My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCAgenda_92May18
FalconHeights
>
Committees and Commissions
>
Planning Commission
>
Planning Commission Packets
>
199x
>
1992
>
PCAgenda_92May18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2009 3:42:54 PM
Creation date
7/7/2009 12:46:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DSLi, IVC. C~OO3 <br />Maple KnoIi Revised PL2in. Review 1~3 May ],gg~ gage ~ <br />maintain tT~e roadway and the sanitary sewer and water lines that run adjacent to it. <br />Additional overstory trees have bees added on the north end of the site in an attempt to screen the <br />development from the residential area to the north. These trees are poplars that are to be <br />transplanted form elsewhere on the site. Due to the distance between the proposed project and the <br />homes td the north, these trees will. probably serve the purpose adegnateIy. <br />The previous planning report suggested additional landscaping betwe,-n the eXlSting office buildings <br />and the proposed mu1~ 'Iy ~_ No additions Izave bees made w the plantings in this area 7a <br />addition, ttie rem wa11- ~.1his area has been changed from a two level terraced waII bo a single <br />wall with a 3 tQ t slope coming down to it_ This design can be more susceptzble to f~ure, <br />depending on sods conditions, due to water flowing down the slope and in behind the wall. 'This is a <br />detail that can be discussed as the project moves forwazd. <br />No plans have as yet been submitted showing the design of the monument sign. ir-~;e <br />caiculatious have also nor been provided at this point. <br />The revised plans represent a siQrtif"icaat improvement for this project. We believe the project is <br />^~?~si5tent with the intent of the Comprehensive Pian and the Zoning prdinance and the requested. <br />amendment and rezoning are appropriate. <br />• <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.