Laserfiche WebLink
STAFF REPORT <br />DATE: 02/04/2024 <br /> CONSENT <br />AGENDA ITEM: Pebble Park Parking Expansion <br />TO: CITY COUNCIL <br />SUBMITTED BY: Adam Swanepoel, Assistant Public Works Director <br />REVIEWED BY: Marty Powers, Public Works Director <br /> <br />BACKGROUND: <br />With an increase of public use of new playset, pickleball courts and increase in and field use in <br />Pebble Park, parking has become more challenging. The use has resulted in a disruption of the <br />traffic flow in and out of the park because of the narrow drive aisle. With the pickleball courts <br />located close to the park entrance, staff have observed that parking has spilled over into the drive <br />aisle and along the west side of the parking lot resulting in users having minimal space to back <br />up or turn around. <br /> <br />ISSUE BEFORE CITY COUNCIL: <br />Would City Council like to expand the existing parking lot at Pebble Park and replaced the hillside with <br />wildflowers and plant up to four mature trees. <br /> <br />PROPOSAL DETAILS/ANALYSIS <br /> <br />Pebble Park’s parking lot is a gravel lot that currently serves a number of attractive amenities within the <br />park. Current users of the pickleball courts, pavilion, baseball field and soccer area find this area fills up <br />quickly in the summer months. Expansion of the parking area is being considered to provide a larger parking <br />area. <br /> <br />The west side of the parking lot is a densely overgrown hill consisting mainly of buckthorn and Ash trees. <br />In 2024 public works staff removed much of the infected Ash trees and trimmed several of the other low <br />hanging tree branches into the park. With the removal of the dense vegetation this exposed the hillside and <br />opened the area for additional parking. <br /> <br />Staff is recommending the removal of the remaining vegetation and smaller trees in this area to expand the <br />parking lot. Staff would remove dirt from an area of 30x150 feet from the current lot into the hillside to <br />make it uniform and free of roots/debris. Public works staff would remove the dirt and fill in the parking <br />area with recycled asphalt. A series of boulders would be placed near the base of the hill to prevent runoff <br />and serve as a retaining wall to minimize the slope and create a boarder for parking. <br /> <br />Staff is recommending seeding the disturbed hill with perennial wildflowers. These flowers would grow <br />back every year creating a colorful hillside. Staff would also recommend planting four mature trees for <br />shade within the park since the removal of numerous ash trees and cotton wood trees in 2023. <br /> <br /> <br />Trees $1000 <br />Wildflower Seed Mix $500 <br />Erosion Blanket $200