Laserfiche WebLink
i• <br />• <br />• <br />PARTIAL PAYMENT ESTIMATE <br />NO. 2 <br />FROM: July 20, 2003 <br />TO: June 27, 2003 <br />CONTRACTOR: JAY BROS. <br />ADDRESS: <br />OWNER: CITY OF FALCON HEIGHTS <br />PROJECT: 2003 SVeet 8 UtlIHy Improvements-Fohvell Avenue and Sheldon Avenue <br />COMPLETION DATE August 15, 2003 AMOUNT OF CONTRACT <br />SUBSTANTIAL: ORIGINAL: <br />FINAL: REVISED: <br /> <br />:•:~:;:; <br />. E <br /> <br />ii:iiiii5t:;;;; <br />`f3E1N8:?;E::E::: <br /> <br />fpi.i;iii::::;,;:: i::::;:;:; <br />:?:`;:ti~ltSpER)tib:::::;:::;: <br />~.... <br /> <br />':::~:~:~:~::::: ~:~:~. ~:~: ~: ~ ::.:.:.:::.:.:.: <br />:~: ~:~: ESD'FAl:~4?pggp::::::;::: <br /> <br />.. :::::::::::::::::::::::E~:::::::~:::::::::::E:E!:::::::;:~:~:::::::~:::::: <br />4.. <br />...... <br />:: <br />::EtN T. <br /> <br />.....?411'Y`.....•...,.;.UI'd7:..•.~.• <br /> <br /> <br /> <br />.-;:Eh'k'S~::~:~:~:~::~atM T::;: <br /> <br /> <br /> <br />;: <br /> SCHEDULE 1.0 SHELDON STREET SAP 124-050-02 <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 2021.501 <br />2104.601 <br />2104.503 <br />2104.503 <br />2104.505 <br />2104.505 <br />2104.513 <br />2105.501 <br />2105.525 <br />2232.501 <br />2350.501 <br />2360.502 <br />2357.502 <br />2521.501 <br />2531.501 <br />2531.507 <br />2563.501 <br />2575.505 MOBILIZATION <br />REMOVE CONCRETE CURB AND GUTTER <br />REMOVE CONCRETE DRIVEWAY PAVEMENT <br />REMOVE CONCRETE SIDEWALK <br />REMOVE BITUMINOUS PAVEMENT (FULL DEPTH) <br />REMOVE BITUMINOUS DRIVEWAY PAVEMENT <br />SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH) <br />COMMON EXCAVATION (P) <br />TOPSOIL BORROW <br />MILL BITUMINOUS SURFACE (1') <br />TYPE LV WEARING COURSE MOCTURE <br />2 t/2° BITUMINOUS DRIVEWAY PAVEMENT <br />BITUMINOUS MATERIAL FOR TACK COAT <br />4' CONCRETE WALK <br />CONCRETE CURB AND GUTTER DESIGN 86-18 <br />6" CONCRETE DRNEWAY PAVEMENT <br />TRAFFIC CONTROL <br />SOD LS <br />LF <br />SY <br />SY <br />SY <br />SY <br />LF <br />CY <br />CY <br />SY <br />TN <br />TN <br />GAL <br />SF <br />LF <br />SY <br />LS <br />SY 1.00 <br />1,260.00 <br />178.00 <br />67.00 <br />400.00 <br />50.00 <br />1,265.00 <br />50.00 <br />100.00 <br />1,900.00 <br />241.00 <br />12.00 <br />96.00 <br />67.00 <br />7,260.00 <br />107.00 <br />1.00 <br />1,800.00 $6,000.00 <br />$2.45 <br />$6.00 <br />$3.00 <br />$2.00 <br />$4.50 <br />$1.20 <br />$15.00 <br />$12.00 <br />$2.57 <br />$50.00 <br />$72.00 <br />$3.70 <br />$5.00 <br />$8.55 <br />$38.12 <br />$1,000.00 <br />$3.50 0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />1,200.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 $0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$1,440.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />1,200.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />O.DO <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 $0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$1,440.00 <br />50.00 <br />$0.00 <br />$O.OD <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />T SCHEDULE 1.0 SHELDON STREET -TOTAL $1.440.00 $1,440.00 <br /> SCHEDULE 1.1 MISCELLANEOUS CURB REPAIR <br />19 <br />20 2104.501 <br />2104.505 REMOVE CONCRETE CURB AND GUTTER <br />REMOVE BITUMINOUS PAVEMENT (FULL DEPTH) LF <br />SY 118.00 <br />14.00 $3.00 <br />$15.00 0.00 <br />0.00 $0.00 <br />$0.00 0.00 <br />0.00 $0,00 <br />$0.00 <br />21 2104.513 SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH) LF 126.00 $4.00 0.00 $0.00 0.00 50.00 <br />22 <br />23 2105.501 <br />2350.503 COMMON EXCAVATION (P) <br />BITUMINOUS PATCH (FULL DEPTH) CY <br />SY 5.00 <br />14.00 $20.00 <br />$55.00 0.00 <br />0.00 $0.00 <br />$0.00 0.00 <br />0.00 $0.00 <br />$0.00 <br />24 <br />25 <br />26 <br />27 2357.502 <br />2506.602 <br />2531.501 <br />2575.505 BITUMINOUS MATERIAL FOR TACK COAT <br />GROUT CATCHBASIN OR MANHOLE <br />CONCRETE CURB AND GUTTER DESIGN 86-12 <br />SOD GAl <br />EA <br />LF <br />SY 1.00 <br />1.00 <br />118.00 <br />40.00 $5.00 <br />$500.00 <br />$16.50 <br />$3.00 0.00 <br />0.00 <br />0.00 <br />0.00 50.00 <br />$0.00 <br />$0.00 <br />$0.00 0.00 <br />0.00 <br />0.00 <br />0.00 $0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />T SCHEDULE 1.1 MISCELLANEOUS CURB REPAIR-TOTAL $0.00 $p,00 <br /> SCHEDULE 1.2 SHELDON STREET TESTING- NOT STATE AID <br />28 <br />29 SPEC <br />SPEC CONCRETE TESTING <br />BITUMINOUS CORE TESTING (SET OF THREE CORES) EA <br />EA 5.00 <br />1.00 $100.00 <br />$300.00 0.00 <br />0.00 $0.00 <br />$0.00 0.00 <br />0.00 $0.00 <br />$O.DO <br />T SCHEDULE 1.2 SHELDON STREET TESTING-TOTAL $0.00 $0.00 <br /> SCHEDULE 20 FOLWELL AVENUE, STREET -NOT STATE AID <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 2021.501 <br />2701.502 <br />2101.507 <br />2104.501 <br />2104.505 <br />2104.505 MOBILIZATION <br />CLEARING (DIAMETER > 4') <br />GRUBBING (DIAMETER > 4') <br />REMOVE CONCRETE CURB AND GUTTER <br />REMOVE BITUMINOUS PAVEMENT <br />REMOVE CONCRETE DRIVEWAY PAVEMENT LS <br />TREE <br />TREE <br />LF <br />SY <br />SY 1.00 <br />6.00 <br />6.00 <br />1,410.00 <br />2,500.00 <br />150.00 $7,500.00 <br />$100.00 <br />$50.00 <br />$245 <br />$3.00 <br />$6.00 0.25 <br />0.00 <br />0.00 <br />100.00 <br />0.00 <br />0.00 $1,875.00 <br />$0.00 <br />$0.00 <br />$245.00 <br />$0.00 <br />$0.00 0.75 <br />0.00 <br />0.00 <br />1,400.00 <br />2,000.00 <br />0.00 $5,625.00 <br />$0.00 <br />$0.00 <br />$3,430.00 <br />$6,000.00 <br />$0.00 <br />o:w rozoseo,noonwemaPS,mwwe~erirt <br />PAGE 1 <br /> <br />