My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCAgenda_05Dec9
FalconHeights
>
City Council
>
City Council Agenda Packets
>
200x
>
2005
>
CCAgenda_05Dec9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2009 9:49:47 AM
Creation date
7/6/2009 3:20:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CJ <br />CITY OF FALCON HEIGHTS <br />RESOLUTION NO. OS-24 <br />December 14, 2005 <br />RESOLUTION RECEIVING FEASIBILITY REPORT ON ROSELAWN AVENUE <br />RECONSTRUCTION PROJECT AND ORDERING PUBLIC HEARINGS <br />BE IT RESOLVED by the Council of the City of Falcon Heights as follows: <br />1. By resolution adopted September 28, 2005, the Council directed the City Engineer to prepare <br />preliminary reports as to the feasibility of the proposed improvements: <br />Roselawn Avenue Reconstruction (between Snelling and Hamline Avenue) <br />2. The City Engineer was also directed to include in the report the estimated cost of the proposed <br />improvements. The preliminary report and cost estimates have been submitted and considered by the <br />Council and are hereby approved and directed to be placed on file in the office of the City <br />Administrator. The improvements proposed to be made in the general manner set forth in the report <br />are designated as Roselawn Avenue Reconstruction. <br />3. The Council shall meet at the City Hall, 2077 West Larpenteur Avenue, in said City, on January 11, <br />2006, at 7:00 p.m. for the purpose of holding a public hearing on the proposed improvements under <br />and pursuant to the provisions of Minnesota Statutes, Chapter 429, and the Administrator is hereby <br />authorized and directed to cause notice of the time, place, and purpose of that meeting to be <br />• published twice in the official newspaper, Roseville Review, which publications shall be a week <br />apart, and the second publication shall be not less than three days before the date of the hearing. <br />4. The notice shall be in substantially the following form: (see attachments). <br />5. The general nature, estimated cost and area proposed to be assessed for Roselawn Avenue <br />Reconstruction are determined to be as stated in the foregoing notice, as fully as though the same <br />were separately set forth and resolved herein. <br />I, the undersigned, being the duly qualified City Administrator of the City of Falcon Heights, <br />County of Ramsey, State of Minnesota, do hereby certify that I have carefully compared the attached and <br />foregoing extract of minutes of a regular meeting of said City Council held on the 14th day of December, <br />2005, with the original thereof on file in my office. <br />WITNESS MY HAND officially as such Administrator this 14th day of December, 2005. <br />Moved by: <br />Approved: <br />Susan L. Gehrz, Mayor <br />December 14, 2005 <br />GEHRZ <br />KUETTEL <br />• LAMB <br />LINDSTROM <br />TALBOT <br />In Favor Attested: <br />Heather M. Worthington <br />City Administrator <br />December 14, 2005 <br />Against <br />~CHG02:40069922.v1 ~9/28/OS 11:33 AM <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.