My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PC Packet 10.22.2024
FalconHeights
>
Committees and Commissions
>
Planning Commission
>
Planning Commission Packets
>
202x
>
2024
>
PC Packet 10.22.2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 8:48:33 AM
Creation date
1/29/2025 8:47:19 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
576 square feet of yard storage building space. <br />(2) On lot 2, block 1, a 68-unit apartment building with at least 68 parking spaces. At least <br />54 of the required parking spaces must be below grade and integrated into the apartment <br />building. The site may have up to: <br />60,537 square feet of residential living space; <br />Four stories with underground parking; and <br />Private access easement between lot 1 and lot 2 to be recorded into the property record <br />of both parcels. <br />(e) Permitted accessory uses. <br />(1) On lots 1 and 2, block 1, the accessory uses in the R-5M zoning district; <br />(2) On lot 1, block 1, seasonal hoop houses for growing vegetables. <br />(f) Development plan. The PUD must be maintained in accordance with the following <br />development plan which is on file with the city and which is incorporated herein by <br />reference: <br />(1) Urban farm project addition plat; <br />(2) Topographic survey and grading, drainage and utility plan prepared by Jacobson <br />Engineers & Surveyors dated July 28, 2014; <br />(3) The following prepared by LHB for lot 1, block 1: <br />Architectural site plan w/landscape layout dated August 18, 2014; <br />First floor plan dated August 18, 2014; <br />Yard storage building - Color option 1 dated July 28, 2014 or yard storage building - <br />Color option 2 dated August 18, 2014; <br />Exterior elevations - Color option 1 dated August 18, 2014 or exterior elevations - <br />Color option 2 dated July 28, 2014. <br />(4) The following plans prepared by Kelly Brothers, Ltd and their contractors/partners for <br />lot 2, block 1 with up to a five percent variance as approved by the city administrator: <br />a. Development plans, dated October 31, 2018 including; <br />• Grading plan <br />• Drainage plan <br />• Utility plan <br />• Floor plans <br />• Elevations <br />• Operations and maintenance plan <br />b. Development plans, dated September 3, 2020 including:
The URL can be used to link to this page
Your browser does not support the video tag.