My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCMin_59Jul7
FalconHeights
>
City Council
>
City Council Meeting Minutes
>
195x
>
1959
>
CCMin_59Jul7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2009 3:53:37 PM
Creation date
6/22/2009 4:11:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />Car Wash Klosterman was in and asked about the possibility of <br /> running a storm water drainage line into the storm suer <br /> pox going in on Snelling. He was told it was a County <br /> Storm Sevrer. It was suggested that Ljungren check the <br /> matter and make recommendations to the County. <br />Larpenteur Ljungren reported he and Dahlgren had not completed their <br />Snelling study yet. Ljungren had talked to Julep regarding the matter, <br />Interchange at which time.. he estimated the cost of the study would be <br /> about X300.00. Ljungren feels this will also take care of <br /> Dahlgren's charges and Julep indicated the business men might <br /> be willing to pay half the cost. Julep and the business men <br /> are talking about multiple lanes. Ljungren does not think it <br /> practical. Thinks you would have to have a similar arrangement <br /> almost all the way to Arden Hi11s. Ljungren favors a diamond <br /> type interchange with immediately parallel service lanes sep- <br /> arated by a guard. rail or a grade differential. <br />Fire Train- Ljungren advised that Northern States would furnish the Village <br />ing Tower with the necessary poles when they take the poles down on <br /> Larpenteur. <br />~.~~~ <br />Prater Main The water main extension was discussed and Ljungren submitted <br />Extension a report on the estimated cost, suggested meter sizes, assessable <br /> frontage and service connection charges. <br />V. H. lot Shavor moved that the Village Engineer be requested to revie~r <br /> the lot around the Village Hall and make recommendations as to <br /> its proper development. Seconded by Warkentien and carried. <br />Sump Hole Graham advised it is necessary for us to contact St, Paul <br /> and get their permission before pumping storm water into the <br /> sewer. Zn the past the City has asked that we do not pump any <br /> storm water into the sewer until the peak load has passed. <br /> Graham will contact the City of St. Paul and set up the method <br /> of procedure to be followed in the future. Fire Chief Nelson <br /> suggested renting a pump rather than using Fire Department <br /> equirment for this work, It is possible to rent a high capacity <br /> pump for this purpose for about X36.00 for 2!t hours, we to pick <br /> it up and return it. <br />Dogs Warkentien read proposed dog ordinance xhich was referred to <br /> Attorney Graham for checking. <br />Parking Lot Coppini reported he had received complaints that there was a <br /> terrific amount of dust being raised on the parking lot at <br /> Applebaum's, Nilsen will contact Julep. <br />Sump Hole Nilsen and Coppini will check on amount of water still standing <br /> Friday morning 7/10/59. <br />Bills On motion by Coppini, seconded by Shavor, the following bills <br /> were ordered paid: <br /> LeRoy Humphrey, policing June $.61.00 <br /> Earl. Smith, ditto u2,04 <br /> Henry J, Dachtera, ditto 122.00 <br /> Kenneth Schmidt, ditto 9600 <br /> Peter T. Peterson, ditto 90.00 <br /> Jerome R. Johnson, overtime policing June 52.04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.