My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCAgenda_03Jul23
FalconHeights
>
City Council
>
City Council Agenda Packets
>
200x
>
2003
>
CCAgenda_03Jul23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2009 8:56:50 AM
Creation date
6/26/2009 8:36:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ Froward R. Green Company <br />December 6, 2002 <br />File 900765CSM <br />Mr. Bill Maertz <br />Parks Director <br />City of Falcon Heights <br />2077 Larpenteur Avenue West <br />Falcon Heights, MN 55113-5551 <br />RE~ ENGINEERING SERVICES PROPOSAL <br />CURTISS FIELD PARK <br />Dear Mr. Maertz <br />Howard R. Green Company is pleased to provide you with this proposal for engineering services <br />relating to the final plan preparation for the improvements to Curtiss Field Park. We have based <br />our proposal on the Curtis Field Park Site Improvements preferred alternative described in the <br />City-provided October 2002 Feasibility Report. <br />• SCOPE.OF SERVICES <br />Landscape <br />1. Evaluate and design final location of sidewalk/path. Basic footprint of the deck behind the <br />shelter to be completed under this scope. If the City desires, HRG staff will complete <br />design and structural construction documents to be negotiated at the attached hourly <br />rates. <br />2. Design and locate preselected ornamental fence surrounding the playground and along <br />the eastern border of the park. Finalize location and installation details for preselected <br />benches, signs, and gazebo. <br />3. Enhance picnic area through plantirigs and relocation/addition of tables, grills, and other <br />amenities as directed by the City. <br />4. Develop a site landscape planting plan, specifications and details for vegetative screening, <br />park entries, and site enhancement. Leaf drop and impact to water storage area will be a <br />key evaluation item for plant selection. <br />• Grading ,Utility, & Street <br />1. Prepare grading plan detailing additional panding area and removal of the existing <br />Snelling Avenue frontage road. <br />2. Prepare removal .plan showing all vegetative clearing, site removals such as fences, <br />sidewalks. <br />3. Relocate watermain along Snelling Avenue frontage road in accordance with St. Paul <br />• water requirements.. <br />4. Modify storm sewer to match new pond grading. <br />Ltr-120602-MEnergy Park Drive St. Paul, MN 55108 651/644-4389 fax 651/644-9446 toli free 888/368-4389 <br />
The URL can be used to link to this page
Your browser does not support the video tag.