My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCMin_58Mar13
FalconHeights
>
City Council
>
City Council Meeting Minutes
>
195x
>
1958
>
CCMin_58Mar13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2009 3:45:00 PM
Creation date
6/22/2009 3:08:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~C7 <br />CURBING Ljungren felt that in constructing the storm sewer with the necessary <br />HOYT AVE. catch basins and other appurtenances, that-some slight revision in <br />CONTD. grade might be necessary along Hoyt Avenue, as well as relocation of <br />-some of the catch basins. He also mentioned the possibility that <br />the curb might be damaged by heavy construction equipment. <br />LARPE"~1TEUR Village Engineer Ljungren reported he had met with the County <br />AVENUE Engineers and had gone over the preliminary plans wi±.h them.. <br />IP~IPROVEil.ENT They informed .him that if the Village will take care of getting <br />the five or six necessary construction easements on the North <br />Side of Larpenteur, between Pascal and Alrert, the County will <br />modify-its backslopes and lay a sidewalk bench for .future use <br />all along the improvement. <br />Ljungren also presented a letter from Ramsey County wherein they <br />stated they are submitting to us for approval, through him, plan <br />sheets of the proposed Larpenteur Avenue Construction Project. <br />This project, beginning at Arona and terminating at Fernwood, <br />will be constructed this summer. Afield inspection on the site <br />has been made by Ljungren and County Engineer Representative Knute <br />Ancker. They discussed the Larpenteur Avenue Grade, the grades <br />of Village streets affected by the project, and the storm sewer <br />design. <br />The contract will have a provision requiring that the west one- <br />half of Arona be kept open to traffic at all times, subject to <br />sewer instllations. It may be that a greater portion of the inter- <br />section can be kept open to traffic. ,The plans provide for high <br />early strength concrete at the intersections. This will enable <br />traffic to cross the pavement after approximately 72 hours of <br />curing. <br />The plans and specifications will be completed next week and The <br />County does not anticipate any changes in the plan sheets as <br />submitted to Falcon Heights for annroval. A completed set of <br />plans and specifications will be sent to the .Village for its <br />files. <br />The County plans to begin this work about ~:4ay 15th and have the <br />project completed for traffic by August 15th, 1958.• <br />The County submitted a resolution for the annroval of the prelim- <br />inary plans and after riscussion, the following resolution was <br />moved by Shavor, seconded by Warkentien and unanimously carried: <br />RESOLUTION: VyHEREAS, preliminary plans for Larpenteur Avenue <br />from Arona Avenue to Hamline Avenue showing proposed alignment, <br />profiles, grades, sewers, typical section, a.nd cross sections for <br />the improvement of State A.id Road No. 30 within the limits of <br />the Village of Falcon Heights as a State Aid Project have been <br />prepared and presented to the Village, <br />NOW, THEREFORE, IT IS RF~S~LVED, That said preliminary plans be <br />in all things approved. <br />Nilsen moved, .Shavor seconded that we notify the County Engineers <br />that we are interested in the future improvements in the boule= <br />vard, and will obtain the necessary easements. Pgotion unanimously <br />carried. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.