosion or decay. (2) The inverts of all outlets shall be at the exact same elevation as measured from a liquid surface in the bottom of the box . 3) The inlet invert shall be a minimum of one ( 1 ) _ iri.ch ._ab.ov.e the .outlet i_nv.ert✓ (4) The outlet inverts shall be a minimum of four (4) inches above the distribution box floor. ( 5) Each distribution pipe shall be connected separately to the distribution box and shall not be subdivided . (6) When Sewage Tank Effluent is delivered to the distribution box by pump, a baffle, wall , or device shall be installed in the distribution box , or the pump discharge shall be directed against a wall or side of the box on which there is no outlet. The baffle shall be adequately secured and shall extend at least one ( .1. ) .inc=h above the crown of the inlet. line. 18 r � b. Sloping Ground . Where the elevation difference of the ground surface exceeds twenty-eight (28) | | inches in any direction within the Soil Treatment System and a distribution box cannot be used as , specified in 404 '08, 1 . A ' , a drop box shall be installed at the inlet end of each distribution line as follows: ( 1 ) Connections .between drop boxes shall be by watertight piping . (2) The drop box shall be watertight and constructed of durable materials not subject to excessive corrosion or decay. (3) The invert of the inlet pipe shall be a minimum of one ( 1 ) inch above the invert of the outlet pipe leading to the next trench. (4) The invert of the outlet pipe leading to the next trench shall be a minimum of two (2) inches above the invert of the outlet pipe to 'the trench served -by 'the box . ( 5) When the sewage effluent is delivered to the box by a pump, the discharge shall be directed � - against a wall or side of the box on which there is no outlet. � ^ (2) Pressure Distribution. Where required, pressure distribution of Sewage effluent shall be as follows: a. Pressure distribution laterals shall be sized as shown in Table I . b. Laterals shall be spaced no further than twenty (20) inches from a trench or a bed wall . c . Laterals shall be spaced no further than forty (40) inches apart. d . Laterals shall be connected to a manifold or header pipe of two (2) inch diameter or as required by design of pipe from pump and inlet position . e. Laterals and manifold shall be installed so as to drain completely after every dosing . ! 19 2 441 TABLE I Maximum Allowable Lateral Lengths in Feet from Header or Manifold Pipe Diameter Perforation Perforation 1 inch 1 1/4 inch 1 1/2 inch Spacing ( in ) Diameter ( in ) 30 3/16 _;<i 52 7C: 7/32 45 57 1/4 2 38 50 36 3/16 36 60 75 7/32 33 51 63 1/4 27 4 ' 54 (3) Dosing . Where installed , a Dosing Device shall comply with the following requir-ements: a. The Dosing Chamber shall be watertight and constructed of sound and durable materials not subject to excessive corrosion or decay. b. The Dosing Chamber shall have one or more manholes, twenty ( 0) inches in least dimension , located directly above the Dosing Device. The manhole shall extend through the chamber cover to finished grade and shall be provided with a cover secured to prevent unauthorized access. c . The size of the effluent dose shall be determined by the Soil Treatment System design but in no case shall the chamber _be sized to provide a dose of less than seventy-five (75) gallons. d .. Dosing Devices for gravity distribution : ( 1 ) A pump or siphon shall be utilized to deliver the dose to the Soil Treatment unit for gravity distribution over the soil treatment area. (2) For dwellings, the Dosing Device shall discharge a minimum of six hundred (600) gallons per hour but not more than twenty-seven hundred (2,700) gal ions per hour. (3) For other establishments, the Dosing Device shall discharge at a rate at least ten ( 10) percent greater than the water supply flow rate but no faster than the rate at which effluent will flow out of the distribution box . 20 (4 ) When the Dosing Device is a siphon , a regular maintenance inspection shall be made at a minimum of six (6) month intervals by the owner or his agent. The siphon shall be maintained in operating condition at all times. ( 5) When the Dosing Device is a pump, it shall be cast iron or bronze fitted with stainless steel screws or constructed of other sound , durable and corrosion-resistant materials as approved by the Zoning Administrator. (6) Where the soil treatment area is at a higher elevation than the pump, sufficient dynamic head shall be provided for both the elevation difference and friction loss. (7) Where the Dosing Device is a pump, an alarm device shall be installed to provide warning of pump failure. (8) Electrical service ±o_pumps and control shall be completed in compliance with the Minnesota State Electrical Code or as amended . Separate electrical permits and inspections are required from the Minnesota Board of Electricity. e. Dosing Devices for pressure distribution : ( 1 ) The dosing device shall be a pump which is cast iron or bronze fitted and with stainless steel screws or constructed of sound , durable and corrosion-resistant materials. (2) The pump discharge capacity shall be a minimum of seven and one741alf (7 1/2) gallons per minute for each one hundred ( 100) square feet of soil treatment area. (3) The pump discharge head shall be at least five ( 5) feet greater than the head required to overcome pipe friction losses and the elevation difference between the pump and the distribution device. (4) The quantity of effluent delivered for each pump cycle shall be no greater than twenty-five (25) percent of one ( 1 ) day' s sewage flow. ( 5) An alarm device shall be installed to provide warning of pump failure. 21 2 (6 ) Electrical service to pumps and control shall be completed in compliance with the Minnesota State Electrical Code. Separate electrical permits and inspections are required from the Minnesota Board of Electricity. 4.04.09. Final treatment and disposal of all Sewage Tank e:ffl.u.ent shall be by means of a standard soil treatment and disposal system. ( 1 ) System sizing : a. The required soil treatment area shall be determined by the daily Sewage flow, either measured or estimated , and the Percolation Rate of the soil within the soil treatment area. b. Sewage flows for Dwellings shall be calculated as shown in Table II . Number of Bedrooms shall be determined by an examination of building plans and shall include all rooms having a reasonable potential for use as a Bedroom. In the case of existing development, the number of Bedrooms shall be -determined by -an inspection of the premises. Minimum daily Sewage flow capacity for any Dwelling unit shall provide for two (2) Bedrooms. For multiple residential units, the daily Sewage f low shall consist of the sum of the flows of the individual. units, TABLE II Number of Bedrooms Gallons Per Day *:With Garbage Disposal 300 45.. 450 600 4 ' (: -i fouc•- 5 750 +.t Qi ii i 6 or more 9.00 _pau.s _ 1..0.50 plus 150 gallons for each 150 gallons for each additional additional *Use of garbage disposal is not recommended for on-site Systems. c . For establishments or facilities other than residential , the daily Sewage flows shall be calculated or estimated , using best available information or data_ Metered water use data for comparable facilities shall , in all instances, take precedence over estimated usage. d . The soil treatment area shall be at least as large as set forth in Table III . r TABLE F Di.._I:::: III Percolation Rate Required Soil Treatment Area (minutes per inch) in square feet ( per gallon of Sewage flow per- day ) Faster than 0. 1. unsuitable *0. 1 - 5 0.83 6 - 15 1 .27 16 - 30 1 .67 31 - 45 2.0 46 - 2.20 Slower than 60 unsuitable *Distribution of Sewage effluent shall be by pressure flow over the treatment area or by dividing treatment area into a minimum of four (4) equal parts connected serially, by means of drop boxes. e. Table III lists the required bottom area assuming twelve ( 12) inches of filter material below the distribution pipe. The required bottom area may be reduced, for trenches only, by the following percentages: T14ent.y .(20) -percent for eighteen ( 18) inches of filter material below the pipe, and thirty-four (34) percent for twenty-four (24) inches. In all insstances the filter material shall extend a minimum of two (2) inches above the distribution pipe. 2. System location: a. On slopes in excess of twelve ( 1 2) percent, the soil profile shall be carefully evaluated in the location of the proposed soil treatment area and downslope to identify the presence of layers with different permeabilities that would cause si.dehi_l. l. seepage. In no case shall a trench be located within f ft.es'n.. .(15) ._foot .f . wfe.r.e __=.u!ch a layer surfaces on the down slope. b. Soil Treatment Systems shall _ = located as specified in Table IV. c . Soil treatments �ir`E?�:is shall not be placed in areas sub i ec t to flooding or in areas designated as floodplains, except that in areas where Ten ( 10) Year Flood information is available from and/or approved by the Minnesota DNR. Soil Treatment Systems may be installed in accordance with Section 502.06. TABLE IV Minimum Setback Distances (f=eet.) Soil Feature Sewage Tank Treatment. ArE-:a. Water supply we]. ]. less than fifty 50 100 ( 50) feet and not encountering at least ten ( 10) feet of impervious material Any other water supplyppiy well or 50 50 buried water suction pipe Buried pipe distributing water 10 10 under pressure Buildings 10 20* Property Lines 10*. 10* The ordinary high water mark of : 7;0*: 150* LS-1 Natural Environment Lakes and Streams LS-2 Recreation Development 30*: 100 Lakes and Streams LS-3 General Development Lake=_. ?* 100 and Streams Wild and scenic rivers rural 30*: 150 districts Wild and scenic rivers urban 30* 100 districts Wild and scenic river, blufflines 40*: 40 ( twelve ( 12) percent slope) . . All unclassified waters 7;0* s.'?`_' Other bluffl.ines ( twenty (20) 20* 20 percent slopes) *May be altered through normal variance process. (3) Design and construction : a. In soils having Percolation Rates of fifteen ( 15) minutes per inch or faster, the bottom of system filter materials shall be a minimum of four ( 4 ) feet above the Water Table or Bedrock . 24 b' In soils having Percolation Rates of sixteen ( 16) • minutes per inch through sixty (60) minutes per , inch, the bottom of the system filter material shall be a minimum of three (3 ) feet above the Water Table or Bedrock . c ' Individual trenches shall be a minimum of eighteen ( 18) inches and a maximum of thirty-six (36) inches in width. d. Individual trenches shall not exceed one hundred ( 100) feet in length. e. The bottom of trench excavations shall be level in all directions . f ' Trenches shall be excavated in such a manner as to leave the soil at the bottom and sides in a natural , unsmeared , uncompacted condition . No excavation shall be permitted in soils where the moisture content of the soil exceeds the plastic limit. g . Excavation or other equipment shall not be driven on the soil treatment area. h. Filter material shall be placed to a depth of at least twelve ( 12) inches and not more than twenty-four (24) inches below the distribution pipe. Distribution pipes - gravity distribution . ( 1 ) Distribution pipes used in soil treatment systems for gravity flow distribution shall be a minimum of four (4 ) inches in diameter, and of sound and durable material not subject to .corrosion, or decay or to loss of strength under continuously wet conditions. (2) Perforated distribution pipe shall have one ( 1 ) or more rows of holes of not less than one-half ( 1/2) inch diameter spaced not more than thirty-six (36) inches apart. Holes shall be cleanly bored and spaced so as to prevent failure due to loads . Distribution pipe shall have a minimum load bearing capacity of not less than one thousand ( 1 ,000) pounds per lineal foot after perforation . j ' Pressure distribution . ( 1 ) Distribution pipes used in soil treatment systems for pressure distribution shall be a minimum of one ( 1 ) inch in diameter and of 25 2 sound and durable material not subject to corrosion or decay or to loss of strength under continuously wet conditions. (2) Perforations shall be cleanly bored , sized and spaced as shown in Table 1 . Distribution pipes shall be laid level or on a uniform slope of not more than four (4 ) inches per one hundred ( 100) feet away from the distribution device' 1 . Filter material shall be covered with three (3) to four (4) inches of uncompacted hay or straw, or other approved permeable material ' m. Trenches shall be backfilled and crowned above finished grade to allow for settling . The top six (6) inches of backfill shall be of the same texture and density as the soil adjacent to the trenches' n . Themmioimum -depthof sxzil cover over the distribution pipes shall be eight (8) inches. The maximum depth of cover shall be twenty-four (24) inches. `—i o. The owner or his agent shall establish grass cover over the soil treatment area as soon as possible after installation to protect the system. Where seeding cannot be accomplished prior to September 1 , the soil treatment area shall be protected by a uniform cover of hay or straw. (4) Dual fields. a' Dual field systems may be installed in soils having percolation rates slower than five ( 5) minutes per inch. b. Dual field systems shall be sized , designed and constructed as set forth in this Ordinance for standard systems except as follows: ( 1 ) The soil treatment area shall be divided into two (2) or more equal parts. (2) Alternating soil treatment areas shall each be connected to a valve box outlet. c ' Any portion of a divided system shall be used for no more than one ( 1 ) year unless inspection of effluent levels indicates that a longer duration is acceptable. 26 , ` (6 ) Where trench bottoms terminate entirely in natural ! �� ' soils, fill to achieve required cover may be placed at the time of system installation . (7) Where trench bottoms are required to terminate in fill , such fill shall be placed without compaction and allowed to settle for a period of at least twelve ( 12) months. After settlement, soil shall be tested and data submitted for approval . (8) Where fill is placed to achieve adequate separation from the water table, a minimum of three (3) observation wells shall be placed within the filled area as follows: a. Install one ( 1 ) inch to four (4) inch diameter, solid pipe, to a minimum depth of six (6) feet below final grade and three (3) feet below design depth of system, capped above ground surface. b. Bore hole for pipe a minimum of four (4 ) inches larger than the diameter of the pipe. c . Set pipe on two (2) inches of pea gravel , with six (6) inches of gravel extending up around outside ! of pipe bottom. ' ` � d . Fill around remainder of pipe and compact at | ground surface. e. Observations shall be made by a certified soil tester as follows: ( 1 ) First observation to be made within two (2) weeks after frost is absent and every seven (7) days thereafter until June 1st, or until the site is determined to be unacceptable, whichever comes first. (2) If water is observed after the frost is absent, or at any other time, an observation shall be made one ( 1 ) week later' If water is present at both observations, monitoring can . cease since the site is unacceptable. . (3) If water is not present at the second observation , monitoring shall continue until June 1st. If any two successive observations show the presence of water above the critical depth, the site is unacceptable. r (4) The occurrence of rainfall (s) of one-half , ( 1/2) inch intensity or more during the _. monitoring period may necessitate observations at more frequent intervals. 28 2 L � �� �� 1[(��� � � SECTION 5. ALTERNATIVE SYSTEMS � . 501 . Applicability. 501 .01 . Replacement of existing systems. Except as provided by Section 501 .02 and 501 .03, on previously developed sites where system replacement is required by virtue of existing System failure and where site and soil conditions do not permit installatin of a Standard System, an alternative system as provided by this section may be considered subject to the following conditions: (1 ) The engineering design and substantiation of perfomnance of proposed system shall be submitted for approval ' (2) There shall be no discharge allowed to the ground surface or surface waters. (3) Method of treatment and disposal of wastes shall provide protection to the public health and general ' welfare equal to that provided by a -Standard System. (4) Proposed alternative systems shall be required to comply with all state rules and standards. (5) City reserves the right to require financial security to assume adequate performance of system. 501 .02. Modified standard system. On any site, where soil conditions may reasonably be altered by placing fill to provide suitable conditions as required for a Standard System, a modified Standard System may ,be considered subject to the following conditions: ( 1 ) Soil and site conditions shall be evaluated and system sized and located as prescribed by this Ordinance for a standard system. (2) Modified soil areas shall be adequate in size to accommodate a minimum of two (2) complete systems. On specific sites, area requirements may be increased when appropriate under the long range sewer plan for the location . (3) Proposed fill projects shall require engineered design to be submitted for review and approval by the permitting authority prior to the start of work , and the issuance of a grading permit as required by the Zoning Ordinance. - (4 ) Fill material shall be selected and placed under � | competent supervision ' ( 5) Existing soils shall be protected from compaction and properly prepared by scarifying or plowing , prior to placement of fill . 27 � -A� Nr . PIP" ( 5) A site which is saturated at or above the critical depth of seven (7) consecutive days or more in a normal / spring season ( preceded by six (6) months of precipitation which is at a minimum normal for the area) is an unacceptable site. 501 .03 ' Experimental systems. Systems utilizing innovative techniques or methods may be considered for new development under the following conditions: ( 1 ) System being proposed is substantiated by engineering data. (2) System is in compliance with Minnesota Pollution Control Agency rules. (3) An adequate area of suitable soils as required for standard systems is identified and reserved on the site. (4) Performance monitoring of the system, including but not limited towater /usemeteriog` effluent quality and system maintenance are provided . ( 5) Failure of experimental system to function or to properly treat Sewage will require discontinuation of „ use and replacement with an acceptable alternative. 502. Permitted alternative systems. 502.01 . Sewage treatment beds. Where existing developed sites are limited in area so as to preclude installation of a Standard trench System, a sewage treatment bed may be considered subject to the following conditions: ( 1 ) Soil and site conditions shall be evaluated and system sized and located as prescribed by this Ordinance for a Standard System. (2) Bed construction shall be limited to areas having an natural slope of six (6) percent or less. (3) Excavation for beds shall be by back hoe or other' means that allows equipment wheels or tracks to remain on surface soil ' Excavation equipment or other vehicles shall not be driven on the soil treatment area' (4 ) Gravity distribution pipes in beds shall be uniformly spaced no more than five ( 5) feet apart and not more , than thirty (30) inches from the sidewalls of the bed . ( 5) Distribution of Sewage effluent may be by gravity or pressure distribution . Installation shall be as specified in 404.09(3) ' 29 6 | � � 502.02' Sewage treatment mounds' On sites having soil conditions which do not permit installation of a Standard System, a sewage treatment mound may be considered . Proposed mounds shall require engineered design (conforming to the following conditions) to be submitted for review and approval prior to any permit issuance or construction . ( 1 ) General conditions. a. The soil Percolation Rate in all layers of the natural or fill soil to a depth 'of at least twenty-four (24) inches below the sand shall be faster than one hundred twenty ( 120) minutes per inch. b. Below the sand layer there shall be at least one ( 1 ) layer of soil , at least twelve ( 12) inches in depth, which has a Percolation Rate slower than five ( 5) minutes per inch. c . Mounds shall be located on flat areas or crests of slopes. Mounds shall not be installed on natural slopes exceediog three (3) .percao± where the Percolation Rate is slower than sixty (60) minutes per inch in the twenty-four (24) inches below the sand layer. d . Mounds shall not be located on slopes exceeding � six (6) percent where the Percolation Rate is ^ - slower than thirty (30) minutes per inch in the twenty-four (24 ) inches below the sand layer . (2) Soil surface preparation . a. The discharge pipe from the pump to the mound area shall be installed prior to soil surface preparation . The trench shall be carefully backfilled and compacted to prevent effluent seepage. b' The total area selected for the mound , including the dikes, shall be plowed to a minimum depth of eight (8) inches or the sod layer broken and roughened by back hoe teeth. Furrows shall be thrown up slope and no dead furrow shall be permitted under the mound . The soil shall be plowed or broken only when soil moisture to a depth of eight (8) inches is below the plastic limit. c . Where soils in the top eight (8) inches of the -` natural surface have percolation rates faster than fifteen ( 15) minutes per inch, disking may be used for surface preparation ' 30 [ '- ! d . A rubber tired tractor may be used for plowing or . disking but in no case shall such equipment be used after the soil preparation is completed in soils having a Percolation Rate slower than fifteen ( 15) minutes per inch. A crawler or track type tractor shall be used for these conditions. e. Mounds shall not be located on slopes exceeding twelve ( 12) percent under any conditions. f . Mounds shall be installed only in areas where existing soil conditions provide a minimum twenty-four (24 ) inch depth to Water Table or Bedrock . g. The bottom area of the filter material shall be sized on the basis of 0.83 square feet per gallon of waste per day. h. In no case shall the width of the filter material in a single bed exceed ten (10) feet. i . Mound locations shall be subject to setback requirements listed in Table IV. Distances shall be measured from the toe of the slope. Installation of mound systems shall , in all cases, require installation of water use metering at the dwelling or facility being served . k . Mound construction shall proceed immediately after completion of soil surface preparation. (3) Mound construction . a. A minimum of twelve ( 12) inches of Sand (302.01-25) shall be placed over the prepared surface to the limits of the proposed filter material . A crawler type tractor and blade shall be used to move sand into place, maintaining a minimum of six (6) inches of sand beneath the equipment to minimize compaction of the soil surface. The sand layer shall be level when placement is completed . b ' Filter material to a minimum depth of nine (9) inches shall be placed over the sand layer, below the distribution pipe. c . Distribution of effluent over the filter material shall be either by four (4) inch distribution pipe with gravity flow from a distribution box or by perforated pipe under pressure from a manifold ' 31 2 1 ( 1 ) Gravity distribution ' (a ) Four (4 ) inch distribution pipes shall be rigid plastic with one-half ( 1/2) inch minimum diameter holes spaced no further than thirty-six (36 ) inches apart. Pipe shall be placed with one ( 1 ) row of holes at the bottom of the pipe. ( b) Distribution pipe shall slope downward , two (2) inches per one hundred ( 100) feet away from the distribution box , spaced no further than five ( 5) feet apart and no further than thirty (30) inches from the edge of the filter material . (c ) The outer ends of the distribution pipe shall be connected ' (d ) Distribution pipes shall be connected to the outlets of a distribution box . (e) The quantity of effluentdelivered to the distribution system per pump dose shall be at least twenty-five (25) percent of the daily sewage flow. ( f ) Gravity distribution shall be permitted only where soils existing at the mound location have Percolation Rates of sixty (60) minutes per inch or faster. (2) Pressure distribution . ( a) Perforations shall be as required by Table I . Holes shall be cleanly drilled , straight into pipe, and not angled . ( b) Perforated pipe laterals shall be connected to a two (2) inch diameter manifold pipe, with ends capped . Laterals shall be spaced no more than forty (40) inches on center and no further than twenty (20) inches from the edge of the filter material . (c ) The perforated pipe laterals shall be installed level with perforations downward . (d ) Manifold pipe shall be connected to the supply pipe from the pump. Manifold shall be sloped downward toward the supply pipe. , d . A minimum of two (2) inches of filter material shall be � placed over the top of the laterals or distribution pipes. 32 2 0r e. Straw or hay, to an uncompacted depth of three ( 3) to four (4) inches, or other approved permeable material shall be placed over the entire filter material area . f ' Construction vehicles shall not be allowed on the filter material until backfill is placed . g . Sandy loam soil shall be placed over the covered filter material to a minimum depth of twelve ( 12) inches at the center of the mound and six (6) inches at the edges. h. A maximum of two (2) ten ( 10) foot wide beds may be installed side bY side in a single mound if the soil Percolation Rate is between five ( 5) and sixty (60) minutes per inch to a depth of at least twenty-four (24) inches below the sand layer. Beds shall be separated by four (4) feet of sand . i . Where two (2) beds are installed side by side, the sandy loam covering fill shall be placed to a depth of eighteen ( 18) inches at the center of the mound and six (6) inches at the edges. j . Six (6) inches to topsoil shall be placed on the fill material over the entire area of the mound and grass cover established as soon as possible. k . No shrubs or trees shall be planted on the top of the mound. Shrubs may be planted on the side slopes and at the foot of the mound . I . Side slopes on the completed mound shall be no steeper than three (3) to one ( 1 ) . m. Surface run-off from areas adjacent to the mound shall be diverted away from the mound by construction of appropriate diversion structures. 502'03- Collector systems. On previously developed sites, where site and soil conditions do not provide suitable conditions for final treatment and disposal on an individual Lot, a Soil Treatment System located on another lot or lots may be employed under terms approved by the Governing Body. ( 1 ) General conditions. a. Collector systems designed to serve fifteen ( 15) dwelling units or five thousand ( 5,000) gallons of waste per day` whichever is less, shall require • ! application for and issuance of a state disposal system permit from the MPCA. 33 �m� | glii w b' Collector systems shall be designed by a registered Professional Engineer , licensed in the • State of Minnesota, and certified by the MPCA as competent in the field of on-site system design ' c . Application to the Zoning Administrator shall be accompanied by engineering drawings and specifications and shall demonstrate compliance with the Zoning Ordinance, Plumbing Code and issues relating to joint ownership of land , joint system maintenance responsibilities, homeowners associations, easements, covenants and such other items as may apply to the specific proposal . (2) Design . a. The size of common Soil Treatment Systems shall be based on the sum of the areas required for each • dwelling unit or establishment being served . b. Sewage Tanks may be either individually installed at each Dwelling ..Unit or a_common Sewage Tank . Common Tanks shall be sized using the formula: one thousand one hundred twenty five ( 1 , 125) gallons plus seventy-five (75) percent of the daily sewage flow, except that the minimum size for any common sewage tank shall be three thousand (3,000) gallons, and shall be compartmented if a � single tank . (3) Sewers. a. Sewer systems shall be designed for the daily flows for dwelling units plus flows from other establishments. h. The sewer for systems wi±h commoo .Sewage Tanks shall be so constructed to give mean velocities, when flowing full , of not less than two (2) feet per second . The sewer for systems with individual Sewage Tanks shall be so constructed and designed to hydraulically conduct the flow for which designed . In no case shall a gravity sewer be less than four (4) inches in diameter. c . Infiltration or exfiltration shall not exceed two hundred (200) gallons per inch of pipe diameter per mile per day. d ' Cleanouts, brought flush with or above finished grade shall be provided wherever a common sewer joins an individual Building Sewer or piping from an individual Sewage Tank , or every one hundred ( 100) feet, whichever is less, unless manhole access is provided ' 34 2 A v e. There shall be no physical connection between 1 sewers and water supply systems' Sewers shall be .' -/ set back from water supply systems and piping as , � required for building sewers- (See 404 .01 ) Where it is not possible to achieve proper separation distances, the sewer connections shall be watertight and pressure tested . (4 ) Pumps and pump stations. a. Pump stations shall be watertight. b. Pump stations shall be provided with manhole access flush with or above grade, with covers constructed so as to prevent unauthorized entry. c . Pumps and pump stations shall be sized to handle peak system flows. d . Each pumping station shall be provided with an alarm system which will warn of pump failure, overflow or other malfunction . ( 5) Maintenance. a. All property owners using a collector system and common drainfield shall assure, through use of personnel or approved equivalent means, that the system will be adequately maintained throughout its useful life. The system so maintained includes but is not limited to common drainfields, common individual sewage tanks, pumps, pump stations, and common sewers. b. The permitting authority shall be provided the right of access to any and all components of a common system for the purpose of periodic maintenance and operational inspection . c . In the event of uncorrected deficiencies which pose an immediate hazard to the public health or welfare, the governing body may take such corrective actions as are necessary to mitigate the hazard . Costs incurred in such event shall be paid by the system owners. 502.04. Sewage osmosis. The electroosmosis system (a proprietary installation process under U.S. and Canadian patents) may be considered for installation on previously developed sites or sites meeting the criteria for experimental systems. ( 1 ) Standards and criteria for approval . , . a. Sewage osmosis installations shall comply with all _-: applicable requirements for Standard Systems contained in this Ordinance as pertain to system 35 2 � N6 _ | � � location Water Table and Bedrock ti , separation distances, Sewage Tanks, pumps, pump stations, r� distribution devices and materials' . b. Sewage osmosis shall be considered for use only in clay soils having percolation rate slower than sixty (60) minutes per inch. c . Water use metering shall be installed in conjunction with all osmosis systems. d . The Permitting Authority shall be provided right of access to perform periodic maintenance and operational inspections of the system. 502.05. Sewage Holding Tanks. If approved by the City Council Sewage Holding Tanks may be considered for installation on previously developed sites, as a temporary method for periods of up to one ( 1 ) year, during which time measures are being taken to provide municipal sewer service or the installation of an approved alternative system as provided in this Ordinance. ( 1 ) Design ..and installation . a. A Sewage Holding Tank shall be constructed and installed as specified in this Ordinance for Sewage Tanks. � b. Holding Tanks shall be located as required for Sewage Tanks, Table IV, and at locations readily accessible by normal pumping equipment. c . Holding Tanks shall be provided with a clean-out pipe of six (6) inch minimum diameter extending to or above the ground surface, capped or sealed to prevent odors and inflow of surface water. d . Holding Tanks shall be provided with a manhole of twenty (20) inch minimum least dimension to within a minimum of twelve ( 12) inches below finished grade' Covers shall be secured to prevent unauthorized entry. e. When installed in areas of high ground water, within six (6) feet of the ground surface, Holding Tanks shall be installed entirely above the ground water level or shall be installed according to an engineer' s design to prevent flotation . �! 36 A . ,t (2) Capacity ' �- � a' Sewage Holding Tanks shall have a minimum capacity of one thousand two hundred ( 1 ,200) gallons or four hundred (400) gallons times the number of Bedrooms for a Dwelling Unit, whichever is greater. b. For Other Establishments, capacity shall be based on measured or estimated flow rates. Minimum capacity shall be equal to at least eight (8) times the daily flow rate. c . Water use metering shall be required for each Dwelling Unit or other establishment served by a Holding Tank . 3. Service and maintenance. a. Where Holding Tanks are installed , the owner shall provide and maintain a contract with a licensed pumper, providing for regular pumping of the tank. b. Records of pumping data, to include dates, quantities and septage disposal location , shall be maintained by the pumping contractor and reported quarterly to the Permitting Authority' c ' Holding Tanks shall be provided with alarm or warning devices which will activate a signal when the tank reaches seventy-five (75) percent of its capacity. d . The permitting authority shall be provided right of access to perform periodic maintenance and operational inspections of the system. 502.06. Floodplain systems. Installation of Individual on-site Sewage Treatment Systems in areas subject to recurrent flooding is prohibited except as provided herein . ( 1 ) Where Ten ( 10) Year Flood occurrence data is available from and/or approved by the State of Minnesota, DNR, Individual Sewage Treatment Systems may be considered subject to the following : a. Every portion of an individual on-site sewage Treatment System installed in a Floodplain area shall comply with all other codes, ordinances, and regulations applicable to Shorelands, Floodplains, wild and scenic rivers and general Zoning ' b' The soil treatment area shall be a Standard trench � | System with no pipe or other opening installed ^ ~ between the filter material and the ground surface. 37 2 � The trench system shall be located on the highest feasible area of the lot and shall have location precedence over all other improvements except the water supply well . d . The bottom of all trenches shall be at an elevation no lower than the elevation designated as the ten ( 10) year flood occurrence. e. Where topography permits, sewage tanks may be installed to provide gravity flow to the soil treatment area. f . Pumping stations shall be installed so as to prevent the pump from operating when inundated by flood waters. g . On Lots where the principal structure complies with requirements for a floodproofed building , fill may be placed to bring the soil treatment area up to the required elevation . Provisions of 501 '02 shall apply to fill . h. When the top of the Sewage Tank is inundated during floods, the dwelling must cease discharge of Sewage into it. This may be accomplished by temporary evacuation of the dwelling until flood waters recede or by diverting sewage to a Holding Tank sized and installed according to the requirements of 502.06 ( 1 ) j . i . The Building Sewer shall be designed to prevent back flow of liquid into the building when the system is inundated . If a Holding Tank is installed for temporary diversion use, the Building Sewer shall be designed to provide rapid diversion of Sewage into the Holding Tank when the system is inundated . j . Where a Holding Tank is used under provisions of this section , its capacity shall be equal to one hundred ( 100) gallons times the number of Bedrooms times the number of days between the ten ( 10) year stage on the rising limb of the Regional Flood Hydrograph and the ten ( 10) year stage on the falling limb, or one thousand ( 1 ,000) gallons, whichever is greater. k . Whenever the water level has reached a stage above the top of the Sewage Tank , the tank shall , before being returned to use, be pumped to remove all solids and liquids. . ' 38 PP SECTION 6' OPERATION AND MAINTENANCE . / 601 ' General Requirements. ` 601 .01 . Each Individual Sewage Treatment System currently existing as well as those installed under this Ordinance shall be operated and maintained according to the provisions of this section . 601 .02. Responsibility for proper operation and maintenance of Individual Sewage Treatment Systems shall be as follows: ( 1 ) The owner of each Dwelling Unit or Other Establishment served by an Individual Sewage Treatment System shall be responsible for the proper functioning and maintenance of the system. (2) The Zoning Administrator shall be responsible to ensure, through routine periodic monitoring, investigation of complaints, and other appropriate means, that corrective action is ordered to protect the health, safety and welfare of the city in the event that the responsible owner is negligent or fails to take action as required by this Ordinance. 601 .03. Maintenance inspection shall be performed annually by , the owner or an individual or firm certified and licensed to provide maintenance services if required by the zoning administrator. Such , inspection shall include, but is not limited to: ( 1 ) Measurement of accumulated sludge and scum in the septic tank . (2) Inspection of effluent levels in Soil Treatment Systems which are provided with inspection wells. (3) Inspection of pumps and pump stations when included as part of the system. (4) Inspection of distribution devices, valve boxes and drop boxes. 601 .04 . Whenever inspection of the Septic Tank discloses that the accumulated sludge in the bottom of the tank has reached a point twelve ( 12) inches or less from the bottom of the outlet baffle device, or that the bottom of the floating scum layer is less than three (3) inches above the bottom of the outlet baffle device, the owner shall have the tank promptly pumped to remove all accumulated septage. _ � Exception : Where a conforming Septic Tank serving a Dwelling is ' regularly pumped on an annual basis, the annual inspection of sludge and scum accumulation is waived . | 9 2 � N� AI ! � 601 .05. Whenever inspection of pump stations, distribution �� ` devices, valve or drop boxes indicates the accumulation of solids � ' | such device shall be promptly cleaned . ' ! 601 -06. For existing systems having one or more Seepage Pits or drywells as part of the system, annual inspection shall be made as follows: ( 1 ) Between the date of May 1 and June 30 each year, the depth of liquid in each Seepage Pit or Drywell shall be measured . (2) When such measurement indicates a liquid level one ( 1 ) foot or less below the inlet ' invert, a second measurement shall be made eight (8) to twelve ( 12) hours after the first measurement, during which time no discharge of liquid to the tank is permitted . (3) When the second measurement indicates a drop in liquid level of less than two (2) feet during the indicated period of time, the system shall be considered inadequate. . (4) The owner shall be responsible to provide adequate expansion or replacement of any Soil Treatment System � found to be inadequate as a result of (3) above. . 601 .07' Pumping of Sewage Tanks and other components of Sewage Treatment Systems shall be performed only by contractors licensed by the City of Hugo or Washington County to provide such services. 601 .08. Septage shall be disposed of only by approved means as follows: ( 1 ) Where practicable, into a municipal Sewage treatment system. (2) When municipal facilities are not available, at a land disposal site approved by the Zoning Administrator' (3) In no case shall Septage be discharged to any body of water or to the ground surface at locations which have not been approved for surface application . 301 .09. Records and Reports- Licensed contractors shall maintain accurate records of pumping activity and shall report such data quarterly to the Zoning Administrator on forms provided by him. ! � ' ' 40 2 A � , SECTION 7. ADMINISTRATION 701 . Applicability. 701 .01 . The Ordinance shall apply and be in effect for the stated purposes within the corporate limits of the City of Hugo. 701 .02. Enforcement. ( 1 ) The City of Hugo and/or its authorized agent representative shall be responsible for administration and enforcement of this Ordinance. (2) The Zoning Administrator or his agent shall be qualified and certified by the MPCA as competent in the design , evaluation and inspection of Individual Sewage Treatment Systems. 701 .03. Board of Adjustment and Appeals. ( 1 ) The Hugo City Council shall hear and decide appeals and review any order, decision or determination made by the Zoning Administrator regarding the enforcement of this Ordinance. (2) The City Council shall hear and act upon all Variance requests where provisions of this Ordinance are specifically variable. (3) An appeal of an administrative decision or determination may be filed by any person or governmental agency with the City Clerk . 701 .04. Permits shall be required for Individual Sewage Treatment Systems as follows: ( 1 ) All new installations of Sewage Tanks, Treatment Systems and components thereof . (2) All repair, extension , replacement or modification of existing Sewage Treatment Systems and components. (3) Any change in use of a facility served by an existing Sewage Treatment System. (4) Permits shall not be required for normal routine inspection and maintenance of Sewage Treatment Systems. (5) No building permit shall be issued for construction , alteration , expansion or remodeling of any Dwelling Unit or Other Establishment served by an Individual Sewage Treatment System until the permit required for the treatment system has first been issued if it is determined by the Zoning Administrator that the existing system is inadequate. 41 � ! ( 6 ) Where work requiring a Permit under this Ordinance has been commenced without first having obtained a Permit, work shall be ordered to stop until the Permit requirement has been satisfied . (7 ) Permit Applications shall be available at Hugo City Hall and shall be approved by the Zoning Administrator. 701 .05. Inspection as required to determine compliance with this Ordinance shall be performed by the Zoning Administrator or his authorized agent under the following circumstances: ( 1 ) Site inspections to verify and evaluate soil and site conditions and to determine suitability of soils and Sewage Treatment System design . (2) Installation inspections shall be made at each installation, prior to any work having been covered by backfill ' a. The Applicant shall be responsible to notify the Zoning Administrator a minimum of twenty-four (24) hours prior to the time work is ready for inspection or reinspection ' b. Work which is backfilled prior to required inspection may be ordered to be uncovered whenever necessary to determine compliance. c . When , upon inspection, any part of the system is ( determined not to be in compliance with this Ordinance, written notice shall be provided by the Zoning Administrator indicating the deficiency and the required corrections. d . Noted deficiencies shall be properly corrected and reinspected before any other work on the project is continued . e. No system shall be placed or replaced in service until final inspection and approval of the installation. f . Contractor, upon completion of installation , shall file with the Zoning Administrator, as-built drawings indicating the location of system components dimensioned from a permanent reference point. (3) Operation and maintenance inspections shall be performed by the Zoning Administrator as required to insure compliance with this Ordinance. 42 A 4) The Owner or occupant of a property shall be responsible to provide access at reasonable times, to the Zoning Administrator or his agent, for the purpose of performing inspections required under this Ordinance. ( 5) Fees for inspections, reinspections, or other services rendered under this Ordinance shall be as set by resolution of the City or it' s Authorized Agent from time-to-time. 43 SECTION 8. CERTIFICATION, LICENSES AND PERMITS 801 . Certification . 801 .01 . Effective April 1 , 1989, any person , firm or corporation proposing to engage in the business of soil testing , design , construction , installation ., or pumping of on-site sewage treatment systems within the jurisdiction of this Ordinance, shall be required to provide to the Zoning Administrator, proof of certification by the MPCA. 8C)2. Licensing . 802.01 . All persons, firms, or corporations proposing to engage in the business of installation , constructing, pumping , or providing maintenance services for Individual Sewage Treatment Systems within the City shall first obtain an annual license to carry on such work . 802.02. Annual licenses shall be in effect from January 1 to December 31 and shall be valid only during the year for which issued. 802.03. License applications shall be submitted to the Zoning Administrator and shall contain the following: ( 1 ) Name of individual , firm, or corporation seeking license. { (2) After April 1 , 1989, proof of certification by the MPCA. (3) Documentation indicating insurance coverage which shall remain in effect during the license term and noncancel lation provisions which provide a minimum ten ( 10) day notice to the Zoning Administrator prior to cancellation , as follows: a. Public liability insurance, not less than one hundred thousand dollars ($100,000.00) for inJuries including accidental death to any one ( 1 ) person and subject to the same limit for- each person in an amount of not less than three hundred thousand dollars ($300,000.00) on account of any one ( 1 ) accident. b. Property damage insurance, not less than fifty thousand dollars ($50,000.00) for each accident and not less than one hundred thousand ($100,000.00) aggregated . c . Workmen ' s compensation insurance coverage of employees as required by Minnesota Statutes. 44 , ORDINANCE 89-256 AN ORDINANCE REGULATING THE LOCATION, DESIGN, INSTALLATION, USE AND MAINTENANCE, REQUIRING PERMITS AND INSPECTION OF INDIVIDUAL SEWAGE TREATMENT SYSTEMS WITHIN THE CITY OF HUGO. The City Council of the City of Hugo, Washington County, Minnesota, ordains as follows: 1 . ADOPTION - The attached document , entitled "CHAPTER 263 - INDIVIDUAL SEWAGE TREATMENT SYSTEMS" is adopted by this reference, and shall ' � govern all applications for individual sewage treatment systems filed with the City after it' s effective date. 2. REPEAL - Existing Chapter 262 Article II , Sections 25-38 of the Hugo City Code, entitled "ON-SITE SEWER SYSTEMS" is hereby repealed , PROVIDED, HOWEVER, all applications for individual sewage treatment systems pending prior to the effective date shall be governed by the provisions thereof until the later of : a) rejection of the application ; b) granting of the application ; c ) completion by applicant of all obligations undertaken pursuant thereto; and d ) final disposition of any litigation pertaining to any such application or contractural relationship established thereunder. . EFFECTIVE' DATE This Ordinance shall be effective upon adoption by the City and publication as required by law. 4. CITY CODE' - At it ' s effective date, this Ordinance shall be incorporated in the Hugo City Code. Upon roll call , the following members voted AYE: McAllister , Jesinski , Olson , Vail , Atkinson Upon roll call , the following members voted NAY: NONE Whereupon said Ordinance was adopted and ' Fassed this 6th day of March , 1988. (' '/ / '//- ` � ' ' tkin-an , Mayor / / ATTEST: / �N� 2 .. 1 . .___.c..e_e . . ____........... Mary }� Crea er, Cit��Clerk �� Pub ' hed in he Forest Lake Times this_ ay of_ , 1989.. ' NOTICE OF INDIVIDUAL SEWAGE TREATMENT SYSTEM ORDINANCE he Hugo City Council adopted and passed Ordinance 1989-256 entitled "AN ORDINANCE REGULATING THE LOCATION, DESIGN, INSTALLATION, USE AND MAINTENANCE, REQUIRING PERMITS AND INSPECTION OF INDIVIDUAL SEWAGE TREATMENT SYSTEMS WITHIN THE CITY OF HUGO" on March 6, 1989, a complete copy of which is on file and available for inspection by the public during regular office hours in the office of the City Clerk , Hugo City Hall , 5524 Upper 146th Street, Hugo, MN. In compliance with M.S.A. 412.919, Subd . 4, the Hugo City Council has directed the following Summary of said Ordinance be published : . SUMMARY Consistent with the City' s Comprehensive Plan , Hugo has established a policy of controlling the use of Individual Sewage Treatment Systems (septic systems) because the uncontrolled use of said systems adversely affects the public health, safety , and general welfare by contributing to water pollution and impairing land values as noted in the Intent and Purpose of the Ordinance. Said Ordinance repeals former Chapter 262, Article II for On-site Sewer Systems. Ordinance provides for expanded definitions, and general provision which include include, but are not limited to, the following : applicability , general requirements, site evaluation , and construction and materials. The Ordinance also provides for alternative systems, permitted alternative systems, operation and oaintenance, general administration , certification , licensing and permits; ?nforcement f the Ordinance, and the effects and said Ordinance. The Jrdinance uprades current City standards, and allows for enforcement of by the City Of Hugo or Washington County as per designation of the Hugo City CouncilOrdinance prohibits certain installations, requires soil borings and percolation tests, specifies construction materials, specifies sewage and septic tanks, restricts sewage tank location , provides for maintenance requirements, prescribes setback distances, addresses replacement of existing systems, and modification to standard systems; permits certain mound systems, prohibits certain holding tanks, addresses floodplain systems, requires inspections and fees, as well licensing of ' installers; provides for Board of Adjustrent and Appe�� s, and enforcement of Ordinance. / /' . or kinsGn , Mayor ' / / ATTEST: /26a-/ce. 4---.2.,./ „,„ ' Mar Creager, C Clerk Published in the Forest Lake Times this 30tb day of March, 1989. ORDINANCE 89-256 CHAPTER 262 . INDIVIDUAL SEWAGE TREATMENT SYSTEM ORDINANCE AN ORDINANCE REGULATING THE LOCATION, DESIGN, INSTALLATION, USE AND MAINTENANCE OF INDIVIDUAL SEWAGE TREATMENT SYSTEMS WITHIN THE CITY OF HUGO. PURSUANT TO THE AUTHORITY GRANTED IN MINNESOTA STATUTES, SECTIONS 145.915 AND 394.21 ET SEQ. , THE CITY COUNCIL OF THE CITY OF HUGO, MINNEOSTA, DOES ORDAIN: SECTION 1 . TITLE 101 . Short Title. This Ordinance shall 'be -known , cited and referred to as the Individual Sewage Treatment System Ordinance, except as referred to herein, where it shall be known as, "this Ordinance" . SECTION 2. INTENT AND PURPOSE 201 . This Ordinance is adopted for the purpose of : ( 1 ) Protecting the health, safety, and welfare of the residents of the community, present and future. (2) Regulating the location , design , installation , use and maintenance of individual sewage treatment systems so as to prevent contamination of the surface and ground waters within the city. (3) Protecting the individual water supply wells of the community from contamination by inadequate, improperly designed, located , installed or maintained individual sewage treatment systems. (4) Providing for the orderly development of the rural areas of the community which are not served nor planned to be served by central public waste treatment facilities so as to preclude the installation of " central public systems. 1 I SECTION 3. DEFINITIONS 301 . Rules. 301 .01 . In the event of conflicting provisions in the text of this Ordinance, and/or other ordinances, the more restrictive provisions shall apply. The Zoning Administrator shall determine which is more "restrictive" and appeals from .such .determination shall be made in the manner provided herein . 301 .02. Words used in the present tense shall include the past and future tense; the singular includes the plural and the plural includes the singular. The word "shall " is mandatory, and the word "may" is permissive. 301 .03. Unless otherwise specified all distances shall be measured horizontally. 302. Definitions. 302.01 . For the purpose of this Ordinance, certain terms, words and phrases are hereby defi-ri-ed as follows: ( 1 ) Agent. Washington County Planning Department and Code Enforcement . (2) Aeration . The bringing about of intimate contact between air and a liquid by spraying the liquid irk he air, bubbling air through the liquid or agitating liquid surface in air. (3) Aeration tank . A tank or container into which liquid or sewage is subjected to aeration . (4) Alternative System. An Individual Sewage Treatment System, other than the Standard -System -defi-ned herein . ( 5) Applicant. Authorized person , firm or corporation making application for required permit(s) for a Sewage. Treatment System, and shall include the owner(s) and such other parties as may be specifically authorized for specific requirements. (6) Baffle. A device permanently attached or integral to the Sewage Tank to provide proper operation of the Sewage Tank and maximum retention of solids. (7) Bedrock . That layer of parent materials which by its composition and structure, as compared to soil , is inadequate to provide adequate filtration and treatment. of Sewage Tank Effluent. (8) Bedroom' Any room within a dwelling unit which, by virtue of its design and location , might reasonably be used as a sleeping room. (9) Building Drain . That part of the lowest piping of the drainage system-whi-cti receives the Sewage discharge inside the walls of the building and conveys it to the Building Sewer which begins at least one foot outside the building line. ( 10) Building Sewer. That part of the drainage system which extends from the Building Drain and conveys its • discharge to an Individual Sewage Treatment System. (11 ) Capacity. The internal liquid volume of a Sewage Tank below the outlet level . ( 12) Cesspool . An underground pit into which raw household Sewage or other untreated liquid waste is discharged and from which the liquid is allowed to seep into the surrounding soil . See 402.04 . ( 13) City. The City of Hugo, Minnesota ( 14) City Council . The Governing Body of the City duly elected and serving pursuant to Minnesota Statutes' (15) Distribution Pipe. Perforated pipe or spaced agricultural drain tile which is used to distribute Sewage Tank Effluent in a Soil Treatment System. (16) DNR. The- Minnesota Department of Natural Resources' (17) Dosinq Chamber. A separate tank or chamber which receives effluent from the Sewage Tank and serves as a reservoir for the Dosing Device. ( 18) Dosinq Device. A pump, siphon , or other device which mechanically discharges Sewage Tank Effluent from the Dosing Chamber to the Soil Treatment System. ( 19) Dwelling Unit. A residential building , or portion thereof, intended for occupancy by an individual or a family, but not including hotels, motels, boarding rooms or rooming houses, tourist homes, or trailers located in a mobile home park . (20) Filter Material . Clean rock , crushed igneous rock or similar durable and decay-resistent material free from dust, sand , silt or clay which is insoluble in Sewage Tank Effluent. The size shall range from three-fourths inch and two and one—half inches. (21 ) Flood Plain . The area adjoining a river, stream, channel , lake, or low area which is subject to periodic ,-` flooding , as presently defined or as may be defined by a cognizant governmental body or agency, and subject to ! regulations of Chapter 320, Article II-Flood Plain Management of the City Code, as it may be amended from time to time. (22)Governing Body. See City Council . (23) Grey Water. Liquid waste from a dwelling or other establishment produced by bathing , laundry, culinary operations and from floor drains, and specifically excluding Toilet Waste. (24) Holding Tank . A Watertight Sewage Tank for the temporary storage of Sewage until it is transported to an approved point for treatment and disposal . (25) Individual Sewage Treatment System. A Sewage Treatment System or part thereof , serving a dwelling or Other Establishment, or group thereof , consisting of one or more Septic Tanks and a Soil Treatment System. (26) Lot. A Parcel of land , either platted or unplatted , upon which a principal building , including a Dwelling Unit, is or may be placed , and separated from other Parcels by a separate legal description . (27) MHD. The Minnesota Department of Health. (28) Mottling . A zone of chemical oxidation and reduction activity within the soil , appearing as patches of red , brown, orange or gray or combinations thereof . (29) Mound System. An Alternative Sewage Treatment System designed with the soil treatment area built above existing grade to overcome the limitations of water table, Bedrock, or -soil -permeability. (30) MPCA. The Minnesota Pollution Control Agency. (31 ) Natural Soil . Soil which exists undisturbed in its natural state. Fill shall be considered as natural soil after it has been in place for a minimum of twelve ( 12) months. (32) Ordinary High Water Mark . A mark delineating the highest water level which has been maintained for a sufficient period of time to leave evidence upon the landscape. In the case of controlled outlet waters, the outflow elevation of the control structure. (33) Other Establishment. Any public or private structure other than a dwelling , which generates Sewage. ` ~ (34 ) Owner. The person (s) , firm( s) , and or corporation (s) , or other legal entities having fee title to a Lot, or the contract purchaser of a Lot acting with consent of the fee title holder' J (35) Parcel . See Lot . (36) Percolation . The movement or flow of water or liquid through the interstices or-the pores of a soil or other porous medium. (• 7 ) Percolation Rate. The calculated time rate of drop of a water level in a test hole as specified in Section (38) Permitting Authority. The City or its duly designated Agent. (39) Plastic Limit. A soil moisture content, below which the soil may be manipulated for the purpose of installing a Soil Treatment System. (40) Sand . A soil texture composed by weight of at least eight-five (85) percent of soil particles ranging in size between 0.05 and 2.0 mm. (41 ) Seepage Pit ( leaching pit or drywell ) . A lined -un-derground pit into which- Sewage Tank Effluent or other liquid waste is discharged and from which seepage into the soil occurs through the bottom and sidewall openings. (42) Septaqe. Those accumulated solids and liquids removed from a Sewage Tank or holding Tank during regular periods of maintenance. (43) Sewage. Any water carried domestic waste, exclusive of footing and roof drainage, from any dwelling , industrial , agricultural , commercial establishment , or other structure. Domestic waste includes but is not limited to liquid waste produced by bathing , laundry, and culinary operations, and liquid waste from toi lets and floor drains, and specifically excludes animal waste and commercial process waste. (44) Sewage Flow Rate. Flow rates as determined by actual metered water use or as estimated on the basis of use and er�occupancy. (45) See Tank . A Watertight tank used for the retention of Sewage, Including , but is not limited to Septic Tanks, Holding Tanks, and pumping chambers. (46) Sewage Tank Effluent. That liquid which flows from a Septic Tank under normal operation . (47) Septic Tank . A sound , durable, Watertight Sewage Tank designed and constructed to receive the discharge of Sewage from a Building Sewer, separate solids from liquid , digest organic matter and store liquids through a period of detention . r= • � l (48) Shoreland . The perimeter of any lake in whole or in • . ` part within the City, subject to setback , usage, and/or other use regulations of any cognizant governmental body or agency. (49) Site. The area bounded by the dimensions required for the proper location of the Soil Treatment System. ( 50) Site, Previsoulv Developed . A lot or parcel upon which a dwelling or other establishment is in existence as of the enactment of this Ordinance. ( 51 ) Slope. The ratio of vertical rise or fall to horizontal distance. ( 52) Soil Characteristics, Limiting . Those soil characteristics which preclude the installation of a Standard System, including but not limited to proximity to bedrock or watertable, and percolation rates which are excessively fast or excessively slow. f53) T-he alteration ofnatural soil conditions by means including but not limited to placement of fill , removal of soil or alteration of topography. ( 54) Soil Survey. The U.S. Department of Agriculture, Soil Conservation Service, Soil Survey of Washington County, • 1977. ( 55) Soil Textural Classification. Where soil particle sizes or textures are specified in this Ordinance, they refer to the soil textural classification found in the Soil Survey Manual , Handbook No. 18, U.S. Department of Agriculture, 1951 . ( 56)- Soil Treatment Area. - Thatarea of trench -or bed bottom which is in direct contact with the filter material of the Soil Treatment System. ( 57) Soil Treatment System. A system whereby Sewage Tank Effluent is treated and disposed of below the ground surface by filtration and percolation through the soil . ( 58) Standard System. An individual Sewage Treatment System employing a Building Sewer, Sewage Tank and the Soil Treatment System commonly known as a drainfield or leachfield ' ( 59) Surface Discharge. The discharge of any sewage onto the surface of any land, or the escape of any sewage • discharged into an Individual Sewage Treatment System • onto the surface of any land . 6 2� ,A 2 (60) Surface Water Flooding . The one hundred ( 100 ) year Floodplain along rivers and streams as defined by the Federal Emergency Management Agency, or in the absence of such data, as determined by the largest flood of record . On lakes, highwater levels as determined or recorded by the DNR and/or the Federal Emergency Management Agency. (61 ) Ten Year Flood . That flood which can be expected to occur, on an average, of once in ten ( 10) years; or the level to which flood waters have a ten ( 10) percent chance of rising in any given year. ( 58) Toilet Waste. Fecal matter, urine, toilet paper and any water used for flushing . (59) Valve Box . Any device which can stop Sewage Tank Effluent from flowing to a portion of the Soil Treatment System. (60) Water TabLe. The- hig-hestele*ation of the soil where all voids are filled with water, as evidenced by soil Mottling , the presence of water, or other information . (61 ) Watertiqht. Constructed and maintained to prevent inflow of water or outflow of effluent. (62) Zoning Administrator. The City of Hugo Zoning Administrator, deputy zoning administrator or his designated agent. (63) Zoning Map. The official map adopted by the City which delineates the zoning district and Flood Plain boundaries, as it may be amended by the City Council from tixr�� to-time. 7 �N�- �� � SECTION 4. GENERAL PROVISIONS 401 . Applicability . 401 .01 . Administration by state agencies. ( 1 ) Individual Sewage Treatment Systems which serve a single facility generating greater than fifteen thousand ( 15,000) gallons per day shall make application for and obtain a state disposal system permit from the MPCA. (2) Collector systems which serve fifteen ( 15) dwellings or five thousand ( 5,000) gallons per day, whichever is less, shall make application for and obtain a state disposal system permit from the MPCA. (3) Individual Sewage Treatment Systems serving facilities licensed or otherwise regulated by the State of Minnesota shall -ma4*s ,appli-cation for and obtain permits and/or approvals from the appropriate state agency. (4) Any individual Sewage Treatment System requiring approval by the State of Minnesota shall also comply '- - : ! with this Ordinance and all other applicable local codes and ordinances. 401 .02. Administration under this Ordinance. All Individual Sewage Treatment Systems installed subsequent to the adoption of this Ordinance and all alterations, extensions, modifications or repairs to existing systems irrespective of the date of original installation shall be regulated in accordance with all requirements of this Ordinance. Existing systems which show evidence of Sewage Tank Effluent discharge to the ground surface, ground or surface waters or other evidence of failure to-adequately treat the Sewage Tank Effluent shall be replaced , reconstructed or repaired within ninety (90) days of notice and order to comply by the Zoning AdministraThe. 402. General Requirements. 402.01 . Surface Discharge. Unless specifically permitted by the MPCA, Sewage, Sewage Tank Effluent, or seepage from a Soil Treatment System shall not be discharged to the ground surface, abandoned wells, bodies of surface water, or into any rock or soil formation the structure of which is not conducive to purification by filtration or into any well or other excavation in the ground . 8 2 402.0 2. Treatment Required . The Sewage Treatment System, or systems, shall be designed , installed and maintained , to receive all Sewage from the dwelling , building , or Other Establishment served . Footing or roof drainage shall not enter any part of the system. 402.03. System Components. The Sewage Treatment System shall consist of a Building Sewer, Sewage Tank and Soil Treatment System. All Sewage shall be treated in a Sewage Tank or Toilet Waste treatment device, and the Sewage Tank Effluent shall be discharged to the Soil Treatment System. 402.04. Prohibited Installations. Cesspools shall not be installed . 40 .05. Location . Sewage Treatment Systems and each component thereof shall be located and installed to insure that, with proper maintenance, it will function in a sanitary manner, will not create a nuisance nor contaminate any domestic water supply well . Location shall consider Lot size and configuration , proposed structures and other improvements, topography, surface drainage, soil conditions, depth to groundwater, geology, -existing and proposed water supply wells, accessibility for maintenance, and expansion or replacement of the system. Installation of Systems in low swampy areas, drainage swales or area subject to recurrent flooding is prohibited . Systems shall not be located within utility or drainage easements nor with dedicated public or private rights-of-way. 402.06. Clear Water Waste. Uncontaminated clear water waste from geothermal heat pump installations shall not be introduced into individual sewage treatment systems. Such waste may be discharged to the ground surface or to a body of water, however in no case shall surface discharge be permitted where such discharge encroaches on an adjoining property or public way. Where subsurface disposal is provided , such installation shall be separated from the required sewage treatment site and shall be designed and sized as prescribed for a standard soil treatment system. 403. Site Evaluation. 403.01 . Prior to the issuance of a building permit, a permit to _rtTt_ t install an Individual Sewage Treatment System must be obtained and a field investigation may be conducted by the Zoning Administrator of all proposed sites_. for Sewage Treatment Systems, at which time they shall be evaluated as to: ( 1 ) Depth to the highest known or calculated ground water table, zone of periodic saturation , or Bedrock . 2) Soil conditions, properties and permeability. (= ) Slope. (4 ) The existence of low lands, surface drainage swales, local surface depressions and rock outcrops. 0 h _ A r �� ( 5) All legal setback requirements from: existing and proposed buildings; property lines; Sewage Tanks; Soil Treatment Systems; water supply wells, buried water and utility lines; the Ordinary High Water Mark of lakes, rivers, streams, flowages, or other bodies of surface water; and the location of all existing Sewage Treatment Systems and water supply wells on adjoining Lots within one hundred ( 100) feet of the proposed Soil Treatment System. (6) Surface water flooding probability. 403.02' Soil Testing. Applicants for Sewage Treatment System permits will be required to submit soil test data derived from soil borings and Percolation Tests for each proposed site or installation . 403.03. Conduct of Tests. All testing shall be conducted in accordance with the requirements of this Ordinance and shall be done by qualified personnel , certified under the MPCA training and certification program. Exception : Testing may be done by any individual on a lot proposed for his personal residenee -or-presently occupied by him. Any such testing which results in data which is inconsistent with actual soil conditions may be rejected by the Zoning Administrator and professional testing required . 403.04. Soil Borings. At a minimum, four (4) satisfactory soil borings per site shall be made, outlining the perimeter of a minimum area of five thousand (5,000) square feet per lot for a permit application . Larger areas may be required where conditions of use, soils, topography or vegetation require. Soil borings shall be made as follows: ( 1 ) Borings shall be by auger or excavation and shall be staked and protected until notification that field evaluation has been completed . (2) Borings or excavations shall be made to a minimum depth of eight (8) feet below existing or proposed grade, or until bedrock or watertable is encountered , whichever is less. (3) A soil texture description shall be recorded by depth and notations made where texture changes occur. (4) Particular effort shall be made to determine the highest known water table or zone of periodic saturation by observation and recording the first occurrence of mottling in the soil , or if mottling is not encountered , the open holes in clay or loam soils shall be observed after standing undisturbed a minimum of sixteen ( 16) hours, at which time, depth to standing water, if present, shall be measured . 10 2 A � . ( 5) If one ( 1 ) or more borings encounters unsuitable or limiting conditions, additiohal borings shall be made in order to outline an adequate area of suitable soil conditions. If the minimum site area cannot be identified by suitable borings, work should be suspended and the data submitted to the Zoning Administrator. 403.05. Percolation Tests. For all sites, after soil borings have outlined the minimum area of suitable soils, Percolation Tests shall be made as follows: ( 1 ) Test hole locations and dimensions: a. Within the outlined area, a minimum of two (2) percolation tests, evenly spaced shall be made. Where soil conditions vary within the tested area, one ( 1 ) additional percolation test shall be made in each soil type. b. Each test hole shall be six (6) to eight (8) inches in diameter, have vertical sides, and be bored or-dug- to the depth 'of the bottom of the proposed drainfield trench. c . Hole diameter and soil texture descriptions shall be recorded noting depths where texture changes occur. (2) Preparation of the test hole: a. The bottom and sides of the hole shall be carefully scratched to remove any smearing and to provide a natural soil surface. b. All loose material shall be removed from the bottom of the test hole and two (2) inches of cuoe=quar±er .(1/4) -to three-quarters (3/4) inch gravel shall be placed in the hole to protect the bottom from scouring . (3) Soil saturation and swelling : a. The hole shall be carefully filled with clear water to a minimum depth of twelve ( 12) inches above the hole bottom and maintained at this depth for not less than four (4) hours. (Failure to adequately saturate the test hole may result in rejection of the test. ) b. The soil shall then be allowed to swell for at least sixteen ( 16 ) but not more than thirty (30) hours. In soils classified as sand , the saturation and swelling procedure shall not be required and the test may proceed if one ( 1 ) filling of the hole has seeped away in less than ten ( 10) minutes, L11 A91 (4) Percolation Rate measurement : a. In sandy soils adjust the water depth to eight (8) inches above the soil at the bottom of the test | | hole. From a fixed reference point , the drop in water level shall be measured in inches to the nearest one-eigth ( 1/8) inch at ten ( 10) minute intervals. If eight (8) inches of water seeps away in less than ten ( 10) minutes, a shorter time interval may be used . But in no case shall the depth of water exceed eight (8) inches. The test shall continue until three (3) consecutive measurements vary by no more than ten ( 10) percent. b. In other than sandy soils, adjust the water depth to eight (8) inches over the soil at the bottom of the test hole. From a fixed reference point, the drop in water level shall be measured in inches to the nearest one-eight ( 1/8) inch at thirty (30) minute intervals, refilling after each measurement to maintain an eight (8) inch starting head . The test shall -c-ontinue until three (3) consecutive measurements vary by no more than ten ( 10) percent. The rate may also be measured by observing the time it takes the water level to drop one ( 1 ) inch from an eight (8) inch reference „ point, provided a constant water depth of at least eight (8) inches has been maintained for at least four (4) hours immediately prior to the measurement. ( 5) Calculation of Percolation Rates: a. Divide the time interval by the drop in water level to obtain the percolation rate in minutes per inch. b. Percolation rates shall be determined for each test hole and recorded on worksheets showing all measurements and calculations' (6) Percolation tests shall not be run where frost exists at and below the test hole bottom. 404 . Construction and Materials. ' 404.01 . Building Sewers. The design , construction , and location of and the materials permitted for use in building sewers shall be as regulated by the Minnesota State Building Code as it may be amended ' � ! 12 2 Pr , 404.02. Sewage Tanks. All tanks, regardless of material or method of construction shall be: ! ( 1 ) Watertight. (2) So designed and constructed as to withstand all lateral earth pressures under saturated soil conditions with the tank empty. (3) So designed and constructed as to withstand a minimum of seven (7) feet of saturated earth cover above the tank top. (4) Not subject to excessive corrosion or decay. ( 5) Any tank installed where the water table is closer than three (3) inches to the bottom of the excavation at the time of installation shall be required to have an integrally cast bottom. 404.03. Septic Tanks. All tanks, regardless of material or method of construction , shall be designed to conform to the following criteria: ( 1 ) The liquid depth of any Septic Tank or compartment thereof shall not be less than thirty (30) inches. A liquid depth greater than six and one-half (6 1/2) feet shall not be considered in determining tank capacity. (2) No tank or compartments thereof shall have an inside horizontal dimension less than twenty-four (24) inches. (3) The inlet and outlet of each tank shall be submerged by means of a baffle device. (4) The space in the tank between the design liquid level and the top of the inlet and outlet baffles shall not izeless than twenty (20) percent of the total design liquid capacity, except that in horizontal cylindrical tanks this space shall be not less than fifteen ( 15) percent of the total design liquid capacity. ( 5) Baffle Devices. Shall be constructed of acid resistant concrete, acid resistant fiberglass or plastic and shall be integrally cast with the tank , affixed with a permanent waterproof adhesive or affixed with stainless steel connectors, top and bottom. Where a sanitary tee is used as a baffle device, it shall be joined to the inlet or outlet pipe with a permanent waterproof adhesive. (6) The inlet baffle shall extend below the design liquid level a minimum of six (6) inches but not more than twenty (20) percent of the total design liquid depth, and a minimum of one ( 1 ) inch above the crown of the inlet sewer. 13 � 2 �� � (; ) The outlet baffle and baffles between compartments 414 shall extend below the design liquid level a distance equal to forty (40) percent of the design liquid depth, except in horizontal cyl. .i.ndrical tanks where this • dimension shall be thirty-five (35) percent of the design liquid depth. Baffles shall extend above the design liquid level as required in 404.03(4) , however in no case shall they extend less than six (6) inches above the design liquid level . (8) There shall be a minimum of one ( 1 ) inch between the underside of the top of the tank and the highest point of the inlet and outlet baffles. (9) The inlet invert shall be not less than three' (3) inches above the outlet invert. ( 10) Sanitary tees used as baffles shall be a minimum of four (4) inches in diameter. Inlet baffles shall be not less than six (6) inches or more than twelve ( 12) inches measured from the end of the inlet pipe to the nearest edge of the baffle. Outlet baffles shall be six (6) inches, measured from the end of the outlet pipe to the nearest edge of the baffle. ( 11 ) Access to the Septic Tank shall be as follows: There shall be one or more manholes, at least twenty (20) inches least dimension located within • six (6) feet of all walls of the tank . The manhole shall extend through the cover to a point within twelve (12) inches below finished grade. The manhole cover shall be covered by at least six (6) inches of earth. b. There shall be an inspection pipe of at least four-. (4) inches diameter or a manhole over both the inlet and outlet baffle device. The inspection pipe shall extend through the cover and be capped flush with or above finished grade. ty downward prosection of the center line of the inspection pipe shall be directly in line with the center line of the inlet and outlet baffle device. ( 1.2) Compartmentation of Septic Tanks, Septic Tanks larger than three thousand (3,000) gallons and fabricated as a single unit shall be divided into two (2) or more compartments as follows: a. When divided into two (2) compartments, not less than one-half nor more than two-thirds (2/3) of the total volume shall be in the first compartment , at the inlet side of the tank . 14 b' When divided into three (3) or more compartments, one-half ( 1/2) of the total volume shall be in the first compartment and the other half equally divided in the other compartments.c . Connections between compartments shall be baffled as specified for inlet and outlet baffle devices. d . Adequate venting shall be provided between compartments by baffles or by an opening of at least fifty ( 50) square inches at the top of the compartment wall . e' Adequate access to each compartment shall be provided by one or more manholes as specified in 404.03, ( 11 ) (a) . ( 13) Multiple Tanks. Where more than one ( 1 ) tank is used to obtain the required liquid volume, they shall be installed as follows: a. Multiple tanks shall be connected in series. b. Each tank shall comply with all provisions of this section . c . No more than four (4 ) tanks in series can be used to achieve the required liquid volume. d . The first tank shall be no smaller in volume than any subsequent tanks in series. 404.04. Tank Capacity. The required volume or liquid capacity of a septic tank shall be determined on the basis of estimated sewage flows as follows: ( 1 ) Dwellings. The Septic Tank capacity shall be determined-1ry thenumber ^of bedrooms contemplated or provided in the dwelling unit served and shall be at least as large as the capacities given below: Number of Bedrooms Tank Liquid Capacities (Gallons) 2 or less 1 ,000 3 or 4 1 ,200 5 or 6 1 , 500 7, 8, or 9 2,000 For ten ( 10) or more Bedrooms, the Septic Tank shall be sized as an Other Establishment. For multiple family dwellings containing two (2) or more dwelling units, the size shall be the sum of the individual dwelling unit requirements. 15 2 (2) Other Establishments ' The liquid capacity of a Septic Tank serving an establishment or use other than a dwelling shall be sufficient to provide a Sewage detention period of not less than thirty-six (36 ) hours in the tank for Sewage flows less than fifteen hundred ( 1 , 500) gallons per day, but in no instance shall the liquid capacity be less than one thousand ( 1 ,000) gallons. For Sewage flows of fifteen hundred ( 1 , 500) gallons per day or more, the minimum liquid capacity shall equal one thousand one hundred twenty-five ( 1 , 125) gallons plus seventy-five (75) percent of the daily Sewage flow. 404.05. Sewage Tank Location . The location of each Sewage Tank shall be according to the following : ( 1 ) The Sewage Tank shall be placed so as to be accessible for maintenance pumping for removal of liquids and accumulated solids. (2) The Sewage Tank shall be installed on undisturbed or compacted soils capable of bearing the weight of the tank , its contents -and 'covering earth. (3) Sewage Tanks shall be set back as specified in Table IV. (4) Sewage Tanks shall not be placed in areas subject to flooding or in Floodplains delineated by the Floodplain � ~ Ordinance as it may be amended from time to time. Exception: Where Ten ( 10) Year Flood information is available, Sewage Tanks may be installed within the ten ( 10) year floodplain floodway zone "A" in accordance with all provisions of Section 502.06. 404.06. Maintenance. Each Septic Tank installed under this Ordinance as well as all existing .Septic Tanks, shall be maintained in proper operating condition at all times. ( 1 ) The owner of each septic tank shall be responsible for maintenance of the tank and may be required to report its condition to the city. (2) Accumulated septage shall be removed from each tank prior to the time when the sludge layer reaches a point twelve ( 12) inches below the bottom of the outlet baffle or when the bottom of the scum layer reaches a point three (3) inches above the bottom of outlet baffle. (3) Pumping for removal of Septage from Septic Tanks shall be performed only by persons certified and licensed by the City or it ' s agent. See Section S. 16 Pr _ / . ' (4 ) Disposal of Septage shall be only at approved disposal sites or facilities' Dumping or spreading of Septage on the surface of the ground is prohibited except where surface disposal sites have been specifically approved and permitted . ( 5) The Zoning Administrator shall maintain appropriate records of Septage pumping and disposal activities and shall require such reporting by licensees as is reasonable and necessary to insure that adequate maintenance and disposal is being accomplished . (6) In any instance where it is determined that maintenance practices or procedures are inadequate or improper, the Zoning Administrator shall require the owner to comply with the provisions of this Ordinance within thirty (30) days of notice served upon the owner. 404.07' Aerobic Tanks. Aerobic tanks shall comply with the requirements set forth for Sewage Tanks in this Ordinance, and with the following : ( 1 ) The Tank , including each-individual unit or compartment shall be readily accessible for inspection and maintenance and shall be provided with secured covers. (2) The Raw Sewage Flow from the Building Sewer shall be intercepted by a trash trap prior to its entering the aeration compartment. The trash trap shall have a net holding capacity of not less than twenty (20) percent of the average daily Sewage flow. The invert level of the inlet to the trap shall be above the liquid level and shall discharge directly into the trap. The outlet from the trap to the aeration compartment shall have a deep baffle or shall be equipped with a tee or long ell . (3) The trash trap shall be_readily �_ccessible for inspection and effective cleaning and shall be so constructed as to prevent unauthorized access. (4) The aeration compartment shall have a minimum holding capacity of five hundred ( 500) gallons or one hundred twenty ( 120) gallons per bedroom, whichever is greater. ( 5) The method of aeration shall be mechanical , diffused air, or both. The method used shall maintain aerobic conditions at all times. (6 ) The settling compartment shall have a minimum net holding capacity equal to twenty (20) percent of the : volume of the aeration compartment. The design shall : provide for effective settling and continuous return of � settled sludge to the aeration compartment ' 17 2 L 1 ( 7 ) A minimum one ( 1 ) year warranty and an initial. two ( 2 ) year service c._ontrac_t which specifies regular inspection calls and effluent quality checks shall he provided as a part of the purchase agreement. Copies of the warranty and service contract shal 1. be filed with the permit application submitted to the Zoning Administrator. (8) All other features of Aerobic Tanks not specifically mentioned in this Ordinance shall comply with National Sanitation Foundation Standard No. 40 (November 1970) . 404.08. Distribution and Dosing of Effluent. The distribution and dosing of Sewage effluent to the Soil Treatment System shall be as follows: (1 ) Gravity Distribution. a. Level or Slightly Sloping Ground . Sewage Tank effluent may be distributed by a distribution box provided that the final ground surface elevation of the lowest trench in the system is at least one ( 1) foot -above -the -out-]-et inverts ..of the distribution box . Distribution boxes shall be constructed and installed according to the following: ( 1 ) The box shall be watertight, with a removable cover and shall be constructed of durable materials not subject to excessive= corrosion or decay. (2) The inverts of all outlets shall be at the exact same elevation as measured from a liquid surface in the bottom of the box . 3) The inlet invert shall be a minimum of one ( 1 ) _ iri.ch ._ab.ov.e the .outlet i_nv.ert✓ (4) The outlet inverts shall be a minimum of four (4) inches above the distribution box floor. ( 5) Each distribution pipe shall be connected separately to the distribution box and shall not be subdivided . (6) When Sewage Tank Effluent is delivered to the distribution box by pump, a baffle, wall , or device shall be installed in the distribution box , or the pump discharge shall be directed against a wall or side of the box on which there is no outlet. The baffle shall be adequately secured and shall extend at least one ( .1. ) .inc=h above the crown of the inlet. line. 18 r � b. Sloping Ground . Where the elevation difference of the ground surface exceeds twenty-eight (28) | | inches in any direction within the Soil Treatment System and a distribution box cannot be used as , specified in 404 '08, 1 . A ' , a drop box shall be installed at the inlet end of each distribution line as follows: ( 1 ) Connections .between drop boxes shall be by watertight piping . (2) The drop box shall be watertight and constructed of durable materials not subject to excessive corrosion or decay. (3) The invert of the inlet pipe shall be a minimum of one ( 1 ) inch above the invert of the outlet pipe leading to the next trench. (4) The invert of the outlet pipe leading to the next trench shall be a minimum of two (2) inches above the invert of the outlet pipe to 'the trench served -by 'the box . ( 5) When the sewage effluent is delivered to the box by a pump, the discharge shall be directed � - against a wall or side of the box on which there is no outlet. � ^ (2) Pressure Distribution. Where required, pressure distribution of Sewage effluent shall be as follows: a. Pressure distribution laterals shall be sized as shown in Table I . b. Laterals shall be spaced no further than twenty (20) inches from a trench or a bed wall . c . Laterals shall be spaced no further than forty (40) inches apart. d . Laterals shall be connected to a manifold or header pipe of two (2) inch diameter or as required by design of pipe from pump and inlet position . e. Laterals and manifold shall be installed so as to drain completely after every dosing . ! 19 2 441 TABLE I Maximum Allowable Lateral Lengths in Feet from Header or Manifold Pipe Diameter Perforation Perforation 1 inch 1 1/4 inch 1 1/2 inch Spacing ( in ) Diameter ( in ) 30 3/16 _;<i 52 7C: 7/32 45 57 1/4 2 38 50 36 3/16 36 60 75 7/32 33 51 63 1/4 27 4 ' 54 (3) Dosing . Where installed , a Dosing Device shall comply with the following requir-ements: a. The Dosing Chamber shall be watertight and constructed of sound and durable materials not subject to excessive corrosion or decay. b. The Dosing Chamber shall have one or more manholes, twenty ( 0) inches in least dimension , located directly above the Dosing Device. The manhole shall extend through the chamber cover to finished grade and shall be provided with a cover secured to prevent unauthorized access. c . The size of the effluent dose shall be determined by the Soil Treatment System design but in no case shall the chamber _be sized to provide a dose of less than seventy-five (75) gallons. d .. Dosing Devices for gravity distribution : ( 1 ) A pump or siphon shall be utilized to deliver the dose to the Soil Treatment unit for gravity distribution over the soil treatment area. (2) For dwellings, the Dosing Device shall discharge a minimum of six hundred (600) gallons per hour but not more than twenty-seven hundred (2,700) gal ions per hour. (3) For other establishments, the Dosing Device shall discharge at a rate at least ten ( 10) percent greater than the water supply flow rate but no faster than the rate at which effluent will flow out of the distribution box . 20 (4 ) When the Dosing Device is a siphon , a regular maintenance inspection shall be made at a minimum of six (6) month intervals by the owner or his agent. The siphon shall be maintained in operating condition at all times. ( 5) When the Dosing Device is a pump, it shall be cast iron or bronze fitted with stainless steel screws or constructed of other sound , durable and corrosion-resistant materials as approved by the Zoning Administrator. (6) Where the soil treatment area is at a higher elevation than the pump, sufficient dynamic head shall be provided for both the elevation difference and friction loss. (7) Where the Dosing Device is a pump, an alarm device shall be installed to provide warning of pump failure. (8) Electrical service ±o_pumps and control shall be completed in compliance with the Minnesota State Electrical Code or as amended . Separate electrical permits and inspections are required from the Minnesota Board of Electricity. e. Dosing Devices for pressure distribution : ( 1 ) The dosing device shall be a pump which is cast iron or bronze fitted and with stainless steel screws or constructed of sound , durable and corrosion-resistant materials. (2) The pump discharge capacity shall be a minimum of seven and one741alf (7 1/2) gallons per minute for each one hundred ( 100) square feet of soil treatment area. (3) The pump discharge head shall be at least five ( 5) feet greater than the head required to overcome pipe friction losses and the elevation difference between the pump and the distribution device. (4) The quantity of effluent delivered for each pump cycle shall be no greater than twenty-five (25) percent of one ( 1 ) day' s sewage flow. ( 5) An alarm device shall be installed to provide warning of pump failure. 21 2 (6 ) Electrical service to pumps and control shall be completed in compliance with the Minnesota State Electrical Code. Separate electrical permits and inspections are required from the Minnesota Board of Electricity. 4.04.09. Final treatment and disposal of all Sewage Tank e:ffl.u.ent shall be by means of a standard soil treatment and disposal system. ( 1 ) System sizing : a. The required soil treatment area shall be determined by the daily Sewage flow, either measured or estimated , and the Percolation Rate of the soil within the soil treatment area. b. Sewage flows for Dwellings shall be calculated as shown in Table II . Number of Bedrooms shall be determined by an examination of building plans and shall include all rooms having a reasonable potential for use as a Bedroom. In the case of existing development, the number of Bedrooms shall be -determined by -an inspection of the premises. Minimum daily Sewage flow capacity for any Dwelling unit shall provide for two (2) Bedrooms. For multiple residential units, the daily Sewage f low shall consist of the sum of the flows of the individual. units, TABLE II Number of Bedrooms Gallons Per Day *:With Garbage Disposal 300 45.. 450 600 4 ' (: -i fouc•- 5 750 +.t Qi ii i 6 or more 9.00 _pau.s _ 1..0.50 plus 150 gallons for each 150 gallons for each additional additional *Use of garbage disposal is not recommended for on-site Systems. c . For establishments or facilities other than residential , the daily Sewage flows shall be calculated or estimated , using best available information or data_ Metered water use data for comparable facilities shall , in all instances, take precedence over estimated usage. d . The soil treatment area shall be at least as large as set forth in Table III . r TABLE F Di.._I:::: III Percolation Rate Required Soil Treatment Area (minutes per inch) in square feet ( per gallon of Sewage flow per- day ) Faster than 0. 1. unsuitable *0. 1 - 5 0.83 6 - 15 1 .27 16 - 30 1 .67 31 - 45 2.0 46 - 2.20 Slower than 60 unsuitable *Distribution of Sewage effluent shall be by pressure flow over the treatment area or by dividing treatment area into a minimum of four (4) equal parts connected serially, by means of drop boxes. e. Table III lists the required bottom area assuming twelve ( 12) inches of filter material below the distribution pipe. The required bottom area may be reduced, for trenches only, by the following percentages: T14ent.y .(20) -percent for eighteen ( 18) inches of filter material below the pipe, and thirty-four (34) percent for twenty-four (24) inches. In all insstances the filter material shall extend a minimum of two (2) inches above the distribution pipe. 2. System location: a. On slopes in excess of twelve ( 1 2) percent, the soil profile shall be carefully evaluated in the location of the proposed soil treatment area and downslope to identify the presence of layers with different permeabilities that would cause si.dehi_l. l. seepage. In no case shall a trench be located within f ft.es'n.. .(15) ._foot .f . wfe.r.e __=.u!ch a layer surfaces on the down slope. b. Soil Treatment Systems shall _ = located as specified in Table IV. c . Soil treatments �ir`E?�:is shall not be placed in areas sub i ec t to flooding or in areas designated as floodplains, except that in areas where Ten ( 10) Year Flood information is available from and/or approved by the Minnesota DNR. Soil Treatment Systems may be installed in accordance with Section 502.06. TABLE IV Minimum Setback Distances (f=eet.) Soil Feature Sewage Tank Treatment. ArE-:a. Water supply we]. ]. less than fifty 50 100 ( 50) feet and not encountering at least ten ( 10) feet of impervious material Any other water supplyppiy well or 50 50 buried water suction pipe Buried pipe distributing water 10 10 under pressure Buildings 10 20* Property Lines 10*. 10* The ordinary high water mark of : 7;0*: 150* LS-1 Natural Environment Lakes and Streams LS-2 Recreation Development 30*: 100 Lakes and Streams LS-3 General Development Lake=_. ?* 100 and Streams Wild and scenic rivers rural 30*: 150 districts Wild and scenic rivers urban 30* 100 districts Wild and scenic river, blufflines 40*: 40 ( twelve ( 12) percent slope) . . All unclassified waters 7;0* s.'?`_' Other bluffl.ines ( twenty (20) 20* 20 percent slopes) *May be altered through normal variance process. (3) Design and construction : a. In soils having Percolation Rates of fifteen ( 15) minutes per inch or faster, the bottom of system filter materials shall be a minimum of four ( 4 ) feet above the Water Table or Bedrock . 24 b' In soils having Percolation Rates of sixteen ( 16) • minutes per inch through sixty (60) minutes per , inch, the bottom of the system filter material shall be a minimum of three (3 ) feet above the Water Table or Bedrock . c ' Individual trenches shall be a minimum of eighteen ( 18) inches and a maximum of thirty-six (36) inches in width. d. Individual trenches shall not exceed one hundred ( 100) feet in length. e. The bottom of trench excavations shall be level in all directions . f ' Trenches shall be excavated in such a manner as to leave the soil at the bottom and sides in a natural , unsmeared , uncompacted condition . No excavation shall be permitted in soils where the moisture content of the soil exceeds the plastic limit. g . Excavation or other equipment shall not be driven on the soil treatment area. h. Filter material shall be placed to a depth of at least twelve ( 12) inches and not more than twenty-four (24) inches below the distribution pipe. Distribution pipes - gravity distribution . ( 1 ) Distribution pipes used in soil treatment systems for gravity flow distribution shall be a minimum of four (4 ) inches in diameter, and of sound and durable material not subject to .corrosion, or decay or to loss of strength under continuously wet conditions. (2) Perforated distribution pipe shall have one ( 1 ) or more rows of holes of not less than one-half ( 1/2) inch diameter spaced not more than thirty-six (36) inches apart. Holes shall be cleanly bored and spaced so as to prevent failure due to loads . Distribution pipe shall have a minimum load bearing capacity of not less than one thousand ( 1 ,000) pounds per lineal foot after perforation . j ' Pressure distribution . ( 1 ) Distribution pipes used in soil treatment systems for pressure distribution shall be a minimum of one ( 1 ) inch in diameter and of 25 2 sound and durable material not subject to corrosion or decay or to loss of strength under continuously wet conditions. (2) Perforations shall be cleanly bored , sized and spaced as shown in Table 1 . Distribution pipes shall be laid level or on a uniform slope of not more than four (4 ) inches per one hundred ( 100) feet away from the distribution device' 1 . Filter material shall be covered with three (3) to four (4) inches of uncompacted hay or straw, or other approved permeable material ' m. Trenches shall be backfilled and crowned above finished grade to allow for settling . The top six (6) inches of backfill shall be of the same texture and density as the soil adjacent to the trenches' n . Themmioimum -depthof sxzil cover over the distribution pipes shall be eight (8) inches. The maximum depth of cover shall be twenty-four (24) inches. `—i o. The owner or his agent shall establish grass cover over the soil treatment area as soon as possible after installation to protect the system. Where seeding cannot be accomplished prior to September 1 , the soil treatment area shall be protected by a uniform cover of hay or straw. (4) Dual fields. a' Dual field systems may be installed in soils having percolation rates slower than five ( 5) minutes per inch. b. Dual field systems shall be sized , designed and constructed as set forth in this Ordinance for standard systems except as follows: ( 1 ) The soil treatment area shall be divided into two (2) or more equal parts. (2) Alternating soil treatment areas shall each be connected to a valve box outlet. c ' Any portion of a divided system shall be used for no more than one ( 1 ) year unless inspection of effluent levels indicates that a longer duration is acceptable. 26 , ` (6 ) Where trench bottoms terminate entirely in natural ! �� ' soils, fill to achieve required cover may be placed at the time of system installation . (7) Where trench bottoms are required to terminate in fill , such fill shall be placed without compaction and allowed to settle for a period of at least twelve ( 12) months. After settlement, soil shall be tested and data submitted for approval . (8) Where fill is placed to achieve adequate separation from the water table, a minimum of three (3) observation wells shall be placed within the filled area as follows: a. Install one ( 1 ) inch to four (4) inch diameter, solid pipe, to a minimum depth of six (6) feet below final grade and three (3) feet below design depth of system, capped above ground surface. b. Bore hole for pipe a minimum of four (4 ) inches larger than the diameter of the pipe. c . Set pipe on two (2) inches of pea gravel , with six (6) inches of gravel extending up around outside ! of pipe bottom. ' ` � d . Fill around remainder of pipe and compact at | ground surface. e. Observations shall be made by a certified soil tester as follows: ( 1 ) First observation to be made within two (2) weeks after frost is absent and every seven (7) days thereafter until June 1st, or until the site is determined to be unacceptable, whichever comes first. (2) If water is observed after the frost is absent, or at any other time, an observation shall be made one ( 1 ) week later' If water is present at both observations, monitoring can . cease since the site is unacceptable. . (3) If water is not present at the second observation , monitoring shall continue until June 1st. If any two successive observations show the presence of water above the critical depth, the site is unacceptable. r (4) The occurrence of rainfall (s) of one-half , ( 1/2) inch intensity or more during the _. monitoring period may necessitate observations at more frequent intervals. 28 2 L � �� �� 1[(��� � � SECTION 5. ALTERNATIVE SYSTEMS � . 501 . Applicability. 501 .01 . Replacement of existing systems. Except as provided by Section 501 .02 and 501 .03, on previously developed sites where system replacement is required by virtue of existing System failure and where site and soil conditions do not permit installatin of a Standard System, an alternative system as provided by this section may be considered subject to the following conditions: (1 ) The engineering design and substantiation of perfomnance of proposed system shall be submitted for approval ' (2) There shall be no discharge allowed to the ground surface or surface waters. (3) Method of treatment and disposal of wastes shall provide protection to the public health and general ' welfare equal to that provided by a -Standard System. (4) Proposed alternative systems shall be required to comply with all state rules and standards. (5) City reserves the right to require financial security to assume adequate performance of system. 501 .02. Modified standard system. On any site, where soil conditions may reasonably be altered by placing fill to provide suitable conditions as required for a Standard System, a modified Standard System may ,be considered subject to the following conditions: ( 1 ) Soil and site conditions shall be evaluated and system sized and located as prescribed by this Ordinance for a standard system. (2) Modified soil areas shall be adequate in size to accommodate a minimum of two (2) complete systems. On specific sites, area requirements may be increased when appropriate under the long range sewer plan for the location . (3) Proposed fill projects shall require engineered design to be submitted for review and approval by the permitting authority prior to the start of work , and the issuance of a grading permit as required by the Zoning Ordinance. - (4 ) Fill material shall be selected and placed under � | competent supervision ' ( 5) Existing soils shall be protected from compaction and properly prepared by scarifying or plowing , prior to placement of fill . 27 � -A� Nr . PIP" ( 5) A site which is saturated at or above the critical depth of seven (7) consecutive days or more in a normal / spring season ( preceded by six (6) months of precipitation which is at a minimum normal for the area) is an unacceptable site. 501 .03 ' Experimental systems. Systems utilizing innovative techniques or methods may be considered for new development under the following conditions: ( 1 ) System being proposed is substantiated by engineering data. (2) System is in compliance with Minnesota Pollution Control Agency rules. (3) An adequate area of suitable soils as required for standard systems is identified and reserved on the site. (4) Performance monitoring of the system, including but not limited towater /usemeteriog` effluent quality and system maintenance are provided . ( 5) Failure of experimental system to function or to properly treat Sewage will require discontinuation of „ use and replacement with an acceptable alternative. 502. Permitted alternative systems. 502.01 . Sewage treatment beds. Where existing developed sites are limited in area so as to preclude installation of a Standard trench System, a sewage treatment bed may be considered subject to the following conditions: ( 1 ) Soil and site conditions shall be evaluated and system sized and located as prescribed by this Ordinance for a Standard System. (2) Bed construction shall be limited to areas having an natural slope of six (6) percent or less. (3) Excavation for beds shall be by back hoe or other' means that allows equipment wheels or tracks to remain on surface soil ' Excavation equipment or other vehicles shall not be driven on the soil treatment area' (4 ) Gravity distribution pipes in beds shall be uniformly spaced no more than five ( 5) feet apart and not more , than thirty (30) inches from the sidewalls of the bed . ( 5) Distribution of Sewage effluent may be by gravity or pressure distribution . Installation shall be as specified in 404.09(3) ' 29 6 | � � 502.02' Sewage treatment mounds' On sites having soil conditions which do not permit installation of a Standard System, a sewage treatment mound may be considered . Proposed mounds shall require engineered design (conforming to the following conditions) to be submitted for review and approval prior to any permit issuance or construction . ( 1 ) General conditions. a. The soil Percolation Rate in all layers of the natural or fill soil to a depth 'of at least twenty-four (24) inches below the sand shall be faster than one hundred twenty ( 120) minutes per inch. b. Below the sand layer there shall be at least one ( 1 ) layer of soil , at least twelve ( 12) inches in depth, which has a Percolation Rate slower than five ( 5) minutes per inch. c . Mounds shall be located on flat areas or crests of slopes. Mounds shall not be installed on natural slopes exceediog three (3) .percao± where the Percolation Rate is slower than sixty (60) minutes per inch in the twenty-four (24) inches below the sand layer. d . Mounds shall not be located on slopes exceeding � six (6) percent where the Percolation Rate is ^ - slower than thirty (30) minutes per inch in the twenty-four (24 ) inches below the sand layer . (2) Soil surface preparation . a. The discharge pipe from the pump to the mound area shall be installed prior to soil surface preparation . The trench shall be carefully backfilled and compacted to prevent effluent seepage. b' The total area selected for the mound , including the dikes, shall be plowed to a minimum depth of eight (8) inches or the sod layer broken and roughened by back hoe teeth. Furrows shall be thrown up slope and no dead furrow shall be permitted under the mound . The soil shall be plowed or broken only when soil moisture to a depth of eight (8) inches is below the plastic limit. c . Where soils in the top eight (8) inches of the -` natural surface have percolation rates faster than fifteen ( 15) minutes per inch, disking may be used for surface preparation ' 30 [ '- ! d . A rubber tired tractor may be used for plowing or . disking but in no case shall such equipment be used after the soil preparation is completed in soils having a Percolation Rate slower than fifteen ( 15) minutes per inch. A crawler or track type tractor shall be used for these conditions. e. Mounds shall not be located on slopes exceeding twelve ( 12) percent under any conditions. f . Mounds shall be installed only in areas where existing soil conditions provide a minimum twenty-four (24 ) inch depth to Water Table or Bedrock . g. The bottom area of the filter material shall be sized on the basis of 0.83 square feet per gallon of waste per day. h. In no case shall the width of the filter material in a single bed exceed ten (10) feet. i . Mound locations shall be subject to setback requirements listed in Table IV. Distances shall be measured from the toe of the slope. Installation of mound systems shall , in all cases, require installation of water use metering at the dwelling or facility being served . k . Mound construction shall proceed immediately after completion of soil surface preparation. (3) Mound construction . a. A minimum of twelve ( 12) inches of Sand (302.01-25) shall be placed over the prepared surface to the limits of the proposed filter material . A crawler type tractor and blade shall be used to move sand into place, maintaining a minimum of six (6) inches of sand beneath the equipment to minimize compaction of the soil surface. The sand layer shall be level when placement is completed . b ' Filter material to a minimum depth of nine (9) inches shall be placed over the sand layer, below the distribution pipe. c . Distribution of effluent over the filter material shall be either by four (4) inch distribution pipe with gravity flow from a distribution box or by perforated pipe under pressure from a manifold ' 31 2 1 ( 1 ) Gravity distribution ' (a ) Four (4 ) inch distribution pipes shall be rigid plastic with one-half ( 1/2) inch minimum diameter holes spaced no further than thirty-six (36 ) inches apart. Pipe shall be placed with one ( 1 ) row of holes at the bottom of the pipe. ( b) Distribution pipe shall slope downward , two (2) inches per one hundred ( 100) feet away from the distribution box , spaced no further than five ( 5) feet apart and no further than thirty (30) inches from the edge of the filter material . (c ) The outer ends of the distribution pipe shall be connected ' (d ) Distribution pipes shall be connected to the outlets of a distribution box . (e) The quantity of effluentdelivered to the distribution system per pump dose shall be at least twenty-five (25) percent of the daily sewage flow. ( f ) Gravity distribution shall be permitted only where soils existing at the mound location have Percolation Rates of sixty (60) minutes per inch or faster. (2) Pressure distribution . ( a) Perforations shall be as required by Table I . Holes shall be cleanly drilled , straight into pipe, and not angled . ( b) Perforated pipe laterals shall be connected to a two (2) inch diameter manifold pipe, with ends capped . Laterals shall be spaced no more than forty (40) inches on center and no further than twenty (20) inches from the edge of the filter material . (c ) The perforated pipe laterals shall be installed level with perforations downward . (d ) Manifold pipe shall be connected to the supply pipe from the pump. Manifold shall be sloped downward toward the supply pipe. , d . A minimum of two (2) inches of filter material shall be � placed over the top of the laterals or distribution pipes. 32 2 0r e. Straw or hay, to an uncompacted depth of three ( 3) to four (4) inches, or other approved permeable material shall be placed over the entire filter material area . f ' Construction vehicles shall not be allowed on the filter material until backfill is placed . g . Sandy loam soil shall be placed over the covered filter material to a minimum depth of twelve ( 12) inches at the center of the mound and six (6) inches at the edges. h. A maximum of two (2) ten ( 10) foot wide beds may be installed side bY side in a single mound if the soil Percolation Rate is between five ( 5) and sixty (60) minutes per inch to a depth of at least twenty-four (24) inches below the sand layer. Beds shall be separated by four (4) feet of sand . i . Where two (2) beds are installed side by side, the sandy loam covering fill shall be placed to a depth of eighteen ( 18) inches at the center of the mound and six (6) inches at the edges. j . Six (6) inches to topsoil shall be placed on the fill material over the entire area of the mound and grass cover established as soon as possible. k . No shrubs or trees shall be planted on the top of the mound. Shrubs may be planted on the side slopes and at the foot of the mound . I . Side slopes on the completed mound shall be no steeper than three (3) to one ( 1 ) . m. Surface run-off from areas adjacent to the mound shall be diverted away from the mound by construction of appropriate diversion structures. 502'03- Collector systems. On previously developed sites, where site and soil conditions do not provide suitable conditions for final treatment and disposal on an individual Lot, a Soil Treatment System located on another lot or lots may be employed under terms approved by the Governing Body. ( 1 ) General conditions. a. Collector systems designed to serve fifteen ( 15) dwelling units or five thousand ( 5,000) gallons of waste per day` whichever is less, shall require • ! application for and issuance of a state disposal system permit from the MPCA. 33 �m� | glii w b' Collector systems shall be designed by a registered Professional Engineer , licensed in the • State of Minnesota, and certified by the MPCA as competent in the field of on-site system design ' c . Application to the Zoning Administrator shall be accompanied by engineering drawings and specifications and shall demonstrate compliance with the Zoning Ordinance, Plumbing Code and issues relating to joint ownership of land , joint system maintenance responsibilities, homeowners associations, easements, covenants and such other items as may apply to the specific proposal . (2) Design . a. The size of common Soil Treatment Systems shall be based on the sum of the areas required for each • dwelling unit or establishment being served . b. Sewage Tanks may be either individually installed at each Dwelling ..Unit or a_common Sewage Tank . Common Tanks shall be sized using the formula: one thousand one hundred twenty five ( 1 , 125) gallons plus seventy-five (75) percent of the daily sewage flow, except that the minimum size for any common sewage tank shall be three thousand (3,000) gallons, and shall be compartmented if a � single tank . (3) Sewers. a. Sewer systems shall be designed for the daily flows for dwelling units plus flows from other establishments. h. The sewer for systems wi±h commoo .Sewage Tanks shall be so constructed to give mean velocities, when flowing full , of not less than two (2) feet per second . The sewer for systems with individual Sewage Tanks shall be so constructed and designed to hydraulically conduct the flow for which designed . In no case shall a gravity sewer be less than four (4) inches in diameter. c . Infiltration or exfiltration shall not exceed two hundred (200) gallons per inch of pipe diameter per mile per day. d ' Cleanouts, brought flush with or above finished grade shall be provided wherever a common sewer joins an individual Building Sewer or piping from an individual Sewage Tank , or every one hundred ( 100) feet, whichever is less, unless manhole access is provided ' 34 2 A v e. There shall be no physical connection between 1 sewers and water supply systems' Sewers shall be .' -/ set back from water supply systems and piping as , � required for building sewers- (See 404 .01 ) Where it is not possible to achieve proper separation distances, the sewer connections shall be watertight and pressure tested . (4 ) Pumps and pump stations. a. Pump stations shall be watertight. b. Pump stations shall be provided with manhole access flush with or above grade, with covers constructed so as to prevent unauthorized entry. c . Pumps and pump stations shall be sized to handle peak system flows. d . Each pumping station shall be provided with an alarm system which will warn of pump failure, overflow or other malfunction . ( 5) Maintenance. a. All property owners using a collector system and common drainfield shall assure, through use of personnel or approved equivalent means, that the system will be adequately maintained throughout its useful life. The system so maintained includes but is not limited to common drainfields, common individual sewage tanks, pumps, pump stations, and common sewers. b. The permitting authority shall be provided the right of access to any and all components of a common system for the purpose of periodic maintenance and operational inspection . c . In the event of uncorrected deficiencies which pose an immediate hazard to the public health or welfare, the governing body may take such corrective actions as are necessary to mitigate the hazard . Costs incurred in such event shall be paid by the system owners. 502.04. Sewage osmosis. The electroosmosis system (a proprietary installation process under U.S. and Canadian patents) may be considered for installation on previously developed sites or sites meeting the criteria for experimental systems. ( 1 ) Standards and criteria for approval . , . a. Sewage osmosis installations shall comply with all _-: applicable requirements for Standard Systems contained in this Ordinance as pertain to system 35 2 � N6 _ | � � location Water Table and Bedrock ti , separation distances, Sewage Tanks, pumps, pump stations, r� distribution devices and materials' . b. Sewage osmosis shall be considered for use only in clay soils having percolation rate slower than sixty (60) minutes per inch. c . Water use metering shall be installed in conjunction with all osmosis systems. d . The Permitting Authority shall be provided right of access to perform periodic maintenance and operational inspections of the system. 502.05. Sewage Holding Tanks. If approved by the City Council Sewage Holding Tanks may be considered for installation on previously developed sites, as a temporary method for periods of up to one ( 1 ) year, during which time measures are being taken to provide municipal sewer service or the installation of an approved alternative system as provided in this Ordinance. ( 1 ) Design ..and installation . a. A Sewage Holding Tank shall be constructed and installed as specified in this Ordinance for Sewage Tanks. � b. Holding Tanks shall be located as required for Sewage Tanks, Table IV, and at locations readily accessible by normal pumping equipment. c . Holding Tanks shall be provided with a clean-out pipe of six (6) inch minimum diameter extending to or above the ground surface, capped or sealed to prevent odors and inflow of surface water. d . Holding Tanks shall be provided with a manhole of twenty (20) inch minimum least dimension to within a minimum of twelve ( 12) inches below finished grade' Covers shall be secured to prevent unauthorized entry. e. When installed in areas of high ground water, within six (6) feet of the ground surface, Holding Tanks shall be installed entirely above the ground water level or shall be installed according to an engineer' s design to prevent flotation . �! 36 A . ,t (2) Capacity ' �- � a' Sewage Holding Tanks shall have a minimum capacity of one thousand two hundred ( 1 ,200) gallons or four hundred (400) gallons times the number of Bedrooms for a Dwelling Unit, whichever is greater. b. For Other Establishments, capacity shall be based on measured or estimated flow rates. Minimum capacity shall be equal to at least eight (8) times the daily flow rate. c . Water use metering shall be required for each Dwelling Unit or other establishment served by a Holding Tank . 3. Service and maintenance. a. Where Holding Tanks are installed , the owner shall provide and maintain a contract with a licensed pumper, providing for regular pumping of the tank. b. Records of pumping data, to include dates, quantities and septage disposal location , shall be maintained by the pumping contractor and reported quarterly to the Permitting Authority' c ' Holding Tanks shall be provided with alarm or warning devices which will activate a signal when the tank reaches seventy-five (75) percent of its capacity. d . The permitting authority shall be provided right of access to perform periodic maintenance and operational inspections of the system. 502.06. Floodplain systems. Installation of Individual on-site Sewage Treatment Systems in areas subject to recurrent flooding is prohibited except as provided herein . ( 1 ) Where Ten ( 10) Year Flood occurrence data is available from and/or approved by the State of Minnesota, DNR, Individual Sewage Treatment Systems may be considered subject to the following : a. Every portion of an individual on-site sewage Treatment System installed in a Floodplain area shall comply with all other codes, ordinances, and regulations applicable to Shorelands, Floodplains, wild and scenic rivers and general Zoning ' b' The soil treatment area shall be a Standard trench � | System with no pipe or other opening installed ^ ~ between the filter material and the ground surface. 37 2 � The trench system shall be located on the highest feasible area of the lot and shall have location precedence over all other improvements except the water supply well . d . The bottom of all trenches shall be at an elevation no lower than the elevation designated as the ten ( 10) year flood occurrence. e. Where topography permits, sewage tanks may be installed to provide gravity flow to the soil treatment area. f . Pumping stations shall be installed so as to prevent the pump from operating when inundated by flood waters. g . On Lots where the principal structure complies with requirements for a floodproofed building , fill may be placed to bring the soil treatment area up to the required elevation . Provisions of 501 '02 shall apply to fill . h. When the top of the Sewage Tank is inundated during floods, the dwelling must cease discharge of Sewage into it. This may be accomplished by temporary evacuation of the dwelling until flood waters recede or by diverting sewage to a Holding Tank sized and installed according to the requirements of 502.06 ( 1 ) j . i . The Building Sewer shall be designed to prevent back flow of liquid into the building when the system is inundated . If a Holding Tank is installed for temporary diversion use, the Building Sewer shall be designed to provide rapid diversion of Sewage into the Holding Tank when the system is inundated . j . Where a Holding Tank is used under provisions of this section , its capacity shall be equal to one hundred ( 100) gallons times the number of Bedrooms times the number of days between the ten ( 10) year stage on the rising limb of the Regional Flood Hydrograph and the ten ( 10) year stage on the falling limb, or one thousand ( 1 ,000) gallons, whichever is greater. k . Whenever the water level has reached a stage above the top of the Sewage Tank , the tank shall , before being returned to use, be pumped to remove all solids and liquids. . ' 38 PP SECTION 6' OPERATION AND MAINTENANCE . / 601 ' General Requirements. ` 601 .01 . Each Individual Sewage Treatment System currently existing as well as those installed under this Ordinance shall be operated and maintained according to the provisions of this section . 601 .02. Responsibility for proper operation and maintenance of Individual Sewage Treatment Systems shall be as follows: ( 1 ) The owner of each Dwelling Unit or Other Establishment served by an Individual Sewage Treatment System shall be responsible for the proper functioning and maintenance of the system. (2) The Zoning Administrator shall be responsible to ensure, through routine periodic monitoring, investigation of complaints, and other appropriate means, that corrective action is ordered to protect the health, safety and welfare of the city in the event that the responsible owner is negligent or fails to take action as required by this Ordinance. 601 .03. Maintenance inspection shall be performed annually by , the owner or an individual or firm certified and licensed to provide maintenance services if required by the zoning administrator. Such , inspection shall include, but is not limited to: ( 1 ) Measurement of accumulated sludge and scum in the septic tank . (2) Inspection of effluent levels in Soil Treatment Systems which are provided with inspection wells. (3) Inspection of pumps and pump stations when included as part of the system. (4) Inspection of distribution devices, valve boxes and drop boxes. 601 .04 . Whenever inspection of the Septic Tank discloses that the accumulated sludge in the bottom of the tank has reached a point twelve ( 12) inches or less from the bottom of the outlet baffle device, or that the bottom of the floating scum layer is less than three (3) inches above the bottom of the outlet baffle device, the owner shall have the tank promptly pumped to remove all accumulated septage. _ � Exception : Where a conforming Septic Tank serving a Dwelling is ' regularly pumped on an annual basis, the annual inspection of sludge and scum accumulation is waived . | 9 2 � N� AI ! � 601 .05. Whenever inspection of pump stations, distribution �� ` devices, valve or drop boxes indicates the accumulation of solids � ' | such device shall be promptly cleaned . ' ! 601 -06. For existing systems having one or more Seepage Pits or drywells as part of the system, annual inspection shall be made as follows: ( 1 ) Between the date of May 1 and June 30 each year, the depth of liquid in each Seepage Pit or Drywell shall be measured . (2) When such measurement indicates a liquid level one ( 1 ) foot or less below the inlet ' invert, a second measurement shall be made eight (8) to twelve ( 12) hours after the first measurement, during which time no discharge of liquid to the tank is permitted . (3) When the second measurement indicates a drop in liquid level of less than two (2) feet during the indicated period of time, the system shall be considered inadequate. . (4) The owner shall be responsible to provide adequate expansion or replacement of any Soil Treatment System � found to be inadequate as a result of (3) above. . 601 .07' Pumping of Sewage Tanks and other components of Sewage Treatment Systems shall be performed only by contractors licensed by the City of Hugo or Washington County to provide such services. 601 .08. Septage shall be disposed of only by approved means as follows: ( 1 ) Where practicable, into a municipal Sewage treatment system. (2) When municipal facilities are not available, at a land disposal site approved by the Zoning Administrator' (3) In no case shall Septage be discharged to any body of water or to the ground surface at locations which have not been approved for surface application . 301 .09. Records and Reports- Licensed contractors shall maintain accurate records of pumping activity and shall report such data quarterly to the Zoning Administrator on forms provided by him. ! � ' ' 40 2 A � , SECTION 7. ADMINISTRATION 701 . Applicability. 701 .01 . The Ordinance shall apply and be in effect for the stated purposes within the corporate limits of the City of Hugo. 701 .02. Enforcement. ( 1 ) The City of Hugo and/or its authorized agent representative shall be responsible for administration and enforcement of this Ordinance. (2) The Zoning Administrator or his agent shall be qualified and certified by the MPCA as competent in the design , evaluation and inspection of Individual Sewage Treatment Systems. 701 .03. Board of Adjustment and Appeals. ( 1 ) The Hugo City Council shall hear and decide appeals and review any order, decision or determination made by the Zoning Administrator regarding the enforcement of this Ordinance. (2) The City Council shall hear and act upon all Variance requests where provisions of this Ordinance are specifically variable. (3) An appeal of an administrative decision or determination may be filed by any person or governmental agency with the City Clerk . 701 .04. Permits shall be required for Individual Sewage Treatment Systems as follows: ( 1 ) All new installations of Sewage Tanks, Treatment Systems and components thereof . (2) All repair, extension , replacement or modification of existing Sewage Treatment Systems and components. (3) Any change in use of a facility served by an existing Sewage Treatment System. (4) Permits shall not be required for normal routine inspection and maintenance of Sewage Treatment Systems. (5) No building permit shall be issued for construction , alteration , expansion or remodeling of any Dwelling Unit or Other Establishment served by an Individual Sewage Treatment System until the permit required for the treatment system has first been issued if it is determined by the Zoning Administrator that the existing system is inadequate. 41 � ! ( 6 ) Where work requiring a Permit under this Ordinance has been commenced without first having obtained a Permit, work shall be ordered to stop until the Permit requirement has been satisfied . (7 ) Permit Applications shall be available at Hugo City Hall and shall be approved by the Zoning Administrator. 701 .05. Inspection as required to determine compliance with this Ordinance shall be performed by the Zoning Administrator or his authorized agent under the following circumstances: ( 1 ) Site inspections to verify and evaluate soil and site conditions and to determine suitability of soils and Sewage Treatment System design . (2) Installation inspections shall be made at each installation, prior to any work having been covered by backfill ' a. The Applicant shall be responsible to notify the Zoning Administrator a minimum of twenty-four (24) hours prior to the time work is ready for inspection or reinspection ' b. Work which is backfilled prior to required inspection may be ordered to be uncovered whenever necessary to determine compliance. c . When , upon inspection, any part of the system is ( determined not to be in compliance with this Ordinance, written notice shall be provided by the Zoning Administrator indicating the deficiency and the required corrections. d . Noted deficiencies shall be properly corrected and reinspected before any other work on the project is continued . e. No system shall be placed or replaced in service until final inspection and approval of the installation. f . Contractor, upon completion of installation , shall file with the Zoning Administrator, as-built drawings indicating the location of system components dimensioned from a permanent reference point. (3) Operation and maintenance inspections shall be performed by the Zoning Administrator as required to insure compliance with this Ordinance. 42 A 4) The Owner or occupant of a property shall be responsible to provide access at reasonable times, to the Zoning Administrator or his agent, for the purpose of performing inspections required under this Ordinance. ( 5) Fees for inspections, reinspections, or other services rendered under this Ordinance shall be as set by resolution of the City or it' s Authorized Agent from time-to-time. 43 SECTION 8. CERTIFICATION, LICENSES AND PERMITS 801 . Certification . 801 .01 . Effective April 1 , 1989, any person , firm or corporation proposing to engage in the business of soil testing , design , construction , installation ., or pumping of on-site sewage treatment systems within the jurisdiction of this Ordinance, shall be required to provide to the Zoning Administrator, proof of certification by the MPCA. 8C)2. Licensing . 802.01 . All persons, firms, or corporations proposing to engage in the business of installation , constructing, pumping , or providing maintenance services for Individual Sewage Treatment Systems within the City shall first obtain an annual license to carry on such work . 802.02. Annual licenses shall be in effect from January 1 to December 31 and shall be valid only during the year for which issued. 802.03. License applications shall be submitted to the Zoning Administrator and shall contain the following: ( 1 ) Name of individual , firm, or corporation seeking license. { (2) After April 1 , 1989, proof of certification by the MPCA. (3) Documentation indicating insurance coverage which shall remain in effect during the license term and noncancel lation provisions which provide a minimum ten ( 10) day notice to the Zoning Administrator prior to cancellation , as follows: a. Public liability insurance, not less than one hundred thousand dollars ($100,000.00) for inJuries including accidental death to any one ( 1 ) person and subject to the same limit for- each person in an amount of not less than three hundred thousand dollars ($300,000.00) on account of any one ( 1 ) accident. b. Property damage insurance, not less than fifty thousand dollars ($50,000.00) for each accident and not less than one hundred thousand ($100,000.00) aggregated . c . Workmen ' s compensation insurance coverage of employees as required by Minnesota Statutes. 44 • (4) No work shall be performed under any license unless and until required proof of insurance is filed with and approved by the Zoning Administrator. ( 5) The Zoning Administrator may revoke, or refuse issuance or renewal of a license for cause, as follows: a. For installation , construction , alteration , repair or pumping of any Individual Sewage Treatment System in violation of this Ordinance. b. For failure or refusal to correct defective work cited under the provisions of this Ordinance. c . Before any license is refused or revoked , the applicant or licensee shall be granted a hearing before the Hugo City Council or designated agent to show cause why such license should not be refused or revoked . (6) The annual license fee shall be as established from time-to-time by resolution of the City of Hugo and/or Washington County Board of Commissioners. 803. Permits. 80=:.01 . No person, firm, or corporation shall install , alter, repair or extend any Individual Sewage Treatment System in the City of Hugo without first having obtained a permit therefor from the Zoning Administrator for the specific work , and having paid the fee prescribed for such permit as determined from time to time by resolution of the City and/or the Washington County Board of Commissioners. 803.02. Permit application shall be made in writing upon forms provided by the Zoning Administrator and shall contain data including , but not limited to the following : ( 1 ) Correct legal description of the property on which the proposed work is to take place. (2) Site plan , drawn to scale, showing the location of all proposed and existing structures, property lines, water supply wells, terrain features such as bluff lines, water bodies or water ways, buried utilities, easements and other unique features of the site. ( ) Soil test data, including soil boring logs, percolation test data with field notes, and location and identification of test area. (4) Plans and details of the proposed installation or work , including engineering data when required . 45 L ( 5) Building plans showing existing and proposed room arrangement and uses. (6) For other than dwellings, calculated or measured water use rates occupancy and occupant load . (7) Evidence of compliance with state or other jurisdiction regulations where applicable. 803.05. Permits shall be valid upon issuance, for a period of six (6) months and may be renewed , when no changes are proposed , upon application for renewal and payment of the fee prescribed . 803.06. Permits issued under this Ordinance may be revoked upon written notice of the Zoning Administrator when such permit has been issued based upon erroneous or inaccurate application data. 46 1 Nr � P � SECTION 9' ENFORCEMENT 901 . Violations and Penalties. 901 .01 . It is hereby declared unlawful for any person , firm or corporation to violate any term or provision of this Ordinance. Violation thereof shall be a misdemeanor. Each day that a violation is allowed to continue shall constitute a separate offense. 901 .02. In the event of a violation or a threatened violation of this Ordinance, the Zoning Administrator, in addition to other remedies, may request appropriate actions or proceedings to prevent, restrain, correct, or abate such violations or threatened violations and it shall be the duty of the City prosecutor to initiate such action . 901 .03. Any firm, person or corporation who violates any of the provisions of these regulations, shall be guilty of a misdemeanor. Each day that a violation is permitted to exist shall constitute a separate offense. < � 47 1141 SECTION 10. EFFECTUATION 1001. Separability. 1001 _01_ It is hereby declared to be the intent that the several provisions of this Ordinance are separable in accordance with the following: (1) If any court of competent jurisdiction shall adjudge any provision of this Ordinance to be invalid, such judgement shall not affect any other provisions of this Ordinance not specifically included in said judgement. (2) If any court of competent jurisdiction shall adjudge invalid the application of any portion of this Ordinance to a particular property, building or other structure, such judgement shall not affect the application of said provision to any other property, building , or structure not specifically included in said judgement. 1002.01 Effective Date. This Ordinance shall be effective upon it's adoption by City and publication as required by law. .41SFY A__ • ATTEST: - 'eorg- Hinson ayor Mary Creager, City CiOrk Published in the Forest Lake Times this 30th day of March, 1989. -48- N r AFFIDAVIT OF PUBLICATION STATE OF MINNESOTA ss COUNTY OF WASHINGTON Duane A. Rasmussen , being duly sworn, on oath says that he is the publisher or authorized agent and employee of the publisher of the City of Hugo newspaper known as The Times, and has full knowledge of the facts NOTICE OF which are stated below: INDIVIDUAL SEWAGE TREATMENT SYSTEM (A) The newspaper has complied with all of the requirements con- ORDINANCE ENACTMENT The Hugo City Council adopted and passed Ordinance 1989-256entitled"AN stituting qualification as a legal newspaper, as provided by Minnesota ORDINANCE REGULATING THE LOCATION, DESIGN, INSTALLA- TION,USE AND MAINTENANCE,RE- Statute 331 A.02. 331A.07 and other applicable laws, as amended. QUIRING PERMITS AND INSPEC- TION OF INDIVIDUAL SEWAGE TREATMENT SYSTEMS WITHIN THE (B)The printed public notice CITY OF HUGO" on March 6, 1989, a complete copy of which is on file and available for inspection by the public during regular office hours in the office of the City Clerk, Hugo City Hall, 5524 Upper 146th Street,Hugo,MN. In corn- which is attached was cut from the columns of said newspaper, and pliance with M.S.A.412.919,Subd.4,the Hugo City Council has directed the fol- lowing Summary of said Ordinance be was printed and published once each week, for one successive published: SUMMARY Consistent with the City's Comprehen- weeks; it was first published on Thursday , the 30 day sive Plan,Hugo has established a policy of controlling the use of Individual Sew- of March , 19 89 , and was thereafter printed and published age Treatment Systems (septic sys- tems) because the uncontrolled use of said systems adversely affects the pub- each week to and including Thursday , the 30 day lic health, safety, and general welfare by contributing to water pollution and o impairing land values as noted in the In- of March , 19 89 . tent and Purpose of the Ordinance.Said Ordinance repeals former Chapter 262- e II for On-site Sewer Systems.Or- dinance provides for expandeddefini- U•Lbruagetuie,„, tions, and general provision which in- BY: dude,but are not limited to,the follow- ing: applicability, general require- ments,site evaluation,and construction TITLE: Publisher and materials. The Ordinance also provides for alternative systems, per- mitted alternative systems, operation Subscribed maintenance, general administra- and sworn to before me on tion, certification, licensing and per- mits; enforcement of the Ordinance, this thirty-first and the effects and said Ordinance.The Ordinance upgrades current City stan- dards,and allows for enforcement of by day of March , 19 8.9 the City of Hugo or Washington County as per designation of the Hugo City Council.Ordinance prohibits certain in- stallations, ‘4 •447. ..,C requires soil borings and percolation tests,specifies construction materials, specifies sewage and septic s � rt' tanks, restricts sewage tank location, CNotary Public provides for maintenance requirements, <. prescribes setback distances,addresses "., • - replacement of existing systems, and (Notorial Seal) • 5 modification to standard systems; per- mits certain mound systems, prohibits -' '.` certain holding tanks, addresses flood- plain systems,requires inspections and 4,4%Abrade.^ 0.- � fees, as well licensing of installers; (1)Lowest classified rate paid by commercial provides for Board of Adjustment and Appeals,and enforcement of Ordinance. users for comparable space $ 4.40 col.inch /s/George Atkinson George Atkinson,Mayor ATTEST: (2)Maximum rate allowed by law for the above /s/Mary Ann Creager matter - 7 col.inch h Mary Ann Creager,City Clerk (Published in THE TIMES March 30,1989) (3)Rate actually charged for the above matter $ 4.40 col.inch (4)Rate actually charged for additional insertions $ col.inch N r AFFIDAVIT OF PUBLICATION STATE OF MINNESOTA ss COUNTY OF WASHINGTON Duane A. Rasmussen , being duly sworn, on oath says that he is the publisher or authorized agent and employee of the publisher of the City of Hugo newspaper known as The Times, and has full knowledge of the facts NOTICE OF which are stated below: INDIVIDUAL SEWAGE TREATMENT SYSTEM (A) The newspaper has complied with all of the requirements con- ORDINANCE ENACTMENT The Hugo City Council adopted and passed Ordinance 1989-256entitled"AN stituting qualification as a legal newspaper, as provided by Minnesota ORDINANCE REGULATING THE LOCATION, DESIGN, INSTALLA- TION,USE AND MAINTENANCE,RE- Statute 331 A.02. 331A.07 and other applicable laws, as amended. QUIRING PERMITS AND INSPEC- TION OF INDIVIDUAL SEWAGE TREATMENT SYSTEMS WITHIN THE (B)The printed public notice CITY OF HUGO" on March 6, 1989, a complete copy of which is on file and available for inspection by the public during regular office hours in the office of the City Clerk, Hugo City Hall, 5524 Upper 146th Street,Hugo,MN. In corn- which is attached was cut from the columns of said newspaper, and pliance with M.S.A.412.919,Subd.4,the Hugo City Council has directed the fol- lowing Summary of said Ordinance be was printed and published once each week, for one successive published: SUMMARY Consistent with the City's Comprehen- weeks; it was first published on Thursday , the 30 day sive Plan,Hugo has established a policy of controlling the use of Individual Sew- of March , 19 89 , and was thereafter printed and published age Treatment Systems (septic sys- tems) because the uncontrolled use of said systems adversely affects the pub- each week to and including Thursday , the 30 day lic health, safety, and general welfare by contributing to water pollution and o impairing land values as noted in the In- of March , 19 89 . tent and Purpose of the Ordinance.Said Ordinance repeals former Chapter 262- e II for On-site Sewer Systems.Or- dinance provides for expandeddefini- U•Lbruagetuie,„, tions, and general provision which in- BY: dude,but are not limited to,the follow- ing: applicability, general require- ments,site evaluation,and construction TITLE: Publisher and materials. The Ordinance also provides for alternative systems, per- mitted alternative systems, operation Subscribed maintenance, general administra- and sworn to before me on tion, certification, licensing and per- mits; enforcement of the Ordinance, this thirty-first and the effects and said Ordinance.The Ordinance upgrades current City stan- dards,and allows for enforcement of by day of March , 19 8.9 the City of Hugo or Washington County as per designation of the Hugo City Council.Ordinance prohibits certain in- stallations, ‘4 •447. ..,C requires soil borings and percolation tests,specifies construction materials, specifies sewage and septic s � rt' tanks, restricts sewage tank location, CNotary Public provides for maintenance requirements, <. prescribes setback distances,addresses "., • - replacement of existing systems, and (Notorial Seal) • 5 modification to standard systems; per- mits certain mound systems, prohibits -' '.` certain holding tanks, addresses flood- plain systems,requires inspections and 4,4%Abrade.^ 0.- � fees, as well licensing of installers; (1)Lowest classified rate paid by commercial provides for Board of Adjustment and Appeals,and enforcement of Ordinance. users for comparable space $ 4.40 col.inch /s/George Atkinson George Atkinson,Mayor ATTEST: (2)Maximum rate allowed by law for the above /s/Mary Ann Creager matter - 7 col.inch h Mary Ann Creager,City Clerk (Published in THE TIMES March 30,1989) (3)Rate actually charged for the above matter $ 4.40 col.inch (4)Rate actually charged for additional insertions $ col.inch