My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCMin_56May23
FalconHeights
>
City Council
>
City Council Meeting Minutes
>
195x
>
1956
>
CCMin_56May23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2009 3:26:45 PM
Creation date
6/24/2009 2:15:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
684 <br />by the Village Engineer. Seconded by Utecht and motion <br />carried unanimously. <br />Culvert, Holton After discussion, Shavor moved that the Village Engineer <br />at Ruggles be authorized to arrange for the installation of:a <br />drainage culvert at the intersection of Ruggles and Holton <br />at a sum not to exceed X150.00, the work to be done under <br />the Village Engineer's supervision, Seconded by Cartwright <br />and motion carried unanimously. <br />Sanitary sewer Messrs. N. L. Hermes and Nick Labalestra inquired regarding <br />service inquiry, sanitary sewer connections for business properties they <br />N L Hermes are developing. It was suggested that they handle the <br />Nick Labalestra matter direct with the City of St Paul. <br />Fairview Ave. The Clerk read copy of a letter dated May 16, 1956, from <br />speed limit the Board of County Commissioners, indicating the County <br />signs will investigate speed zoning on Fairview Avenue between <br />Larpenteur and Roselawn in connection with the posting of <br />proper speed limit signs on Fairview. <br />Fire Trucks Letter of May 12, 1956, from Howard Stiff, Superintendent, <br />replacement value Minnesota Motorized Fire Truck Company, St Paul, was read. <br /> Mr. Stiff said to replace our 600 GPM Pumper would cost <br /> approximately X16,000. today - that the original price was <br /> ~7,795.~ - and that to replace our 750 GPM Pumper would <br /> cost about X17,500, the original price being ~12,t~95.00. <br /> He also said these figures are exclusive of hose and <br /> miscellaneous equipment, and that the National Board of <br /> Fire Underwriters figure the life span of afire truck <br /> at 20 years. The letter also quoted ~lt0.00 as the <br /> estimated cost for repacking each pumper, hydrostatic <br /> testing, etc. <br />Use of Hall by Mayor Utecht reported on the understanding ~ ich was reached <br />Boy Scout troop with leaders of the Boy Scout Troop for use by the Troop <br /> of the Village Hall for the rest of the school year. <br />Snelling & Larp. As approved informally by the council, the clerk reported <br />traffic to be that our Public Safety Committee would arrange to meet <br />considered by shortly with traffic engineers of the State Highway Department <br />State, County & and County to consider the traffic situation at Snelling <br />Village public and Larpenteur and related matters. The Committee will submit <br />safety represent- its report and recommendations at a later date. <br />atives. <br />Truck for Trustee Nilsen reported on contacts he made with firms <br />limited street regarding 22 to 3-ton trucks in connection with the proposal <br />maintenaryce fobs that the Village purchase a light truck for limited street <br /> maintenance work. After discussion, Nilsen was asked to <br /> check into the possibility of having this truck service <br /> done on a contract basis. <br />Parks & Playground- Utecht moved that the Clerk notify Mr. Rechtiene, Chairman, <br />leveling drainage Parks & Playgrounds, that the council has authorized grading <br />area <br />
The URL can be used to link to this page
Your browser does not support the video tag.