HomeMy WebLinkAbout2016.01.14 PC PacketAGENDA
HUGO PLANNING COMMISSION
THURSDAY, JANUARY 14, 2016
HUGO CITY HALL
7:00 p.m.
A. ROLL CALL (Arcand, Kleissler, Knauss, Lessard, McRoberts, Patzner, Rosenduist)
B. PLEDGE OF ALLEGIANCE
C. APPROVAL OF MINUTES
1. December 17, 2015
D. PUBLIC HEARING
E. NEW BUSINESS
1. LaValle Fields Apartments - Concept Plan
F. OLD BUSINESS
1. Appointment to Board of Zoning
2. Appointment to Ordinance Review Committee
G. ADJOURNMENT
* Reminder: The planning Commission will be having the goal -setting workshop/potluck on
Thursday, January 28" at 6:40 p.m.!
If you need accommodations for the Planning Commission meeting please contact
Rachel Juba at (651) 762-6304 or riuba a,ci.hu2o.mn.us, thank you.
Minutes for the Planning Commission Meeting of December 17, 2015
Chair, Kleissler called the meeting to order at 6:58 p.m.
PRESENT: Arcand, Kleissler, Knauss, Lessard, Patzner, Rosenquist
ABSENT: McRoberts.
STAFF: Rachel Juba, Planner
Rachel Leitz, Community Development Assistant
Oath of Office
Juba introduced the newly elected Planning Commission member, Lynn Patzner.
Commissioner Patzner stated that she has lived in the City of Hugo for a couple of years and had worked with
the Planning Commission and City Council for a project she was part of with Xcel. Commissioner Patzner said
in her free time she serves on a couple of other groups including the MN Construction Association, the local
HOA for her neighborhood, and volunteer coaches at the YMCA.
Juba had Commissioner Patzner read the oath of office and sign.
Approval of Minutes for the Planning Commission Meeting of October 8, 2015
Commissioner Arcand made a motion, seconded by Commissioner Rosenquist, to approve minutes for the
meeting of October 8, 2015.
All Ayes. Motion carried.
Solar Energy Systems Ordinance
Leitz began describing the newly created solar energy systems ordinance. She stated that after many requests
for information from residents and solar companies, the City Council approved the Ordinance Review
Committee (ORC) to begin creating a solar energy ordinance to regulate future solar projects within the City.
Leitz went through the solar energy system ordinance and concluded that the ORC agreed that a solar ordinance
was necessary within the City of Hugo and recommended approval to the Planning Commission. She also stated
that staff recommends opening of the public hearing for public comments and recommends approval of the solar
energy system ordinance.
Commissioner Arcand stated that the ordinance refers to "the owner" when talking about removing an
abandoned project and wondered if that meant the owner of the system or owner of the property.
Lcitz stated that it depends. She stated that if the owner of the property is also the one who holds the interim
use permit for a solar farm, then they would be required to remove the system. If the property owner has a lease
agreement with a company to operate the solar farm, then there would be some sort of stipulation within that
agreement that they would be required to remove the system.
Commissioner Arcand stated that the section regarding removing the system mentions something about the City
holding some sort of deposit for the removal of the system.. He asked if the owner had access to that money to
remove the system.
Juba stated that this deposit would be a letter of credit or something similar where if after the 90 days the
system isn't removed then the City would be able to use that to remove the system, but this money wouldn't be
turned over to the property owner to remove the system.
Commissioner Arcand stated that he wasn't clear on number 8a. He stated that this line states that approval
should not be any longer than 3 years.
Juba stated that this must be a typo and the 3 years is supposed to be 25 years, as that is generally the length of a
solar farm contract.
Commissioner Arcand asked if 3(f) is a date that is to be determined or if that is something under review.
Juba stated that the solar farm use could be approved from 1-25 years. She said it was similar to the home
occupation permit where it can be approved for up to 5 years. At the time the applicant applies, they can apply
for a certain term and the Planning Commission or staff will set a recommended date.
Leitz stated that solar farm contracts generally ran for 25 years. She said these projects are expensive and if
there is no possibility that someone can have a term up to 25 years, the chances that someone would want to risk
installing a solar farm is small.
Commissioner Arcand stated that he was surprised to see that the City would allow solar farms within
floodplains.
Leitz stated that the ORC decided that they would be willing to see a project in this location because they did
not want to use prime developable land for solar farms.
Juba stated that many people believe that all floodplains are wetlands, which is not true. She stated that it's
unlikely that solar farms can be constructed within wetlands, but may be able to be put in floodplains.
Commissioner Arcand asked if there is flexibility on screening. He gave an example of driving down
Frenchman Road and the elevation dropping down where people can see over a mile of landscape. He stated
that there is no way a project could be screened from that view.
Leitz stated that the screening requirement was mostly geared towards the screening of a project from
neighboring properties.
Commissioner Arcand suggested that staff look at that section and see if there needs to be a clarification on who
the system is being screened from.
Commissioner Arcand asked if this ordinance will be tweaked as time moves on.
Leitz stated that staff can look at the changes suggested by the Planning Commission and the public before it
moves onto the City Council. She stated that otherwise, the ORC had a project before that consisted of looking
at other ordinances and cleaning them up. Leitz described that solar technology is changing and that the
ordinance could be altered at that time, depending if the change effects the ordinance.
Commissioner Arcand wanted to clarify that approving this ordinance would not mean that it's the end of
looking at it and possibly making changes.
Commissioner Patzner stated that the ordinance reads that if the property transfers, they could transfer the
permit if the solar farm remains intact and operable. She wondered if it would be beneficial to clarify that the
next user has to put in that same financial security for the removal by the City after that 90 day period.
Juba stated that staff can take a look at that. She stated that within the interim use permit section, it says in case
of transfer, the new owner would have to post a financial security before the permit is actually transferred. She
stated that staff can look at that section and see if it would be beneficial to add something along the lines of,
"the new owner must meet all requirements within the interim use section upon transfer."
Commissioner Rosenquist made a comment that staff did have the City Attorney review the ordinance.
Chair Kleissler opened the public hearing at 7:32 p.m.
No one from the audience stepped forward.
Chair Kleissler closed the public hearing at 7:33 p.m.
Commissioner Rosenquist made a motion, seconded by Commissioner Arcand, to recommend approval of the
solar energy systems ordinance, with the stipulation that all comments made from the Planning Commission be
reviewed prior to the City Council meeting.
All Ayes, Motion carried.
Discussion on Met Council System Statement
Juba stated that the Metropolitan Council has completed the system statements for every community in the
seven -county metropolitan area within the Metropolitan Council's jurisdiction. The system statement is a
customized document informing each community how it is affected by the Metropolitan Council's policy plans
for regional systems: transportation, aviation, water resources, and regional parks and open space. This
document is required by state law and intended to help communities review and, if necessary, amend their local
comprehensive plans. This plan will guide growth in the City through the year 2040. Juba explained the City
has 60 days to review the system statement and there is an appeal process, if deemed necessary. She talked
about the land use categories designated for the City of Hugo and explained the new category, Emerging
Suburban Edge, for the western half of the City, which is currently in the Metropolitan Urban Service Area
(MUSA) and will be expected to develop at three to five units per acre. The eastern half of Hugo is in a
Diversified Rural category with a density of at four units per 40 acres.
Juba explained the system statement estimates Hugo's population to be at 29,000 by 2040. This estimate is
down from past estimate of 40,000 by the year 2030, and the Met Council had already guaranteed service
capacity for this. Also a big discussion at the Met Council is the creation of a hosing policy outlining goals for
affordable housing. The goal set for Hugo is to provide for 834 total units of affordable housing between 2020
and 2030. These goals are tied into livable community funding and transportation funding. Juba also talked
about the transportation map and significant changes in the long term sewer service area map, which now shows
the eastern portion of Hugo not in the sewer service area.
Juba explained that staff does not see significant revisions being made to the 2030 Comprehensive Plan.
Forecasts are lower than they were 10 years ago, affordable housing will be a challenge, and eastern Hugo will
be a significant discussion since it is no longer inside the long-term sewer service area. She stated that staff will
prepare a work plan early next year for the Comprehensive Plan update process.
Commissioner Rosenquist commented that he's glad that the City had the population estimates from 2030
approved from the last Comprehensive Plan and has the sewer capacity for that growth because in his
experience, growth is very difficult to forecast.
Commissioner Arcand asked who regulated the movement of the City's MUSA line.
Juba stated that the City can plan the movement of the MUSA line. She stated that she's not sure the MUSA
line will change for the 2040 plan because it was pretty aggressive in the 2030 plan, but if the City believes it
should move, it can plan for it.
Commissioner Arcand asked about the affordable housing requirements. He stated that the City doesn't dictate
the economy or housing market and asked how the Met Council can associate those scores with the ability to
get funding.
Juba stated that further conversations need to be held with the Met Council on how to even track affordable
units within the City.
Leitz stated that the Met Council is looking for the City to plan for these projects, which would be planning
higher density areas if these projects are to come to the City of Hugo.
Commissioner Arcand asked if the Met Council is talking about new construction affordable units to calculate
this score.
Leitz stated that a majority of the points for these scores is based on new construction, but there is also points
for rehabilitation.
Commissioner Arcand asked if there were any points for constructed homes that are being sold at an affordable
price.
Leitz stated that she had mentioned that townhomes in the Waters Edge development sold for very affordable
prices during the recession and it wasn't made clear to her why the City wouldn't receive points for these units.
She stated that further conversations need to happen with the Met Council to establish how they review there
surveys.
Commissioner Rosenquist commented that it is very difficult to come up with new construction affordable units
without subsidizing the projects or providing some other incentives.
Update on Web Streaming of Planning Commission Meetings
Juba stated that starting next year, staff will be recording the Planning Commission meetings and web streaming
them live for the public.
Schedule 2016 Goal Setting and Potluck Workshop
Juba reminded the Planning Commission that goal setting occurs yearly to guide the direction of the
Commission in the next year. Staff is wanting the Planning Commission to set a date for this year's informal
goal setting workshop and potluck.
The Commission agreed that the goal setting workshop will be held on January 14, 2016 at 6:00 p.m.
*This was rescheduled to January 28th at 6:00 p.m.
Appointment to Board of Zoning
Juba stated that Rick Gwynn was on the Board of Zoning prior to stepping down. The Board of Zoning reviews
all variances that are not in combination with another application and any appeals of approvals. Staff is
requesting the Planning Commission appoint a member to the Board of Zoning.
The Planning Commission asked for staff to provide them with the section of the code related to the Board of
Zoning.
The Planning Commission asked for staff to put this item on the next Planning Commission agenda.
Appointment to Ordinance Review Committee
Juba stated that Rick Gwynn was also on the Ordinance Review Committee. The Ordinance Review Committee
reviews sections of the code that staff believe needs updating.
The Planning Commission asked for staff to put this item on the next Planning Commission agenda.
Adjournment
Commissioner Knauss made a motion, Commissioner Arcand seconded, to adjourn at 8:06 p.m.
All Ayes. Motion carried.
Respectfully Submitted,
Rachel Leitz, Community Development Assistant
Agenda Number fi__L
CITY OF HUGO
COMMUNITY DEVELOPMENT`
DEPARTMENT
Memorandum
TO: Hugo Planning Commission
FROM: Rachel Juba, Planner
SUBJECT: LaValle Fields, LLC. Apartment Concept Plan for property located west
of Lions Park.
DATE: January 7, 2016 for the Planning Commission Meeting of January 14, 2016
ZONING: Planned Unit Development (PUD)
1. BACKGROUND:
The property is generally located to the north of 145`i, Street and west of Finale Avenue near
Lions Park. The property owner, Marvin LaValle, has signed a contract with the applicant, Bill
Lentsch (LaValle Fields, LLC), to develop the parcel of land. The property is currently vacant
and contains flat, buildable land with a portion of wetlands.
In 2014, the City approved a PUD General Plan for the 39.56 acre property (16.18 buildable) and
at that time the property was rezoned to PUD. The property was previously zoned Central
Residential (CR -3) with an allowed density of 4 units per acre. The plan included four buildings,
one being the Keystone senior housing facility. The senior housing is allowed up to 130 units,
but was approved for 100 units with the ability to expand. The PUD General Plan proposed three
apartment buildings for a total of 165 units. The two buildings shown on the west side of the
property were proposed to be 3 stories and the building closest to Finale Avenue was proposed to
be 2 stories. The total number of units approved for the PUD is 295 units for an overall density
of 18 units per acre.
The approved PUD General Plan includes two phases. Phase 1 was the senior housing facility
and the reconstruction of Finale Avenue from 145th Street to 146th Street, which is complete.
Phase 2 included three apartment buildings as well as the realignment and construction of Finale
Avenue north of 146th Street to 147th Street. Phase 2 also includes the construction of 147th Street
to Oneka Parkway. Although the construction of Finale Avenue and 147th Street are required
with Phase 2, the right-of-way was dedicated with Phase 1. The land dedication for a portion of
the park dedication requirement was also dedicated with Phase 1.
LaValle Fields . Apartment Concept Plan
Page 2
The approved PUD General Plan includes two accesses into the site from Finale Avenue across
146th Street and Upper 146th Street on the cast side of the site. Generally good circulation was
shown within the site and parking areas, with a connection from the apartments to the senior
housing project. The plan also showed a trail connection from CSAH 8 to Lions Park.
The applicant was granted flexibility on Iand use, density, and building height. In exchange for
the flexibility the applicant committed to preserving a wetland, providing a public trail
connection to Lions Park, creating a stormwater reuse project, and reducing impervious surface
by using underground parking. The PUD approval and granted flexibly is also based on the PUD
General Plan and the conditions listed in the approving resolution.
During the approval process, there were discussions from the PIanning Commission and City
Council on the project in regards to the land use and density, they generally agreed that the Iand
use and density were compatible with the area. There were concerns about the apartments in
regards to architecture and building material, building orientation and placement, apartment
management, and parking. These concerns were addressed with conditions listed in the
resolution for approval of the PUD General Plan. Below are the conditions listed in the
resolution related to the apartment buildings:
The architecture and design of the apartment buildings shall also be subject to:
i. a revised building orientation and footprint to reduce the appearance of the
massing of the large buildings.
ii. recessions and projections in building walls to break up the Iong flat
expansions of the buildings.
iii. breaks and variation within the building material to reduce the monotony
of the design.
iv. a higher percentage of stone and/or brick than other building materials
proposed.
V. No vinyl siding shall be used, cementitious siding is preferred, unless a
comparable siding material is reviewed and approved by staff.
The applicant has submitted a concept plan for the Planning Commission and City Council to
review. The applicant would like to get feedback from the Planning Commission and City
Council on the project in regards to general layout, building orientation and placement, and
building architecture. Staff recommends the Planning Commission and City Council consider the
previously approved plan and approving resolution conditions when reviewing the concept plan.
2. CONCEPT PLAN:
General Layout
The concept plan includes two market rate apartment buildings on the 17.62 acre property of
which approximately 7 acres are buildable. Building A, towards the west, is a 3 story building
and has a 53,600 square foot building footprint for a total of 159,850 square feet. Building B,
LaValle Fields - Apartment Concept Plan
Page 3
closest to Finale Avenue, is a 2 story building and has a 60,500 square foot building foot print for
a total of 121,000 square feet. The applicant has stated that the outlot would be subdivided to
accommodate the development. The applicant has stated that the first phase of the apartments
concept plan would be building A and that the second phase would be building B. The applicant
did not provide a lot layout for staff's review. It is unclear to staff where property lines would be
proposed and what portions of the concept plan would be completed with each phase.
The two buildings shown on the PUD General Plan on the west side of the property, overlooking
the wetland, have become one building (building A) on the concept plan. The building is
approximately 800 feet long and is linear with a small bend in the middle. The building is shown
having 97 units with a combination of underground and surface parking. Building B, closest to
Finale Avenue, has a larger foot print than previously proposed in the PUD General Plan. The
building is shown having 73 units with a combination of .underground and surface parking.
Building B has a more compact design and with some revisions would seem to reduce the mass
of the building. The total number of units shown on the concept plan is 170 units, which is more
than the 165 units allowed by the PUD General Plan. It is unclear to staff whether the applicant
would be asking for a higher number of units during the approval process.
A portion of the concept plan shows a building and the gazebo on property that is not controlled
by the applicant. Staff is not opposed to this area being added to the project, but it should be
resolved with the first phase to ensure proper planning. The concept plan shows building A is
planned around the uncontrolled property, but building B and the gazebo are included on the
uncontrolled property.
During the PUD General Plan approval process the City Council added conditions to the
resolution regarding the apartment buildings. The first item required a "revised building
orientation and footprint to reduce the appearance of the massing of the large buildings". The
concept plan shows two larger buildings, and one in a generally linear design. It is in staff's
opinion that the placement of the building to the west and the very long linear design does not
meet this condition. It has been discussed with the applicant that the total square footage of the
building is not the issue, it's the linear design. The same number of units, or even more units,
could be included in the building if the massing of the building was reduced. This could be
accomplished with a compact building design that wraps around itself or a non-linear foot print
to break up the long expansions of the walls. There are many good examples of apartment
buildings, the same size or larger, which have used a compact design or non-linear footprint to
reduce the massing of a large building.
There is one access into the site from Finale Avenue between Upper 1461i Street and 1471' Street.
In general this access will work, but the parking area does not have good circulation and includes
a long dead end aisle. Staff recommends the plan be revised to allow circulation and eliminate
the long dead parking aisle. The access into the underground parking area is located too close to
the access into the site. This access will be busy during the morning and afternoon. It is a
concern to staff that there will be a congestion issue at this location due to its proximity to the
access into the site. Staff recommends that the access into the underground parking be relocated
with the consideration of stacking of cars during busy times of the day.
LaValle Fields - Apartment Concept Plan
Page 4
The PUD conditions require a trail connection to the existing trail on the senior housing property
to Upper 1460' Street to access Lions Park. This has not been shown on the concept plan. There
are sidewalks shown within the plan connecting the buildings to the openspace in the center of
the site. There seems to be a lot of space within the concept plan that is not used efficiently. It is
good that there is a common open space between the buildings, but the buildings could better be
oriented to relate to each other and create a large common area with several amenities.
Building Architecture
The applicant has provided building elevations and renderings of the proposed apartment
building A, but has not shown a concept for building B. The applicant has stated that the building
materials for building A will be a combination of various types of stone with cement board
siding or other comparable siding material. The plans show a pitched roof with dormers along
the sides. There are gables periodically along the walls over entrances and in-between. The
colors are generally good, but the number of different colors should be reduced and be comprised
of compatible earth tones. The building could provide deeper overhangs and include a
combination of horizontal and vertical siding design. There was not a calculation submitted for
the amount of stone versus other building materials, but it appears more stone needs to be added
meet the required ratio of 50% per the performance standards for multi -family residential
developments.
The plans show the fagade being broken up with horizontal projections and a combination of
building materials. There are windows along the sides of the building projections. There is a
significant main entrance to the building, including secondary entrances that are visible and
clearly defined. The horizontal projections at the secondary accesses into the building could be
extended vertically to the third floor, instead of only being on the first floor. Multiple breaks in
the roofline, as encouraged in the Multi -Family Design Guidelines, may help further break up the
facade. To accomplish four-sided architecture, the back of the building will need some work. It
is lacking vertical projections that are created on the front of the building. The back of the
building will be very visible from the west along 147th Street.
Although there are some good elements in the architecture of the building, it does not eliminate
the look of a very long building. The walls of the building, even with the decks and projections at
the entrances, are still generally flat and long. Building B, if designed well, could help break up
the massing of Building A, but that is unknown at this time and it remains unclear whether the
building would be built.
Apartment Management and Amenities
The applicant has stated that building A would be owned and managed by ARMC Properties.
They have stated that there would be on-site management and underground parking. The
amenities for the apartments that the applicant has listed in the narrative are, a spa/exercise room,
community room, attached deck, and dog park.
The applicant is showing a gazebo in the center common space, as well as a play area/basketball
court on the north end of the site. The center common space would need more than a gazebo to
be a valued amenity to the project. If the applicant wants to provide additional common space for
LaValle Fields - Apartment Concept Plan
Page 5
a play arealbasketball court, another location should be considered. Although the applicant has
not provided staff with a plan for the lots lines and what would be built for each phase, it has
been stated by the applicant that the center common open space would be built with phase 2.
3. CONCLUSION/RECOMMENDATION:
Staff does not have concerns with apartments as a land use or the proposed density of the project,
as this was expected and approved with the PUD General Plan. Staff's primary concern is with
the massing of the buildings. The buildings will appear extremely long and large on the site. This
could be addressed by providing more numerous smaller buildings, or alternatively by providing
a more dramatic undulations in the shapes of the buildings. The architecture of building A has
good elements, but it is in staff's opinion that a more compact design of the building or a non-
linear footprint would further minimize the expansion of the long walls. The architectural
elements alone do not break up the large massing of the building, it still seems very long.
The applicant received flexibility for a higher density based on the approved PUD General Plan
and conditions listed in the resolution. There were a few items that needed to be worked on and
conditions were listed the resolution to address these concerns. Phase 2, the apartment project
included buildings that related to each other, shared parking and amenities, and connections to
Lions Park. It is in stars opinion that the concept plan as lost important elements from the PUD
General Plan in which the City was comfortable with granting zoning flexibility. The applicant
has stated that the property will be split and it remains unclear where property lines would be
proposed and what portions of the concept plan would be completed with each phase. The
apartment phase will be further divided, and could be sold to different developers, creating
standalone projects, not a planned development. This changes the plan and loses important
elements such as, relationship between the buildings, cohesiveness in the project, shared
common openspace and amenities, and trail connections.
Staff has concerns with the viability smaller, independent apartment projects. The concept plan
concentrates on building A, leaving building B an afterthought with no commitment that it will
be built. It's unclear if the amenities listed and shown on the concept plan will be shared between
the apartments. In general, apartments with lower than 200 units can succeed as long as they are
part of an overall development and with shared amenities. As the applicant has stated the
amenities are very important in apartment projects and are a draw for the target market. Staff
believes that the planning for building B, along with the parking and common areas, is just as
important to the development as building A and the property should be designed as a planned
development.
The concept plan does not meet the intent of the PUD approval in regards to reducing the
appearance of the mass of the large buildings or an overall apartment campus layout. The layout
of the site does not seem to function well for an apartment development in regards to access,
circulation, and common openspace. In addition, the location of the entrance into the
underground parking and the circulation within the interior parking lot needs to be thought
through and redesigned.
LaValle Fields - Apartment Concept Plan
Page 6
Staff recommends that the Planning Commission and City Council provide feedback on the
concept plan to the applicant. Below are areas the Planning Commission and City Council should
provide feedback on:
• general layout of the concept plan
• development phasing
• building orientation and placement
• massing of the buildings compared to the approved PUD
architecture and building material
• trail connections, common outdoor spaces, and amenities
ATTACHEMENTS:
1. Location Map
2. Engineers Memo dated Friday, January 8, 2016
3. Applicants Narrative dated January 6, 2015
4. Approved PUD General Plan for LaValle Fields
5. Proposed Apartment Elevations from PUD General Plan
6. Approved PUD General Plan Resolution
7. Concept Plan dated December 28, 2015
8. Concept Plan Building Elevations and Renderings dated January 7, 2016
LaValle Fields
Apartment Concept Plan
Vicinity Map
47
bar
Site Map
1 inch = 250 feet W E
s
tv
tide
S �7 At -
7W'14' Y
M1 �
I
L
F ,r,Ila
�n �L
Site
. .
,
WS
k Building a legacy —your legacy.
January 8, 2016
Ms. Rachel Juba
City Planner
City of Hugo
14669 Fitzgerald Avenue North
Hugo, MN 55038
Re: Concept Plan Review
LaValle Fields Phase 2 — Hugo Apartments
WSB Project No. 1904-91
Dear Ms. Juba:
701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763-541-4800
Fax: 763-541-1700
We have completed our review for LaValle Fields Concept Plan Review. The following information was
received for review:
■ LaValle Fields — Hugo Apartments Site Plan, dated December 28, 2015
Based on the review of the site plan, we offer the following comments related to the application:
Transportation and Roadways
1. A detailed evaluation of the roadway needs to serve the development of LaValle Fields was
completed during the LaValle Fields Preliminary Plat process. As part of the approvals related to
LaValle Fields, Phase 2 of the project triggers the need to complete the following roadway
improvements:
• Finale Avenue from 146th Street to 147t` Street within the right-of-way dedicated as part of
LaValle Fields.
147th Street from Fitzgerald Avenue to Oneka Parkway, which is a collector roadway in the City's
Comprehensive Transportation Plan. A portion of this segment is existing and provides access to
Lion's Park, and the remainder would be a new roadway segment. The roadway would be
designed to a width of 32 feet, and include a bituminous trail on one side of the road. The final
design elements and financing for this segment of roadway will be determined as the project
moves forward.
Stormwater Management
Stormwater runoff on the site will be collected in a new storm sewer system. The system will
discharge to a pond located along Branch #3 of JD #3 (Clearwater Creek) east of Oneka Parkway.
The pond was preliminarily sized as part of LaValle Fields, and would accommodate runoff from the
City Park, the proposed construction of 1470' Street and Finale Avenue, as well as Orchard Hills and
the proposed Phase 2 development. The final design of the facility will be completed if the project
moves forward.
Equal Opportunity Employer
wsbeng.com
KAPemnalVVdie Lam Field$Ph 2 Cone _,pt Plan ReMm Cl D616.doa
Ms. Rachel Juba
January 8, 2016
Page 2
2. The project will include a stormwater reuse system, with the intent to provide irrigation to the
development property as well as Lion's Park. The design of the system, implementation schedule,
permitting, and maintenance responsibilities will need to be completed if the project moves forward.
3. The proposed stormwater pond is within an existing FEMA floodplain area. As a result, there will
need to be modifications made to the existing regulatory floodplain. We expect that this issue can be
resolved during final design, once the specific impacts can be quantified.
4. The stormwater pond, once constructed, will allow for the removal of the temporary pond constructed
as part of the Orchard Hills Senior Facility since it will be designed to accommodate the entire
development property.
Utilities
1. City utilities were extended to the south end of the Phase 2 site as part of the Orchard Hills project.
City utility extensions will be required within the realigned Finale Avenue, as well as 147th Street, in
order to provide service to adjacent properties, as well as to complete. a water connection between the
City Well and 14611 Street so that the required flow and pressure is available to serve the
development.
Wetlands
1. A wetland delineation has been completed for the entire portion of the property located east of Oneka
Parkway. The wetland delineation report has been approved by the City of Hugo (as LGL). We do
not anticipate wetland impacts related to the building construction; however, there may be impacts
related to the extension of 147th Street or as part of the pond construction which will need to be
addressed if necessary.
2. The proposed stormwater management pond near Oneka Parkway is preliminarily designed in a
manner that will affect the existing Branch 3 Judicial Ditch #3. The concept is similar to the existing
pond located within the northwest quadrant of the CSAH 8/Oneka Parkway intersection. There will
need to be coordination with the Rice Creek Watershed District, as well as the DNR, moving forward
to develop a final layout, plan and wetland/ditch permit.
Thank you for the opportunity to provide comments on this project. If you have any questions, please do
not hesitate to contact me at 763-287-7192.
Sincerely,
WSB & Associates, Inc.
a edy, PE
i Engineer
cc: Scott Anderson, Public Works Director
Steve Duff, Senior Engineering Technician
Katy Thompson, Water Resource Engineer (email only)
Lydia Larson, Assistant City Engineer (email only)
KAPerennAL; Ale Larson\Gty of Hup\Lavak Fields Ph 2 Concept Plan R&Aew03 0816.dou
ECEI E
JAN 6 2016
Bl(• l5-6��
To Whom It May Concern,
Partnership
Investment
Group
On behalf of my client ARMC, I am providing some basic project information via this document which will
serve as the project narrative. Consistent with our PUD approval, phase one of 165 unit approval will consist of 97
market rate apartment units. The market rate apartment units will consist of 2 -bedroom and 3 -bedrooms units
and the building common space is to include amenities found in upscale developments. The configuration of the
building will provide the necessary maximum use of land available for this phase while creating an aesthetically
pleasing living environment. The existing out -lot shall be split to accommodate the structure while leaving the
balance for a future phase.
The majority of renters today tends to be younger in age and is single or dual -income families without kids.
However, we are also starting to see a trend of empty nesters starting to look at rental property as an option.
Recent surveys also show that today's renter tends to be a more active user of amenities and public spaces than
they were in the past and are looking for rentals that will accommodate to their pets as well. To meet these
needs, the development will have a dog park located to the west of the building. Amenities provided to residents
will consist of a mini -spa, a community/party room just off the community balcony and an attached deck. We
have promoted the newly designed Lions Park as a great amenity as well, which we will be offering outdoor
exercise classes. The facility will have on site management and last but not least, under -ground parking — the
most demanded amenity by renters in this part of the country. The target rent for this facility will beat and above
the median income of the area.
I'd like to add that I am very excited about this project as it will bring a much-needed upscale apartment
building into downtown Hugo. This building will be a boom to the city both aesthetically and economically.
Communities with stronger population growth generate the largest increases in the residential property tax base
which in turn increases the municipal budget leading to local government spending on infrastructure thereby
raising property values, thus increasing further the residential property tax base.
Sincerely,
William M. Lentsch
6607 145' Circle N. Hugo, MN 55038 (651) 2164253
1.1
Wt
r --
i
CNALOW8
PRQmpm
UNIT TYPE
APARTMENTS 363 (2 PER UNIT + 1 PER 5) B 5
SENIOR HOUSINQ 64
YE11OR CAREE 10 1 �PERR6 1 +s1
109wem ai PER UNM
OWL 13-14M
OFOONNAWM
001M t14. 7018
,
p
If
�a
`r
r
Ilk'.Y F.. 6/
T r -
r — T
` ! �pl �
I i
Aptxci-rd
PkA 0 Georrer
P0VN
J g O) PAOM ARK AREA'
I Ar �
4
SITE PLAN
L.AVALLE FIELDS P.U.D.
rLci
0.
g
E.
SFW:
PARDMOKP
VASUPAERrappmr.
LLO
le
umPLAMM
A ENCi7VWiiNo
PLOWE
amm~'m
9��
LM AKE16ItNOM4
PFl7m1tlP1)„1-,7
PAX#M)5W-ff 1
NORTH
1�
- LEM 10
chi F xi
DRY APAK I MI=N
D. MN �
Plao
3 STORY APARTMENT
HUGO, MN
5b
Y
L-
RECEIVED
Nov i 2013
Per 13-0-1
lei -D `l
RESOLUTION 2014-3
APPROVING PUD GENERAL PLAN FOR LAVALLE FIELDS LLC FOR
PROPERTY LOCATED WEST OF FINALE AVENUE NOR'T'H OF
FRENCHMAN ROAD (COUNTY ROAD 8)
WHEREAS, LaValle Fields LLC has requested approval of a PUD general plea to allow
295 senior housing and multi -family residential units on the 29.17 sere property legally
described as follows:
(See Attached)
WHEREAS, the Planmag Commission has reviewed $re PUD general pian at a duly
called Public Hearing and recommends approval, and;
NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CTTY COUNCIL OF
THE CTTY OF HUGO, h4 NNESOTA, that it should and hereby does approve the
request by LaYalle Fields LLC, subject to the following conditions:
1. A PUD general plan is approved to allow the erection of 295 senior; housing and
mufti -family residential units. The development shall be am rutted in accordance
with the plans and application received by the City on October 21, 2013, and
revisions received on December 2, 2013, except as amended by this resolution.
2. Approval is contingent upon City Council approval of the requested retuning of the
29.17 acre property and preliminary plc#,
3. The PUD general plan is approved based on the finding that the proposed project is
consistent with the City's C.omprehasive Plan.
4. PUD flean'bility is granted to allow:
a Flexibility to allow senior housing and apartments as a land use
b. Flan'bility to allow a density of over 10 units per acre, where 6 units per
acre aro required.
a Flay Wlity to allow the building height to a maximum of 50 feet to
accommodate 3 story buildings, where 35 &ret is required by otdinaaoe in
the u xWying zoning district.
5. No dewelopment is wwved for Oudot C. Future developer of Outlot C will be
subject to the City requirements at the time of developmrent.
6. All uses allowed in CR -3 zoning disW am permitted uses m the Lavalle Fields
subdivision. Additional permitted uses hdude senior housing and. apedmet.
Resolution 2014-3
Page 2
7. The preliminmy phaft plan is Sa mlly approved.
a. Phase 1 shall include:
i. A maximum of 130 senior housing units.
ii. Finale Avenue between 14P Street and 140 Sheet shall be
raaansiructod as an ud m section roadway to a width of 26 fed
with the &* layer ofbitundnous prior to the issuance of
C tificate of Occupancy for the lot buuNW&
iii. A 50 Enol wide roadway easement shall be dedicated for the
realignment of Finale Avenue fiom just south of Upper 140 Street
to 147° Sheet, as shown on the plan.
iv. A 60 foot wide roadway easement shall be dedicated for the
extension of 1476 Street fiom its curroat terminus to Ondm
Parkway, as shown on the plan.
v. The 1.76 acres (Outlot A) shall be dedicated to the City to satisfy
77% of the parkland dedication requirement.
b. Phase 2 shall include-
GA
nclude
GA maximum of 165 apartment units.
ii. The entire length of 147x' Street to Owh Pa&way shall be
cora "led with the first layer of bituminous prior to issuasux of a
Certificate of Occupancy for the 1st building,. The de;vdoper shall
be 'ble for 65% of the total project costs, subject to City
Council review and approval at the time of site plan approval.
iii. The entire length of the Mage pxmm reslwmart Rough the
project shall be constructed with the first layer of biftniuous prior
to the issuance of a CCdfiMft of Oocanpaacy for the 1st building.
Iv. The remaining 23% to satisfy panic dedication req is shall
be paid.
8. The developer shall submit final site plans, building elevations, oft rcat impsuVement
plans, qty plans6 8?fS ark drainage Ph+ hndmqft Plana, lighting and
srgaage plans along with the required had use applications for each phase of the
devellopmenl.
ResobWon 2014-3
Page 3
9. The developer shall evaluate the feasibility of a water rein pmja t for the
devolopahheuI and to accommodate Lions Park. If a water ranee project is f+eWb* as
evaluated by City stair it shall be cmMucted.
10. The building secs for the PUD areas follows.-
a.
ollows:
a. For portions of the building that are over 35 feet in height:
i. 50 foci from all exterior property lines, except due areas that abut a
public $that right- of -way.
b. 30 feet from arterior property lines.
a 30 feet from all public right of way.
d 10 fed faohn all interior property lines.
11. The applicant must comply with the following, prior to Final Plat and Final PUD Plan
application:
Arr dbd urat nerd Design shhndards
a. All buildings shall meat the requirem Is in the Multi -Family Design Guidelines
b. All budding elevations shall receive nearly equal treatanent and visual qualities.
c. All buildings within the development shall be cohesive in architecture, design,
colors, and building materials.
d The Wddtedaro and design of the apartment buildings shall also be subject to:
i. a revised building orientation and footprint to reduce the
appears me of the massing of the barge bufldb*L
ii. rwessions and projections. in building walla to break up the long
flat expansions of the buildings.
iii. breaks and variation within tho building material to reduce the
monotony of the design.
iva higher perces tags of stone and/or brick than other building
materials proposed.
v. No vinyl siding shalt be used, ocamtitiona siding is prof+crred,
unless a comparable siding material is reviewed and approved by
$tai£
e. The trash enclosure shall be screened with materials consistent with due building
material and shall be reviewed and app vved by sta4£
E The developer shall submit a design palate for the entire pn4ed for City review
and approval. The palette shall mdude colors for awnings, siding, shakes
• Resolution 20143
Pulte 4
shutters, shingles, brick and stone. Building colons and materials shall be
cohesive for all buildings within the PUD.
g. All giOUDdaevel mechanical units shall be low profile and located to the side or
rear of the budding and shall be screened fiem view of adjacent properties.
h. The internal roof drainage system that shall be iced into the building design
and shall be reviewed and approved by staff.
�8 and Lighdog
i. TUe landscape plan shall be revised to include the number, site, and type of trees
and shrubs required by Section 90-181 of the w inance. The final plana must be
sul m ued for review and approval by staff.
j. The landscape plan shall be revised to be planned together and not separate for
each phase.
L T1ne openspaoe between the buildings within the dowdopment aRhull be included in
the overall landscape plan. The design of the landscaping shall be active to
enhance the acsthatic of the am
L There shall be a landscape buffer between the senior housing facility and the
nadential banes. The landscaping snap be of a sufficient height and size to
adequately provide a burr. This shall be reviewed and approved by staff.
in. Exterior light" shall be oonsideat thraugbout the development. All lighting
shall be shielded to preveft glare and light trespass, as required by Section 90.239
of the ordinance. Lighting details should be submitted for City review and
approval to ensure a 90 -deg w an off is provided and bulbs are net visible.
Exterior lighting shall be directed down and shielded ficin Aacwt properties and
roadways.
n. The maximum height of parking lot lighting adju at to reddeodal arose shall be
20 feat.
o. The applicant shall provide an overall sign plan for the development.
S&eeb, Paeldng said UdOn
p. The parking cakestions for the senior housing facility shall consider the office
arca. The calculaboons shall be reviewed and apprmred by WE
.
• Resolution 2014.3
page 5
q. The parking calculations for the apartments shall consider overflow perking for
gwwW. The calculations shall be reviewed and approved by staid
r. The parking lots within the development shall meet Section 90-253 of the
ordimsnom
s. Construction details of the fire lane for the senior housing facility shall be
reviewed and approved by staff
Sideways and Trails
t. The sidewalks within the development shall beim and concoct to the
public trait through the development:
u. A 10 foot wide 60 easement shall be dedicated for the public trail. Tho end
trail location shall be reviewed and approved by staff,
v. Tho trail locations shall be setback 10 feet from the neighboring property to the
weal.
w. A #rail shall k installed on 147 Stred with the construction of the, road.
12. The applicant shall comply with all conditions is the City Em's letter dated
December 12, 2013.
13. Each unit in the apartment Wildings shall include a minimum of two bedrooms.
14. The apartment complex shall include on site management.
13. The applicant mud comply with the Mowing, prior to release of the find plat for
reoowbg'
a. The 1.76 acres (Oudot A) shall be dedicated to the City to satisfy 77% of the
parkland dedication requirement
16. The applicant must comply with the following, pier to PUD Find Plan or site plan
approval:
L There shall be notification and a naghbcrrhood meeting for the surrounding
properties at the time prelimin y construction lana are deified for r+000nshuct on
of Finale Avenue between, 145x" Street and 1W Street. This matting will provide
s • itesoW m 2014-3
P&PV
the avrounding property owners with information on the design of the road and
timing of construction.
17. The applicant must comply with the following, prior to issuance of building permits:
a.Prior to the issuance of a building permit for the first buil ft in Phase 1, a
segment of F sale Avew n right of way shall be: dedicated to the City begWaing
approximately 385 feet south of 145* Stred right of way and acterdmg to CSAH
8, with legal description subject to review and approval by do&
b. Tho remaining 23% to satisfy the park dedication requirement shall be paid with
the first building in Phan 2.
c. A PUD final pian must be approved for each phase.
d. The: applicant most record the final plat, easements, deweiopment agreem eso, etc.
at Washington County. Proof of recording must be provided to the City.
ADOPTED by the City Comcil this 3rd day of February, 201
r
Tom We idt, Mayor
ATTEST:
---
Michele Lindau, City auk
Has WAMhMM
NN
PnMiE�iNNfM
nlEnmma
That pgrt of the East Half of the Northeast iivarter of Section 19; that part of the West Half of the
Northwest Quarter of Section 20, which includes Lot I of County Auditor's Plat No. 7 of the Village of
Hu moll in Township 31 North. Range 21 West, Washington County, Minnesota, described jointly as
follow
Cornmencli ng at the point of intersection of the west fine of Section M which line is also the west
line of Lot 1 of County Auditors Plat No. 7. with the north line of the Hugo — Centerville Rood, said
point of Intersection Is 33 feat north of the west quarter corner of Section 2Q thence north, along
the west fine of Section 20, a distance of 154 feet to the point of beginning; thence cost, parafiet
with the South line of Lot 1 of Audltcr's Plat No. 7. a distance of 331 feet. more or less, to a point
distant 280 feet west of the southwest comer of Lot 6, Modc 7 of the Village of Huga; thence north,
a distance of 150 feet; thence east. Parallel with the south line sof Lot 1 of County Auditor's Plat No.
7, a distance of 250 feet to the point of Intersection with a line drown poralM with and distant 30
west of the west line of Blocks 2. 3. 6. and 7 of the Village of Hugo; thence north, ahmg said
parallel line, a distance of 986 feet, more or less, to the point of intersection with a line drawn
parallel with and distant 30 fest south of the north fine of the SW 3t — NW 9 of Stiction 20; thence
west along said parallel line, a distance of 123.9 feet to a point distant 843.9 feet west of the east
line of the SW 31 — NW X. thence northwesterly. along the southwesterly Ilene of a trod described in
Book 90 of Dewier page 206, a distance of 900 feet to the most westerly comer of sold troct;
thence North 50 degrees East, along the westerly line of said troct described in Book g0 Deeds, page
206, a distance of 400 feet to the northeast comer of the Si/2—NEi/4—NEi/4 of Section 19;
thence west, along the north fine of the S1/2—NEi/4—NEI/4, a distance of 1321.3 feet to the
northwest comer of the S1/2—NEi/4—NEI/4 of Section 19; thence south, along the west line of the
NEi/4—NEI/4 of Section 19. a distance of 641.5 feet to a point distant 18 het north of the
southwest cornet of the NEI/4-NF1/4; thence North 88 degrees 07 minutes East a distance of 592
feet to the mast northerly comer of a tract described In Book 78 of Deeds, page 524 which point is
on the mirk elins of Branch No. 3 of ,Aldi W Ditch No. 3. Washington and Md*a Counties. Minnesota;
thence South 73 degrees 47 minutes East. along the northerly line of said tract described in Book 78
of Deeds. page 520, a distance of 600 fest to the northeoit corner of sold tract; thence South 8
degrees 55 minutes , along the easterly line of saki tract described Soak 76 of Deeds. page M.
a distance of 700 feet to the northwest corner of a trail described in Book I86 of Dsede, page 14;
thence South 73 degrees 47 minutes East, along the northerly line of sold tract described in Book
166 of Deede. page 10, and along the northerly line of a tract described in Book 167 of Deeds, page
395, a distance of 125 feet to the northeast comer of said tract described in Bock 167 of Deeds,
page 395x; thence South 8 degrees 55 minutes West, along the easterly 1Me of said tract described in
Book 167 of Deeds. Page 395. a distance of 280 feet, mon or ices► to the northerly line of the Huge
— CantwWle Road; thence southeasterly. along said northerly rood fine, a distance of 170 test. mare
or less, to the west line of a tract described in Book 138 of Deedsf pails 506; thence north, along
the west line of sold tract described in Boolt 138 of Deeds, page 5%. a distance of M fest, mons or
less, to the nor wovt comer thereof. thence east, along the north line of said trod described in
Boot 138 of Deeds, page 506 and along the north line of tracts described M Book 133 of Dads„
page 218 and Book 120 of Deeds, page 241, a distance of 64 feet to the postof beginning,
containing 39 acres. more or lea, and subject to the existing Branch No. 3 of Ditch No. 3,
Washington and Anoka Counties, Minnesota, and also subject to other somwwts and re notions of
record. Including any right of title existing M the adjoosnt Hugo — Centerville Road, to the centerdhw
thereof.
Which Ilss easterly of the easterly right of way line of 0neko Parkway North as described in Document
No, 3663109.
RECEIVED
DEC 0 2 2013
Per 3-6%% -o
WETLAND
----------- - -- —
47TH ST N— —
_-7-----
e • ,
BUILDING A:
3 -STORY APARTMENT BUILDING
97 UNITS
(71) 2 BDRM UNITS
(26) 3 8DRM UNITS
210 PARKING REQ'D
8
�U
�a
E�
:7
u
Op�a
Im
la
msLo
53,600 FOOTPRINT u
159,850 SF APARTMENTS
53,600 SF UNDERGOUND
PARKING
BUILDN' B:
2 -STORY A�ARTMF,NT BUILDING
73 UNITS
(49) 2 BDRU UNITS
(24) 3 BDRM UNITS
:64 PARKING REO'D
60,500 SF FOOTPRINT
121,000 SF APARTMENTS
50,500 SF UNDERGOUND
PARKING
PARKING REQ'MTS = 2 PER UNIT
PLUS 1 PER EVERY 5 UNITS:
374 REQb
374 PROVIDED
OUTDOOR COMMONS AREA = _
27,000 SF (9.700 REQUIRED)
/
Q
C'IS
arm
[
G
t�
Lim
C -A
1
W
L
o
WETLANDLR
r'
pp
C�
i f
T
I
AL
7Fr3r
I 1 I
E ROF�OSED
f I
I 15 1
I
13ULDING
B
-
I I
I
------------------
--
EXISTING BUILDING
EXISTING
-1�
.qi
r �\
r
------------.-----
146TH ST iJ
S1
` LOT
z0 a
—
BUILDING A:
3 -STORY APARTMENT BUILDING
97 UNITS
(71) 2 BDRM UNITS
(26) 3 8DRM UNITS
210 PARKING REQ'D
8
�U
�a
E�
:7
u
Op�a
Im
la
msLo
53,600 FOOTPRINT u
159,850 SF APARTMENTS
53,600 SF UNDERGOUND
PARKING
BUILDN' B:
2 -STORY A�ARTMF,NT BUILDING
73 UNITS
(49) 2 BDRU UNITS
(24) 3 BDRM UNITS
:64 PARKING REO'D
60,500 SF FOOTPRINT
121,000 SF APARTMENTS
50,500 SF UNDERGOUND
PARKING
PARKING REQ'MTS = 2 PER UNIT
PLUS 1 PER EVERY 5 UNITS:
374 REQb
374 PROVIDED
OUTDOOR COMMONS AREA = _
27,000 SF (9.700 REQUIRED)
0 30' 60° f70'
SCALE. I"= 60'-0"
S FI1.T. O`
C'IS
arm
[
G
t�
Lim
C -A
1
W
L
o
0 30' 60° f70'
SCALE. I"= 60'-0"
S FI1.T. O`
i
,�1 1 7. yy�YYG,�F� I _7i 1W .C�EV
V ►t ' . %qlevk�
`�
..f'_'�` - 1TJ `LTI - . � r i - °n5`rirl•-Ti�'yl "G i -
�^�� 'F
Ly �.Ti (26) THREE 8EOI (8) TMRFFHEORMJMS
_g \
— — — ne. lie - BASPNE.'TFLOG
93, 53,600 SF
i3E P:iRIBI STALLS
HASF'%FNT.'
412- 10 3.7 53.600 SF
T)
L�
LU c
��
�
Qwo
dQD
o�T-
a
cz
0
0
O
12-23- 15
16' 32'
SCALE 1132" 1'-0"
84'.0..
f6-0' 2i-6' 16'-0' f2'-0' 12'6' 16'-0" 1T-6' Id' -0' S4'6' 16'-0' 73'3' I;-9' i6'-0" 12'.G 23'-b" I6'-0' 24'4" 16'-0' 16
40.
off
o
—111F S 19•-m •°- f I zr'-z ri�j45 9 O�
20•' 2"' z0' -c• WyV(
o
20'-1" 200" 2-0' -0 20'-0" 20W 20-• n=0" 20'0' 20'-20'-D' -0
I H 127 PAR NG 7' �+•1 W
22'-93/4 Sib b Va 1ph O Q Lo
Lo
_ 3a 9 _ 79 a7.J- b 7
3
Mia
o gs
e6'•''i� un7.nr r ���•�S3
1J'-0" f3'^6' 16.1' 2i-6' 76-0" P9'-0' 13'-6' 16=0 24=6' 16'-0" I2'0" 24'-0' 23.i6.0
383'-0" / 7
BASEMENT FLOOR PLAN
Lu
U 1
In
V ,
Z
Q Is s O
QD
2q' -o' 16'-0' 23'-6' 12'6 !6'-0' 13'-9' 13'-9" IS' -0" S4'-6' 27'-6' I6'-0' 1='-6' 12'-e" 2r.6,12':" r n
S//qb
34
7
I 0.
" I I m - 20'-0" f9'-0'
e 70'0" 20-0 20'0' 20'4' 20=0" 20.0 -7-0
21-2 7/ 23-0' 10'4' 20P' b w
8
22..0. w
18,-0
314 e O
/ .A�' dJ -/1 4 • `_. _ _ _1 Vit f' r :, 8 30 I IL
' 25
o ' m
ED
ti L ' ai
3!:' 76.0 24 6'-
'-E' I0" 24'-0' 72.0 16Y 13'-9' 30'-0' 13'-9• 76•,0" 14•4" 16'4" 13=6 744.0• 16''0• 24'S" 16'-0' 13'fi"
14'3"
383'-f
BASEMENT FLOOR PLAN 12-25- 15
0 6' Is 32•
T1� .
SCALE' 1/16' 1'-0"
5a'_6
89'-0"
r2'd• Ir' -0. 13'-9" 13=9• 16'-B' !2'.0•=Ja.OD6RM
1088ORa9704BORN 2 ROAMM7 FM
� ¢
•• ,, � 171I1724's:I
,
\
C
LE
L
GROUND FLOOR PLAN
1 s a -1'-0
0 5.3' 10.6' 21.3'
SCALE:3132"
\ . PAnO
N�
C r -i
Q�
CooJU�
U W
OO�WU
� Q Q
C)
m
00
(i.QNM
Qx�nC
o � B � a •
o 48�C.
nFg�
^fie
u
`
I�
W y , yy
4c
G
d� LuO
o'=
0 g
D
t It
O �
LOBBY
}amsr
k` I
Cl
�•L�'S 1} cAr:NrY 1 ll
r"
2 BORN
2 BURM
1
I
J
q
103
105
I
2 8ORM
2 BORN
p
1
I
I
I
_
1
I
I
I
I
�
�
�
I
� �
I
U7 ON
Lq
1
m
I
�---
�
13'-C
I6'-0•
I2'-3'
12'3"
16'-0"
14'-0"
i3'd'
lei"
12'-3•
t2'-3"
I
\♦
83.,3.
"t3"
25'_6•
I
B4.-0"
383'-0"
GROUND FLOOR PLAN
- --- - --/ I v
379'-0"
I r�
16'-0"
i2'-3'
IC' -0"
23=6"
r- - - - - - - - -
I
112
1
1!'8
1
110
2 BORN
2 8011M
2 9ORIA
I
I14
3 6ORM
1
❑
a�I
J i
a
I
I I
r<
LJ
�\ J
- 1
nCl
-�
L- %�
LJb(t
GROUND FLOOR PLAN
1 s a -1'-0
0 5.3' 10.6' 21.3'
SCALE:3132"
\ . PAnO
N�
C r -i
Q�
CooJU�
U W
OO�WU
� Q Q
C)
m
00
(i.QNM
Qx�nC
o � B � a •
o 48�C.
nFg�
^fie
u
`
I�
W y , yy
4c
G
d� LuO
o'=
0 g
D
t It
O �
LOBBY
}amsr
k` I
Cl
�•L�'S 1} cAr:NrY 1 ll
r"
379'-0"
_1 l 93'-9" �
73.g• i5.Q. 11..7• 12'-3' i6'-0' 2'-6. 12'-fi. 13._9.
t
_ U
�
' 1 u]
r� wy
126 C]
121 121 z mRM V
z aDR;.; z e3RM 1 � OO 'z A
O^
O oq
f oq
r
r 1:4 U-)
10 1 r � I HF
I
/ I9
1 Po � L
r ItaLa
iinlc� 6
r22
6
3 63RM
,k. ! i6 o 1 2 83RM
3 AORM 3 8DR:4 8 I I 1
\
V__
1 _
f 23'.7^ r6'-0° ]Y-3• 12'.3. I6.0" 24'.0• 12�-p�� 16,-6. 13'-9" 8• \�14-0� '-0
104' -
GROUND FLOOR PLAN
/379'-0" _.. 32,-9.. 2'-Q 1/i6"
LLJ
.3" 16'-0" 13=9'13,9, 16'.J• r2'6" R' -O' 16'-0' 13'-9" 13'-9" 12'-6" C)
cZc
L
Q Il -i O
I its QD
28DRM 127 131
1 18DRM127 2 ROW 2 BD.4M
O O
3731
a
I 731
F-
0
O 7 a LF'
I
C—
e 0
�30�I Q
1 I �
y 1 ® I LL-
L �
8 z
m126 I a
I :M _
2124
BORN Ipp I
Ize
1 2
2 &ORM BDRM I
R
I ? of
I � 14.3.. Ii.p• I
12'-3• 12'-3' 15'.p' 13'-6• 14'-0' I6•-0' 12•,3" 12'_3• 1C.9' / zs:Q• t3� ' m
83'-9"
5.3' 7Q.6' 21.3' A2.2 B
i / I SCALE: 3/32°
GROUND FLOOR PLAN
3.."' 70.6' 21.3'
SCALE.' 3/32"=!'-0"
168-6'
84'-0
12' I6'-0' 13'-9' 13'-9' 16-0" 1Z=o" 11'-6' 16=0' 13'-9' 13'-9' 16'-0' 12' 12'-3'
-6
O
1
7 DORM
z 1 �
�W 12a z ORM pq 1 V
I1 I po
ch C] _
o o
L_ LJ F—
o �7
I I I ¢�uNir
01
I E.
209 1 la g
22ggpM 2 apRM c a f
205 m a cEyl
2 BORM 2 6ORM 1 4
r
1 M <
I 16'-0' 1 13''9 i ITS i
J00"12'
12'-3' -i
U
84'-0'
SECONC FLOOR PLANhh`\\\" °f`x
2 spa' = rA• 1 � �,�.g 1 `
]fia'-C ,-. 93'9• �t /
12'-3' 11'-3"
IoA 3f_"l 'I ~—
.A31g
1 212 a G
208I 2 81oRM 2 BORMBDRM
216
1 3 DORM
71)7 Comm rryjL4L
cc
f
�n
I -PLOY 78' uaRopxr I — O -3} 1 k
2
ale a Y 2WAN 211
209 1 b °
2 BOW2 6' �"'�`
a SPA / ❑SE
273 215
3 80AM 3 L7RM
LO
68'3 lid t
L 1
1J L
dd. _ ROOF
16' 23'-9"
13- ' 147 64" 12'-0' 24-0' 11'-3' 12:;•
6-0' .5.0' ll�Ji
.n /
0'-0 i1.,i104•-3° \ �\ �.�-'�: � ///
383•-]• -. - �\
01T
ROOF •. � � 1 N Z
SECOND FLOOR PLAN
1 23r=1'A• � �t 12-28-t5
PLAN
Le
0 5.3' WS 21.3'
SCALE 3132'=7'-0"
T)
cz
0
C
-j
LL -
1)
Z
0
LU
n
3791-0,
16'-T
T2'3" 12-F
161-01
i6,-p•W-0,
/k' ' W3�,
P P
A
71
-
13`�
W1
1
'
221
223
2 Z05RU
2 Hr'Rw
2 BVRM
fI
217
2 AOp.W
219
3 BDRM
-J
cl
Ir
L
'�'
F
L2La
o ' a,
', t' b
mw
cc
10
�
o
1
Z22
Ll
3 Box"
224
2 HORM
RDRM
220
3Himm
'ti"W13 "7:0*- -
II
12'3'
12-3,
16'0'
T3'9"
135.0'
rc4,3,,
L,
QLE�?ND
FLOOR PIAN
215
2 EDAM
227
2SPAM
r7F
7m
,229
NOW
'31
2 FtaRM
11
il!
! a
r,
RED
rnq
L i m
L)
7m
a)
M M
aL
71,
PLAN
Le
0 5.3' WS 21.3'
SCALE 3132'=7'-0"
T)
cz
0
C
-j
LL -
1)
Z
0
LU
n
13`�
W1
LTJ •�'ilti
PLAN
Le
0 5.3' WS 21.3'
SCALE 3132'=7'-0"
T)
cz
0
C
-j
LL -
1)
Z
0
LU
n
N
5.3' 10.6 21.3'
SG4t£: 3/37-1 •-0"
E,
3'
1 THIRD FLOOR PLAN
3$2 = 1'A'
R O
U
i�
UU��
W
W17j0^
a Z 94
00�:
W m
H
'a M
0
P4R
r
Rol
c e
ljA Z
LL -
5.31
L
A2.4A
168'-6
1•
12'-6' i6'-0'
84'-0'
13'-�' f3'-9' f6'-0• 12'0' 12'-�
16:0' 13'-9' 13'-9" 16'-0" 12'
4
o
306
398 '
2 eORM
2 BDRM
f3O2
304
2 BORN
P77
'
7M
II�JJJ
o
o
ME
7M
0
LJ
-J
L_IV
01
ID
307
2 wim
1 m
1 amim
J
a
303
2 BORN
30s
2 B➢RM
1
t
4
14'-0'
1
r
J
12'-3
16:0'
i4'-9•
73=6'
16'-0"
7Y.3•
17'-j'
16=D'
1 13''7
25 '-0•
rr
83'-9-
383'-9'
FLOOR PLAN
(D
,.HIR
a'sr - ro
379'A'
._... _ _.....w..._..... --
E,
3'
1 THIRD FLOOR PLAN
3$2 = 1'A'
R O
U
i�
UU��
W
W17j0^
a Z 94
00�:
W m
H
'a M
0
P4R
r
Rol
c e
ljA Z
LL -
5.31
L
A2.4A
317
3 FORM
319
3 FORM
m
1- MI E
Me- NOR IIi I
3�a
3 r_,?m : aD
3 FDRM
15=0" 12'-3• 12'-3" r6=D"
71.W1
379'-0'
13•-6• 12•.6• 16-G' 13'-9' 13'-9"
i6'-9•
12'-3' I '-3"
!6'-0"
II
1
321
2 FORM
313
2 FORM
1
I
..+23
2 FDRir.'
F ,^ ,II
u
5.3' 70.6, 21.3' A2.4B
01
SCALE. 3132"=V -O"
II
I
NOAY
r
N
1
3122
FOAM
zN
324
28DRM
b
0
a
1
0
38s'D"
THIRD FLddR PLAN
J
2
2;32'=1'A
5.3' 70.6, 21.3' A2.4B
01
SCALE. 3132"=V -O"
.rz �
u
u
J
Udg
18'-0' P Gt7
HER
L�ci A!
OC If]
Al� L I •y1 � r
II L -i 1 J L ILS rel \J' r � r '' r r -ice = ti �, �� ,^4A < •,+ ry �
Id_ , � �. r yl _ ��•' y-- "� � ���d
irl
tLY1 a
- -
Esu
I � e
si
-
u
- cur•
/
�+ooF
1 1 !
28•-0•
ROOF
(DROOF PLAN
LU
j
3J'0" w
4 Q w O
LJ
-
L., Int I__I
g
O
` ROOF PLAN
12-28- i 5
A2.5
23-2'
16:0•
m
i
LIVING
BEDROOM
BEDROOM
I3'4A4'V
IML7,11T
245 SF
13'-J"
121'
8107B
4--s"
ol
BEDROOM
11=17xi 7'-5
a
T-9' I 4'v'
E�
6 SF
Lit IN0 WORC•OM
IS' -8x79'-0 II'�Jxl1'-7
3 BEDROOM
1-92 5F
16'-0' 1a•-1•
4'-0 X3'-6'
25--g-
3 BEDROOM E
1645 SF
KITCHEN B
10'-6 1/2'
KITCHEN C
3 BEDROOM B
1536 SF
12-28- 15
° 2• 4' e' A3.2
SCALE: 714. 1 W
0
O I
�----�
5,.4. �•-9"� J 1! a'Ar '^
i6=0'
�n
I .3• j
I !
� / I
i I
I !
! 5'J' 4'-0' 3=4"
I
-
Ir
I
Fz
�
i
,y
BEDROOM BEDROOM
LMNG
BEDROOM
f2• -0x73=4 7i' -0x12'-7
iS-8x15 {1
fl' -i 1x i7'-5
EFFICIENT
LI
230 5F
12'-6" 71'-3'
IA
N
6',0x5'-6'
= XS' -6" 2'-0XS'-6'
s'-8" '0 2'-0" 6'6" SW 2'-0'
15'-9'
7210• 74�-3.
1
BEDROOM
11=17xi 7'-5
a
T-9' I 4'v'
E�
6 SF
Lit IN0 WORC•OM
IS' -8x79'-0 II'�Jxl1'-7
3 BEDROOM
1-92 5F
16'-0' 1a•-1•
4'-0 X3'-6'
25--g-
3 BEDROOM E
1645 SF
KITCHEN B
10'-6 1/2'
KITCHEN C
3 BEDROOM B
1536 SF
12-28- 15
° 2• 4' e' A3.2
SCALE: 714. 1 W
u
z'B• Is• -g^ r -B' -a
\ py
BEDROOM w
zz•-I• -6" s• -s"
qa RShfO;
o e0bM0
i��^I 13rI's-r3'--•0exxl12y.'
BEDROOM
33'3B •- @
��@ 3'-B•—
Niryr, �
ry
�1
1
—_,JIII
II
oN
o . 113703-B'3-'-E1•dD0xxR7O193=Of'a-M0
zrarm-9 8rs
'-2a' 33'-33B3' 8 '-0• "hI
'
yf
__eo ryryi,
cel
• I I �II II
SN
ry
k.r \a\v70',6z•
4
II I
Z
—5=aj OOQlIm�OLBl
i
l
�
A
3
..JJJQyy
�ann
co
O
Lo
75o,
o
arG ;
DOI
LIVING
LIVING
It
c 3B
4 5'.5" v
i5II BEDROOM
BEDROOM +,D.q \ Wx127
P O C)
BEDROOM O
72'�a134107 — — —` U
3C
IL - I 4 Lu ZO
8-4-
3-4
- 74..
KITCHEN Ap
3 BEDROOM C 3 BEDROOM D
1662 SF 1662 Sr KITCHEN 8 ZO OmDw m
0
KITCHEN C
2.
SCALE: 1/4" 1 -a'
�y
I
H III In
'1119 111 all.
I Nil
sill Ft I E3
di=i
'Jll 1111
it
ARW
IIIIII! ME
IN Imam SO am 0. EME
Et no MCZ NMI 101,
ISM: is law
on so
flumm W.M.N.M. Ina
owns LI
MILE
jF11ilk ONOn Nlo in6041 some so NoZERO 11111'so 1 11 in316 Irk go No"EM iTSIRlail
so ON am I G!'1110111k, tillMEV -Imm IIIMENOMONEEAlffifillaw MINE MENO IIIon MOIR,"01 SEE IS ME
' ---_
`— ' '
N
IN
14
DIEN
OWNER.
NN
idiom 1111 join No 0 ■0 ■No iiii,ioll IlFli loss.- NN 4m,
non
111ru, 'MEN f
"A
e� ��� in
o in
n 7_ ��.
W
F,:
:1 0. 0.
a MManE
� Set I
MEAM
MEC::::�ME Mo, I
��.«N �....
_ ^..ii�
-ke
ma [gin—
ON
alof a I�•.
............
IIIIIIIIIIIIIIIII111111 =—
[MEN
m 1:11
.... ... Ul11 LIP I ll! —
L �Tlli 111-
F11 ul MEOW
NOR��
.
t,164,ii, M. MOW_
0 MORE:
0
3 t;�jv
q2z
19M
"All - . . . . . . . .
.00
OtME MO
ME
MOW-
l
Mot lullqmw�
H0
H. NO !!1i
aml as
MRan some &Is,
on q■ on IN m Nov.,
MINE
MINE
soon
ME ME
19M
"All - . . . . . . . .
.00
OtME MO
ME
MOW-
lilll I I SII I 12;-A I III
AIIII I In
jlNil I 111 I 11 I INS
IIII!�III!
■i ON MEM
_ ■s1■ jwlw =
f•■J
■■ NICE■■ .r ■■ �.
i001
i ■i ■■
IN ■■ r Com' 4ME
rte'
1
ank
MR
MiN
001. 11111111111111 IIIIIII ,—� _ =I�!Nw Il!Ilf � !_Ifllllllllll!II IIIIIIIIRim
;
�� .�a- -- -- I- iIl■■ ■■e - �� � �_ - — -�■zit ■5��. ��� I—_
�n ■Ji
�~ I�i_I_l ' 1.2�i.�1■ _ i■ i �� 'I it -_F l�■rNMI!Ii■: Ifni
■■
�'_ eL■_■A #1�■; I - _. _ -77 110
-11: -
1z-1,.11111111111flllllll' �----- _: =� 1�N�11�1111�11 : - _
MI
�i■i lar i. � ���_®� j� il, ._`iiaij.-'ll
�!llllll�lllllllll!!lllll' TI� � Y--�-
I Fm
.:..
�� •• s gl�ll' I I�II� !— �� I ��11��11�1 I ILMI IIII"I ,
=�-
� I
x IIkI
flip
IINNIIIIIIIIIiIIimvc In Ila
MR
4w;
w MAN 2E rill du 9Ill I
FIR
Fool
ION
in
� i I
F5 Hil lei W.
MENOMONEE
MIN
=; II�IIFIIIINL SNI
010 �mm m mm]
AMM"
Mo -
am MINI
64 IN
I iJ
II vas S MINI
No
A
Elm No
Im Im volum. Fff i i I
is MEMO SM 00 11 Ima
7
:RNST
tax= ��� !
a on MEN SIR
= W 0
_11EE:
3N, 11�0
win
ink
M
6L
Fm_m —mm
71
]BE __m_
71
me Mo!
ru 1.1.1
Vil-
im!
N.M. No
ON on loom
ME
lil-I
ME AM!
J HIT
No
73
rill
Mit
H 11
Z MIN: d-
0. 0. Be:
MO ME
IIIII==NMI
11I11
I 111RI111]IIIIJI]II 111111111, 1 F11111M
I 11111 =
0
IS OWN
MOMM
illl�nol
mam momm",
; !
10;g
ion no
No
■ON
MOORE
1111110:�:
it11N
Fool
ION
in
� i I
F5 Hil lei W.
MENOMONEE
MIN
=; II�IIFIIIINL SNI
010 �mm m mm]
AMM"
Mo -
am MINI
64 IN
I iJ
II vas S MINI
No
A
Elm No
Im Im volum. Fff i i I
is MEMO SM 00 11 Ima
7
:RNST
tax= ��� !
a on MEN SIR
= W 0
_11EE:
3N, 11�0
win
ink
M
6L
Fm_m —mm
71
]BE __m_
71
me Mo!
ru 1.1.1
Vil-
2 EAVEDETAIL
BUILDING SECTION
114' = IT'
T)
w LD
CCZ
LL -G
Q w O
Q
rO Q T-
V �
L
0
L\
O
W
5 H
12
rvrz —
30 4 U
I'
R
o�Qzx8
O CD 1!5
d c 10
SAVE DETAIL
EAVE DETAIL S sa•-+� s
Iz t f��F�e
12
\15
14
N
N
El
rz
to 5 3.32 — I n
� L1
H ^ m cLLJ?
Ur'rt 313 Z
~ UNfi317 `5 !;3'-0rl" `-
� a 27'-7027,ro f12"LL
iz Q W O
5ra J
SXEWELL WAIL S EYCND
12 O
c a COMM. BALCONY COMM. BALCONY m 1 _.•^ �\ �5
N 1 -
N
� 4
m ^ o
m
OFFICES ATRlUN AiRLUM _
4
M
L4=70' 14'-70° - - Z
O
11..1
(n
25'-5114' Inv r/8• S 0" 15 0• Z
40'-0' 62=7111'
ED
BUILDING SECTION
Alt LAW4
d
I
I.
1
M _RhilTOM
� s �
Y r 1• G 9: '
't
Y h
y �
� r�..:� y��...• ,a Y � �, �;+ ys, tom,
Jr
tomigli
:k�•./ J.�-- Rlw 1.. ..'I°I. �7, �. .. Ilk"rA•�: '.� 7� * " • _ 4 S �•�
AM
Rpm
Li
r
C
jj _ � SIL J - •�
a—.
°1
• Y
_T
Arl-
fd
Air -
ti
PAC
7,4
{ r
,w
r�
_ _ 1alm
I
y� yc.
1�
e
h
•Ago5'"il �l ':SSL. 4}.. ,.}• - 'i,rY-
+4ploL k.f i
JW
ITIIIIL
ry
If s
I _
,
„�.. '�`" &'- 1� a. • —_ II ; u I .. �� *V i, ■ J v I �d II ri 16i
�
4
.q
Y .
' � r
r
I a
i
j.
T
a
Pr
{ t
M* '.
. . . . . . . . . .
.17
Li
LL
OD �
Akio
Df I
Hugo, MN Code of Ordinances Page 1 of 1
Sec. 90-32. - Board of appeals and adjustments.
The board of appeals and adjustments hears and makes recommendations to the city council on
appeals where it is alleged that there is an error in any order, requirement, decision, or determination
made by an administrative officer with respect to this chapter, and to hear and make
recommendations on request for variances to the literal provisions of the regulations where the strict
enforcement would cause undue hardship because of circumstances unique to the property under
consideration.
(1) The board of appeals and adjustments shall consist of one planning commission member,
one city councilmember, and one other resident of the city appointed annually by the city
council. The council shall appoint a presiding official and a secretary. The secretary need not
be a member of the board.
(2) Member removal and replacement shall be as for planning commission members.
(3) A quorum of the board shall be two voting members, and it shall require two voting members
to approve any motion, resolution, or other official action.
(4) The board may adopt such other rules of procedure as are required to efficiently conduct
their duties.
(5) Board of appeals and adjustments responsibilities:
a. Conduct hearings on requested variances to this chapter, and make a recommendation to
the city council whether such variance should be granted or not.
b. Hear appeals regarding alleged errors in any order, requirement, decision, or
determination made by an administrative officer in interpreting this chapter. Provide the
city council a report as to their conclusions, and a recommendation on what corrective
action, if any, is required to correct any error that may occur.
c. Hear appeals to the city engineer's interpretation or establishment of floodplain,
floodway, and flood fringe boundaries. Provide the city council with a recommendation as
to the elevation that should be used to determine such boundaries.
(Prior Code, § 1015-040.1)
about:blank 1/8/2016