Laserfiche WebLink
~~2 <br />Barthel Engineer Ljungren reported he had inspected this entire <br />Villas drainage area. His letter of October 10, 1957, was read, <br />(cont'd.) reviewing his recommendation ~~, the previous meeting that <br />Lot 22 could be used for a parsonage site for the <br />Engineer Congregational Churbh and that Lots 18 and 19 could be <br />Ljungren used for Church parking purposes. He questioned the <br />reports advisability of filling in and utilizing any of the five <br />remaining lots until it is determined tow Lots i8, 19 and 22 <br />are to be treated and after viewing next year's spring run-off. <br />Attorney Attorney Graham reported that the council had considered the <br /> matter earlier in the meeting and wished to have some studies <br /> made before deciding about purchasing the property. He referred <br /> to the question of fill needed to make the lots suitable for <br /> residential purposes and to the cost of draining the water <br /> elsewhere. <br />Engineer Engineer Ljungren indicated the main expense and problem <br /> would be working out of the drainage which he estimated <br /> would take an engineer several weeks. The cost of a <br /> storm sewer for draining the area was also discussed. <br />~ef~rred for It was also pointed out that this was the first time the <br />further study Village had considered purchase of the lots and that time <br /> and study were needed to make a proper determination. <br /> Nilsen then moved that the matter be deferred for further <br /> study and consideration. Seconded by Stewart and motion <br /> carried unanimously. <br />Permit, Congre- Building Inspector Christensen asked for council approval <br />gational Church of a building permit for the proposed addition to the <br />addition, approved Falcon Heights Congregational Church. Utecht moved said <br /> approval, seconded by Shavor and so ordered. <br />Complaint re <br />Autumn Street Letter of October 8, 1957 from Dan C. Blide, 1998 AutumnStregt, <br />ti <br />, <br />Falcon Woods repor <br />ng on the unsatisfactory condition of the work recen~.ly <br />d <br /> one on Autumn Street, was read and referred to the Village <br /> Engineer on motion by Utecht, seconded by Shavor. <br />Falcon Heights In connection with moving the Falcon Heights Congregational <br />Congregational Church parsonage building across Garden Avenue to Lot 22, Block <br />Church posts 91500 1, Barthel Villas; the Church's check No. t~092 made payable <br />check to the Village of Falcon Heights in the amount of ~k1,500 was <br />received to cover possible damage to said street and the <br />newly installed sanitary sewer in the street. Shavor moved <br />that the check be released upon approval of the Street Commissioner <br />and Sanitary Sewer Engineer. Seconded by Nilsen and motion carried <br />unanimously. <br />Snow plowing Letter from the County Engineer under date of September 26, 1957, <br />request was read, asking that the Village submit its snow plowing request <br />so the County may prepare the 1957-58 snow plowing routes. <br />On motion by Utecht, seconded by Nilsen, it was voted unanimously <br />to authorize the Clerk to issue the necessary work order. <br /> <br />