Laserfiche WebLink
~9~ <br />REGULAR MEETING, THURSDAY, SEPTEMBER 12, 1957 <br />Meeting called to order at 7:00 P.M., the following council members being present: <br />William R. Utecht, Mayor; George J. Shavor, Trustee; Harold C. Nilsen, Trustee; <br />Willis Warkentien, Trustee; Clyde J. Stewart, Clerk. Also present: William E. <br />Olsen, Treasurer; Frank N. Graham, Attorney. <br />Minutes of August 22, 1957 were ordered approved as submitted. <br />Hearing, The hearing to consider the making of an improvement on the North <br />Curbing Side of Hoyt Avenue between the Easterly line of Lot 10, ffi.ock 9, <br />Improvement, Northome Second Addition, and the Westerly line of Pascal Avenue, <br />resumed was resumed as provided for in the minutes of August 22, 1957. <br />Mylon J. Sheehan, Letter of September 12, 1957 from Mr. Sheehan was read, stating <br />1503 W. Hoyt Ave. that he ob3ected to the proposed curbing improvement because of <br />the excessive cost, and that he wished to be represented in the <br />matter by Mr, Paul Coppini. <br />Paul Coppini Mr. Coppini said he wanted the curb but wanted to know more about <br />1507 W. Hoyt the cost. Engineer L3ungren who was. present, gave a break-down <br />of the estimated cost of X3.85 per front foot with respect to <br />the concrede curb without gutter, catch basin and street repairs, <br />estimating the total cost of the improvement at X3,650.00. <br />R.J. Pugleasa, stated he did not think the petitioners should pay for street <br />1523 W. Hoyt repairs, and that he did not want the curb at X3.85 per front <br />foot. This lead to a discussion of similar improvements <br />previously petitioned for and assessed to benefited properties <br />and how. street repairs were included in the assessment. The <br />.matter of asking the City of St Paul to do the necessary street <br />work was discussed, and some of the petitioners indicated their <br />willingness to wait another year for the curbing improvemen t. <br />Hearing No one else wishing to be heard, Utecht moved that the hearing <br />recessed until be recessed until 7:00 P.M., September 26, 1957, with the understand- <br />? PM, Sept.26. ing that the engineer contact the City of Saint Paul in the meantime <br />to determine if that City will do the repair work necessary for <br />the said curbing installation, the work to be done early in 1958. <br />Seconded by Stewart and so ordered. <br />Alley Hearing The hearing was resumed at 7:50 F.M. In connection with the <br />recessed until proposed work ~ be done on the alley in Block 1, Northome <br />7 P.M., Sept. 26 Addition, Mr. Ringus and other property owners on the alley who <br />were present, were informed by Engineer Steffes that the <br />contractor, Jay W. Craig Company, should lx able to get in and <br />work on the alley the following week. On motion by Shavor, <br />seconded by Nilsen, it was. noted to recess the hearing until <br />7 P.M., September 26, 1957. <br />Merlin A. appeared before the council and discussed with Mr. Steffes <br />Ahlberg, their complaints regarding digging up of the boulevard, <br />13110 Idaho condition of their driveways as left by the contractor and <br />and culvert and drainage problems. <br />Geo. Williams ', <br />13la.1 W. Idaho After discussion, and on recommendation of Engineer Steffes, <br />it was moved by Utecht, seconded by Nilsen, that the ditch along <br />the west side of Hemline Avenue from the end of the present culvert <br />on the south si a of Idaho to the all between Iowa and Idaho <br />be closed with inch deformed culver~ and three catch basins <br />