Laserfiche WebLink
165l~ The foregoing resolution was moved by Shavor, seconded <br />by Stone and carried. <br />Roof repairs Ptlortensbn moved that the Village go ahead with the roof <br />repairs according to the recommendations of our engineer <br />that we accept the bid of the Quimby Company, but also <br />havean additional estimate made of filling the pitch <br />pockets at the tower legs and reoointing or caulking <br />all bad joints in the coping the and precast concrete <br />coping - the engineer to be authorized to go ahead. with <br />the vrork if he can get a reasonable price. tide will post- <br />~aone the roof drain. Work to be done under the supervision <br />of the engineer, Seconded by Shavor and carried. <br />Adjournment On motion, the meeting adjourned at 11 P, I~~, <br />Approved ~ _~ ~ ~ , <br />?Rayor <br />Signed (~, <br />Cler <br />1 <br />1 <br />