i•
<br />C~
<br />1I l1
<br />u
<br />i`~~
<br />... ;3PE ,
<br />.1-'..~.~.~.•..~...~.~...•:.:•:.:•:•:::.~'~kFl;p~;qC'RIPTION:.::::•::~:.:::::::::•: :~:~::CO T
<br />:;:
<br />N .RACS:IT~
<br />M~ :::::::::::::::: :::
<br />:: ~::Tg(5 [QD i::::::::: :::
<br />~NS1 .3YEF . ..... ;. ~::::.~.~.•..~.~...•.~...•:~::~::.:. .;.
<br />• ;:;uNl#;;;:;:::a~`:;:;:::::;::ttNET;;::; ~i3'r;~~+cM[csUN ~?R'CY'``~~aNOt~i?r
<br />~~~~:::
<br />36
<br />37
<br />38
<br />39
<br />40
<br />41
<br />42
<br />43
<br />44
<br />45
<br />46
<br />47
<br />48
<br />49
<br />50
<br />51
<br />52 2104.513
<br />2104.523
<br />2104.523
<br />2104.523
<br />2105.501
<br />2105.525
<br />2211.501
<br />2232.501
<br />2350.501
<br />2350.502
<br />2357.502
<br />2531.501
<br />2531.507
<br />2545.602
<br />2563.501
<br />2564.602
<br />2575.505 SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH)
<br />SALVAGE LIGHT POLE
<br />SALVAGE SIGN
<br />SALVAGE AND REINSTALL CATCH BASIN
<br />COMMON EXCAVATION (P)
<br />TOPSOIL BORROW
<br />CLASS 5 AGGREGATE BASE
<br />MILL BITUMINOUS SURFACE (1 1/2" DEEP 4' WIDE)
<br />1 1/2" TYPE LV4 BfR1MINOUS WEAR COURSE
<br />2" TYPE LV3 BITUMINOUS BASE COURSE
<br />BITUMINOUS MATERIAL FOR TACK COAT
<br />CONCRETE CURB AND Gll1TER DESIGN 86-18
<br />6" CONCRETE DRIVEWAY PAVEMENT
<br />REINSTALL LIGHT POLE
<br />TRAFFIC CONTROL
<br />REINSTALL SIGN
<br />SOD - LF
<br />EA
<br />EA
<br />EA
<br />CY
<br />CY
<br />TN
<br />LF
<br />TN
<br />TN
<br />GAL
<br />LF
<br />SY
<br />EA
<br />LS
<br />EA
<br />SY 1,800.00
<br />2.00
<br />7.00
<br />3.00
<br />584.00
<br />103.00
<br />1,700.00
<br />1,750.00
<br />210.00
<br />260.00
<br />105.00
<br />1,410.00
<br />150.00
<br />200
<br />1.00
<br />7.00
<br />1,000.00 $1.20
<br />$700.00
<br />$50.00
<br />$800.OD
<br />$8.15
<br />$12.00
<br />$16.00
<br />$1.70
<br />$58.00
<br />$50.00
<br />$3.15
<br />$8.55
<br />$38.12
<br />$1,800.00
<br />$3,000.00
<br />$50.00
<br />$3.50 0.00
<br />0.00
<br />2.00
<br />O.DO
<br />300.00
<br />0.00
<br />929.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.75
<br />0.00
<br />0.00 $0.00
<br />$0.00
<br />$100.00
<br />$0.00
<br />$2,445.00
<br />$0.00
<br />$14,864.00
<br />$O.OD
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$O.OD
<br />$0.00
<br />$2,250.00
<br />$0.00
<br />$0.00 1,700.00
<br />0.00
<br />2.00
<br />0.00
<br />450.00
<br />0.00
<br />929.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />O.DO
<br />0.00
<br />0.00
<br />0.75
<br />0.00
<br />0.00 $2,040.00
<br />$0.00
<br />$100.00
<br />$0.00
<br />$3,667.50
<br />$O.DO
<br />$14,864.00
<br />$O.DO
<br />$p.pp
<br />$0.00
<br />$0.00
<br />$p.00
<br />$0.00
<br />$0.00
<br />$2,250.00
<br />$p,00
<br />$0.00
<br />T SCHEDULE 20 FOLWELL AVENUE, STREET - TOTAL $21,779.00 $37,976.50
<br /> SCHEDULE 21 FOLWELL AVENUE WATERMAIN -NOT STATE AID
<br />53
<br />54
<br />55
<br />56
<br />57
<br />58
<br />59
<br />60
<br />61
<br />62
<br />63 2104.501
<br />2104.509
<br />2502.604
<br />2504.602
<br />2504.602
<br />2504.602
<br />2504.602
<br />2504.603
<br />2504.603
<br />2504.603
<br />2504.604 REMOVE WATER MAIN
<br />REMOVE HYDRANT
<br />2' INSULATION
<br />REPAIR SERVICE STOP BOX
<br />ADJUST VALVE BOX
<br />WATER UTILRY HOLE
<br />REPLACE VALVE BOX
<br />WATERMAIN TRENCH
<br />WATER SERVICE TRENCH
<br />PNEUMOGOPHER
<br />WATERMAIN OFFSET TRENCH /REPLACEMENT TRENCH LF
<br />EA
<br />SY
<br />EA
<br />EA
<br />EA
<br />EA
<br />LF
<br />LF
<br />LF
<br />EA 1,580.00
<br />3.00
<br />71.00
<br />1.00
<br />1.00
<br />3.00
<br />2.00
<br />1,580.00
<br />80.00
<br />40.00
<br />1.00 $3.00
<br />$500.00
<br />56.00
<br />$300.00
<br />$100.00
<br />$500.00
<br />$600.00
<br />$12.40
<br />$1240
<br />$20.00
<br />$750.00 1,OD0.00
<br />1.00
<br />O.OD
<br />0,00
<br />0.00
<br />0.00
<br />0.00
<br />1,000.00
<br />0.00
<br />0.00
<br />0.00 $3,000.00
<br />$500.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$O.OD
<br />$0.00
<br />$12,400.00
<br />$0.00
<br />$O.OD
<br />$0.00 1,500.00
<br />3.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />1,500.00
<br />D.OD
<br />0.00
<br />0.00 $4,500.00
<br />$1,500.00
<br />$0.00
<br />$0,00
<br />- $0.00
<br />$0.00
<br />$0.00
<br />$18,600,00
<br />$0,00
<br />$0.00
<br />$0.00
<br />T SCHEDULE 21 FOLWELL AVENUE WATERMAIN -TOTAL $15,900.00 $24,600.00
<br /> SCHEDULE 22 TESTING FOLWELL AVENUE- NOT STATE AID
<br />64
<br />65
<br />66
<br />67
<br />68
<br />69
<br />70 SPEC
<br />SPEC
<br />SPEC
<br />SPEC
<br />SPEC
<br />SPEC
<br />SPEC SUB•GRADE STANDARD PROCTOR
<br />SUB-GRADE IN PLACE DENSITY (NUCLEAR DENSITY)
<br />CLASS 5 AGGREGATE BASE GRADATION
<br />CLASS 5 STANDARD PROCTOR
<br />IN PLACE DENSITY AND MOISTURE
<br />CONCRETE TESTING
<br />BfTUMINOUS CORE TESTING (SET OF THREE CORES) EA
<br />EA
<br />EA
<br />EA
<br />EA
<br />EA
<br />EA 2.00
<br />4.00
<br />1.00
<br />1.00
<br />3.00
<br />2.00
<br />2.00 $100.00
<br />$30.00
<br />$100.00
<br />$110.00
<br />$30.00
<br />$100.00
<br />$300.00 0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00 $0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00 0.00
<br />0.00
<br />0.00
<br />O.OD
<br />0.00
<br />0.00
<br />0.00 $0.00
<br />$D.~
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0,00
<br />T SCHEDULE 22 FOLWELL AVENUE TESTING -TOTAL $p pp ~ ~
<br /> SCHEDULE 3.0 CHANGE ORDER 1.0 (STATE AID ELIGIBLE)
<br />71
<br />72
<br />73 2506.516
<br />2506.522
<br />2531.602 SANITARY SEWER MANHOLE CASTING (SOLID LID)
<br />ADJUST FRAME & RING CASTING
<br />OUT-WALK PEDEDESTRIAN RAMPS EA
<br />EA
<br />EA 2.00
<br />2.00
<br />3.00 $210.00
<br />$230,00
<br />$195.00 0.00
<br />0.00
<br />0.00 $0.00
<br />$0.00
<br />$0.00 0.00
<br />.0.00
<br />0.00 $O,W
<br />50,00
<br />50.00
<br /> SCHEDULE 3.0 CHANGE ORDER 1.0 -TOTAL SD ~ ~ ~
<br />SCHEDULE 3.1 CHANGE ORDER 20 (NOT STATE AID]
<br />74 2105.522 GRANULAR PIPE BEDDING TON 1,600.00 $16.00 425.00 $6,800.00 825.00 $13,200.00
<br />75 3733.604 Type V GEOTEXTILE FABRIC SY 800.00 $2.25 0.00 $0.00 500.00 $1,125.00
<br />SCHEDULE 3.1 CHANOE ORDER 2D -TOTAL $6,800.00 $14,325.00