Loading...
HomeMy WebLinkAbout1976.10.18 ORD 1976-132 ORDINANCE NO. 1976-4e 1 l5 AN ORDINANCE FOR THE PURPOSE OF PROMOTING HEALTH, SAFETY, ORDER, CONVENIENCE AND GENERAL WELFARE , BY REGULATING THE SPECIFICATIONS , INSTALLATION, AND MAINTENANCE OF ON-SITE SEWER DISPOSAL SYSTEMS IN THE CITY OF HUGO, MINNESOTA. ARTICLE II - ON-SITE SEWER SYSTEMS 262-25. SHORT TITLE. This Ordinance shall be known, cited and referred to as the On-Site Sanitary Sewer Disposal Ordinance, except as referred to herein, where it may be known as, "This Ordinance" , or "This Chapter" . 262-26. INTENT AND PURPOSE. This Ordinance is adopted for the purpose of: (1) Protecting the health, safety and welfare residents and future residents of the City of Hugo. (2) Regulating individual sewer disposal systems so as to prevent contamination of underground bodies of water or of streams, lakes, rivers or other surface bodies of water. (3) Preventing individual sewer disposal systems from creating a health hazard and/or a nuisance for the general public or for individuals. (4)- - Making it unnecessary to provide central public sewage disposal systems for areas of the City of Hugo not intended for urban development in the foreseeable future, as indicated by the Comprehensive Plan for the City of Hugo. 262-27. RULES. The following Rules of Construction apply to this Ordinance. Subd. A. Conflicting Provisions. In the event of conflicting provisions in the text of this Ordinance, the more restrictive provision shall apply. The City Plumbing Inspector shall rule on what is more "restrictive" and appeals from said decisions may be made in the manner provided. Subd. B. Word Meaning. Words used in the present tense include the past and future tense; the singular number includes the plural and the plural includes the singular; the word "shall" is mandatory, and the word "may" is permissive. 262-28. DEFINITIONS. The terms used herein shall be defined as set forth in the following subdivisions. -1- Subd. A. Building Drain. The building drain is that part of the horizontal piping of a building drainage system which receives the discharge from all other soil, waste and drainage pipes inside the walls of any building and conveys the same to the building sewer. Subd. B. Building Sewer. The building sewer is that part of the horizontal portion of the building drainage system extending from the building drain to its connection with the septic tank and carrying the sewage of but one building. Subd. C. Individual Sewage Disposal System. A private sewage disposal system other than a public or community system which receives sewage from an individual establish- ment. Unless otherwise indicated, the word "system" as it appears in this Ordinance means "individual" sewage disposal system. " Subd. D. Inspector. The City Plumbing Inspector. Subd. E. Sewage. Any water-carried domestic waste, exclusive of footing and roof drainage, of any residence, industry or commercial establishment, whether treated or untreated, and includes the liquid wastes produced by bathing, laundry and culinary operations, and from toilets and floor drains; and Raw sewage is sewage which has not been subjected to any treatment process. 262-29. GENERAL PROVISIONS. All Individual Sewage Disposal Systems installed subsequent to -the adoption of this Ordinance and all alterations, extensions and repairs to Individual Sewage Disposal Systems irrespective of the date of original install- ation shall be regulated in accordance with all of the requirements of this Ordinance. Any Individual Sewage Disposal System or pertinent part thereof, irrespective of the date of original installation, which is not located, constructed or installed in accordance with provisions of this Ordinance shall be so relocated, reconstructed or re-installed as to comply with these requirements within three (3) years of the date of the adoption of this Ordinance. Where there is evidence of septic tank effluent percolating from the ground, the system must be corrected and conform to these standards within ninety (90) days after written notification. Subd. A. General Requirements. The following requirements must be satisfied: (1) Location and installation of the individual sewage disposal system and each part thereof shall be such that, with reasonable main- tenance, it will function in a sanitary manner and will not create a nuisance nor endanger the safety of any domestic water -2- supply. In determining a suitable location for the system, consideration shall be given to the size and shape of the lot, slope of natural and finished grade, soil permeability, depth of ground water, geology, proximity to existing or future water supplies, accessibility for maintenance, and possible expansion of the system. (2) No part of the system shall be located so that it is nearer to any water supply than outlined hereinafter, or so that surface drainage from its location may reach any domestic water supply. (3) Raw sewage, septic tank effluent, or seepage from a soil absorption system shall not be discharged to the ground surface, abandoned wells, or bodies of surface water, or into any rock formation the structure of which is not conducive to purfication of water by filtration, or into any well or other excavation in the ground which does not comply with the requirements of this Ordinance. This requirement shall not apply to the disposal of sewage in accordance with a process approved by the State Board of Health or the Water Pollution Control Commission. (4) The lot size shall be sufficient to permit in- stallation of the individual sewage disposal system in accordance with all the requirements pertaining thereto. (5) Installations of individual sewage disposal systems shall not be made in low swampy areas or areas which may be subject to flooding. (6) In areas with a high ground-water table or where limestone or any geological formation similarly faulty is covered by less than fifty (50) feet of earth, the final disposal unit shall be a tile field. The bottom of the trenches shall be not less than four (4) feet above the highest known or calculated water table or the surface of the faulty rock formation. (7) Bulldozers, trucks or other heavy machinery shall not be driven over the system after installation. -3- (8) The system or systems shall be designed to receive all sewage from the dwelling, build- ing or other establishment served, including laundry waste and basement floor drainage. Footing or roof drainage shall not directly enter any part of the system. Where the construction of additional bedrooms , the installation of mechanical equipment, or other factors likely to affect the operation of the system can be reasonably anticipated, the installation of a system adequate for such anticipated need shall be required. (9) The system shall consist of a building sewer, a septic tank, and a soil absorption unit. The soil absorption unit shall consist of a sub-surface disposal field. All sewage shall be treated in the septic tank and the septic tank effluent shall be discharged to the disposal field. The septic tank drain field system shall be considered the only acceptable system for installation unless it can be demonstrated that this system is not feasible on the particular lot in question and if it can be demonstrated that this system is not feasible on the particular lot in question and if it can be demonstrated that the system being proposed as an alternate will not create a pollution problem. (10) Soil absorption systems for the disposal of sewage waste shall not be installed on land where the slope exceeds thirteen percent (13%) . Subd. B. Sewer Construction. The following construction requirements must be satisfied: (1) No buried or concealed portion of the building sewer, or building drain or branch thereof serving any establishment shall be located less than thirty (30) feet from any water- supply well. The buried or concealed building portions of anysewer, building drain or branches thereof located less than fifty (50) feet from any well shall be constructed as extra-heavy cast-iron soil pipe with lead-caulked, air-tested joints . The joints of anysewer, drain or branch located less than forty (40) feet from a well shall be further protected against leak- age by means of bell-joint clamps or six (6) inch concrete encasement or by other equally -4- A effective means . The air test shall be made by attaching an air compressor or test apparatus to a suitable opening and closing all other inlets and outlets to the sewer and/ or drain under test by means of proper testing plugs. Air shall be forced into the system until there is a uniform pressure of five (5) pounds per square inch in the section being tested. The system shall be considered satisfactorily air tested if the pressure therein remains constant for fifteen (15) minutes without the addition of air. (2) The portions of any buried sewer more than fifty (50) feet from a well or buried suction line shall be of adequate size and constructed of castiron, vitrified-clay, cement-asbestos , concrete or other pipe material acceptable in the State Building Code . Clay pipe and clay pipe fittings shall conform to A. S .T.M. specifications for standard strength or extra strength clay pipe and clay pipe fittings. No building drain or building sewer shall be less than four (4) inches in diameter. (3) The space between the bell and spigot of vitrified-clay pipe shall be packed with oakum, hemp or jute or otherwise prepared so as to form a concentric opening uniform in width around the pipe, which opening shall be filled with Portland cement mortar or other acceptable sewer-joint compound. Pour joints are recommended. Where cement joints are used they shall be carefully pointed on the outside and left smooth on the inside by drawing through them a swab or scraper. Construction of the line shall be such as to secure water-tight and root- tight joints, free of obstructions, and shall provide a grade of not less than 1/8 inch per foot. The ten (10) feet of sewer immediately preceding the septic tank shall not slope more than 1/4 inch per foot. No 90° ells shall be permitted, and where the direction of the sewer is changed in excess of 22 1/2° , accessible cleanouts shall be provided. -5- Subd. C. Septic Tank. The septic tank shall meet the following requirements both as to construction and placement: (1) The location of the septic tank shall be such as to provide the stated distances from the following: (a) Property lines, buried pipe distributing water under pressure and occupied buildings - not less than 10 feet (b) Any source of domestic water supply or buried water suction line not less than 50 feet (2) The liquid capacity of a septic tank serving a dwelling shall be based on the number of bedrooms contemplated in the dwelling served and shall conform to capacities given in Table 1 which follows. The liquid capacity of a septic tank serving an establish- ment other than a dwelling shall be sufficient to provide a sewage detention period of not less than 24 hours in the tank but in no instance shall it be less than 1000 gallons. TABLE 1 Minimum Capacities for Septic Tanks (Provides for Use of Garbage-Grinders, Automatic Washers and Other Household Appliances) Equivalent Minimum Tank Capacity Capacity per Bedroom 2 or less 1, 000 500 3 1 , 200 400 4* 1, 200 350 *For each additional bedroom over four, add 300 gallons of additional Capacity. (3) The liquid depth of any septic tank or compartment thereof shall be not less than thirty (30) inches. A liquid depth greater than six and one half (6 1/2) feet shall not be considered in determining tank capacity. -6- (4) No tank or compartment thereof shall have an inside horizontal dimension less than twenty four (24) inches . (5) Inlet and outlet connections of the tank and of each compartment thereof shall be sub- merged by means of vented tees or baffles so as to obtain effective retention of scum and sludge. (6) The space in the tank between the liquid surface and the top of the inlet and outlet baffles or submerged pipes shall be not less than twenty (20) percent of the total required liquid capacity, except that in horizontal cylindrical tanks this space shall be not less than fifteen (15) percent of the total required liquid capacity. (7) The inlet baffle or submerged pipe shall extend at least six (6) inches but not more than twenty (20) percent of the total liquid depth, to the nearest inch, below the liquid surface and at least one inch above the crown of the inlet sewer. (8) The outlet baffle or submerged pipe and the baffles or submerged pipes between compartments shall extend below the liquid surface a distance equal to forty (40) percent, to the nearest inch, of the liquid depth except that the penetration of the indicated baffles or submerged pipes for horizontal cylindrical tanks shall be thirty five (35) percent, to the nearest inch, of the total liquid depth. They also shall extend above the liquid surface to provide for scum storage as required in item #6 above. In no case shall they extend less than six (6) inches above the liquid surface. (9) There shall be at least one inch between the underside of the top of the tank and the highest point of the inlet and outlet devices and partitions so as to provide the required ventilation of the system through the main building stack. -7- (10) The inlet invert shall be not less than three (3) inches above the outlet invert. (11) Construction of the tank shall be such as to assure its being water-tight and to prevent the entrance of rainwater, surface drainage, or ground water. (12) The tank shall be constructed of sound and durable material not subject to excessive corrosion or decay. Metal septic tanks shall comply with Commercial Standard 177-62 of the U. S . Department of Commerce and have the capacity required by Table 1. (13) Adequate access to each compartment of the tank for inspection and sludge removal shall be provided by a manhole (not less than standard size) or removable cover and by a clean-out pipe of not less than 6 inch diameter extending through the cover to a point above the tank not more than six (6) inches below finished ground level. The point at which the clean-out pipe passes through the cover shall be so located that a downward projection of the pipe clears the inlet and outlet device by not less than two (2) inches . The top of the clean-out pipe shall be provided with a readily removable water-tight cap and its location shall be marked by stake or other means at the ground surface. The inlet device shall be made accessible by either the removable cover or the manhole or by the addition of properly placed hand holes. Subd. D. Subsurface Disposal Field. The disposal field shall meet the following requirements : (1) Location of the disposal field shall be in an unobstructed and preferably unshaded area, and the distances given below shall be the minimum horizontal separations between the disposal field and the following: (a) Any water supply well, or buried water suction pipe 50 feet -8- (b) Streams or other bodies of water 100 feet (c) Occupied buildings 20 feet (d) Large trees (see alternate in Subd. D, No. 6 , (d) 10 feet (e) Property lines or buried pipe distributing water under pressure 10 feet (2) When coarse soil formations are encountered, the distances specified in this Subd. D (1) shall be increased appropriately. (3) A distribution box with removable cover and of sufficient size to accommodate the necessary tile field lateral lines shall be constructed at the head of each disposal field. (a) Each tile field lateral line shall be connected separately to the distribution box and shall not be subdivided. (b) The inverts of all outlets shall be at the same elevation, and the inlet invert shall be at least one inch above the outlet inverts. (c) The outlet inverts shall be at least four (4) inches above the distribution box floor for the purpose of securing equal distribution of the septic tank effluent to each tile lateral. (d) In the event that septic tank effluent is delivered to the distribution box by pump or siphon, a baffle wall shall be installed in the distribution box. The baffle shall be secured to the bottom of the box and shall extend vertically to a point at least level with the crown of the inlet pipe. The plane surface of the baffle shall be perpendicular to the inlet flow line. -9- (e) Where the slope of the ground surface does not exceed six (6) inches in any direction within the area utilized for the absorption field, the septic tank effluent may be applied to the absorption field through a system of inter-conn- ected tile lines and trenches in a continuous system. The bottom of the trenches and distribution lines shall be constructed on a relatively level grade, not to exceed six (6) inches difference in elevation. (f) Where the slope of the ground surface exceeds six (6) inches in any direction within the area utilized for the absorp- tion field, serial distribution may be used. The bottom of the trenches and distribution lines shall be constructed a relatively level grade. The distrib- ution tile system shall be arranged so that each trench shall be filled with septic tank effluent before effluent flows to succeeding trenches. The invert of the overflow pipe in the first relief line shall be at least four (4) inches lower than the invert of the spetic tank outlet. (4) Minimum seepage area of the disposal field (total flat area of trench bottom exclusive of sidewall area) shall be determined by the following percolation test procedure as applied to Table 2. (a) Number and location of tests . Two or more tests shall be made in separate test holes spaced uniformly over the proposed absorption field site . (b) Type of test hole. A hole with horizon- tal dimensions of four (4) to twelve (12) inches and vertical sides shall be dug or bored to the depth of the proposed absorption trench. The holes may be bored with an auger of not less than four (4) inches in diameter. -10- (c) Preparation of test hole. The bottom and sides of the hole shall be care- fully scratched with a knife blade or sharp pointed instrument to remove any smeared soil surfaces and to provide a natural soil interface into which water may percolate. All loose material shall be removed from the hole and two (2) inches of coarse sand or fine gravel shall be added to protect the bottom from scouring. (d) Saturation and swelling of the soil. The hole shall be carefully filled with clear water to a minimum depth of twelve (12) inches over the gravel. Water shall be kept in the hole for at least four (4) hours , and preferably overnight, by refilling if necessary, or by supplying a surplus reservoir of water, such as in an automatic siphon. In sandy soils containing little or no clay, the swelling pro- cedure shall not be required and the test may be made as described under Subd. D. (4) (e) (3) after the water from one filling of the hole has completely seeped away. (e) Percolation rate measurement. With the exception of sandy soils, percolation rate measurements shall be made on the day following the procedure described under Subd. D. (4) (d) . (1) If water remains in the test hole after the overnight swelling period, the depth shall be adjusted to approximately six (6) inches over the gravel. From a fixed reference point the drop in water level shall be measured at thirty (30) minute intervals over a two (2) hour period. This drop shall be used to calculate the percol- ation rate. -11- (2) If no water remains in the hole after the overnight swelling period, clear water shall be added to bring the depth of water in the hole to approximately six (6) inches over the gravel. From a fixed reference point the drop in water Level shall be measured at approximately thirty (30) minute intervals for four (4) hours, refilling six (6) inches over the gravel if necessary. The drop that occurs during the final thirty (30) minute period shall be used to calculate the percolation rate. (3) In sandy soils or other soils in which the first six (6) inches of water seeps away in less than thirty (30) minutes after the overnight swell- ing period, the time interval between measurements shall be taken as ten (10) minutes and the test shall be run for one (1) hour. The drop that occurs during the final ten (10) minutes shall be used to calculate the percolation rate. TABLE 2 Absorption Area Requirements for Private Residences and Other Establishments (Per bedroom column provides for residential garbage grinders and automatic sequence washing machines) Percolation rate (time required for water to fall one Required absorption area in (1) * (1) inch, in minutes) Square feet standard trench Per Per gallon of Bedroom waste per day 1 or less (2) * 70 . 20 2 85 . 30 3 100 . 35 4 115 . 40 5 125 . 45 10 165 . 65 15 190 . 80 30 (3) * 250 1 . 10 45 (3) * 300 1. 25 60 (3, 4) * 330 1. 65 * (1) Absorption area for standard trenches is figures as trench- bottom area. * (2) In every case sufficient area should be provided for at Least two bedrooms. * (3) Unsuitable for seepage pits if over 30. * (4) Unsuitable for absorption systems if over 60. -12- (5) Additional criteria for judging soil suitability. (a) In areas of shallow ground water, the depth of the water table shall be determined. No soil absorption system shall be installed in an area where the water table is at any time less than six and one-half (6 1/2) feet below ground level or four (4) feet below the bottom of the drain field trench. Soil absorption systems installed in areas where impermeable layers are found at depths of less than six and one-half (6 1/2) feet shall be considered to be of special design. (b) In addition to percolation test, a minimum of 2 borings penetrating not less than 7 ' shall be included as part of data to be submitted. The boring shall be of sufficient diameter to determine soil conditions and evidence of high water (mottling) . (c) A modification of the percolation test may be used where the percolation test procedure has been previously used and knowledge is available on the character and uniformity of the soil. (6) Construction of disposal trenches . (a) All trenches in a disposal field shall be constructed in accordance with the following standards : (1) Minimum number of lines per field 2 (2) Maximum length of individual lines 100 feet (3) Minimum bottom width of trench -- 18 inches (4) Minimum depth of cover of tile lines 18 inches (5) Preferred depth of cover of tile lines 24 inches (6) Maximum depth of cover of tile lines 36 inches (7) Maximum uniform grade of tile lines 6 inches per 100 ft. (8) Preferred uniform grade of tile lines 2 to 4 inches per 100 feet (9) Size and spacing of trenches - Conform to Table 3 (10) Minimum filter material under tile 6 inches (11) Preferred depth of filter material under tile 12 to 24 inches (12) Minimum filter material over tile-- 2 inches -13- • TABLE 3 Size and Minimum Spacing Requirements for Disposal Trenches Width at Effective absorption bottom in area in Minimum spacing of lines inches Sq. feet per lin. ft. c to c in feet 18 1. 5 6. 0 24 2. 0 6. 5 30 2. 5 7. 0 36 3. 0 7. 5 Absorption trenches or beds wider than thirty-six (36) inches shall be provided with multiple distribution tile lines spaced not more than thirty-six (36) inches nor less than eighteen (18) inches on center, and not more than eighteen (18) inches from the side walls of the trench or bed, except that where tile lines are supported on a satisfactory under-drain system these spacings may be increased. (b) Pipe used for the line between the septic tank and the distribution box and between the distribution box and tile laterals to the point where the laterals are separated six (6) feet, shall be vitrified clay, cement-asbestos, or cast-iron. Joints in such pipe shall be water- tight. Pipe used under driveways or other areas subject to heavy loads shall be bell and spigot cast-iron with leaded caulked joints. Such water-tight sections laid in the disposal field shall not be considered in determining the effective absorption area. (c) Clay or concrete tile used in the disposal field shall be minimum four (4) inch agricultural drain tile twelve (12) inches in length and shall be laid with 1/4 inch open joints. Alternate materials may be used if equivalent performance is indicated. -14- (1) All open joints shall be protected on top by strips of asphalt-treated building paper at least ten (10) inches long and three (3) to six (6) inches wide or by other acceptable means. (2) All bends used in the disposal field shall have tight joints at each end of the bend. (d) Filter material shall be crushed stone, gravel, or similar insoluble, durable and acceptable material having sufficient voids. This material may vary from 1/2 to 2 1/2 inches in size and shall be free of dust, sand or clay. The filter materials shall completely encase the tile in accordance with item #6 , 9 thru 12. In any case, disposal trenches constructed within ten (10) feet of large trees or dense shrubbery shall have at least twelve (12) inches of filter materials beneath the tile (e) The top of the filter material shall be covered with untreated building paper or a two-inch layer of hay or straw so as to prevent settling of backfill material into the filter material. (f) Where it is necessary to fill an area for construction of tile laterals, the bottom of the tile trenches shall extend not less than one (1) foot into the original soil. (g) The trench above the filter material shall be overfilled with four (4) to six (6) inches of earth. The backfill shall be hand-tamped. (h) Before filter material is placed, all smeared or compacted soil in the trench bottom shall be broken up and removed by raking or other effective means to provide natural soil conditions. Subd. E. Maintenance. Maintenance shall be conducted and meet the following requirements: (1) At least once a year the owner of any septic tank or his agent shall measure or arrange for measurement of the depth of sludge and scum in such septic tank. When, as a result of such measurement, the top of the sludge layer in the tank or any compartment of the tank is found to -15- be less than twelve (12) inches below the bottom of the outlet baffle or submerged pipe, or if the bottom of the scum layer is less than three (3) inches above the bottom of the septic tank outlet baffle or submerged pipe, the owner or agent may arrange for the removal and sanitary disposal of sludge and scum from the tank; provided that such requirement for measuring shall be waived for any septic tank which is cleaned as indicated at least once each calendar year. (2) At least once each year the owner of any system equipped with a distribution box may arrange for the opening of the distribution box and the removal of any settled solids therein. Such material may be disposed of to the septic tank or by other means acceptable to the Plumbing Inspector. (3) At least once between May 1 and June 30 of each year the depth of liquid in each seepage pit may be measured. When, as a result of such measurement it is found that the liquid level in the pit is less than one foot below the inlet, a second measurement shall be made eight (8) to twelve (12) hours after the first measurement, during which time no liquid shall be discharged to the seepage pit. If, as a result of the second measurement, it is found that the liquid level in the pit has not lowered at least two (2) feet during the indicated period of time, an additional seepage pit or other acceptable soil absorption system shall be provided. (4) Servicing of septic tanks and soil absorption units shall conform to the Minnesota Department of Health and Minnesota Pollution Control Agency specifications. Disposal of sludge and scum from the system shall be: (a) Into a municipal sewer disposal system where practicable . (b) In the absence of a public sewer, at a disposal site approved by the Plumbing Inspector. (c) Sludge shall not be discharged into any lake or watercourse, nor upon land without burial. -16- IY Subd. F. Alternative Systems. Alternative methods of sewage disposal such as holding tanks, electric or gas incinerators, biological and/or tertiary treatment plants or land disposal systems, wherevery required or allowed in particular circumstances, shall be subject to the standards, criteria, rules and regulations of the Minnesota Department of Health and Minnesota Pollution Control Agency, and shall also require approval of the City Plumbing Inspector . 262-30. ADMINISTRATION. The provisions of this Ordinance shall be administered as hereinafter set forth. Subd. A. Enforcing Officer. The City Plumbing Inspector shall be responsible for the administration of this Ordinance. The City Council shall hear and decide appeals and review any order, requirement, decision or determination made by the City Plumbing Inspector regarding the enforce- ment of this Ordinance. Subd. B. Issuance of Permits. No building permit for any building requiring an on-site sewage disposal system shall be issued until the permit, as required by this Ordinance has been issued, and no Farm Site Permit involving a dwelling and requiring an on-site sewage disposal system shall be issued until the permit, as required in this Ordinance has been issued. Subd. C. Inspection. Inspection pursuant to the requirements of this Ordinance shall be made as follows: (1) The City Plumbing Inspector shall make such inspection or inspections as are necessary to determine compliance with this Ordinance. No part of the system shall be covered until it has been inspected and accepted by the City Plumbing Inspector. It shall be the responsibility of the applicant for the permit to notify the City Plumbing Inspector that the job is ready for inspection or re-inspection and it shall be the duty of the City Plumbing Inspector to make the indicated inspection within twenty-four (24) hours after such notice has been given. It shall be the duty of the owner or occupant of the property to give the City Plumbing Inspector free access to the property at reasonable times for the purpose of making such inspections . -17- (2) If upon inspection the City Plumbing Inspector discovers that any part of the system is not constructed in accordance with the minimum standards provided in this ordinance, he shall give the applicant written notification describing the defects. The applicant shall pay an additional fee as determined by resolution of the Hugo City Council for each re-inspection that is necessary. The applicant shall be responsible for the correction or elimination of all defects , and no system shall be placed or replaced in service until all defects have been corrected or eliminated. 262. 31. LICENSES FOR INSTALLERS. No person, firm or corporation shall engage in the business of installing and constructing sewage disposal systems within the City of Hugo without first obtaining a license to carry on such occupation from the City Plumbing Inspector. Subd. A. Licensing Requirements . Applicant shall file with the City policies of public liability and property damage insurance which shall remain in full force and effect during the entire term of said license and which shall contain a provision that they shall not be cancelled without ten (10) days written notice to the City. Public liability insurance shall not be less than one hundred thousand ($100, 000 . 00) dollars for injuries including accidental death to any one (1) person and subject to the same limit for each person in an amount of not less than three hundred thousand ($300, 000. 00) dollars on account of any one (1) accident, and property damage insurance in the amount of not less than fifty thousand ($50, 000. 00) dollars for each occurence and not less than one hundred thousand ($100, 000. 00) dollars aggregated. No work shall be done under license until said insurance policies have been filed and approved by the City. Such license shall be renewable annually and may be revoked or refused renewal by the Plumbing Inspector for cause. Any installation, construction, alteration or repair of a sewage disposal system by a licensee in violation of the provisions of this ordinance or refusal on the part of a licensee to correct such defective work performed by such licensee shall be cause for revocation of or refusal to renew a license. -18- Subd. B. License Revocation. Before any license issued under the provisions of this section may be revoked or its renewal refused, the licensee shall be given a hearing by the Hugo Planning Commission to show cause why such license should not be revoked or refused. Notice of the time, place and purpose of such hearing shall be in writing. The annual license fee shall be twenty-five ($25. 00) dollars. Application for such license shall be made annually on a form furnished by the City. Licenses shall be in effect from July 1 to June 30 of the following year. 262-32. INDIVIDUAL SEWAGE DISPOSAL SYSTEM PERMIT. No person, firm or corporation shall install , alter, repair, or extend any Individual Sewage Disposal System in the City of Hugo without first obtaining a permit therefor from the City Building Inspector for the specific installation, alteration, repair, or extension; and at the time of applying for said permit, shall pay a fee as determined by resolution of the Hugo City Council . Subd. A. Applications. Applications for permits shall be made in writing upon printed blanks or forms furnished by the City Building Inspector and shall be signed by the applicant. Subd. B. Required Information. Each application for a permit shall have thereon the correct legal description of the property on which the proposed installation, alteration, repair, or extension is to take place, and each application for a permit shall be accompanied by a plot plan of the land showing the location of any proposed or existing buildings located on the property with respect to the boundary lines of soil borings and percolation rates, if necessary, attesting to the compliance with the minimum standards of this Ordinance. A complete plan shall include the location, size and design of all parts of the system to be installed, altered, repaired or extended. The application shall also show the present or proposed location of water supply facilities and water supply piping, and the name of the person, firm or corporation who is to install the system, and shall provide such further information as may be required by the City Building Inspector. 262-33 . PENALTY PROVISION. It is declared unlawful for any person, firm or corporation to violate any of the terms and provisions of this Ordinance, and Violation of any provision thereof shall be a misdemeanor, and upon conviction thereof, shall be punished by a fine not to exceed three hundred dollars ($300. 00) or to be imprisoned in the County Jail for a period not to exceed ninety (90) days, or both, and each day that the violation is permitted to exist shall constitute a separate offense. -19- 262-34 . ABATEMENT ACTION BY CITY. In the event of a violation or a threatened violation of this Ordinance, the City Council, or any member thereof, in addition to other remedies , may institute appropriate actions or proceedings to prevent, restrain, correct, or abate such violations or threatened violations and it is the duty of the City Attorney to institute such action at the direction of the City Council. 262-35. TAXPAYER ACTION. Any taxpayer of the City may institute mandamus proceedings in District Court to compel specific performance by the proper official or officials of any duty required by this Ordinance. 262-36. SEPARABILITY. It is hereby declared to be the intention that the several provisions of this Ordinance are separable in accordance with the following: Subd. A. Invalid Provision. If any court of competent jurisdiction shall adjudge any provision of this Ordinance to be invalid, such judgement shall not affect any other provisions of this Ordinance not specifically included in said judgement. Subd. B. Invalid Application to Property. If any competent jurisdiction shall adjudge invalid the appli- cation of any portion of this Ordinance to a particular property, building, or other structure, such judgement shall not affect the application of said provision to any other property, building or structure not specifically included in said judgement. Subd. C. Other Ordinances Not Altered. Nothing contained in this Ordinance repeals or amends any ordinance requiring a permit or license to engage in any business or occupation. 262-37. VARIANCES. Where there are practical difficulties or unnecessary hardships in the way of carrying out the strict letter of the provisions of this Ordinance, the City Council shall have the power to vary requirements in harmony with the general purpose and interest thereof, so that the public health, and safety. and general welfare may be secured and substantial justice done. 262-38 . EFFECTIVE DATE. This Ordinance shall be effective and in force from and after its adoption and publication as required by law. ADOPTED AND PASSED THIS -7 DAY OF , 1976. ATTEST: OtAg 0 _1&1(21514 Tio CITY CLERK MAYOR Published in the Forest Lake Times This 4 day of NO t)-evh hpy, 1976 -20- ARTICLE II .- ON-SITE SEWER SYSTEMS 262-25. Short Title 262-26. Intent and Purpose 262-27. Rules Subd. A. Conflicting Provisions Subd. B. Word Meaning 262-28. Definitions Subd. A. Building Drain Subd. B. Building Sewer Subd. C. Individual Sewage Disposal System Subd. D. Inspector Subd. E. Sewage 262-29. General Provisions Subd. A. General Requirements Subd. B. Sewer Construction Subd. C. Septic Tank Subd. D. Subsurface Disposal Field Subd. E. Mainenance Subd. F. Alternative Systems 262-30. Administration Subd. A. Enforcing Officer Subd. B. Issuance of Permits Subd. C. Inspection 262-31. Licenses for Installers Subd. A. Licensing Requirements Subd. B. License Revocation 262-32. Individual Sewage Disposal System Permit Subd. A. Application Subd. B. Required Information 262-33. Penalty Provisions 262-34. Abatement Action by City 262-35. Taxpayer Action 262-36. Separability Subd. A. Invalid Provision Subd. B. Invalid Application to Property Subd. C. Other Ordinances not Altered 262-37. Variances 262-38. Effective Date f - ■ ORDINANCE NO.1976-U STATE OF MINNESOTA AN ORDINANCE FOR THE PURPOSE OF PROMOTING HEALTH, SAFETY, SS 2 ORDER, CONVENIENCE AND COUNTY OF Washington GENERAL WELFARE. BY REGULATING THE SPECIFICA- TIONS, INSTALLATION, AND MAIN- Duane A.Rasmussen,being duly sworn,on oath says he is and during all the times herein stated has been the publisher • TENANCE OF ON-SITE SEWER DIS- and printer of the newspaper known as the Forest Lake Times and has full knowledge of the facts herein stated as follows: .. POSAL SYSTEMS IN THE CITY OF AUGO,MINNESOTA. Said newspaper is printed in the English language in newspaper format and in column and sheet form equivalent in printed ARTICLE II - ON-SITE SEWER space to at least 900 squre inches.Said newspaper is a weekly and is distributed at least once each week.Said newspaper SYSTEMS has 50%of its news columns devoted to news of local interest to the community which it purports SHORT TITLE.This OrdinanceP Ports to serve and does not shall be known,cited and referred to as wholly duplicate any other publication and is not made up entirely of patents,plate matter and advertisements.Said news- I the On-Site Sanitary Sewer Disposal Or- paper is circulated in and near the municipality which it purports to serve,has at least 500 copies regularly delivered to dinance, except as referred to herein, paying subscribers,has an average of at least 75%of its total circulation currently paid or no more than three months in where it may be known as."This Ordi- arrears and has entry as second-class matter in its local post-office.Said newspaper purports to serve the City of Forest nance",or"This Chapter". Lake in the County of Washington and it has its known office of issue in the City of Forest Lake in said county,established 262-26.INTENT AND PURPOSE.This and open during its regular business hours for the gathering of news,sale of advertisements and sale of subscriptions and '. 1 Ordinance is adopted for the purpose of: maintained by the managing officer of said newspaper or persons in its employ and subject to his direction and control dur- (1)Protecting the health,safety ing all such regular business hours and at which said newspaper is printed. Said newspaper files a copy of each issue im- and welfare residents and future mediately with the State Historical Society.Said newspaper is made available at single or subscription prices to any per- 2)ieof they of Hugo. (2)Regulating individual sewer son,corporation,partnership or other unincorporated association requesting the newspaper and making the applicable disposal systems so as to pre- payment.Said newspaper has complied with all the foregoing conditions for at least one year preceding the day or dates of vent contamination of under- publication mentioned below.Said newspaper has filed with the Secretary of State of Minnesota prior to January 1,1966 ground bodies of water or of and each January 1 thereafter an affidavit in the form prescribed by the Secretary of State and signed by the managing of- streams, lakes, rivers or other ficer of said newspaper and sworn to before a notary public stating that the newspaper is a legal newspaper. surface bodies of water. (3) Prevent individual sewer disposal systems from creating He further states on oath that the printed Pxblio Notice hereto attached a health hazard and/or a nui- sance for the general public or for individuals. as a part hereof was cut from the columns of said newspaper, and was printed and published therein in the English (4) Making it unnecessary to provide central public sewage disposal systems for areas of the lanuage,once each week,for one successive weeks;that it was first so published on Thursday, City of Hugo not intended for ur- ban development in the theday of NQvoIDlair 19�' �yandwasthereafterprintedandpublishedonevery foreseeable future,as indicated til by the Comprehensive Plan for the City of Hugo. Thursday to and including the qtr day of NAVPmhPV 19 76 262-27.RULES.The following Rules of Construction apply to this Ordinance. Subd. A. Conflicting Provisions. In and that the following is a printed copy of the lower case alphabet from A to Z,both inclusive,and is hereby acknowledged the event of conflicting provisions in as being the size and kind of type used in the composition and publication of said notice,to wit: the text of this Ordinance,the more restrictive provision shall apply. 6-point News Type--abcdefghijklmnopgrstuvwxyz The City Plumbing Inspector shall rule on what is more "restrictive" .ti m mine .�.�►,sei,sF'vlriii.J�wvA�yx and appeals from said decisions 1SAlC1C/C 7rlU1�C1C�f7ClLYti�C7tl►li if�le may be made in the manner pro- �f pro- vided. �IV'f�� (J Subd.B.Word Meaning.Words used in the present tense include the past and future tense;the singular num- ber includes the plural and the Subscribed and sworn t fore me this 4tb day of—Nov. '�' 4} plural includes the singular; the , word"shall"is mandatory,and the word"may"is permissive. e., _� , ' 262-28. DEFINITIONS. The terms 11111. ,. used herein shall be defined as set forth in the following subdivisions. aa+ C. KENNETH JARVIS Subd.A.Building Drain.The build- 04 , CHISAGO COUNTY ing drain is that part of the horizon- N. ary public, County,Minnesota , tat piping of a building drainage NOTARY PUBLIC-MINrJ ES OTA _ system which receives the discharge (NOTORIAL SE ) bT ommission Expires 19 from all other soil, waste and MY COMMISSION EXPIRES SEPT.76,7982 P drainage pipes inside the walls of any building and conveys the same to the building sewer. Subd.B.Building Sewer.The build- ing sewer is that part of the horizon- tal portion of the building drainage system extending from the building drain to its connection with the sep- tic tank and carrying the sewage of but one building. Subd.C.Individual Sewage Disposal System. A private sewage disposal system other than a public Ir com- munity system which receives- sewage from an individual establish- ment. Unless otherwise indicated, the word"system"as it appears in (his Ordinance means "individual" w sewage disposal system." row'Tfie buried or concealed por- Subd.D.Inspector.The City Plumb- tions of any building sewer, ing Inspector. building drain or branches Subd.E.Sewage.Any water-carried thereof located less than fifty domestic waste,exclusive of footing (50)feet from any well shall be and roof drainage,of any residence, constructed as extra-heavy industry or commercial establish- castiron soil pipe with lead- ment,whether treated or untreated, caulked, air-tested joints. The and includes the liquid wastes pro- joints of any sewer, drain or duced by bathing,laundry and culin- branch located less than forty ary operations,and from toilets and (40) feet from a well shall be floor drains; and Raw sewage is further protected against sewage which has not been sub- leakage by means of bell-joint jected to any treatment process. clamps or six(6)inch concrete 262-29. GENERAL PROVISIONS. All encasement or by other equally Individual Sewage Disposal Systems in- effective means. The air test stalled subsequent to the adoption of this shall be made by attaching an Ordinance and all alternations, exten- air compressor or test ap- sions and repairs to Individual Sewage paratus to a suitable opening Disposal Systems irrespective of the and closing all other inlets and date of original installation shall be outlets to tie sewer and/or drain regulated in accordance with all of the under test by means of proper requirements of this Ordinance.Any In- testing plugs.Air shall be forced dividual Sewage Disposal System or per- into the system until there is a tinent part thereof, irrespective of the uniform pressure of five (5) date of original installation,which is not pounds per square inch in the located, constructed or installed in ac- section being tested.The system cordance with provisions of this Ordi- shall be considered satisfac- nance shall be so relocated, torily air tested if the pressure reconstructed or re-installed as to com- therein remains constant for fif- ply with these requirements within three teen (15) minutes without the (3)years of the date of the adoption of addition of air. this Ordinance.Where there is evidence (2) The portions of•any buried septic tank effluent percolating from sewer more than fifty(50)feet ground, the system must be cor- from a well or buried suction ted and conform to these standards line shall be of adequate size and hin ninety (90) days after written constructed of cast-iron, ification. vitrified-clay, cement-asbestos, Subd. A. General Requirements. concrete or other pipe material The following requirements must be acceptable in the State Building satisfied: Code.Clay pipe and clay pipe fit- (1)Location and installation of tings shall conform to A.S.T.M. the indivudal sewage disposal specifications for standard system and each part thereof strength or extra strength clay shall be such that,with reasona- pipe and clay pipe fittings. No ble maintenance,it will function building drain or building sewer in a sanitary manner and will shall be less than four(4)inches not create a nuisance nor en- in diameter. danger the safety of any (3)The space between the bell domestic water supply.In deter- and spigot of vitrified-clay pipe mining a suitable location for shall be packed with oakum, the system,consideration shall hemp or jute or otherwise pre- be given to the size and shape of pared so as to form a concentric the lot, slope of natural and opening uniform in width around finished grade, soil per- the pipe,which opening shall be meability, depth of ground filled with Portland cement water,geology,proximity to ex- mortar or other acceptable fisting or future water supplies, sewer-joint compound. Pour accessibility for maintenance, joints are recommended.Where and possible expansion of the cement joints are used they system. shall be carefully pointed on the (2)No part of the system shall outside and left smooth on the in- be located so that it is nearer to side by drawing through them a any water supply than outlined swab or scraper.Construction of hereinafter, or so that surface the line shall be such as to drainage from its location may secure water-tight and root-tight reach any domestic water sup- joints,free of obstructions,and Ply. shall provide a grade of not less (3) Raw sewage, septic tank than 1/8 inch per foot. The ten effluent,or seepage from a soil (10) feet of sewer immediately absorption system shall not be preceding the septic tank shall _discharged to the ground sur- not slope more than 1/4 inch per face,abandoned wells,or bodies foot.No 90 degree ells shall be of surface water, or into any permitted,and where the direc- rock formation the structure of lion of the sewer is changed in which is not conducive to pur- escess of 221!2 degrees,accessi- ficat ion of water by filtration,or ble cleanouts shall be provided. into any well or other excavation Subd. C. Septic Tank. The septic in the ground which does not tank shall meet the following re- comply with the requirements of quirements both as to construction this Ordinance. This require- and placement: ment shall not apply to the dis- (1) The location of the septic posal of sewage in accordance tank shall be such as to provide with a process approved by the the stated distances from the State Board of Health or the following: Water Pollution Control Com- (a) Property lines, buried mission. pipe distributing water (4) The lotrsize shall be suffi- under pressure and oc- dent to permit installation of the cupied buildings - not less individual sewage disposal than 10 feet. system in accordance with all rb)Any source of domestic the requirements pertaining water supply or buried thereto. water suction line not less (5) Installations of individual than 50 feet. sewage disposal systems shall (2)The liquid capacity of a sep- not be made in low swampy tic tank serving a dwelling shall areas or areas which may be be based on the number of subject to flooding. bedrooms contemplated in the (6)In areas with a high ground- dwelling served and shall con- water table or where limestone form to capacities given in Ta- or any geological formation ble 1 which follows. The liquid similarly faulty is covered by capacity of a septic tank serving less than fifty(50)feet of earth, an establishment other than a the final disposal unit shall be a dwelling shall be sufficient to Itile field. The bottom of the provide a sewage detention trenches shall be not less than period of not less than 24 hours four (4) feet above the highest in the tank but in no instance known or calculated water table shall it be less than 1000 gallons. or the surface of the faulty rock TABLE 1 formation. (7) Bulldozers, trucks or other Minimum Capacities for Septic Tanks heavy machinery shall not be (Provides for Use of Garbage-Grinders, driven over the system after in- Automatic Washers and Other House- drivetion. hold Appliances) (8)The system or systems shall Equivalent be designed to receive all Minimum Tank Capacity sewage from the dwelling,build- Capacity per Bedroom ing or other establishment 2 or less 1000 500 served,including laundry waste I. 1,200 400 and basement floor drainage. 4' 1.200 350 Footing or roof drainage shall *For each additional bedroom over four, not directly enter any part of-the add 300 gallons of additional Capacity. • - system.Where the construction (3)The liquid depth of any sep- of additional bedrooms, the in- tic tank or compartment thereof stallation of mechancial equip- shall be not less thad thirty(30) ment,or other factors likely to inches. A liquid depth greater affect the operation of the than six and one half(6 1/2)feet system can be reasonably anti- 'shall not be considered in deter- cipated, the installation of a mining tank capacity. system adequate for such antici- (4) No tank or compartment paled need shall be required. thereof shall have an inside (9)The system shall consist of a horizontal dimension less than building sewer, a septic tank, twenty four(24)inches. and a soil absorption unit.The (5)Inlet and outlet connections soil absorption unit shall consist of the tank and of each compart- of a sub-surface disposal field. ment thereof shall be sub- , All sewage shall be treated in merged by means of vented tees the septic tank and the septic or baffles so as to obtain effec- tank effluent shall be discharged live retention of scum and to the disposal field.The septic sludge. tank drain field system shall be (6) The space in the tank bet- considered the only acceptable ween the liquid surface and the system for installation unless it top of the inlet and outlet baffles ' can be demonstrated that this or submerged pipes shall be not system is not feasible on the par- less than twenty(20)percent of ticular lot in question and if it the total required liquid can be demonstrated that this capacity,except that in horizon- system is not feasible on the par- tal cylindrical tanks this space ticular lot in question and if it shall be not less than fifteen(15) can be demonstrated that the percent of the total required li- system being proposed as an quid capacity. alternate will not create a pollu- (7) The inlet baffle or sub- tion problem. . merged pipe shall extend at (10)Soil absorption systems for least six(6)inches but not more the disposal of sewage waste than twenty(20)percent of the shall not be installed on land total liquid depth,to the nearest where the slope exceeds thirteen inch, below the liquid surface percent(13'%). and at least one inch above the Subd. B. Sewer Construction. The crown of the inlet sewer. following construction requirements (8) The outlet baffle or sub- must be satisfied: merged pipe and the baffles or (1)No buried or concealed pur- submerged pipes between corn- ti n of the building sewer, or partments shall extend below (ding drain or branch thereof • vmg any establishment shall (Continued on Page 18) ocated less than thirty (30) PAGE 18--FOREST LAKE TIMES--Thursday, November 4, 1976 -. it ' flows to succeeding the water table shall be shall be hand-tamped. placed or replaced in service un- Ordinance repeals or amends any (Continued from Page 17) • trenches. The invert of the determined.No soil absorp- (h)Before filter material is til all defects have been cor- ordinance requiring a permit or overflow pipe in the first.- tion system shall be in- placed,all smeared or corn- rected or eliminated. license to engage in any business or the liquid surface a distance • relief line shall be at least stalled in an area where the patted soil in the trench bot- 262.31. L I C E N SE S F 0 R I N- occupation. equal to forty (40) percent, to four (4) inches lower than water table is at any time torn shall be broken up and STALLERS.No person,firm or corpora- 262-37.VARIANCES.Where there are the nearest inch, of the liquid the invert of the septic tank less than six and one-half(6 removed by raking or other tion shall engage in the business of in- practical difficulties or unnecessary depth except that the penetra- outlet. 1/2)feet below ground level effective means to provide stalling and constructing sewage dis- hardships in the way of carrying out the tion of the indicated baffles or (4) Minimum seepage area of or four (4) feet below the natural soil conditions. posal systems within the City of Hugo strict letter of the provisions of this Ordi- submerged pipes for horizontal the disposal field(total flat area bottom of the drain field Subd.E.Maintenance.Maintenance without first obtaining a license to carry nance, the City Council shall have the cylindrical tanks shall be thirty of trench bottom exclusive of trench. Soil absorption shall be conducted and meet the on such occupation from the City Plumb- power to vary requirements in harmony five(35)percent,to the nearest sidewall area) shall be deter- systems installed in areas following requirements: ing Inspector. with the general purpose and interest inch, of the total.liquid depth. mined by the following percola- where impermeable layers (1) At least once a year the' Subd. A. Licensing Requirements. thereof, so that the public health, and They also shall extend above the tion test procedure as applied to are found at depths of less owner of any septic tank or his Applicant shall file with the City safety, and general welfare may be liquid surface to provide for Table 2. than six and one-half(6 1/2) , agent may measure or arrange policies of public liability and pro- secured and substantial justice done. . scum storage as required in (a)Number and location of feet shall be considered to for measurement of the depth of perty damage insurance which shall 262-38.EFFECTIVE DATE.This Ordi- item No. 6 above. In no case tests. Two or more tests be of special design. sludge and scum in such septic remain in full force and effect dur- nance shall be effective and in force shall they extend less than six shall be made in separate (b) In addition to percola- tank.When,as a result of such ing the entire term of said license from and after its adoption and publica- (6)inches above the liquid sur- test holes spaced uniformly lion test, a minimum of 2 measurement, the top of the and which shall contain a provision tion as required by law. face. over the proposed absorp- borings penetrating not less sludge layer in the tank or any that they shall not be cancelled with- ADOPTED AND PASSED THIS 18 (9) There shall be at least one tion field site. than 7'shall be included as compartment of the tank is out ten (10)days written notice to DAY OF OCTOBER,1976. inch between the underside of (b)Type of test hole.A hole part of data to be submitted. found to be less than twelve(12) the City. Public liability insurance ATTEST:Carol A.Williams/s/ the top of the tank and the high- with horizontal dimensions The boring shall be of suffi- inches below the bottom of the shall not be less than one hundred , /5/Donald Le' est point of the inlet and outlet of four(4)to twelve(12)in- cient diameter to determine outlet baffle or submerged pipe, thousand($100,000.00)dollars for in- devices and partitions so as to ches and vertical sides shall soil conditions and evidence or if the bottom of the scum juries including accidental death to (Published in the Forest Lake`40b provide the required ventilation be dug or bored to the depth of high water(mottling). layer is less than three (3) in- any one(1)person and subject to the 'wember 4,1976) •,' of the system through the main of the proposed absorption (c) A modification of the ches above•the bottom of the same limit for each person in an • building stack. trench. The holes may be percolation test may be used septic tank outlet baffle or sub- amount of not less than three (10)The inlet invert shall be not bored with an auger of not where the percolation test merged pipe,the owner or agent hundred thousand ($300,000.00)dol- less than three(3)inches above less than four (4) inches in procedure has been pre- may arrange for the removal lars on account of any one(1)acci- the outlet invert. diameter. viously used and knowledge and sanitary disposal of sludge dent, and property damage in- (11) Construction of the tank (c)Preparation of test hole. is available on the character and scum from the tank; pro- surance in the amount of not less shall be such as to assure its The bottom and sides of the and uniformity of the soil. vided that such requirement for than fifty thousand ($50,000.00)dol- being water-tight and to prevent hole shall be carefully (6) Construction of disposal measuring may be waived for lars for each occurence and not less the entrance of rainwater,sur- scratched with a knife blade" trenches. any septic tank which is cleaned. than one hundred thousand ($100,- face drainage,or ground water. or sharp pointed instrument (a) All trenches in a dis- as indicated at least once each . 000.00)dollars aggregated.No work (12) The tank shall be con- to remove any smeared soil posal field shall be con- calendar year. shall be done under license until said structed of sound and durable' surfaces and to provide a structed in accordance with (2)At least once each year the insurance policies have been filed material not subject to ex- natural soil interface into the following standards: owner of any system equipped and approved by the City. Such cessive corrosion or decay. which water may percolate. (1).Minimum number of with a distribution box may ar- license shall be renewable annually Metal septic tanks shall comply All loose material shall be lines per field 2 range for the opening of the dis- and may be revoked or refused with Commercial Standard removed from the hole and (2) Maximum length of in- tribution box and the removal of, renewal by the Plumbing Inspector 177-62 of the U.S.Department of ,two (2) inches of coarse dividual lines 100 feet any settled solids therein. Such for cause. Any installation, con Commerce 'and have the sand or fine gravel shall be (3)Minimum bottom width material shall be disposed of to struction, alteration or repair•of a capacity required by Table 1. added to protect the bottom of trench 18 inches the septic tank or by other sewage disposal system by a (13) Adequate access to each from scouring. (4)Minimum depth of cover means acceptable to the Plumb- licensee in violation of the provisions compartment of the tank for in- (d)Saturation and swelling of tile lines 18 inches ing Inspector. of this ordinance or refusal on the spection and sludge removal of the soil.The hole shall be (5)Preferred depth of cover (3)At least once between May 1 part of a licensee to correct such shall be provided by a manhole carefully filled with clear of tile lines 24 inches and June 30 of each year the. defective work performed by such • (not less than standard size)or water to a minimum depth (6) Maximum depth of depth of liquid in each seepage , licensee shall be cause for revoca- removable cover and by a clean- of twelve (12) inches over cover of tile lines.36 inches pit may be measured.When,as tion of or refusal to renew a license. out pipe of not less than 6 inch the gravel. Water shall be (7) Maximum uniform a result of such measurement it Subd.B.License Revocation.Before diameter extending through the kept in the hole for at least grade of tile lines..6 inches is found that the liquid level in any license issued under the provi- cover to a point above the tank four(4)hours,and prefera- (8)Preferred uniform grade the pit is less than one foot below sions of this section may be revoked • not more than six (6) inches bly overnight,by refilling if of tile lines 2 to 4 inches per the inlet,a second measurement or its renewal refused,the licensee below finished ground level.The necessary,or by supplying a 100 feet shall be made eight(8)to twelve shall be given a hearing by the Hugo point at which the cleanout pipe surplus reservoir of water, (9) Size and spacing of (12) hours after the first , Planning Commission to show cause passes through the cover shall such as in an automatic trenches-Conform to Table measurement, during which why such license should not be be so located that a downward siphon. In sandy soils con- (10) Minimum filter time no liquid shall be dis- revoked or refused. Notice of the projection of the pipe clears the taming little or no clay,the material under tile.6 inches charged to the seepage pit.If,as time, place and purpose of such inlet and outlet device by not swelling procedure shall not (11) Preferred depth of a result of the second measure- hearing shall be in writing.The an- less than two(2)inches.The top be required and the test may filter material under tile 12 ment,it is found that the liquid nual license fee shall be twenty-five of the clean-out pipe shall be be made as described under to 24 inches level in the pit has not lowered at ($25.00)dollars.Application for such provided with a readily remova- Subd.D.(4)(e)(3)after the (12) Minimum filter least two(2)feet during the indi- license shall be made annually on a ble water-tight cap and its Coca- water from one filling of the material over tile..2 inches cated period of time, an addi- form furnished by the City.Licenses lion shall be marked by stake or hole has completely seeped TABLE 3 tional seepage pit or other ac- shall be in effect from July 1 to June other means at the ground sur- away. Size and Minimum Spacing Require- ceptable soil absorption system 30 of the following year. face. The inlet device shall be (e) Percolation rate ments for Disposal Trenches shall be provided. 262-32. INDIVIDUAL SEWAGE DIS- made accessible by either the measurement.With the ex- Width Minimum (4)Servicing of septic tanks and POSAL SYSTEM PERMIT.No person, removable cover or the manhole ception of sandy soils, per- al spacing soil absorption units shall con- firm or corporation shall install,alter, by the addition of properly colation rate measurements - form to the Minnesota Depart- repair,or extend any Individual Sewage orbottom Effective absorption of lines ment of Health and Minnesota Disposal System in the City of Hugo placed hand holes. • shall be made on the day in area in c to c Pollution Control Agency without first obtaininga permit Subd.D.Subsurface Disposal Field. following the procedure de- g The disposal field shall meet the scribed under Subd. D. (4) inches Sq.feet per lin.ft.' in feet specifications. Disposal of therefore from the City Building Inspec- following requirements: (d). 18 1.5 6.0 sludge and scum from the for for the specific installation,altera- (1)Location of the disposal field (1)If water remains in 24 2.0 6.5 system shall be: tion, repair, or extension; and at the shall be in an unobstructed and the test hole after the 2.5 7.0 (a)Into a municipal sewer time of applying for said permit,shall 3.0 7.5 disposal system where prat- pay a fee as determined by resolution of preferably unshaded area, and overnight swelling 36 the distances given below shall period, the depth shall Absorption trenches or beds wider than ticable. the Hugo City Council. be the minimum horizontal rep- be adjusted to approx- thirty-six (36) inches shall be provided (b) In the absence of 'a Subd. A. Applications. Applications orations between the disposal imately six (6) inches with multiple distribution tile lines public sewer, at a disposal for permits shall be made in writing field and the following: over the gravel.From a spaced not more than thirty-six(36)in- site approved by the Plumb- upon printed blanks-or forms w. fu (a)Any water supply well, fixed reference point the ches nor less than eighteen (18)inches ing Inspector. nished by the City Building Inspec- or buried water suction pipe drop in water level shall on center,and not more than eighteen (c)Sludge shall not be dis- for and shall be signed by the appli- 50 feet be measured at thirty (18) inches from the side walls of the charged into any lake or cant. (b)Streams or other bodies (30) minute intervals trench or bed, except that where tile watercourse,nor upon land Subd. B. Required Information. of water 100 feet over a two (2) hour lines are supported on a satisfactory without burial. Each application for a permit shall (c) Occupied buildings 20 period. This drop shall under-drain system these spacings may Subd.F.Alternative Systems.Alter- have thereon the correct legal feet be used to calculate the be increased. native methods of sewage disposal description of the property on which (d) Large trees (see alter- percolation rate. * (b) Pipe used for the line such as holding tanks,electric or gas the proposed installation,alteration, nate in Subd.D,No.6,(d)10 (2)If no water remains between the septic tank and incinerators,biological and/or terti- repair,or extension is to take place, feet in the hole after the the distribution box and bet- ary treatment plants or land dis- apd each application for a permit (e)Property lines or buried overnight swelling ween the distribution box posal systems,wherevery required shall be accompanied by a plot plan pipe distributing water • period,clear water shall and tile laterals to the point or allowed in particular circums- of the land showing the location of under pressure 10 feet be addedto bring thewhere the laterals are sepa- lances,shall be subject to the stan- any proposed or existing buildings (2)When coarse soil formations depth of water in the rated six (6) feet, shall be dards, criteria, rules and regula- located on the property with respect are encountered, the distances hole to approximately vitrified clay, cement- tions of the Minnesota Department to the boundary lines of soil borings specified in this Subd. D. (1) six (6) inches over the asbestos,or cast-iron.Joints of Health and Minnesota Pollution and percolation rates,if necessary, shall be increased ap- gravel. From a fixed in such pipe shall be water- Control Agency, and shall also re- attesting to the compliance with the propriately. reference point the drop tight.Pipe used under drive- quire approval of the City Plumbing •minimum standards of this Ordi- (3) A distribution box with in water level shall be ways or other areas subject Inspector. • nance.A complete plan shall include removable cover and of suffi- measured at approx- to heavy loads shall be bell. 262-30. ADMINISTRATION. The pro- the location, size and design of all cient size to accommodate the imately thirty (30) and spigot cast-iron with visions of this Ordinance shall be ad- parts of the system to be installed, necessary tile field lateral lines minute intervals for leaded caulked joints. Such ministered as hereinafter set forth. altered,repaired or extended. The shall be constructed at the head four(4)hours,refilling water-tight sections laid in Subd.A.Enforcing Officer.The City application shall also show the pre- of each disposal field. six (6) inches over the the disposal field shall not Plumbing Inspector shall be respon- sent or proposed location of water (a) Each tile field lateral gravel if necessary.The be considered in determin- sible for the administration of this supply facilities and water supply line shall be connected sepa- drop that occurs during ing the effective absorption Ordinance: The City Connell shall piping,and the name of the person, rately to the distribution box the final thirty (30) area. hear and decide appeals and review firm or corporation who is to install and shall not be subdivided. minute period shall be (c) Clay or concrete tile any order,requirement,decision or the system,and shall provide such (b)The inverts of all outlets used to calculate the used in the disposal field determination made by the City further information as may be re- shall be at the same eleva- percolation rate. shall be minimum four (4) Plumbing Inspector regarding the quired by the City Building Inspec- tion, and the inlet invert (3) In sandy soils or inch agricultural drain tile enforcement of this Ordinance. tor. shall be at least one inch other soils in which the ' twelve(12)inches in length Subd. B. Issuance of Permits. No 262-33. PENALTY PROVISION. It is above the outlet inverts. first six (6) inches of and shall be laid with 1/4 building permit for any building re- declared unlawful for any person,firm (c)The outlet inverts shall water seeps away in less - inch open joints. Alternate quiring an on-site sewage disposal or corporation to violate any of the terms be at least four (4) inches than thirty(30)minutes materials may be used if system shall be issued until the per- and provisions of this Ordinance, and above the distribution box after the overnight equivalent performance is mit,as required by this Ordinance Violation of any provision thereof shall floor for the purpose of swelling period, the indicated. has been issued,and no Farm Site be a misdemeanor,and upon conviction securing equal distribution time interval between (1)All open joints shall Permit involving a dwelling and re- thereof,shall be punished by a fine not to of the septic tank effluent to measurements shall be be protected on top by quiring an on-site sewage disposal exceed three hundred dollars ($300.00) each tile lateral. taken-a s ten (10) strips of asphalt-treated system shall be issued until the per- or to be imprisoned in the County Jail for (d)in the event that septic •minutes and the test building paper at least mit,as required in this Ordinance a period not to exceed ninety(90)days, tank effluent is delivered to shall be run for one(1) ten(10)inches long and has been issued. or both,and each day that the violation the distribution box by hour.The drop that oc- three-(3) to six (6) in- Subd.C.Inspection.Inspection pur- is permitted to exist shall constitute a pump or. siphon, a baffle curs during the final ten ches wide or by other . suant to the requirements of this Or- separate offense. wall.shall be installed in the (10) minutes shall be acceptable means. dinance shall be made as follows: 262-34. ABATEMENT ACTION BY distribution box.The baffle used to calculate the 1 - (2)All bends used in the (1)The City Plumbing Inspector CITY. In the event of a violation or a shall be secured to the bot- percolation rate. disposal field shall have shall make such inspection or in- threatened violation of this Ordinance, tom of the box and shall ex- TABLE 2 tight joints at each end spections_as are necessary to the City Council,or any member thereof, tend vertically to a point at Absorption Area Requirements for of the bend. determine compliance with this in addition to other remedies, may in- easttevelwiththecrownof Private Residences and Other Establish- (d)Filter material shall be Ordinance. No part of the stitute appropriate actions or proceed- ltheea inlet pipe.The plane sur- ments (Per bedroom cotumh provides crushed stone, gravel, .or system shall be covered until it ings to prevent, restrain, correct, or face of the baffle shall be for residential garbage grinders and similar insolvable, durable • has been inspected and accepted abate such violations or threatened perpendicular to the inlet f au- tomatic sequence washing machines) and acceptable material by the City Plumbing Inspector. violations and it is the duty of the City line. Percolation having sufficient voids.This It shall be the responsibility of Attorney to institute such action at the flow Where the slope of the rate(time material play vary from 1/2 the applicant for the permit to direction of the City Council. • surface does not tex- he required for to 2 1/2 inches in,size and notify the City Plumbing Inspec- 262-35.TAXPAYER ACTION.Any tax- groundcoed six (6) inches in anyq Required absorption shall be free of dust,sand or for that the job is ready for in- payer of the City may institute man- water to fall one Qclay. The filter materials spection or re-inspection and it damns proceedings in District Court to direction within the area (1)inch, area in Square feet shall completely encase the . shall be the duty of the City compelspecificgperformance bythe utilized for the absorption in minutes) standard trench(11* re- field,the septic tank effluent Per Pergallon of Ntile in accordance with item indicatedPldInspector inspectionto make in proper officialythis Ordinance.of any duty maybe applied to the ab- No.6,9 thru 12.In any case, within quired by this Ordinance. pp , Bedroom waste per day disposal trenches con- " twenty-four (24) hours after 262-36. SEPARABILITY. It is hereby • sorption field through a 1 or less(2)* 70 .20 system of inter-connected 2 85 30 structed within ten(10)feet such notice hasy been given.neIt several o si the intentionhththat in ice tile lines and trenches in a 3 100 .35 - of large trees or dense shall bathe theduty r pteen to r oe severalprovisionsof the anc with the continuous s})stem.The bot- 4 115 .40 shrubbery shall have at occupant of brngerty to give are separable in accordance with the tom of the trenches and dis- eaet twelve is inches f the City Plumbing Inspector following: tribution lines shall be con- 5 125 .65 filter materials beneath the frees ti etst property at court mp to Provision. Iof any structed on a relatively level 10 165 .65 tile. reasonable times for the pur- court of competent jurisdiction shall 15 190 .80 (e) The top-of the filter pose of making such inspections. adjudge any provision of this Ordi- grade,not to exceed six(6) 30(3)• 250 1.10 material shall be covered . (2) If upon inspection the City nance to be invalid,such judgement inches difference in eleva- 45(3)* 300 1.25 with untreated building Plumbing Inspector discovers shall not affect any other provisions tion. 60(3,4,)* 330 1.65 or a two-inch layer of that anypart of the system is not of this Ordinance not specifically in- .(f) Where the slope of the * (1) Absorption area for standard paper Y P Y ground surface exceeds six P hay or straw so as to prevent constructed in accordance with eluded in said judgement. trenches is figures as trench-bottom settlingof backfill material ' the minimum standardspro- Subd.B.Invalid Application to Pro- wit inches in any direction PP area. into the filter material. vided in this ordinance,he shall perty.If anycompetent jurisdiction —A► within the area utilized for *12)In every case sufficient area should P 1 the absorption field, serial (f)Where it is necessary to give the applicant written shall adjudge invalid the application • distribution may be used. be provided for at Least two bedrooms. fill an area for construction notification describing the of any portion of this Ordinance to a *(3)Unsuitable for seepage pits if over of tile laterals,the bottom of defects.The applicant shall pay particular property, building, or The bottom of the trenches p p y, judgement and.distribution lines shall 30.* - the tile trenches shall ex- an additional fee as determined other structure, such judgement be constructed a relatively (4)Unsuitable for absorption systems tend not less than one.(1) by resolution of the Hugo City shall not affect the application of if over 60.. foot into the original soil. Council for each re-inspection said-provision to otherproperty, level grade.The distribution• g Pany tile system shall be ar- (5)Additional criteria for judg- (g) The trench above the that is necessary.The applicant building or structure not specifically ranged so that each trench ing soil suitability. filter material shall be over- shall be responsible for the cor- included in said judgement. shall be filled with septic ( In areas of shallow filled with four(4)to six(6) rection or elimination of all Subd. C. Other Ordinances Not tank effluent before effluent ground water, the depth of inches of earth.The backfill defects,and no system shall be Altered. Nothing contained in this