My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCMin_61Jul27
FalconHeights
>
City Council
>
City Council Meeting Minutes
>
196x
>
1961
>
CCMin_61Jul27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2009 4:43:39 PM
Creation date
6/23/2009 8:49:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1622 <br /> 2231.502.100 Ga. Bit.. Mat. for tack coat .50 gal 50.00 <br /> 2331.50lt 10.5 ton Bit. Mat. for mixture 3.00 ton 315.00 <br /> 2331,505 190 Gal, Bit. Mat. for fog seal <br /> coat .l~0 gal 76.00 <br /> 2331.511 ton Bit. Mix. wearing course 7.00 ton 1It70.00 <br /> 2331.531 5 cu yd (VM) aggregate for fog <br /> seal coat 15.00 cu yd 75.00 <br /> Estimated total cost 2355.00 <br />Snelling-Idaho, Lemberg reported he would have to give Armor Coat an ex- <br />ext. of time tension of time because St. Paul insists on moving the <br /> hydrant themselves and are delaying the project. <br />Arona Streets It was voted by Nilsen,, seconded by Shavor,and unanim- <br />Stop Signs. ously voted to designate Arona and Crawford as a lt--way <br /> Stop Street, and that the Engineer be authorized to <br /> arrange for the procurement and installation of the <br /> necessary signs. <br />Rees Alley The Deputy Clerk was instructed to call Mr. Julep, rep- <br /> resenting the Douglas Rees' interests, (to be confirmed <br /> by letter Later) advising him that the Village recommends <br /> that Rees have the necessary work done in the alley be- <br /> hind their buildings at this time so the contractors can <br /> tie it in with the Village work and to advise him of the <br /> approximate; cost as outlined in Bonestroo,-Rosene's <br /> letter which read, in part, as follows <br /> 15 ton bit. patching material 12.00 ton 180.00 <br /> 60 gal Bit. seal coat mat .20 gal 12.00 <br /> 6 ton Seal Coat Aggregate 8.00 ton It8.00 <br /> Total estimated cost 2 0. <br />Blomberg curb Copy of Lemberg's letter to Robert Blomberg was read' <br />and gutter, in part, as.followss "There are two ways to have the <br />Iowa at work done -- 1 by requesting the Village to do the work <br />Hamline and having them assess you for it. L~ having the work <br /> done yourself to meet the Village Standards. Estimated <br /> cost: 118' curb and gutter ffi2.50 lip. ft, $295.00. <br /> Bituminous surfacing (figure approximately 100# per sq <br /> yd of surface) 12.00 a ton. These estimated costs do <br /> not include engineering costs.p <br />Engineer's The street maintenance program will be just about cleaned <br />Report up tomorro~r night. He thinks he can correct the drainage <br /> on Albert, near the Shell Station, and will get at it <br /> Tuesday. <br />Mrs. Younger, Mrs. Youngner reported that when the water was installed <br />1867 W. Larp. at her neighbor's, the yard was left in such condition <br /> that the water drains on her property. Lemberg will check <br /> it tomorraR. She asked why her suer rental charge was <br /> so high. Mayor Nil.~~ ll~xplained that it was based on <br />~ <br /> meter siz®, and that <br />he serer rental in St. Paul was <br />
The URL can be used to link to this page
Your browser does not support the video tag.