My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCAgenda_90Apr25_wksp
FalconHeights
>
City Council
>
City Council Agenda Packets
>
199x
>
1990
>
CCAgenda_90Apr25_wksp
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2009 4:44:50 PM
Creation date
7/6/2009 9:59:12 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for <br />Compref~ensive <br />Municipal Plan <br />Revision <br />Similar Project Northfield, Minnesota <br />Experience <br />A comprehensive transportation plan was prepared for the City of <br />Northfield and its immediate adjacent areas. The study included <br />evaluation of several potential river and railroad ~ossings. <br />Faribault, Minnesota <br />SEH provided acommunity-wide transportation study for the City <br />of Faribault. Included in this analysis was a complete sign <br />inventory, an analysis of the operation of all roadways in the City <br />and a long range plan for additional accesses across rivers and <br />railroad tracks as well as consideration of additional interchanges <br />with the interstate freeway system. <br />Golden Valley, Minnesota <br />Two studies were recently completed for the City. The first <br />analyzed the impact of specific office and hotel development in the <br />I-394 corridor. The second study involved traffic analysis for a <br />major redevelopment area along the TH 12/I-394 highway corridor. <br />St. Louis Park, Minnesota <br />A traffic analysis of the west area of the ICnollwood Regional <br />Shopping Center resulted in redesign of Aquilla Avenue and of 37th <br />Street. <br />South St. Paul, Minnesota <br />A study of access to a major industrial area and to a river port <br />resulted in recommendations for a new connecting roadway. The <br />roadway utilized some existing roads but also required the <br />installation or modification of seven railroad crossings. <br /> <br />Short-~Iliott-Hendrickson, Inc. Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.