My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#05 - Kleis Playground Replacement
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
03-04-25
>
#05 - Kleis Playground Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 9:31:29 AM
Creation date
8/15/2025 9:30:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> STAFF REPORT <br />DATE: 03/04/2025 <br /> CONSENT <br /> <br />TO: CITY COUNCIL <br />FROM: Adam Swanepoel, Assistant Public Works Director <br />AGENDA ITEM: Kleis Park Playground Replacement <br />REVIEWED BY: Marty Powers, Public Works Director <br /> <br />CORE STRATEGIES: <br /> <br />☒ Vibrant, inclusive, connected community ☐ Efficient, reliable, innovative services <br />☐ Responsive, transparent, adaptive governance ☐ Balanced Finances now and future <br />☐ Managed Growth ☐ Resilient Infrastructure <br /> <br /> <br />BACKGROUND: <br />The Kleis Park play set was originally installed in 1993 and has exceeded its lifespan. Parks <br />Commissioners reviewed the park and playground set in 2022 and made recommendations for <br />replacement of the structure. <br /> <br />In June of 2019 a tree limb from a nearby oak tree fell on the swing causing half of the swing to be <br />removed, leaving only part of its original structure. In the summer of 2022, staff removed the remaining <br />part of the swing due to safety concerns. Since the removal of the swing, park users have requested and <br />inquired about a replacement swing at the park. In a Parks Commission meeting in September 2022, staff <br />recommended the replacement of the swing set in 2023, however this was delayed in order to place the <br />item in the city’s capital improvement plan. <br /> <br />Staff presented an outline of the playground project at the December 16, 2024 meeting. Commissions <br />recommended a playground structure that suited ages 5-12 which would include swings, additional <br />seating options and a rope structure. <br /> <br />ISSUE BEFORE COUNCIL: <br />Would City Council like to approve a newly constructed playset at Kleis Park with the installation of an <br />asphalt trail, trees and installation expenses not to exceed $115,000? <br /> <br />PROPOSAL DETAILS/ANALYSIS: <br />Flagship Recreation has provided two options for a playset which incorporate the recommendations made <br />by the Park Commission. <br /> <br />Option 1: Offers a double structure, connected with a climbing net and three slides. In addition, a swing <br />with placement for three users. This area is approximately 55 x 53 and includes seating. Total equipment <br />cost for this project is $79,995. <br />
The URL can be used to link to this page
Your browser does not support the video tag.