My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCMin_60Sep12_Special
FalconHeights
>
City Council
>
City Council Meeting Minutes
>
196x
>
1960
>
CCMin_60Sep12_Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2009 4:38:35 PM
Creation date
6/23/2009 8:26:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1503 <br />plaints we are already getting. Dunkley are very good. <br />We haven't had any trouble with them. They know whit they are <br />doing and are very conscientious. Shavors Are we taking any <br />chances? Bonestroos Not with Plant Mix. The Highway Depart- <br />ment has put it in as late as November. Shavor: Is it your <br />recommendation that we can go ahead safely on this?. Bonestroos <br />I feel this way - There is going to b® considerable complain- <br />ing and maintenance if we don't go ahead this Fall. How much <br />chance is there that this will fail by Spring? We have put <br />more material back into the trenches than we took out already. <br />We have packed it so well, it is below what we took out. We <br />blan to use 6" of class 5 material. This includes Roselawn. <br />The County is rather busy, Anklund said they have been turning <br />down all requests, Sodding is in the watermain contract. We <br />have a little excess. We are throwing a little extra material <br />in here. We have to put an inspector on the fob and pull all <br />the slips. We have control over every item. I would dust as <br />soon see the Council go ahead, or we will have an awful lot of <br />grief and mud on our hands. If we run into unduly cold weather, <br />the prices will run until Spring. We are putting in a better <br />road than we took out. Total price will still be less than <br />the original estimate for the entire fob. <br />I would recommend that the Council award the contract to the <br />Dunkley Blacktop Surfacing Company. <br />It was moved by Coppini, seconded by Shavor and unanimously <br />voted that the contract for repairing the streets disturbed by <br />the installation of Watermain Improvement 1960, No. 1., be <br />awarded to Dunkley Blacktop Surfacing Company, 3756 Grand St.~ <br />N. E., Minneapolis, Minnesota, at their quoted price of $11,6l~7.00; <br />work to be started October lst and completed October 20th. <br />Bonestroo: We have told St. Paul we are not satisfied with <br />Service Connection Patching, and are not patching until we knoll <br />what they are going to do. <br />Water Pressure Bonestroo: We checked the water pressure at Bolstad's, Pascal <br />and Roselawn, and it was satisfactory on the second floor. <br />Sewer, Prior, Ewald Hermes was present and asked permission to install sewer <br />Hermes on the proposed extension of Prior, North from Larpenteur, <br />approximately 360'. Bonestroo advised they had checked and. that <br />it could be done by either moving the garage or laying the sewer <br />10' West of the pro3ected center line of the proposed street. <br />Hermes advised they couldn't move the garage. After discussion, <br />it was moved by Warkentien, seconded by Shavor and unanimously <br />voted that-the plan for the extension of sanitary sewer line by Hermes, <br />10' West of the projected centerline of the proposed extension of <br />Prior, from Larpenteur Avenue, approximately 360' North, be <br />approved, the work to be done at Hermes' expense under the super- <br />vision of the Village Engineer and as per the Village Engineer's <br />specifications. <br />Streets Bonestroo recommended that Arona Street from Larpenteur to Crawford <br />be reworked this Fall - we can't leave it as it is - and next <br />
The URL can be used to link to this page
Your browser does not support the video tag.