My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCAgenda_03Sep24
FalconHeights
>
City Council
>
City Council Agenda Packets
>
200x
>
2003
>
CCAgenda_03Sep24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2009 9:41:56 AM
Creation date
6/26/2009 9:23:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Maertz <br />September 4, 2003 <br />Page Two <br />Parking Lot <br />There is a grade break that runs roughly down the middle of the parking lot that causes water to form <br />a large puddle around the pedestrian ramp on Iowa Avenue. We recommend that the parking lot be <br />redesigned so that storm water drains into the existing catch basin. We anticipate that the redesign of <br />the parking lot will take approximately 10 hours of staff time, and 4 hours of survey crew time. <br />Storm Sewer System Evaluation <br />There appears to be a collapse of the storm sewer pipe on the north end of the project. We <br />recommend that all storm sewer pipes be evaluated for serviceability. This would include televising <br />approximately 450 lineal feet of storm sewer. Generally a project of this size is done on a time and <br />materials basis at $160.00 to $200.00 per hour, with a minimum time requirement of 3 to 4 hours. The <br />time required to televise the storm sewer on this project is estimated to be less than 4 hours. The cost <br />of televising the lines would be directly billed to the City. We anticipated that the storm sewer <br />evaluation will take approximately 16 hours of staff time. <br />Fees <br />• <br />Howard R. Green Company will provide the above changes to project scope of services based on our <br />standard hourly rates not to exceed $4,700. • <br />We are ready to proceed immediately after authorization. Please contact me if you have any <br />questions. <br />Sincerely, <br />Howard R. Green Company <br />Greg Robinson <br />Project Engineer <br /> <br />Howard R. Green Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.